Technical Report Culvert A Hydraulic Analysis
|
|
- Ralph Stephen Price
- 6 years ago
- Views:
Transcription
1 DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design Hike and Bike Facilities to 30% Plans Project Pegasus Phase I, IH 30 From Sylvan Avenue to IH 35 (CSJ ) TxDOT Dallas District Contract No P5003 As part of the referenced contract, Parsons Brinckerhoff was authorized to design a mixed use (hike and bike) trail within the west levee sump connecting the west bound collector distributor bridge to the Beckley Avenue sidewalk. As part of the design, the trail will cross over an existing ditch within the West Levee Sump. The crossing will require the placement of a proposed culvert to provide adequate conveyance of drainage within the existing ditch to the West Levee Sump. This technical report presents the hydraulic culvert analysis for the proposed culvert crossing. SCOPE The following tasks were performed for the design and analysis of the proposed culvert: Prepare a drainage area map for the culvert s contributing drainage area. Perform runoff calculations for the culvert contributing drainage area. Perform a hydraulic analysis and perform culvert sizing. Prepare a culvert plan and profile sheet and hydraulic calculation sheet for the re submittal of the 30 percent PS&E. Prepare a drainage report for TxDOT. PROPOSED CULVERT CROSSING DESCRIPTION The proposed crossing consists of a 30 inch RCP culvert with mitered ends conforming to the fill slope. The total length of the structure between the mitered inverts is 86 linear feet. The culvert is proposed at a 4.07 percent slope with the upstream invert elevation set at feet and the downstream invert elevation set at feet. The bikeway path width with respect to the culvert alignment is feet at an approximate elevation of 401 feet. The embankment fill is configured at a 6:1 (H:V) slope along the upstream face and 5:1 (H:V) slope along the downstream face. The culvert end treatments are proposed as mitered faces, conforming to the embankment slope. Stone riprap is proposed Technical Report Culvert A Hydraulic Analysis Page 1
2 downstream of the culvert for erosion protection. The culvert plan and profile is shown in the attached plan set Culvert Layout A. DATA COLLECTION As part of the culvert analysis, the following data was collected: H GAC 2 foot contours, dated 2007 H GAC aerial, dated 2009 Field visit and photographs City of Dallas Interior Levee Drainage Study West Levee Phase II, dated January 2009 by Jacobs/ Carter Burgess. Dallas County FIRM Panel No C0340J, effective date August 23, FEMA EFFECTIVE DATA The proposed Hike and Bike Trail at the Culvert A crossing is located along the City of Dallas West Levee Sump adjacent to the Trinity River. Based on the referenced FEMA data, the proposed project is located outside of the delineated Zone AE flood hazard area, within a shaded Zone X delineated area. The current effective FIRM panel is shown in Figure 1. The referenced flood hazard base flood (100 year) elevation is 404 feet within the West Levee Sump area. From the project survey and proposed trail layout at Culvert A, the proposed trail crossing and the drainage ditch will be inundated and overtopped by the effective base flood elevation due to backwater from the sump area. Technical Report Culvert A Hydraulic Analysis Page 2
3 Figure 1 FEMA FIRM Panel Technical Report Culvert A Hydraulic Analysis Page 3
4 HYDROLOGY The contributing drainage area for the culvert was delineated using the overland 2 foot contours, aerial photography, and a field visit. The overall contributing drainage area for the culvert is approximately 2.45 acres. The contributing drainage area is limited to the area east of North Beckley Avenue and the adjacent tracts along the drainage ditch. The culvert drainage area is shown in Figure 2. The Rational Method was used to compute the drainage area peak runoff rates. The Rational Method equation being Q = CIA, where Q is the computed peak runoff rate; C is the runoff coefficient; I is the frequency runoff intensity; and A is the drainage area. Using the aerial photography, a runoff coefficient averaged c value of was computed for the contributing drainage area. The contributing area land use consists of a mixture of light commercial, undeveloped tracts, drainage channels, and road right of way. The following table presents a breakdown of the land use and the calculations for the average c value. Table 1 Land Use & Runoff Coefficients Type Area (ac) C Grassy Tract Area Commercial Tract/ Buildings Ditch Channel Area Ditch Overbank Area Pavement TOTALS: The longest flow path within the