1 30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI Quantity Unit Price Extension Section 1: Sanitary Manhole Rebilitation $581, Replace sanitary manhole casting (CITY to furnish casting); $ $23, External manhole chimney seal (9"); complete as $ $43, External manhole chimney seal (Infrashield); $ $6, " external manhole chimney seal extension; $ $11, Internal manhole chimney seal (10"); complete as $ $4, " internal manhole chimney seal extension; 3.00 $ $ " internal manhole chimney seal extension; 5.00 $ $1, Re-form/re-shape manhole bench; complete as $ $1, Concrete adjusting rings; $ $12, Rubber adjusting rings; 5.00 $ $3, Reconstruct sanitary sewer manhole (slurry); $ $52, Furnish and install standard sanitary manhole (4' diameter) (slurry); $ $83, Saw cut concrete pavement; 5, $3.00 $16, Remove concrete pavement; Square Yards 2, $4.00 $9, Pavement ties; 1, $6.00 $10, " concrete pavement; Square Yards 2, $68.00 $154, " concrete pavement (HES); Square Yards $75.00 $15, " concrete pavement; Square Yards $69.00 $13, " concrete pavement (HES); Square Yards $77.00 $15, Partial depth joints; $0.10 $ " radius curb with 6" CABC and grading; $10.00 $ " curb and gutter; 7"; with 5" CABC and grading; $30.00 $ I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 1 of 6 Date: 11/17/2015

2 30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI Quantity Unit Price Extension 142 4" concrete sidewalk; $7.00 $1, " concrete sidewalk; driveway; and ramp; $8.00 $ Drilled No. 4 sidewalk tie bars; complete as $5.00 $ Curb ramp detectable warning field; complete as 8.00 $32.00 $ Saw cut asphalt pavement; $2.00 $1, Remove and replace HMA pavement; complete as Square Yards $39.00 $19, Turf restoration; Square Yards $9.00 $2, Manhole lid plug; $14.00 $ Tuck point manhole; 9.00 $ $1, Sanitary manhole grouting setup; complete as $ $29, Sanitary manhole grout; Gallons 2, $2.00 $4, Cold mix patch; Square Yards 1, $22.00 $22, Traffic control; Lump Sum 1.00 $18, $18, Base Bid Total: $581, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 2 of 6 Date: 11/17/2015

3 Vinton Construction Company Dorner Inc. Section 1: Sanitary Manhole Rebilitation Replace sanitary manhole casting (CITY to furnish 100 casting); 102 External manhole chimney seal (9"); complete as 103 External manhole chimney seal (Infrashield); 104 8" external manhole chimney seal extension; 106 Internal manhole chimney seal (10"); complete as " internal manhole chimney seal extension; 110 7" internal manhole chimney seal extension; 111 Re-form/re-shape manhole bench; complete as 112 Concrete adjusting rings; 114 Rubber adjusting rings; 116 Reconstruct sanitary sewer manhole (slurry); 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 122 Saw cut concrete pavement; 124 Remove concrete pavement; Square Yards 126 Pavement ties; 128 7" concrete pavement; Square Yards 130 7" concrete pavement (HES); Square Yards 132 8" concrete pavement; Square Yards 134 8" concrete pavement (HES); Square Yards 136 Partial depth joints; " radius curb with 6" CABC and grading; " curb and gutter; 7"; with 5" CABC and grading; $592, $623, $ $11, $ $59, $ $67, $ $35, $ $7, $ $3, $ $11, $ $8, $ $3, $ $4, $ $ $ $ $ $1, $ $1, $ $6, $ $14, $ $10, $ $13, $ $4, $1, $5, $ $62, $ $51, $ $80, $1, $100, $2.50 $13, $2.11 $11, $10.00 $22, $4.00 $9, $6.50 $11, $7.39 $13, $60.00 $136, $63.00 $143, $63.00 $12, $69.00 $13, $63.00 $12, $74.00 $14, $66.00 $13, $79.00 $15, $5.00 $ $3.17 $ $10.00 $ $32.45 $ $35.00 $ $49.00 $1, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 3 of 6 Date: 11/17/2015

