NUMERICAL AND PHYSICAL MODELING

Size: px
Start display at page:

Download "NUMERICAL AND PHYSICAL MODELING"

Transcription

1 POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada David S. Brown, KGS Group, Winnipeg, MB, Canada Brian Hughes, Northwest Hydraulic Consultants, North Vancouver, BC, Canada Kevin Sydor, Manitoba Hydro, Winnipeg, MB, Canada

2 Project Description Existing Facility Winnipeg River, 150 km northeast of Winnipeg, Manitoba, Canada. Owned and operated by Manitoba Hydro (since 2002) Oldest hydroelectric plant operating in Manitoba (1909 to 1926) Run of River Facility Average River Flow: 850 m 3 /s (range m 3 /s) 16 horizontal turbines (78 MW) and operates at a head of 14 m. 92 spillways and 5 sluiceways (only 6 automated) N Pointe du Bois satellite mosaic from Canada Centre for Remote Sensing Winnipeg River Drainage Basin

3 Project Description Proposed Upgrades Spillway facilities require replacement for: Public and dam safety Concrete deterioration Spillway capacity & operation issues provide a safer working environment for staff Spillway Replacement Project includes: Replacing the existing spillways and sluiceways with a new East Spillway Existing gravity dams maintained and enhanced for dam safety New earthfill dam constructed downstream of the existing spillway facilities. Safely passes floods up to the Inflow Design Flood (IDF) of 5,040 m 3 /s Maintains operation of the powerhouse East Spillway

4 Project Description Project Objectives Spillway performance Constructability Costs Timelines Risk management Environmental considerations Integrated Hybrid Modeling Approach Understand the hydraulic design complexities Optimize the arrangement of the spillway s approach and discharge channels, Investigate construction cost saving alternatives, Evaluate spillway operation Numerical Modelling Physical Modelling

5 Integrated Hybrid Modeling Approach Numerical and Physical Modeling Each has distinct advantages for analyzing and comparing design alternatives Typically, the two types of model studies complement each other For this project, both models were applied simultaneously for an integrated approach to provided a broader and more efficient analysis Fast-tracked design process to meet strict construction schedule requirements

6 Numerical Modeling Description CFD model to Evaluate alternative spillway arrangements and configurations, Provide preliminary hydraulic assessment of the spillway structures, and Establish the initial design of the project. CFD model consists of: Model Dimension: 1200 m of river reach (600 m upstream and 600 m downstream) Mesh sizes ranged: 4m x 4m x 1m 1m x 1m x 0.5m Existing Spillways New Guideberms Existing Gravity Dams Existing Powerhouse New Earthfill Dam New Approach Channel, Spillway, Discharge Channel

7 Physical Modeling Description 1:50 scale 150 m of the forebay Existing spillway and sluiceway facilities Exit from the powerhouse draft tubes 800 m downstream from existing sluiceways Model footprint was 22 m by 24 m Objectives included: Optimization of the approach and discharge channel designs Evaluation of hydraulic performance of the spillway Confirmation of spillway operations

8 Approach Channel Optimization Objectives Reduce excavation volumes and costs Minimizing headlosses Maintaining adequate spillway capacity to safely pass the IDF Design Initial Design developed in numerical model Optimized using an integrated approach Confirmed and analyzed in physical model

9 Approach Channel Optimization Upstream Boundary Condition CFD model results used to define the inflow characteristics for the physical model since the CFD model encompassed a larger area of the outer forebay Performance of the approach channel guide berms is affected by flow direction Velocity magnitudes ±10% and velocity vectors ± 6 degrees Flow rate 4 % lower than that predicted by CFD model

10 Approach Channel Optimization Optimization Process Channel geometry was adjusted and rapidly tested in physical model Guideberms were shaped in physical model to provide smooth approach flow with no flow separation Confirm: Froude number within the channel remained low enough to ensure stable hydraulics Control would remain at the spillway structure Rockfill sizing adequate

11 Approach Channel Optimization Optimization Process CFD model allowed for: Detailed water level and velocity data Continuous mapping and estimation of Froude numbers Physical Model: Data at key points were used to confirm the results from the CFD simulation Design team combined efforts and expertise at model witness tests to expedite the design process Observations over a large range of flow conditions

12 Discharge Channel Optimization Objectives Minimize risk of a hydraulic jump at base of the spillway structure Minimize rock excavation costs Confirm acceptable operation Confirm spillway capacity Confirm acceptable hydraulic conditions at powerhouse tailrace on west bank Design Numerical modeling provided initial design Physical modeling to efficiently optimize the width and curvature of the discharge channel

