Extended leak off testing

Size: px
Start display at page:

Download "Extended leak off testing"

Transcription

1 Extended leak off testing Rev: /01/01

2 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures will ensure that both well integrity and stability are maintained as effectively and as efficiently as practicable. If wellbore problems did occur, procedures in well specific guidelines and other relevant documents should be followed. Responsibilities It will be the responsibility of the Operators drilling representative and senior contractor drilling personnel to ensure that others with duties relating operations contained within this document are aware of their roles and responsibilities. Scope These procedures shall apply to all drilling personnel. Further References Drilling contractor s and Operator s mutually agreed specific Extended leak off test Procedures.

3 Table of contents EXTENDED LEAK OFF TESTING...1 Purpose...2 Responsibilities...2 Scope...2 Further References...2 Table of contents...3 Pre planning Preparations...4 Pre job Procedures...5 EXTENDED LEAK OFF TEST?...8 General...8 Draw guidelines on LOT chart (Fig. 1)...9 During the test...11 Data interpretation...13 Retesting...14 Difference from standard L.O.T. procedures...15

4 Pre planning Preparations Check offset well leak-off tests (a) Expected leak-off pressures, minimum stresses (b) Required pump rates (c) Shape of plots; anything unusual? Check logs (a) Look for exposed sands: may require higher pump rates, have nonlinear LOT plots, have lower leak-off pressures and minimum stresses (b) Check calliper for washouts: increased risk of poor cement job Consider the cement job. (a) Potential problems? (lack of casing centralization and/or movement; low displacement rates; partial loss of returns). (b) Problems while cementing could mean increased risk of poor cement job.

5 Pre job Procedures. 1. A casing test will be performed during kick drill, before drilling out the shoe to insure casing and connection integrity. Record volume versus pressure 2. Obtain an estimate of the expected leak-off pressure from offset wells or from an appropriate fracture gradient prediction technique, e.g. Fracture Gradient Predictor software. 3. Determine the surface pressure required to reach the expected leak-off pressure given the proposed weight of mud in the hole. 4. From the estimated surface pressure in step 3, the volume versus pressure plot measured in step1 and the proposed pump rate, determine the length of time expected to reach leak off. If the time is less than 4 minutes then consider (a) using a lower mud weight for the test, or (b) reducing the pump rate to ensure that at least 4 minutes of build up is observed before leak-off. Leak off procedures 5. Drill out the casing shoe, clean out the rat hole and drill 3 meters (10 feet) of new formation. 6. Circulate the hole clean and circulate until the mud in the annulus has homogenous density. 7. Pull the bit inside the casing shoe. Flush lines at the slow circulation rate (SCR) as planned for the leak off (typically 80 lpm or 0.5 bbls/min, see comments below) up the annulus with the cement pump until returns are observed. 8. Close the BOP, space out drill string and line up to perform leak off test to pump down both drill string and annulus. 9. Test lines to 500psi, bleed off then commence pumping with the cement pump. Start logging pressure and volume data at frequent intervals on cement unit, mud logging unit, and on designated pressure gauges on the drillfloor. ( i.e. As often as the pressure recorders are able to). Also record the test manually on a worksheet at a minimum of every 40 litres (¼ barrel) pumped.

6 10. Pump at the planned pump rate (typically lpm or bbls/min, see comments below) with the cement, until 1 minute after the formation breakdown occurs (formation breakdown occurs when subsequent pressure readings are equal to or less than the previous pressure reading). 11. Close in the well with a valve on the cement unit and record the pressure decline until the pressure has been constant for 5 minutes. 12. Record the data in an appropriate plot format and record the interpretation. 13. Bled back volumes and measure volumes returned. 14. Report leak off pressure, volumes pumped and returned and equivalent mud weight obtained from leak off in drilling, IADC reports etc.

