Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling

Size: px
Start display at page:

Download "Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling"

Transcription

1 Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling Stage) June 2013 Document Reference GWF R

2 Galloper Wind Farm Limited

3 Document title Status Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 24 Temporary Fencing and Other Means of Enclosure (Enabling Stage) Submitted to SCDC Document Reference GWF R Project name Date June 2013 Galloper Wind Farm Project Drafted by Stuart Chandler (Peter Brett Associates) Checked by Date/initials check GWFL Approved by Hugh Morris Date/initials approval 07/06/13

4 CONTENTS Page 1 INTRODUCTION General 1 2 DCO PART 3 REQUIREMENT Requirement 23 Fencing and other means of enclosure 3 3 PROPOSED FENCING Temporary Fencing Boundaries and Gates Contractors Compound Temporary Fencing Temporary Perimeter Fencing (Substation Area) Temporary Stock Fencing - Cable Corridor & Broom Cover Temporary Fencing of Transition Bays and Landfall Works area 5 Drawings Drawing GFW_901 R3 Enabling Works Temporary Construction Fencing Plan (Sheet 1 of 2) Drawing GFW_902 R4 Enabling Works Temporary Construction Fencing Plan (Sheet 2 of 2) Drawing H1 Temporary Fences Types 1 and 2 Responses to DCO Requirement 25 Drainage (Enabling Works Stage) Submitted to SCDC June 2013

5 1 INTRODUCTION 1.1 General This document relates to the proposed Galloper Wind Farm (GWF) project, to be constructed off the coast of Suffolk, and associated infrastructure to connect to the national electricity transmission system at Sizewell, Suffolk. It forms part of a series of submissions to Suffolk Coastal District Council in response to requirements set out in Part 3 of the Galloper Wind Farm Order The Galloper Wind Farm Order 2013 was made by on the 24 th of May 2013, having received a direction from the Secretary of State for Energy, following an examination by the National Infrastructure Directorate of the Planning Inspectorate Section 2 of this document sets out the relevant Requirement being addressed, whist Section 3 sets out GWFL s interpretation of this Requirement and provides the relevant information At this time, GWFL in particular needs to discharge the Requirements associated with the commencement of the Enabling Works to the north of Sizewell Gap, to allow the provision of a site ready for mobilisation of National Grid works in January The National Grid works consist of the transmission compound, sealing end compounds, transmission cable corridors, construction areas and permanent access road and that all trees will need to be cleared from these areas and platforms prepared for the transmission compound and sealing end compounds The temporary fences included in this submission will remain in place for the duration of the project (in the case of the stock-proof perimeter fences) or until they are removed, or replaced by permanent ones at the end of the construction phase. The exception is the temporary fencing of the Transition bays and Landfall area which will only need to be in place for a short period during the specific works at these locations. Response to DCO Requirement 24 Drainage (Enabling Works) SCDC Page 1 June 2013

6 1.1.6 In addition to the temporary construction fencing described in this document, reptile fencing is also required as part of a package of ecological mitigation measures, described in the Ecological Management Plan (Requirement 26). The approximate position of the reptile fencing has been shown on the attached plans as it is in close proximity, or incorporated into to the temporary construction fences Further fencing will also be required around the areas where trees are to be planted to provide protection from deer and rabbits. These fences are shown on the Landscape plan which will be submitted to discharge Requirement 22. These fences will be erected in advance of the landscape planting, which will take place following the completion of construction activities Tree protection fencing is also required at locations where works are in close proximity to trees that are to be retained. At these locations, Herras type fencing will be erected following tree felling, in advance of the enabling works. Details of the tree protection are included in the landscaping plans submitted to discharge Requirement The submitted details relate to the temporary fencing of construction working areas and creation of the temporary contractors compound that is due to be carried out during The details of the permanent fencing will be submitted in advance of the construction stage of the project, which is due to commence in January The work elements that GWFL will need to have completed by end December 2013 are referred to as The Enabling Works and these are listed below: Transmission compound platform preparation Sealing end compound platform preparation Permanent access road Enabling works (including construction compounds) Transmission cable corridor site preparation Response to DCO Requirement 24 Drainage (Enabling Works) SCDC Page 2 June 2013

7 2 DCO PART 3 REQUIREMENT 2.1 Requirement 24 Fencing and other means of enclosure The Draft DCO states: 1) No part of the connection works or the transmission works shall commence until written details of all proposed permanent and temporary fences, walls or other means of enclosure for the relevant part of the relevant works have been submitted to and approved by the relevant planning authority. 2) All permanent and temporary fences, walls or other means of enclosure must be constructed in accordance with the approved details, unless otherwise agreed by the relevant planning authority. 3) All construction sites must remain securely fenced at all times during construction of the relevant works. 4) Any temporary fencing must be removed on completion of the relevant works. 5) Any approved permanent fencing in relation to Works No 6 or Works No 7 or the sealing end compound must be completed before the relevant work or compound is brought into use It should be noted that the draft requirement did not contain provision 5. Details of the permanent fencing of these areas will be submitted in advance of the commencement of construction in these areas and be in place before these areas are brought into operation This document sets out the proposed temporary fencing that will be constructed during the Enabling Works phase of the project. Response to DCO Requirement 24 Drainage (Enabling Works) SCDC Page 3 June 2013