13 Discharge Channel Optimization Optimization Process Several full-day working model demonstrations to resolve concerns, determine limitations, and compare alternatives Results from CFD model simulations prepared in the days prior to the meetings to help interpret and complement results taken from the physical model Provided the opportunity to efficiently test and visualize several designs Physical model considered better at handling transitional flows and wave activity Ongoing collaboration to ensure designs being evaluated were practical, economical and accurate

14 Discharge Channel Optimization Optimization Process Integrated use of CFD and physical models allowed the project team to: expediently optimize the discharge channel design confirm its performance met the required hydraulic criteria over a range of spillway discharges Testing showed significant potential for a reduction in the width of the discharge channel without: adversely impacting the spillway capacity increasing wave activity in the vicinity of the spillway creating water levels that exceed the channel walls The optimization of the discharge channel eliminated approximately 150,000 cubic meters of excavation (a total excavation reduction of 20%) Final Geometry Initial Geometry

15 Summary and Conclusions Numerical Modeling Can be more efficient for evaluation of: Large areas or extended river Major changes such as adjusting structure locations or significant bathymetric alterations Collection of detailed data Physical Modeling Visual, tangible and understandable to most observers Can be more efficient for evaluation of: Localized design refinements Complex hydraulic phenomenon Rapid assessment of wide range of flow conditions & geometric changes Often used to validate CFD models and confirm the final design developed for a project

16 Summary and Conclusions Integrated Hybrid Model Approach Allowed the Project Team to: Expediently optimize the design (channels and guideberms) Confirm detailed data (i.e. Froude Number) in entire channel Understand & visualize the more complex hydraulic conditions (i.e. wave patterns in a channel) Integration of the CFD model and physical model allowed for the expedient interpretation of model results by Project Team The combination of the detailed results from the CFD model and the rapid assessment & visualization of the physical model proved to be invaluable Provided Manitoba Hydro with the confidence that the new arrangement could be constructed on schedule and with reduced project costs.

17 POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING THANK YOU FOR YOUR TIME QUESTIONS? Presenters: Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada, David S. Brown, KGS Group, Winnipeg, MB, Canada, Co-Authors: Brian Hughes, Northwest Hydraulic Consultants, North Vancouver, BC, Canada Kevin Sydor, Manitoba Hydro, Winnipeg, MB, Canada

SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING. Kara Hurtig, Water Resources Engineer, Northwest Hydraulic Consultants, BC, Canada

SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING. Kara Hurtig, Water Resources Engineer, Northwest Hydraulic Consultants, BC, Canada POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Water Resources Engineer, Northwest Hydraulic Consultants, BC, Canada David S. Brown, Senior

More information

T o validate the proposed design of

T o validate the proposed design of P R O J E C T D E S I G N Combining Computational and Physical Modeling to Design the Keeyask Station To develop a design for the proposed 675-MW Keeyask station, Manitoba Hydro integrated computational

More information

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 28th, 1:30 PM The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam E. A. Thompson Sacramento District

More information

16th Australasian Fluid Mechanics Conference: An Evaluation of Computational Fluid Dynamics for Spillway Modelling

16th Australasian Fluid Mechanics Conference: An Evaluation of Computational Fluid Dynamics for Spillway Modelling 16 th Australasian Fluid Mechanics Conference Crown Plaza, Gold Coast, Australia 2-7 December 2007 16th Australasian Fluid Mechanics Conference: An Evaluation of Computational Fluid Dynamics for Spillway

More information

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN Elsa Alves *, Felix Hernando and Rafael Chacón * Laboratório Nacional de Engenharia Civil (LNEC) Av. do Brasil, 101, 1700-066 Lisboa, Portugal

More information

Exercise (3): Open Channel Flow Rapidly Varied Flow

Exercise (3): Open Channel Flow Rapidly Varied Flow Exercise (3): Open Channel Flow Rapidly Varied Flow 1) A hydraulic jump exists in a trapezoidal channel having a bed width of 7 m and side slope of 1:1. The flowing discharge is 25 m 3 /sec. Construct

More information

Options for Reducing Total Dissolved Gas at the Long Lake Hydroelectric Facility. Northwest Hydraulic Consultants Inc, Seattle, Washington, USA

Options for Reducing Total Dissolved Gas at the Long Lake Hydroelectric Facility. Northwest Hydraulic Consultants Inc, Seattle, Washington, USA Options for Reducing Total Dissolved Gas at the Long Lake Hydroelectric Facility Ed Zapel 1, Hank Nelson 2, Brian Hughes 3, Steve Fry 4 1 Northwest Hydraulic Consultants Inc, Seattle, Washington, USA 2

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

Session C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish

Session C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010. BChydro CD FOR GEf\lE IONS B-2 Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604) 623-4407 bchydroregulatorygroup@bchydro.com January 19, 2010 Ms. Erica M. Hamilton Commission Secretary

