Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00
|
|
- Gwenda Daniel
- 5 years ago
- Views:
Transcription
1 30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI Quantity Unit Price Extension Section 1: Sanitary Manhole Rebilitation $581, Replace sanitary manhole casting (CITY to furnish casting); $ $23, External manhole chimney seal (9"); complete as $ $43, External manhole chimney seal (Infrashield); $ $6, " external manhole chimney seal extension; $ $11, Internal manhole chimney seal (10"); complete as $ $4, " internal manhole chimney seal extension; 3.00 $ $ " internal manhole chimney seal extension; 5.00 $ $1, Re-form/re-shape manhole bench; complete as $ $1, Concrete adjusting rings; $ $12, Rubber adjusting rings; 5.00 $ $3, Reconstruct sanitary sewer manhole (slurry); $ $52, Furnish and install standard sanitary manhole (4' diameter) (slurry); $ $83, Saw cut concrete pavement; 5, $3.00 $16, Remove concrete pavement; Square Yards 2, $4.00 $9, Pavement ties; 1, $6.00 $10, " concrete pavement; Square Yards 2, $68.00 $154, " concrete pavement (HES); Square Yards $75.00 $15, " concrete pavement; Square Yards $69.00 $13, " concrete pavement (HES); Square Yards $77.00 $15, Partial depth joints; $0.10 $ " radius curb with 6" CABC and grading; $10.00 $ " curb and gutter; 7"; with 5" CABC and grading; $30.00 $ I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 1 of 6 Date: 11/17/2015
2 30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI Quantity Unit Price Extension 142 4" concrete sidewalk; $7.00 $1, " concrete sidewalk; driveway; and ramp; $8.00 $ Drilled No. 4 sidewalk tie bars; complete as $5.00 $ Curb ramp detectable warning field; complete as 8.00 $32.00 $ Saw cut asphalt pavement; $2.00 $1, Remove and replace HMA pavement; complete as Square Yards $39.00 $19, Turf restoration; Square Yards $9.00 $2, Manhole lid plug; $14.00 $ Tuck point manhole; 9.00 $ $1, Sanitary manhole grouting setup; complete as $ $29, Sanitary manhole grout; Gallons 2, $2.00 $4, Cold mix patch; Square Yards 1, $22.00 $22, Traffic control; Lump Sum 1.00 $18, $18, Base Bid Total: $581, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 2 of 6 Date: 11/17/2015
3 Vinton Construction Company Dorner Inc. Section 1: Sanitary Manhole Rebilitation Replace sanitary manhole casting (CITY to furnish 100 casting); 102 External manhole chimney seal (9"); complete as 103 External manhole chimney seal (Infrashield); 104 8" external manhole chimney seal extension; 106 Internal manhole chimney seal (10"); complete as " internal manhole chimney seal extension; 110 7" internal manhole chimney seal extension; 111 Re-form/re-shape manhole bench; complete as 112 Concrete adjusting rings; 114 Rubber adjusting rings; 116 Reconstruct sanitary sewer manhole (slurry); 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 122 Saw cut concrete pavement; 124 Remove concrete pavement; Square Yards 126 Pavement ties; 128 7" concrete pavement; Square Yards 130 7" concrete pavement (HES); Square Yards 132 8" concrete pavement; Square Yards 134 8" concrete pavement (HES); Square Yards 136 Partial depth joints; " radius curb with 6" CABC and grading; " curb and gutter; 7"; with 5" CABC and grading; $592, $623, $ $11, $ $59, $ $67, $ $35, $ $7, $ $3, $ $11, $ $8, $ $3, $ $4, $ $ $ $ $ $1, $ $1, $ $6, $ $14, $ $10, $ $13, $ $4, $1, $5, $ $62, $ $51, $ $80, $1, $100, $2.50 $13, $2.11 $11, $10.00 $22, $4.00 $9, $6.50 $11, $7.39 $13, $60.00 $136, $63.00 $143, $63.00 $12, $69.00 $13, $63.00 $12, $74.00 $14, $66.00 $13, $79.00 $15, $5.00 $ $3.17 $ $10.00 $ $32.45 $ $35.00 $ $49.00 $1, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 3 of 6 Date: 11/17/2015
4 Vinton Construction Company Dorner Inc " concrete sidewalk; 144 6" concrete sidewalk; driveway; and ramp; 146 Drilled No. 4 sidewalk tie bars; complete as 148 Curb ramp detectable warning field; complete as 150 Saw cut asphalt pavement; 152 Remove and replace HMA pavement; complete as Square Yards 154 Turf restoration; Square Yards 156 Manhole lid plug; 158 Tuck point manhole; 160 Sanitary manhole grouting setup; complete as 162 Sanitary manhole grout; Gallons 168 Cold mix patch; Square Yards 170 Traffic control; Lump Sum Base Bid Total: $7.00 $1, $8.45 $1, $7.00 $ $9.50 $ $7.00 $84.00 $5.28 $63.36 $30.00 $ $32.00 $ $2.00 $1, $1.58 $1, $48.96 $25, $55.00 $28, $10.00 $2, $13.52 $3, $22.00 $ $50.00 $ $ $1, $ $1, $ $29, $ $30, $1.50 $3, $1.58 $3, $0.01 $10.00 $5.00 $5, $33, $33, $25, $25, $592, $623, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 4 of 6 Date: 11/17/2015
