1 50 Year Roads: Don't Accept Anything Less Prepared By Thomas O. Malerk Director of Transportation Engineering Florida Concrete & Products Association NACE Annual Meeting April 22, 2015
2 Presented by Roger C. Schmitt, P.E. Director of District and Local Road Transportation Engineering Florida Concrete and Products Association
3 FACERS Fall Meeting 2016 The Old Way 1930 s Very Few Joints A Newer Way: Lots of Joints Roller Compacted Concrete
4 Thanks to: Jim Armaghani; Manny Uwaibi; Roger Schmitt; Jim Mack: Mike Dowell
5 Outline how to achieve a 50 year concrete roadway what are the cost and sustainability factors how a long life concrete pavement benefits people and business by eliminating frequent repair and replacement work a Florida example: a brief history of the upgrade of about 2 miles of asphalt roadway to concrete pavement in 1988 and how things are working out
6 It All Started Long, Long Ago
7
8 How Tom Got Interested
9 1961; 1978; 1984; 1997; 2002; 2015 Disney World
10 Some Concrete History
11 General Purpose of the State Road Department Supply hard-surfaced rural roads to join cities, counties, towns and villages
12 How Much Rigid Pavement is there in Florida?
13 State Highway System 42,829 lane miles of roadway 10% of the state roadway network; Carries 54% of all traffic in state 41,787 lane miles HMA (97.6%) US average: 94% Life Cycle: Avg=16yr (OGFC=12yr, DGFC=17yr) 1,042 lane miles PCC (2.4%) US average: 6% Life Cycle: set by FDOT Pavement Type Selection Manual at 23 years
14 2500 HISTORY OF FDOT RIGID PAVEMENT LANE MILES 1000 ADDED RIGID LANE MILES YEAR
15 The Dawn of Concrete Pavement Portland Cement patented: st use as concrete pavement: UK 1 st US concrete pavement: 1891 Widespread use post st Florida concrete pavement: st Florida State Road with concrete pavement: SR 1 Jacksonville to Lake City 1928
16 Oldest Concrete Pavement: 125 yrs. Court Avenue, Bellefontain, Ohio Built in layer 5,000 to 8,000 psi 1 ½ and ½ agg and 8% air Why use 2 layers of concrete?
17 US 41 Two Lift Concrete Pavement Placed in 1977
18 My wife Alida and I in 1977
19 Oldest Concrete Pavement Location in Florida
20 FDOT s Oldest Concrete Pavement US 17/92 in DeLand built 1939 (77 years) 2 C/L miles, 3-lanes slab thickness 7 (Reinforced) US 17/92 in Winter Park Built 1936 (80 years) 3.6 C/L miles, 5-lanes slab thickness 7 (Reinforced)
21 How to Make a Pavement Last for at Least 50 Years With Zero or Very Little Maintenance
22 How Thick? - The Idea Decide how long you want the pavement to last, then figure out the thickness considering the concrete properties, traffic, soils and climate. Longer Life = higher upfront, lower life time costs Shorter Life = lower upfront, higher life time costs 20 years is typical for design life calculations For concrete pavement use nothing less than a 50 year design life You decide when enough is enough!
23 Fit the Road to the User Vs
24 Concrete Pavement Types Jointed Plain ($ - 50 years) Continuously Reinforced ($$ - 75 years) Precast, Prestressed, Post Tensioned ($$$ yr)
25 THICKNESS DESIGN METHODS Empirical Design Based on observed performance for the AASHTO Road Test (WinPas) Mechanistic Design Based on calculated pavement response ACPA Design (StreetPave) Mechanical-Empirical (MEPDG) Based on combining calculated pavement responses with observed performance MEPDG to DARWin ME to AASHTO Pavement ME
26 Why did US do the road test in the 50s? The AASHO Road Test was a series of experiments carried out by the American Association of State Highway and Transportation Officials to determine how traffic contributed to the deterioration of highway pavements. Officially, the Road Test was "...to study the performance of pavement structures of known thickness under moving loads of known magnitude and frequency." This study, carried out in the late 1950s in Ottawa, Illinois, is frequently quoted as a primary source of experimental data when vehicle wear to highways is considered, for the purposes of road design, vehicle taxation and costing. The road test consisted of six two-lane loops along the future alignment of Interstate 80.
