1 BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian, and bicycle traffic across approximately 30 canals and waterways in Sacramento. These bridges enable essential activities, such as commerce, transportation and emergency services to take place in an efficient and economical manner. Routine maintenance of the City s bridges is performed by City operations and maintenance staff. Maintenance tasks are identified through a combination of visual inspections performed by City staff and more in-depth, formal, inspections performed under the direction of Caltrans staff. The results of the Caltrans inspections are forwarded to the City for information and, when appropriate, corrective action is taken. Since the majority of the City's bridges are constructed of reinforced concrete, which requires little or no maintenance, structure upkeep costs are minimal. However, the cost for capital improvement projects needed to upgrade or replace existing structures represents a continuing major investment in the City's bridge infrastructure. The City's bridge replacement and rehabilitation program was designed to identify and prioritize needed improvements to the City's existing bridge inventory. (New bridge construction projects are prioritized along with major street projects since they are integral to new roadways.) Rehabilitation projects can consist of large-scale maintenance projects (such as the painting of steel structures) or repairing and upgrading the structural, service, and functional elements of an existing structure. Typically, if the cost of the needed improvements is greater than fifty percent (50%) of the cost of a new structure, and the remaining life expectancy of the existing structure is short, the structure is considered eligible for replacement. GOAL AND POLICIES The Bridge Replacement and Rehabilitation Program is consistent with the following City of Sacramento 2030 General Plan (adopted March 3, 2009) and 2035 General Plan Update (to be adopted in 2014) goal and policies: Goal Comprehensive Transportation System. Provide a transportation system that is effectively planned, managed, operated, and maintained. Policies: Travel System. The City shall manage the travel system to ensure safe operating conditions. Facilities and Infrastructure. The City shall effectively operate and maintain transportation facilities and infrastructure to preserve the quality of the system TPG Bridge Replacement & Rehabilitation F-1
2 PROJECT LIST DEVELOPMENT Eligibility Criteria The Sufficiency Rating assigned by Caltrans is a numeric value that indicates the sufficiency of a bridge to remain in service. Sufficiency Ratings range from zero to 100, with zero representing an entirely insufficient or deficient bridge, and 100 representing an entirely sufficient bridge. Structures that are assigned a Sufficiency Rating of 80 or less are considered eligible for replacement or rehabilitation. Project Identification Caltrans inspects and assigns Sufficiency Ratings to all structures in the City's inventory which carry vehicular traffic or cross a route carrying vehicular traffic and are a minimum of 20 feet in length. Sufficiency Ratings are established by using federal bridge inspection and appraisal guidelines, and represent a weighted analysis of a bridges structural adequacy and safety, serviceability and functional obsolescence, and essentialness for public use. In addition to the sufficiency rating, Caltrans assigns a status flag indicating whether a bridge is Structurally Deficient (SD) or Functionally Obsolete (FO) The SD/FO status of a bridge is determined through the results of the structural inspections and appraisals performed by Caltrans in accordance with item 9 of the Federal - Aid Policy Guide for Title 23, CFR 650. Candidate bridge replacement and rehabilitation projects are identified by reviewing the Sufficiency Ratings and the SD/FO Status Flags assigned to the structures by Caltrans. City bridges that are not inspected by Caltrans are reviewed periodically and, if known deficiencies exist, are added to the candidate list. All of the bridges in the Year 2005 Transportation Programming Guide are inspected by Caltrans. PROJECT RANKING PROCESS Eligible projects are ranked in order of priority based on a deficiency rating system. The higher the total deficiency points assigned to a candidate project, the higher the project is ranked on the list. The ranking consists of assigning deficiency points to each of three major categories. The three categories and their weighting with respect to a maximum deficiency point total of 100 are listed below: 1. Structural Deficiency... (Max. Points: 50) Points = 50 If the Sufficiency Rating 50 and the structure is flagged as Structurally Deficient (SD) or Functionally Obsolete (FO) Points = 25 If the Sufficiency Rating 80 and the structure is flagged as Structurally Deficient (SD) or Functionally Obsolete (FO) Bridge Replacement & Rehabilitation F TPG