8 3 PROPOSED FENCING 3.1 Temporary Fencing Boundaries and Gates Refer to attached drawing, GWF_900, for details of all fence areas and fence boundaries, to be installed at the site, as part of the Enabling Works Contract. The exact line of fences and the positions of fence posts and gates will be adjusted during installation, where necessary to avoid localised obstructions. 3.2 Contractors Compound Temporary Fencing Temporary fencing around the Contractor s compound areas shall comprise 2.4m high plywood hoarding or steel hoarding panels or similar panel hoarding fencing (as described in the Construction Code of Practice for enabling works to be approved under Requirement 28) The temporary fencing of the compound shall include 2No rows of barbed wire set above the top of the fence over a height of 300mm at 150mm centres The plywood hoarding will be painted Juniper Green. The topsoil from the compound area will be stored during the construction phase. It is proposed that this is used to form a temporary bund along the southern side of the compound fence. This bund will be seeded and will remain in place until the compound is reinstated The Contractors compound fencing shall be installed inside the line of reptile fencing, where such fence has been erected as part of ecological mitigation measures Plywood panels shall be securely nailed to treated wooden posts installed at 2.40m centres. The post foundation shall be designed taking into consideration the nature of ground, wind speed and height of hoarding. The post shall be securely installed in concrete base pockets, of minimum size 500x500x600mm deep. 3.3 Temporary Perimeter Fencing (Substation Area) Protective temporary fencing shall be installed along the perimeter of the substation site and any environmental/ ecologically sensitive areas within the site boundary The fencing shall comprise 1.275m high Type 1 steel wire fencing with wooden straining posts. Refer to attached HCD drawing H1 for details. The fence shall consist of wooden post with 4 rows of zinc coated 4.5mm diameter wires, to BS 1722 Part 2: 2006 Table 1 (SW 120) as attached. Post spacing shall be not greater than 1.80m centres. Response to DCO Requirement 24 Drainage (Enabling Works) SCDC Page 4 June 2013

9 3.3.3 The areas enclosed by the fencing will be clearly visible to drivers of construction vehicles The fences shall be maintained weekly to ensure their continued function throughout the Works. On completion of the Enabling Works Contract, responsibility for this fencing shall be passed to the follow on Contractor Details of the temporary fencing to be in place during the construction of the substations and also the permanent fencing to replace this, will be submitted in advance of these works. 3.4 Temporary Stock Fencing - Cable Corridor & Broom Cover Protective temporary fencing shall be installed along the perimeter of the substation site and any environmental/ ecologically sensitive areas within the site boundary The fencing shall comprise 1.275m high Type 1 steel wire fencing with wooden straining posts. Refer to HCD drawing H1 for construction details. The fence shall consist of wooden post with 6 rows of zinc coated 4.5mm diameter wires, to BS 1722 Part 2: 2006 Table 1 (SW 120). Post spacing shall be not greater than 1.80m centres The areas enclosed by the fencing will be clearly visible to drivers of construction vehicles The fences shall be maintained weekly to ensure their continued function throughout the Works. On completion of the Enabling Works, responsibility for this fencing shall be passed to the follow on Contractor Double gates are being installed to provide emergency access and egress from the site. These will be kept closed at all times other than an emergency. 3.5 Temporary Fencing of Transition Bays and Landfall Works area Temporary fencing around the construction areas of transition bays and landfall horizontal directional drilling shall comprise 2.4m high Heras fencing or similar approved link panel fencing The fence panels in these areas shall be covered with plastic or textile mesh screening, to mitigate the visual impact All Heras panels shall be securely fixed / clipped to proprietary steel posts as specified by the manufacturer. The post shall be installed in rubber pads or similar base support, in accordance with the manufacturer s specifications and construction details. Response to DCO Requirement 24 Drainage (Enabling Works) SCDC Page 5 June 2013

10

11

12

East Anglia ONE Offshore Windfarm Fencing and Enclosures Plan DCO Requirement 15 Final for Approval

East Anglia ONE Offshore Windfarm Fencing and Enclosures Plan DCO Requirement 15 Final for Approval East Anglia ONE Offshore Windfarm DCO Requirement 15 Final for Approval ID: EA1-CON-R-IBR-009818 Created by / date: IEC / 22 Sep 2016 Checked by / date: RM / 22 Sep 2016 Approved by / date: PS / 22 Sep

More information

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard. 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect

More information

Non-required Fences Update

Non-required Fences Update Non-required Fences Update Quality of Life & Environment Committee January 11, 2016 Presented by the Department of Sustainable Development and Construction Purpose Follow up on the May 26, 2015, August

More information

PSSI 6 Demarcation of Work Areas in Substations

PSSI 6 Demarcation of Work Areas in Substations 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical), setting down the requirements in those situations where it is necessary

More information

VILLAGE OF ISLAND PARK LOCAL LAW NO. 12 OF THE YEAR A local law Private Swimming Pools

VILLAGE OF ISLAND PARK LOCAL LAW NO. 12 OF THE YEAR A local law Private Swimming Pools VILLAGE OF ISLAND PARK LOCAL LAW NO. 12 OF THE YEAR 2006 A local law Private Swimming Pools Be it enacted by the Mayor and Board of Trustees of the Village of Island Park as follows: PRIVATE SWIMMING POOLS