27 AASHTO Road Test 2016
28 A Real Active Example Here In Florida
29
30
31
32
33 Pavement Sections Experimental Features
34
35 US 1 Concrete Pavement State Road #: SR 5 (US 1) Begin MP: End MP: Length: Direction: Southbound Only Total Lanes: 2 Opened to Traffic September, 1988 Current Age: 28 years Traffic 1988: 11,940 AADT; T= 7% Traffic 2014: 11,053 AADT; T= 4%
36 Concrete Pavement Construction Subbase/Base: Retain Limerock Base: 8.5 in Mill 4 in of average 5 in asphalt Place Type III Leveling: 1 in* Place Type S Asphalt: 1 in Place Slab Thickness: 6, 7, 8 Transverse Joint Spacing: Varies 12, 14, 16, 18 & 20 Longitudinal Joint Spacing: 12 Lanes Joints: Rectangular not skewed Dowel Diameter: ¾ to 1 Dowel Spacing: Variable; 3 dowels in each wheel path; no dowels in last 5 slabs of each test section Shoulder Design: Originally shoulders were natural soil but asphalt shoulders added later
37 1988 Cost Sheet
38 Concrete Pavement Prices 2016: FDOT 5 inch Concrete Pavement: $28.57 per syd* 6 inch Concrete Pavement: $34.29 per syd* 7 inch Concrete Pavement: $40.00 per syd* 8 inch Concrete Pavement: $55.00 per syd* Concrete 7 to 9 : $40 to $55 syd Concrete 9 to 11 : $45 to $60 syd Concrete 11 to 12.5 : $50 to $68 syd Concrete 12.5 to 14 : $52 to $70 syd
39 Performance September 1988 to March 2014
40 Asphalt Pavement
41
42
43
44 Concrete Pavement
45
46
47 10 PCS US 1 Concrete Pavement PCS Rating Cracking Ride Year
48
49
50 Performance 6 Concrete Thickness 35 years
51 Performance 8 Concrete Thickness > 50 Years
52 Life Cycle Cost Summary
53 Comparison on 50-year Life Cycle Costs $3.50 $3.00 Flex Life Cycle Cost $2.50 $2.00 6" 8" $1.50 $1.00 $0.50 $ % 1.40% None Discount Rate
54 cause Tom says so
55 5 X low upfront vs 1 X high upfront Even for a low traffic pavement concrete gives a much longer life span Under low traffic the primary effect on asphalt is cracking due to aging In a 50 year life assessment: 1 6 concrete rehabilitation vs 5 asphalt rehabilitations and no rehabs for 8 vs 5 asphalt rehabilitations It takes five years to program a pavement rehabilitation from the time the pavement reaches the terminal ride so, 25 of the 50 year life cycle is on defective pavement
56 For > 30 million ESAL - FDOT Design
57 Most Appropriate Areas for Concrete Pavement for State and Local Roads Intersections/Local Roads/Town Centers Deceleration and Acceleration Lanes at Intersections with Heavy Truck Traffic Roundabouts vs Four Way Stops Commuter Rail/Bus Stops and Parking Lots Sidewalks, Multi-Use Trails and Bike Paths Pervious and Colored Concrete
58 Successful Asphalt to Concrete Intersection Conversion and Retro-Fit Sample Road and Power Line Road Fort Lauderdale, Florida 22 nd Street Tampa, Florida
