3 RIG TYPES Land rigs in total (approx) 3200 Jack Up,... in total (approx) 485 units 300 * in drilling mode 130 for WD > 350 ft Floaters,... in 2012 total > 400 SS 240 DS 160 Land rig Barge Platform rig Tender rig Jack-Up Semi-sub. moored Semi-sub. DP mode Drillship DP-mode Presentation JB AG JCN JR 3

4 RIG TYPES Onshore/Land rigs Wheel/truck mounted Standard/conventional rig Type Drilling depth range (ft) Light ft Medium ft Heavy ft Ultra heavy ft Offshore / bottom supported Barges: 8 to 25 ft WD Special arctic Posted Submersible: 30 to 150 ft WD Jack-Up: 100 up to 500 ft WD Mat supported / Independent leg Platform Rig Self-contained (compact rig) Tender supported (tender rigs) Offshore / floaters Semi-submersible Conventional moored (up to 7650 ft WD) Dynamic positioning system (5000 to ft WD) Drillships Conventional moored Dynamic positioning system (5000 to ft WD) Presentation JB AG JCN JR 4

5 RIG SIZES: POWER AND CAPABILITIES - some figures (approx) Rig types derricks /mast drawworks total power drilling depths LR Light (/ truck) < lbs < 500 HP < ft (w/ 3 ½ DP) LR Medium duty < lbs < 900 HP < 3000 HP < ft (w/ 3 ½ DP) LR Heavy duty < lbs < 1500 HP < 4000 HP < ft (w/ 5in DP) LR Ultra H. duty < lbs < 3000 HP < 5000 HP < ft (w/ 5in DP) Offshore (modern units) 1.3 to 2 MMlbs 2000 to 6600 HP > HP ft Presentation JB AG JCN JR 5

6 Conventional land rig Presentation JB AG JCN JR 6

7 Conventional land rig Presentation JB AG JCN JR 7

8 Land rig in arctic zone Presentation JB AG JCN JR 8

9 Land rig on A-island Kazakhstan field land rig; winterized option Presentation JB AG JCN JR 9

10 Land rig in arctic zone Source / Illustrations: TOTAL Presentation JB AG JCN JR 11

11 Drilling and well operations on Kharyaga field (Russia) Source: TOTAL EP Russie Presentation JB AG JCN JR 12

12 Truck mounted land rig Presentation JB AG JCN JR 13

13 Drilling operations with heli-rig Presentation JB AG JCN JR 16

14 RIG TYPES Onshore/Land rigs Wheel/truck mounted Standard/conventional rig Type Drilling depth range (ft) Light ft Medium ft Heavy ft Ultra heavy ft Offshore / bottom supported Barges: 8 to 25 ft WD Special arctic Posted Submersible: 30 to 150 ft WD Jack-Up: 100 up to 500 ft WD Mat supported / Independent leg Platform Rig Self-contained (compact rig) Tender supported (tender rigs) Offshore / floaters Semi-submersible Conventional moored (up to 7650 ft WD) Dynamic positioning system (5000 to ft WD) Drillships Conventional moored Dynamic positioning system (5000 to ft WD) Presentation JB AG JCN JR 17

15 Inland water drill barge Source: IADC Drilling Contractor Axxis Drilling Co Presentation JB AG JCN JR 18

16 Drilling barge (in a swamp area) Presentation JB AG JCN JR 19

17 Drilling barge in a swamp area East Kalimantan Presentation JB AG JCN JR 21

18 Wellheads (in a swamp area) Source / Illustrations: TOTAL Presentation JB AG JCN JR 22

19 Drilling barge (for arctic conditions) Presentation JB AG JCN JR 23

20 Presentation JB AG JCN JR 24

21 For operations with a Jack-Up. Some points to verify, - spud cans, leg length vs seabed survey - leg length vs water depth, height of wellhead platform - cantilever extensions vs well bay on wellhead platform - preloading procedures vs seabed survey, rig operating manual Presentation JB AG JCN JR 25

22 Jack-UP (IC) Cantilever type Independent leg Jack-UP (MS) slotted type mat supported type Presentation JB AG JCN JR 26

23 Jack-Up operation on wellhead platform Jack-Up (drilling unit) Wellhead platform Animation Presentation JB AG JCN JR 27

24 Jack-Up (drilling unit) Wellhead platform seabed Presentation JB AG JCN JR 28

25 Presentation JB AG JCN JR 29

26 Characteristics of some big JU In Jack Up for WD > 350 ft Some characteristics JU Name Year WD / leg Total power HP VL elevated st Drawworks Drlg. Pattern ft x ft Pumps Nb. & psi BOP WP Diverter diameter inches ft HP psi Maersk Inspirer / x 66 4 x ,5 Maersk Innovator / x 66 4 x ,5 Rowan Gorilla VI / x 40 4 x Ensco / x 30 3 x ,5 Noble Scott Marks / x 30 3 x In Jack-Up for WD > 350 ft Presentation JB AG JCN JR 30

