Deepwater Horizon, by Metin Çakanyıldırım and references cited therein.

Size: px
Start display at page:

Download "Deepwater Horizon, by Metin Çakanyıldırım and references cited therein."

Transcription

1 Deepwater Horizon Page 1 Outline Summary of the events and companies Technical problems and their association with companies Managerial problems Risk averse vs. risk seeking tendencies Suggestions to avoid disasters Ethics Sources: Deepwater Horizon, by Metin Çakanyıldırım and references cited therein. This file is electronically made available to MERIT students who agree NOT to post or to distribute it to the others.

2 Geography Page 2 Digging Macondo well 582 miles southwest of UTD campus Macondo well is in block 252 of Mississippi canyon; Undersea river canyons are rich in sedimentary rocks 48 miles from the nearest land, 114 miles from Port Fourchon that services and supplies oil rigs 154 miles from Houma helicopter base used for transporting oil & gas personnel to the rigs in Gulf of Mexico

3 Geology Page 3 Macando well is in deepwater region of GOM (Gulf of Mexico), sea depth 5000 ft. It is on the continental shelf where the shelf slope are dropping fast Region has turbidites (sedimentary rocks deposited by currents) with HC reservoirs: high porosity & permeability Cost of drilling 12,000 ft into the seabed is high but the production rate is very high Cost per bbl is low Additional complexity: Gap between pore pressure and fracture pressure is tight in GOM deepwater fields

4 Companies Involved Working Interest in Block 252: 65% BP, 25% Anadarko (Houston based) and 10% MOEX (Japan based). Operated as a joint venture (cost and revenue sharing) while BP was responsible for the operations On the day of blowout only 7 out of 126 on board were BP employees. Other companies: Transocean: Halliburton:. Page 4

5 Transocean s Deepwater Horizon Rig Page 5 From sea level to top of derrick 320 ft ft From sea level to bottom 75 ft 9000 ft of drilling at Macondo with Transocean s Marianas rig, damaged during Huricane Ida in Nov ft of drilling with Transocean s Deepwater Horizon, brought in Feb 2010 to complete the drilling Deepwater Horizon was a dynamically positioned semi-submersible rig. It is transferred from one location to another on cargo ships. At its intended location, it uses directional thrusters (8 small propellers) to maintain its location and orientation If the thrusters do not work (e.g., with power loss), the rig can be carried or rotated by waves. Transocean paid $560 million to Hyundai Heavy Industries in BP rented Deepwater Horizon at a rate of $530,000 per day and incurred a similar amount for fuel, expendables and services, bringing total cost to $1 million per day.

6 Technical Problems Page 6.. A well design with few barriers to gas flow;.

7 A well design with few barriers to gas flow Page 7

8 Managerial Problems Page 8.. Too much re-organization in BP Limited tenure and experience at a certain position.

9 Why they did what they did? Page 9 BP: Well design to avoid pressure build up in the annulus Transocean Need to satisfy the client BP Halliburton..

10 Who wanted to progress fast Page 10 Names / positions of people at BP Transocean Halliburton

11 Recommendations to avoid another disaster Page 11

12 Unethical behavior, if any, how to avoid? Page 12

13 Final Thoughts? Page 13

14 Summary Page 14 Summary of the events and companies Technical problems and their association with companies Managerial problems Risk averse vs. risk seeking tendencies Suggestions to avoid disasters Ethics

15 A Glance Page 15 Discussion in the main body focuses on technical and managerial problems Even with multitude of problems, there are fail-safe mechanisms employed to prevent a blowout One of them id the Blowout preventer BOP did not function well One control panel was out of battery The other was mis-wired Rig crew hesitated to cut the pipe Well manager attempted but could not cut Blowout preventer was investigated afterwards:

16 Value of a Rig Page 16 Rig values drive the rig lease fees, which create pressure on the rig lessee (e.g., BP) Estimated value of a rig by using Rig Valuation Tool (RVT) by Norwegian Company Bassoe Offshore See I went through this valuation in 2017 for Semi-submersible rig Years in service starting Currently drilling: Yes Ability to operate in harsh environment: Yes Hi-tech and specifications: Yes» This rig has a value between $283 and $312 millions, almost half of what Transocean paid in 2001.