More information

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research

More information

Large-scale Field Test

Large-scale Field Test Vaskinn 1 Large-scale Field Test Kjetil Arne Vaskinn kav@trh.statkraftgroner.no Statkraft Grøner AS SUMMARY The objective the controlled failure of large-scale embankment is to monitor and record the failure

More information

Design of Spillway Upgrades

Design of Spillway Upgrades USACE Dam Safety Program Design of Spillway Upgrades Sal Todaro, P.E. Senior Hydraulic Structures Engineer U.S. Army Corps of Engineers Risk Management Center 1 Presentation Overview 1. USACE (RMC) approach

More information

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968 Submitted by EES Consulting 1155 North State

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

Transitional Steps Zone in Steeply Sloping Stepped Spillways

Transitional Steps Zone in Steeply Sloping Stepped Spillways Transitional Steps Zone in Steeply Sloping Stepped Spillways Jalal Attari 1 and Mohammad Sarfaraz 2 1- Assistant Professor, Power and Water University of Technology, Iran 2- Graduate Student, Department

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC PROJECT NO. 516 PROJECT DESCRIPTION EXHIBIT A DECEMBER 2007 Prepared by: SOUTH CAROLINA ELECTRIC & GAS COMPANY

More information

Evaluation of step s slope on energy dissipation in stepped spillway

Evaluation of step s slope on energy dissipation in stepped spillway International Journal of Engineering & Technology, 3 (4) (2014) 501-505 Science Publishing Corporation www.sciencepubco.com/index.php/ijet doi: 10.14419/ijet.v3i4.3561 Research Paper Evaluation of step

More information

HYDRAULIC JUMP AND WEIR FLOW

HYDRAULIC JUMP AND WEIR FLOW HYDRAULIC JUMP AND WEIR FLOW 1 Condition for formation of hydraulic jump When depth of flow is forced to change from a supercritical depth to a subcritical depth Or Froude number decreases from greater

More information

KEEYASK FISH PASSAGE IDENTIFICATION OF DESIGN CONCEPTS

KEEYASK FISH PASSAGE IDENTIFICATION OF DESIGN CONCEPTS KEEYASK FISH PASSAGE IDENTIFICATION OF DESIGN CONCEPTS NOVEMBER 29 TH, 2012 Executive Summary A Keeyask fish passage feasibility study was undertaken with the goal of developing and evaluating a suite

More information

Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams

Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams Joe Orlins, P.E., Ph.D. NWHA Technical Seminar May 15, 2014 Boundary and Cabinet Gorge Dams The Problem: Too Much Gas Boundary

More information

Adopted Regulation Strategy Lake of the Woods Control Board Regulation Meeting March 12, 2013

Adopted Regulation Strategy Lake of the Woods Control Board Regulation Meeting March 12, 2013 Adopted Regulation Strategy Lake of the Woods Control Board Regulation Meeting March 12, 2013 The Lake of the Woods Control Board held a Regulation Meeting March 12, 2013 in Kenora. The strategy was formulated

More information

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators Second International Symposium on Marine Propulsors smp 11, Hamburg, Germany, June 2011 Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the

More information

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates

More information

Scott Dam Spillway Comparing Physical Model Study Results

Scott Dam Spillway Comparing Physical Model Study Results Scott Dam Spillway Comparing Physical Model Study Results Darren Hinton, P.E., Ph.D., Seattle Laboratory Manager, Northwest Hydraulic Consultants, USA Brian Hughes, M.A.Sc., P.E., Principal, Northwest

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

NUMERICAL INVESTIGATION ON WATER DISCHARGE CAPABILITY OF SLUICE CAISSON OF TIDAL POWER PLANT

NUMERICAL INVESTIGATION ON WATER DISCHARGE CAPABILITY OF SLUICE CAISSON OF TIDAL POWER PLANT Proceedings of the Sixth International Conference on Asian and Pacific Coasts (APAC ) December 4 6,, Hong Kong, China NUMERICAL INVESTIGATION ON WATER DISCHARGE CAPABILITY OF SLUICE CAISSON OF TIDAL POWER

More information

OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES

OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES Learning Objectives OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES 1. Learn about gradually varied flow and rapidly varying flow 2. Discuss different types of water surface profiles 3. Discuss the

More information

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 4 Hydraulic Jumps Lecture - 1 Rapidly Varied Flow- Introduction Welcome

More information

Greenup Lock Filling and Emptying System Study

Greenup Lock Filling and Emptying System Study Fourth LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCET 2006) Breaking Frontiers and Barriers in Engineering: Education, Research and Practice 21-23 June

