NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

Size: px
Start display at page:

Download "NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1"

Transcription

1 Presentation JB AG JCN JR 1

2 Kicks & blowouts A kick is an unexpected influx into a well of a formation fluid. Should this influx be uncontrolled during its way from the bottom of the hole up in the open hole or -- when at surface, an internal or a surface blowout will occur. Blowout: is an incident where formation fluid flows out of the well or between formation layers after all the predefined technical well barriers or the activation of the same have failed. Presentation JB AG JCN JR 3

3 Kicks & blowouts occurrences When. - in exploration / appraisal drilling activities many geological and technical uncertainties leading to higher risks, - in workover activities risks of release of hydrocarbons during removal or installation of surface wellhead or BOP equipment. Presentation JB AG JCN JR 4

4 Source SINTEF - period Presentation JB AG JCN JR 5

5 Kicks & blowouts occurrences some figures 34% are surface blowouts 66% are underground blowouts, 60% of occurrence while drilling, 27% while completion/wo, (8% during production, 5% others) Expenses associated with a blowout can reach several million of US$, Expenses for well control, costs for pollution control and containment measures, losses of facilities, penalties, fines... and tragedies, people can be killed. Presentation JB AG JCN JR 6

6 Blowouts. Surface blowout or blowouts Onshore or by mid-waters ( drilling wellheads with BOP s above waters) BOP s are easily accessible. Subsea blowouts Offshore, with subsea wellhead and BOP s ; BOP s are not easily accessible! Shallow gas blowouts A shallow gas blowout is difficult (or impossible ) to control; it may result in losses of lives and loss of the rig/platform; all effort must be made to divert the flow away from the rig: use of diverter and diverter lines Underground blowouts Uncontrolled flow of formation fluids from a high pressure zone into a lower pressure zone; the direction of fluid flow (up or downwards) is an important concern when choosing a control procedure. Presentation JB AG JCN JR 7

7 Presentation JB AG JCN JR 8

8 KICKS & BLOWOUTS - Generalities Semi-submersible Actinia blowout shallow gas Vietnam CADRE DRILLING HAZARDS: shallow gas Presentation JB AG JCN JR 9

9 Presentation JB AG JCN JR 10

10 Presentation JB AG JCN JR 11

11 Nowadays blowouts are major catastrophic events Nowadays blowouts are major catastrophic events Presentation JB AG JCN JR 12

12 Presentation JB AG JCN JR 13

13 BLOWOUTS & Well Engineering Studies OVERVIEW OF MAIN WELL ENGINEERING STUDIES AND TASKS for. Environment studies Max expected surface pressure and well data collection WP of well control equipment,. Mud studies & program Drilling engineering Pore pressure prediction Fracture pressure prediction Well completion studies * Cement: for. studies & program Well control procedures, Internal blowout prevention Casing., wellhead design WELL DRILLING PROGRAMME Well test program Well abandon: program Casing setting depth selection Rock mechanic studies Drilling for. bit program Well control procedures, Internal blowout prevention Drillstring. design Contingency plan (incld. BOCP) Drilling progress curve Well profile (deviation, hole & casing size) Well Collision Avoidance Rig sizing and selection Cost / budget - AFE ** * complulsory for developt well ** Authorisation For Expenditures Presentation JB AG JCN JR 14

14 BLOWOUTS & Well Engineering Studies Mud studies & program Drilling engineering First safety barrier OVERVIEW OF MAIN WELL ENGINEERING STUDIES Impact AND of TASKS mud type on kick detection Environment studies hydrates and well data collection Pore pressure prediction Fracture pressure prediction Well completion studies * Casing setting depth selection Rock mechanic studies Well profile (deviation, hole & casing size) Cement: studies & program Casing, wellhead design Drilling bit program Drillstring design Rig sizing and selection Cement = one safety barrier. WELL DRILLING PROGRAMME Well test program Casing: burst resistance Well abandon: program. Contingency plan (incld. BOCP) Drilling progress curve Selection of BOP WP. Cost / budget - AFE ** * complulsory for developt well ** Authorisation For Expenditures Presentation JB AG JCN JR 15

15 BLOWOUTS & Well Engineering Studies OVERVIEW OF MAIN WELL ENGINEERING STUDIES AND TASKS Environment studies and well data collection Mud studies & program Drilling engineering Pore pressure prediction Fracture pressure prediction Well completion studies * Casing setting depth selection Rock mechanic studies Cement: studies & program Casing, wellhead design All BOP data are needed (capping,.) Drilling bit program Drillstring design WELL DRILLING PROGRAMME Well test program Well abandon: program Contingency plan (incld. BOCP) Drilling progress curve Well profile (deviation, hole & casing size) Rig sizing and selection Cost / budget - AFE ** * complulsory for developt well ** Authorisation For Expenditures Presentation JB AG JCN JR 16