drainage area is approximately 660 feet. The estimated travel time within the drainage area was computed to be 5 minutes. Therefore, the minimum time of concentration (Tc) of 10 minutes was used for the peak flow calculations based on TxDOT criteria. The time of concentration is used to compute the runoff intensity using the equation: I = b/ (Tc + d) e. The b, d, e coefficients are frequency and region dependent. Agencies will have differing intensity coefficients and therefore, equivalent time of concentrations will result in differing intensity values. A comparison of the computed intensity values for Dallas County using the TxDOT and iswm b, d, e coefficients was performed. The TxDOT values were determined to be more conservative; therefore they were used for this project. The following table presents the multiple frequency intensity comparison. Technical Report Culvert A Hydraulic Analysis Page 4
5 Table 2 Intensity Value Comparison: TxDOT and iswm Frequency: 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year TxDOT Values for Dallas County for Tc = 10 min e (in) b d (mins) Intensity (in/hr) NCTCOG iswm Values for Dallas County for Tc = 10 min e (in) b d (mins) Intensity (in/hr) The design frequency utilized to size the proposed culvert for the hike and bike trail was a 10 year storm event and the check flood frequency was for 100 year storm event. Flows were computed for the 10 year and 100 year storm events for the contributing drainage area and are presented in Table 3 along with the drainage area parameters. Table 3 Culvert Drainage Area Parameters and Flows Summary Drainage Area Tc I10 I100 Q10 Q100 (ac) C Value (min) (in/hr) (in/hr) (cfs) (cfs) Technical Report Culvert A Hydraulic Analysis Page 5
6 N Figure 2 Culvert A Drainage Area Technical Report Culvert A Hydraulic Analysis Page 6
7 HYDRAULIC COMPUTATIONS The proposed culvert crossing was analyzed using the Federal Highway Administration (FHWA) HY 8 Culvert Hydraulic Analysis Program, Version 7.2 build date July The design (10 year) and check (100 year) computed flows were used for the hydraulic computations. The proposed culvert dimensions were taken from the culvert layout sheet; this data is described previously. The tailwater condition was computed within the HY 8 model. The downstream channel cross section, which was taken from survey data, was incorporated into the model. The program used normal depth calculations to compute a downstream channel water surface elevation as well as an outlet depth at the culvert face. The highest of these elevations was reported as the culvert s tailwater condition. Because the current version of HY 8 does not have options for modeling mitered inlets, the conventional projecting inlet type was selected for the analysis. This selection provides similar entrance loss results as would the mitered, conformed to fill slope inlet type proposed for the crossing. Because of the inlet type selection, the full length of the culvert crossing (86 feet) was modeled within the HY 8 analysis. The HY 8 model computations results are presented in the following table. Total Culvert Discharge Discharge (cfs) (cfs) Table 4 Culvert A HY 8 Computation Summary Table Headwater Elevation (ft) Inlet Control Depth(ft) Outlet Control Depth(ft) Flow Type Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) * 0 NF * 1 S2n * 1 S2n * 1 S2n * 1 S2n * 1 S2n * 1 S2n * 1 S2n * 1 S2n * 1 S2n * 1 S2n Based on the culvert dimensions and supported by the HY 8 computations, the culvert is inlet controlled. The computed design (10 year) frequency headwater elevation is feet and the 100 year headwater elevation is feet. Based on the survey data along the drainage ditch, the 100 year headwater elevation is still contained within the upstream ditch banks. The drainage ditch bank elevations range from an approximate elevation of 400 feet near the bike path crossing to 404 feet at its upstream end near North Beckley Avenue. Technical Report Culvert A Hydraulic Analysis Page 7
8 SUMMARY Based on the hydraulic analysis and HY 8 modeling presented within this technical report, the proposed 30 inch RCP culvert will provide adequate capacity to convey the contributing 2.45 acres of drainage area runoff for the 10 year design and 100 year check storm events. It was further determined that the backwater effects from the proposed culvert crossing will not raise the upstream water surface elevation within the drainage ditch above the ditch banks for storm events up to and including the 100 year storm event. Technical Report Culvert A Hydraulic Analysis Page 8
9
10
HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.
HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges
More informationCHAPTER 5 CULVERT DESIGN
CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are
More informationAPPENDIX J HYDROLOGY AND WATER QUALITY
APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary
More informationGeneral Information for Culvert Design
Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side
More informationCHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN
SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY
More informationIndiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.
Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials
More informationWMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS
v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream
More informationPlan B Dam Breach Assessment
Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead
More informationCulvert Design An Overview of the NYS Highway Design Manual Chapter 8
Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented
More informationThe Basics of Culvert and Inlet Design
PDHonline Course C619 (8 PDH) The Basics of Culvert and Inlet Design Jerry D. Morrow, PE 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030 6658 Phone & Fax: 703 988 0088 www.pdhonline.org
More informationChapter 11. Culverts and Bridges Design Checklist for Culvert Design
Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional
More informationModeling of Long Culverts and Stormdrains A Comparison of Different Methods
Modeling of Long Culverts and Stormdrains A Comparison of Different Methods Shrinivas Kaulgud, P.E., CFM Cheryl Hannan, P.E., CFM, LEED AP October 12, 2017 Presentation Outline Introduction Case Studies
More informationUSING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1
USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently
More informationAPPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011
APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE
More informationStormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek
Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek City of Fairway, Kansas Fairway Stormwater Level of Service Study - Phase 2 Project No. 108200 Revision 1 12/6/2018 Stormwater
More informationStorm Damage Floating Culverts & Other Inlet Issues
Storm Damage Floating Culverts & Other Inlet Issues Mark Bailey, PE - Hydraulic Manager, INDOT Dale Sedler, PE - Sr. Hydraulic Engineer, INDOT Road School 2016 What causes a culvert to float? 1. Accumulation
More informationOFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL
OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL APRIL 2011 APRIL 2011 Page 1 Preface TIDEROUT 2, Build 1.22 dated June 29, 2006 is the current
More informationHEC 26 Aquatic Organism Passage Design Manual Evolution & Application
HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,
More informationStormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa -
Stormwater Management Pond Design Brief Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - December 2008 Ref: 647-07 J.F. Sabourin and Associates Inc. Water Resources and
More informationEvaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA
Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Prepared For: Woodard & Curran 95 Cedar Street, Suite 100 Providence, RI 02903
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationPROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,
PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA, FLOOD OF FEBRUARY 1986 By J.C. Blodgett and J.B. Lucas U.S. GEOLOGICAL SURVEY Open-File Report 88-82 CO CM I m r-h CM Sacramento, California
More informationCulvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest
Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low
More informationCITY OF ROSEVILLE DESIGN STANDARDS
CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR
More informationInformation for File # SEW
Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street
More informationCulvert Design Basics
PDHonline Course C287 (4 PDH) Culvert Design Basics Instructor: George E. Thomas, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
More informationAPPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES
3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43
More informationSussex County, DE Preliminary Study Overview
Sussex County, DE Preliminary Study Overview Coastal study scope: 102 miles of entire County shoreline Revised 102 panels for coastal study Riverine study scope: 14 streams, 67.1 miles, within the Nanticoke
More informationSAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS
SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes
More informationPENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California