More information

Interlake Tunnel WRA Board Workshop. August 25, 2014

Interlake Tunnel WRA Board Workshop. August 25, 2014 Interlake Tunnel WRA Board Workshop August 25, 2014 1 Agenda Introduction Project Description Background Concept of tunnel operations Engineering and analysis performed to date Preliminary modeling results

More information

Spillway with improved dissipation efficiency - side dissipation beams

Spillway with improved dissipation efficiency - side dissipation beams Spillway with improved dissipation efficiency - side dissipation beams Dušan Ciuha Jurij Mlanik IBE, Consulting Engineers Institute for Hydraulic Research Hajdrihova 4 Hajdrihova 28 Ljubljana Ljubljana

More information

WIND LOADS / MOORING & FISH TAILING. Arjen Koop, Senior Project Manager Offshore Rogier Eggers, Project Manager Ships

WIND LOADS / MOORING & FISH TAILING. Arjen Koop, Senior Project Manager Offshore Rogier Eggers, Project Manager Ships WIND LOADS / MOORING & FISH TAILING Arjen Koop, Senior Project Manager Offshore Rogier Eggers, Project Manager Ships OVERVIEW Wind Loads Wind shielding Fish tailing? 2 WIND LOADS FOR OFFSHORE MARS TLP

More information

Computational fluid dynamics analysis of a mixed flow pump impeller

Computational fluid dynamics analysis of a mixed flow pump impeller MultiCraft International Journal of Engineering, Science and Technology Vol. 2, No. 6, 2010, pp. 200-206 INTERNATIONAL JOURNAL OF ENGINEERING, SCIENCE AND TECHNOLOGY www.ijest-ng.com 2010 MultiCraft Limited.

More information

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms.

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms. CGU HS Committee on River Ice Processes and the Environment 18 th Workshop on the Hydraulics of Ice Covered Rivers Quebec City, QC, Canada, August 18-20, 2015 Design and Installation of two Permanent Booms

More information

APPENDIX 2.1 Lake Sturgeon - Mitigation and Enhancement

APPENDIX 2.1 Lake Sturgeon - Mitigation and Enhancement APPENDIX 2.1 Lake Sturgeon - Mitigation and This page is intentionally left blank. Lake Sturgeon Mitigation and As a provincial crown corporation providing electric energy and natural gas service, Manitoba

More information

Démocratisation des modèles hydrauliques CFD 3D : plusieurs exemples réalisés avec ANSYS CFX

Démocratisation des modèles hydrauliques CFD 3D : plusieurs exemples réalisés avec ANSYS CFX DEMOCRATIZATION OF 3D CFD HYDRAULIC MODELS : SEVERAL EXAMPLES PERFORMED WITH ANSYS CFX Démocratisation des modèles hydrauliques CFD 3D : plusieurs exemples réalisés avec ANSYS CFX Gwenaël CHEVALLET 1,

More information

Modelling of Pressurised Pipes within InfoWorks ICM and CS

Modelling of Pressurised Pipes within InfoWorks ICM and CS Modelling of Pressurised Pipes within InfoWorks ICM and CS 1. Introduction Correctly modelling pressurised pipes, variously described as forcemains or rising mains, can be one of the more difficult aspects

More information

Prediction of Nearshore Waves and Currents: Model Sensitivity, Confidence and Assimilation

Prediction of Nearshore Waves and Currents: Model Sensitivity, Confidence and Assimilation Prediction of Nearshore Waves and Currents: Model Sensitivity, Confidence and Assimilation H. Tuba Özkan-Haller College of Oceanic and Atmospheric Sciences Oregon State University, 104 Ocean Admin Bldg

More information

Investigation of Cavitation Damage Levels on Spillways

Investigation of Cavitation Damage Levels on Spillways World Applied Sciences Journal 1 (1): 7-78, 01 ISSN 1818-495 IDOSI Publications, 01 DOI: 10.589/idosi.wasj.01.1.1.60 Investigation of Cavitation Damage Levels on Spillways 1, 1 1 E. Fadaei Kermani, G.A.