16 Typical circuit of the influx while controlling the well Drillpipe In-hole Pipe rams closed Influx (kick) returns In the annulus Presentation JB AG JCN JR 17

17 Well shut-in: pressures in the well Surface pressure 0 psi psi 0 critical casing press.? ft Casing shoe critical EMW 33 ppg! ft Gas influx Fracturation will occur in open hole Bottom Hole Pressure psi psi psi Equivalent Mud Density at bottom 11 ppg 16.5 ppg 22 ppg! Presentation JB AG JCN JR 20

18 Well kick control: principles (1/2) Initial pressure regimes (well shut in) DP pressure = Pt1 Initial MW = di (known) Annulus press. = Pa1 Pt1 = reference pressure indication for calculation D = well vertical depth, Coeff. = depends on units, di > da Initial mud + Influx = da ( unknown ) P = coeff *D * di + Pt1 = P =coeff * D * da + Pa1 Formation pore press. ( > coeff* D*di ) Presentation JB AG JCN JR 22

19 Well kick control: principles (2/2) Circulating pressure for well control = P1 = Pc1 * + Pt1 + S Annulus press. Pa = Pa1 + S Note: circulating pressure to be maintained if no change of the initial MW, di choke Pressure regimes (starting well control) * Pc1 = circulating pressure measured at reduced flow rate P = coeff *D * di + Pt 1 + S = P= coeff * D * da + Pa1+ S Formation pore press. Presentation JB AG JCN JR 23

20 Drilling conditions Well Control Procedures in progress BOP BOP closed P ann = 0 P ann P ann P ann MAASP max MAASP max Ps max critical P frac P frac critical PR PR PR PR new mud weight Presentation JB AG JCN JR 24

21 WELL CONTROL: Principle & Methods Important data required prior initiating well control procedures: - drillstring geometry - hole geometry - mud density, - pump flow rate per stroke - pressure losses at low flow rates (kill-flow rates) for different well control mud circuits - fracturation pressure & weak points in the open hole - Surface to bit time at kill rate (in stroke and minutes) - Bit to surface time at kill rate (in stroke and minutes) - Maximum Allowable Annular Surface Pressure (MAASP) - Formula for calculating the kill mud density - Formula for calculating circulation pressures due to the effect of heavier mud WELL CONTROL SHEET Presentation JB AG JCN JR 25

22 The basic principle of well-control methods is to keep the bottomhole pressure (BHP) constant while circulating the fluid influx out of the well. The simplest method of doing this is to control the drillpipe pressure by running the pump at a constant rate and controlling the pressure by regulating the choke on the choke manifold Presentation JB AG JCN JR 28

23 SAFETY BARRIERS while drilling and workover operations. Associated well control barriers include drilling fluid, casing, cement, casing shoes, wellhead seals, blowout preventers (BOPs) and the interaction among all of them. Drilling and workover operations shall at all times be conducted with two barriers on each internal and external leak path, capable of operating independently and simultaneously and isolating potential hydrocarbon reservoir from the surface Two barriers are considered as independent if any incident considered in risk analysis cannot induce the loss of the two barriers simultaneously. Source / Illustrations: TOTAL Presentation JB AG JCN JR 29

24 Safety barriers External leak path WH seals Internal leak path BOP s WH seals mud mud * cement mud HC Drill pipe Cem. Equipt. Source / Illustrations: TOTAL Inside DP BOP Presentation Presentation JB AG JCN JB JR - 30

25 Safety barriers External Note: leak path Internal leak path When drilling deepwater wells, the percentage BOP s of drilling time WH seals rotating on bottom while drilling new hole is sometimes mud less than 20%. mud * WH seals It is important to understand that barriers can be impacted significantly during all well operations, not just drilling. cement mud HC Drill pipe Cem. Equipt. Source / Illustrations: TOTAL Inside DP BOP Presentation JB AG JCN JR 31

26 Filters for prevention Filters for protection Causes Loss of well control Swabbing Pore Press prediction Bad cementing. Engineering Procedures Equipment Personnel Consequences Soil instability Well collision Loss of rig stability Loss of well integrity Punch through Bad weather. Blowout Polution control equipt. Capping equipt. Pollution Fire, explosion Damages to wellheads. Presentation JB AG JCN JR 33

27 Drilling hazards blowout prevention -. before drilling operations = engineering studies,. Refer to casing architecture and casing design versus evaluation of formation pore pressure / evaluation of formation fracturation pressure / evaluation of maxi. acceptable surface pressure and set up of the proper BOP equipment. -. while drilling = procedures. permanent monitoring of mud volumes in circulation (gains or losses),. permanent monitoring of mud weight (and mud viscosity),. permanent monitoring of ROP: drilling breaks,. tests (and maintenance) well control equipment incld. BOP, choke manifold, inside-bop, (tests after each new installation and on regular basis (e.g. each week)),. training of rig-crews: regular kick drills to test rig-crews preparedness,. calculations for immediate application of pre-set procedures. Presentation JB AG JCN JR 35

