1 General Info Number: Description: Deadline: PROJECT NO (RE-BID) PAVEMENT REPAIRS EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO JULY 3, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $410,000.00) Bids Business Bid Total Burton Scot Contractors, LLC $265, Shelly Company - Northwest $293, Gerken Paving, Inc. $394, Kokosing Construction Company, Inc. $660,046.19

2 BURTON SCOT CONTRACTORS, LLC 1.00 LUMP $3, $3, PAVEMENT PLANING, ASPHALT CONCRETE (W=4') 2, SQ.YD. $9.00 $26, PAVEMENT PLANING, ASPHALT CONCRETE (W=12') 4, SQ.YD. $7.00 $32, CU.YD. $ $115, SP 404A JOINT SEALER 20, FOOT $0.50 $10, NON-TRACKING TACK COAT GALLON $3.00 $1, SP 614 MAINTAINING TRAFFIC, AS PER PLAN 1.00 LUMP $20, $20, RAISED PAVEMENT MARKERS REMOVED EACH $15.00 $1, SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $3, $3, MOBILIZATION 1.00 LUMP $35, $35, " WHITE LANE LINE, TYPE MILE $ $8, Total: $265, CREDIT >> A Temporary Access Deduct Alternate Proposal is included in the Bid Amount of CREDIT (must be a positive number)::

3 SHELLY COMPANY - NORTHWEST 1.00 LUMP $1, $1, PAVEMENT PLANING, ASPHALT CONCRETE (W=4') 2, SQ.YD. $12.00 $35, PAVEMENT PLANING, ASPHALT CONCRETE (W=12') 4, SQ.YD. $10.00 $46, CU.YD. $ $127, SP 404A JOINT SEALER 20, FOOT $0.50 $10, NON-TRACKING TACK COAT GALLON $2.00 $1, SP 614 MAINTAINING TRAFFIC, AS PER PLAN 1.00 LUMP $35, $35, RAISED PAVEMENT MARKERS REMOVED EACH $3.00 $ SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $4, $4, MOBILIZATION 1.00 LUMP $16, $16, Total: $293, CREDIT >> A Temporary Access Deduct Alternate Proposal is included in the Bid Amount of CREDIT (must be a positive number)::

4 GERKEN PAVING, INC. IB. ART.6 PREMIUM FOR CONTRACT PERFORMANCE BOND 1.00 LUMP $2, $2, PAVEMENT PLANING, ASPHALT CONCRETE (W=4') 2, SQ.YD. $10.50 $31, PAVEMENT PLANING, ASPHALT CONCRETE (W=12') 4, SQ.YD. $7.75 $36, SP 404 ASPHALT CONCRETE SURFACE COURSE, USING CU.YD. $ $170, SP 404A JOINT SEALER 20, FOOT $0.86 $17, NON-TRACKING TACK COAT GALLON $1.95 $1, SP 614 MAINTAINING TRAFFIC, AS PER PLAN 1.00 LUMP $96, $96, RAISED PAVEMENT MARKERS REMOVED EACH $2.50 $ SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $14, $14, MOBILIZATION 1.00 LUMP $10, $10, " YELLOW EDGE LINE, TYPE MILE $ $1, Total: $394, CREDIT >> A Temporary Access Deduct Alternate Proposal is included in the Bid Amount of CREDIT (must be a positive number)::

5 KOKOSING CONSTRUCTION COMPANY 1.00 LUMP $5, $5, PAVEMENT PLANING, ASPHALT CONCRETE (W=4') 2, SQ.YD. $19.00 $56, PAVEMENT PLANING, ASPHALT CONCRETE (W=12') 4, SQ.YD. $19.00 $88, CU.YD. $ $223, SP 404A JOINT SEALER 20, FOOT $0.80 $16, NON-TRACKING TACK COAT GALLON $3.00 $1, SP 614 MAINTAINING TRAFFIC, AS PER PLAN 1.00 LUMP $210, $210, RAISED PAVEMENT MARKERS REMOVED EACH $8.00 $ SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $2, $2, MOBILIZATION 1.00 LUMP $40, $40, Total: $660, CREDIT >> A Temporary Access Deduct Alternate Proposal is included in the Bid Amount of CREDIT (must be a positive number)::