4 Vinton Construction Company Dorner Inc " concrete sidewalk; 144 6" concrete sidewalk; driveway; and ramp; 146 Drilled No. 4 sidewalk tie bars; complete as 148 Curb ramp detectable warning field; complete as 150 Saw cut asphalt pavement; 152 Remove and replace HMA pavement; complete as Square Yards 154 Turf restoration; Square Yards 156 Manhole lid plug; 158 Tuck point manhole; 160 Sanitary manhole grouting setup; complete as 162 Sanitary manhole grout; Gallons 168 Cold mix patch; Square Yards 170 Traffic control; Lump Sum Base Bid Total: $7.00 $1, $8.45 $1, $7.00 $ $9.50 $ $7.00 $84.00 $5.28 $63.36 $30.00 $ $32.00 $ $2.00 $1, $1.58 $1, $48.96 $25, $55.00 $28, $10.00 $2, $13.52 $3, $22.00 $ $50.00 $ $ $1, $ $1, $ $29, $ $30, $1.50 $3, $1.58 $3, $0.01 $10.00 $5.00 $5, $33, $33, $25, $25, $592, $623, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 4 of 6 Date: 11/17/2015

5 Advance Construction Inc. DE GROOT, INC. Section 1: Sanitary Manhole Rebilitation Replace sanitary manhole casting (CITY to furnish 100 casting); 102 External manhole chimney seal (9"); complete as 103 External manhole chimney seal (Infrashield); 104 8" external manhole chimney seal extension; 106 Internal manhole chimney seal (10"); complete as " internal manhole chimney seal extension; 110 7" internal manhole chimney seal extension; 111 Re-form/re-shape manhole bench; complete as 112 Concrete adjusting rings; 114 Rubber adjusting rings; 116 Reconstruct sanitary sewer manhole (slurry); 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 122 Saw cut concrete pavement; 124 Remove concrete pavement; Square Yards 126 Pavement ties; 128 7" concrete pavement; Square Yards 130 7" concrete pavement (HES); Square Yards 132 8" concrete pavement; Square Yards 134 8" concrete pavement (HES); Square Yards 136 Partial depth joints; " radius curb with 6" CABC and grading; " curb and gutter; 7"; with 5" CABC and grading; $796, $869, $ $76, $ $95, $ $66, $ $38, $ $7, $ $3, $ $23, $ $15, $ $5, $ $5, $ $ $ $1, $ $1, $ $1, $ $9, $ $6, $ $18, $ $32, $ $4, $1, $7, $ $66, $1, $103, $1, $100, $1, $152, $1.91 $10, $6.06 $33, $10.00 $22, $12.12 $27, $7.00 $12, $8.48 $15, $75.00 $170, $72.72 $165, $80.00 $16, $78.78 $15, $85.00 $17, $84.84 $16, $90.00 $18, $90.90 $18, $3.00 $ $3.64 $ $45.00 $1, $36.36 $ $60.00 $1, $54.54 $1, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 5 of 6 Date: 11/17/2015

6 Advance Construction Inc. DE GROOT, INC " concrete sidewalk; 144 6" concrete sidewalk; driveway; and ramp; 146 Drilled No. 4 sidewalk tie bars; complete as 148 Curb ramp detectable warning field; complete as 150 Saw cut asphalt pavement; 152 Remove and replace HMA pavement; complete as Square Yards 154 Turf restoration; Square Yards 156 Manhole lid plug; 158 Tuck point manhole; 160 Sanitary manhole grouting setup; complete as 162 Sanitary manhole grout; Gallons 168 Cold mix patch; Square Yards 170 Traffic control; Lump Sum Base Bid Total: $10.00 $1, $9.70 $1, $11.00 $1, $10.91 $1, $5.00 $60.00 $6.06 $72.72 $30.00 $ $36.36 $ $1.90 $1, $3.03 $2, $50.00 $25, $55.55 $28, $30.00 $6, $15.15 $3, $40.00 $ $45.45 $ $ $2, $ $1, $ $29, $ $32, $1.50 $3, $1.67 $4, $38.00 $38, $12.37 $12, $34, $34, $21, $21, $796, $869, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 6 of 6 Date: 11/17/2015

PROPOSAL. PROPOSAL OF, a corporation a

PROPOSAL. PROPOSAL OF, a corporation a PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY

More information

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max: Page 1 of 11 518061 AMINO BROTHERS SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025200 REMOVAL OF EXISTING STRUCTURES 5 070580 FLAGGER

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE R. J. Noble Company Orange, CA 92856 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 190101 ROADWAY EXCAVATION CY 8,500 16.00 136,000.00 9.50 80,750.00

More information

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison 20 minute presentation on proposed project Comments and Questions following presentation 2016 2017 Replace concrete pavement & base Replace curb and sidewalk as needed Proposed contra-flow bike lane Replace