28 Drilling hazards blowout prevention (contd.) - while tripping = procedures.. permanent monitoring of mud filling the hole when RIH or POOH,. training of rig-crews: regular kick drills to test rig-crews preparedness,. calculations for immediate application of pre-set procedures. Well control procedures imply an intensive use of the BOP. If a BOP failure occurs then the kick will be uncontrolled leading/meaning to/a blowout. Presentation JB AG JCN JR 36

29 Alerts or warnings - drilling breaks, - increase of mud level in the active mud tanks, - gas-cut mud or gas/oil shows, - changes in mud properties (chlorides, ), changes of shale densities, - light influx when circulation is stopped, - uncorrect filling of the hole while pulling-out-of hole the drillstring, - decrease in the mud pump discharge pressure. - information provided by MWD,LWD,PWD (gamma ray, resistivity, density, neutron, sonic). WHEN WARNING SIGNS ARISE, PERFORM THOROUGH ASSESSMENTS BEFORE MOVING ON. Presentation JB AG JCN JR 37

30 Overpressure detection Gas Readings Increasing ROP Source: TOTAL Presentation JB AG JCN JR 38

31 Other precautions.. - when drilling with oil-based mud, gas remains in solution as the fluid is circulated up the hole until the bubble point is reached; then a violent kick occurs as gas bursts out of solution in the upper portion of the hole (casing or drilling riser), - When drilling (HP/HT wells) some supercharging/balloning & well breathing effects must be detected to avoid confusion with a kick - When drilling high deviated wells (near horizontal), detection and behaviour of gas bubbles are of important concern. REMEMBER The probability of a well control problem may be low, but the consequences are high enough to justify considering all causes, warnings... Presentation JB AG JCN JR 39

32 Immediate corrective actions - CLOSE THE WELL: implementation by the driller of the well shut-in procedures, When applicable (kick during tripping): whenever possible, attempt to run the drillstring down hole, (stripping), - As soon as possible, implementation of well kick control method and procedures to evacuate the influx from the well bore, Ultime method: If necessary and possible, squeeze/bullhead the influx back into the formation. If an unforeseeable event occurs or if a BOP equipment failure occurs a blowout situation will be imminent; then activate immediately the Blowout Contingency Plan Presentation JB AG JCN JR 40

33 WELL CONTROL: Principle & Methods Some concerns about offshore well control procedures Conventional well control procedures applicable for land or shallow waters. Early kick detection: is necessary - to minimize the influx volume, and - because of the large expansion of gas in the drilling riser that can occur. Notes: - BOP positioned at mudline sometimes nearer to well TD than to surface! - Managed Pressure Drilling (MPD) techniques (equipment & procedures) can provide a precise and real time measurements for early kick-loss detection. Space out: the Driller must quickly determine the space out of the drillstring for closing rams. position of BOP elements (e.g. shear rams) relative to rig floor must be displayed on driller s panel. Hang-off procedures:?? 43 Presentation JB AG JCN JR 43

34 WELL CONTROL: Principle & Methods Some concerns about offshore well control procedures (contd.) Shut-In procedures: Soft or Hard shut-in procedures can be implemented. Whenever the well is shut-in, gas in the riser shall be considered as the first priority and diverted directly overboard. Driller s versus Wait and weight kill method:?? Riser margin: it is recommended (when applicable or if relevant ) to include a riser margin in the mud weight. Presentation JB AG JCN JR 44

35 WELL CONTROL: Principle & Methods Some concerns about offshore well control procedures (contd.) Long kill and choke lines: pressures losses in these lines ** are high even at low circulation rates; consequently MAASP is reduced. It is compulsory to measure all pressure losses at reduced flow rates through different sections of the mud flow paths. ( ** Potential use of choke and kill lines in well control circulation). BOP s: High shear rams capacity must be assessed due to high drillpipe specifications (grade and size). BOP response time: this is a key issue; All systems to operate the BOP s in emergency situations must be tested in due time. For offshore operations, special training courses for Rig Personnel and Office Engineers must be given. Presentation JB AG JCN JR 45

36 Main calculations. Maximum annulus pressure well shut-in and filled with gas == > to evaluate well equipment strength. MAASP * == > to avoid risk of fracturing the formation at the weak zone ( * Maximum Allowable Annulus Surface Pressure). Maximum casing pressure during the circulation of a gas kick with the initial mud weight == > evaluation of well equipment strength and maxi allowable kick volume. Maximum pressure at weak zone during the circulation of a gas kick with the initial mud weight = = > evaluation of maxi allowable kick volume at shut-in. Maximum allowable kick volume at shut-in == > to avoid risk of fracturing the formation at the weak zone. Quick evaluation of the influx pressure gradient = mud pressure gradient + (Pt1 Pa1) / h ( h = initial height of the influx in the annulus) Presentation JB AG JCN JR 50

