Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability.

Size: px
Start display at page:

Download "Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability."

Transcription

1 This information paper is to provide minimum guidelines and information of the erection of temporary fencing for the purpose of barricading, delineation of a work area, and for protection of workers from hazards. If constructed as per the following guidelines temporary fencing will met the minimum requirements AS Temporary fencing and Hoarding Temporary Fencing is to erected as manufacturers instruction, or as a minimum to the requirements listed in the Take 5 for your Erecting Fence 1. Start by placing Block 1 on the ground perpendicular (at 90 degrees) to the line the fence will take. Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability. 2. Take Panel 1 and insert one leg of the panel into one of the receiving holes in Block Place Block 2 at the other end of Panel 1 and insert the panel leg into the receiving hole of Block 2. Both legs of a Panel should be in the front hole of Block 1 and Block 2 or both in the back hole of Block 1 and Block 2. Page 1

2 4. Take Panel 2 and insert one foot into the second receiving hole of Block Place Block 3 at the other end of Panel 2 and insert the panel leg into the corresponding front/back receiving hole of Block Place a temp fence clamp on the vertical pipes above the top rails of the two panels and securely fasten the nut with a 16mm spanner or socket. 7. Continue this process along the line of the fence. 8. Where panels need to be overlapped, clamp panels together, horizontal pipe to horizontal pipe, top and bottom. Page 2

3 Installation of Stay Stays are used to help stabilise the fence. 1. Position the stay for it to be attached to the end upright of the panel, with the metal plate flat on the ground and the top pipe section running parallel to the panel upright 2. Clamp the stay to the panel at a point 100mm from the top of the stay. 3. Securely fasten the nut with a 16mm spanner or socket. 4. Place another clamp on the lower vertical pipe section of the stay that runs parallel with the vertical fence panel pipe. 5. Securely fasten the nut with a 16mm spanner or socket. Page 3

4 6. Clamp the two temporary fence panels together at the bottom, just above the block where there is no wire attached to the panels vertical pipe. 7. Securely fasten the nut with a 16mm spanner or socket. 8. Install 3 blocks on the upright post of the stay. Blocks must be right side up with only plastic visible. To fit blocks on stays First you must remove the plastic from the bottom of the socket where the panel fits into the block. Place the block right side up so that the bottom of the block where the sockets finish is sitting off the ground. Insert a piece of 25mm Nb pipe approx. 400mm long into the socket and hit with a hammer or, Turn the block over and drill the plastic out with a 35mm hole saw Page 4

5 Gates Create a gate that is 2 panels wide by not installing a block in the middle of two panels. Ensure the gate swings inside the boundary of the property, not onto the road or footpath. Secure all gate panels with hinges or clamps. Install gate wheels if required. Install a return panel for the gate to swing off where a gate meets a side boundary. Pedestrian Gates Where personnel access only is required install a pedestrian gate. Install pedestrian gate as you would for a temp fence panel gate, with NO block at one end. Install one stay on each of the panels immediately adjacent to the gateway panel to stabilize the fence. Fit gate wheels if necessary Returns Where a straight fence line comes to an end install a return panel for strength. Install a return panel for the gate to swing off where the gate meets a side boundary. Page 5

6 Shade Cloth Shade Cloth is installed on the temporary fence for privacy screening and dust attenuation. Before attaching any Shade Cloth or Banner Mesh to the temporary fence, full bracing MUST be installed. Bracing for Shade Cloth Regardless of the surface, Shade cloth must only ever be installed in conjunction with stays. Stays must be installed in accordance with the guidelines in this installation instruction document. The number of stays installed should be in accordance with 1300TempFence Certification to AS available on request. Note: In addition to the requirement 1 stay must always be installed at either end of the line of fence. In addition to the regular clamp at the top, panels must be clamped together at the bottom of the panels, just above the block. Attaching Shade Cloth to Temporary Fence Ensure the fence is fully braced before attaching Shade Cloth. Secure shade cloth to the top horizontal pipe of the panel with cable ties at 800mm intervals - 3 per panel. Use fence staples to secure two horizontal lines of 4-5 staples per line/ each panel. Install one line of staples one third from the top of the panel. Install a second line of staples one third from the bottom of the panel. Do not secure the shade-cloth to the bottom of the panel unless necessary. Wire the fence to any solid objects. Page 6

