1 MEMO Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment February 15, 2017 As per the preferred Lakeview Boulevard alignment provided by the Town of Ajax, there exist various drainage culvert crossings which require remediation from a road design and/or wildlife corridor perspective. As shown on a provided topographical drawing and in discussions with the Town consultant, TMIG, three metal culverts are being looked into at this time. It should be noted that no existing storm flow information was available at this time and an opening area is all that is being considered such that existing hydraulic characteristics are maintained. Generally, the subject culverts have little to no cover and are affecting the condition of the road pavement. It should also be noted that this area of the Town of Ajax has been identified to be within a Spill Zone of the Carruther s Creek Floodplain and filling is to be kept to a minimum such that existing floodplain characteristics remain effectively unchanged from that of existing conditions. Therefore, larger diameter or overall rise drainage crossings are not recommended as filling would be required to install these structures. Three or four sided concrete culverts (open bottom vs concrete bottom) with a low overall rise is recommended. Existing Conditions Culvert 1 Consists of twin 450mm diameter CSP s Opening Area = Pi(r) 2 = 0.159m 2 each or 0.318m 2 West Culvert Upstream Invert=75.42 Downstream Invert=75.39 Length=~13.0m Slope=0.23% Capacity=0.074m 3 /s East Culvert Upstream Invert=75.45 Downstream Invert=75.37 Length=~13.0m Slope=0.62% Capacity=0.122m 3 /s 1

2 Use combined flow m 3 /s to size culvert Slope = 0.30% (from TMIG) Rise = use 0.30m A four sided concrete Box Culvert with a rise of 0.30m at 0.30% would need to be a minimum of 0.57m wide. Culvert 2 Consists of a 900mm diameter CSP Opening Area = Pi(r) 2 = 0.636m 2 Upstream Invert=75.22 Downstream Invert=75.17 Length=~14.0m Slope=0.36% Capacity=0.588m 3 /s Use flow of m 3 /s to size culvert Slope = 0.50% (from TMIG) Rise = use 0.750m A four sided concrete Box Culvert with a rise of 0.750m at 0.50% would need to be a minimum of 0.46m wide. Culvert 3 Consists of a 600mm diameter CSP Opening Area = Pi(r) 2 = 0.283m 2 Upstream Invert=75.60 Downstream Invert=75.05 Length=~16.5m Slope=3.33% Capacity=0.607m 3 /s Use flow of m 3 /s to size culvert Slope = 0.50% (from TMIG) Rise = use 0.450m A four sided concrete Box Culvert with a rise of 0.450m at 0.50% would need to be a minimum of 0.72m wide. Notes: * Mannings Equation used to calculate flow capacities see attached * No inlet/outlet controls taken into consideration for capacity calculations at this time. * Existing Elevation/length/diameter information taken from survey prepared by DFP surveyors dated June 3 rd 2015 Project No

3 Full Flow Capacity: Diameter 450 mm Slope 0.62% Manning's n (Pipe Flow) Job Number: Description: East Culvert 1 Lakeview Blvd Town of Ajax m/s Capacity m 3 /s

4 Full Flow Capacity: Diameter 450 mm Slope 0.23% Manning's n (Pipe Flow) Job Number: Description: West Culvert 1 Lakeview Blvd Town of Ajax m/s Capacity m 3 /s

5 Full Flow Capacity: Diameter 900 mm Slope 0.36% Manning's n (Pipe Flow) Job Number: Description: Culvert 2 Lakeview Blvd Town of Ajax m/s Capacity m 3 /s

6 Full Flow Capacity: Diameter 600 mm Slope 3.33% Manning's n (Pipe Flow) Job Number: Description: Culvert 3 Lakeview Blvd Town of Ajax m/s Capacity m 3 /s

7 (Trapezoidal Flow) Input: Job Number: Discharge m 3 /s Description: Lakeside Blvd. Culvert #1 Bottom Width 0.57 m Assessment Depth 0.30 m Slope 0.30% Manning's n Side Slopes 0.00 :1 (H:V) Solve for: 1.17 m/s Flow Area 0.17 m 2 Flow Top Width 0.57 m Wetted Perimeter 1.17 m Critical Depth 0.23 m Critical Slope 0.59% Froude Number 0.68