5 Advance Construction Inc. DE GROOT, INC. Section 1: Sanitary Manhole Rebilitation Replace sanitary manhole casting (CITY to furnish 100 casting); 102 External manhole chimney seal (9"); complete as 103 External manhole chimney seal (Infrashield); 104 8" external manhole chimney seal extension; 106 Internal manhole chimney seal (10"); complete as " internal manhole chimney seal extension; 110 7" internal manhole chimney seal extension; 111 Re-form/re-shape manhole bench; complete as 112 Concrete adjusting rings; 114 Rubber adjusting rings; 116 Reconstruct sanitary sewer manhole (slurry); 118 Furnish and install standard sanitary manhole (4' diameter) (slurry); 122 Saw cut concrete pavement; 124 Remove concrete pavement; Square Yards 126 Pavement ties; 128 7" concrete pavement; Square Yards 130 7" concrete pavement (HES); Square Yards 132 8" concrete pavement; Square Yards 134 8" concrete pavement (HES); Square Yards 136 Partial depth joints; " radius curb with 6" CABC and grading; " curb and gutter; 7"; with 5" CABC and grading; $796, $869, $ $76, $ $95, $ $66, $ $38, $ $7, $ $3, $ $23, $ $15, $ $5, $ $5, $ $ $ $1, $ $1, $ $1, $ $9, $ $6, $ $18, $ $32, $ $4, $1, $7, $ $66, $1, $103, $1, $100, $1, $152, $1.91 $10, $6.06 $33, $10.00 $22, $12.12 $27, $7.00 $12, $8.48 $15, $75.00 $170, $72.72 $165, $80.00 $16, $78.78 $15, $85.00 $17, $84.84 $16, $90.00 $18, $90.90 $18, $3.00 $ $3.64 $ $45.00 $1, $36.36 $ $60.00 $1, $54.54 $1, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 5 of 6 Date: 11/17/2015
6 Advance Construction Inc. DE GROOT, INC " concrete sidewalk; 144 6" concrete sidewalk; driveway; and ramp; 146 Drilled No. 4 sidewalk tie bars; complete as 148 Curb ramp detectable warning field; complete as 150 Saw cut asphalt pavement; 152 Remove and replace HMA pavement; complete as Square Yards 154 Turf restoration; Square Yards 156 Manhole lid plug; 158 Tuck point manhole; 160 Sanitary manhole grouting setup; complete as 162 Sanitary manhole grout; Gallons 168 Cold mix patch; Square Yards 170 Traffic control; Lump Sum Base Bid Total: $10.00 $1, $9.70 $1, $11.00 $1, $10.91 $1, $5.00 $60.00 $6.06 $72.72 $30.00 $ $36.36 $ $1.90 $1, $3.03 $2, $50.00 $25, $55.55 $28, $30.00 $6, $15.15 $3, $40.00 $ $45.45 $ $ $2, $ $1, $ $29, $ $32, $1.50 $3, $1.67 $4, $38.00 $38, $12.37 $12, $34, $34, $21, $21, $796, $869, I:\Engineering\2015 CONTRACTS\15-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\15-11 Bid Tab_ Page 6 of 6 Date: 11/17/2015
PROPOSAL. PROPOSAL OF, a corporation a
PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY
More informationKansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:
Page 1 of 11 518061 AMINO BROTHERS SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025200 REMOVAL OF EXISTING STRUCTURES 5 070580 FLAGGER
More informationRiverside County Transportation Department Summary of Bids
COUNTY'S ESTIMATE R. J. Noble Company Orange, CA 92856 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 190101 ROADWAY EXCAVATION CY 8,500 16.00 136,000.00 9.50 80,750.00
More information20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison
20 minute presentation on proposed project Comments and Questions following presentation 2016 2017 Replace concrete pavement & base Replace curb and sidewalk as needed Proposed contra-flow bike lane Replace
More informationKansas Department of Transportation. Tabulation of Bids
Page 1 of 17 SECTION: 1 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025600 FIELD OFFICE AND LABORATORY (TYPE A) 5 071554 CONCRETE FOR SEAL
More informationBID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT
CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,
More informationRequest for Bid Group 1 CIPP Addendum No. 1 to RFB No. 401712.71.0403 April 1, 2019 The following information encompasses Addendum No. 1 for the above referenced RFB. Bidders shall fully consider and acknowledge
More informationTabulation of Bids. Counties:
Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT
More informationKansas Department of Transportation DISTRICT 1. Project(s): Max: Min:
Page 1 of 10 SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 070580 FLAGGER (SET PRICE) (1) LS (1) LS 1.000 HOUR 86,800.00000 86,800.00 3,375.50000
More informationREPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.