7 Hand Rails In pedestrian traffic areas where the fence blocks present a tripping hazard, hand rails must be installed. Install hand rails to the panel at approximately 1.00 metre high from the ground. Clamp the vertical pipe of the hand rail to the vertical upright pipe of the panel using 2 clamps at each end. Tighten clamps with a 16mm socket. For transverse blocks (with holes running lengthways) alternate the height of each handrail to allow room for attaching to the panels. Dog Bars Dog bars prevent children or balls from going under the fence. Place the dog bar below the panel. Clamp the dog bar to the panel at 3 points. One clamp at each end and one in the middle. Page 7

8 Take 5 Quiz Take 5 Paper CIRCLE THE ANSWER YOU BELIEVE IS CORRECT. 1. The top of each fence panel must be clamped together True False 2. A temporary fence must be stayed if shade cloth is used True False 3. Should temporary support blocks be aligned parallel to the line of the fence YES NO 4. Stays should be weighed down with support blocks or pinned True False 5. A hand rail is to be installed at a height of 1mt True False 6. When would hand rails be required on a temporary fence for your 7. What would you look for when conducting a pre-erection inspection of temporary fencing 8. When are dog bars to be used with temporary fencing 9. What would you look for when conducting an inspection of completed temporary fencing 10. What should you do if you are unsure about how to erect temporary fencing or the integrity of erected temporary fencing? ACKNOWLEDGEMENT RECEIPT I have read and understand the information provided to me for and I have been issued with: Take 5 paper / / Employee s Name (PRINT) Employee s Signature Date / / Trainer's Name (PRINT) Trainer s Signature Date Page 8

9 Take 5 Quiz - Answers 1. The top of each fence panel must be clamped together True False 2. A temporary fence must be stayed if shade cloth is used True False 3. Should temporary support blocks be aligned parallel to the line of the fence YES 4. Stays should be weighed down with support blocks or pinned True 5. A hand rail is to be installed at a height of 1mt True NO False False 6. When should hand rails be required on a temporary fence In pedestrian areas where the temporary fencing may present a tripping hazard 7. Name some of the items you would check when conducting a pre-erection inspection of temporary fencing All components are free from damage and are serviceable, supporting surface is suitable and can support the weight of the fencing, Ensure you understand the correct procedure for erecting the fencing, confirm the fencing will erected in the correct location 8. When are dog bars to be used with temporary fencing Dog bars prevent children or animals from going under the fence and entering the work area 9. What would you look for when conducting an inspection of completed temporary fencing Ensure support blocks are aligned correctly. The panels are clamped at the top. That the temporary fencing does not present a hazard to others in the work area. Where required suitable access and egress is provided to the work area, Suitable signage is displayed in prominent locations along the fencing 10. What should you do if you are unsure about how to erect temporary fencing or the integrity of erected temporary fencing? Do not start work, if you are unsure of how to erect the fencing. If you believe temporary fencing is unsafe, make area safe if you can do so, and inform your supervisor Page 9

8. Fall Protection Procedures WAC

8. Fall Protection Procedures WAC 1.0 Fall Protection Introduction 8. Fall Protection Procedures WAC 296-155-245 If an employee is exposed to a fall hazard of ten (10) feet or more in height, the employee must use a fall restraint, fall

More information

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard. 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect

More information

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup. SERIES 2 RAMP OWNER S MANUAL BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup. Use caution and care for your back when lifting, pushing, pulling, folding or unfolding

More information

FALL PROTECTION / ELEVATED WORK

FALL PROTECTION / ELEVATED WORK SEPTEMBER CORE REFRESHER HSE TOOL BOX FALL PROTECTION / ELEVATED WORK FALL PROTECTION Falls from elevations are one of the most common causes of death in this industry. OSHA requires fall protection when