8 (Trapezoidal Flow) Input: Job Number: Discharge m 3 /s Description: Lakeside Blvd. Culvert #2 Bottom Width 0.46 m Assessment Depth 0.75 m Slope 0.50% Manning's n Side Slopes 0.00 :1(H:V) Solve for: 1.71 m/s Flow Area 0.35 m 2 Flow Top Width 0.46 m Wetted Perimeter 1.96 m Critical Depth 0.55 m Critical Slope 1.03% Froude Number 0.63

9 (Trapezoidal Flow) Input: Job Number: Discharge m 3 /s Description: Lakeside Blvd. Culvert #3 Bottom Width 0.72 m Assessment Depth 0.45 m Slope 0.50% Manning's n Side Slopes 0.00 :1(H:V) Solve for: 1.86 m/s Flow Area 0.33 m 2 Flow Top Width 0.72 m Wetted Perimeter 1.62 m Critical Depth 0.42 m Critical Slope 0.61% Froude Number 0.89

10

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G Alternative Solutions Details TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Krosno Creek Flood Reduction Project PROJECT

More information

Exercise (3): Open Channel Flow Rapidly Varied Flow

Exercise (3): Open Channel Flow Rapidly Varied Flow Exercise (3): Open Channel Flow Rapidly Varied Flow 1) A hydraulic jump exists in a trapezoidal channel having a bed width of 7 m and side slope of 1:1. The flowing discharge is 25 m 3 /sec. Construct

More information

OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES

OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES Learning Objectives OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES 1. Learn about gradually varied flow and rapidly varying flow 2. Discuss different types of water surface profiles 3. Discuss the

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

19.1 Problem: Maximum Discharge

19.1 Problem: Maximum Discharge 19.1 Problem: Maximum Discharge In partially full channel having an equilateral triangular cross section, the rate of discharge is Q = KAR/3 in which K is a constant, A flow area, R is the hydraulic mean

More information

Exercise (4): Open Channel Flow - Gradually Varied Flow

Exercise (4): Open Channel Flow - Gradually Varied Flow Exercise (4): Open Channel Flow - Gradually Varied Flow 1) A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches

More information

1. In most economical rectangular section of a channel, depth is kept equal to

1. In most economical rectangular section of a channel, depth is kept equal to Objective questions:- 1. In most economical rectangular section of a channel, depth is kept equal to a. One-fourth of the width b. Three times the hydraulic radius c. Hydraulic mean depth d. Half the width

More information

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa -

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - Stormwater Management Pond Design Brief Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - December 2008 Ref: 647-07 J.F. Sabourin and Associates Inc. Water Resources and

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia. FRST 557 Lecture 7c Bridges and Culverts: Water Velocity and Discharge Lesson Background and Overview: The previous two lessons presented methods for estimating water volume flow at a particular site and

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018 ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018 Section 1.2 Example. The discharge in a channel with bottom width 3 m is 12 m 3 s 1. If Manning s n is 0.013 m -1/3 s and the streamwise slope is 1 in 200,

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Title: Marsh Creek and Albion River Instream Fish Barrier Removal, Flynn

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

Broadly speaking, there are four different types of structures, each with its own particular function:

Broadly speaking, there are four different types of structures, each with its own particular function: 3 The selection of structures 3.1 Introduction In selecting a suitable structure to measure or regulate the flow rate in open channels, all demands that will be made upon the structure should be listed.