More information

Support Infrastructure

Support Infrastructure GUIDANCE NOTE 06 Support Infrastructure 96 COMMUNITY CRICKET FACILITY GUIDELINES VERSION SEPTEMBER 2015 SECTION 2 Guidance Note 06 Support Infrastructure INTRODUCTION Outside of the main playing, training

More information

Policy. Stormwater Fencing. 1. Overview Objective Scope Summary

Policy. Stormwater Fencing. 1. Overview Objective Scope Summary Policy Stormwater Fencing 1. Overview 1.1. Objective The purpose of the Fencing Policy is to ensure the right information and consistent guidelines are used in fencing Sydney Water s Stormwater Network

More information

TASRAIL STANDARD - FENCING

TASRAIL STANDARD - FENCING TASRAIL STANDARD - FENCING INTERIM FENCING STANDARD v1.0 Boundary Fences Version 2.0 Effective from 20 November 2017 This document is uncontrolled when printed. Page 1 of 6 CONTENTS: 1 Purpose 3 2 References

More information

TOWN OF AURORA. Pool Enclosure Permit Guide. PLANNING AND BUILDING SERVICES Building Division

TOWN OF AURORA. Pool Enclosure Permit Guide. PLANNING AND BUILDING SERVICES Building Division TOWN OF AURORA Pool Enclosure Permit Guide PLANNING AND BUILDING SERVICES Building Division Phone: 905-727-3123 ext. 4388 Fax: 905-726-4731 Email: building@aurora.ca Town of Aurora 100 John West Way, Box

More information

CITY OF TORONTO. BY-LAW No

CITY OF TORONTO. BY-LAW No Authority: Planning and Transportation Committee Report No. 5, Clause No. 9, as adopted by City of Toronto Council on June 7, 8 and 9, 2000 Enacted by Council: June 8, 2000 CITY OF TORONTO BY-LAW No. 394-2000

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

FENCE PERMIT APPLICATION

FENCE PERMIT APPLICATION OFFICE USE ONLY FENCE PERMIT APPLICATION PROCESS & REVIEW FEES $15 (GL#310) Cash or Check Only Approved Denied 110 S. MAIN STREET SPRINGVILLE, UT 84663 801.491.7861 www.springville.org Reviewed by: Print

More information

Three Springs Design Guidelines Fencing and Wall Standards

Three Springs Design Guidelines Fencing and Wall Standards Three Springs Design Guidelines Fencing and Wall Standards Original Adopted: June 12, 2006 Minor Amendment: December 2012 Minor Amendment: March 23, 2017 TABLE OF CONTENTS: FENCING AND WALLS 1.0 INTRODUCTION

More information

BYLAW NUMBER

BYLAW NUMBER THE CORPORATION OF THE TOWN OF MONO BYLAW NUMBER 2011-46 BEING A BYLAW RELATING TO FENCES ENCLOSING PRIVATELEY OWNED OUTDOOR SWIMMING POOLS WHEREAS section 210, paragraph 30 of the Municipal Act (R.S.O.

More information

Fencing your spa or swimming pool

Fencing your spa or swimming pool Fencing your spa or swimming pool A guide to understanding your responsibilities as a pool owner. Contents Introduction to fencing your spa or swimming pool...2 Definitions...3 I m building a new pool

More information

PALERANG DEVELOPMENT CONTROL PLAN FENCING REQUIREMENTS IN RURAL, ENVIRONMENTAL PROTECTION AND RURAL RESIDENTIAL AREAS

PALERANG DEVELOPMENT CONTROL PLAN FENCING REQUIREMENTS IN RURAL, ENVIRONMENTAL PROTECTION AND RURAL RESIDENTIAL AREAS PALERANG DEVELOPMENT CONTROL PLAN FENCING REQUIREMENTS IN RURAL, ENVIRONMENTAL PROTECTION AND RURAL RESIDENTIAL AREAS Palerang Council PO Box 348 Bungendore NSW 2621 Phone: 02 6238 8111 Approved by Council:

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Fencing your spa or swimming pool

Fencing your spa or swimming pool Fencing your spa or swimming pool A guide to understanding your responsibilities as a pool owner. Contents Introduction to fencing your spa or swimming pool...2 Definitions...3 I m building a new pool

More information

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE Rugby Football Union 1 INTRODUCTION The last 15 years has seen major innovations in the development of artificial turf surfaces for sport. Most significant for

More information

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS City of Redding 777 Cypress Avenue Redding CA 96001 Telephone: (530) 225-4013 FAX: (530) 225-4360 A Swimming Pool is any body of water 18 inches

More information

WAIROA DISTRICT COUNCIL P

WAIROA DISTRICT COUNCIL P WAIROA DISTRICT COUNCIL P +64 6 838 7309 W www.wairoadc.govt.nz F +64 6 838 8874 p PO Box 54, Wairoa 4160, Hawke s Bay E consents@wairoadc.govt.nz A Coronation Square, Queen Street, Wairoa INFORMATION

More information

Safety barriers surrounding a swimming pool area at 60A Goldflats Lane, Coatesville, Rodney

Safety barriers surrounding a swimming pool area at 60A Goldflats Lane, Coatesville, Rodney Determination 2010/014 Safety barriers surrounding a swimming pool area at 60A Goldflats Lane, Coatesville, Rodney 1. The matter to be determined 1.1 This is a Determination under Part 3 Subpart 1 of the

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

GATES, CATTLE GUARDS AND PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people.

