1 Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater F.E. Jamaludin, a and J. Koto, a,b,* a) Faculty of Mechanical Engineering,Universiti Teknologi Malaysia, Skudai, Johor Bahru, Malaysia b) Ocean and Aerospace Research Institute, Indonesia *Corresponding author: jaswar.koto@gmail.com & jaswar@utm.my Paper History Received: 10-November-2017 Received in revised form: 20-December-2017 Accepted: 30-December-2107 ABSTRACT Steel Catenary Riser is the preferred solution for riser system in offshore oil & gas production. They are more structurally reliable, technically simple and cost effective compared to other types of riser. As the offshore oil & gas production move to deep and ultra-deepwater regions, the optimum solution have to be determined to overcome the challenges of steel catenary riser such as its weight and size. Catenary Offset Buoyant Riser Assembly (COBRA) is a concept conceived to address most of the problem of steel catenary riser in deepwater. It combines the advantages of steel catenary and hybrid risers and is made up of two parts. The bottom part consists of a rigid steel pipeline in catenary configuration and connected to a sub-surface buoy. A flexible jumper connects it to the floating structure. The flexible jumper and the buoy effectively absorbed the forces acting on the riser and floating structure essentially making the steel catenary undisturbed by the dynamic motions, thus improving its fatigue performance. Numerical simulation of the COBRA concept in a Malaysia deepwater project is carried out by considering the environmental conditions from the Kikeh Field to analyse its static and dynamic performance. The static and dynamic analyses showed that. at the touch-down point, the tension for COBRA is about 50% smaller that for steel catenary riser maing it suitable for deepwater projects in Malaysia. KEY WORDS: Riser, Deepwater, COBRA, Oil & Gas. NOMENCLATURE Catenary Offset Buoyant Riser Assembly International Energy Agency Empirical Orthogonal Functions First Order Reliability Method Floating Production Storage Offloading Steel Catenary Riser 1.0 INTRODUCTION In offshore oil & gas engineering, risers are essentially pipes that connect an offshore floating structure and subsea wells to each other. They are the conduit through which fluids are transferred between the floating structure and the wells. A riser is a unique common element to many floating offshore facilities and is critical to safe field operations. Therefore, it must be designed to be able to maintain its integrity under external and internal loadings throughout its service life. Risers can be categorized into two based on their type of operation. Drilling risers, as shown are used to contain fluids for well control. Production risers are used to convey hydrocarbons from the seabed to the floating structure [1]. The selection of riser solution for deepwater is governed by a set of much more intricate factors compared to shallow water, such as water depth, weight and size. As deepwater fields are becoming more important as the source of hydrocarbon, different concepts of risers have been conceived and studied to consider the limiting effects of these factors. Many shallow water oil & gas fields around the world have matured and depleted making deepwater as the new frontier for exploration and production activities. The International Energy Agency (IEA) estimated that there could be around 270 billion barrels of recoverable oil alone in deepwater worldwide. The impact of deepwater exploration and production trend is also felt in Malaysia. The estimated hydrocarbon deposit in deepwater 9 JSOse Received: 10-November-2017 Accepted: 30-December-2017 [(12) 1: 9-14]

2 fields in Malaysia is approximately 1 billion barrel of oil equivalent and 6 trillion cubic feet of gas. Deepwater resources are expected to contribute to about one third of national oil production by 2020 [2]. As the industry moves further to deep and ultra-deepwater, the engineering challenges for riser become tougher as well. The COBRA concept was conceived to address some of the challenges. This concept consists of a steel catenary riser section from the wellhead connected to a long, slender sub-surface buoy which in turn is connected to the floating structure via a flexible jumper [3]. It combines the conventional steel catenary riser with hybrid riser and inherits the desired advantages of both. This project will simulate the performance of COBRA in a Malaysia deepwater project. 2.0 COBRA CONCEPT COBRA concept was developed by Karunakaran and Baarholm [4]. It is a modification of the hybrid riser concept. The aim is to combine the flexibility features of the hybrid concept with the simplicity and economic features of the steel catenary riser. The concept is an assembly of a rigid steel pipe laid in catenary configuration connected to a subsurface installation, a sub-surface buoyancy can which is tethered down to the seabed and a flexible jumper connected from the buoy to the floating structure as shown in Figure ENVIRONMENTAL DATA The main particulars of the Kikeh field used in the COBRA simulation are shown in Table 1. Table 1: Kikeh field particulars Water Depth 1350 m Water density 1025 kg/m 3 Wave height 6 m Wave period 11.7 s Wind speed 19 m Current speed Varies with depth Soil Stiffness Horizontal 200 kn/m Vertical 50 kn/m The selection of the most suitable of wave spectrum for a particular seaway is essential for hydrodynamic time domain analysis. Maimun et al. [5] had carried out the measurements and analysis of wave heights for the Malaysian waters at two locations. One was carried out in the Straits of Malacca near Kukup using the Shipboard wave radar and another was carried out near Pulau Sibu in South China Sea using wave pressure sensor. Although the results were not conclusive, it has been successfully shown that the standard spectra of Pierson- Moskowitz type could be used for Malaysian waters. The theoretical formulations for the Pierson-Moskowitz spectra are based on Gran [6]. The formulation used the significant wave height and peak period of the measured spectra and since wind speed is not included, uncertainties in wind speed measurement are eliminated. The Pierson-Moskowitz spectra can be represented as: (1) Where:! " is a significant wave height in meter, Ω is a peak frequency Figure 1: COBRA The numerical simulation of the COBRA concept is carried out by positioning the sub-surface buoy, at water depths250 m. The rigid steel pipe is 1550 m long while the flexible jumper is 485 m long. A simulation using Steel Catenary Riser is also carried out to directly compare the performance of the two concepts. The rigid steel pipe is 1945 m long. The touch-down points are similar in both configurations. For both simulations, three positions of the vessel are considered, at minimum offset of -65 m, at origin and at maximum offset of +65 m. The study of extreme oceanographic currents at deepwater locations offshore Borneo in the South China Sea was carried out by Sheikh and Brown [7]. Current speeds over the height of the water column were approximated using Empirical Orthogonal Functions (EOFs) and their extreme profiles derived using the inverse First Order Reliability Method (FORM). These profiles are then compared with consideration of different types of current events and used as a basis to formulate and idealised deepwater design vertical current speed profiles for locations offshore Borneo that are application specific. Figure 2 shows the vertical current profile for the area approximate to the Kikeh field. 10 JSOse Received: 10-November-2017 Accepted: 30-December-2017 [(12) 1: 9-14]

