1 STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA / FAX 415/ PRESENTER: Russ Thompson, Public Works Director SUBJECT: OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD REQUEST Consider awarding a construction contract for the Olive Avenue Class II Bike Lanes project (CIP Project Number ) in the total amount of $333, to Team Ghilotti, Inc. as the lowest responsible bidder. RECOMMENDATION Award construction contract to Team Ghilotti, Inc. DISCUSSION The Olive Avenue Class II Bike Lane Project includes widening and re-striping of Olive Avenue between Samrose Drive and the eastern city limits to accommodate Class II bike lanes on both sides of the road. The roadway cross-section after widening will consist of 11-foot wide travel lanes and 5-foot wide Class II bike lanes in each direction. The current width of the paved roadway is as narrow as 24.5 feet at some locations. To accommodate the proposed pavement width of 32 feet it will be necessary to use the existing gravel shoulders and relocate the centerline of the roadway at some locations. The widening will take place on the south side of the road. Pavement rehabilitation will consist of micro-surfacing. Prior to pavement treatment the existing striping will be removed, and after pavement rehabilitation new striping will be installed. This project is funded under the Highway Safety Improvement Program (HSIP). On November 20, 2015 Caltrans obligated $487,255 in federal Highway Safety Improvement Program (HSIP) funds and granted the City authorization to proceed with construction and construction management. On May 3, 2016, the City Council authorize the advertising of the project for construction bids and staff subsequently advertised the project. The bid opening was held on May 31, 2016, and a total of 2 bids were received. After examination of the same, Team Ghilotti, Inc. was determined cc16_

2 the lowest responsible bidders, with the bid amount of $333, The engineers estimate for the work was $405,630. PUBLIC OUTREACH The project has been previously presented to the Novato City Council at the following meetings: July 17, 2012: Application for a Highway Safety Improvement Program Grant December 11, 2012: Create Project and Fund Preliminary Engineering October 15, 2013: Authorize City Manager to Execute Program Supplement Agreement for Preliminary Engineering November 18, 2014: Prohibition of Excavation January 12, 2016: Authorize City Manager to Execute Program Supplement Agreement for Construction and Construction Management May 3, 2016: Approve Plans and Specifications and Authorize Bid Advertisement There was one public workshop held on April 8, 2015 with 6 attendees. The workshop introduced the project to property owners and residents in the vicinity of the project. The workshop was held jointly with the County of Marin who has a similar project scheduled on the County portion of Olive Avenue immediately east of the City s project. Staff also provided answers to questions from attendees. The workshop presentation is available on the City of Novato website: Class II bike lanes along Olive Avenue from Samrose Drive to easterly city limits are recommended for construction by the City of Novato Bicycle/ Pedestrian Plan (2015). FISCAL IMPACT The project is included in the City of Novato Adopted Capital Improvement Program Budget for 2016/2017. The project is funded by Highway Safety Improvement Program (HSIP) funds and Gas Tax (10% local match required by the grant). The engineer s estimate for construction cost is within the budgeted amounts. ALTERNATIVES Take no action at this time and direct staff as to disposition of this project. ATTACHMENTS 1. Bid Abstract 2. Location Map 3. CIP Budget Excerpt 2 2