General Info Number: Description: Deadline: (Estimated Cost: $1,000,000) PROJECT NO. 53-16-03 REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST 139.50, LORAIN COUNTY, OHIO MAY 23, 2016
More informationLake Waterford Community Association Meeting. November 15, 2016
Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements
More informationCITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court
46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND
More informationADA Training Standard Plans
ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb
More informationR A M P U P! - City of Tacoma's Curb Ramp Installation Matrix
R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &
More information2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS
CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use
More informationCITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS
001-099 100-199 200-299 Stormwater 300-399 400-499 500-599 600-699 700-799 800-899 Miscellaneous Sewers and Drains Streets Water Structures Earthwork Street Lighting and Traffic Signals Landscape and Irrigation
More informationSAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS
SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes
More informationBids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)
General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS
More informationCITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL
ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE
More informationTabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514
Page 1 of 17 18 HNTERDON ROTE 202,ALEXAKEN CREEK ROAD TO RT 179/CR514 Quantity and nits nit Price nit Price nit Price SECTION: 0001 ROADWAY 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS
More informationRestoration Requirements
Restoration Requirements Street Excavation Rules & Regulations Public Works Code Article 2.4 DPW Order 178,940 Regulations Article 2.4 of the Public Works Code requires any person excavating in the Public
More informationR-3501-E2 R-3501-H4. R-3501-HL Mountable Curb Frame, Grate
For a complete listing of FREE OPEN AREAS and PERIMETERS of all grates, refer to pages 306-311. R-3501-D2A See pages 145-146-148 &155 for additional Roll Type products R-3501-D2A C 1.0 3.4 R-3501-E2 ROLL
More informationEast Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study
East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092
More informationEASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO
General Info Number: Description: Deadline: PROJECT NO. 59-18-04 (RE-BID) PAVEMENT REPAIRS EASTBOUND AND WESTBOUND ROADWAYS MILEPOST 80.50 TO MILEPOST 86.15 OTTAWA AND SANDUSKY COUNTIES, OHIO JULY 3, 2018
More information***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***
General Info Number: PROJECT NO. 43-16-03 Description: Deadline: BRIDGE DECK REPLACEMENT AND REHABILITATION, CLIFTON-GUNN ROAD OVER OHIO TURNPIKE M.P. 21.4, RUEGER-SHETLER ROAD OVER OHIO TURNPIKE M.P.
More informationBids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)
General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND
More informationKeeping good roads good
Pavement Preservation (PP) in the State of California- Protecting Their Road and Street Investment R. Gary Hicks PhD, PE CP2 Center, Chico CA Prepared for the 3 rd International Pavement Maintenance Technology
More informationODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.
1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening
More informationName Roads Station Distance Miles
Name Roads Station Distance Miles Saw Mill to San Mateo 62+00 to 135+00 1.382575758 San Mateo to Alamo 135+00 to 261+50 2.395833333 Alamo to NM 599 261+50 to 305+00 0.823863636 Sidewalk and Curb Only Rabbit
More informationPavement Management Report. City Council Meeting of May 21, 2013
Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies
More informationTacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force
1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria
More informationRiverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)
Company Name Base Bid Schedule A Base Bid Schedule B Total COUNTY'S ESTIMATE 367,150.00 328,300.00 $695,450.00 1 All American Asphalt 481,360.00 108,180.00 $589,540.00 2 PTM General Eng Services, Inc.
More informationCHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems
CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components
More information2018 ROAD MAINTENANCE PROGRAM
2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process
More informationCONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW
Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\217-1401.06 Contract 6 Phase I WM\01 CAD\06 CONTRACT WATER DESIGN I.dwg Plot : Nov 13,2014-8:24am. GENERAL NOTES AND LEGEND Drawing file: I:\Eastham.217\Phase
More informationKalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission
FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort
More informationBuilding Great Neighbourhoods BELLEVUE AND VIRGINIA PARK
Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting
More informationTabulation of Bids. Counties: Project(s):
Page: 1 14 ROTE 94, ROTE 46 TO OLD COACH RD Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 154003P MOBILIZATION 0007 157004M CONSTRCTION LAYOT 0012
More informationADA Self Evaluation and Transition Plan for Public Rights-of-Way
ADA Self Evaluation and Transition Plan for Public Rights-of-Way 2014 NWPMA Conference Akmal Siddiqui WSDOT Local Programs 310 Maple Park Avenue SE Olympia, WA 98504 Phone: 360-705-7539 siddiqa@wsdot.wa.gov
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationSTAKING TRAFFIC CONTROL SIGNAL SYSTEMS
Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,
More informationCURB RAMP INSPECTION REPORT
11.9% St Ltg Box Pac Bell Elec St Ltg Box CURB RAMP INSPECTION REPORT 149 BLUXOME STREET - SAN FRANCISCO - 5TH STREET & TOWNSEND STREET APPLICANT: ZAYO GROUP DATE: 2/9/17 1 0.3% 1.4% 12.1% 0.3% 0.6% 12.7%
More informationBuilding Great Neighbourhoods STRATHEARN
Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods
More informationTaylor Road Resurfacing Project
Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project
More information2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014
2014 Street and Utility Improvement Project Feasibility Report January 28, 2014 Public Informational Meeting 22 residents from 17 properties signed in Questions about construction (FAQs) Eyebrow cul-de-sac
More informationFleur Drive Reconstruction
Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths
More informationADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview
ADA Design Overview Section 2 ADA Design Overview Overview Accessible Pedestrian Signals Alternate Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group 2 Pedestrian Access Route (PAR)
More informationCity of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS
City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures Sep/16 R-2 No Drawing Jan/17 R-2A Typical Cross Sections for Granular
More informationAmericans with Disabilities Act Transition Plan for Public Right-of-Way Improvements
Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3
More informationCONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW
Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:11am. GENERAL NOTES AND LEGEND Drawing file: I:\Eastham.217\Phase
More informationCITY OF SOUTH DAYTONA
CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage
More informationTabulation of Bids. Counties:
Page 1 of 16 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 153011M TRAINEES 0007 154003P MOBILIZATION 0010 157004M CONSTRCTION LAYOT
More informationPaul Vraney Bureau of Project Development 02/11/2016
Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationWORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES
WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents
More informationDETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:
GENERAL NOTES: CURB NOTES: 5'-0" MIN 5'-0" 5'-0" MIN 1. 2. THESE SHEETS ARE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA), AND THE REQUIREMENTS OF THE 2011 PROPOSED ACCESSIBILITY GUIDELINES
More informationCDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.
CDBG HANDICAP RAMPS PROJECT NO. 1 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES 3-4 DETAS 5-23
More informationSECTION VII ROADWAY AND SITE IMPROVEMENTS
SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical
More informationPreparing a Curb Ramp Project. December 15, 2010
Preparing a Curb Ramp Project December 15, 2010 3 Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans and identifying ramp types at each quadrant Signalized
More informationMEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report
MEMORANUM ATE: October 6, 2017 TO: FROM: SUBJECT: Mayor & Council Members Mike Anderson, Assistant to the City Manager City Manager s Report Old TH HWY 14/Elm Ave Update *Please see attached document*
More information4 GENERIC COST ESTIMATING TOOL
4 GENERIC COST ESTIMATING TOOL Table 4-1 presents a generic cost estimating tools that can serve as a conceptual planning tool for local jurisdictions to estimate the costs of pedestrian improvements.