3 Factors such as high external pressure can results in pipeline failure such as collapse and buckling propagation. Consideration or these issues were taken towards pipeline wall thickness design process. The thickness determination was made in accordance with DNV class rule. Table 4 summarised the main properties of the rigid steel pipe used in the simulation. Table 4: Rigid Steel Pipe Properties Material Carbon Steel API 5L (PSL2) Grade X65 Density 7850kg/m3 Young s Modulus 2120MPa OD 0.254m Thickness 0.027m Operating Pressure 35MPa Maximum Temperature 60 Figure 2: Offshore Borneo vertical current profile 4.0 VESSEL DATA The Kikeh field is served by FPSO Kikeh. It has a storage capacity of 2,179,000 bbls and supports 5 production, 1 export and 3 water injection risers. Table 2 shows the main particulars of the FPSO used in the simulation. Table 2: FPSO Kikeh Particulars Length 337 m Breadth 55 m Depth 27 m Mass 273,000 tonnes VCG 8.47m from keel LCG 8.68m fwd of amidship Maximum offset 65 m (5% water depth) Length 337 m 5.0 COBRA DATA The COBRA concept is made up of a steel catenary riser section connected to a subsurface buoy tethered to the seabed by two mooring lines. The floating structure is connected to the steel catenary section at the buoy via a flexible jumper held in place by a tensioner located at the structure. 5.1 Flexible Jumper The important criterion of the jumper is the minimum bending radius. It is a definitive radius to which the riser can bend without damage. Table 3 shows the properties of the flexible jumper. Table 3: Flexible Jumper Properties Outer Diameter m Inner Diameter m Minimum Bending Radius 5 m 5.2 Rigid Steel Pipe Selection of wall thickness based on the paper by Junaidi.et.al [8]. 6.0 ANALYSIS ACCEPTANCE CRITERIA The design analysis result shall meet particular limiting criteria and requirements. The following points describe the criteria that need to be fulfilled by the COBRA concept in this study: 1. Maximum/minimum top tension of the flexible jumper The catenary load is supported by the tensioner located at top section of product on the vessel. The wave and current motions create variations of tension load on the riser. The limiting capacity on the tensioner shall be reviewed with maximum tension load experienced by the flexible jumper. In addition, large range of variations on tension load should give more attention in the analysis. 2. Compression No compression load is permitted along the flexible jumpers. 3. Minimum Bend Radius (MBR) of flexible jumper Bending radius is the minimum radius of the riser can be bended without damaging it or making it buckle. The smaller the bend radius, the greater is the flexibility. The product shall not exceed the permissible bending radius that given by the manufacturer. 6.1 COBRA The location of the buoy is at 250 m beneath the water. The current speed at this depth is m/s. The length of the flexible jumper is 485 m and the length of the rigid steel pipe is 1550 m. The buoy is tethered to the seabed by a couple of mooring lines. Static Analysis In static analysis, the static equilibrium configuration is achieved by considering only static loading Flexible Jumper Table 5 shows the outcome of the simulation. Table 5: Flexible Jumper Static Analysis Angle at hang-off point ( ) Angle at buoy ( ) Effective tension at hang JSOse Received: 10-November-2017 Accepted: 30-December-2017 [(12) 1: 9-14]

4 off point (kn) Effective tension at buoy (kn) Minimum bending radius (m) Rigid Steel Pipe Table 6 shows the outcome of the simulation. Table 6: Rigid Steel Pipe Static Analysis Angle at buoy ( ) Effective Tension at Effective Tension at Figure 3: Flexible Jumper Static & Dynamic Effective Tension at hang-off point Dynamic Analysis Nonlinear time domain analysis with irregular wave is considered for the dynamic analysis. The Pierson-Moskowitz wave spectrum with 100-year return period is used in the simulation. Flexible Jumper Table 7: Flexible Jumper Dynamic Analysis Minimum bending radius (m) Hmin (m) Minimum tension (kn) Maximum tension at hang-off point (kn) Maximum tension at Minimum angle at hangoff point ( ) Maximum angle at hangoff point ( ) Minimum angle at buoy ( ) Maximum angle at buoy ( ) Figure 4: Flexible Jumper Static & Dynamic Effective Tension at buoy Figure 5: Flexible Jumper Dynamic minimum and maximum angle at hang-off point 12 JSOse Received: 10-November-2017 Accepted: 30-December-2017 [(12) 1: 9-14]