59 US 27 Broward County
60 Florida: Polk County Concrete Pavement Roundabout 2016
61 Polk County Roundabout
62 SunRail Station Debary: Concrete Pavement for Buses
63 Stadium Bike Trail: Tallahassee
64 Publix Store Zephyrhills, Florida Pervious Concrete Parking Lot
65 Colored and Stamped Concrete Cul-de-sac Frenchman s Creek Club House
66 Open forum.questions!
67 It s Time!
I-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION
I-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION Affan Habib, P.E., Pavement Program Manager March 1, 2019 Presentation Outline 1. Introduction 2. Project Descriptions 3. Pavement Performance 4. Predicted
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationUse of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA
Use of Roller Compacted Concrete By GDOT Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA First Use of RCC By Georgia DOT I-285 Atlanta, GA 2005 Traffic:
More informationSummary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps
Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps Office of Pavement Engineering October 14, 2003 Abstract: This paper summarizes the current practice in ODOT regarding the construction
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationDRAFT WSDOT PAVEMENT POLICY
DRAFT WSDOT PAVEMENT POLICY JANUARY 2010 Washington State Department of Transportation Environmental and Engineering Programs Division State Materials Laboratory Pavements Division P.O. Box 47365 Olympia,
More informationMNDOT PAVEMENT DESIGN MANUAL
MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -
More informationFDOT Bicycle/Pedestrian Focused Initiative & Complete Streets
Florida Department of TRANSPORTATION FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets Billy L. Hattaway, PE District One Secretary Secretary s Pedestrian Safety Initiative Dangerous by Design
More informationEmerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)
Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Presented to: APWA Nor Cal November 3 rd, 2016 Presenters: Jason Shykowsi, P.E., T.E. City of Roseville Debbie Haldeman RCC Council
More informationDriving Indiana s Economic Growth
Driving Indiana s Economic Growth IRI/PCR/RUT Field Verification Kumar P. Dave Manager, Road & Pavement Asset Management & Programming, INDOT 03-06-2012 Organization Chart Pavement Division, INDOT David
More informationAdvanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In
More informationTacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force
1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria
More informationConcrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas
More informationSponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE
PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation
More informationAn Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (September 2015)
An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (September 2015) Equipment Mn/DOT currently collects pavement condition data using a Pathway Services, Inc. Digital Inspection Vehicle
More informationSafety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay
Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay Stephen L. Benson, AICP, CNU-A FDOT District Seven Safety Office Presentation Overview Safety
More informationAn Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (March 27, 2003)
An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (March 27, 2003) Equipment Mn/DOT currently collects pavement condition data using a Pathway Services, Inc. Video Inspection Vehicle
More informationAppendix B Existing ADOT Data Parameters
Appendix B Existing ADOT Data Parameters Appendix 08/04/03 HPMS by Item Number All records 1 Year of Submittal 2 State Code 3 English or Metric Reporting Units 4 County Code 5 Section Identification (ID)
More informationPavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015
Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT February 12, 2015 What is Pavement Management? At a Network Level: Pavement management refers to a systematic
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationPavement Management Program
Pavement Management Program Public Works Department January 5, 2016 Chad Butzow, P.E. Deputy Director Field Operation Services Public Works Department Brian Martineau Pavement Manager Public Works Department
More information(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.