GATES, CATTLE GUARDS AND PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people. Fencing Order No. 307.400-1 Revised December 2015 GATES, CATTLE GUARDS AND PASSAGEWAYS This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people. GENERAL

More information

Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability.

Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability. This information paper is to provide minimum guidelines and information of the erection of temporary fencing for the purpose of barricading, delineation of a work area, and for protection of workers from

More information

Highland Park Glengarry Court. Landscape design and Fencing rules

Highland Park Glengarry Court. Landscape design and Fencing rules Highland Park Glengarry Court Landscape design and Fencing rules Introduction Glengarry Court is to be developed as a comprehensive precinct with its own identity within Highland Park. This includes the

More information

BY-LAW NO A by-law to regulate Pool Enclosures within the Town of Halton Hills.

BY-LAW NO A by-law to regulate Pool Enclosures within the Town of Halton Hills. BY-LAW NO. 2009-0028 A by-law to regulate Pool Enclosures within the Town of Halton Hills. WHEREAS Subsections 8(2) and (3), of the Municipal Act, 2001, S.O. 2001, c.25 authorize a municipality to regulate

More information

Memorandum. Non-required Fences Standards CITY OF DALLAS

Memorandum. Non-required Fences Standards CITY OF DALLAS Memorandum oate August 21, 2015 CITY OF DALLAS Members of the Quality of Life Committee and Environment Committee: Sandy Greyson (Chair), Tiffinni A. Young (Vice Chair), Mark Clayton, Philip T. Kingston,

More information

Department of Public Services Building Engineering Planning Water & Sewer POOL, HOT TUB & FENCE REQUIREMENT CHECKLIST

Department of Public Services Building Engineering Planning Water & Sewer POOL, HOT TUB & FENCE REQUIREMENT CHECKLIST Department of Public Services Building Engineering Planning Water & Sewer Address: Lot# POOL, HOT TUB & FENCE REQUIREMENT CHECKLIST 1. Complete Application a. Page 1, filled out accordingly b. Signed in

More information

THE CORPORATION OF THE TOWN OF GREATER NAPANEE BY-LAW NO

THE CORPORATION OF THE TOWN OF GREATER NAPANEE BY-LAW NO THE CORPORATION OF THE TOWN OF GREATER NAPANEE BY-LAW NO. 98-42 Being a By-law prescribing the height and description of, and the manner of erecting and maintaining fences and gates around privately owned

More information

Environmental Services Buller District Council 4-6 Brougham Street PO Box 21, Westport 7866 Telephone

Environmental Services Buller District Council 4-6 Brougham Street PO Box 21, Westport 7866 Telephone Environmental Services Buller District Council 4-6 Brougham Street PO Box 21, Westport 7866 Telephone 788 9111 Reefton Service Centre 66 Broadway PO Box 75, Reefton Telephone 732 8821 Email info@bdc.govt.nz

More information

The FA Cup, The FA Trophy, The FA Vase and The FA Youth Cup Competitions

The FA Cup, The FA Trophy, The FA Vase and The FA Youth Cup Competitions The FA Cup, The FA Trophy, The FA Vase and The FA Youth Cup Competitions Entry Qualifications and Guidance Notes Season 2009-2010 Introduction The purpose of this document is to ensure that Clubs are more

More information

TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION

TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION Type of Permit: Hot Tub Above ground In Ground Permit Number: Permit Fee: Address of Proposed Work: Town Zoning district: (Check one) Village Zoning district:

More information

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion The SMART Steel Crash Cushion is accepted for use on the New South Wales classified road network. The acceptance is based on the determination

More information

FENCING SYSTEM SOLUTIONS

FENCING SYSTEM SOLUTIONS FENCING SYSTEM SOLUTIONS ABOUT US TE-FENCE is a trademark of TMEC INTERNATIONAL Group international based in Istanbul, Turkey. Our company specialized in designing, manufacturing and installation of fencing

More information

Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs

Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs November December

More information

TOWNSHIP OF DOURO-DUMMER BY-LAW NO

TOWNSHIP OF DOURO-DUMMER BY-LAW NO TOWNSHIP OF DOURO-DUMMER BY-LAW NO. 1999-27 BEING a by-law respecting the erection and maintenance of fences and gates enclosing privately owned outdoor swimming pools. WHEREAS Subsection 30 of Section

More information

MINIBIKE MOTOCROSS CIRCUIT SAFETY GUIDELINES

MINIBIKE MOTOCROSS CIRCUIT SAFETY GUIDELINES MINIBIKE MOTOCROSS CIRCUIT SAFETY GUIDELINES Issue #4 JANUATY 2015 1. The Minibike Circuit Guidelines will be used to conduct course inspections prior to the issue of a Course Certificate 2. A Course Certificate

More information

SMART STEEL CRASH CUSHION

SMART STEEL CRASH CUSHION APRIL 2015 DETAIL SHEET SMART STEEL CRASH CUSHION VicRoads Requirements Refer to Austroads - Safety Barrier System Acceptance Conditions for the SMART Steel Crash Cushion. All requirements listed by Austroads

More information

Intertrack Fencing Construction and Maintenance

Intertrack Fencing Construction and Maintenance Panel Discussion On Intertrack Fencing Construction and Maintenance Tuesday, September 22, 2009 Passenger & Transit Session 9:30AM to 10:00AM. Facilitators: D. Grigg, C.E.T., PMP Hatch Mott MacDonald J.