3 Detail Detail White PROJECT NAME PROJECT NO. : Olive Avenue Class II Bike Lanes-HSIP CITY OF NOVATO ABSTRACT OF BIDS AND AWARD Of CONTRACT DATE 31-May-2016 BID NO BID OPENING 2:00 pm BIDDERS Engineer s Estimate Team Ghilotti, Inc. Ghilotti Bros., Inc. Item TOTAL BID $405, $333, $385, No. DESCRIPTION Unit Qty Unit Price Amount Unit Price Amount Unit Price Amount I Temporary Water Pollution Control/Wildlife Protection ( ) LS 1 $15, $15, $7, $7, $15, $15, Removal of Existing Portland Cement Concrete (10-1.9) Sf 325 $5.00 $1, $30.50 $9, $4.76 $1, Removal of Existing Asphalt Concrete(I0-1.9) Sf 660 $5.00 $3, $23.00 $15, $5.00 $3, Removal of Existing Pavement Markings and Stripings (10-1.9) LS 1 $6, $6,! $5, $5, $6, $6, Construction Area Signs ( ) IS I $5,00t).00 $5, $5, $5, $5, $5,Ot) Maintaining Traftic ( ) IS I $10, $10, $9, $9, $10, $10, Traffic Control System for Lane Closure ( ) IS 1 $15, $15, $10, $10, $15, $15, Clearing and Grubbing(I0-1.I7) 15 1 $20, $20, $5, $5, $20, $20, Common Excavation (lo-l.18)f CY 115 $85.00 $9, $ $15, $ $73, final Stabilization- Hydroseeding(I0-l.l8) IS 1 $5, $5, $3, $3, $2, $2, H Class 2 Agregate Base West of Deer Island Ln ( ) TON 140 $ $21, $ * $16, $ $19, Class 2 Agregate Base East of Deer Island In ( ) TON 30 $ $4, $ $9, $ $6, Road Widening Deep lift I-IMA( ) TON 400 $ $140, $ $81, $ $82, HMA Base Course ( ) TON 100 $ $25, $ $29, $ $26, Plane Existing AC Pavement 0.15 ( ) SY 500 $20.00 $10, $44.00 $22, $17.00 $8, Pavement Reinforcing Fabric ( ) SY 790 $8.00 $6, $5.70 $4, $5.00 $3, HMA Surface Course (0.15 ) ( ) TON 160 $ $40, $ $26, $ $35, Crack Sealing ( ) IS I $5, $5, $9, $9, $9, $9, Microsurfacing Type II ( ) F SY 9,400 $5.00 $47, $4.10 $38, $3.75 $35, Thermoplastic Pavement Stripe Detail 22 ( ) If 1,875 $3.00 $5, $1.90 $3, $1.75 $3, Thermoplastic Pavement Stripe Detail 29 ( ) If 235 $4.00 $ $3.70 $ $3.50 $ Thermoplastic Pavement Stripe - 23 Thermoplastic Pavement Stripe - 24 Thermoplastic Pavement Markings - 39 ( ) If 3,800 $2.00 $7, $0.80 $3, $0.75 $2,850.t)0 39A ( ) IF 385 $2.t)0 $ $0.54 $ $0.50 $I92.5t) ( ) SF 100 $5.Ot) $50t).00 $4.20 $ $4.00 $ Blue Reflective Pavement Markers ( ) EA 3 $2t).00 $60.00 $16.00 $48.00 $15.00 $ Relocate and Reinstall Roadway Sign (lt)-l.27) EA I $ $ $ $215.0f) $ $ TOTAL BID $405, $333, $385, RECOMMENDATION: Award contract to Team Ghilotti, Inc. as the apparent lowest responsible bidder in the amotint of $333, * Corrected math error OTHER INFORMATION: Verified By: Submitted By 3 I agc I of I

4 GRAPHIC SCALE PROJECT LOCATION PROJECT NAME: OLIVE AVENUE CLASS II BIKE LANES-HSIP PROJECT LOCATION: OLIVE AVENUE FROM SAMROSE TO CITY LIMITS PROJECT NUMBER: LOCATION MAP 4

5 5

SUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO

SUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO STAFF REPORT MEETING DATE: May 3, 2016 TO: FROM: City Council Russell Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213

More information

AUTHORIZE BID ADVERTISEMENT

AUTHORIZE BID ADVERTISEMENT STAFF REPORT MEETING DATE: May 17, 2016 TO: City Council FROM: Petr Skala, Assistant Engineer PRESENTER: Russell Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE R. J. Noble Company Orange, CA 92856 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 190101 ROADWAY EXCAVATION CY 8,500 16.00 136,000.00 9.50 80,750.00

More information

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60) Company Name Base Bid Schedule A Base Bid Schedule B Total COUNTY'S ESTIMATE 367,150.00 328,300.00 $695,450.00 1 All American Asphalt 481,360.00 108,180.00 $589,540.00 2 PTM General Eng Services, Inc.

More information

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer STAFF REPORT MEETING DATE: October 1, 217 TO: City Council FROM: Petr Skala, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-89 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher J.