7 Comments to procedure: Step 2 Fracture Gradient Predictor can be obtained from operating and/or service companies. Step 4 It is best to see a minimum of four pressure readings before leak-off occurs to characterise the linear build of the pressure curve so that leak-off can be recognised. Step 6 Take care to clean the rat hole properly, so that the induced fracture will not be propped open by cement or cuttings debris. Consider pumping a hi-vis/hi-density pill to aid in clearing cuttings, which must be circulated out of the hole before the start of the test. If the mud weight is to be increased before drilling ahead, perform leak off before increasing the mud weight to be able to optimise the display of the pressure/volume plot. Step 10 The planned pump rate should be a rate that builds pressure at a minimum of one half the rate observed in the casing test. Typically, this would 80 lpm or 0.5 bbls/min. However, in shallow or higher permeability sediments, higher pumps rates may be required. If the initial pressure build rate is too low, repeat the test at a higher test rate. Pump rates of 120 to 160 lpm (0.75 to 1.0 bbls/min) may be required to get a satisfactory test. Caution: low pressure build rates can also be indicative of significantly increased borehole volume which may indicate the lack of cement behind the casing shoe. If there is a down hole pressure gauge that records data during the test (ex. PWD sub), it should be programmed to give reasonable sampling rate during the test (depends on memory size). Remember to synchronize all clocks (cement unit, mudlogger, PWD etc.) before the LOT. Steps 13 and 14 Bleed back should be done with a constant and low rate. Avoid adjusting the valve during the bleed-back period, as this will disturb interpretation of fracture closure during bleed-back.

8 Extended leak off test? General Modifications to standard leak off procedures ensure better quality of test results and come at the expense of some preparation on behalf of the testing engineer before the test. The modifications provide the following benefits: 1. Increase reliability and consistency of Leak-off pressure data. 2. Provide consistent and reliable estimates of minimum in-situ stress. 3. Provide calibration points for in situ stress profile and pore pressure estimates, including the quantification of fracture gradient changes in depleted reservoirs. 4. Detect cement channels and eliminate unnecessary cement squeezes. 5. Reduce risk of circulation loss. 6. Provide better data for kick control. 7. Improve estimates of mud-weight (MW) window for drilling operations. 8. Provide reliable data needed for drilling and production stability calculations. 9. Provide data needed for fracture stimulation design and completions. 10. Provide data needed for waste disposal down hole injection design. The commonly expressed concern of weakening the formation because of the small fracture that is created during the Leak-off test, is however minimized by the following factors: 1. Fractures exist in the formation or are introduced by the drilling process anyway. 2. Fractures have the capacity to hold mud-weight. 3. In the rare case of an intact formation, the creation of a small fracture due to a LOT weakens the formation by a very small amount equal to the tensile strength of the formation which is negligible. 4. Mud solids plug the tip of the fracture and/or fill the crack restoring approximately the original capacity of the formation to hold mud-weight. Repeated LOTs and stress tests using clear fluids show that creating a small fracture is not a problem. 5. Shales are usually plastic and tend to heal after a fracture closes.

9 Draw guidelines on LOT chart (Fig. 1) 1. Minimum volume line: straight line drawn from origin through last data point of casing integrity test (CIT). 2. Estimated leak-off pressure (converted to surface pressure). Obtained from: Offset well leak-off tests Pore pressure estimates 3. V.min: volume at which the minimum volume line intersects the estimated leak-off pressure. 4. Maximum volume line: double the volume of the minimum volume line. Used to decide if pump rate is fast enough. 5. Minimum acceptable leak-off pressure. Used to decide when to stop pumping, and evaluate cement job. Taken as one of the following: Estimated leak-off pressure minus 1/2 ppg (1 ppg for wildcats) Site-specific criteria 6. Maximum pressure: limit imposed by surface equipment, casing, etc. Typical operator s LOT procedures specify pressure should not exceed 80% of the minimum internal yield of the weakest segment of the casing string. 3 Maximum Allowable Pressure Pressure Estimated LOP Minimum Acceptable LOP Vmin Min. Volume (Casing Test) Max. Volume 0 1 Volume 2 Figure 1: Leak off test guidelines Estimated Leak-Off Pressure = 0.052*TVD*(Est-MW) Est = estimated LOP (ppg) MW = mudweight in the hole TVD = true vertical depth to casing shoe (top of sand for open hole tests) 2*Vmin 7. Circulate mud until shaker is free of cuttings, and mud weight in equals mud weight out for three consecutive measurements with a pressurized mud balance (bottoms up is usually sufficient). Objective: i. Obtain uniform column of drilling fluid with known density ii. Break-down gel structure iii. Build up filter cake