More information

A by-law to regulate pool enclosures within the Town of Oakville

A by-law to regulate pool enclosures within the Town of Oakville THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER 2006-071 A by-law to regulate pool enclosures within the Town of Oakville WHEREAS section 11 of the Municipal Act, 2001, S.O. 2001, c. 25, as amended,

More information

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E IT IS NOT ANTICIPATED THAT ONE COMPANY CAN PROVIDE ALL GROUPS, PLEASE PROVIDE PRICING ONLY ON THE GROUPS YOU CAN PROVIDE SERVICES FOR. This document is to be used by the Bidder to specify proposed Rates.

More information

Stoke Mandeville Parish Council 17 April 2018

Stoke Mandeville Parish Council 17 April 2018 Stoke Mandeville Parish Council 17 April 2018 Stoke Mandeville Parish Council 1 Introductions 2 Construction Approach 3 MWCC in Stoke Mandeville 4 Future Engagement Introduction HS2 Phase One Delivery

More information

Restricting Access to Your Swimming / Small Heated Pool Information / Checklist

Restricting Access to Your Swimming / Small Heated Pool Information / Checklist Restricting Access to Your Swimming / Small Heated Pool Information / Checklist Building Act 2004 (inforce from 1 January 2017) Version 6, August 2018 Code: IS-119 / #459589 2 King George Place, PO Box

More information

Town of Poughkeepsie Received: Permit # Aboveground/Inground Pool Building Permit Application

Town of Poughkeepsie Received: Permit # Aboveground/Inground Pool Building Permit Application Town of Poughkeepsie Received: Permit # Aboveground/Inground Pool Building Permit Application Property Address: Street: City: Zip: Grid Number: Zoning District: Owners Name: Phone: (H) (W) Builder : Phone:

More information

MOTOCROSS CIRCUIT SAFETY GUIDELINES

MOTOCROSS CIRCUIT SAFETY GUIDELINES MOTOCROSS CIRCUIT SAFETY GUIDELINES Issue #3 OCTOBER 2012 1. The MCFederation Motocross Circuit Guidelines will be used to conduct course inspections prior to the issue of a Course Certificate and are

More information

Site Guidance Note 2: Fencing protected trees

Site Guidance Note 2: Fencing protected trees TREE Site Guidance Note 2: This document is only a summary of its subject matter. You should not rely on this general guidance in isolation, and you should always seek detailed advice from an appropriate

More information

Swimming Pools Regulation 1998

Swimming Pools Regulation 1998 New South Wales Swimming Pools Regulation 1998 under the Swimming Pools Act 1992 His Excellency the Lieutenant-Governor, with the advice of the Executive Council, has made the following Regulation under

More information

BY-LAW NUMBER 816. WHEREAS Notice of Motion of the present By-law was given at the Council Meeting held on July 6 th, 2015;

BY-LAW NUMBER 816. WHEREAS Notice of Motion of the present By-law was given at the Council Meeting held on July 6 th, 2015; PROVINCE OF QUEBEC TOWN OF HAMPSTEAD BY-LAW NUMBER 816 BY-LAW CONCERNING SWIMMING POOLS, HOT TUBS AND SPAS WHEREAS Notice of Motion of the present By-law was given at the Council Meeting held on July 6

More information

X coordinate. Y Coordinate. 0 UD_ Partial No. 1 Gorton Hall Drain Yes No. 2 UD_ Yes No

X coordinate. Y Coordinate. 0 UD_ Partial No. 1 Gorton Hall Drain Yes No. 2 UD_ Yes No Appendix 7 Otter Information Table A7.1 Otter Survey Results Site No. Watercourse ID X coordinate Y Coordinate Access Otter Presence 0 UD_01 240518 412322 Partial No 1 Gorton Hall Drain 239812 411376 Yes

More information

CITB Construction site safety update

CITB Construction site safety update D: High risk activities Underground and overhead services This text replaces the text from the current GE700 2015, Section D, Chapter D08, Underground and overhead services, pages 133 to 136. 8.6 Overhead

More information

1.1 This by-law shall be known as "the pool by-law"; In this by law;

1.1 This by-law shall be known as the pool by-law; In this by law; THE CORPORATON OF THE TOWN OF PELHAM BY-LAW NO. 3389 (2013) Being a By-law to establish standards, regulations and maintenance requirements for swimming pools, their enclosures, and equipment; and to Repeal

More information

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools. Building Information BURNABY PLANNING & BUILDING DEPARTMENT Swimming Pools The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

More information

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M Fall Protection 29 CFR 1910.66 Appendix C 29 CFR 1926 Subpart M Duty to Have Fall Protection Provide fall protection systems which meet the criteria of 1926 and 1910 Make fall protection an integral part

More information

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence 3 CONSTRUCTION 3.1 Construction Methods and Sequence The Construction Strategy for the offshore field and pipeline is described in the 2001 Offshore EIS. Some construction activities have taken place since