THE BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION AND ENFORCEMENT REPORT REGARDING THE CAUSES OF THE APRIL 20, 2010 MACONDO WELL BLOWOUT

THE BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION AND ENFORCEMENT REPORT REGARDING THE CAUSES OF THE APRIL 20, 2010 MACONDO WELL BLOWOUT THE BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION AND ENFORCEMENT REPORT REGARDING THE CAUSES OF THE APRIL 20, 2010 MACONDO WELL BLOWOUT September 14, 2011 TABLE OF CONTENTS Executive Summary...1 I. Introduction...

More information

THE DEEPWATER HORIZON: WHO IS RESPONSIBLE? By: Anya Perrilloux. Admiralty Law. November 10, 2012

THE DEEPWATER HORIZON: WHO IS RESPONSIBLE? By: Anya Perrilloux. Admiralty Law. November 10, 2012 THE DEEPWATER HORIZON: WHO IS RESPONSIBLE? By: Anya Perrilloux Admiralty Law November 10, 2012 THE DEEPWATER HORIZON: WHO IS RESPONSIBLE? I. INTRODUCTION On April 20, 2010, an explosion and fire erupted

More information

Safety of DP Drilling Operations in the South China Sea

Safety of DP Drilling Operations in the South China Sea Scandpower Risk Management China Inc Rm. 707 Towercrest International Plaza No. 3 Maizidian West Road Chaoyang District, 100016 Beijing, P.R. China Safety of DP Drilling Operations in the South China Sea

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

Global Floating Rig (Floater) Market: Trends and Opportunities ( ) February 2014

Global Floating Rig (Floater) Market: Trends and Opportunities ( ) February 2014 Global Floating Rig (Floater) Market: Trends and Opportunities (2014-2019) February 2014 Scope of the Report View Report Details The report titled Global Floaters Market: Trends and Opportunities (2014-2019)

More information

Global Service Sector Trends

Global Service Sector Trends Global Service Sector Trends Jerry Logan Vice President Strategy & Portfolio Energy Services Group Halliburton Presentation to the Energy Summit 2005 LSU Center for Energy Studies October 19-20, 2005 Today

More information

Chapter 4 Key Findings. 4 Key Findings

Chapter 4 Key Findings. 4 Key Findings Chapter 4 Key Findings 211 4 Key Findings 212 Chapter 4 Key Findings This summarizes the key findings of the investigation team based on its extensive review of available information concerning the Macondo

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

Deepwater Horizon. Josh Winsor Memorial University of Newfoundland 230 Elizabeth Avenue, St. John s NL, Canada

Deepwater Horizon. Josh Winsor Memorial University of Newfoundland 230 Elizabeth Avenue, St. John s NL, Canada PT-YR: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada March, 2013 Paper Code. (PT-YR - Winsor)

More information

Dynamic Underbalance (DUB)

Dynamic Underbalance (DUB) Dynamic Underbalance (DUB) Perforating Cam Le Perforating Product Champion Agenda Overview DUB Software Tools Case histories 2011 HALLIBURTON. ALL RIGHTS RESERVED. 2 Dynamic Underbalance Software Dynamic

More information

Hurricane IVAN Lessons Learned Energy Loss Adjusters Perspective. Bryan C. Johnson

Hurricane IVAN Lessons Learned Energy Loss Adjusters Perspective. Bryan C. Johnson Hurricane IVAN Lessons Learned Energy Loss Adjusters Perspective Bryan C. Johnson I. Lessons Learned - Adjustment Process II. Lessons Learned - The Storm Lessons Learned - Adjustment Process Issues Regarding

More information

But, who cares, it s done, end of story, [we] will probably be fine and we ll get a good cement job.

But, who cares, it s done, end of story, [we] will probably be fine and we ll get a good cement job. Chapter Four 89 89 Chapter Four But, who cares, it s done, end of story, [we] will probably be fine and we ll get a good cement job. The Macondo Well and the Blowout In March 2008, BP paid a little over

More information

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development 10121-4404-03 Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology

More information

OIL POLLUTION IN THE ARCTIC - RISKS AND MITIGATING MEASURES

OIL POLLUTION IN THE ARCTIC - RISKS AND MITIGATING MEASURES Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands OMAE2011-49157 OIL POLLUTION IN THE ARCTIC - RISKS

More information

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 RIG TYPES Land rigs in 2012... total (approx) 3200 Jack Up,... in 2012... total (approx) 485 units 300 * in drilling mode 130 for WD > 350 ft Floaters,...