5 Figure 6: Flexible Jumper Dynamic minimum and maximum angle at buoy Rigid Steel Pipe Table 8: Rigid Steel Pipe Dynamic Analysis Maximum tension at Minimum tension at Stress at buoy (MPa) Stress at taper stress joint (MPa) Stress at touch-down point (MPa) Figure 8: Rigid Steel Pipe Static and Dynamic tension at touchdown point 6.2 STEEL CATENARY RISER (SCR) The whole riser system is made entirely of rigid steel pipe for this configuration. The rigid steel pipe used is the same as the pipe used for the bottom part of COBRA and laid in catenary configuration. The total length of the pipe is 1945 m and it also includes a 10 m taper stress joint with 2.5 inch wall thickness. Static Analysis Table 9: Steel Catenary Riser Static Analysis Angle at buoy ( ) Effective Tension at Effective Tension at Dynamic Analysis Nonlinear time domain analysis with irregular wave is considered for the dynamic analysis. The Pierson-Moskowitz wave spectrum with 100-year return period is used in the simulation. Figure 7: Rigid Steel Pipe Static and Dynamic tension at buoy Table 10: Steel Catenary Dynamic Static Analysis Maximum tension at Minimum tension at Stress at buoy (MPa) Stress at taper stress joint (MPa) Stress at touch-down point (MPa) JSOse Received: 10-November-2017 Accepted: 30-December-2017 [(12) 1: 9-14]

6 therefore reducing its weight and length even more. Reducing its length will help to reduce the riser spread area and thus reducing the probability of clashing with other seabed installation facilities. At the touch-down point, the tension for COBRA is about 50% smaller that for steel catenary riser. Therefore, the COBRA concept is suitable for application in deepwater projects in Malaysia. REFERENCES Figure 9: Steel Catenary Riser Static and Dynamic tension at hang-off point Figure 10: Steel Catenary Riser Static and Dynamic tension at touch-down point 6.3 COMPARISON BETWEEN COBRA & SCR Maximum Tension at Hang-off point (kn) Maximum Tension at Stress at touch-down point (MPa COBRA SCR Chakrabarti, Subrata K., 2005, Handbook of Offshore Engineering, Elsevier 2. Khalid, N., 2008, Kikeh - A Prized Catch, Deepwater Southeast Asia Congress 2008 Shanghai, 9-10 October Karunakaran, D., Aasen, H., Baarholm, R., 2011, New Uncoupled Deepwater RiserConcept for Harsh Environment Catenary Offset Buoyant Riser Assembly (COBRA), In: Deepwater Offshore Technology Conference. New Orleans, USA, October Karunakaran D. and Baarnholm, R., 2013, Cobra Riser Concept for Ultra-DeepwaterCondition, Offshore Technology Conference, Houston, Texas, USA, 6 May Maimun, A. et al., 2006, Seakeeping Analysis of a Fishing Vessel Operating in Malaysian Water, Jurnal Mekanikal, No. 22, Gran, S., 1991, A Course in Ocean Engineering, Elsevier Science Publishers B.V., The Netherlands 7. Sheikh, R., Brown, A., 2010, Extreme Vertical Deepwater Current Profiles In The South China Sea, Offshore Borneo, Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2010, June 6-11, 2010, Shanghai, China 8. Junaidi, M.N., Koto, J., 2016, Review on Design of Oil Subsea Pipeline in Kikeh Field, Malaysia, Journal of Ocean, Mechanical and Aerospace Science and Engineering, Vol.32(1), pp Det Norske Veritas, 2010, Dynamic Risers, Offshore Standard DNV-OS-F CONCLUSIONS The outcome of the simulations showed that the COBRA configuration has better performance than Steel Catenary Riser in terms of tension requirement. The tension requirement for COBRA at the vessel hang-off point is only 10% of the tension requirement for Steel Catenary Riser. This is because for COBRA the tensioner is used to hold flexible jumper which is lighter that rigid steel pipe for the same diameter and thickness. The tension of the rigid steel pipe for COBRA at its hang-off point is absorbed by the buoy. The higher tension of the Steel Catenary Riser at the hang-off point is due to its length and weight. The length of the steel pipe, meanwhile can be further shorten 14 JSOse Received: 10-November-2017 Accepted: 30-December-2017 [(12) 1: 9-14]

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

The Impact of Composites on Future Deepwater Riser Configurations

The Impact of Composites on Future Deepwater Riser Configurations The Impact of Composites on Future Deepwater Riser Configurations Thomas Brown 2H Offshore Engineering Ltd NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Deepwater Riser Technology Today s deepwater

More information

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands Proceedings of the ASME 2011 30th International

More information

Learn more at

Learn more at Bottom Weighted Riser A Novel Design for Re-location and Disconnection Frank Lim and John McGrail 2H Offshore Engineering Ltd. Woking, Surrey, United Kingdom ABSTRACT Flexible pipe risers have limitations

More information

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer

More information

Feasibility of Steel Lazy Wave Risers in the North Sea

Feasibility of Steel Lazy Wave Risers in the North Sea NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Feasibility of Steel Lazy Wave Risers in the North Sea Rohit Shankaran 2H Offshore Engineering Ltd. Agenda Risers in deepwater North Sea Are steel catenary

More information

FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA

FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA Mazlan Muslim and Md Salim Kamil Marine and Design Technology Section, University Kuala Lumpur MIMET, Lumut, Perak, Malaysia E-Mail

More information

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs PAU, FRANCE 5-7 APRIL 2016 Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs Author: Fan Joe Zhang Presenter: Styrk Finne DNV GL - Software Contents Typical

More information

Learn more at

Learn more at IBP1833_06 COST EFFICIENT ARTIFICIAL BUOYANT SEABED DRILLING SOLUTION Dan Moutrey 1, Frank Lim 2 Copyright 2006, Instituto Brasileiro de Petróleo e Gás - IBP This Technical Paper was prepared for presentation

More information

A New Thermoplastic Composite Riser for Deepwater Application

A New Thermoplastic Composite Riser for Deepwater Application A New Thermoplastic Composite Riser for Deepwater Application Martin van Onna, Managing Director Airborne Composite Tubulars Patrick O Brien, Group Director Strategic Business & Marketing, Wood Group Kenny

More information

Design Challenges & Solutions for Large Diameter Export Risers

Design Challenges & Solutions for Large Diameter Export Risers Design Challenges & Solutions for Large Diameter Export Risers Elizabeth Tellier, Hugh Howells & Mark Cerkovnik 2H Offshore Engineering AOG 2011 Agenda WA export riser design challenges Development options

