1 Heron s Application for Wind Industry - Gorillas Need Not Apply Iain Steven, Technical Director, CDC Ltd
2 This presentation is given with minimal text projected. The story of the Gorillas need not apply is provided by the presenter Over the next few minutes I d like to offer a Darwinian perspective on the brief history of jack-ups. And I m going to be bold by suggesting that the current evolutionary trend for bigger and bigger isn t necessarily in your favour Bigger isn t necessarily going to satisfy your operation & maintenance needs. Why? Because as Darwin himself suggested, adaptability is the key to survival Speakers Notes
3 Scorpion. Zapata. 1 st lattice leg Jack-Up MODU ft WD. 3
4 The Scorpion was the first jackup with the now familiar lattice leg design, built way back in the days of black and white telly, with a maximum operating water depth of 80ft (24m) (image source: http//petrowiki.org/history_of_offshore_drilling_units ) 4
5 Rowan Gorilla ft WD with 500ft legs Image Gorilla 1 5 All Energy, All Energy, May May
6 Fast Forward to 1983 and we have the introduction of the first music CDs in the UK alongside the Gorilla 1. Water depth 350ft (106m) (image source: ) 6 All Energy, All Energy, May May
7 Rowan Companies Rig Bob Palmer A LeTourneau Super Gorilla XL. 490ft WD. Leg length 647ft Circa
8 16 years later, in 1999, we have the opening of the Scottish Parliament coinciding with the launch of the super gorilla XL class of jack-up, with a design water depth of up to 550ft (167m) Bit of controversy with water depth, between designer claims and what continental shelf regulators will Permit as working water depth. Somewhere between 450ft and 490ft. (image source:.. ) 8
9 Rowan Companies Rig ROWAN GORILLA 7 At Forties-E A LeTourneau Super Gorilla 400ft WD (North Sea). 607ft Legs 9
10 Here is another super gorilla, the Rowan Gorilla 7 this time. This is the Rowan Gorilla 7 at Forties Echo (image source:. ) 10
11 MAERSK XLE Class A GUSTO CJ70 500ft WD. 675ft Legs Circa
12 2014, and coming in at >$600m we have the MAERSK XLE class of jack-up, with a design water depth of up to 492ft (150m) operating year round in the North Sea and legs 678ft in length (Image source:.. ) But even today, with 56 years of technological advances in jack-up design, achieving these water depths doesn t come cheap. Or would something smaller, more flexible, more capable of reaching the parts other jack-ups cannot reach do a better job instead? So let s talk about reaching the parts other jackups cannot reach - 12
13 The Heron, 470ft Leg 13
14 And how a Heron, rather than a super-sized Gorilla might represent the next step in jack-up evolution. With a nod to the super Gorillas, the brave and bold Terns and the Scyllas, the installation of foundations, towers and turbines is already well catered for within the jack-up market. But when it comes to the maintenance of these same towers and turbines is bigger really better? The super jack-ups are limited in supply, pressures on demand will push their day rates higher. Do you want to pay for more when less will do? On the other hand, the Heron is purpose built to meet the maintenance needs of offshore wind. Image source: CDC 14
15 With cantilever Up to 400ft WD 470ft Leg 15
16 If you do need an installation vessel, for smaller turbines, in developing markets our Chameleon variant will do the trick Image source: CDC 16
17 The Heron, 470ft Leg 17
18 But for maintenance, the Heron, with its second elevating deck is the only jack-up, in fact the only support vessel capable of providing walk-to-work environment at nacelle height. As well as reaching the parts other jack-ups cannot reach, the Heron overcomes many of the constraints due to weather and sea conditions experienced by other support vessels. There s no bump and jump here. With an ability to operate in greater wind speeds than large boom cranes and greater wave heights than barges your window for planned maintenance is no longer confined to just the summer months. Imagine being able to provide controlled conditions for inspection and repair safety is increased, planned operations are no longer at the mercy