1 City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering Director 8K TH 63 River Crossing Bridge Replacement Project ACTION REQUESTED: Adopt Resolution No Receiving Engineer's Report and Calling for Hearing on Improvements. ATTACHMENTS: Resolution No Location Map Engineer' s Report BACKGROUND: Below are the project events that have taken place to date. 10/ 12/ 2015 Council adopted Res approving the visual quality manual. 10/ 26/ 2015 Council approved a professional services agreement with SRF Consulting Group for design of the City utility relocations affected by the project. 11/ 23/ 2015 Council held a public hearing and adopted Res approving the project layout. 1/ 11/ Council accepted the Planning Commission' s findings that the CIP is consistent with the Comprehensive Plan. 1/ 11/ 2016 Council adopted Res entering into MnDOT agreement No for cost share of City utility relocation design. 3/ 28/2016 Council accepted a future contribution of up to $ 400, 000 from the RW Area Fund and Jones Family Foundation for project aesthetics. 9/ 12/ 2016 Council adopted Res ordering the preparation of the engineer's report. DISCUSSION: MnDOT' s proposed TH 63 River Crossing Bridge replacement project will include reconstruction of segments of Main Street/ TH 61, 3rd Street/ TH 63, and Bluff Street. Within the reconstruction of these streets, the City of Red Wing will have some streetscape aesthetic costs, and relocation/ replacement of sanitary sewer and watermains, along with service line replacements.

2 At Council' s direction, staff is proposing to assess the street reconstruction costs at the same assessable rate ($ / LF) as the Main Street reconstruction project rather than the current rate of the fee ordinance ($ / LF). With adoption of Resolution No. 7010, staff anticipates holding a neighborhood meeting on 10/ 11/ 2016; Holding a Project Public Hearing and Ordering the Public Improvement & Preparation of Plans on 10/ 24/ The overall project plans are being designed by MnDOT' s consultant SRF) with input from city staff for project aesthetics and city utilities. FUNDING: Below are the estimated funding sources and amounts for the City of Red Wing' s portion of the project from the current Capital Improvement Plan and the Engineer's Report. Engineer' s Estimated Funding Sources: Report CIP General Obligation Street Reconstruction Bonds = $ 1, 000, 000 $ 1, 000, 000 General Fund = $ 360, 000 $ 360, 000 Assessment Fund ( Street & Utility Service Assess.) _ $ 84,016 $ 0 Other ( RW Area Fund & Jones Family Foundation) _ $ 315,000 $ 315,000 Estimated Total Project Costs = $ 1, 759, 016 $ 1, 675, 000 Estimated Expenditures Preliminary & Final Design 180, 000 Construction Administration 109, 125 Streetscape Aesthetics 854, 000 3rd Street Cycle Track 5, 000 Traffic Control & Mobilization 30, 000 City Share of Sanitary Sewer & Water Improvements 103, 000 Contingencies 150, 000 Estimated Total Project Costs 1, 431, 125 Note: The above costs will be further refined when the plans are completed & MnDOT develops the cooperative agreement for the construction funding. ALTERNATIVES: 1) Adopt Resolution No ) Modify Resolution No before adoption. 3) Defeat Resolution No ( Staff would need direction on how to proceed). RECOMMENDATION: Staff recommends Alternative 1) above.