More information

Risk Control at United Fire Group

Risk Control at United Fire Group In the United States, falls are the leading cause of fatalities on a construction site. Employers and employees need to do the following: Where protection is required, select fall protection systems appropriate

More information

Advantage Lockers & Bike

Advantage Lockers & Bike Advantage Lockers & Bike Advantage Bike Racks & Lockers Inc. is the #1 supplier of Storage Lockers and Bike Racks to the Lower Mainland s residential construction industry. With 25+ years of experience

More information

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS U.S.A. Patent Number 5,36,83 ORNAMENTAL CANTILEVER GATE INSTRUCTIONS *NOTICE: Ornamental Cantilever Gates are supplied with rolls of 2 mesh safety screening in sufficient quantities to cover the entire

More information

Installation Instructions for the AlphaDeck Staging System

Installation Instructions for the AlphaDeck Staging System Installation Instructions for the AlphaDeck Staging System Step 1 - Preparation A. Before setting up this system, determine the location of the stages and all the parts you will need. B. Read through the

More information

NEXT GENERATION FLEX FENCE

NEXT GENERATION FLEX FENCE NEXT GENERATION FLEX FENCE Area To Be Fenced.. With Next Generation Flex Fence any post that is not in a straight line with another post must be braced. Layout your fence installation. Determine all end

More information

Fall Protection- Part 2

Fall Protection- Part 2 Optional Information Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: Fall Protection- Part 2 Self Inspection Checklist Instructions: This checklist covers fall

More information

INSTRUCTIONS FOR CHAIN LINK INSTALLATION

INSTRUCTIONS FOR CHAIN LINK INSTALLATION INSTRUCTIONS FOR CHAIN LINK INSTALLATION This guide explains how to correctly install our chain link fencing and post system. The guide provides details of which post type you will need for your fence

More information

FCX Department of Occupational Health and Safety. Flagging and Barricading Guideline

FCX Department of Occupational Health and Safety. Flagging and Barricading Guideline FCX Department of Occupational Health and Safety Flagging and Barricading Guideline Approval Date: 11/12/13 Original Date: 03/30/09 SOP # FCX-19 Revision # 1 Supersedes X High Medium Task Risk Low NA Contents

More information

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time. STEP 4 Starting where you marked the end post location, move down your fence line 6 feet and make another mark. This mark is where your second upright post will be installed. Continuing down the fence

More information

OSHA 29CFR 1910 Subpart D Walking-Working Surfaces Content

OSHA 29CFR 1910 Subpart D Walking-Working Surfaces Content OSHA 29CFR 1910 Subpart D Walking-Working Surfaces Content 1910.28 Duty to have Fall Protection and Falling Object Protection 1910.29 Fall Protection Systems and Falling Object Protection Criteria and

More information

Mini. Monkey Tower. Monkey Tower Mini User Manual. Scaffolding in Seconds Version 1.1 EN 1298 IM en 01/02/2012

Mini. Monkey Tower. Monkey Tower Mini User Manual. Scaffolding in Seconds   Version 1.1 EN 1298 IM en 01/02/2012 Monkey Tower Scaffolding in Seconds www.monkeytower.co.uk Mini Monkey Tower Mini User Manual Version 1.1 EN 1298 IM en 01/02/2012 Monkey Tower Ltd North Wing Ingatestone Hall Ingatestone Essex CM4 9NS

More information

Tripod Setup Guide (M-TPx)

Tripod Setup Guide (M-TPx) Items needed: 1/2 inch wrench, mast level (M-MLA), medium size wire cutters, crescent wrench, all-purpose grease, tape measure, tie wraps, redi-mix cement (optional), shovel (optional), sledge hammer (for

More information

Assembly Instructions. -Cantilever Boat Lifts

Assembly Instructions. -Cantilever Boat Lifts Assembly Instructions -Cantilever Boat Lifts Winch Instruction Page Safety Information 1. The winch is built for the multipurpose of hauling and lifting operations. It is not to be used as a hoist for