27 Maersk Innovator Maersk Inspiror Presentation JB AG JCN JR 31

28 Jack-Up operation on wellhead platform Presentation JB AG JCN JR 32

29 Presentation JB AG JCN JR 33

30 Typical (IC*) Jack-Up over a WHP * Independent leg / Cantilever Presentation JB AG JCN JR 34

31 Conventional Jack-Up ( stand alone operations) Jack-Up towed over short distances Jack-Up moved over long distances Presentation JB AG JCN JR 35

32 Additional offshore operations which can be performed with a JU Jack-Up Topside Jacket 36 Presentation JB AG JCN JR 36

33 compact rig installed on a WP Compact rig Wellhead platform Presentation JB AG JCN JR 37

34 Wellhead platform drilling (assisted by a conventional tender rig ) Hoisting, safety Rotary functions Derrick set Pumping, power functions Source/ Courtesy: Transocean Presentation JB AG JCN JR 38

35 Wellhead platform drilling (assisted by a conventional tender rig ) Presentation JB AG JCN JR 39

36 Wellhead drilling platform assisted by a new deep-water tender rig Presentation JB AG JCN JR 40

37 RIG TYPES Onshore/Land rigs Wheel/truck mounted Standard/conventional rig Type Drilling depth range (ft) Light ft Medium ft Heavy ft Ultra heavy ft Offshore / bottom supported Barges: 8 to 25 ft WD Special arctic Posted Submersible: 30 to 150 ft WD Jack-Up: 100 up to 500 ft WD Mat supported / Independent leg Platform Rig Self-contained (compact rig) Tender supported (tender rigs) Offshore / floaters Semi-submersible Conventional moored (up to 7650 ft WD) Dynamic positioning system (5000 to ft WD) Drillships Conventional moored Dynamic positioning system (5000 to ft WD) Presentation JB AG JCN JR 41

38 For operations with a floater Some points to verify, - anchors type vs seabed survey - riser design, floating elements vs water depth - booster line vs water depth - heave response curves vs meteo-oceano survey Presentation JB AG JCN JR 43

39 DW floaters: Relative heave motion response vs. Wave period Source: TOTAL Offshore Reference Book Presentation JB AG JCN JR 44

40 OFFSHORE ENVIRONMENT WITH. -- Action of winds, -- Action of waves, Drilling floating unit (semi-submersible) Telescopic joint Drilling riser -- Action of currents and, Kill & choke lines Guide Guide lines lines -- impact of water depth, -- impact of seabed (formation) wellhead TGB & PGB Subsea BOP s Subsea wellhead Presentation JB AG JCN JR 45

41 Tensioning devices Floater response to wind, wave Impact of waves Non-linear current profile Drilling riser (w/ buoyancy modules) Water Depth Flex-joint Subsea equipment seabed Presentation JB AG JCN JR 46

42 WELL CONSTRUCTION: the basics Rig move on location Running WH Running BOP and riser Drilling msl Semi-submersible Flow line Drillstring WD Drilling riser Sub sea BOP Mud line = Sea bed Sub sea wellhead Presentation JB AG JCN JR 47

43 Conventional semi-submersible. In operation. deballasted In transit: dry tow Presentation JB AG JCN JR 48

44 Semi-submersible Leiv-Eiriksson (in drilling conditions) Presentation JB AG JCN JR 49

45 SEMI SUBMERSIBLE Aker Spitsbergen The new Aker H-6e is the world's biggest and most advanced drilling semi. It have features that make them particularly well suited for drilling under extreme conditions Presentation JB AG JCN JR 50

46 DRILLSHIP * PACIFIC SANTA ANNA * Drilling Contractor: Pacific Drilling year built / delivered: 1Q 2012 The drillship owned by Pacific Drilling is thought to be the first of its kind in the world equipped to perform dual gradient drilling (DGD). DGD uses a subsea mud pump (Chevron design) to withdraw the drilling mud from the well at the seabed and return it through a separate line to the drillship. It is equipped with a DGD riser, a mud lift pump handling system, six mud pumps three for drilling fluid and three for seawater extensive fluid management system enhancements. Presentation JB AG JCN JR 51

47 DYNAMIC POSITIONING SYSTEM (DYPO) A computer controlled system to automatically maintain a ship s position and heading by using its own thrusters (propellers). (Thruster system: gives a thrust to counter the environment condition, so that the drillship or the semi-sub. can be in desired position) Presentation JB AG JCN JR 52