More information

Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS

Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS Tze King Lim, Dhyan Deka, Elizabeth Tellier, Hugh Howells AOG 2018, Perth 15 th March 2018 Agenda Lazy wave risers an enabling technology

More information

Learn more at

Learn more at Full scale model tests of a steel catenary riser C. Bridge 1, H. Howells 1, N. Toy 2, G. Parke 2, R. Woods 2 1 2H Offshore Engineering Ltd, Woking, Surrey, UK 2 School of Engineering, University of Surrey,

More information

Risers for Deepwater FPSO s

Risers for Deepwater FPSO s Risers for Deepwater FPSO s John Bob-Manuel Senior Engineer 2H Offshore Engineering Ltd. March 2013 Agenda 2H overview Challenges of Deepwater Operations Freestanding Riser Overview Riser Configurations

More information

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements STRIDE PROJECT Steel Risers in Deepwater Environments Achievements 1999-21 Neil Willis Principal Engineer 2H Offshore Engineering 6 th Annual Deepwater Technologies and Developments Conference 21 The presentation

More information

FPSO Riser Solutions for Harsh environments

FPSO Riser Solutions for Harsh environments FPSO Riser Solutions for Harsh environments Hanh Ha and Hugh Howells AOG Perth, March 2015 Overview Design challenges Flexibles Configurations and response Mild Environment Riser Harsh Environment Riser

More information

Learn more at

Learn more at vs. for Deepwater Applications Technical Appraisal John McGrail and Frank Lim 2H Offshore Engineering Limited Woking, UK ABSTRACT This paper provides a technical appraisal of the use of Single Line Offset

More information

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7 Development of a New Deep-Water Riser System Daniel Karunakaran Subsea 7 Introduction Grouped SLOR TM is an open bundle riser solution developed by Subsea 7 and 2H Offshore Array of close standing SLOR

More information

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development 10121-4404-03 Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology

More information

Fatigue Analysis of Catenary Mooring System due to Harsh Environment in Head Seas

Fatigue Analysis of Catenary Mooring System due to Harsh Environment in Head Seas EPI International Journal of Engineering Vol. 1, No. 1, February 2018, pp. 30-38 DOI: 10.25042/epi-ije.022018.06 ISSN:2615-5109 Fatigue Analysis of Catenary Mooring System due to Harsh Environment in Head

More information

Offshore Oil and Gas Platforms for Deep Waters

Offshore Oil and Gas Platforms for Deep Waters Offshore Oil and Gas Platforms for Deep Waters Atilla Incecik Department of Naval Architecture, Ocean and Marine Engineering University of Strathclyde, Glasgow, UK (atilla.incecik@strath.ac.uk) Summary

More information

Faculty of Science and Technology MASTER S THESIS. Writer: Lurohman Mamin Masturi

Faculty of Science and Technology MASTER S THESIS. Writer: Lurohman Mamin Masturi Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Offshore Technology, Subsea Technology Spring semester, 2014 Open / Restricted access Writer: Faculty supervisor: Prof.

More information

Deepwater Challenges Pipeline Installation Case

Deepwater Challenges Pipeline Installation Case Deepwater Challenges Pipeline Installation Case Seminar Nasional Oceano, ITS, 28 March 2011, Surabaya Gunawan Suwarno, 28 March 2011 DeepLay Energy Services email : marketing@deep-lay.com 1 Deepwater Development

More information

OMAE INVESTIGATION ON THE USE OF DIFFERENT APPROACHES TO MOORING ANALYSIS AND APPROPRIATE SAFETY FACTORS

OMAE INVESTIGATION ON THE USE OF DIFFERENT APPROACHES TO MOORING ANALYSIS AND APPROPRIATE SAFETY FACTORS Proceedings of the ASME 212 31 st International Conference on Ocean, Offshore and Arctic Engineering OMAE212 June 1-15, 212, Rio de Janeiro, Brazil OMAE212-84121 INVESTIGATION ON THE USE OF DIFFERENT APPROACHES

More information

17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe

17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe API Specification 17J Third Edition, January 2008 National Adoption of ISO 13628:2006(Identical) Petroleum and natural gas industries Design and operation of subsea production systems Part 2: Unbonded

More information

Grouped SLOR Deep Water Riser System and Installation Assessment

Grouped SLOR Deep Water Riser System and Installation Assessment Grouped SLOR Deep Water Riser System and Installation Assessment Daniel Karunakaran, Dan Lee, Subsea 7 Stephen Hatton, Nick Dale, 2H Offshore Engineering Ltd John Mair, Subsea 7 Abstract The growing trend

More information

Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France

Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France DOT-2014 Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France Copyright 2014, Deep Offshore Technology International This paper was

More information

A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA

A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA Arun S. Duggal, FMC SOFEC Floating Systems, USA Charles O. Etheridge, FMC SOFEC Floating Systems, USA James Mattinson, FMC SOFEC Floating Systems,

More information

DESIGN CONSIDERATIONS FOR SELECTION OF FLEXIBLE RISER CONFIGURATION

DESIGN CONSIDERATIONS FOR SELECTION OF FLEXIBLE RISER CONFIGURATION PD-Vol. 42, Offshore and Arctic Operations - 1992 ASME 1992 DESIGN CONSIDERATIONS FOR SELECTION OF FLEXIBLE RISER CONFIGURATION N. Ismail, R. Nielsen, and M. Kanarellis Wellstream Corporation Panama City,

More information

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific June 2011 Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific Daniel Brooker, MCS Kenny Presentation Agenda 1. Objectives 2. Top Tensioned Riser (TTR) Selection Drivers