37 Underground blowout flow outside the wellhead Catastrophic situation weak point Bad cementing job or, Weak point(s) in the openhole Initial too large influx, or driller s mishandling Presentation JB AG JCN JR 52

38 DRILLING HAZARDS Lusi mud flow Indonesia (may 2006) Source: photos M.Tingay and Channel 9, may 2007 Presentation JB AG JCN JR 53

39 Results / consequences of. - Engineering works? (questionable casing-setting-depth design? ) - Operational human error? - External events? Presentation JB AG JCN JR 54

40 Underground blowout (internal blowout) Tubing failure (leak) weak point HP zone loss zone or depleted zone! packer Presentation JB AG JCN JR 55

41 Underground blowout (internal blowout) Such blowouts are catastrophic as they can lead to - the loss of the well, - new hazards when drilling wells in the vicinity, - subsurface / internal contamination between reservoir layers,. Precaution first preventing measures: - perform engineering tasks === > casing point selection, - update blowout prevention data sheets, - perform regularly kick drills, - evaluate, as necessary, cement bond behind casing after cementing job, - check casing/tubing integrity tests as necessary ( before DST), Presentation JB AG JCN JR 56

42 BLOWOUT - WELL CONTROL Whenever an exploration well is planned, the drilling team must prepare a Blowout Contingency Plan. Such plan, to list actions to be taken for the safeguard of the People, the environment and the assets; to list all updated contacts for assistance. A special team blowout task force is mobilised with all competencies (geoscientist, reservoir, drilling, logistics, contract Engineers) as soon as possible. At the same time - relief well(s) will be engineered; rig(s), special directional drilling equipment, pumping means will be located and/or mobilized - fire-fighters Specialists (*) will be mobilised together with their equipment for well killing and/or well capping ( * Wild Well Control, Boots & Coots, Cudd, West, John Wright Co, Red Adair) Presentation JB AG JCN JR 59

43 ONSHORE / OFFSHORE BLOWOUTS RELIEF WELLS Source / Illustrations: Wild Well control Presentation JB AG JCN JR 60

44 relief well drilled directionally Blowout on the WP Surface wellhead Floating rig Subsea wellhead 1000 to 1500 m Blowout well Relief well Source / illustration: Books from IFP and Chambre Syndicale de la Recherche et de la Production du Pétrole et du gaz naturel reservoir Presentation JB AG JCN JR 61

45 ONSHORE BLOWOUT Well capping Source / Illustrations: Wild Well control Presentation JB AG JCN JR 62

46 Presentation JB AG JCN JR 63

47 Source / Illustrations: Wild Well control Presentation JB AG JCN JR 64

48 Source / Illustrations: Wild Well control Presentation JB AG JCN JR 65

49 Presentation JB AG JCN JR 66

50 Source / Illustrations: Wild Well control Presentation JB AG JCN JR 67

51 Presentation JB AG JCN JR 68

52 Source / Illustrations: Wild Well control Presentation JB AG JCN JR 69

53 Source / Illustrations: Wild Well control Presentation JB AG JCN JR 70

54 Slides were prepared for presentation and information to Students of Schools and Universities only. References Slides presented were prepared with illustrations from the following referenced documents: - API Standards and Recommended Practices, - Neal J. Adams, Drilling Engineering, PennWell Books, Tulsa, Oklahoma, 1985, - (Halliburton) - Petroleum Well Construction J Willey & Sons - Miscellaneous books from Chambre Syndicale de la Recherche et de la Production du Pétrole et du gaz naturel - IFP Drilling data handbook - Miscellaneous documentation from TOTAL Drilling Division - Halliburton Completion Services - Miscellaneous books from IFP - Leading Edge Advantage Ltd (Under Balance Drilling). - Miscellaneous documentation from web-sites: O&GJ, World Oil, SPE - Transocean, Saipem, Pride Drilling Contractors - Baker Hughes, Schlumberger, Weatherford, Wild Well Control Service Companies - Cameron, Hydril, Companies. Presentation JB AG JCN JR 71

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 RIG TYPES Land rigs in 2012... total (approx) 3200 Jack Up,... in 2012... total (approx) 485 units 300 * in drilling mode 130 for WD > 350 ft Floaters,...