More information

Safe Work Procedure for installation of external cladding

Safe Work Procedure for installation of external cladding Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce

More information

TYPICAL S/W TOWER STATIC STABILISER IMPORTANT NOTES

TYPICAL S/W TOWER STATIC STABILISER IMPORTANT NOTES IMPORTANT NOTES Towers should only be erected by competent trained personnel and records of both erection and regular inspection every seven days maintained. At working platform levels fit a standard and

More information

Quiz. telescoping. designed to. established. 1 Pag. EWP Pre Reading

Quiz. telescoping. designed to. established. 1 Pag. EWP Pre Reading EWP Pre Reading and Quiz Due to the intensivee nature of our EWP course, it is mandatory that you study this manual thoroughly before attending your course. Doing so will ensure you have the best possible

More information

IMPORTANT SAFETY NOTICE

IMPORTANT SAFETY NOTICE OWNER S MANUAL NOTE: Any photos of the YBIKE or decals in the owner s manual are intended to be used as a reference only, and there may be some differences to the unit you purchased. IMPORTANT SAFETY NOTICE

More information

ROOFING FALL PROTECTION 27.I

ROOFING FALL PROTECTION 27.I ROOFING FALL PROTECTION 27.I Prior to the start of work, a structural analysis of the roof shall be conducted by a Qualified Person to assure that the load capacity of the roof deck will not be exceed.

More information

Installation and Training Manual

Installation and Training Manual AirForce1 Tower Kit Installation and Training Manual FuturEnergy Limited Ettington Park Business Centre Stratford upon Avon CV37 8BT +44 (0)1789 451070 Table of Contents Safety Notes... 3 Parts Supplied

More information

Assembly, disassembly and user manual

Assembly, disassembly and user manual Assembly, disassembly and user manual D000A Product description: Plate-forme individuelle roulante légère "PIRL" (Lightweight rolling individual platform) compliant with norm NF P 9-. Single operator use.

More information

Title- Fall Protection Effective Date: 03 Jan 14 Revision-0

Title- Fall Protection Effective Date: 03 Jan 14 Revision-0 Whaley Steel Corp Environment, Health & Safety Manual Section-3.0 Title- Fall Protection Effective Date: 03 Jan 14 Revision-0 1.0 PURPOSE 1.1 The purpose of the fall protection program is to: ensure all

More information

CPWR - The Center for Construction Research and Training. Fall Hazard Identification and Control Audit of the Aria Building. City Center Project

CPWR - The Center for Construction Research and Training. Fall Hazard Identification and Control Audit of the Aria Building. City Center Project CPWR - The Center for Construction Research and Training Fall Hazard Identification and Control Audit of the Aria Building City Center Project Las Vegas, Nevada September, 2008 Submitted by Mark Fullen

More information

Fall Protection Resource Guide P AGE 1

Fall Protection Resource Guide P AGE 1 Fall Protection Resource Guide P AGE 1 As a Home Builder, we do not self-perform any work. This section is a resource guide only and is not intended to put any requirements on the company. All subcontractors,

More information

Imhoff Custom Services Inc.

Imhoff Custom Services Inc. Imhoff Custom Services Inc. Fall Protection Program Falls are the leading cause of deaths in construction situations and account for about one third of all fatalities. These falls and deaths involve a

More information

2016 Pool Permit Application & Information Package

2016 Pool Permit Application & Information Package 2016 Pool Permit Application & Information Package **IMPORTANT** ALL APPLICATIONS MUST BE APPROVED BY PETERBOROUGH PUBLIC HEALTH PRIOR TO SUBMITTING TO THE TOWNSHIP OF OTONABEE-SOUTH MONAGHAN *PETERBOROUGH

More information

STEEL TRENCH SHIELDS DW MODELS

STEEL TRENCH SHIELDS DW MODELS STEEL TRENCH SHIELDS DW MODELS 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Phone: 713.943.0750 Toll Free: 800.231.6662 Fax: 713. 943.8483 COPYRIGHT, U.S.A., SPEED SHORE CORPORATION, 2009 April 16,