HEC-RAS Version 3.1.3 May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California X X XXXXXX XXXX XXXX XX XXXX X X X X X X X X X X X X X X X X X X X XXXXXXX XXXX
More informationSTRUCTURE S-65 PURPOSE SPILLWAY OPERATION
STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of
More informationGALLATIN COUNTY, MONTANA AND INCORPORATED AREAS
GALLATIN COUNTY, MONTANA AND INCORPORATED AREAS Community Name Community Number * BELGRADE, CITY OF 300105 BOZEMAN, CITY OF 300028 GALLATIN COUNTY UNINCORPORATED AREAS 300027 * MANHATTAN, TOWN OF 300034
More informationAppendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING
Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G Alternative Solutions Details TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Krosno Creek Flood Reduction Project PROJECT
More informationAPPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS
TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The
More informationAnnex E Bridge Pier Protection Plan
Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central
More informationPRELIMINARY STORM DRAINAGE REPORT
PRELIMINARY STORM DRAINAGE REPORT DRURY LANE DEVELOPMENT 704 1ST STREET SULTAN, WA 98294-94240 PARCEL #28083200305500 AUDITOR S FILE NO. 1090255 CITY OF SULTAN SNOHOMISH COUNTY, WASHINGTON PREPARED FOR:
More informationDam Modification Report Stingy Run Fly Ash Reservoir Appendix E Spillway System Design Calculations E1: Spillway/Energy Dissipater Design for 100-year Event CHE8273 8 September 4, 2014 Written by: CJW
More informationCALIFORNIA SALMONID STREAM HABITAT RESTORATION MANUAL APPENDIX IX-A CULVERT CRITERIA FOR FISH PASSAGE INTRODUCTION
APPENDIX IX-A STATE OF CALIFORNIA RESOURCES AGENCY DEPARTMENT OF FISH AND GAME CULVERT CRITERIA FOR FISH PASSAGE For habitat protection, ecological connectivity should be a goal of stream-road crossing
More informationCLAIBORNE LOCK AND DAM PERTINENT DATA
CLAIBORNE LOCK AND DAM PERTINENT DATA GENERAL Location Clarke, Monroe, & Wilcox Counties, Alabama; Alabama River, river mile 72.5 Drainage area Millers Ferry to Claiborne sq. mi. 836 Total drainage area
More informationRock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E.
Rock Ramp Design Guidelines David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E. Rock Ramp Design Guidelines OUTLINE Local and System Interactions with Rock Ramps Ramp Geometry
More informationOFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011
OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011 APRIL 2011 Chapter 13 Culverts Table of Contents Foreword.3 13.1 Introduction.. 4 13.2 Policy 6 13.3 Passage
More informationSTORM DRAIN STUDY WRIGHT PROPERTY 203 CENTRAL AVENUE GAITHERSBURG, MD
STORM DRAIN STUDY WRIGHT PROPERTY 203 CENTRAL AVENUE GAITHERSBURG, MD PRELIMINARY PLAN OF SUBDIVISION 120160330 LOTS 1-6 AND PARCEL A BEING A RESUBDIVISION OF LOTS 12, 14, & 16 AND PARTS OF LOTS 13,15,
More informationMEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design
MEMORANUM TNC Fisher Slough Final esign and Permitting Subject: RAFT Technical Memorandum: Levee Emergency Spillway esign To: From: Internal Memorandum For Record Yen Hsu Chen (Tetra Tech) avid Cline (Tetra
More informationHYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10
HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 RACETRACK ROAD CULVERT OVER THE SPRING RUN & GREEN SPRINGS ROAD CULVERT OVER AN UNNAMED TRIBUTARY TO SPRING RUN BERWICK TOWNSHIP
More informationMEMO. Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment.
MEMO Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment February 15, 2017 As per the preferred Lakeview Boulevard alignment provided by
More informationEllis Y. Byeon, PE Bryan VanderGheynst, PE 1
Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1 Background Information: City of Trenton, Mercer County Assunpink Creek, Pond Run and Delaware River Lower 2.5 miles of the Assunpink Creek Lower 0.6 miles of
More informationAPPENDIX C. Fluvial and Tidal Hydraulics Report
APPENDIX C Fluvial and Tidal Hydraulics Report BUENA VISTA LAGOON ENHANCEMENT PROJECT FLUVIAL AND TIDAL HYDRAULICS ANALYSES Prepared for: SANDAG 401 B Street, Suite 800 San Diego, California 92101 Contact:
More informationAquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA
Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA TOPICS COVERED Aquatic Organism Passage (AOP) Benefits of AOP Crossings
More informationIllinois State Water Survey
Illinois State Water Survey HYDROLOGY DIVISION SWS Contract Report 508 COMPARISON OF 1987 AND 1989 BED PROFILE SURVEYS OF THE LOWER CACHE RIVER by Richard Allgire Office of Sediment and Wetland Studies
More informationSediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.