of the weather and your costs are reduced. The Heron is purpose built for providing heavy maintenance. Gearbox, generator and blade repair and maintenance can all take place without the need to wait on or pay for a more expensive crane barge. In fact blade repair and maintenance can take place on foot with the Heron second deck providing a safer working environment by replacing the need for rope access. Capable of handling up to 250 tons more than enough t handle the gearbox, generator or blades of even the largest turbines you re no longer reliant on the services or associated costs of, the large boom cranes. And with the second extending deck providing a safer working environment, you can eliminate the need for, the risks of and the cost of helicopter services. In fact, with he ability to scan blades with an industrial MRI, rather than a hand held device, inspection and repair will become more proactive, reducing the likelihood 18 and cost of forced outage
19 The Heron is purpose built to provide in-field central accommodation. As more wind turbine generators are developed further offshore, you know more offshore maintenance strategies will be required. The Heron can house >120 personal on a stable non-moving platform. Its daughter craft enables the in-field servicing of local turbines while the vessel itself attends to heavier scheduled or unscheduled activities. The Heron is a self propelled DP2 jack-up designed to MODU class. It has lots of wind related letters after its name. The MODU class extends its competitiveness and its market appeal, allowing the Heron to step over to work in the oil & gas sector. It was designed specifically with offshore wind in mind. It was designed specifically to meet your operation and maintenance needs. And we believe it offers the next successful step in jack-up evolution. My colleagues are handing out brochures, please take one. And if you have any questions, we d be delighted to answer them. Thank you. Image source: CDC 19
Offshore Service Vessels for Wind Farming. BALTEXPO 2011, September 2011
Offshore Service Vessels for Wind Farming BALTEXPO 2011, September 2011 Agenda 1. Market Outlook and Vessel Prognosis 2. Design Concepts Wind Turbine Installation Ships 3. Rules and Regulations 4. Maintenance
More informationSite-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments
OIL & GAS Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments Noble Denton marine services Mike White 1 SAFER, SMARTER, GREENER Overview What are we talking
More informationWind Turbine Installation Vessels
Oil & Gas Wind Turbine Installation Vessels Presentation for IMCA Copenhagen Meeting Richard Stonor / Mark Hayward 1 IMCA 14 June - Wind 2016 Installation Vessels SAFER, SMARTER, GREENER Opening comments
More informationAssessment and operation of Wind Turbine Installation Vessels.
Noble Denton Marine Services Assessment and operation of Wind Turbine Installation Vessels. Risk reduction through implementation of good practice recommendations Mark Hayward 24 January 2017 1 DNV GL
More informationA DECADE OF EXPERIENCE
SEA INSTALLER Efficient and cost-effective A DECADE OF EXPERIENCE SEA INSTALLER reflects more DECK than a decade of experience in SEA INSTALLER's deck measures 3,350 m2 The deck is reinforced and can carry
More informationMinimal Structures for Marginal Nova Scotia Developments
Minimal Structures for Marginal Nova Scotia Developments May 12, 2009 Cameron Dunn Martec is a member of the Lloyd s Register Group 1 2 Minimal Structures Project NSDOE working to make the Nova Scotia
More informationNational Maritime Center
National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 12 Choose the best answer to the following Multiple Choice Questions. 1. What class of bulkhead is required around
More informationChallenges in Ship Design to Maintain Thrusters inside Ship
DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Thrusters Challenges in Ship Design to Maintain Thrusters inside Ship Tom Nylund and Timo Rintala Beacon Finland 1 DP Conference - Challenges in Ship Design
More informationInnovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.
Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)
More informationOffshore Wind Vessels. Steven Kopits Douglas-Westwood LLC
Offshore Wind Vessels Steven Kopits Douglas-Westwood LLC Offshore Wind: Removing Market Barriers DOE Webinar July 25, 2012 1 www.dw-1.com Our business History and Office Locations Established 1990 Aberdeen,
More informationA2SEA corporate presentation. Søren Rønnow Poulsen Key Account Manager, Scandinacia & Baltic
A2SEA corporate presentation Søren Rønnow Poulsen Key Account Manager, Scandinacia & Baltic Who we are Introducing A2SEA Founded in 2000 Owned by DONG Energy (51%) and Siemens Wind Power (49%) Owns 67%
More informationCHAPTER 6 OFFSHORE OPERATIONS
CHAPTER 6 OFFSHORE OPERATIONS I. GENERAL It is very important that all personnel who will be working offshore be thoroughly familiar with the provisions of this section of the Company's. All rules and
More informationFAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5
FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5 MAIN PARTICULARS LENGTH OVER ALL 60.68 m LENGTH WATER LINE 59.35 m BREADTH MAX 20.80 m DRAUGHT MAX 3.10 m DEPTH 6.70 m MAX SPEED 37.0 knots @
More informationTRACK RECORD SEP. 2018
TRACK RECORD SEP. 2018 TABLE OF CONTENTS 1 INTRODUCTION... 3 2 MOTION COMPENSATED GANGWAY... 5 2.1 In operation at Walney Extension... 6 2.2 In operation at Borkum Riffgrund II... 7 3 MOTION COMPENSATED
More informationGERMAN RENEWABLE SHIPBROKERS S GERMAN RENEWABLE VESSEL PORTFOLIO ANY VESSEL ANYTIME
GERMAN VESSEL PORTFOLIO ANY VESSEL ANYTIME YOU THINK OFFSHORE WE FOLLOW YOUR THOUGHTS! A vessel for construction works at sea? An installation vessel for wind turbine generators or a sale and purchase
More informationLNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN
LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;
More informationRisk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico
Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico Lew Dennis Decommissioning Manager Chevron Gulf of Mexico Business Unit 1 Key Messages Focusing on Risk Reduction in Decommissioning
More informationFire and Safety for Offshore drilling and production Ajey Walavalkar ANSYS Inc.
Fire and Safety for Offshore drilling and production Ajey Walavalkar ANSYS Inc. 1 ANSYS, Inc. September 12, Fire and safety related applications Gas Dispersion and Ventilation Formation of combustible
More informationTaking Safety & Professionalism to New Heights!
Taking Safety & Professionalism to New Heights! www.megarme.com A Brief History of Industrial Rope Access Originally imported to the UK from France in the mid - 1980 s Rope Access techniques rapidly gained
More informationDesign of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras
(Refer Slide Time: 00:32) Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 1 Concepts of Fixed Offshore Platform
More informationOFFSHORE WIND: A CRASH COURSE
OFFSHORE WIND: A CRASH COURSE OFFSHORE WIND: DEFINED OFFSHORE WIND: Construction of wind farms in bodies of water to generate electricity from wind. Unlike the typical usage of the term offshore in the
More informationTHE ROLE OF INSTALLATION AND SUPPORT VESSELS
THE ROLE OF INSTALLATION AND SUPPORT VESSELS Ulstein - Offshore wind in Taiwan - 9-12 April 2018 Gunnar Haug, Ulstein Asia Pte Ltd OFFSHORE WIND FARM DEVELOPMENT OFFSHORE WIND EVOLUTION INSTALLATION VESSELS
More informationBuscas una profesión con futuro?
Buscas una profesión con futuro? Guide for the use of ropes in vertical work Produced by: Spanish Wind Energy Association AEE recommendations Year 2014 Index Pg. 1. Background 3 2. Objective 4 3. Justifying
More information10/18/2010. Wind Energy: Agenda. Introduction Wind Industry Wind Turbines Wind Industry Challenges Crawler Cranes
Wind Energy: challenges for the lifting i industry Scott Sanders Manitowoc Cranes Aviad Shapira Technion Israel Institute of Technology Agenda Introduction Wind Industry Wind Turbines Wind Industry Challenges
More informationWind Turbine Shuttle. Ferdinand van Heerd
Wind Turbine Shuttle Ferdinand van Heerd Contents Introduction Concept Resistance Seakeeping Vessel motion compensation system Hoisting motion compensation system Landing the wind turbine Workability Efficiency
More informationExamining the merits of jack up platforms as foundations for the offshore wind industry
Examining the merits of jack up platforms as foundations for the offshore wind industry By 20 May 2011 1 ABSTRACT A new type of offshore wind foundation has emerged from the offshore oil fields and is