More information

Northside School Class I Bike Path, Cool, CA Application Attachments

Northside School Class I Bike Path, Cool, CA Application Attachments PLHD Grant Application, 12/9/2011 County of El Dorado Department of Transportation Northside School Class I Bike Path, Cool, CA Application Attachments 1. Project Site Map 2. Auburn State Recreation Area

More information

Item No. 14 Town of Atherton

Item No. 14 Town of Atherton Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY

More information

Tabulation of Bids. Counties: Project(s):

Tabulation of Bids. Counties: Project(s): Page: 1 14 ROTE 94, ROTE 46 TO OLD COACH RD Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 154003P MOBILIZATION 0007 157004M CONSTRCTION LAYOT 0012

More information

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Sponsor St Peters Project No. RB19-000022 Project Type Other TOTAL FUNDING Total County Sponsor Federal $1,177,251.00 $238,179.00 $59,546.00 $879,526.00

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Presented to: APWA Nor Cal November 3 rd, 2016 Presenters: Jason Shykowsi, P.E., T.E. City of Roseville Debbie Haldeman RCC Council

More information

Project Status Update

Project Status Update Project Status Update : Novato Boulevard, 4th & 3rd Streets, Sir Francis Drake Boulevard (3), and Miller Avenue Major roads projects target the most heavily traveled roads in Marin County for repairs,

More information

Pavement Management Report. City Council Meeting of May 21, 2013

Pavement Management Report. City Council Meeting of May 21, 2013 Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies

More information

BPP / SUB

BPP / SUB Development Services Department Project/File: Lead Agency: Site address: Millwell Place Subdivision/ BPP15-0031/ SUB15-0064 This is a preliminary plat application to allow for the development of 68 building

More information

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 16 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 153011M TRAINEES 0007 154003P MOBILIZATION 0010 157004M CONSTRCTION LAYOT

More information

ITEM 3 ATTACHMENT A RESOLUTION NO

ITEM 3 ATTACHMENT A RESOLUTION NO ITEM 3 ATTACHMENT A RESOLUTION NO. 2018-1575 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALABASAS, CALIFORNIA, ADOPTING THE FISCAL YEAR 2017-18 LIST OF PROJECTS FUNDED BY SB 1: THE ROAD REPAIR AND

More information

PROPOSAL. PROPOSAL OF, a corporation a

PROPOSAL. PROPOSAL OF, a corporation a PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

Processing Requests & Petitions For Streets To Be Improved/Chip Sealed

Processing Requests & Petitions For Streets To Be Improved/Chip Sealed Procedure Title: PUBLIC WORKS Processing Requests & Petitions For Streets To Be Improved/Chip Sealed Beginning in May each year, residents are invited to fill out the PETITION FOR CHIPSEAL Form (Attachment

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

SC 41/Joe Rouse Intersection Improvements

SC 41/Joe Rouse Intersection Improvements SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

APPENDIX G: DETAILED COST ESTIMATES

APPENDIX G: DETAILED COST ESTIMATES APPENDIX G: DETAILED COST ESTIMATES August 2012 7 YUBA COUNTY BIKEWAY MASTER PLAN Preliminary Estimate Memorandum Prepared for: Fehr and Peers Transportation Consultants & Yuba County Department of Public

More information

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO General Info Number: Description: Deadline: PROJECT NO. 59-18-04 (RE-BID) PAVEMENT REPAIRS EASTBOUND AND WESTBOUND ROADWAYS MILEPOST 80.50 TO MILEPOST 86.15 OTTAWA AND SANDUSKY COUNTIES, OHIO JULY 3, 2018

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

5:30 1 Introductions, appointment of note taker (5 minutes) Ad

5:30 1 Introductions, appointment of note taker (5 minutes) Ad DALZIEL BUILDING. 250 FRANK H. OGAWA PLAZA. SUITE 4344. OAKLAND. CALIFORNIA. 94612 Public Works Agency TEL: (510) 238-3466 Transportation Planning & Funding Division FAX: (510) 238-7415 Bicycle and Pedestrian

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Trail Feasibility. 1. Introduction FINAL. October What s inside?

Trail Feasibility. 1. Introduction FINAL. October What s inside? VOLUSIA COUNTY MPO CITY OF PORT ORANGE FINAL Trail Feasibility October 2006 What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way 4 Trail Concept Plan

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

IMPLEMENTATION WORKBOOK

IMPLEMENTATION WORKBOOK Lawrence Township Bicycle and Pedestrian Planning Assistance Study IMPLEMENTATION WORKBOOK Final Action Plan - Part 2 April 2009 Prepared For: The Township of Lawrence and the New Jersey Department of

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514 Page 1 of 17 18 HNTERDON ROTE 202,ALEXAKEN CREEK ROAD TO RT 179/CR514 Quantity and nits nit Price nit Price nit Price SECTION: 0001 ROADWAY 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

Peter Kremer, WSP/Parsons Brinckerhoff

Peter Kremer, WSP/Parsons Brinckerhoff Peter Kremer, WSP/Parsons Brinckerhoff COMPLETE STREETS IMPLEMENTATION OVERVIEW Level-of-Traffic-Stress Analysis Somers Point Regional Trail Network Atlantic County Technical Assistance Outreach, Training