7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion
More informationLARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)
LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) INTRODUCTIONS * Pipeline 1041 Application Coordinator Todd Blomstrom Public Works Director Mark Peterson County Engineer Terry Gilbert Community Development
More informationHydrologic, Hydraulic and Geomorphic Technical Memorandum
Appendix A Hydrologic, Hydraulic and Geomorphic Technical Memorandum 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis
More informationAPPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS
OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11, EVALUATING SCOUR AT BRIDGES APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS APRIL 2011 APPENDIX C ESTIMATING SCOUR IN
More informationSuitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationWashington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer
Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage
More informationEast Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study
East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092
More informationCOST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION
COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates
More informationEvaluating Surge Potential in CSO Tunnels
14 Evaluating Surge Potential in CSO Tunnels Karen E. Ridgway Tunnels are being proposed to control combined sewer overflow (CSO) in numerous cities in the United States and Canada. The tunnels are intended
More informationRoadway Design Manual
Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationRESILIENCE THROUGH RESTORATION
RESILIENCE THROUGH RESTORATION RECLAMATION DISTRICT NO. 1601 TWITCHELL ISLAND SAN JOAQUIN RIVER SETBACK LEVEE PROJECT TWITCHELL ISLAND BASICS Nearly 12 miles of levee Storm drainage facilities Protects
More informationHURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING
HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology
More informationSTRUCTURE 65-B PURPOSE SPILLWAY OPERATION
STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector
More informationDiscussion on the Selection of the Recommended Fish Passage Design Discharge
Discussion on the Selection of the Recommended Fish Passage Design Discharge Introduction The provision of fish passage is a requirement for most proposed culvert and bridge installations in Alberta, depending
More informationDesigning Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods
Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research
More informationFish Passage Assessment Report Mare Brook Culverts
Fish Passage Assessment Report Mare Brook Culverts Fish Passage Assessment Component of Mare Brook Watershed Assessment and Community Engagement Project Prepared for: FB Environmental Associates 97A Exchange
More informationJEFFERSON COUNTY, ARKANSAS AND INCORPORATED AREAS
JEFFERSON COUNTY, ARKANSAS Community Name Community Number ALTHEIMER, CITY OF 050107 HUMPHREY, CITY OF 050108 JEFFERSON COUNTY 050440 (UNINCORPORATED AREAS) PINE BLUFF, CITY OF 050109 REDFIELD, CITY OF
More information3.0 Basin and Watershed Characteristics
3.0 Basin and Watershed Characteristics 3.1 Basin Characteristics 3.1.1 Crystal Lake Crystal Lake, located in the cities of Burnsville and Lakeville (Dakota County), covers an area of approximately 292
More informationSummary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.
Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI 01-001 Should really follow HEC 18, but this summary will get you the main points. 1: Determine scour analysis variables 2: Analyze long-term bed
More informationWanganui Rd Flood Modelling Investigation
Wanganui Rd Flood Modelling Investigation Greater Shepparton City Council July 2017 Document Status Version Doc type Reviewed by Approved by Date issued 01 Draft Ben Tate Ben Tate 27/07/2017 Project Details
More informationOutlet Structures T-12
Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed
More informationTABLE OF CONTENTS LEGAL NOTICE
Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED
More informationAPPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES. Lake Okeechobee & EAA Vol 3 A-i December 2005 Version 1 Draft 4
1 1 1 1 1 1 1 1 0 1 0 1 0 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Lake Okeechobee & EAA Vol A-i December 00 1 1 1 1 1 1 1 1 0 1 from the drainage area served, under a design head of. feet pool
More informationHuntington District. For More Information Contact (304)
Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationHillview Crossing Townhome Development
Territorial Landworks, Inc. P.O. Box 3851 (406) 721 0142 Missoula, MT 59806 PRELIMINARY GRADING AND DRAINAGE ENGINEERING DESIGN REPORT FOR CALCULATIONS USING USDA/NRCS WinTR 55 PROGRAM & IN ACCORDANCE