More information

Simulating Streams Through Culverts in Mat-Su, Alaska

Simulating Streams Through Culverts in Mat-Su, Alaska Simulating Streams Through Culverts in Mat-Su, Alaska Project Managers Bill Rice, P.E., USFWS Hydrologist Mary Price, USFWS Fishery Biologist The Team Approach US Fish and Wildlife Service Bill Rice, P.E.,

More information

Evaluating Surge Potential in CSO Tunnels

Evaluating Surge Potential in CSO Tunnels 14 Evaluating Surge Potential in CSO Tunnels Karen E. Ridgway Tunnels are being proposed to control combined sewer overflow (CSO) in numerous cities in the United States and Canada. The tunnels are intended

More information

Hours / 100 Marks Seat No.

Hours / 100 Marks Seat No. 17421 15116 3 Hours / 100 Seat No. Instructions (1) All Questions are Compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary. (4)

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

Minimum Standards for Driveway Construction Village of Bear Creek

Minimum Standards for Driveway Construction Village of Bear Creek Minimum Standards for Driveway Construction Village of Bear Creek An exception to the following requirements may only be granted by city council. The needs of each drainage system are considered independently,

More information

Modelling of Pressurised Pipes within InfoWorks ICM and CS

Modelling of Pressurised Pipes within InfoWorks ICM and CS Modelling of Pressurised Pipes within InfoWorks ICM and CS 1. Introduction Correctly modelling pressurised pipes, variously described as forcemains or rising mains, can be one of the more difficult aspects

More information

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results We have received the first PRELIMINARY results from several tests (science) conducted on the dam area. Per the engineers they are still refining the depths of the void areas (holes under the concrete areas).

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

HYDRAULIC JUMP AND WEIR FLOW

HYDRAULIC JUMP AND WEIR FLOW HYDRAULIC JUMP AND WEIR FLOW 1 Condition for formation of hydraulic jump When depth of flow is forced to change from a supercritical depth to a subcritical depth Or Froude number decreases from greater

More information

Photo 1: Typical 4 Weephole

Photo 1: Typical 4 Weephole April 25, 2008 MEMORANDUM To: Shelly LeClaire Milford Highway Department From: Tom Jenkins, P.E. Baystate Environmental Consultants, Inc. RE: Results of Field Inspection of Charles River Culvert Potential

More information

Dam Modification Report Stingy Run Fly Ash Reservoir Appendix E Spillway System Design Calculations E1: Spillway/Energy Dissipater Design for 100-year Event CHE8273 8 September 4, 2014 Written by: CJW

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M. WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm

More information

Experiment (13): Flow channel

Experiment (13): Flow channel Experiment (13): Flow channel Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

Storm Damage Floating Culverts & Other Inlet Issues

Storm Damage Floating Culverts & Other Inlet Issues Storm Damage Floating Culverts & Other Inlet Issues Mark Bailey, PE - Hydraulic Manager, INDOT Dale Sedler, PE - Sr. Hydraulic Engineer, INDOT Road School 2016 What causes a culvert to float? 1. Accumulation

More information

Fish Friendly Crossings- Examples from Nash Stream

Fish Friendly Crossings- Examples from Nash Stream Fish Friendly Crossings- Examples from Nash Stream Maggie Machinist- North Regional Forester, Division of Forests and Lands. Nash Stream Nash Stream Forest is 40,000 acres, owned and managed by NH Division

More information

STORM DRAIN STUDY WRIGHT PROPERTY 203 CENTRAL AVENUE GAITHERSBURG, MD

STORM DRAIN STUDY WRIGHT PROPERTY 203 CENTRAL AVENUE GAITHERSBURG, MD STORM DRAIN STUDY WRIGHT PROPERTY 203 CENTRAL AVENUE GAITHERSBURG, MD PRELIMINARY PLAN OF SUBDIVISION 120160330 LOTS 1-6 AND PARCEL A BEING A RESUBDIVISION OF LOTS 12, 14, & 16 AND PARTS OF LOTS 13,15,

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

2D Modelling Series. Modelling Structures in Floodplains

2D Modelling Series. Modelling Structures in Floodplains 2D Modelling Series Modelling Structures in Floodplains Jessica Jefferys Products Manager XP Solutions XP-LIVE Webinars XP-LIVE educational program Webinars have been recorded and are available at http://www.xpsolutions.com/

More information

TM /AFM 88-5, Chap Underground hydraulic design Inlets UFC - Drainage In Areas Other Than Airfields

TM /AFM 88-5, Chap Underground hydraulic design Inlets UFC - Drainage In Areas Other Than Airfields sults of laboratory research concerning soil infiltration through pipe joints and the effectiveness of gasketing tapes for waterproofing joints and seams are available. 3 6. Underground hydraulic design.