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M. General Info Number: Description: Deadline: (Estimated Cost: $1,000,000) PROJECT NO. 53-16-03 REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST 139.50, LORAIN COUNTY, OHIO MAY 23, 2016

More information

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016*** General Info Number: PROJECT NO. 43-16-03 Description: Deadline: BRIDGE DECK REPLACEMENT AND REHABILITATION, CLIFTON-GUNN ROAD OVER OHIO TURNPIKE M.P. 21.4, RUEGER-SHETLER ROAD OVER OHIO TURNPIKE M.P.

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

Tabulation of Bids. Counties: Project(s):

Tabulation of Bids. Counties: Project(s): Page: 1 14 ROTE 94, ROTE 46 TO OLD COACH RD Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 154003P MOBILIZATION 0007 157004M CONSTRCTION LAYOT 0012

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE R. J. Noble Company Orange, CA 92856 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 190101 ROADWAY EXCAVATION CY 8,500 16.00 136,000.00 9.50 80,750.00

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY

More information

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max: Page 1 of 11 518061 AMINO BROTHERS SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025200 REMOVAL OF EXISTING STRUCTURES 5 070580 FLAGGER

More information

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps Office of Pavement Engineering October 14, 2003 Abstract: This paper summarizes the current practice in ODOT regarding the construction

More information

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514 Page 1 of 17 18 HNTERDON ROTE 202,ALEXAKEN CREEK ROAD TO RT 179/CR514 Quantity and nits nit Price nit Price nit Price SECTION: 0001 ROADWAY 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS

More information

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min: Page 1 of 10 SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 070580 FLAGGER (SET PRICE) (1) LS (1) LS 1.000 HOUR 86,800.00000 86,800.00 3,375.50000

More information

Kansas Department of Transportation. Tabulation of Bids

Kansas Department of Transportation. Tabulation of Bids Page 1 of 17 SECTION: 1 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025600 FIELD OFFICE AND LABORATORY (TYPE A) 5 071554 CONCRETE FOR SEAL

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 16 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 153011M TRAINEES 0007 154003P MOBILIZATION 0010 157004M CONSTRCTION LAYOT

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

IL Route 71 Construction Update

IL Route 71 Construction Update 100 Parkers Mill Oswego, IL. 60543 (630) 554-3618 4.20.16 IL 71 TRAFFIC ADVISORY: Tentatively scheduled for April 21st A new traffic pattern from Paradise to Wolf Crossing on IL 71 will be in use. The

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

The first lift, mainline, shall be placed using a spray paver.

The first lift, mainline, shall be placed using a spray paver. Page 1 of 15 The first lift, mainline, shall be placed using a spray paver. No patches shall be left open without proper traffic control. 11. The contractor shall be responsible for noting the location

More information

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60) Company Name Base Bid Schedule A Base Bid Schedule B Total COUNTY'S ESTIMATE 367,150.00 328,300.00 $695,450.00 1 All American Asphalt 481,360.00 108,180.00 $589,540.00 2 PTM General Eng Services, Inc.

More information

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge US 1 NB & Ramps Chelsea September 11, 2017 Maurice J. Tobin Memorial Bridge Big Mystic Truss Current Project Little Mystic Truss Toll

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107. CONTRACTOR S WEEKLY UPDATE February 2nd, 2015 Volume 2, Issue 107 DOUG s CORNER COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug s Corner.1 3 Traffic/Active Work 4-5 Construction Notices.6-10 Project

More information

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT

More information

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison 20 minute presentation on proposed project Comments and Questions following presentation 2016 2017 Replace concrete pavement & base Replace curb and sidewalk as needed Proposed contra-flow bike lane Replace