10 8. Hang off drill string approximately 10 ft. into casing. Rig up cement pump as shown in Fig. 2. TEST HEAD PURGE VALVE CEMENT PUMP PRESSURE GAUGE DRILLING FLUID DRILL PIPE DISPLACEMENT TANK BLEED VALVE SHUT-IN VALVE RIG FLOOR CLOSED BOP Figure 2: Equipment rig up for a leak off test. 1. Shut-in valve: Installed between the pressure gauge and pump. Close this valve during shut-in; do not rely on the pump to hold pressure. 2. Bleed valve: Installed between shut-in valve and pump. Open during shut-in to check for leaks in the shut-in valve. Also used to bleed off pressure when the test is completed. 3. Purge valve: Used to purge air. Open while filling drill pipe and test head; close when mud starts to flow out valve. 4. Pressure gauge: Four inches or larger for easy visibility. Liquid filled, mounted away from test line for smoother readings. Lowest range, smallest dial increments possible to minimize uncertainties caused by needle oscillations 5. Pump down drill pipe whenever possible. Mud in the drill pipe is less likely to be gelled or contaminated with drill solids than in the annulus. 6. Pressure test: Pressure test the entire surface system before running either a CIT or leak-off test. Observe for leaks. 7. Close annular blow-out preventer.

11 During the test Pumping 1. Maintain constant pump rate. 2. Try 1/4 bbl/min unless offset well data indicates otherwise. 3. Record/plot pressure every 1/4 bbl regardless of pump rate. 4. If plot drops below maximum volume line before reaching Vmin (see Fig. 3), stop test, bleed off pressure, and start over using 1/4 bbl/min faster pump rate. 5. Do not exceed 1 bbl/min Pressure Min. Volume (Casing Test) Too Slow Max. Volume Good Rate Vmin Volume Stop pumping (see Fig. 4): Figure 3: Determining pump rate A: If slope decrease occurs above minimum acceptable leak-off pressure, pump an additional 3/4 to 1 bbl (another 3 to 4 data points), then stop. B: If slope decrease occurs below minimum acceptable leak-off pressure, pump one or two more bbls to see if pressure will resume building. If pressure resumes building, return to Case A. C: If plot continuously curves, stop when pressure levels off (3 to 4 points at roughly the same pressure). D: Stop if the pressure abruptly drops while pumping (hard breakdown).

12 Maximum Allowable Pressure Predicted LOP Minimum Acceptable LOP D A B C Pressure A B C D If slope decrease occurs above the minimum acceptable LOP, pump an additional 3/4-1 bbls (3-4 data points), then stop. If slope decrease occurs below the minimum acceptable LOP, pump 1 or 2 more bbls to see if pressure build-up resumes. For continuously curving plot, stop when pressure levels off. Stop if pressure abruptly drops while pumping (hard breakdown). Volume Shut-in Well Figure 4; When to stop pumping 1. Stop pumps, close shut-in valve. 2. Plot Initial Shut In Pressure (ISIP) immediately after valve is closed, and every two minutes thereafter. 3. Monitor shut-in pressure until the shut-in pressure stabilizes. 4. Look for surface leaks. Bleed-off pressure: record recovered: volume.

13 Data interpretation Record Measured Depth (MD), True Vertical Depth (TVD), Azimuth and Inclination of the well at the shoe (top of first sand for open hole LOT). Also record pump rate, volume pumped, volume recovered, casing size, and mud properties from the morning report (mud weight, WBM or OBM, LC material, PV, YP, etc.) Pick leak-off pressure (LOP) - see Fig Draw best fit straight line through pumping data. Ignore first data point. 2. Leak-off pressure is the first point where: a) There is a permanent decrease in slope b) The pressure is the MS pressure. Pick minimum stress (MS) on shut-in curve (Fig. 5) 1. Draw best fit straight line through shut-in data. Start with ISIP. 2. MS is the first point: a) After a permanent decrease in slope b) Where the pressure is LOP PRESSURE (PSI) 1, LOP: Point at Which Slope Decreases Stop Pump ISIP MS: First Point After Slope Decreases Record Every 1/4 bbl Regardless of Pump Rate Record Every Minute for 20 Minutes, or Until the Pressure Stabilizes, Whichever Time Is Least 200 Ignore First Data Point SHUT-IN TIME (MINUTES) VOLUME (BBLS) Figure 5: Determining leak off pressure and minimum stress