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationMILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO
MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve
More informationRC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found
RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found on Sheet 1. RC-67M note Construct curb ramps with a minimum
More informationCITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS
CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut
More informationConcrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas
More informationDesign Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope
Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian
More informationTANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects
January 2012 TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects 1. PURPOSE OF REPORTING The purpose of Tangible Capital Asset (TCA) reporting is to comply with PSAB 3150 reporting
More informationAdvanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In
More informationInspector MUST Sign and Date Each Inspection
Work Area: Applicant: Mercer County Department of Transportation - Highways Division Application and Permit for Road Work in Mercer County, New Jersey NO. East Windsor Ewing Hamilton Hopewell Lawrence
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS
ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS 841.1 DESCRIPTION: This item shall consist of hydrostatic testing operations, of water mains in accordance with these specifications. 841.2 MATERIALS: The materials
More informationField guide for Accessible Public Rights-of-Way Edition
Field guide for Accessible Public Rights-of-Way 2015 Edition BRIEFING MEMO SUBJECT: Department of Justice/Department of Transportation Joint Technical Assistance on Title II of the Americans with Disabilities
More informationWelcome! Sherbrooke Neighbourhood Renewal Open House. Sherbrooke Open House February 3, Capital Construction
Welcome! Sherbrooke Neighbourhood Renewal Open House Overview of the Neighbourhood Renewal Program Presented By: Annie Duong, P.Eng. Current Neighbourhood Roadway Infrastructure Neighbourhoods in Edmonton:
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington
More informationCity of West Des Moines PAVEMENT MANAGEMENT SYSTEM
City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationSTANDARD OPERATING PROCEDURES
SOP#C-10 SPILL RESPONSE DATE ISSUED: 11/15/2013 DATE REVISED: WASTEWATER DIVISION APPROVED BY: Robert Englent 1) PURPOSE: The City responds to SSOs and other sewer emergencies according to the SSO Response
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationSD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.
SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery
More informationWELL COMPLETION & PROTECTION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD
WELL COMPLETION & PROTECTION MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD www..com WELL COMPLETION & PROTECTION TABLE OF CONTENTS TABLE OF CONTENTS (FLUSHMOUNTS)... 2-5 MONITORING
More informationSAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS
SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS Why does the City have a Safe Walks Program? The Safe Walks program was initiated in 2006 at the request of City Council in order to address the increasing
More informationBID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan
PROJECT PH3512 - Otsego Township - On 21st Street, 102nd Avenue (west) to 101st Avenue, then east on 101st & 102nd Avenue to 16th Street - 2.96 miles Michigan Paving & Materials Reith-Riley PH3512 HMA
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationHospital Link Project Project Update November 2017
Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationGeneral Notes. Project No /15/2018 Page 1 of 1
5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for
More informationSummary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps
Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps Office of Pavement Engineering October 14, 2003 Abstract: This paper summarizes the current practice in ODOT regarding the construction
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update April 1, 2016 Corkscrew Road West of I-75: Lee County DOT will
More informationCLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
More informationJanuary 25, Franklin Pasture Sanitary Sewer Cure-In-Place Pipe Lining Bid No Bid Date: 2/7/17 ADDENDUM NO 1
PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director January 25, 2017 Franklin Pasture Sanitary Sewer Cure-In-Place Pipe Lining Bid. 2017-005 Bid Date: 2/7/17 ADDENDUM NO 1 SPECIFICATION REVISIONS: QUESTIONS
More informationBuilding Great Neighbourhoods QUEEN ALEXANDRA
Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.
More informationCity of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate
City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate Project ID Project Category Project Name Qty/Len(Mi) Cost Estimate BB 1 Bike boulevard Jefferson Street or
More informationPlanning Committee STAFF REPORT May 6, 2015 Page 2 of 4 Background In November 2011, the City of Walnut Creek applied for Measure J Program 12 TLC fun
Planning Committee STAFF REPORT Meeting Date: May 6, 2015 Subject Summary of Issues Recommendations Approval of Resolution 15-20-G for Construction of Northwest Walnut Creek Pedestrian and Bicycle Access
More informationAccess requests to County streets and roadways are processed through one of the following methods:
13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.
More informationIL Route 71 Construction Update
100 Parkers Mill Oswego, IL. 60543 (630) 554-3618 4.20.16 IL 71 TRAFFIC ADVISORY: Tentatively scheduled for April 21st A new traffic pattern from Paradise to Wolf Crossing on IL 71 will be in use. The
More informationCity of Davis Pavement Management Program
City of Davis Pavement Management Program Davis Street and Bike Path System 163 centerline miles of streets (33 million square feet) 34.6 miles of arterials 21% 22.8 miles of collectors 14% 103.9 miles
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More information