More informationOVERVIEW. Capabilities & Services
+1.713.467.0505 Sales@boamarine.com www.boamarine.com OVERVIEW Capabilities & Services BOA MARINE SERVICES provides engineering, construction and contracting services related to fi xed and fl oating offshore
More informationBarging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab
REQUIRED READING FOR THE GLOBAL OIL AND GAS INDUSTRY SINCE 1975 www.offshore-engineer.com NOVEMBER 2005 Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab Barging in on Trent PLUS:
More informationWind Energy 101 for Southeastern Policy Makers Overview of Wind Energy Development and Potential in the US
Wind Energy 101 for Southeastern Policy Makers Overview of Wind Energy Development and Potential in the US Jim Doane, Senior Engineer March 2012, Charlotte, North Carolina, USA Agenda Introduction to PMSS
More informationHurricane IVAN Lessons Learned Energy Loss Adjusters Perspective. Bryan C. Johnson
Hurricane IVAN Lessons Learned Energy Loss Adjusters Perspective Bryan C. Johnson I. Lessons Learned - Adjustment Process II. Lessons Learned - The Storm Lessons Learned - Adjustment Process Issues Regarding
More informationVirginia Offshore Wind Advanced Technology Demonstration Program and Test Pad Sites
Virginia Offshore Wind Advanced Technology Demonstration Program and Test Pad Sites Briefing to Virginia Offshore Wind Development Authority Richmond, VA 08 December 2011 George Hagerman VCERC Director
More informationTechnology and innovation challenges for UK Offshore Wind Energy Andrew Scott
Technology and innovation challenges for UK Offshore Wind Energy Andrew Scott Offshore Wind Operations/Science Meets Industry, Bergen 2013 10 September 2013 2013 Energy Technologies Institute LLP The information
More informationDONGE FLUSHING YARD. This combination of using and constructing equipment improves the quality of our products since 25 years.
DONGE FLUSHING YARD Introduction: Donge Flushing Yard (DFY) designs and constructs dredging and port equipment. DFY has developed 6 major standard product-types. Macon Charter, a sister company, charters
More informationV MW Offshore leadership
V120-4.5 MW Offshore leadership OptiSpeed allows the rotor speed to vary within a range of approximately 60 per cent in relation to nominal rpm. Thus with OptiSpeed, the rotor speed can vary by as much
More informationRPSEA UDW Forum June 22 & 23, Secure Energy for America
RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors
More informationNOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1
Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 RIG TYPES Land rigs in 2012... total (approx) 3200 Jack Up,... in 2012... total (approx) 485 units 300 * in drilling mode 130 for WD > 350 ft Floaters,...
More informationWIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE
WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE HUTTLE TABLE OF CONTENTS 01 DESCRIPTION 03 1.1 Vessel General 03 1. Purpose of the Vessel 0 1.3 High Workability 0 1. Installation Scenarios 05
More informationOFFSHORE WIND ACCELERATOR (OWA) Access Competition. Competition Overview and Technical Specification
OFFSHORE WIND ACCELERATOR (OWA) Access Competition Competition Overview and Technical Specification In partnership with In collaboration with Supported by Version 1.0. Wednesday 29 September 2010. Offshore
More informationDesign of Offshore Structures Prof. Dr. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras
Design of Offshore Structures Prof. Dr. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 2 Concept of Fixed Offshore Platform Deck and Jacket 2
More informationOFFSHORE CRANES & ACCESS SYSTEMS
OFFSHORE CRANES & ACCESS SYSTEMS DEMANDING CONDITIONS EXCEPTIONAL SOLUTIONS EFFECTIVE TAILOR-MADE EQUIPMENT FOR ALL INSTALLATION TYPES 2 With over 300 offshore cranes and hoisting systems installed on
More informationHelideck Limitations List (HLL)
HELIDECK LIMITATIONS LIST PART A 1) INTRODUCTION Under the Air Navigation Order (ANO) UK helicopter operators are responsible for ensuring that helidecks to which they fly are fit for purpose. Installation
More informationINNOVATIVE MOORING SYSTEMS
INNOVATIVE MOORING SYSTEMS VESSEL AUTOMOORING MODULES QUAY AUTOMOORING INSTALLATIONS DOCKLOCK brings mooring to a next level PAGE 2 FOR OVER A CENTURY THE WORLD S LEADING EXPERT IN MOORING, BERTHING AND
More information35 years of unparalleled support to the offshore oil and gas industry.