More information

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00 30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 Quantity Unit Price Extension Section 1: Sanitary Manhole Rebilitation $581,301.80 100 Replace sanitary manhole casting (CITY

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

Taylor Road Resurfacing Project

Taylor Road Resurfacing Project Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project

More information

Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center

Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center 35 Rock Road - Monday thru Friday EASTBOUND Effective: November 26, 2018 & Valley Industries 5:01A 5:07A 5:17A 5:28A 5:23A 5:30A 5:40A 5:51A 5:47A 5:54A 6:04A 6:16A 5:35A 5:41A 5:51A 5:58A 6:10A 6:17A

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS Section Page 48-1 GENERAL... 48.1 48-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS... 48.1 48-3 PAINTED TRAFFIC STRIPES AND

More information

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS SECTION 48 TRAFFIC STRIPES AND PAVEMENT MARKINGS 48-1 GENERAL Traffic stripes and pavement markings shall

More information

Cincinnati Dayton Rd Widening

Cincinnati Dayton Rd Widening Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge

More information

Page 1 of KA

Page 1 of KA Page 1 of 8 70-27 KA 4555-01 70-27 KA 4555-01 It is intended that "Wet Continuous" wet reflective pavement markings be used on all White and Yellow lines. 9 Wet continuous beads shall be used for all edge

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way

More information

2 Months of road works in Port of Antwerp Severe traffic disruption expected

2 Months of road works in Port of Antwerp Severe traffic disruption expected 2 Months of road works in Port of Antwerp Severe traffic disruption expected In the summer of 2017 (July-August), the Agency for Roads and Traffic (AWV) will replace the concrete pavement of the R2 road

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for

More information

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION Field Operations Director 003513 Sr. Community Educator 003542 Asst. Field Operations Director 001046 Stormwater Operations Analyst 003833 Special Projects

More information

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS Section Page 48-1 GENERAL...48.1 48-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS...48.1 48-3 PAINTED TRAFFIC STRIPES AND PAVEMENT

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY DESIGN DESIGNATION A.A.D.T - = V = M.P.H PLANS FOR PROPOSED HIGHWAY INDE OF SHEETS DESCRIPTION TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES (QU) (1 SHEET)--------

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS DESCRIPTION TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES (QU) (1 SHEET)--------

More information

Page 1 of KA

Page 1 of KA Page 1 of 11 75-16 KA 5188-01 KA 5188-01 Page 2 of 11 (0+00-28+69) 14,664 SQYDS ROCK EDGE WEDGE 0+00-26+30 D = 0.083333' W = 2.0' 26+30-338+65 D = 0.25' W = 3.0' KA 5188-01 Page 3 of 11 28+69-338+65 (103,553

More information

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Presented to: APWA Nor Cal November 3 rd, 2016 Presenters: Jason Shykowsi, P.E., T.E. City of Roseville Debbie Haldeman RCC Council

More information

Township of Springwater

Township of Springwater Township of Springwater Approved: November 2008 Effective: Date of Passing Next Review: TBD Department: Public Works Subject: Sidewalks Policy Number: A09 SI A. Authority This policy shall be approved

More information

DISTRICT CONSTRUCTION PROGRAM

DISTRICT CONSTRUCTION PROGRAM ODOT DISTRICT 3 2016 CONSTRUCTION PROGRAM photo by Tom Puskar SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR

More information

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741 B741 TEMPORARY S - OPSS 741 741.1 GENERAL Temporary concrete barriers (TCBs) are precast units that are installed with interlocking devices connecting consecutive sections. The following types of connections

More information

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA Use of Roller Compacted Concrete By GDOT Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA First Use of RCC By Georgia DOT I-285 Atlanta, GA 2005 Traffic:

More information

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas

More information

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In

More information

ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND

ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND TMACOG TRANSPORTATION SUMMIT MARCH 16, 2018 Mike Gramza, District Two, Capital Programs Administrator John R. Kasich, Governor Jerry Wray, ODOT