More information

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018 EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018 Normal and Critical Depths Q1. If the discharge in a channel of width 5 m is 20 m 3 s 1 and Manning s n is 0.02 m 1/3 s, find: (a) the normal depth and Froude number

More information

Hydrologic, Hydraulic and Geomorphic Technical Memorandum

Hydrologic, Hydraulic and Geomorphic Technical Memorandum Appendix A Hydrologic, Hydraulic and Geomorphic Technical Memorandum 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 ED FIELDING Commissioner, District 2 HAROLD E. JENKINS II Commissioner, District

More information

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA AUTHORS: Joe Richards, Environmental Science Associates Jane Atha, Washington Department of Fish & Wildlife Colin Thorne,

More information

Follow this and additional works at:

Follow this and additional works at: Lehigh University Lehigh Preserve Fritz Laboratory Reports Civil and Environmental Engineering 1987 Model study. Of a culvert safety grating - south 4th and brookdale streets, ALLENTOWN, PA for the Allentown

More information

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for: Annual CCR Landfill Inspection Lansing Landfill Prepared for: Interstate Power and Light Company Lansing Generating Station 2320 Power Plant Drive Lansing, Iowa 52151 Prepared by: SCS ENGINEERS 2830 Dairy

More information

Design Data 22M. Flotation of Circular Concrete Pipe. w w I = w - x 1000 (3) (SG x 1000)

Design Data 22M. Flotation of Circular Concrete Pipe. w w I = w - x 1000 (3) (SG x 1000) Design Data M Flotation of Circular Concrete Pipe There are several installation conditions where there is the possibility that concrete pipe may float even though the density of concrete is approximately.4

More information

Hours / 100 Marks Seat No.

Hours / 100 Marks Seat No. 17421 21415 3 Hours / 100 Marks Seat No. Instructions : (1) All Questions are compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary.

More information

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design MEMORANUM TNC Fisher Slough Final esign and Permitting Subject: RAFT Technical Memorandum: Levee Emergency Spillway esign To: From: Internal Memorandum For Record Yen Hsu Chen (Tetra Tech) avid Cline (Tetra

More information

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 4 Hydraulics Jumps Lecture - 4 Features of Hydraulic Jumps (Refer Slide

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

Culvert Design Basics

Culvert Design Basics PDHonline Course C287 (4 PDH) Culvert Design Basics Instructor: George E. Thomas, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

Fish Passage Assessment Report Mare Brook Culverts

Fish Passage Assessment Report Mare Brook Culverts Fish Passage Assessment Report Mare Brook Culverts Fish Passage Assessment Component of Mare Brook Watershed Assessment and Community Engagement Project Prepared for: FB Environmental Associates 97A Exchange

More information

A THESIS M.S. CIVIL ENGINEERING UNIVERSITY OF ALASKA ANCHORAGE ALEXANDRA WEST JEFFERIES, P.E.

A THESIS M.S. CIVIL ENGINEERING UNIVERSITY OF ALASKA ANCHORAGE ALEXANDRA WEST JEFFERIES, P.E. Assessing Fish Passage Success in Culvert Structures with the Development of a Two-Dimensional Algorithm Considering Physical Capabilities of Juvenile Salmonids ALEXANDRA WEST JEFFERIES, P.E. A THESIS

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The

More information

UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY

UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY OCTOBER 25, 2012 PREPARED FOR MORRISON COUNTY PUBLIC WORKS BY COLLINS ENGINEERS,

More information

Climate Change Adaptation and Stream Restoration. Jack Williams;