35 years of unparalleled support to the offshore oil and gas industry. Offshore Construction Commercial Diving Cable Laying Remotely Operated Vehicles (ROV s) Marine Services I.R.M. ABOUT US CCC (Underwater
More informationFocus on Operational Efficiency and Crew Safety - Introducing Advanced ROV Technology in Marine Towed Streamer Seismic
Focus on Operational Efficiency and Crew Safety - Introducing Advanced ROV Technology in Marine Towed Streamer Seismic R. Tonnessen* (Petroleum Geo-Services) & T. Skadberg (Petroleum Geo- Services) SUMMARY
More informationDynamic Positioning Control Augmentation for Jack-up Vessels
DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Design and Control Session Dynamic Positioning Control Augmentation for Jack-up Vessels By Bradley Deghuee L-3 Communications 1 Introduction Specialized
More informationMUMBAI HIGH INCIDENT AND REGULATORY PROGRESS SINCE
MUMBAI HIGH INCIDENT AND REGULATORY PROGRESS SINCE J.B.VERMA EXECUTIVE DIRECTOR OISD, INDIA OISD Oil Industry Safety Directorate Introduction Established in 1986 Technical Department under MOP&NG for HSE
More informationEntry Level Requirements and Basic Introductory Course Outline for New Remotely Operated Vehicle (ROV) Personnel
AB Entry Level Requirements and Basic Introductory Course Outline for New Remotely Operated Vehicle (ROV) Personnel International Marine Contractors Association www.imca-int.com IMCA R 002 Rev. 2 May 2009
More informationExperience with the design, manufacture, test and commercialisation of the REpower 6M turbine
Experience with the design, manufacture, test and commercialisation of the REpower 6M turbine UK Offshore Wind Danish Embassy in London 4th of December 2012 Norbert Giese, REpower Systems SE REpower founded
More informationPolar Research Vessel Operational Requirements and Summary of Technical Studies
Polar Research Vessel Operational Requirements and Summary of Technical Studies Presentation to UNOLS by Jim St John Science and Technology Corporation - Polar Technology Office Why a New Antarctic Research
More informationDESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)
DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project) Presented by: Tomasz Płotka - StoGda 0. StoGda Ship Design & Engineering Ltd Beginning of the StoGda Ship Design
More informationWhich Asset Classes to Invest In and When to Do It. OSVs vs MODUs: Forecasts for utilization, day rate development & asset values
Which Asset Classes to Invest In and When to Do It OSVs vs MODUs: Forecasts for utilization, day rate development & asset values James Frew- Maritime Strategies International (MSI) Marine Money Offshore
More informationApplication of rope access methods in the construction, inspection, repair and maintenance of wind turbines
Application of rope access methods in the construction, inspection, repair and maintenance of wind turbines Introduction IRATA International s rope access system is a safe method of working at height,
More informationOFFSHORE WIND JAPAN & JAPANS FIRST SELF-PROPELLED JACK-UP
OFFSHORE WIND JAPAN & JAPANS FIRST SELF-PROPELLED JACK-UP HHWE NIEUWJAARSBIJEENKOMST, 19 JANUARI 2017 By: Jan-Mark Meeuwisse OUR REFERENCES IN WIND No. Name Series Owner Year 1 WIND NG-600 DDB/Ziton 1995
More informationTARPON A Minimal Facilities Platform
TARPON A Minimal Facilities Platform Contents Introduction TARPON Description TARPON Features TARPON Benefits TARPON Proofs TARPON Typical Installation Options Design Codes & Certification Novel Application
More informationMooring Systems for Yachts
Product Presentation Mooring Systems for Yachts DualDocker GmbH Gewerbegebiet Nord 6 5222 Munderfing AUSTRIA www.dualdocker.com Problem Conventional Mooring Systems Heavy, dirty mooring ropes Inefficient
More informationDECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017
DECOMMISSIONING Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017 FEELINGS AGENDA BACKGROUND THE VESSEL THE FUNCTIONS PARTNERS BACKGROUND BACKGROUND BACKGROUND OLSO PARIS CONVENTION