More information

City of Beverly Hills North Santa Monica Blvd Reconstruction. Community Meeting Presentation September 30 and October 1, 2015

City of Beverly Hills North Santa Monica Blvd Reconstruction. Community Meeting Presentation September 30 and October 1, 2015 City of Beverly Hills North Santa Monica Blvd Reconstruction Community Meeting Presentation September 30 and October 1, 2015 1 Project Description Complete reconstruction of boulevard (pavement, curbs,

More information

Tack Coat Effect on Field Performance. February 3rd, 2015 NCAUPG/ICT Joint Meeting

Tack Coat Effect on Field Performance. February 3rd, 2015 NCAUPG/ICT Joint Meeting Tack Coat Effect on Field Performance February 3rd, 2015 NCAUPG/ICT Joint Meeting Bonded Pavement Experimentation What happens if significantly higher application rates are used? What forms of distress

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management

SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management 2004 Specifications CSJ 6216-60-001 SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management 1. Description. This item will govern for complete vegetation management of highway rightof-way, including

More information

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP January 19, 2015 Volume 2, Issue 105 DOUG s CORNER COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug s Corner.1 3 Traffic/Active Work 4-6

More information

(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.

(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. S-1 (2399) PAVEMENT SURFACE SMOOTHNESS Use this with SP2016-115 (CONCRETE PAVEMENT) (unless it s an alternate job) and SP2016-137.1 (PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT January 25, 2017 RM 620/2222 BYPASS - INTRODUCTION Because of the enormous traffic demand at the RM 620/2222 intersection, TxDOT searched for a way to relieve

More information

Inspector MUST Sign and Date Each Inspection

Inspector MUST Sign and Date Each Inspection Work Area: Applicant: Mercer County Department of Transportation - Highways Division Application and Permit for Road Work in Mercer County, New Jersey NO. East Windsor Ewing Hamilton Hopewell Lawrence

More information

CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No (WED)

CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No (WED) CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No. 2016 003 (WED) Sealed bids for the construction of the Street Lighting Pole and Traffic Signal Pole Painting

More information

ASPHALT PAVING LEVEL 1

ASPHALT PAVING LEVEL 1 ASPHALT PAVING LEVEL 1 Module 3: Yield Calculations: Tack Coat and Mix Spread Rate FDOT Course Module 3 1 Welcome the students to the third module in this course that covers tack coat and mix spread rates,

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

Agenda. NTTA Network of Roadways. Emergency Procurement Caught on Video: Real Life Emergency Response Presented to: APWA

Agenda. NTTA Network of Roadways. Emergency Procurement Caught on Video: Real Life Emergency Response Presented to: APWA Emergency Procurement Caught on Video: Real Life Emergency Response Presented to: APWA J.C. Wood, P.E. Director of Maintenance North Texas Tollway Authority September 19, 2011 Agenda Setting the Stage

More information

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP December 29, 2014 Volume 2, Issue 102 DOUG s CORNER COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug s Corner.1 3 Traffic/Active Work 4-6

More information

"Emul Asph (SS-1HP) Tack".

Emul Asph (SS-1HP) Tack. Page 1 of 25 Application of Emulsified Asphalt, (fog seal 2-lane section). Using a distributor, uniformly apply fog seal to the rumble strip with two passes of the distributor, one in each direction of

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016 Pavement Markings: Past, Present, and Future TxDOT Short Course October 2016 Then 1911 640,000 registered vehicles in the US 200,000 miles of paved roads 2,000 fatalities First Pavement Markings 1911 Wayne

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

WARRINGTON TOWNSHIP BOARD OF SUPERVISORS. April 14, 2015 Regular Meeting

WARRINGTON TOWNSHIP BOARD OF SUPERVISORS. April 14, 2015 Regular Meeting WARRINGTON TOWNSHIP BOARD OF SUPERVISORS April 14, 2015 Regular Meeting CALL TO ORDER MOMENT OF SILENCE PLEDGE OF ALLEGIANCE SPECIAL RECOGNITION PRESENTATION ELBOW LANE DAY CAMP GENERAL BUSINESS EXECUTIVE