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC Dilution-Based Dual Gradient Well Control Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC In this very short presentation, we will Review Dilution-based

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

Chapter 4 Key Findings. 4 Key Findings

Chapter 4 Key Findings. 4 Key Findings Chapter 4 Key Findings 211 4 Key Findings 212 Chapter 4 Key Findings This summarizes the key findings of the investigation team based on its extensive review of available information concerning the Macondo

More information

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper Offshore Managed Pressure Drilling Experiences in Asia Pacific SPE paper 119875 Authors: Steve Nas, Shaun Toralde, Chad Wuest, SPE, Weatherford Solutions Sdn Bhd, SPE, Weatherford Indonesia SPE, Weatherford

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0 International Well Control Forum IWCF Drilling Well Control Syllabus and 4 March 2017 Version 7.0 IWCF Drilling Well Control Syllabus and 4 Contents Guidance Notes... 5 1.1. Introduction... 5 1.2. Who

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

Well Control Institute (WCI) Core Curriculum and Related Learning Outcomes: Supervisory Level

Well Control Institute (WCI) Core Curriculum and Related Learning Outcomes: Supervisory Level Well Control nstitute (WC) Core Curriculum and Related Learning Outcomes: Level Revision 4B ay 14, 2014 Prepared by Black & Veatch Corp. DRAFT WORK PRODUCT FOR NDUSTRY COENT Well Control nstitute (WC)

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

August 21, Deepwater MPD / PMCD

August 21, Deepwater MPD / PMCD August 21, 2011 Deepwater MPD / PMCD Managed Pressure Drilling (MPD) Pressure held on top of riser while drilling. Drill in overbalance condition Pressurized Mud Cap Drilling (PMCD) Pressure of mud column

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

VOLUMETRIC METHODS and STRIPPING OPERATIONS

VOLUMETRIC METHODS and STRIPPING OPERATIONS VOLUMETRIC METHODS and STRIPPING OPERATIONS WELL CONTROL SCHOOL Muscat, Oman Training Center VOLUMETRIC METHODS and STRIPPING OPERATIONS The material contained here, is based on the best sources available

More information

7/27/2011. How Things Can Go Wrong In The Drilling Of Oil / Gas Wells

7/27/2011. How Things Can Go Wrong In The Drilling Of Oil / Gas Wells How Things Can Go Wrong In The Drilling Of Oil / Gas Wells Provide a general background of the various risks inherent in the drilling of oil / gas wells. The participants will have a better knowledge and

More information

Worked Questions and Answers

Worked Questions and Answers Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of

More information

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion PTRT 1471: Exploration and Production I Chapter 6: Drilling and Well Completion Well Planning Drilling is a major investment (over $100m for offshore) Planning is aimed at maximizing investment Wells are

More information

Evaluation of deepwater kicks and future countermeasures

Evaluation of deepwater kicks and future countermeasures WELLS AND WELL INTERVENTION Evaluation of deepwater kicks and future countermeasures Paal Skalle, Per Holand 2 and Sigbjørn Sangesland Norwegian University of Science and Technology and 2 SINTEF/ExproSoft

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

OPTIMUM SELECTION OF WELL CONTROL METHODS

OPTIMUM SELECTION OF WELL CONTROL METHODS OPTIMUM SELECTION OF WELL CONTROL METHODS Md AHAMMAD SHARIF Assistant professor, Department of Petroleum Engineering, GIET College of Engineering, Rajahmundry. Dr. S. SRIGOWRI REDDY Professor, GIET College

More information

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-D Revision 0 13 February 2015 DC 2015 COPYRGHT PROTECTED

More information

Wednesday, March 6, 2013 Houston, TX. 2:30 4:00 p.m. CLOSING SESSION BLOWOUT! A NIGHTMARE IN THE OIL PATCH

Wednesday, March 6, 2013 Houston, TX. 2:30 4:00 p.m. CLOSING SESSION BLOWOUT! A NIGHTMARE IN THE OIL PATCH Wednesday, March 6, 2013 Houston, TX 2:30 4:00 p.m. CLOSING SESSION BLOWOUT! A NIGHTMARE IN THE OIL PATCH Presented by Bill Mahler Executive Vice President and General Manager Wild Well Control What could

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

The SPE Foundation through member donations and a contribution from Offshore Europe

The SPE Foundation through member donations and a contribution from Offshore Europe Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing ECD Reduction Tool R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing Drilling Engineering Association, Fourth Quarter Meeting November 20, 2008 1 Presentation outline Description

More information

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES SHUT-IN PROCEDURES Shut-in Procedures Learning Objectives You will learn general shut-in procedures: For surface BOPs. For subsea BOPs. You will learn to interpret shut-in pressures and be able to perform

More information

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Commentary on the book by Andrew Hopkins. By Graham Dalzell Commentary on the book by Andrew Hopkins By Graham Dalzell How we drill oil wells The disaster itself how it happened; (anonymised)- oil, well and drilling companies Andrew s conclusions on the Human,

More information

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013 Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Petroleum Engineering Spring semester, 2013 Open Writer: Øystein Røssland (Writer s signature) Faculty supervisor: Professor

More information

WILD WELL CONTROL WARNING SIGNS OF KICKS

WILD WELL CONTROL WARNING SIGNS OF KICKS WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn

More information

Well Control for Supervisors for Drilling Operations Core Curriculum and Related Learning Objectives