More information

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL L Boddy and T Clarke, Austal Ships, Australia SUMMARY CFD analysis has been conducted on a 100m catamaran hull

More information

Red River Basin and FM Diversion Hydrology. North Dakota Water Education Foundation Executive Briefing July 13, 2012

Red River Basin and FM Diversion Hydrology. North Dakota Water Education Foundation Executive Briefing July 13, 2012 Red River Basin and FM Diversion Hydrology North Dakota Water Education Foundation Executive Briefing July 13, 2012 Red River Basin Total Drainage Area: 45,000 square miles North Dakota Fargo, ND Moorhead,

More information

Effect of channel slope on flow characteristics of undular hydraulic jumps

Effect of channel slope on flow characteristics of undular hydraulic jumps River Basin Management III 33 Effect of channel slope on flow characteristics of undular hydraulic jumps H. Gotoh, Y. Yasuda & I. Ohtsu Department of Civil Engineering, College of Science and Technology,

More information

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER +)) SNC LAVALIN Lower Churchill Project RIPRAP DESIGN FOR SLI Document No. 505573-3001-4HER-0011-00 Nalcor Reference No. MFA-SN-CD-0000-CV-RP-0006-01 Rev. 81 Date: 07 -Dec-2012 Prepared by: Checked by:

More information

Adopted Regulation Strategy LWCB Regulation Meeting - March 22, 2010

Adopted Regulation Strategy LWCB Regulation Meeting - March 22, 2010 Adopted Regulation Strategy LWCB Regulation Meeting - March 22, 2010 The Lake of the Woods Control Board held a Regulation Meeting in Kenora on March 25, 2010 and adopted the following strategy. The strategy

More information

OPTIMIZATION OF RECUPERATER FIN GEOMETRY FOR MICRO GAS TURBINE

OPTIMIZATION OF RECUPERATER FIN GEOMETRY FOR MICRO GAS TURBINE OPTIMIZATION OF RECUPERATER FIN GEOMETRY FOR MICRO GAS TURBINE S.Ramamurthy 1 and Bharat Makwana 2 1 Scientist,National Aerospace Laboratories, Bangalore, ramamurthy_srm@yahoo.com 2 Engineer,INOX Private

More information

Clackamas River Hydroelectric Project Flows and whitewater recreation: Updated information about Three Lynx and Bob s Hole boating

Clackamas River Hydroelectric Project Flows and whitewater recreation: Updated information about Three Lynx and Bob s Hole boating Clackamas River Hydroelectric Project Flows and whitewater recreation: Updated information about Three Lynx and Bob s Hole boating Prepared for Portland General Electric 121 SW Salmon Street Portland,

More information

A Research on the Airflow Efficiency Analysis according to the Variation of the Geometry Tolerance of the Sirocco Fan Cut-off for Air Purifier

A Research on the Airflow Efficiency Analysis according to the Variation of the Geometry Tolerance of the Sirocco Fan Cut-off for Air Purifier A Research on the Airflow Efficiency Analysis according to the Variation of the Geometry Tolerance of the Sirocco Fan Cut-off for Air Purifier Jeon-gi Lee*, Choul-jun Choi*, Nam-su Kwak*, Su-sang Park*

More information

Calculation of the Internal Blast Pressures for Tunnel Magazine Tests

Calculation of the Internal Blast Pressures for Tunnel Magazine Tests Calculation of the Internal Blast Pressures for Tunnel Magazine Tests by Kevin Hager Naval Facilities Engineering Service Center Pt Hueneme, CA and Naury Birnbaum Century Dynamics, Inc. San Ramon, CA ABSTRACT

More information

Spillway Deflector Design Using Physical and Numerical Models

Spillway Deflector Design Using Physical and Numerical Models Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 28th, 4:00 PM Spillway Deflector Design Using Physical and Numerical Models M. Politano University of Iowa,

More information

Modelling and Assessment of Marine Renewable Energy Resources. Andrew Cornett Canadian Hydraulics Centre National Research Council Canada May 2008

Modelling and Assessment of Marine Renewable Energy Resources. Andrew Cornett Canadian Hydraulics Centre National Research Council Canada May 2008 Modelling and Assessment of Marine Renewable Energy Resources Andrew Cornett Canadian Hydraulics Centre National Research Council Canada May 2008 Background Pan-Canadian resource inventory in 2005/06 Canada

More information

Increased Project Bankability : Thailand's First Ground-Based LiDAR Wind Measurement Campaign

Increased Project Bankability : Thailand's First Ground-Based LiDAR Wind Measurement Campaign Increased Project Bankability : Thailand's First Ground-Based LiDAR Wind Measurement Campaign Authors: Velmurugan. k, Durga Bhavani, Ram kumar. B, Karim Fahssis As wind turbines size continue to grow with

More information

Follow this and additional works at:

Follow this and additional works at: University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Tidal Energy from the Severn Estuary: Opportunities and Challenges

Tidal Energy from the Severn Estuary: Opportunities and Challenges Co-financed with the support of the European Union 1 ERDF Atlantic Area Programme Investing in our common future Tidal Energy from the Severn Estuary: Opportunities and Challenges Prof Roger Falconer,

More information

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 4 Hydraulics Jumps Lecture - 4 Features of Hydraulic Jumps (Refer Slide

More information

Lake Sturgeon Stewardship and Enhancement Program

Lake Sturgeon Stewardship and Enhancement Program Lake Sturgeon Stewardship and Enhancement Program Report # 11-05 Construction of Shoals to Enhance Lake Sturgeon Spawning Habitat in the Winnipeg River at Pointe du Bois: 2011 Monitoring Program Report

More information

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results We have received the first PRELIMINARY results from several tests (science) conducted on the dam area. Per the engineers they are still refining the depths of the void areas (holes under the concrete areas).