S-1 (2399) PAVEMENT SURFACE SMOOTHNESS Use this with SP2016-115 (CONCRETE PAVEMENT) (unless it s an alternate job) and SP2016-137.1 (PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE
More informationPavement Type Selection Not a Black or White Issue. Marvin Traylor
1 Pavement Type Selection Not a Black or White Issue Marvin Traylor 2 A Modern Life Cycle Cost Analysis Initial Costs Out Year Costs User Delay Costs 3 Score Card PCC HMA Initial Costs Out Year Costs User
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationFDOT Bicycle/Pedestrian Focused Initiative & Complete Streets
Florida Department of TRANSPORTATION FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets DeWayne Carver, AICP State Bicycle/Pedestrian Coordinator Secretary s Pedestrian Safety Initiative Dangerous
More informationNon-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s
Non-State Federal Aid Highways Pavement Condition Ratings 2010 H e r k i m e r a n d O n e i d a C o u n t i e s 2010 PAVEMENT CONDITION RATINGS for the Non-State Federal Aid Highway System in Herkimer
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationPENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)
PENNDOT HPMS DATA COLLECTION GUIDE Bureau of Planning and Research April 2016 (Updated March 2018) State Street Dauphin County NOTES INTRODUCTION The purpose of this document is to provide you with some
More informationPENNDOT HPMS DATA COLLECTION GUIDE
PENNDOT HPMS DATA COLLECTION GUIDE Bureau of Planning and Research April 2016 (Updated September 2017) State Street Dauphin County INTRODUCTION The purpose of this document is to provide you with some
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationFlorida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer
Florida Department of TRANSPORTATION Asphalt Update Howie Moseley State Bituminous Materials Engineer Acknowledgements Jim Musselman Rhonda Taylor Curtis Curl My Background Graduate of the University of
More informationCase Studies Using Falling Weight Deflectometer Data with Mechanistic Empirical Design and Analysis
Case Studies Using Falling Weight Deflectometer Data with Mechanistic Empirical Design and Analysis International Symposium on Pavement Performance Trends, Advances, and Challenges December 5, 2011, Tampa,
More informationBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY
7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)
More informationPUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No.
for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida Financial Project ID No.: 441210-1-32-0 1 Welcome to the Public Hearing for State Road (S.R.) 5/U.S. 1 Roundabout
More informationBenefits of Center Line Rumble Strips on Rural 2-Lane Highways in Louisiana
Benefits of Center Line Rumble Strips on Rural 2-Lane Highways in Louisiana Xiaoduan Sun, Ph.D., P.E. University of Louisiana at Lafayette 2018 Louisiana Transportation Conference Baton Rouge, February
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationSoutheaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division
Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee Michael J. Doran, P.E. Maintenance Division Why are we here today? The Solution Background Information Geographic Locations
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationIllini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering
Illini Union Champaign, IL February 24, 2015 Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering Temporary Concrete Barrier Pinning and Drop-off Policy
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationChapter 3 DESIGN SPECIFICATIONS
Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More informationEast Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study
East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES
NEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES BY NARINDER S. KOHLI, P.E. PRINCIPAL ENGINEER PAVEMENT DESIGN, NJDOT (609) 530 8140 NARINDER.KOHLI@DOT.STATE.NJ.US RIDE
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationFive Years Later. Illinois Asphalt Pavement Association Annual Meeting March 9, William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research
I-70 Five Years Later Illinois Asphalt Pavement Association Annual Meeting March 9, 2009 William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research Joint Venture: Howell Asphalt/Paving Champaign Asphalt
More informationThe specific activities consisted of:
Mount Olive Development Corporation (MODCO) Speak Up Broward Program for Empowering People Dates of program: May 2014 August 2014 Communities Served: 33311, 33313, and 33301 Zip Code Areas Target Audience:
More informationFlorida s Intersection Safety Implementation Plan (ISIP)