Well Control for Supervisors for Drilling Operations Core Curriculum and Related Learning Objectives Well Control for Supervisors for Drilling Operations Core Curriculum and Related Learning Objectives Form WSP-02-DO-S Second Edition Revision 1 19 June 2015 ADC 2015 COPYRGHT PROTECTED DOCUENT All rights

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well Jace R. Larrison, P.E. Blowout Engineers, LLC Recent advances in well control modeling simulators have incorporated

More information

BLACK HILLS PLATEAU PRODUCTION COMPANY

BLACK HILLS PLATEAU PRODUCTION COMPANY BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado

More information

Extended leak off testing

Extended leak off testing Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures

More information

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-S Revision 0 13 February 2015 DC 2015 COPYRGHT

More information

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

Protecting People and the Environment during Stimulation Treatments in Offshore Settings Protecting People and the Environment during Stimulation Treatments in Offshore Settings NASEM Workshop: Offshore Well Completion and Stimulation using Hydraulic Fracturing and Other Technologies Paul

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS (WIRELINE, COILED TUBING & SNUBBING) CORE CURRICULUM AND RELATED FORM WCT-2WSI INTRODUCTORY LEVEL For information on how an course

More information

Hard or Soft Shut-in : Which is the Best Approach?

Hard or Soft Shut-in : Which is the Best Approach? HARD - SOFT shut-in? Hard or Soft Shut-in : Which is the Best Approach? March '93 INTRODUCTION There is now reasonable acceptance through-out the industry for the use of a hard shut-in procedure following

More information

Safety and Risk Analysis of Deepwater Drilling using Managed Pressure Drilling Technology

Safety and Risk Analysis of Deepwater Drilling using Managed Pressure Drilling Technology Safety and Risk Analysis of Deepwater Drilling using Managed Pressure Drilling Technology Jyoti Bhandari 1, Faisal Khan* 1, and Vikram Garaniya 1 1.Offshore Safety and Risk Management Group, Australian

More information

Well Control for Drilling Operations Personnel Core Curriculum and Related Learning Objectives

Well Control for Drilling Operations Personnel Core Curriculum and Related Learning Objectives Well Control for Drilling Operations Personnel Core Curriculum and Related Learning Objectives Form WSP-02-DO-D Second Edition, Revision 1 19 June 2015 ADC 2015 COPYRGHT PROTECTED DOCUENT All rights reserved.

More information

NORSOK Standard D-010 Rev 4, August 2012

NORSOK Standard D-010 Rev 4, August 2012 Foreword 2 Introduction 2 1 Scope 4 2 Normative and informative references 4 2.1 Normative references 4 2.2 Informative references 5 3 Terms, definitions and abbreviations 5 3.1 Terms and definitions 6

More information

W I L D W E L L C O N T R O L COMPLICATIONS

W I L D W E L L C O N T R O L COMPLICATIONS COMPLICATIONS Complications Learning Objectives You will learn to detect changes that deviate from established trends. You will learn how to respond to problems such as: Pump problems String problems Hole

More information

Tibor Szabó DRILLING THROUGH SHALLOW GAS ZONES IN HUNGARY

Tibor Szabó DRILLING THROUGH SHALLOW GAS ZONES IN HUNGARY Tibor Szabó Petroleum Engineering Department University of Miskolc, Hungary DRILLING THROUGH SHALLOW GAS ZONES IN HUNGARY The prospecting activity for CH is more than 60 years old in Hungary. During this

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM DRILLING OPERATIONS CORE CURRICULUM AND RELATED JOB SKILLS FORM WCT-02DS SUPERVISORY LEVEL The purpose of the core curriculum is to identify a body of knowledge

More information

Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations

Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations High resolution pressure control at your fingertips, during your UBD and

More information

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director SPE Forum: Source Control for Wells in Shallow Water Lars Herbst, Gulf of Mexico Regional Director Agenda Introduction and Background Historical Well Control Events Scope of Discussion Scenario Driven

More information

Marine Technology Society

Marine Technology Society Marine Technology Society Dynamic Positioning Conference 21-22 October, 1997 Session I Review of DP Applications, Consequences and Cost of Failures Drilling Fundamentals-DP Operations-Drilling with Riser

More information

Cased-Hole Logging Environment

Cased-Hole Logging Environment Cased-Hole Logging Environment 2 Planning a Production Logging Job Planning is an important part of a production logging job. Frequently these jobs can only be done in safety during daylight. Thus, the

More information

PTTCO Drilling Well Control Training Course

PTTCO Drilling Well Control Training Course www.pttco.org PTTCO Drilling Well Control Training Course 1.1 Course objectives 1.2 Course duration 1.3 Number of trainees in a course 1.4 Prerequisites 1.5 Instructor s specific qualifications 1.6 Course

More information

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford AADE-07-NTCE-69 A Downhole Tool for Reducing ECD R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford Copyright 2007, AADE This paper