More information

Stability of Concrete Macro-Roughness Linings for Overflow Protection of Earth Embankment Dams ( 1 ) - Discussion

Stability of Concrete Macro-Roughness Linings for Overflow Protection of Earth Embankment Dams ( 1 ) - Discussion Stability of Concrete Macro-Roughness Linings for Overflow Protection of Earth Embankment Dams ( 1 ) - Discussion H. Chanson (Reader) Dept of Civil Engineering, The University of Queensland, Brisbane QLD

More information

Cabinet Gorge Dam Spillway Modifications for TDG Abatement - Design Evolution and Field Performance

Cabinet Gorge Dam Spillway Modifications for TDG Abatement - Design Evolution and Field Performance Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 29th, 1:30 PM - 3:30 PM Cabinet Gorge Dam Spillway Modifications for TDG Abatement - Design Evolution and Field

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Computational analysis of fish survival at the John Day Powerhouse

Computational analysis of fish survival at the John Day Powerhouse Computational analysis of fish survival at the John Day Powerhouse Jim Kiel Laurie Ebner Introduction Design a CFD model that can be used to predict the pressures in the turbine runner environment. What

More information

THEORETICAL EVALUATION OF FLOW THROUGH CENTRIFUGAL COMPRESSOR STAGE

THEORETICAL EVALUATION OF FLOW THROUGH CENTRIFUGAL COMPRESSOR STAGE THEORETICAL EVALUATION OF FLOW THROUGH CENTRIFUGAL COMPRESSOR STAGE S.Ramamurthy 1, R.Rajendran 1, R. S. Dileep Kumar 2 1 Scientist, Propulsion Division, National Aerospace Laboratories, Bangalore-560017,ramamurthy_srm@yahoo.com

More information

3D NUMERICAL MODELLING OF THE CAPACITY FOR A PARTIALLY PRESSURIZED SPILLWAY

3D NUMERICAL MODELLING OF THE CAPACITY FOR A PARTIALLY PRESSURIZED SPILLWAY 3D NUMERICAL MODELLING OF THE CAPACITY FOR A PARTIALLY PRESSURIZED SPILLWAY Samuel Vingerhagen 1 & Nils Reidar B. Olsen 1 1 Department of Hydraulic and Environmental Engineering, The Norwegian Univeristy

More information

Applications of ELCIRC at LNEC

Applications of ELCIRC at LNEC stratification in the Guadiana estuary tidal propagation in the Óbidos lagoon Lígia Pinto Anabela Oliveira André B. Fortunato 2 O utline Stratification in the Guadiana estuary The Guadiana estuary Objectives

More information

Riverboat Simulator Activity

Riverboat Simulator Activity Riverboat Simulator Activity Purpose: The purpose of this activity is to analyze the relationship between the two vector components of motion for a river boat as it travels across a river in the presence

More information

How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology. Jump Start Guide

How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology. Jump Start Guide How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology Jump Start Guide Problem Statement In this guide, you will be introduced to the tools in BLOWDOWN that can be used

More information

MF ER

MF ER Page 1 of 59 Newfoundland and Labrador Hydro Lower Churchill Project Pre-Feed Engineering Services Muskrat Falls Hydroelectric Project MF1050 Spillway Design Review FINAL Document No: 722850-MF1050-40ER-0001-00

More information

CFD and Physical Modeling of DSI/ACI Distribution

CFD and Physical Modeling of DSI/ACI Distribution CFD and Physical Modeling of DSI/ACI Distribution APC Round Table & Exposition July 09, 2013 Matt Gentry mgentry@airflowsciences.com 734-525-0300 1 Outline Introduction Flow Analysis Techniques Application

More information

Abrupt marine boundary layer changes revealed by airborne in situ and lidar measurements

Abrupt marine boundary layer changes revealed by airborne in situ and lidar measurements Abrupt marine boundary layer changes revealed by airborne in situ and lidar measurements David A. Rahn 1, Thomas R. Parish 2, and David Leon 2 1 Univeristy of Kansas 2 Univeristy of Wyoming Precision Atmospheric

More information

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018 EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018 Normal and Critical Depths Q1. If the discharge in a channel of width 5 m is 20 m 3 s 1 and Manning s n is 0.02 m 1/3 s, find: (a) the normal depth and Froude number