14 3. Compute equivalent mud weights (ppg) for leak-off pressure and minimum stress: LOP EMW = MW + LOP/(0.052*TVD) MS EMW = MW + MS/(0.052*TVD) where MW is the mud weight (ppg) in the hole at the time of the leak-off test, and TVD is true vertical depth to the casing shoe (top of first sand for open hole LOT). 4. Evaluate the cement job. Cement channels may be indicated by any of the following: 1. LOP EMW is below the equivalent mud weight for the minimum acceptable leak- off pressure 2. LOP EMW / MS EMW Shut-in pressure not levelling off (in shale) Keep in mind that the LOP at the shoe could be less than the LOP that is needed. If the minimum stresses measured before and after a squeeze are similar, the squeeze was wasted, even if the LOP went up. Similar minimum stresses mean the same formation is taking fluid. Either: 1. The channel was not repaired, or 2. There is no channel, and the targeted LOP is unrealistic. Retesting ALWAYS retest before squeeze 1. Use same mud weight, pump rate. 2. Channel confirmed when retest shows no improvement. Retest to confirm minimum stress measurement Test again if results vary significantly from previous test. Retest if pressure abruptly dropped significantly while pumping (hard break-down) to determine a valid LOP. Do not use the peak pressure as the LOP.

15 Difference from standard L.O.T. procedures 1. Consistently collect three to four data points after leak-off before pump is stopped. 2. Monitor shut-in pressure for twenty minutes, or until the pressure stabilizes, whichever time is least. 3. Repeat test before squeezing to confirm presence of channel; also repeat test to confirm minimum stress measurement. 4. Use accurate surface gauges to measure pressure - do not rely on standard rig gauge. 5. Install shut-in valve between cement pump and pressure gauge; do not rely on the pump to hold pressure.

Worked Questions and Answers

Worked Questions and Answers Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Step-Rate Formation Integrity Test Method for Geothermal Wells

Step-Rate Formation Integrity Test Method for Geothermal Wells GRC Transactions, Vol. 41, 2017 Step-Rate Formation Integrity Test Method for Geothermal Wells William M. Rickard, Ozgur Balamir and Ernesto Rivas Geothermal Resource Group, Inc. services@geothermalresourcegroup.com

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

August 21, Deepwater MPD / PMCD

August 21, Deepwater MPD / PMCD August 21, 2011 Deepwater MPD / PMCD Managed Pressure Drilling (MPD) Pressure held on top of riser while drilling. Drill in overbalance condition Pressurized Mud Cap Drilling (PMCD) Pressure of mud column

More information

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures BAROID DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton January 2014 1 Copyright

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing ECD Reduction Tool R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing Drilling Engineering Association, Fourth Quarter Meeting November 20, 2008 1 Presentation outline Description

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) AADE-07-NTCE-41 A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) Paknejad, A., Texas A&M University; Schubert, J., Texas A&M University

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following

More information

Hard or Soft Shut-in : Which is the Best Approach?

Hard or Soft Shut-in : Which is the Best Approach? HARD - SOFT shut-in? Hard or Soft Shut-in : Which is the Best Approach? March '93 INTRODUCTION There is now reasonable acceptance through-out the industry for the use of a hard shut-in procedure following

More information

Rig Math. Page 1.

Rig Math. Page 1. Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Squeeze Cementing Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Definition Squeeze Cementing is the process of applying hydraulic pressure to force or squeeze a cement slurry

More information

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

Float Equipment TYPE 925/926

Float Equipment TYPE 925/926 Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category

More information

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC Dilution-Based Dual Gradient Well Control Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC In this very short presentation, we will Review Dilution-based

More information

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well Jace R. Larrison, P.E. Blowout Engineers, LLC Recent advances in well control modeling simulators have incorporated

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study

More information

WILD WELL CONTROL WARNING SIGNS OF KICKS

WILD WELL CONTROL WARNING SIGNS OF KICKS WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

Faculty of Science and Technology. Master Thesis. Writer: Audun Tufte Veisene (Writer s signatures)

Faculty of Science and Technology. Master Thesis. Writer: Audun Tufte Veisene (Writer s signatures) Faculty of Science and Technology Master Thesis Study program/ Specialization: Petroleum Engineering/ Drilling Technology Spring semester, 2014 Open Writer: Audun Tufte Veisene (Writer s signatures) Faculty