Florida Department of TRANSPORTATION Florida s Intersection Safety Implementation Plan (ISIP) Alan El-Urfali, PE State Traffic Engineering and Operations Office March 28, 2017 Intersection Safety Implementation
More informationMAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report
Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction
More informationKeeping good roads good
Pavement Preservation (PP) in the State of California- Protecting Their Road and Street Investment R. Gary Hicks PhD, PE CP2 Center, Chico CA Prepared for the 3 rd International Pavement Maintenance Technology
More informationTerwillegar Drive Expressway Draft Concept Plan
Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction
More informationCity of West Des Moines PAVEMENT MANAGEMENT SYSTEM
City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000
More information2018 AASHTO BIKE GUIDE
2018 AASHTO BIKE GUIDE Your presenters Jessica Fields, PE Denver Office Director Sagar Onta, PE, PTOE Denver Engineering Director 35 years of combined experience street design, transportation planning,
More informationS.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project
Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationBRIDGE REPLACEMENT AND REHABILITATION PROGRAM
BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,
More informationCOMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015
COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationHIR on Oklahoma Turnpikes
HIR on Oklahoma Turnpikes Tammy Robinson, P.E., Division Engineer EST, Inc. Stephen A. Cross, PhD, PE Professor, Oklahoma State Executive Director Pavement Recycling & Reclaiming Center HIR on Oklahoma
More informationPresented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E
Presented to: Louisiana Transportation Conference February 26, 2018 Presenter: Corey Zollinger, P.E. - 1 - AGENDA What is Roller Compacted Concrete, Where has it Been Used, and Why? RCC Construction Process
More informationLANE ELIMINATION PROJECTS
PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:
More informationPavement Quality Indicators
Pavement Quality Indicators Five Year Report (2009-2013) for The Nebraska Department of Roads Research Technician: Connor Villanueva Advisor: Prof Wayne Jensen 1. Report No SPR- P1 (13) 4. Title and Subtitle
More informationVDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010
VDOT s Pavement Management Program Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 Outline Pavement Management network and project level Pavement Data Collection and QA/QC Data
More informationKentucky Transportation Center
Kentucky Transportation Center TECHNICAL ASSISTANCE REPORT Forensic Pavement Evaluation for US 31 W, Jefferson County, Kentucky KTC TA-15 02/KH91 14 1F DOI: http://dx.doi.org/10.13023/ktc.ta.2015.02 Author(s):
More informationFDOT Complete Streets Initiative
Florida Department of TRANSPORTATION FDOT Complete Streets Initiative Billy L. Hattaway, PE District One Secretary FDOT s Pedestrian Safety Initiative Dangerous by Design (2011, 2014) Orlando, Tampa, Jacksonville,
More informationRoundabouts. By: Nezamuddin, Valparaiso University. February 19, 2015
Roundabouts By: Nezamuddin, Valparaiso University February 19, 2015 Outline 1. Background on Roundabouts 2. Silhavy Rd. Corridor Improvement Project in Valparaiso, IN 3. 5-points Roundabout in Valparaiso,
More informationZlatko Krstulich, P.Eng. City of O9awa
Zlatko Krstulich, P.Eng. City of O9awa 1. Introduction to the Ontario Traffic Manual Series 2. What is OTM Book 18: Bicycle Facilities? 3. Study / Committee Team Members 4. Brief overview of the content
More informationMalabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)
Malabar Road (SR 514) PD&E Town of Malabar Briefing (July 17, 2017) 1 Agenda Project limits and briefing focus PD&E process and project status Public and agency project comments Review Recommended Alternatives:
More informationOff-Road Facilities Part 1: Shared Use Path Design
Off-Road Facilities Part 1: Shared Use Path Design Presentation by: Eric Mongelli, P.E. Tom Huber October 9, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar @tooledesign
More informationPhone: Fax: Project Reference No. (to be filled out by MassHighway):
Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is
More informationAEMA-ARRA-ISSA-PPRA Fall Meeting Recycling, Ayrton Senna Highway Brasil, & USA
AEMA-ARRA-ISSA-PPRA Fall Meeting 2015 Recycling, Ayrton Senna Highway Brasil, & USA CCPR (Cold Central Plant Recycling) 2012: The Ayrton Senna Highway in Brazil was rehabilitated under challenging conditions
More informationTHE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS
THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS Prepared for City of Santa Ana Draft Report January 1999 Prepared by M. Y. Shahin, Ph.D., P.E. Consulting Engineer RJN
More informationBases, Ballasts, and Paving