More information

Evaluating the Spillway Capacity of the Morning Glory Spillway at Harriman Dam

Evaluating the Spillway Capacity of the Morning Glory Spillway at Harriman Dam Evaluating the Spillway Capacity of the Morning Glory Spillway at Harriman Dam Damian M. Gomez, P.E., CFM, Gomez and Sullivan Engineers, D.P.C. Dan Gessler, Ph.D., P.E., D.WRE, Alden Research Laboratory,

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH Engineer Regulation 1110-2-1451 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design ACQUISITION OF LANDS DOWNSTREAM FROM SPILLWAYS FOR HYDROLOGIC

More information

Firth Creek Habitat Enhancement Project 1993

Firth Creek Habitat Enhancement Project 1993 Firth Creek Habitat Enhancement Project 1993 A. R. Langston December 1993 PWFWCP Report No. 77 The Peace/Williston Fish & Wildlife Compensation Program is a cooperative venture of BC Hydro and the provincial

More information

AMEC010570_0001. Via . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1.

AMEC010570_0001. Via  . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1. { TIME\@ "d MMMM yyyy" } AMEC Project Number VM00448 Via EMAIL Imperial Metals Corporation 200-580 Hornby Street Vancouver, B.C. V6C 3B6 Attention: Mr. Ron Martel Environmental Superintendent Reference:

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018

3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018 3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018 3.1 Normal Flow vs Gradually-Varied Flow V 2 /2g EGL (energy grade line) Friction slope S f h Geometric slope S 0 In flow the downslope component of weight balances

More information

St. Mary Diversion Dam Case Study of a 100 year Old Diversion

St. Mary Diversion Dam Case Study of a 100 year Old Diversion Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 29th, 4:00 PM - 6:00 PM St. Mary Diversion Dam Case Study of a 100 year Old Diversion B. J. Heiner U.S. Bureau

More information

Global Flow Solutions Mark Zagar, Cheng Hu-Hu, Yavor Hristov, Søren Holm Mogensen, Line Gulstad Vestas Wind & Site Competence Centre, Technology R&D

Global Flow Solutions Mark Zagar, Cheng Hu-Hu, Yavor Hristov, Søren Holm Mogensen, Line Gulstad Vestas Wind & Site Competence Centre, Technology R&D Global Flow Solutions Mark Zagar, Cheng Hu-Hu, Yavor Hristov, Søren Holm Mogensen, Line Gulstad Vestas Wind & Site Competence Centre, Technology R&D vestas.com Outline The atmospheric modeling capabilities

More information

Upstream Passage Assessment of American Shad Using 3D Acoustic Telemetry

Upstream Passage Assessment of American Shad Using 3D Acoustic Telemetry Upstream Passage Assessment of American Shad Using 3D Acoustic Telemetry Timothy Hogan, Alden Research Laboratory Corey Wright, Blue Leaf Environmental Skip Medford, Enel Green Power North America Abstract

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC PROJECT NO. 516 DESCRIPTION OF SALUDA HYRDOELECTRIC PROJECT EXHIBIT A AUGUST 2008 Prepared by: SOUTH CAROLINA

More information

STUDY ON TSUNAMI PROPAGATION INTO RIVERS

STUDY ON TSUNAMI PROPAGATION INTO RIVERS ABSTRACT STUDY ON TSUNAMI PROPAGATION INTO RIVERS Min Roh 1, Xuan Tinh Nguyen 2, Hitoshi Tanaka 3 When tsunami wave propagation from the narrow river mouth, water surface is raised and fluctuated by long

More information

Wind tunnel effects on wingtip vortices

Wind tunnel effects on wingtip vortices 48th AIAA Aerospace Sciences Meeting Including the New Horizons Forum and Aerospace Exposition 4-7 January 2010, Orlando, Florida AIAA 2010-325 Wind tunnel effects on wingtip vortices Xin Huang 1, Hirofumi

More information

Hydraulics of stepped spillways : current status

Hydraulics of stepped spillways : current status FORUM ARTICLE Hydraulics of stepped spillways : current status H. CHANSON Department of Civil Engineering, The University of Queensland, Brisbane QLD 4072, Australia Email : h.chanson@mailbox.uq.edu.au

More information

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018 ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018 Section 1.2 Example. The discharge in a channel with bottom width 3 m is 12 m 3 s 1. If Manning s n is 0.013 m -1/3 s and the streamwise slope is 1 in 200,

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title: Watana Project, Briefing document on RCC considerations SuWa 109 Author(s)

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

The pinnacle of car racing is Formula One, and Red Bull

The pinnacle of car racing is Formula One, and Red Bull Success in Formula One requires an enormous amount of coordination. Collaboration between engineering, IT and manufacturing allows the team to innovate rapidly, introducing new updates between every race.