More information

Pavement Management Program

Pavement Management Program Pavement Management Program Public Works Department January 5, 2016 Chad Butzow, P.E. Deputy Director Field Operation Services Public Works Department Brian Martineau Pavement Manager Public Works Department

More information

OneBayArea Grant Application

OneBayArea Grant Application OneBayArea Grant Application ER Taylor Elementary School Safe Routes to School Project Submitted by the San Francisco Department of Public Works To the San Francisco County Transportation Authority April

More information

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge US 1 NB & Ramps Chelsea September 11, 2017 Maurice J. Tobin Memorial Bridge Big Mystic Truss Current Project Little Mystic Truss Toll

More information

Design of Stanley Park S-Curve

Design of Stanley Park S-Curve ADMINISTRATIVE REPORT Date: May 4, 2001 TO: FROM: Author/Local: F. Klotzbach/7118 RTS NO. 01644 CC File No. Standing Committee on Transportation and Traffic General Manager of Engineering Services, in

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

City of Davis Pavement Management Program

City of Davis Pavement Management Program City of Davis Pavement Management Program Davis Street and Bike Path System 163 centerline miles of streets (33 million square feet) 34.6 miles of arterials 21% 22.8 miles of collectors 14% 103.9 miles

More information

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

More information

TOWN OF MORAGA. CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019

TOWN OF MORAGA. CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019 TOWN OF MORAGA CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019 Edric Kwan, Public Works Director April Malvino Miller, BKF Project Design Manager Shawn

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 Traffic Improvements Project Goals Widen roadway to construction two-way left turn lanes-greatly decreases congestion Ease access to & from

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: STEVE MYRTER, P. E. DIRECTOR OF PUBLIC WORKS SUBJECT: SPRING STREET

More information

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: May 10, 2016 Department: Submitted By: Prepared By: Agenda Title: Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. CITY

More information

Pavement Rehabilitation & Buffered Bike Lane

Pavement Rehabilitation & Buffered Bike Lane Pembina Highway from Grant Avenue to Osborne Street Pavement Rehabilitation & Buffered Bike Lane Welcome April 21, 2016 Please complete and submit a comment sheet prior to leaving or complete it online

More information

General References Definitions. (1) Design Guidance. (2) Supporting Information

General References Definitions. (1) Design Guidance. (2) Supporting Information Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to

More information

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate Project ID Project Category Project Name Qty/Len(Mi) Cost Estimate BB 1 Bike boulevard Jefferson Street or

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741 B741 TEMPORARY S - OPSS 741 741.1 GENERAL Temporary concrete barriers (TCBs) are precast units that are installed with interlocking devices connecting consecutive sections. The following types of connections

More information

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS Section Page 48-1 GENERAL...48.1 48-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS...48.1 48-3 PAINTED TRAFFIC STRIPES AND PAVEMENT

More information

Derby Street. Project Updates. Salem, Massachusetts

Derby Street. Project Updates. Salem, Massachusetts Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets

More information

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015 Outer Cape Bicycle & Pedestrian Master Plan PUBLIC WORKSHOP #2 March 26, 2015 Introductions TODAY S DISCUSSION PRESENTATION: Project Background : Where have we been? Where are we now? Steering Committee

More information

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In

More information

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017 TO: Mayor Savage and Members of Halifax Regional Council SUBMITTED BY: Jacques Dubé, Chief Administrative

More information

YAVAPAI COUNTY PUBLIC WORKS

YAVAPAI COUNTY PUBLIC WORKS YAVAPAI COUNTY PUBLIC WORKS PROVIDES ENGINEERING, ROADWAY MAINTENANCE, SOLID WASTE, AIRPORTS AND EMERGENCY MANAGEMENT SERVICES FLOOD CONTROL DISTRICT, SPECIAL DISTRICTS (EXCEPT ROAD IMPROVEMENT DISTRICTS)

More information

Committed to Service

Committed to Service Development Services Department Committed to Service January 19, 2016 TO: FROM: SUBJECT: ACHD Board of Commissioners Mindy Wallace, AICP Planner III Kirsten Subdivision/BPP15-0023 Executive Summary: The

More information

Township of Springwater

Township of Springwater Township of Springwater Approved: November 2008 Effective: Date of Passing Next Review: TBD Department: Public Works Subject: Sidewalks Policy Number: A09 SI A. Authority This policy shall be approved