More information

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A. Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A. Sean Yakeley, Ed Wood and Yang Xu (Baker Hughes Inc)

More information

Bureau of Ocean Energy Management

Bureau of Ocean Energy Management Bureau of Ocean Energy Management Offshore Energy Opportunities Mike Celata Regional Director Gulf of Mexico Region 1 March 9, 2017 Outer Continental Shelf Lands Act (T)he outer Continental Shelf is a

More information

SHELL ALASKA. December Use this area for cover image (height 6.5cm, width 8cm) Shell Exploration & Production Co.

SHELL ALASKA. December Use this area for cover image (height 6.5cm, width 8cm) Shell Exploration & Production Co. SHELL ALASKA December 2014 Use this area for cover image (height 6.5cm, width 8cm) Shell Exploration & Production Co. 1 DEFINITIONS AND CAUTIONARY NOTE The companies in which Royal Dutch Shell plc directly

More information

Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014

Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014 Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014 Randy Bennett Sr. Staff Health & Safety Engineer Process Safety Management Group Aera Energy LLC Key Points Process

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 06/29/2015

More information

LOWER MISSISSIPPI RIVER PRE-ENTRY INFORMATION

LOWER MISSISSIPPI RIVER PRE-ENTRY INFORMATION LOWER MISSISSIPPI RIVER PRE-ENTRY INFORMATION Notice of Arrivals Prior to Arrival at any U.S. port, the vessel master should ensure a complete and accurate Notice of Arrival has been submitted to National

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

Gulf of Mexico Oil Spill

Gulf of Mexico Oil Spill Bulletin 1204 May 2013 Estimation of the Baseline for Assessment of Economic Impacts of the Gulf of Mexico Oil Spill on Mississippi s Commercial Fishing Sector Discrimination based upon race, color, religion,

More information

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Dynamic Positioning: Method for Disaster Prevention and Risk Management Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

Appendix K Appendix K

Appendix K Appendix K Appendix K BOP Leaks There were five minor leaks in the Deepwater Horizon BOP control system: three were identified after the BOP stack was latched to the wellhead in February 2010, and two were identified

More information

Evaluation of deepwater kicks and future countermeasures

Evaluation of deepwater kicks and future countermeasures WELLS AND WELL INTERVENTION Evaluation of deepwater kicks and future countermeasures Paal Skalle, Per Holand 2 and Sigbjørn Sangesland Norwegian University of Science and Technology and 2 SINTEF/ExproSoft

More information

Characterization of Completion Operational Safety for Deepwater Wells

Characterization of Completion Operational Safety for Deepwater Wells 2013 2nd International Conference on Environment, Energy and Biotechnology IPCBEE vol.51 (2013) (2013) IACSIT Press, Singapore DOI: 10.7763/IPCBEE. 2013. V51. 25 Characterization of Completion Operational

More information

Abstract Objective Scope of Study Introduction Procedures

Abstract Objective Scope of Study Introduction Procedures AADE-05-NTCE-71 A Practical Solution to Control Gas Migration Ned Shiflet, Forest Oil Corporation; Michael O. Dion, TAM International; and David P. Flores, TAM International This paper was prepared for

More information

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Commentary on the book by Andrew Hopkins. By Graham Dalzell Commentary on the book by Andrew Hopkins By Graham Dalzell How we drill oil wells The disaster itself how it happened; (anonymised)- oil, well and drilling companies Andrew s conclusions on the Human,

More information

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Chris Carstens Unocal Corporation 14141 Southwest Freeway Sugar Land, Texas 77478 Mike Breaux Unocal Corporation 14141

More information

Risk-Based Process Safety for Upstream Oil & Gas: Put Your Boots on It s Coming! Mark Hansen and Jim Johnstone

Risk-Based Process Safety for Upstream Oil & Gas: Put Your Boots on It s Coming! Mark Hansen and Jim Johnstone 1. They did not attack the fuel storage Risk-Based Process Safety for Upstream Oil & Gas: Put Your Boots on It s Coming! Mark Hansen and Jim Johnstone Slide 2 Why is there Concern About Process Safety?