More information

Coal Bed Methane (CBM) Permeability Testing

Coal Bed Methane (CBM) Permeability Testing Coal Bed Methane (CBM) Permeability Testing WTN Network Meeting April 28-29, 2011 ExxonMobil Exploration / Well Testing Team CBM Flow Characteristics Flow mechanism Gas desorbs when pressure drops below

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

Along-string pressure, temperature measurements hold revolutionary promise for downhole management Along-string pressure, temperature measurements hold revolutionary promise for downhole management IT S WIDELY KNOWN that the majority of stuck pipe incidents occur while pulling out of hole. If we can

More information

DB Bridge Plug. Features. Benefits. Applications

DB Bridge Plug. Features. Benefits. Applications DB Bridge Plug The WELLFIRST Premium Cast Iron Bridge Plug designed to run on electric line. Rated between 2000-10000-psi differential, and 300 F from above and below. Features Field Proven Design Constructed

More information

VOLUMETRIC METHODS and STRIPPING OPERATIONS

VOLUMETRIC METHODS and STRIPPING OPERATIONS VOLUMETRIC METHODS and STRIPPING OPERATIONS WELL CONTROL SCHOOL Muscat, Oman Training Center VOLUMETRIC METHODS and STRIPPING OPERATIONS The material contained here, is based on the best sources available

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick Railroad Commission of Texas Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick 1 RRC Regulations Primary directives: - Prevent Waste - Promote Conservation - Protect

More information

BaraShield -664 LCM Standard Field Application Procedure

BaraShield -664 LCM Standard Field Application Procedure BaraShield -664 LCM Standard Field Application Procedure Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton March 2016 1 Copyright 2011

More information

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA Well Control Manual Bharat PetroResources Limited BLOCK: CB-ONN-2010/8 GUJRAT-INDIA Prepared By: EnQuest PetroSloutions Pvt. Ltd. Contents 1.0.0 Definitions 2.0.0. Causes of Kicks 3.0.0. Kick indications

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

The Alberta Energy Regulator (AER) has approved this directive on January 31, Introduction Purpose of This Directive...

The Alberta Energy Regulator (AER) has approved this directive on January 31, Introduction Purpose of This Directive... Directive 008 Release date: January 31, 2018 Effective date: January 31, 2018 Replaces previous edition issued February 29, 2016 Surface Casing Depth Requirements The Alberta Energy Regulator (AER) has

More information

GEOTHERMAL WELL COMPLETION TESTS

GEOTHERMAL WELL COMPLETION TESTS GEOTHERMAL WELL COMPLETION TESTS Hagen Hole Geothermal Consultants NZ Ltd., Birkenhead, Auckland, New Zealand. ABSTRACT This paper reviews the measurements that are typically made in a well immediately

More information

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES DOCUMENT CONTROL: Created Date: May 06, 2013 Last Updated Date: September 15, 2015 Last Updated By: Stuart Ellsworth

More information

DRILLSCENE PROACTIVE DRILLING DECISIONS

DRILLSCENE PROACTIVE DRILLING DECISIONS DRILLSCENE PROACTIVE DRILLING DECISIONS RISE TO THE CHALLENGE OF REAL-TIME DRILLING CONTROL Today s oil and gas drilling operations present significant technical challenges in remote locations and increasingly

More information

OCTOBER 2017 ISSUE Page 1 of 7

OCTOBER 2017 ISSUE Page 1 of 7 Field testing is performed on fully assembled pipelines for the purpose of determining pipeline acceptability. Following visual acceptance of joints and pipeline components, pressure pipelines in their

More information

Disposal/Injection Well Pressure Test Report (H-5)

Disposal/Injection Well Pressure Test Report (H-5) RAILROAD COMMISSION OF TEXAS Disposal/Injection Well Pressure Test Report (H-5) Lauryn McFarland Engineering Technician Summary When Mechanical Integrity Test (MIT) is required How to file MIT How to perform

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

Representing EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

Representing EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE OIL AND GAS DOCKET NO. 03-0231502 THE APPLICATION OF JOHNSON SANFORD OPERATING COMPANY TO AMEND ITS PERMIT TO DISPOSE OF OIL AND GAS WASTE BY INJECTION INTO A POROUS FORMATION PRODUCTIVE OF OIL OR GAS,

More information

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper Offshore Managed Pressure Drilling Experiences in Asia Pacific SPE paper 119875 Authors: Steve Nas, Shaun Toralde, Chad Wuest, SPE, Weatherford Solutions Sdn Bhd, SPE, Weatherford Indonesia SPE, Weatherford

More information

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 1. Introduction. 2. Data Input. Header. Bit Information. Mud Information. Casing Program. P.D.M./Turbine. Drill String Design.