3 Bridges rated Structurally Deficient (SD) or Functionally Obsolete (FO) with a Sufficiency Rating (SR) 50 are eligible candidates for replacement under the State of California, Highway Bridge Replacement and Rehabilitation Program (HBRRP). Bridges rated Structurally Deficient (SD) or Functionally Obsolete (FO) with a Sufficiency Rating (SR) 80 are eligible for rehabilitation under this program. 2. Service Deficiency... (Max. Points: 20) The service deficiency of a bridge is determined by comparing the type of facilities it provides to those which are desired. The three types of facilities considered are vehicular, bicycle, and pedestrian. The cumulative score in the service deficiency category has a range from 0 to 20, with 20 reflecting a high degree of deficiency. Vehicular Facilities (Max. Points: 10) Points = 10 If V/C 0.8 (below Level of Service C) Points = 0 If V/C 0.8 (Level of Service C or better) Service deficiencies in the vehicular facilities of a structure are determined by evaluating the volume to capacity ratio (V/C) of the roadway segment between the two intersections nearest to the structure. Bicycle Facilities (Max. Points: 10) Points = 10 If Class II Bike routes 1 have a gap across or are detoured around the bridge A gap across the structure exists when bike lanes on either the structure or its approaches are absent for an existing Class II Bike route. A gap also exists if the travel lane closest to the curb is less than 15 feet for bridges that are not included in the 2010 Bikeway Master Plan (BMP). Pedestrian Facilities (Max. Points: 10) Points = 10 If there are sidewalk gaps across the bridge A gap across the structure exists if sidewalks are absent from the structure or its approaches in either direction of travel. 3. Functional Deficiency... (Max. Points: 30) The functional deficiency of a bridge is determined by evaluating the adequacy of its facilities. The factors used to determine and rate functional deficiency are summarized below. Accident Rate (Max. Points: 10) 1 A Class II Bike route is an on-street route with striped bike lanes TPG Bridge Replacement & Rehabilitation F-3
4 The accident rate of the bridge is compared to the highest accident rate of all the bridges being evaluated. The accident rate used is the average rate for the three latest years for which accident data is available. Points are assigned as follows: 3 Year Average Accident Rate 2 of Project X 10 = Highest Accident Rate of Projects Considered Deck Geometry (Max. Points: 10) The deck geometry adequacy is evaluated based on the geometric features of a structure with respect to minimum vehicle lane width, bike lane width, sidewalk width, and horizontal and vertical clearances 3. Deficiency points are assigned to a structure that does not meet certain minimum criteria, as follows: 1 point per foot short for each vehicle lane width less than 11 feet 2 points per foot short for each bike lane less than 5 feet 2 points per foot short for each sidewalk width less than 4 feet 1 point per foot short of horizontal clearance less than 3 feet 1 point per inch short of overhead clearance less than 14 feet Deficiency points are totaled for each structure and normalized, as follows: Points = Point Total of Project x 10 Highest Point Total of All Candidate Projects Waterway Adequacy.(Max. Points: 10) Points = 10 If bridge has a score 3 for Caltrans Item 71 Points = 0 If bridge has a score 3 for Caltrans Item 71 The Waterway Adequacy (Caltrans Item 71) is based on the frequency of floodwater overtopping the structure and approaches, and the significance of the resulting traffic delays. The Waterway Adequacy appraisal rating is reported on a scale of 0 (bridge closed) to 9 (superior to present desirable criteria). The City's rating system assigns waterway adequacy points to only those structures with a code of 3 (requiring high priority of corrective action) or less. 2 The accident Rate is the annual number of accidents per 1 million vehicle miles. Accident Rate = Accidents x 10 6 / (ADT x segment miles x 365) 3 Horizontal clearance is measured from the edge of the travel lane to the nearest obstruction, such as an abutment, column, or bridge rail. Bridge Replacement & Rehabilitation F TPG
5 SUMMARY Table F-1 presents the final point total and relative deficiency ranking for all twenty-six bridge rehabilitation and replacement projects, along with the ratings given for each of the three major evaluation categories. The table also lists the identified deficiencies for each structure. Figure F-1 depicts the approximate location of each of the bridge projects. Three new projects were added to the list: Elvas Ave at J St Rio Linda Blvd at Hagginwood Creek Arden Wy at UPRR, BNSF, Amtrak, LRT The following projects were deleted from the list: Norwood Ave at Arcade Creek Completed Roseville Rd at Arcade Creek Funded Auburn Blvd at Arcade Creek Funded Rio Linda Blvd at Magpie Creek Funded Vinci Ave at Magpie Creek Diversion Most recent inspection report shows a Verano St at Arcade Creek Most recent inspection report shows a Sufficiency Rating greater than 80 and no SD/FO flag Marysville Blvd at Arcade Creek Most recent inspection report shows a Florin Perkins Rd at Morrison Creek Most recent inspection report shows a Wyndham Dr at Union House Creek Most recent inspection report shows a Gloria Dr at Main Canal Most recent inspection report shows a Sufficiency Rating greater than 80 and no SD/FO flag 2014 TPG Bridge Replacement & Rehabilitation F-5