3 Resolution No Receiving Report and Calling for Hearing on Improvement U.S. Trunk Highway 63 Mississippi River Crossing Bridge Reconstruction From W. 3rd Street and Plum Street/ TH 58 in Red Wing, MN, crossing the Mississippi River to 825th Street in Hager City, WI) State Project No. S. P WHEREAS, pursuant to resolution of the council adopted September 12, 2016, a report has been prepared by the City Engineer with reference to the proposed improvement of Main Street TH 61) from Potter Street to 1, 900' easterly, 3rd Street from Plum Street to Bluff Street, and Bluff Street from 3rd Street to 4th Street as part of the TH 63 reconstruction project from Plum Street in Red Wing to 825th Street in Hager City by reconstruction of the sanitary sewer and services and water main and services; as well as reconstruction of the streets and bridges by removals, storm sewer, grading, aggregate base, bituminous pavement, concrete curb and gutter, concrete sidewalks, street lighting, boulevard restoration, aesthetics, and related construction, and this report was received by the Council on September 26, 2016, and WHEREAS, the report provides information regarding whether the proposed improvement is necessary, connection cost with effective, some and feasible; whether it should other improvement; the best estimated be made as cost of the proposed or in improvement as recommended; and a description of the methodology used to calculate individual assessments for affected parcels. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF RED WING, MINNESOTA: 1. The Council will consider the improvement of such streets in accordance with the report and the assessment of abutting property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes Chapter 429 at an estimated total cost of the City' s portion of the improvement of $ 1, 431, A public hearing shall be held on such proposed improvement on the 24th day of October, 2016 in the Council Chambers of City Hall at 7: 00 p. m. and the Clerk shall give mailed and published notice of such hearing and improvement as required by law. Adopted by the Council this 26th day of September, Dean Hove, Council President ATTEST: Kathy Seymour Johnson, MCMC City Clerk seal) Presented to the Mayor at Approved this m. on this day of September, day of September, 2016 Daniel D. Bender, Mayor

4 PROPOSED T.H. 63 RIVER CROSSING BRIDGE REPLACEMENT IMPROVEMENTS LOCATION MAP WISCONSIN i 63 Barn Bluff 0 o P P c rd V, Z 51' O V S. D 61 Sy ' A., 6 h S 58 E w C, S SKYL S F` S O N City of REQ NG ENGNEERNG DEPARTMENT RON L ROSEN, NAL, ENGINEERING DIRECTOR JAY A., OWENS, CITY ENGINEER

5 Engineer' s Report TH 63 Bridge and Approaches Reconstruction Project I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Enaineer under the laws of the State of Minnesota. 0b g2o2o f/? - License Da e No. City Engineer Background The proposed project involves constructing a new TH 63 river crossing bridge, construction/ reconstruction of the approach roadways leading to the new bridge including reconstruction of W 3rd Street from Bluff Street to Plum Street and construction of a new "button -hook" ramp realignment of TH 63 to meet TH 61 east of the bridge), and relocation and reconstruction of public utilities along E 3`d Street and other streets as needed for the bridge and approach construction or due to the age of the existing utilities. The existing river bridge is aging and is in need of replacement due to its status as a ' fracture critical" bridge, meaning that if one member of the bridge failed the entire bridge could collapse. Most of the design and construction cost for this project will be paid for by MnDOT; however, the city is responsible for some project costs as detailed below: Aesthetic improvements ( such as decorative light poles, colored concrete sidewalks, and decorative trees/ plantings) Replacement of water and sanitary sewer mains and services along W 3`d Street between Plum Street and Potter Street, Bluff Street between 3`d Street and 4th Street, and along TH 61 between Potter Street and Bluff Street Other utility work not deemed necessary to the construction of the bridge or approaches Cycle track median on W 3`d Street Impacts to city streets beyond W 3`d Street will be needed to construct the bridge approach " button -hook" ramp but will be paid for by MnDOT are as follows: Reconstruction of Bluff Street north of W 4th Street to provide connection to Red Wing Shoe back parking lot Vacation and removal of E 3`d Street between Bluff Street and approximately 200' west of Sanderson Street. A cul- de- sac will be constructed on E 3`d Street to serve the remaining houses along E 3`d Street. Reconstruction of TH 61 from Potter Street to new " button -hook" ramp intersection with TH 63