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

October 30, Subject: Solicitation Number: ITB Printing of Florida Class E Driver License Handbook

October 30, Subject: Solicitation Number: ITB Printing of Florida Class E Driver License Handbook October 30, 2015 To: Prospective Vendor Subject: Solicitation Number: ITB 008-16 Printing of Florida Class E Driver License Handbook Addendum No. 1 The enclosed information has been provided for consideration

More information

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS Section Page 48-1 GENERAL... 48.1 48-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS... 48.1 48-3 PAINTED TRAFFIC STRIPES AND

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed

More information

MNDOT PAVEMENT DESIGN MANUAL

MNDOT PAVEMENT DESIGN MANUAL MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -

More information

TRAFFIC CALMING POLICY & PROCEDURES

TRAFFIC CALMING POLICY & PROCEDURES TRAFFIC CALMING POLICY & PROCEDURES AS ADOPTED BY MONTCLAIR TOWNSHIP COUNCIL AUGUST 4, 2009 TABLE OF CONTENTS 1. INTRODUCTION... 2 Purpose... 2 Traffic Calming Definition... 2 Statement Of Township Council

More information

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS SECTION 48 TRAFFIC STRIPES AND PAVEMENT MARKINGS 48-1 GENERAL Traffic stripes and pavement markings shall

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY STAFF REPORT MEETING DATE: September 13, 2016 TO: FROM: City Council Bob Brown, Community Development Director Russ Thompson, Public Works Director Patrick Filipelli, Management Analyst 922 Machin Avenue

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review.

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review. Memorandum CITY OF DALLAS DATE December 9, 2011 TO subject Honorable Members of the Transportation & Environment Committee: Linda Koop (Chair), Sheffie Kadane (Vice Chair), Pauline Medrano, Vonciel Jones

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

Traffic Circulation & Pedestrian Safety Study

Traffic Circulation & Pedestrian Safety Study Lyons Township High School North Campus La Grange, Illinois Parking Lot Vaughan Building N Main Building Prepared for: Prepared by: July 23, 2015 Contents List of Figures, iii 1. Introduction...1 2. Existing

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

River Road - Proposed Road Safety Enhancement Measures

River Road - Proposed Road Safety Enhancement Measures City of Richmond Report to Committee To: From: Re: Public Works and Transportation Committee Victor Wei, P. Eng. Director, Transportation Date: June 6, 2017 River Road - Proposed Road Safety Enhancement

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

BEVERLY HILLS STAFF REPORT. To: From: Subject: INTRODUCTION DISCUSSION. Meeting Date: August 7, 2018

BEVERLY HILLS STAFF REPORT. To: From: Subject: INTRODUCTION DISCUSSION. Meeting Date: August 7, 2018 BEVERLY HILLS 9.4 STAFF REPORT Meeting Date: August 7, 218 To: From: Subject: Honorable Mayor & City Council Ryan Gohlich, AICP, City Planner / Assistant Director of Community Development Commemorative

More information

SRTS IMPLEMENTATION COSTS

SRTS IMPLEMENTATION COSTS SRTS IMPLEMENTATION COSTS What Is a Estimate? A cost estimate establishes the anticipated budget required to implement the actions (the improvement projects and programs) identified in your School Travel

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way

More information

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida Roger Cox, P.E. Manager coxw@hillsboroughcounty.org 813.272.5912 Public Works Department Systems Planning Discussion Points Hillsborough

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council Bicycle and Pedestrian Connectivity Study Old Colony Planning Council Outline Why consider bike/peds in road designs? Why are measures needed? Connecting Land Use with Transportation Evaluation Tools:

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

AGENDA ITEM G-2 Public Works

AGENDA ITEM G-2 Public Works AGENDA ITEM G-2 Public Works STAFF REPORT City Council Meeting Date: 12/6/2016 Staff Report Number: 16-214-CC Regular Business: Approve the Oak Grove University Crane Bike Improvement Concept Plan, authorize

More information

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan PROJECT PH3512 - Otsego Township - On 21st Street, 102nd Avenue (west) to 101st Avenue, then east on 101st & 102nd Avenue to 16th Street - 2.96 miles Michigan Paving & Materials Reith-Riley PH3512 HMA

More information

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering Illini Union Champaign, IL February 24, 2015 Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering Temporary Concrete Barrier Pinning and Drop-off Policy

More information

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 RECOMMENDED ACTION: Consider HSIP Candidate Projects for the FY2019-2022 TIP as Being Consistent

More information