More information

Aidin Kazemi Daliri, Sepanta Naimi*

Aidin Kazemi Daliri, Sepanta Naimi* JER Manuscript Template 1 The fixed marine risers dynamic analysis with 1 st and 5 th order rogue wave Aidin Kazemi Daliri, Sepanta Naimi* Department of Civil Engineering, Specialty of Coastal Engineering,

More information

TLP Minimum tendon tension design and tendon down-stroke investigation

TLP Minimum tendon tension design and tendon down-stroke investigation Published by International Association of Ocean Engineers Journal of Offshore Engineering and Technology Available online at www.iaoejoet.org TLP Minimum tendon tension design and tendon down-stroke investigation

More information

REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS

REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS AMIR H. IZADPARAST SENIOR RESEARCH ENGINEER, HYDRODYNAMICS AND MOORING TECHNOLOGY, SOFEC JIAXING CHEN RESEARCH ENGINEER,

More information

Permanent buoyancy systems. matrix composites & engineering

Permanent buoyancy systems. matrix composites & engineering Permanent buoyancy systems matrix composites & engineering Contents Permanent buoyancy systems 3 Materials qualification testing 4 Distributed buoyancy clamping system 5 Buoyancy building block system

More information

TARPON A Minimal Facilities Platform

TARPON A Minimal Facilities Platform TARPON A Minimal Facilities Platform Contents Introduction TARPON Description TARPON Features TARPON Benefits TARPON Proofs TARPON Typical Installation Options Design Codes & Certification Novel Application

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

OTC Global Analysis of Shallow Water FPSOs Arun S. Duggal, Y. H. Liu (Allen), and Caspar N. Heyl, FMC SOFEC Floating Systems, Inc.

OTC Global Analysis of Shallow Water FPSOs Arun S. Duggal, Y. H. Liu (Allen), and Caspar N. Heyl, FMC SOFEC Floating Systems, Inc. OTC 1672 Global Analysis of Shallow Water FPSOs Arun S. Duggal, Y. H. Liu (Allen), and Caspar N. Heyl, FMC SOFEC Floating Systems, Inc. Copyright 24, Offshore Technology Conference This paper was prepared

More information

International Journal of Scientific & Engineering Research, Volume 7, Issue 10, October ISSN

International Journal of Scientific & Engineering Research, Volume 7, Issue 10, October ISSN International Journal of Scientific & Engineering Research, Volume 7, Issue 10, October-2016 172 DYNAMIC ANALYSIS OF MINI TENSION LEG PLATFORMS UNDER RANDOM WAVES Shibin P Shaji, Dr. Jayalekshmi R. Abstract

More information

EFFECT OF VORTEX INDUCED VIBRATION ON FATIGUE DAMAGE OF TOP-TENSIONED RISER SUBJECTED TO CURRENT LOAD

EFFECT OF VORTEX INDUCED VIBRATION ON FATIGUE DAMAGE OF TOP-TENSIONED RISER SUBJECTED TO CURRENT LOAD EFFECT OF VORTEX INDUCED VIBRATION ON FATIGUE DAMAGE OF TOP-TENSIONED RISER SUBJECTED TO CURRENT LOAD Ke Xin Lai 1,2, Do Kyun Kim 1,2,3 and Eileen Wee Chin Wong 1,4 1 Ocean and Ship Technology Research

More information

Deepwater Floating Production Systems An Overview

Deepwater Floating Production Systems An Overview Deepwater Floating Production Systems An Overview Introduction In addition to the mono hull, three floating structure designs Tension leg Platform (TLP), Semisubmersible (Semi), and Truss Spar have been

More information

INDEX OF REVISIONS DESCRIPTION AND/OR AFFECTED SHEETS

INDEX OF REVISIONS DESCRIPTION AND/OR AFFECTED SHEETS I-ET-300.00-59-27-PPC-00 CLIENT OR JOB OR PROJECT PRODUCTION DEVELOPMENT CC Fro m UNITS AND PRODUCTION SYSTEMS CENPES INDEX OF REVISIONS REV. DESCRIPTION AND/OR AFFECTED S 0 ORIGINAL ORIGINAL REV. A REV.

More information

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc Presented at OMAE, New Orleans, February 2000 Introduction Characteristics

More information

Coupling and Analysis of 981 Deep Water Semi-submersible. Drilling Platform and the Mooring System

Coupling and Analysis of 981 Deep Water Semi-submersible. Drilling Platform and the Mooring System 4th International Conference on Renewable Energy and Environmental Technology (ICREET 2016) Coupling and Analysis of 981 Deep Water Semi-submersible Drilling Platform and the Mooring System XuDong Wang1,

More information

Global Buckling Design for Flexible Flowlines

Global Buckling Design for Flexible Flowlines Global Buckling Design for Flexible Flowlines Challenges, Approach and Lessons Learned Mostafa Tantawi 1 Agenda Background to flexible lines Mechanical behavior of Flexible vs Steel. Why flexible buckling

More information

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Re-usable Riser and Flowline System for Deep Water Application C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Table of Contents Flexible Pipe Technology Deep Water Challenges for Riser, Flowline and Umbilical

More information

U S F O S B u o y a n c y And Hydrodynamic M a s s

U S F O S B u o y a n c y And Hydrodynamic M a s s 1 U S F O S B u o y a n c y And Hydrodynamic M a s s 2 CONTENTS: 1 INTRODUCTION... 3 2 ACCURACY LEVELS... 3 2.1 LEVEL-0... 3 2.2 LEVEL-1... 3 2.3 PANEL MODEL... 3 3 EX 1. SINGLE PIPE. NON FLOODED... 4

More information

IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view?

IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view? IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view? Seamocs meeting in Malta Gaute Storhaug, DNV Maritime 19th of March 2009 Overview

More information

Offshore engineering science

Offshore engineering science Offshore engineering science In this research stream theoretical models advanced geotechnical models and new numerical techniques were used in applied offshore engineering topics such as loading, design

More information

FINITE ELEMENT ANALYSIS OF PIPELINE GLOBAL WALKING WITH SPANNING AND LATERAL BUCKLING

FINITE ELEMENT ANALYSIS OF PIPELINE GLOBAL WALKING WITH SPANNING AND LATERAL BUCKLING Proceedings of the ASME 2014 33rd International Conference on Ocean, Offshore and Arctic Engineering OMAE2014 June 8-13, 2014, San Francisco, California, USA OMAE2014-24159 FINITE ELEMENT ANALYSIS OF PIPELINE

More information

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;

More information

Slamming Analysis on a 35,000 Ton Class of Drillship

Slamming Analysis on a 35,000 Ton Class of Drillship Slamming Analysis on a 35,000 Ton Class of Drillship Mahasin M. Ahmad, a,* Eko B. Djatmiko, b, and Handayanu, b a) Master Degree Student, Marine Technology Post-Graduate Program, Institut Teknologi Sepuluh

More information

A Novel Platform for Drilling in Harsh High-Latitude Environments.

A Novel Platform for Drilling in Harsh High-Latitude Environments. AADE-7-NTCE-73 A Novel Platform for Drilling in Harsh High-Latitude Environments. Brian Roberts, Technip; Chunqun Ji, Technip; Jim O Sullivan, Technip and Terje Eilertsen, Technip. Copyright 27, AADE This

More information

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING By Marian Copilet, Durham Pipeline Technology Ltd., Gateshead, UK & Prof. Ernie Appleton, University of Durham 1. ABSTRACT This paper discusses

More information

EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE

EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE Sabri ALKAN 1, Ayhan Mentes 2, Ismail H. Helvacioglu 2, Nagihan Turkoglu 2 1 Department of Mechanical Engineering,

More information

Subsea Wellhead and Conductor Fatigue

Subsea Wellhead and Conductor Fatigue Subsea Wellhead and Conductor Fatigue 29th January 2014 Simeon Powell, PE Importance of Wellhead Fatigue Fatigue failure of high pressure wellhead housing Due to VIV West of Shetland Region 440 meter water

More information

ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES

ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES GE Oil & Gas PII Pipeline Solutions Inessa Yablonskikh Principal Consultant Aberdeen, November, 14 th 2007 Assessment And Analysis Of Pipeline Buckles Introduction

More information

Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering

Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering ABSTRACT Drilling operations for subsea wells are typically carried out

More information

Offshore platforms survivability to underwater explosions: part I

Offshore platforms survivability to underwater explosions: part I Computational Ballistics III 123 Offshore platforms survivability to underwater explosions: part I A. A. Motta 1, E. A. P. Silva 2, N. F. F. Ebecken 2 & T. A. Netto 2 1 Brazilian Navy Research Institute,

More information

Homework of chapter (3)

Homework of chapter (3) The Islamic University of Gaza, Civil Engineering Department, Fluid mechanics-discussion, Instructor: Dr. Khalil M. Al Astal T.A: Eng. Hasan Almassri T.A: Eng. Mahmoud AlQazzaz First semester, 2013. Homework

More information

E02 Rigid hinged stinger with piggyback line

E02 Rigid hinged stinger with piggyback line E02 Rigid hinged stinger with piggyback line This model represents a rigid stinger hinged off the back of a lay vessel using the pipelay supports feature. In addition to the lay pipe, another line is included

More information

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs RAMS 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs Introduction to RAMS Tritech s RAMS is a 360 anchor-chain and riser integrity monitoring system for Floating Production Storage and Offloading

More information

Edit this text for your title

Edit this text for your title Edit this text for your title MEK 4450 Marine Operations 1-3 Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2014 Installation of flexibles and cables Typical

More information

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, Offshore Technology, Subsea Technology

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, Offshore Technology, Subsea Technology Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Offshore Technology, Subsea Technology Spring semester, 2012 Writer: Faculty supervisor: Dr. Daniel Karunakaran, Ph.D (University

More information

Irrigation &Hydraulics Department lb / ft to kg/lit.

Irrigation &Hydraulics Department lb / ft to kg/lit. CAIRO UNIVERSITY FLUID MECHANICS Faculty of Engineering nd Year CIVIL ENG. Irrigation &Hydraulics Department 010-011 1. FLUID PROPERTIES 1. Identify the dimensions and units for the following engineering

More information

The wind tunnel tests of wind pressure acting on the derrick of deepwater semi-submersible drilling platform

The wind tunnel tests of wind pressure acting on the derrick of deepwater semi-submersible drilling platform Available online at www.sciencedirect.com Energy Procedia 14 (2012) 1267 1272 2011 2nd International Conference on Advances in Energy Engineering (ICAEE2011) The wind tunnel tests of wind pressure acting

More information

Preliminary study of moored power cables

Preliminary study of moored power cables Preliminary study of moored power cables Joana Prat (1), Joaquín del Río (2), Alejandro Arbos (3) (1) Dept. Matemàtica Aplicada 4. Universitat Politècnica de Catalunya, EPSEVG-UPC. Víctor Balaguer s/n,

More information

Aasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen

Aasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen Aasta Hansteen Operational Experiences FFU Seminar 28 th January 2016 Tom-Erik Henriksen Agenda Introduction to Aasta Hansteen Main Challenges & Risks Operational Experiences - 2015 Campaigns 2 seabed-to-surface

More information

$ Millions. The PC Semi: A Low Motion Semisubmersible Capable of a Wet or Dry Tree Configuration. Semi Hull CAPEX Differentials. Topsides.