6 Complete Streets The City of Red Wing adopted a Complete Streets Policy on January 10, This policy states that consideration will be given to ( 1) bicycle, ( 2) pedestrian and ( 3) transit facilities during the design phase of streets proposed to be reconstructed within the City of Red Wing. Due to the bridge' s status as a city landmark and gateway to the city, it is desired that good pedestrian and bicycle facilities be provided for non -motorized traffic wishing to use the new bridge. The following subsections detail the street characteristics for each street and highway in the project area with any pedestrian, bicycle, or transit improvements incorporated into the proposed design. W 3rd Street (Plum Street to Bluff Street) 2015 ADT: 9,200 1) This segment is currently an approximately 57' wide arterial highway with no parking. Traffic speeds have not been collected along this street segment but are likely low heading eastbound from the traffic signal at Plum Street and higher coming westbound down off the existing bridge approach. The traffic volumes are currently relatively high due to W 3`d Street' s connection to the river bridge. The proposed design will significantly reduce traffic volumes along W 3`d Street since the traffic wishing to access the river bridge from downtown Red Wing will be diverted to the new "button -hook" ramp. Additionally, traffic volumes coming off the bridge wishing to access southbound TH 61 and southbound TH 63 will be diverted to the new "button -hook" ramp rather than coming into downtown Red Wing via W 3rd Street. 2) The proposed design for W 3rd Street includes a separated two-way bicycle facility along the north side of W 3rd Street between Plum Street and Potter Street. This bicycle facility will provide a safe connection for bicycles between the new bridge and the downtown area. MnDOT' s Cultural Resources Unit has requested the northerly curb line to remain in its current location. By doing so, there is extra space along this corridor to facilitate this two/ way protected bike lane. 3) There are currently sidewalks along both sides of W 3rd Street between Plum Street and Potter Street. These sidewalks will be reconstructed and, in some locations, expanded to up to 10' in width. Pedestrian ramps along this corridor will also be reconstructed to meet ADA standards. 4) W 3rd Street is not currently on a Red Wing transit route. There are transit generators along W 3rd Street in this area (such as the Red Wing Shoe Company factory). However, transit service is offered nearby within walking distance to any transit generators, and thus no transit improvements are proposed along W 3rd Street. TH 63 ( River Bridge to TH 61) 2015 ADT: 11, 800 1) This segment varies between 30' wide on the existing river bridge and more than 55' wide along the approach to the river bridge. The existing roadway section is one lane of traffic in each direction with varying width shoulders. Traffic speeds have not been collected along this segment by the city, but average speeds likely 2

7 meet or exceed the 30 mph speed limit. The roadway width of the proposed design varies between 36' on the new river bridge and 66' on the " button -hook" ramp. The roadway section across the bridge is proposed to be one lane in each direction with 6' shoulders on each side, and the roadway section on the " buttonhook" ramp is proposed to include turn lanes as TH 63 approaches TH 61. The proposed slip ramp to W 3rd Street is proposed to include only one southbound lane with a shoulder. 2) There are currently no sidewalks along TH 63 between one the river bridge or on the approach up to the Potter Street intersection. A 12' shared -use path is proposed along the river bridge and the ramp from the proposed bridge to the W 3' d Street / Potter Street intersection for pedestrian use. 3) Bicycle traffic is currently allowed along TH 63 on the river bridge and approach, but the existing roadway design is not conducive to safe biking due to ( likely) high traffic speeds and high traffic volumes. The proposed 12' shared -use path along the bridge will provide a safe connection for bikers to cross the river bridge. 4) TH 63 is not a part of a transit route and does not have any transit generators along its length between the river bridge and Potter Street. No transit improvements are proposed along TH 63 as a part of the project. TH 61 ( Potter Street to E 5th Street Bridge) 2015 ADT: 8, 000 1) This segment consists of 4-12' wide lanes with a varying width raised median and no shoulders. The speed limit on this segment varies between 30 mph ( on the west end) and 55 mph ( on the east end). Traffic speeds have not been collected along this segment by the city, but average speeds likely meet or exceed the 30 mph speed limit on the lower -speed area. The proposed design would keep the existing section except where widening out to provide turn lanes at the proposed " button -hook" ramp. 2) The only sidewalk present along TH 61 in this segment is on the south side of the highway between Potter Street and the north side of the Red Wing Shoe building. This segment is the transition area between an urban street and rural highway, and there are no destinations along TH 61 east of the TH 63 bridge that would warrant pedestrian traffic or a sidewalk. Sidewalk facilities are provided in the adjacent neighborhoods for pedestrian access between the downtown area and the east side neighborhoods and Barn Bluff. 3) Bicycle traffic is currently allowed along TH 61, but the existing roadway design is not conducive to safe biking due to high traffic speeds and high traffic volumes. E 7th Street is signed as an alternative biking route to connect downtown Red Wing and TH 61 to the east. No biking facilities are proposed to be constructed with this project due to the availability of safer alternative facilities and a lack of destinations for bikers along TH 61. 4) TH 61 is not a part of a transit route and does not have any transit generators along its length east of Potter Street. No transit improvements are proposed along TH 61 as a part of the project. 3