More information

Technical Report 99-4 EFFECTS OF A SHAD FISHERY ON PASSAGE OF ADULT CHINOOK SALMON THROUGH THE OREGON-SHORE FISHWAY LADDER AT THE DALLES DAM

Technical Report 99-4 EFFECTS OF A SHAD FISHERY ON PASSAGE OF ADULT CHINOOK SALMON THROUGH THE OREGON-SHORE FISHWAY LADDER AT THE DALLES DAM Technical Report 99-4 EFFECTS OF A SHAD FISHERY ON PASSAGE OF ADULT CHINOOK SALMON THROUGH THE OREGON-SHORE FISHWAY LADDER AT THE DALLES DAM - 1996 A report for Project MPE-P-95-1 by C.A. Peery, T.C. Bjornn,

More information

Investigation on Divergent Exit Curvature Effect on Nozzle Pressure Ratio of Supersonic Convergent Divergent Nozzle

Investigation on Divergent Exit Curvature Effect on Nozzle Pressure Ratio of Supersonic Convergent Divergent Nozzle RESEARCH ARTICLE OPEN ACCESS Investigation on Divergent Exit Curvature Effect on Nozzle Pressure Ratio of Supersonic Convergent Divergent Nozzle Shyamshankar.M.B*, Sankar.V** *(Department of Aeronautical

More information

5th International Symposium on RCC Dams General Introduction

5th International Symposium on RCC Dams General Introduction OVERVIEW OF THE DESIGN, CONSTRUCTION, MATERIALS AND INNOVATIVE INSTRUMENTATION FOR ROLLER COMPACTED CONCRETE DAMS By Engr. Ch. Foad Hussain 1 Introduction to the Author Engr. Chaudhry Foad Hussain has

More information

AIRFLOW AND TEMPERATURE FIELD CALCULATIONS FOR WINTER SPORTS FACILITIES

AIRFLOW AND TEMPERATURE FIELD CALCULATIONS FOR WINTER SPORTS FACILITIES AIRFLOW AND TEMPERATURE FIELD CALCULATIONS FOR WINTER SPORTS FACILITIES Andrea Frisque* Stantec Consulting, Vancouver BC V6B6A3, Canada Rowan, Williams, Davies & Irwin (RWDI), Vancouver, BC, V5Z 1K5, Canada**

More information

Development of Technology to Estimate the Flow Field around Ship Hull Considering Wave Making and Propeller Rotating Effects

Development of Technology to Estimate the Flow Field around Ship Hull Considering Wave Making and Propeller Rotating Effects Development of Technology to Estimate the Flow Field around Ship Hull Considering Wave Making and Propeller Rotating Effects 53 MAKOTO KAWABUCHI *1 MASAYA KUBOTA *1 SATORU ISHIKAWA *2 As can be seen from

More information

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M. WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm

More information

On the use of rotor equivalent wind speed to improve CFD wind resource mapping. Yavor V. Hristov, PhD Plant Performance and Modeling Vestas TSS

On the use of rotor equivalent wind speed to improve CFD wind resource mapping. Yavor V. Hristov, PhD Plant Performance and Modeling Vestas TSS On the use of rotor equivalent wind speed to improve CFD wind resource mapping Yavor V. Hristov, PhD Plant Performance and Modeling Vestas TSS Firestorm- Number 53 on Top500 list from June 2011 14664 processors

More information

Free Surface Flow Simulation with ACUSIM in the Water Industry

Free Surface Flow Simulation with ACUSIM in the Water Industry Free Surface Flow Simulation with ACUSIM in the Water Industry Tuan Ta Research Scientist, Innovation, Thames Water Kempton Water Treatment Works, Innovation, Feltham Hill Road, Hanworth, TW13 6XH, UK.

More information

EMPIRICAL EVALUATION OF THREE WIND ANALYSIS TOOLS FOR CONCEPT DESIGN OF AN URBAN WIND SHELTER

EMPIRICAL EVALUATION OF THREE WIND ANALYSIS TOOLS FOR CONCEPT DESIGN OF AN URBAN WIND SHELTER Y. Ikeda, C. M. Herr, D. Holzer, S. Kaijima, M. J. Kim. M, A, Schnabel (eds.), Emerging Experience in Past, Present and Future of Digital Architecture, Proceedings of the 20th International Conference

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

HERBERT HOOVER DIKE REHABILITATION PROJECT

HERBERT HOOVER DIKE REHABILITATION PROJECT HERBERT HOOVER DIKE REHABILITATION PROJECT Update to the Broward County Water Advisory Board 19 September 2013 Ingrid Bon, PE Project Manager Forward Initial Levees Along Lake Okeechobee Authorized by

More information