48 DYNAMIC POSITIONING SYSTEM Presentation JB AG JCN JR 53

49 Drillship (ultra deep water) SAIPEM Drillship (ultra deep water) DEEPWATER DISCOVERY Some sizes : 228 m x 42 m x 12 m Total installed power kw dual activities Source / illustration: Transocean Presentation JB AG JCN JR 54

50 Rig SS «Polyarnaya Zvezda» Presentation JB AG JCN JR 55

51 SEMI-SUB. vs. DRILLSHIPS.... SS DS - variable loads transit/moving speed stability + + ANCHOR-MOORING vs DYPO.... CONV. MOORING DYPO - time for rig positionning - sensitive weather areas fuel consumption field development Presentation JB AG JCN JR 56

52 Driller s dog house Offshore new offshore unit Rig onshore Presentation JB AG JCN JR 57

53 Rig rental costs (approx.) Operational daily costs (approx.) Land rig 30 to 45 K$ / d $/d Drilling barge 45 to 100 K$ / d $/d Tender rig (conventional) 50 to 120 K$ / d $/d Jack-Up (300 ft) 100 to 250 K$ / d 170 to $/d Semi-submersible (5000 < WD < 7500 ft) 200 to 250 K$ / d 380 to $/d Drillships (5000 < WD < 7500 ft) K$ / d $/d ( 7500 < WD < ft) + / K$ /d $/d Figures vary with type of contract (short/long term), market conditions, geographical area... Presentation JB AG JCN JR 58

54 COST TO BUILD A NEW RIG (approx. in 2011 cost in million $) Presentation JB AG JCN JR 59

55 Slides were prepared for presentation and information to Students of Schools and Universities only. References Slides presented were prepared with illustrations from the following referenced documents: - API Standards and Recommended Practices, - Neal J. Adams, Drilling Engineering, PennWell Books, Tulsa, Oklahoma, 1985, - (Halliburton) - Petroleum Well Construction J Willey & Sons - Miscellaneous books from Chambre Syndicale de la Recherche et de la Production du Pétrole et du gaz naturel - IFP Drilling data handbook - Miscellaneous documentation from TOTAL Drilling Division - Halliburton Completion Services - Miscellaneous books from IFP - Leading Edge Advantage Ltd (Under Balance Drilling). - Miscellaneous documentation from web-sites: O&GJ, World Oil, SPE - Transocean, Saipem, Pride Drilling Contractors - Baker Hughes, Schlumberger, Weatherford, Wild Well Control Service Companies - Cameron, Hydril, Companies. Presentation JB AG JCN JR 60

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Kicks & blowouts A kick is an unexpected influx into a well of a formation fluid. Should this influx be uncontrolled... -- during its way from the bottom of the hole up in the

More information

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper Offshore Managed Pressure Drilling Experiences in Asia Pacific SPE paper 119875 Authors: Steve Nas, Shaun Toralde, Chad Wuest, SPE, Weatherford Solutions Sdn Bhd, SPE, Weatherford Indonesia SPE, Weatherford

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE VESSEL DESIGNS HUISMAN PRODUCT BROCHURE VESSEL ESIGNS TABLE OF CONTENTS 01 GENERAL 03 1.1 Introduction 03 1.2 Development 03 02 DRILL SHIPS 06 2.1 HuisDrill 12000 06 03 MOBILE OFFSHORE DRILLING UNITS 07

More information

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc Presented at OMAE, New Orleans, February 2000 Introduction Characteristics

More information

Marine Technology Society

Marine Technology Society Marine Technology Society Dynamic Positioning Conference 21-22 October, 1997 Session I Review of DP Applications, Consequences and Cost of Failures Drilling Fundamentals-DP Operations-Drilling with Riser

More information

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by Thank you Greg. 1 The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by Mr. Muhammad Sadiq, however in short,

More information

Global Floating Rig (Floater) Market: Trends and Opportunities ( ) February 2014

Global Floating Rig (Floater) Market: Trends and Opportunities ( ) February 2014 Global Floating Rig (Floater) Market: Trends and Opportunities (2014-2019) February 2014 Scope of the Report View Report Details The report titled Global Floaters Market: Trends and Opportunities (2014-2019)

More information

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Dynamic Positioning: Method for Disaster Prevention and Risk Management Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

The SPE Foundation through member donations and a contribution from Offshore Europe

The SPE Foundation through member donations and a contribution from Offshore Europe Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as