More information

Kansas Department of Transportation. Tabulation of Bids

Kansas Department of Transportation. Tabulation of Bids Page 1 of 17 SECTION: 1 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025600 FIELD OFFICE AND LABORATORY (TYPE A) 5 071554 CONCRETE FOR SEAL

More information

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,

More information

Request for Bid Group 1 CIPP Addendum No. 1 to RFB No. 401712.71.0403 April 1, 2019 The following information encompasses Addendum No. 1 for the above referenced RFB. Bidders shall fully consider and acknowledge

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT

More information

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min: Page 1 of 10 SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 070580 FLAGGER (SET PRICE) (1) LS (1) LS 1.000 HOUR 86,800.00000 86,800.00 3,375.50000

More information

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M. General Info Number: Description: Deadline: (Estimated Cost: $1,000,000) PROJECT NO. 53-16-03 REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST 139.50, LORAIN COUNTY, OHIO MAY 23, 2016

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court 46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND

More information

ADA Training Standard Plans

ADA Training Standard Plans ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb

More information

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &

More information

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS 001-099 100-199 200-299 Stormwater 300-399 400-499 500-599 600-699 700-799 800-899 Miscellaneous Sewers and Drains Streets Water Structures Earthwork Street Lighting and Traffic Signals Landscape and Irrigation

More information

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514 Page 1 of 17 18 HNTERDON ROTE 202,ALEXAKEN CREEK ROAD TO RT 179/CR514 Quantity and nits nit Price nit Price nit Price SECTION: 0001 ROADWAY 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS

More information

Restoration Requirements

Restoration Requirements Restoration Requirements Street Excavation Rules & Regulations Public Works Code Article 2.4 DPW Order 178,940 Regulations Article 2.4 of the Public Works Code requires any person excavating in the Public

More information

R-3501-E2 R-3501-H4. R-3501-HL Mountable Curb Frame, Grate

R-3501-E2 R-3501-H4. R-3501-HL Mountable Curb Frame, Grate For a complete listing of FREE OPEN AREAS and PERIMETERS of all grates, refer to pages 306-311. R-3501-D2A See pages 145-146-148 &155 for additional Roll Type products R-3501-D2A C 1.0 3.4 R-3501-E2 ROLL

More information

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

More information

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO General Info Number: Description: Deadline: PROJECT NO. 59-18-04 (RE-BID) PAVEMENT REPAIRS EASTBOUND AND WESTBOUND ROADWAYS MILEPOST 80.50 TO MILEPOST 86.15 OTTAWA AND SANDUSKY COUNTIES, OHIO JULY 3, 2018

More information

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016*** General Info Number: PROJECT NO. 43-16-03 Description: Deadline: BRIDGE DECK REPLACEMENT AND REHABILITATION, CLIFTON-GUNN ROAD OVER OHIO TURNPIKE M.P. 21.4, RUEGER-SHETLER ROAD OVER OHIO TURNPIKE M.P.

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

Keeping good roads good

Keeping good roads good Pavement Preservation (PP) in the State of California- Protecting Their Road and Street Investment R. Gary Hicks PhD, PE CP2 Center, Chico CA Prepared for the 3 rd International Pavement Maintenance Technology

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

Name Roads Station Distance Miles

Name Roads Station Distance Miles Name Roads Station Distance Miles Saw Mill to San Mateo 62+00 to 135+00 1.382575758 San Mateo to Alamo 135+00 to 261+50 2.395833333 Alamo to NM 599 261+50 to 305+00 0.823863636 Sidewalk and Curb Only Rabbit

More information

Pavement Management Report. City Council Meeting of May 21, 2013

Pavement Management Report. City Council Meeting of May 21, 2013 Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies

More information

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force 1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria

More information

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60) Company Name Base Bid Schedule A Base Bid Schedule B Total COUNTY'S ESTIMATE 367,150.00 328,300.00 $695,450.00 1 All American Asphalt 481,360.00 108,180.00 $589,540.00 2 PTM General Eng Services, Inc.