More informationCapt. Daley's Sea Stories
Capt. Daley's Sea Stories M/V Ken C Tamblyn Equatorial Guinea, Africa 3 September 2010 The Ken C Tamblyn is a VSO-480 chartered by Baker Hughes to perform frac jobs on offshore wells. A well is frac d
More informationUPWIND Light wind: <8 knots Sail Setting
UPWIND Since the Laser is a strictly one designed class with very few controls, upwind sailing becomes very physical and technical. Big efforts will only result in little gains in your upwind speed. However,
More informationThe Great Eastern Shipping Co. Ltd. Debt Investors Meet September 2016
The Great Eastern Shipping Co. Ltd. Debt Investors Meet September 2016 Corporate Profile The Great Eastern Shipping Company Shipping (Bulk) Offshore (Through wholly-owned subsidiary Greatship (India) Limited)
More informationAlstom Ocean Energy Path towards Industrailsation. Ken Street 18 th April 2013
Alstom Ocean Energy Path towards Industrailsation Ken Street 18 th April 2013 Three main activities in four Sectors Equipment & services for power generation Equipment & services for rail transport ALSTOM
More informationPile Gripper Systems
Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +
More informationDevelopmental Products
Types of Ropes Courses Developmental Products Contents Types of Developmental Ropes Courses Page RCD Developmental Elements 2-3 RCD Linear Ropes Course 4-6 RCD All in One Ropes Course 7-9 RC D Free Standing
More informationSite-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations
OIL & GAS Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations Noble Denton marine services Mike White 1 SAFER, SMARTER, GREENER Overview Review of several incidents:
More informationG9 Offshore wind health and safety association
G9 Offshore wind health and safety association 2013 annual incident data report www.g9offshorewind.com About the G9 Offshore wind health and safety association The primary aim of the G9 is to deliver world
More informationG+ Global offshore wind health and safety organisation
G+ Global offshore wind health and safety organisation 2016 incident data report www.gplusoffshorewind.com About the G+ Global offshore wind health and safety organisation The primary aim of the G+ is
More informationType 093B Assessment Christopher P. Carlson 13 April 2018
Type 093B Assessment Christopher P. Carlson 13 April 2018 Type 093B Key Judgments u Since the lead hull was rolled out in 2002, there are six, possibly seven, units within three subclasses. Two Type 093
More informationNorway s solution: Hywind- world s first full scale floating turbine Dr. Nenad Keseric Asset Manager/Specialist Statoil ASA MPR RE Operations
Norway s solution: Hywind- world s first full scale floating turbine Dr. Nenad Keseric Asset Manager/Specialist Statoil ASA MPR RE Operations Strategy and Support Leveraging Statoil s offshore oil and
More informationMARINE SECURITY OPERATIONS BULLETIN
MARINE SECURITY OPERATIONS BULLETIN File number: 4303-1 No: 2017-001 APPLYING PLACE OUTSIDE OF CANADA AND INTERFACE AS DESCRIBED IN THE MARINE TRANSPORTATION SECURITY REGULATIONS PURPOSE The purpose of
More informationV MW. Exceptional performance and reliability at high-wind-speed sites. vestas.com
V90-3.0 MW Exceptional performance and reliability at high-wind-speed sites vestas.com We deliver on the promise of wind power SUPERIOR YIELD AT HIGH-WIND-SPEED SITES High standards for weight and performance
More informationSAFETY AND RESCUE TRAINING FOR HIGH-HAZARD ENVIRONMENTS
SAFETY AND RESCUE TRAINING FOR HIGH-HAZARD ENVIRONMENTS SAFETY TRAINING Confined Space Fall Protection Excavation/Trench Forklift/Telehandler RESCUE TRAINING Confined Space Rescue Tower Rescue Surface
More information2016 Range Overview. Summer
2016 Range Overview Summer 15 Windsurfing Sails Fringe - Wave 3 batten FRINGE 3 batten maneuver wave sail SIZE BOOM LUFF MAST adjustable top* RDM 3.0 134 337* 310 or 340 3.3 138 348* 340 3.5 141 357* 340
More informationQuicker and Safer Deployment of Deepwater MODU Moorings.