More information

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER INNOVATIVE ANALYSIS IMPROVED BLOWOUT PREVENTER 1. BRIEF DESCRIPTION OF THE SITUATION The blowout preventer (BOP) is a valve assembly usually mounted on the sea floor at the mouth of an oil well to control

More information

Learn more at

Learn more at IBP1833_06 COST EFFICIENT ARTIFICIAL BUOYANT SEABED DRILLING SOLUTION Dan Moutrey 1, Frank Lim 2 Copyright 2006, Instituto Brasileiro de Petróleo e Gás - IBP This Technical Paper was prepared for presentation

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 15871 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Safety and Risk Engineering. HSE Case Implementation Clive Rawson Safety and Risk Engineering HSE Case Implementation Clive Rawson Purpose ALARP Risk Assessment Major Accident Events Bowties Safety Critical Systems Performance Standards Implementation Getting HSE Case

More information

Guidance for Complying with BOEM NTL No N06 on Worst Case Discharge for Offshore Wells

Guidance for Complying with BOEM NTL No N06 on Worst Case Discharge for Offshore Wells Guidance for Complying with BOEM NTL No. 2010- N06 on Worst Case Discharge for Offshore Wells Society of Petroleum Engineers August 26, 2010 Chair: Tim Magner, Chevron Committee Members Jonathan Harris,

More information

Ballast. Stability Lab Experiment. Have you ever been in a boat at sea in large waves? The boat moves up and down as the waves pass under the boat.

Ballast. Stability Lab Experiment. Have you ever been in a boat at sea in large waves? The boat moves up and down as the waves pass under the boat. Ballast & Stability Lab Experiment Have you ever been in a boat at sea in large waves? The boat moves up and down as the waves pass under the boat. In the Gulf of Mexico and other areas of the world, waves

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Date: Tracking No.: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Submitted

More information

Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy

Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy Computational Analysis of Oil Spill in Shallow Water due to Wave and Tidal Motion Madhu Agrawal Durai Dakshinamoorthy 1 OUTLINE Overview of Oil Spill & its Impact Technical Challenges for Modeling Review

More information

ANNUAL PERFORMANCE REPORT FOR 2016 REPORTING YEAR

ANNUAL PERFORMANCE REPORT FOR 2016 REPORTING YEAR ANNUAL PERFORMANCE REPORT FOR 2016 REPORTING YEAR September 19, 2017 NOTICE Data published in the Center for Offshore Safety s (COS) Annual Performance Report for the 2016 Reporting Year are based on data

More information

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) BOP CLASSIFICATION SYSTEM FOR ONSHORE NEWFOUNDLAND AND LABRADOR INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) PREPARED BY THE PETROLEUM RESOURCE DEVELOPMENT DIVISION

More information

Appendix M Structural Analysis of the Macondo #252 Work String. Appendix M Structural Analysis of the Macondo #252 Work String

Appendix M Structural Analysis of the Macondo #252 Work String. Appendix M Structural Analysis of the Macondo #252 Work String Appendix M Structural Analysis of the Macondo #252 Work String Appendix M Structural Analysis of the Macondo #252 Work String Structural Analysis of the Macondo #252 Work String SES Document No.: 1101190-ST-RP-0003

More information

Chukchi Sea Oil and Gas Development

Chukchi Sea Oil and Gas Development Chukchi Sea Oil and Gas Development Andrew Mattox, MBA, Director 1, David Coil, PhD, Director 2, Erin McKittrick, M.S., Director 3, Elizabeth Lester PhD 4, Bretwood "Hig" Higman, PhD, Executive Director

More information

Planning of Drilling Operations in Extreme Ocean Currents

Planning of Drilling Operations in Extreme Ocean Currents DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 OPERATIONS Planning of Drilling Operations in Extreme Ocean Currents Luca Pivano - Marine Cybernetics/DNV GL Kristopher Eide - Marine Cybernetics/DNV

More information

Hard or Soft Shut-in : Which is the Best Approach?

Hard or Soft Shut-in : Which is the Best Approach? HARD - SOFT shut-in? Hard or Soft Shut-in : Which is the Best Approach? March '93 INTRODUCTION There is now reasonable acceptance through-out the industry for the use of a hard shut-in procedure following

More information

Air gap on semi-submersible MOUs under DNVGL Class. Current & Future Design Practice

Air gap on semi-submersible MOUs under DNVGL Class. Current & Future Design Practice Air gap on semi-submersible MOUs under DNVGL Class Current & Future Design Practice Topics for the presentation Wood Group Norway Motivation DNVGL OTG-13 DNVGL OTG-14 Case study Impact on semi submersible

More information

A Novel Platform for Drilling in Harsh High-Latitude Environments.