Climate Change Adaptation and Stream Restoration. Jack Williams; Climate Change Adaptation and Stream Restoration Jack Williams; jwilliams@tu.org 1 Goals for this presentation Develop strategies for adapting streams to climate impacts by Thinking like a watershed Understanding

More information

2O-2 Open Channel Flow

2O-2 Open Channel Flow Iowa Stormwater Management Manual O- O- Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The procedures for performing

More information

Fish Passage Planning and Design

Fish Passage Planning and Design Fish Passage Planning and Design Culvert Fishway Planning and Design Guidelines Part I Design Drawings for Fishway Projects Ross Kapitzke James Cook University School of Engineering and Physical Sciences

More information

Bolton, CT. January 7, 2016

Bolton, CT. January 7, 2016 BOLTON GREENWAY EXTENSION Preliminary Design Bolton, CT January 7, 2016 Tonight s Agenda Introduction Project Overview Review of Previous Meeting Progress since Last Meeting Review of significant impacts/issues

More information

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector

More information

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT NAPA COUNTY, CALIFORNIA PREPARED BY NAPA COUNTY RESOURCE CONSERVATION DISTRICT 1303 JEFFERSON ST. SUITE 500B NAPA, CALIFORNIA 94559 WWW.NAPARCD.ORG

More information

Stormwater Management Report for the Macri Dixon Condo Block

Stormwater Management Report for the Macri Dixon Condo Block for the Macri Dixon Condo Block Town of Milton February 2017 JFSA Ref. No.: 1287-15 Prepared for : Prepared by : David Schaeffer Engineering Ltd. 52 Springbrook Drive, Ottawa, ON K2S 1B9 tel.: 613.836.3884,

More information

The Basics of Culvert and Inlet Design

The Basics of Culvert and Inlet Design PDHonline Course C619 (8 PDH) The Basics of Culvert and Inlet Design Jerry D. Morrow, PE 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030 6658 Phone & Fax: 703 988 0088 www.pdhonline.org

More information

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures Sep/16 R-2 No Drawing Jan/17 R-2A Typical Cross Sections for Granular

More information

Stephens Creek Culvert Replacement. CAC April 28, 2010

Stephens Creek Culvert Replacement. CAC April 28, 2010 Stephens Creek Culvert Replacement CAC April 28, 2010 1 Top of Bank Willamette Moorage Park Existing Culverts 50 ft Greenway Setback 200 ft Greenway Setback Existing Macadam Bay Access Stephens Creek Existing

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

Chutes Part 2: Synthetic linings

Chutes Part 2: Synthetic linings s Part 2: Synthetic linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] s can

More information

Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017

Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017 Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017 Background The culvert at Rue des Trappistes and Westendorf Coulee needs to be replaced as it is at

More information

Rock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E.

Rock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E. Rock Ramp Design Guidelines David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E. Rock Ramp Design Guidelines OUTLINE Local and System Interactions with Rock Ramps Ramp Geometry

More information

Green CCR Surface Impoundment

Green CCR Surface Impoundment Green CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment 2017 Annual Inspection Report January 11, 2018 Prepared By: Project ID: 170138A

More information

Hydraulic Engineering

Hydraulic Engineering PDHonline Course H146 (4 PDH) Hydraulic Engineering Instructor: Mohamed Elsanabary, Ph.D., Prov. Lic. Engineering. 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax:

More information

Section 5: Pond Outlets

Section 5: Pond Outlets Section : Pond Outlets Defining and calculating pond outlet devices 8 Minutes Press Space, PageDown, or Click to advance. Press PageUp to reverse. Esc to exit. Right-Click for other options. Outlets Introduction

More information

Casablanca Boulevard & GO Station Access

Casablanca Boulevard & GO Station Access Casablanca Boulevard & GO Station Access Class Environmental Assessment STAKEHOLDER WORKSHOP Thursday September 27th, 2018 5:30PM 8:00PM 1 WORKSHOP PURPOSE Provide an overview of the Design Alternatives

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.015.003 Report issued: July 03, 2017 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