More information

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

Learn more at

Learn more at Full scale model tests of a steel catenary riser C. Bridge 1, H. Howells 1, N. Toy 2, G. Parke 2, R. Woods 2 1 2H Offshore Engineering Ltd, Woking, Surrey, UK 2 School of Engineering, University of Surrey,

More information

Subsea Wellhead and Conductor Fatigue

Subsea Wellhead and Conductor Fatigue Subsea Wellhead and Conductor Fatigue 29th January 2014 Simeon Powell, PE Importance of Wellhead Fatigue Fatigue failure of high pressure wellhead housing Due to VIV West of Shetland Region 440 meter water

More information

Learn more at

Learn more at IBP1833_06 COST EFFICIENT ARTIFICIAL BUOYANT SEABED DRILLING SOLUTION Dan Moutrey 1, Frank Lim 2 Copyright 2006, Instituto Brasileiro de Petróleo e Gás - IBP This Technical Paper was prepared for presentation

More information

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Safety and Risk Engineering. HSE Case Implementation Clive Rawson Safety and Risk Engineering HSE Case Implementation Clive Rawson Purpose ALARP Risk Assessment Major Accident Events Bowties Safety Critical Systems Performance Standards Implementation Getting HSE Case

More information

Trine Risøy, Bergen,

Trine Risøy, Bergen, part of Aker The Installation of Subsea Structures without Offshore Crane Vessel Trine Risøy, Bergen, 04.06.2008 2008 Aker Solutions AKER MARINE CONTRACTORS (AMC) 35 years experience worldwide: Subsea

More information

POWER TAKE-OFF SYSTEMS OF OFFSHORE RIG POWER PLANTS

POWER TAKE-OFF SYSTEMS OF OFFSHORE RIG POWER PLANTS POWER TAKE-OFF SYSTEMS OF OFFSHORE RIG POWER PLANTS Wieslaw Tarelko Gdynia Maritime University ul. Morska 81-87, 81-225 Gdynia, Poland tel.: +48 58 6901331 e-mail: tar@am.gdynia.pl Abstract The growing

More information

Global Service Sector Trends

Global Service Sector Trends Global Service Sector Trends Jerry Logan Vice President Strategy & Portfolio Energy Services Group Halliburton Presentation to the Energy Summit 2005 LSU Center for Energy Studies October 19-20, 2005 Today

More information

Safety of DP Drilling Operations in the South China Sea

Safety of DP Drilling Operations in the South China Sea Scandpower Risk Management China Inc Rm. 707 Towercrest International Plaza No. 3 Maizidian West Road Chaoyang District, 100016 Beijing, P.R. China Safety of DP Drilling Operations in the South China Sea

More information

Minimal Structures for Marginal Nova Scotia Developments

Minimal Structures for Marginal Nova Scotia Developments Minimal Structures for Marginal Nova Scotia Developments May 12, 2009 Cameron Dunn Martec is a member of the Lloyd s Register Group 1 2 Minimal Structures Project NSDOE working to make the Nova Scotia

More information

A Novel Platform for Drilling in Harsh High-Latitude Environments.

A Novel Platform for Drilling in Harsh High-Latitude Environments. AADE-7-NTCE-73 A Novel Platform for Drilling in Harsh High-Latitude Environments. Brian Roberts, Technip; Chunqun Ji, Technip; Jim O Sullivan, Technip and Terje Eilertsen, Technip. Copyright 27, AADE This

More information

Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments

Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments OIL & GAS Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments Noble Denton marine services Mike White 1 SAFER, SMARTER, GREENER Overview What are we talking

More information

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Slot Recovery Procedures: Slot Recovery Running Procedures 1. Cut And Retrieve Operation: Borais s cut and retrieve equipment: 1.

More information

Faculty of Science and Technology MASTER S THESIS

Faculty of Science and Technology MASTER S THESIS Faculty of Science and Technology MASTER S THESIS Study program/specialization: Offshore Technology - Marine and Subsea Technology Spring semester, 2012 Open / Restricted access Author: John Normann Gundersen

More information

Fully Submersible Heavy Lift Vessel

Fully Submersible Heavy Lift Vessel Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Oil and Gas Authority (OGA) (15th February 2016) CONTENT Leadon structures demobilisation Competitiveness (case studies) Decommissioning options Installation

More information

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico From the Wellhead to the Tanker Offshore Production Systems Index Offshore Installations Subsea Systems Field overview Christmas Trees Manifolds Templates Mid-Water Arches Topsides FPSOs The Oil Production

More information

Lachlan John Walsh. Candidate Submission form

Lachlan John Walsh. Candidate Submission form Date: July 5, 2017 Candidate Submission form Name: Lachlan John Walsh Email address: walshlochie@yahoo.com.au Date of birth: 26-12-1974 Height: Weight: Position Applied for: Expected day rate in USD: Date