A Novel Platform for Drilling in Harsh High-Latitude Environments. AADE-7-NTCE-73 A Novel Platform for Drilling in Harsh High-Latitude Environments. Brian Roberts, Technip; Chunqun Ji, Technip; Jim O Sullivan, Technip and Terje Eilertsen, Technip. Copyright 27, AADE This

More information

Marine Technology Society

Marine Technology Society Marine Technology Society Dynamic Positioning Conference 21-22 October, 1997 Session I Review of DP Applications, Consequences and Cost of Failures Drilling Fundamentals-DP Operations-Drilling with Riser

More information

Live well deployment of long perforating gun system using combined CT technologies

Live well deployment of long perforating gun system using combined CT technologies Live well deployment of long perforating gun system using combined CT technologies SPE ICoTA European Well Intervention Conference Aberdeen - 12 November, 2014 Simon Smith, Technical Support Manager Baker

More information

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc Presented at OMAE, New Orleans, February 2000 Introduction Characteristics

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

Corporate Overview. About Us. Our People. Diving Services. Offshore Services

Corporate Overview. About Us. Our People. Diving Services. Offshore Services Corporate Overview Legacy Offshore is an innovative provider of subsea construction and inspection services to domestic and international oil and gas industries operating at water depths up to 1000 feet.

More information

Eliminating Fatal Risks. Dale Bradford Drilling Superintendent

Eliminating Fatal Risks. Dale Bradford Drilling Superintendent Eliminating Fatal Risks Dale Bradford Drilling Superintendent Setting the Stage: The BHPB Fatal Risks BHPB Fatal Risks identified following a review of past fatalities and significant incidents within

More information

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) AADE-07-NTCE-41 A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) Paknejad, A., Texas A&M University; Schubert, J., Texas A&M University

More information

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion PTRT 1471: Exploration and Production I Chapter 6: Drilling and Well Completion Well Planning Drilling is a major investment (over $100m for offshore) Planning is aimed at maximizing investment Wells are

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 03/16/2016

More information

How HSE regulates onshore oil and gas

How HSE regulates onshore oil and gas Health and Safety Executive How HSE regulates onshore oil and gas Paul Bradley (Operations Manager Wells and Mines) Craig Norman (Well Engineering and Operations Inspector) Health & Safety Executive Health

More information

GOM Diving Safety Work Group. Recommended Minimum Dive Team Manning 3/18/2016

GOM Diving Safety Work Group. Recommended Minimum Dive Team Manning 3/18/2016 GOM Diving Safety Work Group COMMITTEE WORK GROUP Recommended Minimum Dive Team Manning 3/8/206 DISCLAIMER This US GOM DSWG document is not meant to be all inclusive, and not every rule and regulation

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

The wind tunnel tests of wind pressure acting on the derrick of deepwater semi-submersible drilling platform

The wind tunnel tests of wind pressure acting on the derrick of deepwater semi-submersible drilling platform Available online at www.sciencedirect.com Energy Procedia 14 (2012) 1267 1272 2011 2nd International Conference on Advances in Energy Engineering (ICAEE2011) The wind tunnel tests of wind pressure acting

More information

Is my well safe? Terje Løkke-Sørensen, CTO, add energy

Is my well safe? Terje Løkke-Sørensen, CTO, add energy Is my well safe? Terje Løkke-Sørensen, CTO, add energy Introduction What is? a Safe Well?.. an Unsafe Well? A well with 2 well barriers both fully intact? A well with known issues risks can be managed?

More information

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Kicks & blowouts A kick is an unexpected influx into a well of a formation fluid. Should this influx be uncontrolled... -- during its way from the bottom of the hole up in the

More information

Quicker and Safer Deployment of Deepwater MODU Moorings.