More information

CORPORATION OF THE MUNICIPALITY OF PORT HOPE BY-LAW NO. 31/2006

CORPORATION OF THE MUNICIPALITY OF PORT HOPE BY-LAW NO. 31/2006 CORPORATION OF THE MUNICIPALITY OF PORT HOPE BY-LAW NO. 31/2006 A By-law to Require Owners of Privately Owned Outdoor Swimming Pools and Hot Tubs to Erect and Maintain Fences and Gates Around Such Swimming

More information

Swimming Pool Requirements

Swimming Pool Requirements Swimming Pool Requirements 8040 S. 6th Street Oak Creek, WI 53154 (414) 766-7000 www.oakcreekwi.org Revised: August 8. 2017 PERMITS A permit from the Inspection Department is required prior to putting

More information

F4. Coastal Mooring Zone and moorings outside the Coastal Mooring Zone

F4. Coastal Mooring Zone and moorings outside the Coastal Mooring Zone F4. Coastal Mooring Zone and moorings outside the Coastal Mooring Zone F4.1. Zone description This section addresses the provisions relating to moorings in the Coastal Mooring Zone and those outside the

More information

Building Standards Department Pool Requirements 111 N. Michigan AV, Bradley, IL Phone Fax PRIVATE SWIMMING POOLS

Building Standards Department Pool Requirements 111 N. Michigan AV, Bradley, IL Phone Fax PRIVATE SWIMMING POOLS Building Standards Department Pool Requirements 111 N. Michigan AV, Bradley, IL 60915 Phone 815-933-5008 Fax 815-933-5068 PRIVATE SWIMMING POOLS GENERAL PERMIT PROCEDURES: Call J.U.L.I.E. at 1-800-892-0123

More information

18,000 +/- ACRE KNOX COUNTY, TEXAS RANCH BENJAMIN, TEXAS

18,000 +/- ACRE KNOX COUNTY, TEXAS RANCH BENJAMIN, TEXAS 18,000 +/- ACRE KNOX COUNTY, TEXAS RANCH BENJAMIN, TEXAS LOCATION: Approximately 90 miles southwest of Wichita Falls. The southern ranch boundary adjoins the City of Benjamin. The western ranch boundary

More information

FEE SCHEDULE POOL PERMIT FEES. Refundable Security (Cash of L.C.) 1 Hot Tub, Spa, etc. $ nil 2 Above Ground Pool $ nil

FEE SCHEDULE POOL PERMIT FEES. Refundable Security (Cash of L.C.) 1 Hot Tub, Spa, etc. $ nil 2 Above Ground Pool $ nil FEE SCHEDULE POOL PERMIT FEES Type of Pool Total Fee Refundable Security (Cash of L.C.) 1 Hot Tub, Spa, etc. $100.00 nil 2 Above Ground Pool $200.00 nil 3 Inground Pools (assumed $350.00 $1500.00 subdivision)

More information

The Corporation of the Town of New Tecumseth

The Corporation of the Town of New Tecumseth The Corporation of the By-law 2007-100 (Consolidated as amended) FENCE BY-LAW To prescribe the height and description of fences and to regulate fences around privately owned swimming pools in the. Consolidation

More information

A5.1 Permitted activities

A5.1 Permitted activities Section A5 Transportation A5.1 Permitted activities A5.1.1 Activities within roads Note: Refer to Section D for the definition of road (a) Any activity associated with the movement of traffic and the functioning

More information

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169 Styal Golf Course Accommodation Works Non-Technical Summary 1007/6.15.2/169 September 2013 Document Control Sheet Project Title: Styal Golf Course Report Title: Non Technical Summary Document No: 1032775.014.001

More information

WINDOVER FARMS OF MELBOURNE HOMEOWNERS ASSOCIATION, INC Windover Way, Melbourne, FL (321) FENCE APPLICATION

WINDOVER FARMS OF MELBOURNE HOMEOWNERS ASSOCIATION, INC Windover Way, Melbourne, FL (321) FENCE APPLICATION WINDOVER FARMS OF MELBOURNE HOMEOWNERS ASSOCIATION, INC. 4025 Windover Way, Melbourne, FL 32934 (321) 259-2216 FENCE APPLICATION Date: Lot Number HOMEOWNER Name Address City State Zip Phone: Home ( ) Work

More information

Private Swimming Pool Permit Application

Private Swimming Pool Permit Application Private Swimming Pool Permit Application Pool Address: Legal: Lot: Block: Plan: Subdivision: Applicant Information: Are you also the primary contact? Yes No Name: Address: Postal Code: Phone: Email Address:

More information

SWIMMING POOL REQUIREMENTS

SWIMMING POOL REQUIREMENTS PERMITS A permit from the Inspection Department is required prior to putting up a permanent pool. A permit is required for permanent pools, such as the following: SWIMMING POOL REQUIREMENTS The pool is

More information

Contractors' Code of Safe Practice

Contractors' Code of Safe Practice Contractors' Code of Safe Practice Introduction As the controller of premises, The University of Hong Kong has a duty to ensure, so far as is reasonably practicable, the health and safety of all its employees,

More information

Working with Grantors

Working with Grantors Working with Grantors Introduction Welcome to this Grantors Code of Practice. SSE s core purpose is to provide the energy that people need in a reliable and sustainable way. A key component of this is