More information

Analysis of Offshore Drilling's Vertical Load Using Semi-Submersible Rig

Analysis of Offshore Drilling's Vertical Load Using Semi-Submersible Rig Analysis of Offshore Drilling's Vertical Load Using Semi-Submersible Rig Herianto, a,* a) Department of Petroleum Engineering, Faculty of Mineral Technology, Univesitas Pembangunan Nasional Veteran Yogyakarta,

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

RIG CAPABILITIES For Multi Well/Pad Development

RIG CAPABILITIES For Multi Well/Pad Development RIG CAPABILITIES For Multi Well/Pad Development Advantages to Multi-Well Pad - Continuous Operations Minimize EHS Risk Less iron to move Less trucking Less risks for spills Fewer or no Well Heads to avoid

More information

OVERVIEW. Capabilities & Services

OVERVIEW. Capabilities & Services +1.713.467.0505 Sales@boamarine.com www.boamarine.com OVERVIEW Capabilities & Services BOA MARINE SERVICES provides engineering, construction and contracting services related to fi xed and fl oating offshore

More information

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development 10121-4404-03 Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology

More information

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR ATMA 2006 HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR Partie 1 Pierre-Armand THOMAS TECHNIP Division Offshore - Paris (France) Diapositives

More information

Learn more at

Learn more at Bottom Weighted Riser A Novel Design for Re-location and Disconnection Frank Lim and John McGrail 2H Offshore Engineering Ltd. Woking, Surrey, United Kingdom ABSTRACT Flexible pipe risers have limitations

More information

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe THE PROJECT: GOLDENEYE GOLDENEYE FACTS ST. FERGUS GOLDENEYE PLATFORM Gas Condensate Field

More information

The Impact of Composites on Future Deepwater Riser Configurations

The Impact of Composites on Future Deepwater Riser Configurations The Impact of Composites on Future Deepwater Riser Configurations Thomas Brown 2H Offshore Engineering Ltd NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Deepwater Riser Technology Today s deepwater

More information

OIL & GAS DRILLING PROGRAM

OIL & GAS DRILLING PROGRAM Your Hose & Fitting Connection OIL & GAS DRILLING PROGRAM HOSE & FITTINGS ww.jgbhose.com JGB Headquarters 115 Metropolitan Dr. Liverpool, NY 13088 (315) 451-2770 Buffalo Branch 2540 Walden Ave. Cheektowaga,

More information

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins GLS New Technology Rising to the Challenge of Subsea lifting Subsea 2012 Paddy Collins Introductions Aubin Design, Develop and Supply own chemical technical technology Cement and Stimulation Pipeline products

More information

BUCCANEER ALASKA OPERATIONS, LLC. BUCCANEER ALASKA OPERATIONS, LLC Cook Inlet Exploratory Drilling Program. Community Outreach: KPB Assembly

BUCCANEER ALASKA OPERATIONS, LLC. BUCCANEER ALASKA OPERATIONS, LLC Cook Inlet Exploratory Drilling Program. Community Outreach: KPB Assembly Community Outreach: KPB Assembly Agenda 1. Project Overview 2. 3. Waste Management 4. Environmental Management 5. Permits Required & Processing Schedule Processing 6. Q & A / Agency Feedback 2 Project

More information

Deepwater Horizon, by Metin Çakanyıldırım and references cited therein.

Deepwater Horizon, by Metin Çakanyıldırım and references cited therein. Deepwater Horizon Page 1 Outline Summary of the events and companies Technical problems and their association with companies Managerial problems Risk averse vs. risk seeking tendencies Suggestions to avoid

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

DRILLING HOSE SOLUTIONS

DRILLING HOSE SOLUTIONS DRILLING HOSE SOLUTIONS HIGH PRESSURE FLEXIBLE LINES FOR A WIDE RANGE OF DRILLING APPLICATIONS HIGH QUALITY - HIGH STANDARD WE DELIVER ACCORDING TO THE HIGHEST LEVELS OF SPECIFICATIONS AND STANDARDS WITH

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy

Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy 1 OUTLINE Overview of Oil Spill & its Impact Technical Challenges for Modeling Review

More information

Caltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement

Caltec.   The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement Caltec brings simple passive technology that enables oil and gas operators to harness the kinetic energy of the production process to enhance their production, extending economic field life and reducing

More information

OFFSHORE. Trasfor OFFSHORE

OFFSHORE. Trasfor OFFSHORE OFFSHORE Trasfor OFFSHORE 2 Trasfor I Offshore Introduction Trasfor s transformers for offshore applications ensure the highest performance level of reliability in any working condition. More than 40 skilled