Quicker and Safer Deployment of Deepwater MODU Moorings. Quicker and Safer Deployment of Deepwater MODU Moorings www.offspringinternational.com Deepwater MODU Mooring Deepwater exploration increasing further offshore Deeper moorings over 7,000ft Larger MODUs

More information

New generation of solid expandable liners help give operators a jump on trouble zones

New generation of solid expandable liners help give operators a jump on trouble zones New generation of solid expandable liners help give operators a jump on trouble zones By Pat York, Weatherford SINCE SOLID EXPANDABLE technology has gained credibility as an effective contingency option,

More information

TABLE OF CONTENTS INTRODUCTION AND STATEMENT OF PURPOSE 6 SUMMARY OF EDUCATIONAL BACKGROUND AND WORK EXPERIENCE 6 EXECUTIVE SUMMARY 9

TABLE OF CONTENTS INTRODUCTION AND STATEMENT OF PURPOSE 6 SUMMARY OF EDUCATIONAL BACKGROUND AND WORK EXPERIENCE 6 EXECUTIVE SUMMARY 9 EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 2 TABLE OF CONTENTS INTRODUCTION AND STATEMENT OF PURPOSE 6 INTRODUCTION 6 STATEMENT OF PURPOSE 6 SUMMARY OF EDUCATIONAL BACKGROUND AND WORK

More information

FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5

FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5 FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5 MAIN PARTICULARS LENGTH OVER ALL 60.68 m LENGTH WATER LINE 59.35 m BREADTH MAX 20.80 m DRAUGHT MAX 3.10 m DEPTH 6.70 m MAX SPEED 37.0 knots @

More information

Good Morning everyone, I will be talking this morning about the review and restructure of Cruise Whitsundays Safety Management Systems.

Good Morning everyone, I will be talking this morning about the review and restructure of Cruise Whitsundays Safety Management Systems. Good Morning everyone, I will be talking this morning about the review and restructure of Cruise Whitsundays Safety Management Systems. 1 This presentation is about the restructure of Cruise Whitsundays

More information

MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT

MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT Ionuț-Cristian SCURTU Principal instructor, Navy Academy Mircea cel Batran Constanta, Romania Abstract-The fast evolution

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST Contractor: WorleyParsons Canada Services Ltd. Project: Hebron Topsides Project Package: SC-64 GBS Caisson Field Welding Services Category: XXXXX-XXXXX Closing Date: 19 June 2013

More information

Secure Energy for America. RPSEA UDW Forum June 22 & 23, 2010

Secure Energy for America. RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Presentation Prepared by Dr. Keith Millheim, Ph.D., Nautilus International LLC Tom Williams, Nautilus International LLC Richard Dessenberger,

More information

The SPE Foundation through member donations and a contribution from Offshore Europe

The SPE Foundation through member donations and a contribution from Offshore Europe Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as

More information

Design Challenges & Solutions for Large Diameter Export Risers

Design Challenges & Solutions for Large Diameter Export Risers Design Challenges & Solutions for Large Diameter Export Risers Elizabeth Tellier, Hugh Howells & Mark Cerkovnik 2H Offshore Engineering AOG 2011 Agenda WA export riser design challenges Development options

More information

Modeling effects of fishing closures in the Western Florida Shelf

Modeling effects of fishing closures in the Western Florida Shelf Modeling effects of fishing closures in the Western Florida Shelf David J. Die and Steven Saul* University of Miami * Currently SEFSC/NMFS/NOAA Outline Effects of fishing closures DWH Fishing closures

More information

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001 OCS Report MMS 2002-040 Investigation of Loss of Well Control Eugene Island Block 277 OCS-G 10744 Well A-2 Off the Louisiana Coast July 6, 2001 U.S. Department of the Interior Minerals Management Service

More information

NORSOK STANDARD D-002 Edition 2 (2013)

NORSOK STANDARD D-002 Edition 2 (2013) Date: 2015-06-01 NORSOK STANDARD D-002 Edition 2 (2013) Well intervention equipment Frequently asked questions - FAQ NORSOK 2015 2 INTRODUCTION NORSOK standard D-002 Revision 2 was released in June 2013.