$ Millions. The PC Semi: A Low Motion Semisubmersible Capable of a Wet or Dry Tree Configuration. Semi Hull CAPEX Differentials. Topsides. The : A Low Motion Semisubmersible Capable of a Wet or Dry Tree Configuration In our ever changing and uncertain market conditions, it is extremely important to ensure capital investments are successful

More information

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico (GOM) Field Development, Phase 2

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico (GOM) Field Development, Phase 2 Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico (GOM) Field Development, Phase 2 10121-4404-03 Jelena Vidic-Perunovic Doris, Inc. 1 Best of RPSEA 10 Years of Research - Ultra-Deepwater

More information

Proceedings of the International Conference on Emerging Trends in Engineering and Management (ICETEM14) 30-31,December, 2014, Ernakulam, India

Proceedings of the International Conference on Emerging Trends in Engineering and Management (ICETEM14) 30-31,December, 2014, Ernakulam, India INTERNATIONAL JOURNAL OF DESIGN AND MANUFACTURING TECHNOLOGY (IJDMT) Proceedings of the International Conference on Emerging Trends in Engineering and Management (ICETEM14) ISSN 0976 6995 (Print) ISSN

More information

Learn more at

Learn more at STRIDE JIP Phase III SUT Talk 15th November 2 Offshore VIV monitoring (vortex induced vibration) Catenary riser interaction with deepwater seabeds 3 Full Scale Riser Monitoring To get real measurements

More information

STATION KEEPING EXTENSIVE MODEL TESTING OF A DRY-TREE SPREAD-MOORED BARGE IN BRAZILLIAN WATERS

STATION KEEPING EXTENSIVE MODEL TESTING OF A DRY-TREE SPREAD-MOORED BARGE IN BRAZILLIAN WATERS STATION KEEPING EXTENSIVE MODEL TESTING OF A DRY-TREE SPREAD-MOORED BARGE IN BRAZILLIAN WATERS Arjan Voogt (MARIN) and Mamoun Naciri (SBM) Deep Offshore Technology XIV (DOT-2002) ABSTRACT This paper describes

More information

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences. Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)

More information

Trine Risøy, Bergen,

Trine Risøy, Bergen, part of Aker The Installation of Subsea Structures without Offshore Crane Vessel Trine Risøy, Bergen, 04.06.2008 2008 Aker Solutions AKER MARINE CONTRACTORS (AMC) 35 years experience worldwide: Subsea

More information

Numerical modelling of disconnectable turret mooring systems

Numerical modelling of disconnectable turret mooring systems Numerical modelling of disconnectable turret mooring systems A. Duggal, S. Ryu & O. De Andrade Research & Development Department, SOFEC Inc., USA. Abstract Floating, Production, Storage, and Offloading

More information

Technip Presentation. Deep Water Umbilicals Challenges. & Technology Solutions. Ian Probyn R&D Business Development Manager

Technip Presentation. Deep Water Umbilicals Challenges. & Technology Solutions. Ian Probyn R&D Business Development Manager Deep Water Umbilicals Challenges Technip Presentation & Technology Solutions Ian Probyn R&D Business Development Manager MCE Deep Water Developments London, March 25th 2015 Technip Today With engineering,

More information

Performance Calculation of Floating Wind Turbine Tension Leg Platform in the South China Sea

Performance Calculation of Floating Wind Turbine Tension Leg Platform in the South China Sea 568 J. Eng. Technol. Sci., Vol. 47, No. 5, 2015, 568-588 Performance Calculation of Floating Wind Turbine Tension Leg Platform in the South China Sea Hai Feng Wang & You Hua Fan School of Natural Sciences

More information

Learn more at

Learn more at Design Challenges of Deepwater Dry Tree Riser Systems for Different Vessel Types Claire Chedzoy and Frank Lim 2H Offshore Engineering Limited Woking, UK ABSTRACT This paper aims to review the key design

More information

Comparison and Sensitivity Investigations of a CALM and SALM Type Mooring System for Wave Energy Converters

Comparison and Sensitivity Investigations of a CALM and SALM Type Mooring System for Wave Energy Converters J. Mar. Sci. Eng. 214, 2, 93-122; doi:1.339/jmse2193 Article OPEN ACCESS Journal of Marine Science and Engineering ISSN 277-1312 www.mdpi.com/journal/jmse Comparison and Sensitivity Investigations of a

More information

COUPLED DYNAMIC ANALYSIS OF MOORING LINES FOR DEEP WATER FLOATING SYSTEMS

COUPLED DYNAMIC ANALYSIS OF MOORING LINES FOR DEEP WATER FLOATING SYSTEMS Proceedings of International Conference in Ocean Engineering, ICOE Proceedings 2009 of ICOE 2009 Coupled Dynamic Analysis IIT Madras, of Chennai, Mooring India. Lines for Deep Water Floating Systems 1-5

More information

Corrugated Hose Loop Calculations

Corrugated Hose Loop Calculations Corrugated Hose Loop Calculations The loop installation is one of the most common application for metal hoses. It allows the flexible hose assembly to work properly. Care must always be exercised to ensure

More information

Parametric Investigation of Dynamic Characteristics of Mooring Cable of Floating-type Offshore Wind Turbine

Parametric Investigation of Dynamic Characteristics of Mooring Cable of Floating-type Offshore Wind Turbine The 0 World Congress on Advances in Civil, Environmental, and Materials Research (ACEM ) Seoul, Korea, August 6-30, 0 Parametric Investigation of Dynamic Characteristics of Mooring Cable of Floating-type

More information

Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service

Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service Users of this Guidance Note should ensure that they are referring to the latest issue which can be downloaded from www.umf.as. The

More information

Abstract. 1. Introduction. 2. Design Requirements. Naval Engineer - INTERMOOR DO BRASIL 2. Petroleum Engineer INTERMOOR DO BRASIL 3

Abstract. 1. Introduction. 2. Design Requirements. Naval Engineer - INTERMOOR DO BRASIL 2. Petroleum Engineer INTERMOOR DO BRASIL 3 IBP1687_14 MOORING SYSTEM FOR A SEMI-SUBMERSIBLE RIG IN ULTRA-DEEPWATER AND UNDER SEVERE CURRENTS Debora C. B. Ralha 1, Manuela C. Corrêa 2, Jeremy Abercrombie 3 and Karina G. Pinheiro 1 Copyright 2014,