More information

Plastic Safety Systems

Plastic Safety Systems SafetyRail TM & SafetyWall TM ADA-Compliant Pedestrian Barricade Product Guide Distributed by: On the Roadway for Safety Download PSS Product Catalog. SafetyRail ADA-Compliant Pedestrian Barricade For

More information

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

8MAY15 US RACK, Inc Falcon Drive, Madera, CA 8MAY15 US RACK, Inc. - 2850 Falcon Drive, Madera, CA 93637-559-661-3050 INSTRUCTIONS for Bedrail-mounted MOTORCYCLE RACK, Model 2001-4TRA WARNING: Do NOT attempt to install or use this rack without following

More information

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices. Title: Elevated Walking/Working Surfaces (Fall Protection) Site Function: Safety Procedure No.: MC032.122 Page: 1 of 16 McIntosh Site Reviewed: 02/2013 Effective: 03/2013 Supersedes: 08/2012 Preparer:

More information

WAIROA DISTRICT COUNCIL P

WAIROA DISTRICT COUNCIL P WAIROA DISTRICT COUNCIL P +64 6 838 7309 W www.wairoadc.govt.nz F +64 6 838 8874 p PO Box 54, Wairoa 4160, Hawke s Bay E consents@wairoadc.govt.nz A Coronation Square, Queen Street, Wairoa INFORMATION

More information

Fall Protection / Open Holes & Guardrail

Fall Protection / Open Holes & Guardrail Fall Protection / Open Holes & Guardrail 1. Leading Edges Policy Statement It is GW Communications policy that any worker exposed to a fall 6 or greater, shall be protected from coming into contact with

More information

GATES, CATTLE GUARDS AND PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people.

GATES, CATTLE GUARDS AND PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people. Fencing Order No. 307.400-1 Revised December 2015 GATES, CATTLE GUARDS AND PASSAGEWAYS This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people. GENERAL

More information

User Manual 1792 Standing Seam Metal Roof Retractable Swivel Anchor

User Manual 1792 Standing Seam Metal Roof Retractable Swivel Anchor 1 User Manual 1792 Standing Seam Metal Roof Retractable Swivel Anchor This manual is intended to meet the Manufacturer Instructions as required by ANSI Z359.1 and should be used as part of an employee

More information

1.0 Scope and Application

1.0 Scope and Application 1.0 Scope and Application This policy contains safety requirements to protect employees from falls of six (6) feet or more when performing elevated work except on ladders and scaffolding (See Ladders and

More information

Instructions for the following series products:

Instructions for the following series products: Instructions for the following series products: U-Bolt Roof Anchors (See back page for specific model numbers.) User Instruction Manual U-bolt Roof Anchor This manual is intended to be used as part of

More information

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M Fall Protection 29 CFR 1910.66 Appendix C 29 CFR 1926 Subpart M Duty to Have Fall Protection Provide fall protection systems which meet the criteria of 1926 and 1910 Make fall protection an integral part

More information

Operator s Safety Manual Sumner Max Jax / Beam Jax

Operator s Safety Manual Sumner Max Jax / Beam Jax May 2013 Operator s Safety Manual Sumner Max Jax / Beam Jax www.sumner.com 7514 Alabonson Road Houston, TX 77088 U.S.A ph: 281.999.6900 fax: 281.999.6966 75 Saltsman Drive Unit 5 Cambridge, ON N3H 4R7

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions Soccer Goal Model: SG20 Series Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE

More information

Walking and Working Surfaces: Comprehensive Training

Walking and Working Surfaces: Comprehensive Training Walking and Working Surfaces: Comprehensive Training PROGRAM SYNOPSIS: To ensure workers are provided with safe working and traveling surfaces, OSHA has developed and recently updated its regulation 29

More information

PSSI 6 Demarcation of Work Areas in Substations

PSSI 6 Demarcation of Work Areas in Substations 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical), setting down the requirements in those situations where it is necessary

More information

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning GEMTOR, INC....when your life is on the line One Johnson Avenue Matawan, NJ 07747 732-583-6200 800-405-9048 Fax 732-290-9391 OWNER'S MANUAL Installation, Operating, Inspection and Maintenance Instructions