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

TARPON A Minimal Facilities Platform

TARPON A Minimal Facilities Platform TARPON A Minimal Facilities Platform Contents Introduction TARPON Description TARPON Features TARPON Benefits TARPON Proofs TARPON Typical Installation Options Design Codes & Certification Novel Application

More information

Offshore exploration in the arctic Alain Wassink GustoMSC

Offshore exploration in the arctic Alain Wassink GustoMSC Offshore exploration in the arctic Alain Wassink GustoMSC Offshore exploration in the arctic Why? Challenges? What challenges? The heart of the matter: Principles Solutions Why? Offshore exploration in

More information

THE DEEP OFFSHORE MARKET

THE DEEP OFFSHORE MARKET THE DEEP OFFSHORE MARKET Ivan REPLUMAZ CEO Offshore Branch INVESTOR DAY, PARIS, FRANCE - October 22, 2004 I. INTRODUCTION II. DEEP WATER DEVELOPMENT CONCEPTS III. RESERVES AND PRODUCTION IV. MAIN OPERATORS

More information

Evaluation of deepwater kicks and future countermeasures

Evaluation of deepwater kicks and future countermeasures WELLS AND WELL INTERVENTION Evaluation of deepwater kicks and future countermeasures Paal Skalle, Per Holand 2 and Sigbjørn Sangesland Norwegian University of Science and Technology and 2 SINTEF/ExproSoft

More information

TECHNICAL SPECIFICATION SCHILLING UHD III WORK CLASS ROV SYSTEM

TECHNICAL SPECIFICATION SCHILLING UHD III WORK CLASS ROV SYSTEM TECHNICAL SPECIFICATION SCHILLING UHD III WORK CLASS ROV ROVOP, Silvertrees Drive, Westhill, Aberdeen AB32 6BH, Scotland, UK T +44 (0) 1224 472565 E rov@rovop.com www.rovop.com TECHNICAL SPECIFICATION

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

Managing Dynamic Positioning (DP) Operations

Managing Dynamic Positioning (DP) Operations Managing Dynamic Positioning (DP) Operations Captain Andy Goldsmith, IMCA Technical Adviser IOSH Offshore Conference Tools for the trade 19 October 2017 1 2 IMCA OPERATIONAL STRUCTURE BOARD CEO SECRETARIAT

More information

Deepwater Floating Production Systems An Overview

Deepwater Floating Production Systems An Overview Deepwater Floating Production Systems An Overview Introduction In addition to the mono hull, three floating structure designs Tension leg Platform (TLP), Semisubmersible (Semi), and Truss Spar have been

More information

R. Randall Center for Dredging Studies Texas A&M University

R. Randall Center for Dredging Studies Texas A&M University R. Randall Center for Dredging Studies Texas A&M University i Glory (Caisson) holes for subsea installations Pipeline trenches Deep ocean mining LNG ports & ship channels Summary WEDA 33 & TAMU 44 2 WEDA

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Planning of Drilling Operations in Extreme Ocean Currents

Planning of Drilling Operations in Extreme Ocean Currents DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 OPERATIONS Planning of Drilling Operations in Extreme Ocean Currents Luca Pivano - Marine Cybernetics/DNV GL Kristopher Eide - Marine Cybernetics/DNV

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 12 Choose the best answer to the following Multiple Choice Questions. 1. What class of bulkhead is required around

More information

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE HUTTLE TABLE OF CONTENTS 01 DESCRIPTION 03 1.1 Vessel General 03 1. Purpose of the Vessel 0 1.3 High Workability 0 1. Installation Scenarios 05

More information

DECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017

DECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017 DECOMMISSIONING Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017 FEELINGS AGENDA BACKGROUND THE VESSEL THE FUNCTIONS PARTNERS BACKGROUND BACKGROUND BACKGROUND OLSO PARIS CONVENTION

More information

Shell Castor & Pollux Rig Equipment Primary Items

Shell Castor & Pollux Rig Equipment Primary Items Shell Castor & Pollux Rig Equipment Primary Items DRAW WORKS WITH SKID Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: 39,000 lbs Estimated construction Weight 21,800kg Crane #1: Sub

More information

Learn more at

Learn more at STRIDE JIP Phase III SUT Talk 15th November 2 Offshore VIV monitoring (vortex induced vibration) Catenary riser interaction with deepwater seabeds 3 Full Scale Riser Monitoring To get real measurements

More information

The Developing Design of the Blowout Preventer in Deep Water

The Developing Design of the Blowout Preventer in Deep Water The Developing Design of the Blowout Preventer in Deep Water IADC World Drilling 2011 Conference & Exhibition 15-16 June 2011, Bella Centre, Copenhagen Eric Brown Project Manager National Oilwell Varco