More information

Manual Of Standard Traffic Signs And Pavement Markings Alberta

Manual Of Standard Traffic Signs And Pavement Markings Alberta Manual Of Standard Traffic Signs And Pavement Markings Alberta Traffic Accommodation and Control Alberta Highway Pavement Marking Guide and made available by Alberta Transportation, please see the following

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number Michigan Department of Transportation 2004 Traffic and Safety Notes Cross Reference between the Old Note Number and the New Note Number OLD NEW Number Number Title (Prior to 2004) 1.1.1 101-Series General

More information

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

Tabulation of Bids. ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, SALEM Letting Date: Counties:

Tabulation of Bids. ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, SALEM Letting Date: Counties: Page 1 of 13 Long Life Pavement Markings Contract, South-2016, DP (1) ZONE STRIPING INC (2) TRAFFIC LINES INC (3) ACCENT STRIPE INC nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT

More information

Name Roads Station Distance Miles

Name Roads Station Distance Miles Name Roads Station Distance Miles Saw Mill to San Mateo 62+00 to 135+00 1.382575758 San Mateo to Alamo 135+00 to 261+50 2.395833333 Alamo to NM 599 261+50 to 305+00 0.823863636 Sidewalk and Curb Only Rabbit

More information

900 BICYCLE FACILITIES Traffic Engineering Manual

900 BICYCLE FACILITIES Traffic Engineering Manual TABLE OF CONTENTS Part 9 - BICYCLE FACILITIES 900 GENERAL... 9-3 900-1 General Background... 9-3 900-2 Designated Bicycle Routes... 9-3 901 SIGNINGS... 9-4 902 MARKINGS... 9-4 902-1 General... 9-4 902-2

More information

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer Florida Department of TRANSPORTATION Asphalt Update Howie Moseley State Bituminous Materials Engineer Acknowledgements Jim Musselman Rhonda Taylor Curtis Curl My Background Graduate of the University of

More information

FOR LOOP RAMPS-TAPERED DECELERATION LANE

FOR LOOP RAMPS-TAPERED DECELERATION LANE 6" WHITE DOTTED LINE: 5 MARK, 20 SKIP 6" WHITE CRYSTAL MONO-DIRECTIONAL MAIN LINE END (EVERY 50 FEET) 50 FEET BEYOND LAST CRYSTAL PAVEMENT MARKER 5 AMBER MONO-DIRECTIONAL 50 FEET BEFORE LAST CRYSTAL PAVEMENT

More information

Restoration Requirements

Restoration Requirements Restoration Requirements Street Excavation Rules & Regulations Public Works Code Article 2.4 DPW Order 178,940 Regulations Article 2.4 of the Public Works Code requires any person excavating in the Public

More information

INTERSECTION WITH RIGHT TURN TAPER

INTERSECTION WITH RIGHT TURN TAPER (TYP.) TAPER 4" BROKEN INTERSECTION WITH RIGHT TURN TAPER 4" SOLID WHITE 4" BROKEN ARROW & LEGEND MARKINGS (SEE NOTE 2) INTERSECTION WITH RIGHT TURN LANE Notes: 1. Paint intersection tapers greater than

More information

Challenges of Tack Coat

Challenges of Tack Coat Challenges of Tack Coat Jim Weston Pavement Implementation Engineer Lynn Peterson Secretary of Transportation The 53 rd Idaho Asphalt Conference Moscow, ID October 24, 2013 What is tack coat and why use

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes The Pothole Solution... p.2 Specifications... p.3 Using Perma-Patch in Severe Weather... p.4 www.permapatch.com Frequently

More information

B741 - TEMPORARY CONCRETE BARRIERS - OPSS 741

B741 - TEMPORARY CONCRETE BARRIERS - OPSS 741 B741 - - OPSS 741 741.1 GENERAL Temporary concrete barrier (TCB) is a portable barrier system consisting of freestanding precast concrete segments that are positively connected together to form a continuous