More information

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW MARCH 2014 / DEFINING TECHNOLOGY FOR EXPLORATION, DRILLING AND PRODUCTION / WorldOil.com MANAGED PRESSURE DRILLING How automated MPD enables drilling of an impossible well in Mexico REGIONAL OUTLOOK: EAST

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WIRELINE OPERATIONS CORE CURRICULUM AND RELATED FORM WCT-2WLF FUNDAMENTAL LEVEL The purpose of the core curriculum is to identify a body of knowledge and

More information

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach

More information

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A. Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A. Sean Yakeley, Ed Wood and Yang Xu (Baker Hughes Inc)

More information

AADE 2009NTCE-04-04: PRACTICAL ASPECTS AND VALUE OF AUTOMATED MPD IN HPHT WELLS

AADE 2009NTCE-04-04: PRACTICAL ASPECTS AND VALUE OF AUTOMATED MPD IN HPHT WELLS sudden appearance of permeable sequences abnormally pressured to higher than anticipated levels in an already narrow margin. 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE

More information

DRILLING HOSE SOLUTIONS

DRILLING HOSE SOLUTIONS DRILLING HOSE SOLUTIONS HIGH PRESSURE FLEXIBLE LINES FOR A WIDE RANGE OF DRILLING APPLICATIONS HIGH QUALITY - HIGH STANDARD WE DELIVER ACCORDING TO THE HIGHEST LEVELS OF SPECIFICATIONS AND STANDARDS WITH

More information

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Squeeze Cementing Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Definition Squeeze Cementing is the process of applying hydraulic pressure to force or squeeze a cement slurry

More information

Characterization of Completion Operational Safety for Deepwater Wells

Characterization of Completion Operational Safety for Deepwater Wells 2013 2nd International Conference on Environment, Energy and Biotechnology IPCBEE vol.51 (2013) (2013) IACSIT Press, Singapore DOI: 10.7763/IPCBEE. 2013. V51. 25 Characterization of Completion Operational

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS SNUBBING CORE CURRICULUM AND RELATED FORM WCT-2SS SUPERVISORY LEVEL The purpose of the core curriculum is to identify a body of

More information

CHE Well Testing Package/Service:

CHE Well Testing Package/Service: CHE Well Testing Package/Service: CHE delivers well testing package And services, trailer mounted well testing package and offshore/onshore well testing services with over 10 years experience. Our testing

More information

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Advanced Applications of Wireline Cased-Hole Formation Testers Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Agenda Introduction to Cased Hole Formation tester Tool specifications Applications

More information

North Dakota Petroleum Council Re-stimulation Initiative

North Dakota Petroleum Council Re-stimulation Initiative North Dakota Petroleum Council Re-stimulation Initiative Refracs: Completion Discussion for Bakken Generation 1 Wellbores Originally presented to the Interim Energy Development and Transmission Committee

More information

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA Well Control Manual Bharat PetroResources Limited BLOCK: CB-ONN-2010/8 GUJRAT-INDIA Prepared By: EnQuest PetroSloutions Pvt. Ltd. Contents 1.0.0 Definitions 2.0.0. Causes of Kicks 3.0.0. Kick indications

More information

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study

More information

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) AADE-07-NTCE-41 A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) Paknejad, A., Texas A&M University; Schubert, J., Texas A&M University

More information

EVALUATION OF LIQUID LIFT APPROACH TO DUAL GRADIENT DRILLING

EVALUATION OF LIQUID LIFT APPROACH TO DUAL GRADIENT DRILLING EVALUATION OF LIQUID LIFT APPROACH TO DUAL GRADIENT DRILLING A Thesis by UGOCHUKWU NNAMDI OKAFOR Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements

More information

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) BOP CLASSIFICATION SYSTEM FOR ONSHORE NEWFOUNDLAND AND LABRADOR INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) PREPARED BY THE PETROLEUM RESOURCE DEVELOPMENT DIVISION

More information

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Chris Carstens Unocal Corporation 14141 Southwest Freeway Sugar Land, Texas 77478 Mike Breaux Unocal Corporation 14141

More information

OIL POLLUTION IN THE ARCTIC - RISKS AND MITIGATING MEASURES

OIL POLLUTION IN THE ARCTIC - RISKS AND MITIGATING MEASURES Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands OMAE2011-49157 OIL POLLUTION IN THE ARCTIC - RISKS

More information

SPE MS Well Collision Avoidance Management and Principles

SPE MS Well Collision Avoidance Management and Principles SPE 184730-MS Well Collision Avoidance Management and Principles S.J. Sawaryn, Consultant On behalf of the SPE Wellbore Positioning Technical Section (WPTS) Collision Avoidance Sub-Committee also referred

More information

What are the Well Control Complications While Drilling with Casing or Liner? Tawfik Elshehabi and H. Ilkin Bilgesu, West Virginia University

What are the Well Control Complications While Drilling with Casing or Liner? Tawfik Elshehabi and H. Ilkin Bilgesu, West Virginia University AADE-16-FTCE-79 What are the Well Control Complications While Drilling with Casing or Liner? Tawfik Elshehabi and H. Ilkin Bilgesu, West Virginia University Copyright 2016, AADE This paper was prepared