More information

Feasibility of Steel Lazy Wave Risers in the North Sea

Feasibility of Steel Lazy Wave Risers in the North Sea NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Feasibility of Steel Lazy Wave Risers in the North Sea Rohit Shankaran 2H Offshore Engineering Ltd. Agenda Risers in deepwater North Sea Are steel catenary

More information

Offshore Oil and Gas Platforms for Deep Waters

Offshore Oil and Gas Platforms for Deep Waters Offshore Oil and Gas Platforms for Deep Waters Atilla Incecik Department of Naval Architecture, Ocean and Marine Engineering University of Strathclyde, Glasgow, UK (atilla.incecik@strath.ac.uk) Summary

More information

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES ContiTech Rubber Industrial Kft. Hose Technical Department HANDLING Page: 1/9 Date: 31.07.2008 Invalidate the document TKO AS3 rev.4 INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

More information

3.9 MW-30JD Mooring Winch. Technical Parameter

3.9 MW-30JD Mooring Winch. Technical Parameter 3.9 MW-30JD Mooring Winch MW-30JD Mooring Winch is single roller, it s mooring positioned by drawing steel wire rope. As a important corollary equipment of Jack-up platform, it can be used of Jack-up platform

More information

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs RAMS 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs Introduction to RAMS Tritech s RAMS is a 360 anchor-chain and riser integrity monitoring system for Floating Production Storage and Offloading

More information

The SDS Skip. Subsea Deployment Systems Ltd.

The SDS Skip. Subsea Deployment Systems Ltd. The SDS Skip SUBSEA SKIP An alternative to enhance the recovery of structures, spool pieces, mattresses etc. during decommissioning work Can be used to transport complex structures or spool pieces to field

More information

Abstract. 1. Introduction. 2. Design Requirements. Naval Engineer - INTERMOOR DO BRASIL 2. Petroleum Engineer INTERMOOR DO BRASIL 3

Abstract. 1. Introduction. 2. Design Requirements. Naval Engineer - INTERMOOR DO BRASIL 2. Petroleum Engineer INTERMOOR DO BRASIL 3 IBP1687_14 MOORING SYSTEM FOR A SEMI-SUBMERSIBLE RIG IN ULTRA-DEEPWATER AND UNDER SEVERE CURRENTS Debora C. B. Ralha 1, Manuela C. Corrêa 2, Jeremy Abercrombie 3 and Karina G. Pinheiro 1 Copyright 2014,

More information

D RILLING L I RIG EQUIPMENT N G CONTRACTOR

D RILLING L I RIG EQUIPMENT N G CONTRACTOR D RILLING L I RIG EQUIPMENT 18 September/October embe tobe 2007 07 D R I L L I N G CT O R Improved top drive systems boost reliability, push capacity limits D RILLING RIG EQUIPMENT By Jerry Greenberg,

More information

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

Protecting People and the Environment during Stimulation Treatments in Offshore Settings Protecting People and the Environment during Stimulation Treatments in Offshore Settings NASEM Workshop: Offshore Well Completion and Stimulation using Hydraulic Fracturing and Other Technologies Paul

More information

FMB12329 Accommodation Work Barge

FMB12329 Accommodation Work Barge FMB12329 Accommodation Work Barge Delivery 2014 Class Notation: ABS + Maltese Cross + A1 Barge for unrestricted service Function: completely outfitted for pipelay derrick work and other related duties

More information

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific June 2011 Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific Daniel Brooker, MCS Kenny Presentation Agenda 1. Objectives 2. Top Tensioned Riser (TTR) Selection Drivers

More information

IMCA Competence Assessment Portfolio June 2013

IMCA Competence Assessment Portfolio June 2013 IMCA Competence Portfolio June 2013 Name: Start Date in Current Self- Checklist Entry Level Criteria Acceptance Criteria Attained Certification 500 GRT or more: Valid certificate of competency or certificate

More information

Barging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab

Barging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab REQUIRED READING FOR THE GLOBAL OIL AND GAS INDUSTRY SINCE 1975 www.offshore-engineer.com NOVEMBER 2005 Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab Barging in on Trent PLUS:

More information

IMCA Competence Assessment Portfolio June 2013

IMCA Competence Assessment Portfolio June 2013 IMCA Competence Portfolio June 2013 Name: Start Date in Current Self- Checklist Entry Level Criteria Acceptance Criteria Attained Certification 500 GRT or more: Valid certificate of competency or certificate