8 Low- volume residential streets ( Bluff Street & E 3`d Street) 2015 ADT: < 100 1) These low-volume, low -speed residential streets have roadway widths between 20' and 30'. The proposed project will not significantly change the character of these streets beyond making each street into a dead- end with a cul- de-sac or turnaround. 2) Sidewalks are present along Bluff Street and E 3`d Street and will be replaced with the proposed project. 3) Since these streets are low-volume and low -speed streets, bike traffic is able to be safely accommodated along these streets without additional bike facilities or additional signing/ striping. 4) Neither of these streets are along a transit route nor are either of these streets likely to be used as a transit route in the future. No transit improvements are proposed along these streets as a part of the project. Cost due to the Complete Streets Policy Based on the above recommendations for each street segment, the incremental cost of implementation of the Complete Streets Policy for this project is estimated at $ 5, 000. This cost is for the two-way protected bike lane with median on W 3`d Street. The balance of the proposed pedestrian and bicycle improvements listed previously in this report are all being funded by MnDOT. Any aesthetic improvements desired by the city will be the responsibility of the city to fund.

9 ENGINEER' S ESTIMATE PRELIMINARY ESTIMATE OF QUANTITIES & COSTS FOR THE CITY OF RED WING' S PORTION OF THE RECONSTRUCTION OF THE TH 63 RIVER BRIDGE AND APPROACHES IN THE CITY OF RED WING, MINNESOTA. CITY OF RED WING PROJECT COSTS Category Totals Aesthetic Costs ( Decorative light poles, colored concrete sidewalks, trees/plantings, etc.) = $ 735, rd Street Cycle Track = $ 5, Traffic Control and Mobilization (City Share) = $ 30, Sanitary Sewer and Water Main Improvements ( 26. 8% City Cost Share) = $ 103, TOTAL CONSTRUCTION COSTS = $ 873, Construction Administration ( 12. 5%) = $ 109, TOTAL PRELIMINARY ESTIMATED IMPROVEMENT COSTS = $ 982, PROJECT REVENUE SOURCES Quantity Unit Description Unit Price Totals LIN. FT. Street Improvement Footage Assessable , EACH Water Relay Assessable ( Reduced Rate) 1, , EACH Sewer Relay Assessable ( Reduced Rate) 1, , EACH Sewer Relay Assessable ( Full Rate) 1, , TOTAL ASSESSMENT REVENUE = $ 84, Red Wing Area Fund Contribution ( Aesthetic Lighting & Landscaping) = $ 315, TOTAL PRELIMINARY REVENUE _ $ 399, stimated Non -Assessable Street/ Utility Improvement Costs to be Absorbed by the City of Red Wing = $ 583, This project is cost effective, feasible and necessary. The TH 63 bridge is a deteriorating, fracture -critical bridge, and the bridge approaches are in need of reconstruction to match into the new bridge and to relieve traffic in downtown Red Wing. ASSESSMENT METHODOLOGY - Assessments for this project are based on the current City of Red Wing Assessment Policy and the current City of Red Wing Fee Ordinance, except that the street frontage assessment rate used is the 2014 commercial/industrial street assessment rate per City Council direction to be consistent with the assessment rates used on the recently completed Main Street reconstruction project. September 22, 2016 ENGINEERING DEPARTMENT RED WING, MINNESOTA RAPROJECTS\ STREETSi High Bridge Replacement\[ Engineer' s Estimate - TH 63 Bridge.x] s12015

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

Item No. 14 Town of Atherton

Item No. 14 Town of Atherton Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

COMMITTEE RECOMMENDATIONS. That Council approve:

COMMITTEE RECOMMENDATIONS. That Council approve: 4. MODIFICATIONS TO INNES ROAD (REGIONAL ROAD 30) AND TENTH LINE ROAD (REGIONAL ROAD 47) TO ACCOMMODATE THE DEVELOPMENT OF THE TRINITY COMMONS SHOPPING CENTRE COMMITTEE RECOMMENDATIONS That Council approve:

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

BPP / SUB

BPP / SUB Development Services Department Project/File: Lead Agency: Site address: Millwell Place Subdivision/ BPP15-0031/ SUB15-0064 This is a preliminary plat application to allow for the development of 68 building

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112) Project Area Map 6 COUNTY 112 COUNTY Preliminary Design of Wayzata Boulevard Improvements(CSAH 112) Public Open House Open House To Do List: Sign in Visit with Hennepin County staff and design team Learn

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

Giles Run Connector Road

Giles Run Connector Road Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY STAFF REPORT MEETING DATE: September 13, 2016 TO: FROM: City Council Bob Brown, Community Development Director Russ Thompson, Public Works Director Patrick Filipelli, Management Analyst 922 Machin Avenue

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

IMPLEMENTATION STRATEGIES

IMPLEMENTATION STRATEGIES GEORGETOWN SIDEWALK MASTER PLAN 34% of funding is dedicated to Downtown Overlay District sidewalks 28% of funding is recommended within 1/4 mile of Southwestern University 26% of funding is recommended

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. 4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 6123 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY WHEREAS, the term Complete Streets describes a comprehensive, integrated transportation

More information

City of Memphis On-Street Parking Modification Guidelines

City of Memphis On-Street Parking Modification Guidelines City of Memphis Effective Date: December 1, 2013 Bicycle/Pedestrian Program 125 N. Main Street Memphis, TN 38103 (901) 576-6710 www.bikepedmemphis.com City of Memphis Executive Summary It is current practice

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION 5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs

More information

Street Paving and Sidewalk Policy

Street Paving and Sidewalk Policy City Commission Policy 600 Street Paving and Sidewalk Policy DEPARTMENT: Public Works DATE ADOPTED: June 7, 1995 DATE OF LAST REVISION: December 10, 2014 Policy No. 600.01 AUTHORITY: PASS City of Tallahassee-Leon

More information

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road Project Status Update Presentation to City of Markham Development Services Committee October 22, 2013 Presentation Outline Background Status

More information

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION TABLE 1A CG-6 CURB AND GUTTER SECTION HORIZONTAL AND VERTICAL CONTROLS CURB AND GUTTER ROADWAYS MAXIMUM 3:1 CUT OR FILL SLOPE CURVE DATA MIN. SIGHT DISTANCE PROJECTED TRAFFIC VOLUME (ADT) MIN. DESIGN SPEED

More information

Building Great Neighbourhoods LANSDOWNE

Building Great Neighbourhoods LANSDOWNE Building Great Neighbourhoods LANSDOWNE We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection REPORT FOR ACTION Road Alterations - Wellington Street, Church Street, and Front Street Intersection Date: November 1, 2016 To: Toronto and York Community Council From: Director, Public Realm Section,

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

CSAH 101 Preliminary Design

CSAH 101 Preliminary Design CSAH 101 Preliminary Design Public Open House No. 2 January 29, 2013 CSAH 62 to Hutchins Drive Welcome / Introductions Hennepin County Craig Twinem, Transportation Maury Hooper, Transportation Nick Peterson,

More information

Environment and Public Works Committee Presentation

Environment and Public Works Committee Presentation Mixed Use Centers Complete Streets Guidelines Project Environment and Public Works Committee Presentation December 10, 2008 Project Objectives: Conduct an inter-departmental and agency process to study

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including

More information

Third Street Bridge & Corridor Project

Third Street Bridge & Corridor Project Third Street Bridge & Corridor Project Preparation for the FY2018 budget to commence October 1, 2017, includes funding to address a project that has been considered since 1994. The Third Street bridge

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

Transportation Analysis and Plan

Transportation Analysis and Plan The City of Waconia is a growing community that will need many miles of additional collector and local streets to serve the development that is forecast. This plan will examine ways to provide those improvements

More information

South Carolina Department of Transportation. Engineering Directive

South Carolina Department of Transportation. Engineering Directive South Carolina Department of Transportation Engineering Directive Directive Number: ED-22 Effective: December 16, 2009 Subject: References: Purpose: This Directive Applies to: Considerations for Bicycle