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

INSTALLING A SWIMMING POOL/HOT TUB PROCESS AND INFORMATION GUIDE

INSTALLING A SWIMMING POOL/HOT TUB PROCESS AND INFORMATION GUIDE INSTALLING A SWIMMING POOL/HOT TUB PROCESS AND INFORMATION GUIDE Dan Sharina (Building Official) (519) 856-9596 ext. 117 dsharina@get.on.ca www.get.on.ca All Drawings submitted for building permit must

More information

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016 Ormiston Academies Trust Ormiston Horizon Academy Working at Height Policy Project/job number: Author: Sharlene Smith/Handsam Date: 25/10/16 Contributors: Sharlene Smith Version number: 1.1 Reviewed by:

More information

IS37 10 Metre Instrument Mast Handbook

IS37 10 Metre Instrument Mast Handbook IS37 10 Metre Instrument Mast Handbook Version 10.1 6 th February 2014 Environdata Australia Pty Ltd 42-44 Percy Street Warwick Queensland 4370 Australia Phone: (07) 4661 4699 Fax: (07) 4661 2485 International

More information

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control

More information

Original Gondola Train Operator s Manual

Original Gondola Train Operator s Manual 1-888-400-5227 Original Gondola Train Operator s Manual Gondola Train BEFORE MOVE BEGINS (OPTIONAL) It is helpful to vice grip, clamp - one row on one side of shelves together (or bolt through holes on

More information

Fall Protection Checklist. Guardrail System

Fall Protection Checklist. Guardrail System Fall Protection Checklist Location/Department: Date of Inspection: Inspectors: Corrective Actions: Work order/memos were issued: Yes No Date issued: In accordance with the MIOSHA and OSHA standards the

More information

SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

SPEED SHORE MANUFACTURER S TABULATED DATA MHS MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs January 01, 2005 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Tel:

More information

E-trike Li Assembly Guide

E-trike Li Assembly Guide PREPARATION 1. Read this assembly manual BEFORE commencing assembly. 2. Carefully remove all the components and packaged hardware from the shipping boxes. 3. Unpack the contents of the large double box

More information

LOAD-BEARING SHEETS SAFETY ANCHOR SA

LOAD-BEARING SHEETS SAFETY ANCHOR SA www.ruukki.com LOAD-BEARING SHEETS SAFETY ANCHOR SA 113-153 INSTRUCTIONS FOR USE Contact Information Please see your local contact information from www.ruukki.com Figure 1. Cross-section of the safety

More information

S110 Steel Level Panel Installation Instructions

S110 Steel Level Panel Installation Instructions S110 Steel Level Panel Installation Instructions NOTE: Fairway Architectural Railing Solutions will not be held liable for incorrect or unsafe installations by installer. It is the installer s resposibility

More information

Final Assembly Instructions Bikes with Quill Stems

Final Assembly Instructions Bikes with Quill Stems Final Assembly Instructions Bikes with Quill Stems Thank you for buying your new bicycle from L.L.Bean. Read these instructions carefully before beginning the final assembly. Prior to shipping, our expert

More information

User Instructions 1790 Rail Anchor

User Instructions 1790 Rail Anchor User Instructions 1790 Rail Anchor This document is intended to meet the Manufacturer s Instruction requirements as stated by ANSI Z359.1, and should be used as part of an employee training program as

More information

CITY OF TORONTO. BY-LAW No

CITY OF TORONTO. BY-LAW No Authority: Planning and Transportation Committee Report No. 5, Clause No. 9, as adopted by City of Toronto Council on June 7, 8 and 9, 2000 Enacted by Council: June 8, 2000 CITY OF TORONTO BY-LAW No. 394-2000

More information

Instant Garage 20' x 12' 3" x 8' 3"

Instant Garage 20' x 12' 3 x 8' 3 Instant Garage 20' x 12' 3" x 8' 3" Assembly Instructions Description Model # Instant Garage 20' x 12' 3" x 8' 3" - Grey CIG 1220 3503502 Recommended Tools OR THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED

More information

FALL PROTECTION GUIDELINE

FALL PROTECTION GUIDELINE FALL PROTECTION GUIDELINE July 2001 Table of Contents INTRODUCTION...3 CONTROL MEASURES...4 SURFACE PROTECTION...4 FIXED BARRIERS...5 EXAMPLES OF GUARDRAIL...6 WARNING BARRIERS...7 HANDRAILS...8 SURFACE

More information

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more) TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more) Release: 1 TLILIC2005A Licence to operate a boom-type elevating work platform (boom length 11 meters or

More information

Applications Residential apartment buildings Educational facilities Railway stations Bus interchanges Commercial & industrial sites

Applications Residential apartment buildings Educational facilities Railway stations Bus interchanges Commercial & industrial sites C a g e s Leda s bicycle cages fall into 2 categories. Multiple rack cages cyclists can leave their bicycle in a secured area which is shared with other cyclists. Individual storage which allows cyclists

More information

SAFETY FIRST. Inspection Proper Set Up Proper Climbing & Use Proper Storage & Carrying Operating Instructions

SAFETY FIRST. Inspection Proper Set Up Proper Climbing & Use Proper Storage & Carrying Operating Instructions SAFETY FIRST Inspection Proper Set Up Proper Climbing & Use Proper Storage & Carrying Operating Instructions Max weight on the 18 inch platforms 500 pounds SWL Certified at 2,000 pounds. Qualified under

More information

Support Infrastructure

Support Infrastructure GUIDANCE NOTE 06 Support Infrastructure 96 COMMUNITY CRICKET FACILITY GUIDELINES VERSION SEPTEMBER 2015 SECTION 2 Guidance Note 06 Support Infrastructure INTRODUCTION Outside of the main playing, training

More information

List of Figures. List of Tables

List of Figures. List of Tables City of Columbia Engineering Regulations PART 19: SPECIFICATIONS FOR FENCING MATERIALS Table of Contents Paragraph Description Page No. 19.1 General 19-1 19.2 Construction Materials 19-1 List of Figures

More information

The Agility Association of Canada

The Agility Association of Canada APPENDIX F - OBSTACLE CONSTRUCTION STANDARDS, 2018 JUMP HEIGHTS F 2 Obstacle Specifications F 2.5 Jumps: General Construction Notes Notes: Jump height is measured from the ground to the top of the pole

More information

VERSA BIKE RACK INSTRUCTIONS

VERSA BIKE RACK INSTRUCTIONS VERSA BIKE RACK INSTRUCTIONS Models #8, 8 Important This rack is designed for use with a or. receiver hitch. The rack is designed to hold a maximum of two bicycles. Do not use it for anything other than

More information

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Intent??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Fall Protection is an integral part of our commitment to a safe work

More information

FALL PROTECTION PLAN INSTRUCTIONS

FALL PROTECTION PLAN INSTRUCTIONS Sonic Drilling Ltd. FALL PROTECTION PLAN INSTRUCTIONS Each employer must ensure that a fall protection system is used when work is done at a place from which a fall of 3 m (10 ft) or more may occur, or

More information

Vibration isolation system 1VIS10W. User manual

Vibration isolation system 1VIS10W. User manual Vibration isolation system 1VIS10W User manual Standa 2014 Table of contents 1. General information 3 1.1. Introduction 3 1.1.1. Safety 5 1.2. Location of the table 5 1.3. Air supply requirements 5 2.

More information

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11) PURPOSE The objective of this policy & guideline is to eliminate the potential for injuries and fatalities to employees and contractors resulting from falls from elevated work areas at Drew University

More information

Method statement for. The installation of. Precast Concrete Piles. (Site Name).