6 Bridge Replacement & Rehabilitation F-6 TABLE F-1 YEAR BRIDGE REPLACEMENT/ REHABILITATION 2014 Rank 2010 Rank Council District Bridge No. BRIDGE NAME SD/FO FLAG Sufficiency Rating Structural Deficiency Score Service Deficiency Score Functional Deficiency Score TOTAL SCORE Maximum Points in Scoring Category: C0076 H American River FO C0364L I I Street Viaduct SD C0006 JIBBOOM UP RR YARD SD C0093 LA MANCHA Elder Creek SD C0300 SUTTERVILLE UP RR, BNSF RY & 24th St FO C0069 ELVAS H Street FO C0143R HOWE University Avenue (Northbound) New 3 24C0071 ELVAS J Street C0143L HOWE University Avenue (Southbound) C0142R HOWE La Riviera Dr (Northbound) C0107L HOWE American River (Southbound) C0142L HOWE La Riviera Drive (Southbound) C0107R HOWE American River (Northbound) C0091 STOCKTON Union House Creek C0521 FRANKLIN Union House Creek SD New 2,3 24C0353 ARDEN UP,BNSF,AMTRAK,SCRTD LRT C0252 MACK Morrison Creek SD C TH South Sacramento Drain C0219L CENTER Elder Creek SD C0096 STOCKTON Morrison Creek Tributary New 2 24C0127 RIO LINDA Hagginwood Creek ,8 24C0299 CENTER Strawberry Creek SD C0097 STOCKTON Morrison Creek C0116 FRANKLIN Laguna Creek SD C0295 EXECUTIVE AIRPORT Executive Drain CO378 K K Street at Holiday Garage "New" in the 2010 Rank column indicates projects added this year.
7
Designing with the Railroad
Designing with the Railroad 23 CFR 646.214 (b)(2) requires that crossings be evaluated when they are within limits or near terminus of Federally Funded project. Some rough numbers for planning: Active
More informationUS Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River
Purpose and Need March 2015 US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Adams County - Quincy, IL Marion County, MO Region 4 District 6 Table of Contents I. Purpose of the
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the
More informationSTUDY PROCESS & SCHEDULE
STUDY PROCESS & SCHEDULE Route Centennial Bridge Study KDOT Project No. -52 KA-3229-01 STUDY OVERVIEW STUDY SCHEDULE The Kansas Department of Transportation (KDOT) has identified a future need to replace
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationBICYCLE PROGRAM INTRODUCTION
INTRODUCTION BICYCLE PROGRAM Facilities for bicycles and pedestrians are an integral part of the transportation system. Given the City's mild climate and flat terrain, bicycling and walking are viable
More informationNew Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007
New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way
More informationHOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING
4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown
More informationHennepin County Bicycle and Pedestrian Planning
Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationReadington Road (C.R. 637) Construction
Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon
More informationEngineering - Bicycle and Pedestrian
Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman
More informationTULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY
CITY OF TULSA BICYCLE & PEDESTRIAN INFRASTRUCTURE TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY 31, 2013 CITY OF TULSA ENGINEERING SERVICES DEPARTMENT CITY OF TULSA ADA TRANSITION
More informationLiving Streets Policy
Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create
More informationDRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA
DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346
More informationPRESS RELEASE San Joaquin Council of Governments
PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,
More informationAttachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program
Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the
More informationKeep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents
Keep Placer Moving Placer is Growing Keep Placer Moving POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents 30% of the total housing market growth in the Sacramento region.
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationCity of Moorhead Committee of the Whole Meeting
City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationClinton Street Bridge over the Maumee River. ODOT Project DEF April 1, 2015 Stakeholder s Meeting
Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 April 1, 2015 Stakeholder s Meeting Purpose of Stakeholder Meeting Review the project and why it s happening Share the results of the
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationTABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...
TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationUS287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals
Chapter 5: City of Fort Collins US287 through Fort Collins is known as College Avenue, runs for approximately 9.25 miles, and bisects the City north to south. Within the City, US287 is a principal arterial.
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationChapter 7 Related Plans, Policies, Projects, and Funding
Chapter 7 Related Plans, Policies, Projects, and Funding The Los Rios Community College District campuses are located in or adjacent to various governmental jurisdictions, each of which have plans, projects
More informationCONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach
CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District
More informationChapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)
Chapter 14 PARLIER This chapter describes the current status and future plans for biking and walking in the City of Parlier. RELATIONSHIP TO CITY PLANS AND POLICIES The Parlier General Plan is the primary
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationPedestrian Project List and Prioritization
To: Kyle Wagenschutz, City of Memphis CC: From: Anne Conlon and John Cock, Alta Planning + Design Date: December, 2014 Re: Project List Development (Task 3.1-3.2) and Project List Prioritization (Task
More informationConstruction Staging Area Vaughan Road
REPORT FOR ACTION Construction Staging Area - 109 Vaughan Road Date: May 25, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationCITY OF BLOOMINGTON COMPLETE STREETS POLICY
CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationProject Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015
Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationExecutive Summary. September 3, 2014
D Executive Summary September 3, 2014 Study Background and Purpose Citizens for Picture Rocks is a community advocacy group representing the Picture Rocks Fire Department, Pima County Sheriff s Department,
More informationDraft North Industrial Area-Wide Traffic Plan
Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block
More informationProject Status Update
Project Status Update : Novato Boulevard, 4th & 3rd Streets, Sir Francis Drake Boulevard (3), and Miller Avenue Major roads projects target the most heavily traveled roads in Marin County for repairs,
More informationDRAFT BUENA VISTA 2020 TRANSPORTATION PLAN
DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationBuilding Great Neighbourhoods BONNIE DOON
Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationHennepin County Transportation Department
Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationIMPLEMENTATION STRATEGIES
GEORGETOWN SIDEWALK MASTER PLAN 34% of funding is dedicated to Downtown Overlay District sidewalks 28% of funding is recommended within 1/4 mile of Southwestern University 26% of funding is recommended
More informationWelcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study
Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question
More informationSANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008
SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,
More informationTraffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon
Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section
More informationMEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA
MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE Monday, April 25, 2016 5:30 p.m., Regular Meeting PERMIT CENTER CONFERENCE ROOM 1950 Parkside Drive,
More informationAppendix C 3. Bicycle / Pedestrian Planning
Appendix C 3. Bicycle / Pedestrian Planning BICYCLE/PEDESTRIAN PLANNING 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city-wide
More informationFY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationCITY OF SACRAMENTO TRANSPORTATION PROGRAMMING GUIDE APRIL HEATHER FARGO Mayor. Council District 1 Council District 5
CITY OF SACRAMENTO TRANSPORTATION PROGRAMMING GUIDE APRIL 2002 HEATHER FARGO Mayor RAY TRETHEWAY LAUREN HAMMOND Council District 1 Council District 5 SANDY SHEEDY DAVID JONES Council District 2 Council
More informationWhere Did the Road Go? The Straight and Narrow about Curves
Where Did the Road Go? The Straight and Narrow about Curves Renae Kuehl, SRF Consulting Group October 23, 2018 What is a County Roadway Safety Plan or CRSP?" CRSP Identifies priority location-specific
More informationPublic Works and Infrastructure Committee. General Manager, Transportation Services
STAFF REPORT ACTION REQUIRED Extending the Bay Street Bicycle Lanes Date: May 16, 2013 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Toronto Centre
More informationMay 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return
Summary: Local return is an important revenue source for cities to maintain their local transportation infrastructure. Most cities use their local return to operate small bus systems and repave streets,
More informationMajor Bike Routes 102 Avenue Workshop April 21, 2015
Major Bike Routes 102 Avenue Workshop April 21, 2015 Our Purpose Today Provide context on how Major Bike Routes fit into Edmonton s future Share information on what we heard in our last phase, and how
More informationChapter 5. Complete Streets and Walkable Communities.