More information

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico From the Wellhead to the Tanker Offshore Production Systems Index Offshore Installations Subsea Systems Field overview Christmas Trees Manifolds Templates Mid-Water Arches Topsides FPSOs The Oil Production

More information

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy OTC-24699-MS Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy Copyright 2014, Offshore Technology Conference This paper was prepared for presentation

More information

Experimental Analysis on the Mooring Lines Force Behaviour of Semisubmersible

Experimental Analysis on the Mooring Lines Force Behaviour of Semisubmersible Jurnal Teknologi Full paper Experimental Analysis on the Mooring Lines Force Behaviour of Semisubmersible in Regular Waves N.M. Khairuddin a, Mohamad Pauzi b, Jaswar Koto a* a Department of Aeronautics,

More information

Stability of Pipeline and details of Anchor blocks

Stability of Pipeline and details of Anchor blocks Stability of Pipeline and details of Anchor blocks For Offshore pipeline laying at Gulf of Kutch, Gujarat. Client WELSPUN (I) LTD, Gujarat EPC Contactor PATEL CONSTRUCTION CO. Consultants Prof. R. Sundaravadivelu

More information

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction This lecture deals with the equipment developed and the experience gained during

More information

ITTC Recommended Procedures and Guidelines

ITTC Recommended Procedures and Guidelines Page 1 of 6 Table of Contents 1. PURPOSE...2 2. PARAMETERS...2 2.1 General Considerations...2 3 DESCRIPTION OF PROCEDURE...2 3.1 Model Design and Construction...2 3.2 Measurements...3 3.5 Execution of

More information

International Journal of Offshore and Coastal Engineering Vol.1 No. 1 pp August 2017 e-issn: Department of Ocean Engineering ITS

International Journal of Offshore and Coastal Engineering Vol.1 No. 1 pp August 2017 e-issn: Department of Ocean Engineering ITS International Journal of Offshore and Coastal Engineering Vol.1 No. 1 pp. 8 15 August 2017 e-issn: 2580-0914 2017 Department of Ocean Engineering ITS Submitted: May 14, 2017 Revised: July 05, 2017 Accepted:

More information

Catenary Mooring Chain Eigen Modes and the Effects on Fatigue Life

Catenary Mooring Chain Eigen Modes and the Effects on Fatigue Life Catenary Mooring Chain Eigen Modes and the Effects on Fatigue Life Tor Anders Nygaard and Jacobus de Vaal, IFE Morten Hviid Madsen and Håkon Andersen, Dr.techn Olav Olsen AS Jorge Altuzarra, Vicinay Marine

More information

MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT

MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT Ionuț-Cristian SCURTU Principal instructor, Navy Academy Mircea cel Batran Constanta, Romania Abstract-The fast evolution

More information

Elastic-Plastic Finite Element Analysis for Zhongwei--guiyang Natural Gas Pipeline Endangered by Collapse

Elastic-Plastic Finite Element Analysis for Zhongwei--guiyang Natural Gas Pipeline Endangered by Collapse Abstract Elastic-Plastic Finite Element Analysis for Zhongwei--guiyang Natural Gas Pipeline Endangered by Collapse Gengxin Wu,Peng Zhang,Zhixiang Li,Zunhai Ke,Guizhi Li,Anmin Jiang 2 School of Civil Engineering

More information

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Dynamic Positioning: Method for Disaster Prevention and Risk Management Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

Design and Finite Element Analysis of Fabricated Panama chock with 225T capacity

Design and Finite Element Analysis of Fabricated Panama chock with 225T capacity LOWER HULL TOP DEC K EL. 3 1 ' - 2 " AB L [ 9 5 0 0 ] ( E) AIR DUC T ( INB D) ( E) B HD 1 4 m m `AH' ( E) PL. 1 2 m m `AH' ( E) L 1 5 0 x9 0 x1 2 m m `AH' - DO- - DO- SMIT BRACKET PANAMA CHOCK International

More information

OTC Buckle Arrestors for Deepwater Pipelines Carl G. Langner / Langner & Associates

OTC Buckle Arrestors for Deepwater Pipelines Carl G. Langner / Langner & Associates OTC 10711 Buckle Arrestors for Deepwater Pipelines Carl G. Langner / Langner & Associates Copyright 1999, Offshore Technology Conference This paper was prepared for presentation at the 1999 Offshore Technology

More information

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1 Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1 Minggui Zhou 1, Dano Roelvink 2,4, Henk Verheij 3,4 and Han Ligteringen 2,3 1 School of Naval Architecture, Ocean and Civil Engineering,

More information

CONCEPT APPLICATION FOR PIPELINES USING A SUBMERGED FLOATING TUNNEL FOR USE IN THE OIL AND GAS INDUSTRY

CONCEPT APPLICATION FOR PIPELINES USING A SUBMERGED FLOATING TUNNEL FOR USE IN THE OIL AND GAS INDUSTRY International Journal of Technology (2017) 4: 719-727 ISSN 2086-9614 IJTech 2017 CONCEPT APPLICATION FOR PIPELINES USING A SUBMERGED FLOATING TUNNEL FOR USE IN THE OIL AND GAS INDUSTRY Ery Budiman 1*,

More information

Model Tests for a Floating Wind Turbine on Three Different Floaters

Model Tests for a Floating Wind Turbine on Three Different Floaters Bonjun J. Koo 1 Technip USA, Inc., 11700 Katy Freeway, Suite 150, Houston, TX 77079 e-mail: bkoo@technip.com Andrew J. Goupee Advanced Structures and Composites Center, University of Maine, 35 Flagstaff

More information