CITY OF ROSEVILLE DESIGN STANDARDS

CITY OF ROSEVILLE DESIGN STANDARDS CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR

More information

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek City of Fairway, Kansas Fairway Stormwater Level of Service Study - Phase 2 Project No. 108200 Revision 1 12/6/2018 Stormwater

More information

Added Introduction: Comparing highway design and stream design

Added Introduction: Comparing highway design and stream design Added Introduction: Comparing highway design and stream design Highway width is sized for the traffic, the width expanding as volume and speed increase. The ROW width is also designed to handle the speed

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

1.0 Introduction. Lake Tahoe Boulevard Enhancement Project Project Background

1.0 Introduction. Lake Tahoe Boulevard Enhancement Project Project Background 1.0 Introduction 1.1. Project Background The Lake Tahoe Boulevard Enhancement Project (Project) is intended to provide a critical link in the regional bicycle path network and to stabilize soil, restore

More information

CEE 345, Part 2, Winter 2012, Final Exam Solutions (Open Channel Flow)

CEE 345, Part 2, Winter 2012, Final Exam Solutions (Open Channel Flow) CEE 45, Part, Winter 0, Final Exam Solutions (Open Channel Flow). (a) (8) List and briefl describe the forces that must be considered in an analsis of flow in a trapezoidal channel with a slope of 0.006.

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

GENERAL LEGEND 12"CMP

GENERAL LEGEND 12CMP PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET

More information

EUROFLO CULVERT PIPE. Fittings / Pipes

EUROFLO CULVERT PIPE. Fittings / Pipes EUROFLO CULVERT PIPE Fittings / Pipes F EUROFLO FITTINGS RUBBERS SIZE CODE COMMENT 250 OD 315 OD 400 OD 500 OD 630 OD 800 OD 1000 OD 1200 OD 520-250-RBR 520-315-RBR 520-400-RBR 520-500-RBR 520-630-RBR

More information

Reams Road RCA Study. Board of County Commissioners Public Hearing

Reams Road RCA Study. Board of County Commissioners Public Hearing Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement

More information

3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018

3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018 3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018 3.1 Normal Flow vs Gradually-Varied Flow V 2 /2g EGL (energy grade line) Friction slope S f h Geometric slope S 0 In flow the downslope component of weight balances

More information

Packwood Hydroelectric Project Barrier Analysis December 12, 2006

Packwood Hydroelectric Project Barrier Analysis December 12, 2006 Packwood Hydroelectric Project Barrier Analysis December 12, 2006 Study Area Natural barriers to upstream fish passage on Lake Creek at RM 1.03 and RM 1.95 Snyder Creek culvert under the Project tailrace

More information

Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1

Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1 Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1 Background Information: City of Trenton, Mercer County Assunpink Creek, Pond Run and Delaware River Lower 2.5 miles of the Assunpink Creek Lower 0.6 miles of

More information

Discussion on the Selection of the Recommended Fish Passage Design Discharge

Discussion on the Selection of the Recommended Fish Passage Design Discharge Discussion on the Selection of the Recommended Fish Passage Design Discharge Introduction The provision of fish passage is a requirement for most proposed culvert and bridge installations in Alberta, depending

More information

KlassikDrain Section. Technical Handbook and Product Catalog. General purpose trench drainage

KlassikDrain Section. Technical Handbook and Product Catalog. General purpose trench drainage Technical Handbook and Product Catalog Surface Drainage 6 Surface drainage options 8 Product selection 10 Trench drain hydraulics 16 Loadings 22 Material data 24 End user requirements Standard Products

More information

Water surface slope extending up to 20 channel widths up and downstream of crossing.

Water surface slope extending up to 20 channel widths up and downstream of crossing. Site Evaluations Site Information Site Location: Mt ood NF, Forest Road 7 Year Installed: Pre-987 Lat/Long: 8 W Watershed rea (mi ): N Stream Slope (ft/ft) : Channel Type: Step-pool ankfull Width (ft):

More information