Quicker and Safer Deployment of Deepwater MODU Moorings www.offspringinternational.com Deepwater MODU Mooring Deepwater exploration increasing further offshore Deeper moorings over 7,000ft Larger MODUs
More informationIntroduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc
DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc Presented at OMAE, New Orleans, February 2000 Introduction Characteristics
More informationHywind. Deep offshore wind operational experience. Finn Gunnar Nielsen, Statoil RDI
Hywind. Deep offshore wind operational experience. Finn Gunnar Nielsen, Statoil RDI The starting point -2001 Inspired by floating sailing marks. Seawind matured during 2002 Tong, K.C. OWEMES seminar, Atena,
More informationA NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING
A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING By Marian Copilet, Durham Pipeline Technology Ltd., Gateshead, UK & Prof. Ernie Appleton, University of Durham 1. ABSTRACT This paper discusses
More informationA Professional Commercial Diving & Marine contractor. Tel :
A Professional Commercial Diving & Marine contractor. Tel : +65 68982561 Introducing - DIVE SQUAD PTE. LTD. A revolutionary Commercial diving company to cater to your fleet s underwater works and maintenance.
More informationOIL & GAS OPTIMIZATION OF AN OFFSHORE PLATFORM ORIENTATION
OIL & GAS OPTIMIZATION OF AN OFFSHORE PLATFORM ORIENTATION 34 OPTIMIZATION OF AN OFFSHORE PLATFORM ORIENTATION OIL & GAS A FUNCTIONAL METHOD FOR THE OPTIMIZATION OF A TENSION LEG OFFSHORE PLATFORM ORIENTATION
More informationOffshore Pipeline Installation SEABED INTERVENTION THE GAME-CHANGING EFFECT DISRUPTION TO HEAVY LIFTING HOW DO YOU MAKE THE SEABED?
OSI 2016 VOLUME 9 ISSUE 1 OSI VOL. 9 ISSUE 1 2016 i n d u s t r y DECOMMISSIONING THE GAME-CHANGING EFFECT DISRUPTION TO HEAVY LIFTING OFFSHORE-INDUSTRY.EU SEABED INTERVENTION HOW DO YOU MAKE THE SEABED?
More informationOffshore wind power in the Baltic sea
Offshore wind power in the Baltic sea Conditions for profitability Henrik Malmberg 2014-09-27 Content BACKGROUND... 2 PURPOSE... 2 ABOUT THE AUTHOR... 2 RELEVANT ISSUES... 3 WIND CONDITIONS AND ENERGY
More informationCourses for the Wind Turbine Industry:
Courses for the Wind Turbine Industry: Basic Technical Training, Basic Safety Training according to GWO s standards and an overview of Rescue Center Denmark s offers to the industry. Approved by DNV-GL
More informationThat is why. April 24, 2008
That is why Page 1 Our Vision: Wind, Oil and Gas Page 2 Our Product R&D and manufacture Assembly and testing Sales and planning Transport Installation Maintenance A 100% focused value chain Producing turbines
More informationThe Impact of Composites on Future Deepwater Riser Configurations
The Impact of Composites on Future Deepwater Riser Configurations Thomas Brown 2H Offshore Engineering Ltd NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Deepwater Riser Technology Today s deepwater
More informationLiebherr Top Technology. Cranes for Wind Power
Liebherr Top Technology Cranes for Wind Power 5 concepts for the wind power Liebherr offers optimized crane concepts for the most diverse situations and requirements for the erection of wind s for highest
More informationKetchikan Harbors Thomas Basin and Bar Point Harbor
Ketchikan Harbors Thomas Basin and Bar Point Harbor Condition of Improvements 30 December 2014 Thomas Basin & Bar Point Harbors Ketchikan, Alaska (CWIS No. 000631 & 087071) Authorization (1) Rivers and
More informationBUCCANEER ALASKA OPERATIONS, LLC. BUCCANEER ALASKA OPERATIONS, LLC Cook Inlet Exploratory Drilling Program. Community Outreach: KPB Assembly
Community Outreach: KPB Assembly Agenda 1. Project Overview 2. 3. Waste Management 4. Environmental Management 5. Permits Required & Processing Schedule Processing 6. Q & A / Agency Feedback 2 Project