More information

A DECADE OF EXPERIENCE

A DECADE OF EXPERIENCE SEA INSTALLER Efficient and cost-effective A DECADE OF EXPERIENCE SEA INSTALLER reflects more DECK than a decade of experience in SEA INSTALLER's deck measures 3,350 m2 The deck is reinforced and can carry

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

ANALYSIS OF OFFSHORE DRILLING S VERTICAL LOAD USING SEMI SUBMERSIBLE RIG

ANALYSIS OF OFFSHORE DRILLING S VERTICAL LOAD USING SEMI SUBMERSIBLE RIG ANALYSIS OF OFFSHORE DRILLING S VERTICAL LOAD USING SEMI SUBMERSIBLE RIG Dr. Ir. Drs. H. Herianto, M.T a * a) Petroleum Engineering Department, Faculty of Mineral Technology, Univesitas Pembangunan Nasional

More information

AUTOMATED MONITORING EQUIPMENT FOR ACIP AND DD PILES

AUTOMATED MONITORING EQUIPMENT FOR ACIP AND DD PILES AUTOMATED MONITORING EQUIPMENT FOR ACIP AND DD PILES Presented by: W. Morgan NeSmith, P.E. Berkel & Company Contractors Inc. 770.941.5100 mnesmith@berkelapg.com ANNUAL KANSAS CITY SPECIALTY GEOTECHNICAL

More information

2007 Gas-Lift Workshop

2007 Gas-Lift Workshop 2007 Gas-Lift Workshop Field Application of Automation and Control Equipment by Cleon Dunham Oilfield Automation Consulting 2/11/2007 2007 Gas-Lift Workshop 1 Gas-Lift Automation & Control Equipment Outline

More information

Marine Technology Society

Marine Technology Society Marine Technology Society Dynamic Positioning Conference 21-22 October, 1997 Session 3 Operator Training Dynamic Positioning Familiarization Course By: Greg Navarre Global Marine (Houston) Session Planner

More information

Challenges in Ship Design to Maintain Thrusters inside Ship

Challenges in Ship Design to Maintain Thrusters inside Ship DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Thrusters Challenges in Ship Design to Maintain Thrusters inside Ship Tom Nylund and Timo Rintala Beacon Finland 1 DP Conference - Challenges in Ship Design

More information

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Commentary on the book by Andrew Hopkins. By Graham Dalzell Commentary on the book by Andrew Hopkins By Graham Dalzell How we drill oil wells The disaster itself how it happened; (anonymised)- oil, well and drilling companies Andrew s conclusions on the Human,

More information

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7 Development of a New Deep-Water Riser System Daniel Karunakaran Subsea 7 Introduction Grouped SLOR TM is an open bundle riser solution developed by Subsea 7 and 2H Offshore Array of close standing SLOR

More information

Heron s Application for Wind Industry - Gorillas Need Not Apply

Heron s Application for Wind Industry - Gorillas Need Not Apply Heron s Application for Wind Industry - Gorillas Need Not Apply Iain Steven, Technical Director, CDC Ltd This presentation is given with minimal text projected. The story of the Gorillas need not apply

More information

Marine Technology Society

Marine Technology Society Marine Technology Society Dynamic Positioning Conference 21-22 October, 1997 Session 3 Operator Training Induction Course By: Greg Navarre Global Marine (Houston) Session Planner Greg Navarre Global Marine

More information

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project) DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project) Presented by: Tomasz Płotka - StoGda 0. StoGda Ship Design & Engineering Ltd Beginning of the StoGda Ship Design

More information

Rig move Code of Practice (COP) and Scope of Work (SOW)

Rig move Code of Practice (COP) and Scope of Work (SOW) INSURANCE GROUP Rig move Code of Practice (COP) and Scope of Work (SOW) - Presented on behalf of the Joint Rig Committee October 2011 www.lancashiregroup.com 1 Purpose Outline Criteria for Rig Move surveying

More information

Platelets & Plasma The Management of Unplanned Flow

Platelets & Plasma The Management of Unplanned Flow Platelets & Plasma The Management of Unplanned Flow Who are Brinker? Managing Unplanned Flo Range of innovative products & specialist services to enable operators to effectively manage unplanned flow events

More information

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC Dilution-Based Dual Gradient Well Control Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC In this very short presentation, we will Review Dilution-based

More information

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement Rotary Steerable System for high-performance drilling and accurate wellbore placement The PowerDrive X6 RSS maintains control under the most difficult conditions, bringing the benefits of rotary steerable

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content Contents 1. Abbreviations 2. Background 3. Definition 4. Well Conditions 5. HPHT Safety Case

More information

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Re-usable Riser and Flowline System for Deep Water Application C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Table of Contents Flexible Pipe Technology Deep Water Challenges for Riser, Flowline and Umbilical

More information