More information

Swimming Pool Requirements Packet

Swimming Pool Requirements Packet Plot Plans shall indicate the following: Drawn to an appropriate scale with pool depths shown and dimensions to other structures Have an engineer address any surcharge loads on the pool or from the pool

More information

LOCAL RULES and TERMS OF COMPETITON FOR GOLF AUSTRALIA AMATEUR CHAMPIONSHIPS 2019

LOCAL RULES and TERMS OF COMPETITON FOR GOLF AUSTRALIA AMATEUR CHAMPIONSHIPS 2019 LOCAL RULES and TERMS OF COMPETITON FOR GOLF AUSTRALIA AMATEUR CHAMPIONSHIPS 2019 The following Local Rules & Terms of Competition apply until further notice to all Amateur Championships conducted under

More information

Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai

Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai Summary This determination considers whether the barriers to a small heated pool comply with Clause

More information

CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS

CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS SWIMMING POOLS (IN-GROUND OR ABOVE-GROUND), SPAS AND HOT TUBS (CONTAINS WATER OVER 24 INCHES DEEP) Please read all of the following

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Butterfly Valves C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Butterfly Valves C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 15103 - Butterfly Valves C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 VALVE MANUFACTURER... 1 1.03 GUARANTEE... 1 PART 2 - PRODUCT... 1

More information

POOL FENCING A Guide to the Fencing of Swimming Pools Act 1987

POOL FENCING A Guide to the Fencing of Swimming Pools Act 1987 POOL FENCING A Guide to the Fencing of Swimming Pools Act 1987 Enforcement Team Inspections and Enforcement Unit Christchurch City Council 163-173 Tuam Street PO Box 237, Christchurch Telephone 941-8999

More information

Sports Fencing Specialists

Sports Fencing Specialists Leading UK manufacturer of fencing and gates Sports Fencing Specialists Sports Pitches, MUGA s and more Let us inspire you www.heras.co.uk Sports Pitches, MUGA s and more. ABOUT US HERAS UK FENCING SYSTEMS

More information

Appendix C Projected Outputs and Progress

Appendix C Projected Outputs and Progress Greenlink Final Report November 2001. 58 Appendix C Projected Outputs and Progress Greenlink Final Report November 2001. 59 1. Collection of Propagules were collected for several of the sites in the propagules

More information

The Corporation of the Town of Bradford West Gwillimbury. By-law Swimming Pool Fence By-law

The Corporation of the Town of Bradford West Gwillimbury. By-law Swimming Pool Fence By-law The Corporation of the Town of Bradford West Gwillimbury By-law 2016-65 Swimming Pool Fence By-law A by-law to provide for the owners of privately-owned outdoor swimming pools to erect and maintain fences.

More information

hockey hockey Integral Weighted Goals Aluminium Goals Fence Folding Goals Premier Hockey Goals Folding Wheelaway Goals

hockey hockey   Integral Weighted Goals Aluminium Goals Fence Folding Goals Premier Hockey Goals Folding Wheelaway Goals hockey www.harrod.uk.com 67 Integral Weighted Goals Aluminium Goals Fence Folding Goals Premier Folding Wheelaway Goals Freestanding Goals Socketed Goals Backboards Nets Indoor Posts hockey setting the

More information

WALCOOM. Walcoom Corporation FIELD FENCE.

WALCOOM. Walcoom Corporation FIELD FENCE. WALCOOM Walcoom Corporation FIELD FENCE "The best solution for farm and pasture fencing" Walcoom Corporation has been offering the strong and durable field fencing products for 20 years. We are specialized

More information

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984.

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984. Swimming Pools ** Permits are required for pools having a water surface area exceeding 100 square feet ** Permits are required for pools having a water surface area exceeding 100 square feet (11-3-3/8

More information

THE CORPORATION OF THE CITY OF BELLEVILLE BY LAW NUMBER

THE CORPORATION OF THE CITY OF BELLEVILLE BY LAW NUMBER THE CORPORATION OF THE CITY OF BELLEVILLE BY LAW NUMBER 2006 65 A BY LAW TO PRESCRIBE THE HEIGHT AND DESCRIPTION OF, AND THE MANNER OF ERECTING AND MAINTAINING FENCES AND GATES SURROUNDING PRIVATELY OWNED

More information

Swimming Pool Fence By-law

Swimming Pool Fence By-law Swimming Pool Fence By-law PS-5 Consolidated May 3, 2010 As Amended by By-law No. Date Passed at Council PS-5-00001 May 29, 2000 PS-5-02002 February 18, 2002 PS-5-04003 June 14, 2004 PS-5-01004 May 3,

More information

Point LaBarbe/McGulpin Point Response April 2 May 8, 2018 Regional Response Team 3 Meeting November, 2018

Point LaBarbe/McGulpin Point Response April 2 May 8, 2018 Regional Response Team 3 Meeting November, 2018 Point LaBarbe/McGulpin Point Response April 2 May 8, 2018 Regional Response Team 3 Meeting November, 2018 TJ Mangoni District Response Advisory Team Supervisor Ninth Coast Guard District 216-214-4285 Summary

More information

Pool / Hot Tub Permit

Pool / Hot Tub Permit Application Date: Pool / Hot Tub Permit Lower Southampton Township 1500 Desire Avenue, Feasterville, Pa 19053 215-357-7300 Permit Number: Permit Fee: Fee includes required fencing permit and bonding fee.