More information

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: MONTANA ROAD CONSTRUCTION REPORT 09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: US 191 - WARM SPRINGS CREEK BRIDGE MILE POST 10.0 TO 10.1 SITE IS 10 MILES NORTH OF LEWISTOWN, MT. CONTRACTOR

More information

Request for Bid Group 1 CIPP Addendum No. 1 to RFB No. 401712.71.0403 April 1, 2019 The following information encompasses Addendum No. 1 for the above referenced RFB. Bidders shall fully consider and acknowledge

More information

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,

More information

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid City of Conway Mayor s Office 1201 Oak Street Conway, AR 72032 www.cityofconway.org Invitation and Bid 2010-25 INVITATION TO THE VENDOR ADDRESSED: Bidders are invited to furnish the items listed herein

More information

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers. SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS 1 SCOPE This specification shall apply to the installation of raised pavement markers. 2 DEFINITIONS Type A Marker - Retroreflective raised pavement

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

Highway Committee MINUTES OF MEETING August 22, 2016

Highway Committee MINUTES OF MEETING August 22, 2016 Highway Committee MINUTES OF MEETING August 22, 2016 Meeting of the Highway Standing Committee of the Chemung County Legislature Minutes of a meeting of the Highway Committee of the Chemung County Legislature

More information

PAT Meeting #2 Future Alternatives Meeting Agenda

PAT Meeting #2 Future Alternatives Meeting Agenda PAT Meeting #2 Future Alternatives Meeting Agenda Future Build Alternatives Discussion August 18, 2017 Viera Gov't Center, Atlantic Room, Building C, 3rd Floor 9:00 AM 11:00 AM 1. Schedule Update 2. Issues/Opportunities

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 13 December 19, 2018 Alico Road Widening from Ben Hill Griffin

More information

ACCELERATED CONSTRUCTION STRATEGIES. Selection and Impact

ACCELERATED CONSTRUCTION STRATEGIES. Selection and Impact ACCELERATED CONSTRUCTION STRATEGIES Selection and Impact Accelerated Construction Strategies Why Use Accelerated Construction Strategies? Reduce construction time Promote innovative construction strategies

More information

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION Lithuanian Roads LITHUANIAN ROAD ADMINISTRATION LITHUANIA in Europe Territory 65 300 km 2 Population 3 491 000 General road network information State roads Main roads 1724,3 km National roads 4864,0 km

More information

Mile Marker Signs and the. David DiNocco Transportation Planner Massachusetts Department of Transportation

Mile Marker Signs and the. David DiNocco Transportation Planner Massachusetts Department of Transportation Mile Marker Signs and the Linear Referencing System David DiNocco Transportation Planner Massachusetts Department of Transportation Agenda 2 Introduction MA Road Inventory Database Why Replace Mile Markers?

More information

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015 Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT February 12, 2015 What is Pavement Management? At a Network Level: Pavement management refers to a systematic

More information

DESIGN PUBLIC HEARING SEPTEMBER 26, 2017 PULASKI ELEMENTARY SCHOOL NEW BEDFORD, MASSACHUSETTS 6:00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING SEPTEMBER 26, 2017 PULASKI ELEMENTARY SCHOOL NEW BEDFORD, MASSACHUSETTS 6:00 PM FOR THE PROPOSED DESIGN PUBLIC HEARING SEPTEMBER 26, 2017 AT PULASKI ELEMENTARY SCHOOL NEW BEDFORD, MASSACHUSETTS 6:00 PM FOR THE PROPOSED KING S HIGHWAY IMPROVEMENTS PROJECT Project No. 606709 Roadway/Bridge Project Management

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:

More information

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018: Veterans Boulevard (formerly Boundary Road) This two-year construction project will widen and pave all of Veterans Boulevard. In 2017, the first portion of the road from Highway 16A to 44 Avenue was completed.

More information