More information

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components

More information

2018 ROAD MAINTENANCE PROGRAM

2018 ROAD MAINTENANCE PROGRAM 2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process

More information

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1=40' Scale FOR REVIEW Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\217-1401.06 Contract 6 Phase I WM\01 CAD\06 CONTRACT WATER DESIGN I.dwg Plot : Nov 13,2014-8:24am. GENERAL NOTES AND LEGEND Drawing file: I:\Eastham.217\Phase

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

Tabulation of Bids. Counties: Project(s):

Tabulation of Bids. Counties: Project(s): Page: 1 14 ROTE 94, ROTE 46 TO OLD COACH RD Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 154003P MOBILIZATION 0007 157004M CONSTRCTION LAYOT 0012

More information

ADA Self Evaluation and Transition Plan for Public Rights-of-Way

ADA Self Evaluation and Transition Plan for Public Rights-of-Way ADA Self Evaluation and Transition Plan for Public Rights-of-Way 2014 NWPMA Conference Akmal Siddiqui WSDOT Local Programs 310 Maple Park Avenue SE Olympia, WA 98504 Phone: 360-705-7539 siddiqa@wsdot.wa.gov

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,

More information

CURB RAMP INSPECTION REPORT

CURB RAMP INSPECTION REPORT 11.9% St Ltg Box Pac Bell Elec St Ltg Box CURB RAMP INSPECTION REPORT 149 BLUXOME STREET - SAN FRANCISCO - 5TH STREET & TOWNSEND STREET APPLICANT: ZAYO GROUP DATE: 2/9/17 1 0.3% 1.4% 12.1% 0.3% 0.6% 12.7%

More information

Building Great Neighbourhoods STRATHEARN

Building Great Neighbourhoods STRATHEARN Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods

More information

Taylor Road Resurfacing Project

Taylor Road Resurfacing Project Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project

More information

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014 2014 Street and Utility Improvement Project Feasibility Report January 28, 2014 Public Informational Meeting 22 residents from 17 properties signed in Questions about construction (FAQs) Eyebrow cul-de-sac

More information

Fleur Drive Reconstruction

Fleur Drive Reconstruction Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths

More information

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview ADA Design Overview Section 2 ADA Design Overview Overview Accessible Pedestrian Signals Alternate Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group 2 Pedestrian Access Route (PAR)

More information

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures Sep/16 R-2 No Drawing Jan/17 R-2A Typical Cross Sections for Granular

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1=40' Scale FOR REVIEW Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:11am. GENERAL NOTES AND LEGEND Drawing file: I:\Eastham.217\Phase

More information

CITY OF SOUTH DAYTONA

CITY OF SOUTH DAYTONA CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 16 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 153011M TRAINEES 0007 154003P MOBILIZATION 0010 157004M CONSTRCTION LAYOT

More information

Paul Vraney Bureau of Project Development 02/11/2016

Paul Vraney Bureau of Project Development 02/11/2016 Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES: GENERAL NOTES: CURB NOTES: 5'-0" MIN 5'-0" 5'-0" MIN 1. 2. THESE SHEETS ARE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA), AND THE REQUIREMENTS OF THE 2011 PROPOSED ACCESSIBILITY GUIDELINES

More information

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO. CDBG HANDICAP RAMPS PROJECT NO. 1 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES 3-4 DETAS 5-23

More information

SECTION VII ROADWAY AND SITE IMPROVEMENTS

SECTION VII ROADWAY AND SITE IMPROVEMENTS SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical

More information

Preparing a Curb Ramp Project. December 15, 2010

Preparing a Curb Ramp Project. December 15, 2010 Preparing a Curb Ramp Project December 15, 2010 3 Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans and identifying ramp types at each quadrant Signalized

More information

MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report

MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report MEMORANUM ATE: October 6, 2017 TO: FROM: SUBJECT: Mayor & Council Members Mike Anderson, Assistant to the City Manager City Manager s Report Old TH HWY 14/Elm Ave Update *Please see attached document*

More information

4 GENERIC COST ESTIMATING TOOL

4 GENERIC COST ESTIMATING TOOL 4 GENERIC COST ESTIMATING TOOL Table 4-1 presents a generic cost estimating tools that can serve as a conceptual planning tool for local jurisdictions to estimate the costs of pedestrian improvements.