More information

List of Figures. List of Tables

List of Figures. List of Tables City of Columbia Engineering Regulations PART 19: SPECIFICATIONS FOR FENCING MATERIALS Table of Contents Paragraph Description Page No. 19.1 General 19-1 19.2 Construction Materials 19-1 List of Figures

More information

Tips on Permanent Powered Fencing and Temporary Powered Fencing

Tips on Permanent Powered Fencing and Temporary Powered Fencing Tips on Permanent Powered Fencing and Temporary Powered Fencing The following outlines various simple, yet proven, methods in constructing both fixed and portable fencing systems as well as providing information

More information

2011 EDUCATION SEMINAR RULES OF GOLF PRESENTED BY : ROBERT O. SMITH

2011 EDUCATION SEMINAR RULES OF GOLF PRESENTED BY : ROBERT O. SMITH 2011 EDUCATION SEMINAR RULES OF GOLF PRESENTED BY : ROBERT O. SMITH RULE 33-1 THE COMMITTEE MUST ESTABLISH THE CONDITIONS UNDER WHICH A COMPETITION IS TO BE PLAYED. CONDITIONS OF THE COMPETITION TIME OF

More information

Fencing. Fencing - a look back in time

Fencing. Fencing - a look back in time Fencing Fencing - a look back in time In olden days, when grazing animals grazed outlying land, fields and meadows were fenced in to protect crops from domestic livestock. Nowadays, animals no longer as

More information

Vacuum Excavation in the vicinity of the Wellington Electricity Network

Vacuum Excavation in the vicinity of the Wellington Electricity Network Vacuum Excavation in the vicinity of the Network. Document no: ENG-116 Document Rev: 1 Issue Status: Final Issue Date: 14/05/2015 Page 1 of 9 Contents 1. PURPOSE... 3 2. POLICY... 3 3. SCOPE... 3 4. REFERENCES...

More information

CITY OF TORONTO. BY-LAW No

CITY OF TORONTO. BY-LAW No Authority: Planning and Transportation Committee Report No. 3, Clause No. 2a, as adopted by City of Toronto Council on June 22, 23 and 24, 2004 Enacted by Council: June 24, 2004 CITY OF TORONTO BY-LAW

More information

WPB: RFP for Repairing Division Street Fences -- ISSUED: November 2016

WPB: RFP for Repairing Division Street Fences -- ISSUED: November 2016 Intent The Wicker Park Bucktown Chamber of Commerce and the Special Service Area #33, seeks a contractor to repair or replace sections of fences surrounding tree pits on Division Street that are part of

More information

General Safety and Health Provisions for Construction Self Inspection Checklist

General Safety and Health Provisions for Construction Self Inspection Checklist Optional Information Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: General Safety and Health Provisions for Construction Self Inspection Checklist Instructions:

More information

TOWER INSPECTION REPORT

TOWER INSPECTION REPORT 3010 S. Hwy 77, Suite 600 Waxahachie, Texas 75165 http://ctctower.com Office: 972/923-9504 Fax: 972/923-9619 TOWER INSPECTION REPORT PREPARED FOR MR. CUSTOMER 1,563 GUYED TOWER NEAR CITY, STATE JANUARY

More information

Request for Proposal Ground Set Up Tender. Hong Kong Sixes th October 29 th October, 2017

Request for Proposal Ground Set Up Tender. Hong Kong Sixes th October 29 th October, 2017 Request for Proposal Ground Set Up Tender Hong Kong Sixes 2017 28 th October 29 th October, 2017 6 th February 11 th February 2018 Table of Contents HK Sixes Event Overview Page 2 About the Project Page

More information

REQUIREMENTS FOR NEW AND EXISTING DOMESTIC SWIMMING POOLS

REQUIREMENTS FOR NEW AND EXISTING DOMESTIC SWIMMING POOLS Lismore City Council REQUIREMENTS FOR NEW AND EXISTING DOMESTIC SWIMMING POOLS (Swimming Pools Act 1992) Introduction The purpose of this pamphlet is to inform the community about the requirements of the

More information

ARENA SYSTEMS TO SUIT YOUR SPORT

ARENA SYSTEMS TO SUIT YOUR SPORT Introduction Introduction ARENA SYSTEMS TO SUIT YOUR SPORT ROCKLYN PROVIDE A FULL SERVICE FROM SURVEY, DESIGN, GROUNDWORKS, INSTALLATION AND MAINTENANCE SERVICE. Now more than ever, outdoor sports facilities

More information

Appendix J: Q1-Highway 35 Route Construction Plan

Appendix J: Q1-Highway 35 Route Construction Plan PSC REF#:150055 Wisconsin CPCN Appendix J Appendix J: Q1-Highway 35 Route Construction Plan Public Service Commission of Wisconsin RECEIVED: 06/29/11, 8:51:24 AM Hampton Rochester La Crosse 345 kv Transmission

More information

0 CITY OF SANTA ANA 0

0 CITY OF SANTA ANA 0 : A traffic control plan (Plan) is required whenever work is to be performed within the public right-of-way and is deemed necessary by the City of Santa Ana's (City) Traffic Engineer. Work cannot start

More information