More information

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following graphs.

More information

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Chris Carstens Unocal Corporation 14141 Southwest Freeway Sugar Land, Texas 77478 Mike Breaux Unocal Corporation 14141

More information

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) BOP CLASSIFICATION SYSTEM FOR ONSHORE NEWFOUNDLAND AND LABRADOR INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) PREPARED BY THE PETROLEUM RESOURCE DEVELOPMENT DIVISION

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS What are some applications in which you ve successfully used this product? New Completions - Stage by Stage Diversion Between Frac plugs for Intra-Stage Diversion Replace Frac Plugs with Perf PODs - Full

More information

Colorado Oil and Gas Conservation Commission

Colorado Oil and Gas Conservation Commission Colorado Oil and Gas Conservation Commission http://cogcc.state.co.us/ FORM 5A Completed Interval Report INDUSTRY TRAINING Denver, Colorado November 27, 2012 Form 5A Completed Interval Report Introduction

More information

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells CHDT Cased Hole Dynamics Tester testing and sampling in cased wells Applications Evaluation of old wells for bypassed hydrocarbons Development of critical economic data for well evaluation Reduced-risk

More information

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment Contents 1. GENERAL INFORMATION & RECOMMENDATIONS 1 2. INSTALLATION FLOAT EQUIPMENT 2 2.1 PRE-USE FIELD INSPECTION 2 2.2 POSITION FLOAT ON CASING STRING 3 3. RUNNING OF FLOAT EQUIPMENT 3 3.1 CIRCULATION

More information

Chapter 4 Key Findings. 4 Key Findings

Chapter 4 Key Findings. 4 Key Findings Chapter 4 Key Findings 211 4 Key Findings 212 Chapter 4 Key Findings This summarizes the key findings of the investigation team based on its extensive review of available information concerning the Macondo

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

Dynamic Underbalance (DUB)

Dynamic Underbalance (DUB) Dynamic Underbalance (DUB) Perforating Cam Le Perforating Product Champion Agenda Overview DUB Software Tools Case histories 2011 HALLIBURTON. ALL RIGHTS RESERVED. 2 Dynamic Underbalance Software Dynamic

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the

More information

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also) RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at

More information

Petr 311 Wellbore pressures and Kick Control

Petr 311 Wellbore pressures and Kick Control etr 311 Wellbore pressures and Kic Control Reeber b. 05D Consider the wellbore static hydraulic syste The pressures in the drill string and the annulus can be represented as a U-tube. The su of the pressures

More information

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011 IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011 Report: Wiping performance Pressure drop-rupture disc function-gas kick circulation Ketil Botnmark, Kjell Mikalsen 20.05.2011 This report resumes the

More information

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Advanced Applications of Wireline Cased-Hole Formation Testers Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Agenda Introduction to Cased Hole Formation tester Tool specifications Applications

More information

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW MARCH 2014 / DEFINING TECHNOLOGY FOR EXPLORATION, DRILLING AND PRODUCTION / WorldOil.com MANAGED PRESSURE DRILLING How automated MPD enables drilling of an impossible well in Mexico REGIONAL OUTLOOK: EAST

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251

More information

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General... American Petroleum Institute Contents Page 1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General... 7 Apparatus and Materials... 8 High-temperature/high-pressure

More information

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems As a result of a recent job incident utilizing a Ball Drop Type firing system deployed on coiled tubing, the following

More information

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS A DIFFERENT KIND OF ENERGY COMPANY Nine Energy Service isn t your typical oilfield services company. Our success stems from a culture driven by performance

More information

BaraBlend -665 LCM Standard Field Application Procedure

BaraBlend -665 LCM Standard Field Application Procedure BAROID BaraBlend -665 LCM Standard Field Application Procedure Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton Apr 2016 1 Copyright

More information

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection In the administration of ORS 537.505 to 537.795, the Director of the Water Resources Department has statutory authority under the provisions of ORS 537.780 "to prescribe and enforce general standards for