More information

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets Division BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic and parking modifications to install

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 12 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various bicycle improvements and traffic modifications

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report. COUNCIL REPORT Report No. ENG 08-018 Executive Committee Date: May 0, 018 File No: 5400-1 To: From: Subject: Mayor and Council Purvez Irani, Senior Transportation Engineer Bluejay Street Road Improvements

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

2. Executing a legal agreement with respect to (1) above.

2. Executing a legal agreement with respect to (1) above. 3. INSTALLATION OF TRAFFIC CONTROL SIGNALS AT HUNT CLUB AND PAUL ANKA TO ACCOMMODATE THE DEVELOPMENT OF A GAS BAR, CONVENIENCE STORE AND CAR WASH COMMITTEE RECOMMENDATIONS That Council approve the installation

More information

ITEM 3 ATTACHMENT A RESOLUTION NO

ITEM 3 ATTACHMENT A RESOLUTION NO ITEM 3 ATTACHMENT A RESOLUTION NO. 2018-1575 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALABASAS, CALIFORNIA, ADOPTING THE FISCAL YEAR 2017-18 LIST OF PROJECTS FUNDED BY SB 1: THE ROAD REPAIR AND

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: STEVE MYRTER, P. E. DIRECTOR OF PUBLIC WORKS SUBJECT: SPRING STREET

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

Application of a Complete Street

Application of a Complete Street Application of a Complete Street Southbend to Prima Vista Update May 14, 2018 Meeting Agenda Perspective and History Public input received Typical sections being considered Presentation of the 2-lane master

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE 2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE COMMITTEE RECOMMENDATIONS AS AMENDED That Council approve: 1. The endorsement

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Cross Street Corridor Non-Motorized Enhancement Project Project Description

Cross Street Corridor Non-Motorized Enhancement Project Project Description Cross Street Corridor Non-Motorized Enhancement Project Project Description A cooperative study of the Cross Street neighborhood was completed in May 2002 by the City of Ypsilanti, the Depot Town Downtown

More information

COMPLETE STREETS CHECKLIST City of Philadelphia The City of Philadelphia's Complete Streets policies are designed ensure that city streets are safe, comfortable and convenient for people of all ages and

More information

1. Provide a dedicated westbound approach bus lane at the intersection;

1. Provide a dedicated westbound approach bus lane at the intersection; 3. MODIFICATIONS AT HIGHWAY 417 WESTBOUND OFF-RAMP/PINCREST ROAD - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public hearing, that Council approve the preliminary design for the proposed modifications

More information

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_ AGENDA ITEM SUMMARY AGENCY: City Council MEETING DATE: June 25, 2012 DEPARTMENT: Community Dev PREPARED BY: T Spade DEPT. DIR. APPROVAL: MJ CITY MGR. APPROVAL: LR PRESENTED BY: T Spade TITLE: RECEIVE REPORT

More information

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement: Various Modifications Lower Jarvis Street and Lake Shore Boulevard East; Lower Jarvis Street, east side, between Lake Shore Boulevard East and The Esplanade - 45-77 Lower Jarvis Street; and Lower Jarvis

More information

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO. TRAFFIC STUDY Birch Bluff Road / Pleasant Avenue 01/15/2018 City of Tonka Bay 4901 Manitou Road Tonka Bay, MN 55331 WSB PROJECT NO. 10805-000 Birch Bluff Road/ Pleasant Avenue Traffic Study For: City of

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:

More information

Pre-Construction Meeting

Pre-Construction Meeting Pre-Construction Meeting Wednesday, March 21 Drop-in from 5 9pm Please visit displays for project information, talk to staff, and ask questions! Edmonton.ca/SouthsideBikeRoutes Objectives & Project Scope

More information

Circulation Improvement Strategy. Chapter 5: Improvement Strategy. Cross Street Neighborhood Improvement Plan

Circulation Improvement Strategy. Chapter 5: Improvement Strategy. Cross Street Neighborhood Improvement Plan Circulation Improvement Strategy Chapter 5: Circulation Improvement Strategy Circulation Observations: Sidewalks are located throughout most of the neighborhood, although several sidewalks do not have

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information