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found on Sheet 1. RC-67M note Construct curb ramps with a minimum

More information

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut

More information

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas

More information

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian

More information

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects January 2012 TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects 1. PURPOSE OF REPORTING The purpose of Tangible Capital Asset (TCA) reporting is to comply with PSAB 3150 reporting

More information

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In

More information

Inspector MUST Sign and Date Each Inspection

Inspector MUST Sign and Date Each Inspection Work Area: Applicant: Mercer County Department of Transportation - Highways Division Application and Permit for Road Work in Mercer County, New Jersey NO. East Windsor Ewing Hamilton Hopewell Lawrence

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS 841.1 DESCRIPTION: This item shall consist of hydrostatic testing operations, of water mains in accordance with these specifications. 841.2 MATERIALS: The materials

More information

Field guide for Accessible Public Rights-of-Way Edition

Field guide for Accessible Public Rights-of-Way Edition Field guide for Accessible Public Rights-of-Way 2015 Edition BRIEFING MEMO SUBJECT: Department of Justice/Department of Transportation Joint Technical Assistance on Title II of the Americans with Disabilities

More information

Welcome! Sherbrooke Neighbourhood Renewal Open House. Sherbrooke Open House February 3, Capital Construction

Welcome! Sherbrooke Neighbourhood Renewal Open House. Sherbrooke Open House February 3, Capital Construction Welcome! Sherbrooke Neighbourhood Renewal Open House Overview of the Neighbourhood Renewal Program Presented By: Annie Duong, P.Eng. Current Neighbourhood Roadway Infrastructure Neighbourhoods in Edmonton:

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

STANDARD OPERATING PROCEDURES

STANDARD OPERATING PROCEDURES SOP#C-10 SPILL RESPONSE DATE ISSUED: 11/15/2013 DATE REVISED: WASTEWATER DIVISION APPROVED BY: Robert Englent 1) PURPOSE: The City responds to SSOs and other sewer emergencies according to the SSO Response

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc. SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery

More information

WELL COMPLETION & PROTECTION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

WELL COMPLETION & PROTECTION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD WELL COMPLETION & PROTECTION MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD www..com WELL COMPLETION & PROTECTION TABLE OF CONTENTS TABLE OF CONTENTS (FLUSHMOUNTS)... 2-5 MONITORING

More information

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS Why does the City have a Safe Walks Program? The Safe Walks program was initiated in 2006 at the request of City Council in order to address the increasing

More information

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan PROJECT PH3512 - Otsego Township - On 21st Street, 102nd Avenue (west) to 101st Avenue, then east on 101st & 102nd Avenue to 16th Street - 2.96 miles Michigan Paving & Materials Reith-Riley PH3512 HMA

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for

More information

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps Office of Pavement Engineering October 14, 2003 Abstract: This paper summarizes the current practice in ODOT regarding the construction

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update April 1, 2016 Corkscrew Road West of I-75: Lee County DOT will

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

January 25, Franklin Pasture Sanitary Sewer Cure-In-Place Pipe Lining Bid No Bid Date: 2/7/17 ADDENDUM NO 1

January 25, Franklin Pasture Sanitary Sewer Cure-In-Place Pipe Lining Bid No Bid Date: 2/7/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director January 25, 2017 Franklin Pasture Sanitary Sewer Cure-In-Place Pipe Lining Bid. 2017-005 Bid Date: 2/7/17 ADDENDUM NO 1 SPECIFICATION REVISIONS: QUESTIONS

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate Project ID Project Category Project Name Qty/Len(Mi) Cost Estimate BB 1 Bike boulevard Jefferson Street or

More information

Planning Committee STAFF REPORT May 6, 2015 Page 2 of 4 Background In November 2011, the City of Walnut Creek applied for Measure J Program 12 TLC fun

Planning Committee STAFF REPORT May 6, 2015 Page 2 of 4 Background In November 2011, the City of Walnut Creek applied for Measure J Program 12 TLC fun Planning Committee STAFF REPORT Meeting Date: May 6, 2015 Subject Summary of Issues Recommendations Approval of Resolution 15-20-G for Construction of Northwest Walnut Creek Pedestrian and Bicycle Access

More information

Access requests to County streets and roadways are processed through one of the following methods:

Access requests to County streets and roadways are processed through one of the following methods: 13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.

More information

IL Route 71 Construction Update

IL Route 71 Construction Update 100 Parkers Mill Oswego, IL. 60543 (630) 554-3618 4.20.16 IL 71 TRAFFIC ADVISORY: Tentatively scheduled for April 21st A new traffic pattern from Paradise to Wolf Crossing on IL 71 will be in use. The

More information

City of Davis Pavement Management Program

City of Davis Pavement Management Program City of Davis Pavement Management Program Davis Street and Bike Path System 163 centerline miles of streets (33 million square feet) 34.6 miles of arterials 21% 22.8 miles of collectors 14% 103.9 miles

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information