Sections Included In This Standard: 1.1 Paving and Surfacing 1.2 Protection of the Work 1.3 Repair of Pavement 1.4 Pavement Marking 1.1 PAVING AND SURFACING A. DESIGN REQUIREMENTS 1. Applicable Design
More informationProject Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1
Financial Management Number: 432639-6-22-01 Federal Aid Project Number: 0202-054-P Efficient Transportation Decision Making Number: 14230 Project Development & Environment (PD&E) Study SR 90 (SW 8th Street
More informationPerformance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research
2007-18 Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research
More information2016 TELL THE TPO SURVEY
RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION 2016 TELL THE TPO SURVEY CAMPAIGN SUMMARY August 2016 Introduction The River to Sea Transportation Planning Organization (TPO) conducted its second Tell
More informationOverview of FDOT District 7 Safety Programs and Initiatives in Tampa Bay, FL
Overview of FDOT District 7 Safety Programs and Initiatives in Tampa Bay, FL Executive Safety Summit Florida Department of Transportation District 7 June 8, 2011 Peter Hsu, P.E. District Safety & Special
More informationTransportation Knowledge
FE REVIEW COURSE SPRING 2017 Transportation Engineering 4/26/2017 Transportation Knowledge 8-12 problems Traffic safety Traffic capacity Traffic flow theory Traffic control devices Transportation planning
More informationRennick Yard Roller-Compacted Concrete Pavement
RCC Pavement Council Rennick Yard Roller-Compacted Concrete Pavement February 12, 2016 Submitted By: NCE 1885 S. Arlington Ave., Suite 111 Reno, NV 89509 Phone: 775.329.4955 Site Plan and Pavement Sections
More informationKentucky s Surface Transportation System
Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit
More informationCTH M HIGHWAY PROJECT CTH Q to STH 113
CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING
More informationRoundabout Feasibility Memorandum
Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationJ-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB
J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB US 231 and SR 62 and SR 68 US 231 and SR 62 Intersection Traffic Data Traffic
More information2018 ROAD MAINTENANCE PROGRAM
2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationDownloaded from Downloaded from /1
VI SEMESTER FINAL EXAMINATION-2003 Q. [1] [a] Draw a right angle four-arm intersection of two roads and show various conflicts points if [a] both roads are with way movements, and [b] one road is with
More informationStudy of the Effects of Buried Pipe Integrity on Roadway Subsidence
Pipe-RU6558 Study of the Effects of Buried Pipe Integrity on Roadway Subsidence FINAL REPORT October 2005 Submitted by Dr. Husam Najm * Professor Dr. Ali Maher * Professor/Director Dr. Nenad Gucunski *
More informationHILLSBOROUGH COUNTY PUBLIC WORKS TECHNICAL MANUALS AND SPECIFICATIONS 2 YEAR MANDATORY UPDATES (2017) COMMENTS & RESPONSES COMMENT / JUSTIFICATION
Services Division 1 County Staff 1.1 Recommend adding a paragraph advising the EOR/developer that all streets within and contiguous to a proposed development must be coordinated with other existing or
More informationROUNDABOUTS. Improving Safety and Efficiency. SR83 & Smithville Western Rd. Joel Montgomery, PE Director of Administration
ROUNDABOUTS Improving Safety and Efficiency SR83 & Smithville Western Rd. Joel Montgomery, PE Director of Administration The Ohio Department of Transportation District 3 906 North Clark Ave. Ashland, OH
More informationWho is Toole Design Group?
2018 AASHTO Bike Guide Status Update NCHRP 15 60 Amalia Leighton Cody, PE, AICP & Kenneth Loen, PE Washington APWA October 4, 2018 Who is Toole Design Group? TDG is a full service engineering, planning
More informationWashington St. Corridor Study
FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs
More information2017 Temporary traffic control guidelines for pedestrians. v.2
2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered
More informationMark Malone, P.E. SD DOT
Mark Malone, P.E. SD DOT SD10 Grading & Surfacing From 8 th Ave W to 8 th Ave E 1 mile plus transition lengths Complete Urban Reconstruction Grading, C&G, Storm Sewer, Sidewalk, Concrete Surfacing Railroad
More informationBuilding Great Neighbourhoods BONNIE DOON
Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement
More informationChapter 4.3 Enterprise Elementary. Volusia County MPO. March Page 7.0
Chapter 4.3 Enterprise Elementary Enterprise, FL Volusia County MPO March 2008 Page 7.0 Volusia County MPO Bicycle and Pedestrian School Safety Review Study Introduction Enterprise Elementary School is
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationComplete Streets. Designing Streets for Everyone. Sarnia
Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the
More information