Chapter 5. Complete Streets and Walkable Communities. 5.1 Description of Complete Streets. Cities throughout the world, and specifically the United States, are coming to embrace a new transportation and
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationPLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION
Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.
More informationWelcome! San Jose Avenue Open House August 25, 2015
Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an
More informationComplete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project
Complete Streets Initiatives City of Ottawa Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project Zlatko.Krstulic@Ottawa.ca May
More informationStaff Report City of Manhattan Beach
Agenda Item #: Staff Report City of Manhattan Beach TO: THROUGH: FROM: Honorable Mayor Wilson and Members of the City Council Geoff Dolan, City Manager Richard Thompson, Director of Community Development
More information10/30/2012 VIA
10/30/2012 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: The Cannery On-Site
More information12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)
12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.
More informationVIII. Project Prioritization & Implementation
Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process
More informationNew Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid
New Jersey Department of Transportation Complete Streets Summit 10-24-2017 Shukri Abuhuzeima NJDOT-Local Aid Grant Resources State Funded Programs Funding Levels Funding appropriated for FY 2017 State
More informationRESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY
RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune
More information10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014
10/8/2014 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: CVS Pharmacy
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed
More informationGOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.
2. TRANSPORTATION ELEMENT The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation
More informationPerryville TOD and Greenway Plan
Perryville TOD and Greenway Plan Greenway Glossary Pathway: A bicycle and pedestrian path separated from motorized vehicular traffic by an open space, barrier or curb. Multi-use paths may be within the
More informationGerald P. Oliveto, P.E. George Franz NJDOT
Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing
More informationCITY OF LOMITA CITY COUNCIL REPORT
CITY OF LOMITA CITY COUNCIL REPORT TO: FROM: City Council Ryan Smoot, City Manager Item No. SCH 12 PREPARED BY: Mark A. McAvoy, P.E., Public Works Director/City Engineer MEETING DATE: August 1, 2017 SUBJECT:
More informationProposed. City of Grand Junction Complete Streets Policy. Exhibit 10
Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel
More informationWELCOME Public Information Centre
WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background
More information5.3 TRAFFIC, CIRCULATION AND PARKING
5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May
More information2040 RTP. Chapter 6: Investments in our Transportation Future
2040 RTP Chapter 6: Investments in our Transportation Future This chapter describes the transportation investments proposed for the San Benito region that support the goals and objectives of the Regional
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationDRAFT. Table of Contents. Background
Douglas County Table of Contents Existing Infrastructure 86 Funding 89 Policy and Program Recommendations 90 Infrastructure Recommendations 92 Conclusion 95 Background Home to 4,500 residents and Baker
More informationFUNDING SOURCES CHAPTER 6
CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2
More informationRoad Diets FDOT Process
Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local
More information7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811
7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:
More information4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811
4/14/2017 VIA EMAIL Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811 RE: Mack & Franklin Development (P17-016) Dear Ms. Lim:
More informationSan Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation
San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San
More informationImplementation Report # False Creek Bridges
Implementation Report #1 2013-04-24 False Creek Bridges ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit
More informationHennepin Avenue Reconstruction Washington Avenue to 12 th Street
CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat
More informationMEMORANDUM. Sutter Street Bicycle Lanes, Stockton, CA SF
MEMORANDUM Date: To: From: Subject: PURPOSE Anthony J. Lopes, Siegfried Engineering Christine Carey & Matthew Ridgway, Fehr & Peers Sutter Street Bicycle Lanes, Stockton, CA SF09-0468 The City of Stockton
More informationBluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle
Bluffdale 14600 South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle From Pony Express to UPRR Bridge over SR-140 $ 669,700 $ 624,361 To build bicycle/shoulder lanes on SR-140. SR-140 is an official
More informationPhone: Fax: Project Reference No. (to be filled out by MassHighway):
Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is
More informationStreet Paving and Sidewalk Policy
City Commission Policy 600 Street Paving and Sidewalk Policy DEPARTMENT: Public Works DATE ADOPTED: June 7, 1995 DATE OF LAST REVISION: December 10, 2014 Policy No. 600.01 AUTHORITY: PASS City of Tallahassee-Leon
More informationADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility
ADA Transition Plan FY19-FY28 Date: November 5, 2018 Prepared by: City Of Gainesville Department of Mobility 1.0 INTRODUCTION 1.1 BACKGROUND The federal statute known as the Americans with Disabilities
More information