More informationInterim Guidance Fish Presence Absence
Interim Guidance Fish Presence Absence Source: Forest Practices Act Guidance for Division 635 of the forest practices act dealing with stream classification when no fish surveys have been done (referenced
More informationSELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT
SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT NAPA COUNTY, CALIFORNIA PREPARED BY NAPA COUNTY RESOURCE CONSERVATION DISTRICT 1303 JEFFERSON ST. SUITE 500B NAPA, CALIFORNIA 94559 WWW.NAPARCD.ORG
More informationVOLUME 2 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER
VOLUME 2 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER DAYTONA BEACH, CITY OF 125099 NEW SMYRNA BEACH, CITY OF 125132 DAYTONA BEACH SHORES, CITY OF 125100
More informationExercise (3): Open Channel Flow Rapidly Varied Flow
Exercise (3): Open Channel Flow Rapidly Varied Flow 1) A hydraulic jump exists in a trapezoidal channel having a bed width of 7 m and side slope of 1:1. The flowing discharge is 25 m 3 /sec. Construct
More informationSection 10 - Hydraulic Analysis
Section 10 - Hydraulic Analysis Methodology Documentation Functionality Summary Sizing Methodology Fixed/Resize Combined Flow Storm: Sizing as per d/d Structures.dat Storm vs. Sanitary Methodology HGL/EGL
More informationTraffic Impact Memorandum. May 22, 2018
BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared
More informationTotal Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc.
Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed December 2004 The Cadmus Group, Inc. Grand Valley State University Annis Water Resources Institute Submitted
More informationExercise (4): Open Channel Flow - Gradually Varied Flow
Exercise (4): Open Channel Flow - Gradually Varied Flow 1) A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches
More informationFish Passage Assessment of Private Stream Crossings on Lower Stonybrook Creek
Fish Passage Assessment of Private Stream Crossings on Lower Stonybrook Creek Prepared by: Michael Love & Associates In cooperation with: Center for Ecosystem Management and Restoration Funded by: Coastal
More informationLow Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]
Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered
More informationHard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563
Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationNorth Diversion Channel Physical Modeling:
North Diversion Channel Physical Modeling: Bike Notch Implementation Between Vineyard Arroyo Confluence to Osuna Bridge August 29, 2011 Prepared for Albuquerque Metropolitan Arroyo Flood Control Authority
More informationSouth Burlington Multi-Site Stormwater Infrastructure Assessment Site No. 2 Bartlett Bay Road Culvert
South Burlington Multi-Site Stormwater Infrastructure Assessment Site No. 2 Bartlett Bay Road Culvert Assessment of Culvert Capacity and Recommendations for Improvements Prepared for: Tom DiPietro Deputy
More informationTABLE OF CONTENTS LEGAL NOTICE
Closure Plan for Existing CCR Revision: 1 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED
More informationSUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD
SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD FINAL ROUTE AND POND STUDY PROJECT NO. C-9570.10 Prepared for: Pasco County
More informationMADISON COUNTY, ILLINOIS AND INCORPORATED AREAS
VOLUME 2 OF 2 MADISON COUNTY, ILLINOIS AND INCORPORATED AREAS * * * COMMUNITY COMMUNITY NAME NUMBER ALHAMBRA, VILLAGE OF 170270 ALTON, CITY OF 170437 BETHALTO, VILLAGE OF 170438 COLLINSVILLE, CITY OF 170439
More informationDr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS
Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationPlanning & Zoning Commission
Preliminary Plat Westwood, Section 3 Planning & Zoning Commission Planning & Development Department March 21, 2016 Request Subdivide approximately 38.1 acres of previously unplatted property to create
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationSkagit River Historical Flood Elevations and Peak Flow Estimates
Skagit River Historical Flood Elevations and Peak Flow Estimates to be presented at Skagit River GI H&H Technical Workshop Wednesday, June 17, 2009 Background Corps of Engineers began a General Investigation
More informationTRAFFIC IMPACT STUDY CRITERIA
Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat
More informationREVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering
REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other
More informationFollow this and additional works at:
Lehigh University Lehigh Preserve Fritz Laboratory Reports Civil and Environmental Engineering 1987 Model study. Of a culvert safety grating - south 4th and brookdale streets, ALLENTOWN, PA for the Allentown
More information