More information

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions NOTE: Changes to the Form 5A, effective June 1, 2012, to accommodate the disclosure requirements are indicated by a preceding asterisk (*) and bold italics. All other fields are unchanged. FORM 5A HEADING

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

Inflatable Packers for Grouting 11/10/00

Inflatable Packers for Grouting 11/10/00 Introduction Inflatable Packers for Grouting 11/10/00 Inflatable packers are frequently used for grout injection in geotechnical applications for structural reinforcement and/or water-proofing of foundations,

More information

Design of the full casing program in a deviated well

Design of the full casing program in a deviated well TECHNICAL UNIVERSITY OF CRETE SCHOOL OF MINERAL RESOURCES ENGINEERING MSc in Petroleum Engineering Design of the full casing program in a deviated well MSc Thesis Panagiotis Aslanidis Mineral Resources

More information

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC Perforation Design for Well Stimulation R. D. Barree Barree & Associates LLC Typical Shaped Charge Primer charge Main explosive charge Case or container Detonating cord groove ¾ point of initiation Liner

More information

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE OIL AND GAS DO0KET NO. 01-0249550 THE APPLICATION OF REGENCY FS LP UNDER RULE 36 AND RULE 46 TO DISPOSE OF OIL AND WASTE CONTAINING HYDROGEN SULFIDE GAS INTO ITS TILDEN GPI WELL NO. 1, TILDEN, S. (WILCOX

More information

Operations planning for optimal hole cleaning

Operations planning for optimal hole cleaning Operations planning for optimal hole cleaning Rev 1.0 14 th March 2004. Technical comments? info@kingdomdrilling.co.uk Page 1 Table of contents Operations planning for optimal hole cleaning... 1 Table

More information

OIL AND GAS DOCKET NO

OIL AND GAS DOCKET NO OIL AND GAS DOCKET NO. 09-0241077 THE APPLICATION OF GILBOW TANK TRUCK SERVICE, INC., TO DISPOSE OF OIL AND GAS WASTE BY INJECTION INTO A POROUS FORMATION NOT PRODUCTIVE OF OIL OR GAS, GILBOW WELL NO.

More information

OPTIMUM SELECTION OF WELL CONTROL METHODS

OPTIMUM SELECTION OF WELL CONTROL METHODS OPTIMUM SELECTION OF WELL CONTROL METHODS Md AHAMMAD SHARIF Assistant professor, Department of Petroleum Engineering, GIET College of Engineering, Rajahmundry. Dr. S. SRIGOWRI REDDY Professor, GIET College

More information

RIH intermediate section casing in Bazian-1 exploration oil well

RIH intermediate section casing in Bazian-1 exploration oil well Energy and Sustainability V 559 RIH intermediate section casing in Bazian-1 exploration oil well A. K. Darwesh Petroleum Engineering Department, Engineering Faculty, Koya University, Kurdistan Abstract

More information

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

Book 3 - Well Control Calculations

Book 3 - Well Control Calculations Welltrain Distance Learning Programme - DRILLING CALCULATIONS www.welltrain.com.au Welltrain Distance Learning Programme Book 3 - Well Control Calculations 162 Colin Street, West Perth, WA 6005 Tel: +61

More information

Kicks Controlling Techniques Efficiency in Term of Time

Kicks Controlling Techniques Efficiency in Term of Time Engineering, 2017, 9, 482-492 http://www.scirp.org/journal/eng ISSN Online: 1947-394X ISSN Print: 1947-3931 Kicks Controlling Techniques Efficiency in Term of Time Ali K. Darwesh, Thorkild Maack Rasmussen,

More information

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES SHUT-IN PROCEDURES Shut-in Procedures Learning Objectives You will learn general shut-in procedures: For surface BOPs. For subsea BOPs. You will learn to interpret shut-in pressures and be able to perform

More information

Abstract Objective Scope of Study Introduction Procedures

Abstract Objective Scope of Study Introduction Procedures AADE-05-NTCE-71 A Practical Solution to Control Gas Migration Ned Shiflet, Forest Oil Corporation; Michael O. Dion, TAM International; and David P. Flores, TAM International This paper was prepared for

More information

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware 57007-88 Introduction Safety Precautions This instruction sheet describes how to set up and use the Hach (Figure 1). A water weir is a device that raises or diverts water to regulate the flow. Hach s water

More information

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh

More information