More information

OFFSHORE. Trasfor OFFSHORE

OFFSHORE. Trasfor OFFSHORE OFFSHORE Trasfor OFFSHORE 2 Trasfor I Offshore Introduction Trasfor s transformers for offshore applications ensure the highest performance level of reliability in any working condition. More than 40 skilled

More information

FPSO Riser Solutions for Harsh environments

FPSO Riser Solutions for Harsh environments FPSO Riser Solutions for Harsh environments Hanh Ha and Hugh Howells AOG Perth, March 2015 Overview Design challenges Flexibles Configurations and response Mild Environment Riser Harsh Environment Riser

More information

II. Executive Summary III. Education, Expertise, And Experience IV. Introduction... 19

II. Executive Summary III. Education, Expertise, And Experience IV. Introduction... 19 TABLE OF CONTENTS I. Scope Of Review.... 11 II. Executive Summary... 11 III. Education, Expertise, And Experience.... 17 IV. Introduction.... 19 V. BP Failed To Follow Its Own Written Practices And Violated

More information

Dynamically Positioned (DP) Mobile Offshore Drilling Unit (MODU) Critical Systems, Personnel and Training

Dynamically Positioned (DP) Mobile Offshore Drilling Unit (MODU) Critical Systems, Personnel and Training Commandant United States Coast Guard 2100 2 nd Street, S.W. STOP 7581 Washington, DC 20593-7581 Staff Symbol: CG-xxx Phone: (202) 372-xxxx Fax: (202) 372-xxx CG-xxx Policy Letter XX-11 From: To: Subj:

More information

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 16947 Status: Submitted RAILROAD COMMISSION OF TEAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Investigation of Blowout and Fire Eugene Island Block 284 OCS-G 0991 Well A-13 March 1, 2001

Investigation of Blowout and Fire Eugene Island Block 284 OCS-G 0991 Well A-13 March 1, 2001 OCS Report MMS 2001-084 Investigation of Blowout and Fire Eugene Island Block 284 OCS-G 0991 Well A-13 March 1, 2001 Gulf of Mexico Off the Louisiana Coast U.S. Department of the Interior Minerals Management

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015

More information

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011 AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF SEMS HAZARD ANALYSIS TRAINING September 29, 2011 Purpose The purpose of this meeting is to provide guidelines for determination of hazard

More information

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013 Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Petroleum Engineering Spring semester, 2013 Open Writer: Øystein Røssland (Writer s signature) Faculty supervisor: Professor

More information

Authors: Luiz Barbieri and Martha Bademan

Authors: Luiz Barbieri and Martha Bademan This is a review and discussion of a proposal to develop and implement a Gulf Offshore Recreational Fishing Permit in support of more accurate, precise, and timely catch and effort estimates for offshore

More information

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015 International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages 116- ISSN: 2289-4713 Improving Reservoir Recovery Factor Using Enhanced Electrical Submersible Pump Design; a Case

More information

A New Thermoplastic Composite Riser for Deepwater Application

A New Thermoplastic Composite Riser for Deepwater Application A New Thermoplastic Composite Riser for Deepwater Application Martin van Onna, Managing Director Airborne Composite Tubulars Patrick O Brien, Group Director Strategic Business & Marketing, Wood Group Kenny

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking.: Approved 03/11/2015

More information

Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we

Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we U.S Department of the Interior 0MB Control Number 1010-0141 Minerals Management Service MMS 0MB Approval Expires 08/31/2008 Form MMS 123A1123S Electronic Version Lease Area/Block Well Name ST 01 BP 00

More information

Chapter 4.7 Kick Detection. Well Monitoring and Kick Detection. Pit Gain (Volumetric Comparison)

Chapter 4.7 Kick Detection. Well Monitoring and Kick Detection. Pit Gain (Volumetric Comparison) Chief Counsel s Report Chapter 4.7: Kick Detection 165 Chapter 4.7 Kick Detection The Chief Counsel s team finds that rig personnel missed signs of a kick during displacement of the riser with seawater.

More information

Charlton 30/31 Field Development Project

Charlton 30/31 Field Development Project Charlton 30/31 Field Development Project Final Design Presentation: 4/30/2016 Prepared for: The Attendees of the Spring 2016 Undergraduate Research Day Team #3: Elizabeth Barsotti, Mitch Weigel, Charles

More information

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content Contents 1. Abbreviations 2. Background 3. Definition 4. Well Conditions 5. HPHT Safety Case

More information

This in an internal Commission document provided to Industry for reference purposes only.

This in an internal Commission document provided to Industry for reference purposes only. FORM C EMERGENCY INCIDENT FORM BC Oil and Gas Commission 6534 Airport Road Fort St. John BC V1J 4M6 Phone: (250) 794-5200 emp@bcogc.ca This in an internal Commission document provided to Industry for reference

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information