More information

Simulation study evaluating alternative initial responses to formation fluid influx during managed pressure drilling

Simulation study evaluating alternative initial responses to formation fluid influx during managed pressure drilling Louisiana State University LSU Digital Commons LSU Master's Theses Graduate School 2007 Simulation study evaluating alternative initial responses to formation fluid influx during managed pressure drilling

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

New generation of solid expandable liners help give operators a jump on trouble zones

New generation of solid expandable liners help give operators a jump on trouble zones New generation of solid expandable liners help give operators a jump on trouble zones By Pat York, Weatherford SINCE SOLID EXPANDABLE technology has gained credibility as an effective contingency option,

More information

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content Contents 1. Abbreviations 2. Background 3. Definition 4. Well Conditions 5. HPHT Safety Case

More information

Risk-Based Process Safety for Upstream Oil & Gas: Put Your Boots on It s Coming! Mark Hansen and Jim Johnstone

Risk-Based Process Safety for Upstream Oil & Gas: Put Your Boots on It s Coming! Mark Hansen and Jim Johnstone 1. They did not attack the fuel storage Risk-Based Process Safety for Upstream Oil & Gas: Put Your Boots on It s Coming! Mark Hansen and Jim Johnstone Slide 2 Why is there Concern About Process Safety?

More information

Well Control Emergency Response Plan

Well Control Emergency Response Plan Well Control Emergency Response Plan U.S. Oil and Gas Land Operations Provided by Wild Well Control, Inc. and Travelers This emergency response plan is not intended to replace sound judgment. It is to

More information

SPE/IADC Abstract

SPE/IADC Abstract SPE/IADC 125311 Pressurized Mud Cap Drilling Drastically Reduces Non-Productive Time in Soka Field, South Sumatera Michael Runtuwene, Sanny Suprihono, and Dany Rizka, SPE, Medco E&P Indonesia, Andi Eka

More information

NORSOK Standard D-010 Rev 4. August 2012

NORSOK Standard D-010 Rev 4. August 2012 NORSOK Standard D-010 Rev 4. August 2012 Changes to the section: The content of the section is by and large the same as the rev. 3 version, but we have improved the text, made some new statements and removed

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management DOCUMENT NUMBER: 800-0810-003 TITLE: EFFECTIVE DATE: AUTHORITY: POLICY: PURPOSE: APPLICABILITY: DISCLAIMER: Guidelines for Development

More information

SIMULATION OF A RE-ENTRY WITH CASING DRILLING UNDER HPHT CONDITIONS Gabriella Federer-Kovacs 1. Introduction

SIMULATION OF A RE-ENTRY WITH CASING DRILLING UNDER HPHT CONDITIONS Gabriella Federer-Kovacs 1. Introduction Simulation of a re-entry with casing drilling under HPHT conditions SIMULATION OF A RE-ENTRY WITH CASING DRILLING UNDER HPHT CONDITIONS Gabriella Federer-Kovacs 1. Introduction Due to the ongoing depletion

More information

UPM A Virtual Wellbore Modelling System to Prevent and Enhance the Detection of Well Control Events in Deepwater Drilling

UPM A Virtual Wellbore Modelling System to Prevent and Enhance the Detection of Well Control Events in Deepwater Drilling UPM 16080 A Virtual Wellbore Modelling System to Prevent and Enhance the Detection of Well Control Events in Deepwater Drilling Brian Piccolo, Austin Johnson, Scott Petrie, Henry Pinkstone, Christian Leuchtenberg

More information

Nye rapporteringskrav til brønnkontrollhendelser Monica Ovesen Petroleumstilsynet (Ptil)

Nye rapporteringskrav til brønnkontrollhendelser Monica Ovesen Petroleumstilsynet (Ptil) Nye rapporteringskrav til brønnkontrollhendelser Monica Ovesen Petroleumstilsynet (Ptil) ntall brønnhendelser Brønnkontrollhendelser - trend 1996-2011 30 25 20 15 Leteboring Prod.boring 10 5 0 1996 1997

More information

Chapter 8: Reservoir Mechanics

Chapter 8: Reservoir Mechanics PTRT 1472: Petroleum Data Management II Chapter 8: Reservoir Mechanics - Reservoir drives Types of Natural Gas Reservoir Fluids Natural gas is petroleum in a gaseous state, so it is always accompanied

More information

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Safety and Risk Engineering. HSE Case Implementation Clive Rawson Safety and Risk Engineering HSE Case Implementation Clive Rawson Purpose ALARP Risk Assessment Major Accident Events Bowties Safety Critical Systems Performance Standards Implementation Getting HSE Case

More information

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10)

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10) Health, Safety and Environmental Management in Petroleum and offshore Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module No. #

More information