More informationWindar Photonics Wind Sensor. Great at Control
Windar Photonics Wind Sensor Version 1.0 2012 Contents Imagine Being Able to Predict the Wind 5-6 Wind Sensors in a New Light 7-8 You Harvest the Wind Better from the Top 9-10 Result of a Bright Idea 11-12
More informationINCREASE OPERATING DAYS ENHANCE DECK SAFETY AND SPEED MINIMIZE SEA SICKNESS HEAVY DUTY GYROSTABILIZERS FOR COMMERCIAL & DEFENCE APPLICATIONS
LESS MOTION MORE OCEAN HEAVY DUTY GYROSTABILIZERS FOR COMMERCIAL & DEFENCE APPLICATIONS INCREASE OPERATING DAYS ENHANCE DECK SAFETY AND SPEED MINIMIZE SEA SICKNESS 2 VEEM Gyro DEFENCE Image courtesy of
More informationThe Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd
The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer
More informationFPSO Riser Solutions for Harsh environments
FPSO Riser Solutions for Harsh environments Hanh Ha and Hugh Howells AOG Perth, March 2015 Overview Design challenges Flexibles Configurations and response Mild Environment Riser Harsh Environment Riser
More informationOPERATION & MAINTENANCE
OPERATION & MAINTENANCE Gerard van Bussel section Wind Energy Typical contribution to energy cost O & M 23% Decommissioning 3% Investment 74% O & M 25-30% Investment & Decommissioning ~ 75 % Opti-OWECS
More informationNorth Sea,
(RDM-collectie Johan Journée) John s Homepage by John H. Mitchell North Sea, 1974-1976 http://home.earthlink.net/~john280z/photos81.htm Note: These photos are scanned-in 30 year old photos, not 100% quality.
More informationThe impact of different means of transport on the operation and maintenance strategy for offshore wind farms
The impact of different means of transport on the operation and maintenance strategy for offshore wind farms W.A.A.M. Bierbooms, M Sc.; G.J.W. van Bussel, PhD * Section Wind Energy, Faculty Civil Engineering
More informationTITAN 200 OFFSHORE SUBSTRUCTURE FOR WIND TURBINES
TITAN 200 OFFSHORE SUBSTRUCTURE FOR WIND TURBINES 5/6/2014 Concept of Operations (Preliminary) Offshore wind farms are becoming increasingly more difficult to install employing larger wind turbines, moving
More informationPROVEN, RELIABLE PRODUCTS FROM A TRUSTED PARTNER Samson Heavy-Lift Slings
PROVEN, RELIABLE PRODUCTS FROM A TRUSTED PARTNER Samson Heavy-Lift Slings SAMSON HEAVY-LIFT SLINGS TESTED AND PROVEN TECHNICALLY SOUND Samson s R&D department has performed comprehensive testing of sling
More informationBoatWasher Swede, , MS Float
BoatWasher Swede, 400-600, MS Float Cleans the hull from algea, barnacles and other fouling. Cleans both motor- and sailing yachts. Three sizes of washers fits most boat types, up to approximate 25-meter
More informationWind Loads On Offshore Structures Marin
We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with wind loads on offshore
More informationLoss Control Strategies for Lifeguards Atlantic County Municipal Joint Insurance Fund. June 28, 2016 Ocean City, New Jersey
Loss Control Strategies for Lifeguards Atlantic County Municipal Joint Insurance Fund June 28, 2016 Ocean City, New Jersey In honor of Honolulu (HI) Firefighter Clifford Rigsbee June 17, 2016 Firefighter
More informationRemote Operated Bulldozer system tackles B.C. s steep slopes
Remote Operated Bulldozer system tackles B.C. s steep slopes Island Pacific Logging has been using the steep slope Remote Operated Bulldozer (ROB) winch assist system developed in New Zealand on Vancouver
More informationAPPROVED MAIN COURSES
Training in ORP - Wind Sector - Preparation of customised courses for our customers. Delivery of these, and our own and specific courses under the Global Wind Organisation (GWO) Standard Preparation Delivery
More informationOMAE Large Marine Lifts in Shallow Water by Alan P. Crowle CB&I
Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands OMAE2011-49168 Large Marine Lifts in Shallow Water
More information