Method statement for. The installation of. Precast Concrete Piles. (Site Name). Method statement for The installation of Precast Concrete Piles At (Site Name). 1 of 5 Standard Operating Procedures for Pile Driving. This method statement will outline how the authorised/ competent operatives

More information

ARKANSAS TECH UNIVERSITY FACILITIES MANAGMENT HEALTH AND SAFETY MANUAL

ARKANSAS TECH UNIVERSITY FACILITIES MANAGMENT HEALTH AND SAFETY MANUAL FALL PROTECTION (PERSONAL FALL ARREST SYSTEMS) 15.0 The purpose of this policy is to specify procedures and training for the safety of the employees in the Facilities Management Group while working on

More information

PUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG

PUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG PUNE TECHTROL PVT LTD Instruction and Maintenance Manual for and Tape Gauge FTG INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR FLOAT AND TAPE GAUGE FTG 1 Introduction : It is used to measure and indicate

More information

Fencing your spa or swimming pool

Fencing your spa or swimming pool Fencing your spa or swimming pool A guide to understanding your responsibilities as a pool owner. Contents Introduction to fencing your spa or swimming pool...2 Definitions...3 I m building a new pool

More information

rooftop anchor Standing Seam Metal Roofs

rooftop anchor Standing Seam Metal Roofs The Ultimate in Fall Protection INSTRUCTION MANUAL ANSI Z359.1 OSHA This manual is intended to meet the Manufacturer s Instructions as required by ANSI Z359.1 and should be used as part of an employee

More information

Appendix 4C - Sample SWMS Trenching

Appendix 4C - Sample SWMS Trenching Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :

More information

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum Chapter 2 Rigging Cutting Wire Rope The wire rope must be tightly seized on both sides of the point where the wire rope will be cut, as shown in Figure 2-1. Seize the wire rope with either seizing wire

More information

1.2 LIMITATIONS: Consider the following application limitations before using this equipment:

1.2 LIMITATIONS: Consider the following application limitations before using this equipment: User Instruction Manual Standing Seam Roof Anchor This manual is intended to meet the Manufacturer s Instructions, and should be used as part of an employee training program as required by OSHA. Figure

More information

Barricades and Falling Object Protection Plans

Barricades and Falling Object Protection Plans Title: Barricades and Falling Object Protection Plans Freeport Site Function: Environmental, Health & Standard No.: BCF020.042 Rev 7 Page: 1 of 7 REVISION HISTORY Date Revision Number Details of Change

More information

Fencing your spa or swimming pool

Fencing your spa or swimming pool Fencing your spa or swimming pool A guide to understanding your responsibilities as a pool owner. Contents Introduction to fencing your spa or swimming pool...2 Definitions...3 I m building a new pool

More information

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step* PG 1 OF 9 PORTA-DOCK, INC. 74A ABL/APW 1056 & 44A FLB APW 1056 PORTA-LIFT Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step* STEP 1. Separate and group

More information

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E IT IS NOT ANTICIPATED THAT ONE COMPANY CAN PROVIDE ALL GROUPS, PLEASE PROVIDE PRICING ONLY ON THE GROUPS YOU CAN PROVIDE SERVICES FOR. This document is to be used by the Bidder to specify proposed Rates.

More information

POOL FENCE STARTER KIT INSTALLATION MANUAL WARNING! ADULT ASSEMBLY ONLY DESIGNED FOR ASSEMBLY ON GRASS

POOL FENCE STARTER KIT INSTALLATION MANUAL WARNING! ADULT ASSEMBLY ONLY DESIGNED FOR ASSEMBLY ON GRASS POOL FENCE STARTER KIT Complies with Australian Standard, AS1926.1-2012: Safety barriers for swimming pools INSTALLATION MANUAL Pool not included DESIGNED FOR ASSEMBLY ON GRASS WARNING! ADULT ASSEMBLY

More information

FALL PROTECTION (SAF-SPI-06)

FALL PROTECTION (SAF-SPI-06) 1. PURPOSE To describe the Ontario Operations standard methods for preventing serious injury resulting from fall from heights and to provide a Standard for Fall Protection to safeguard employees who work

More information

Anchor Posts. *Patent Nos: Europe USA 12/372,965 2 ANCHOR SYSTEMS ANCHOR POSTS

Anchor Posts. *Patent Nos: Europe USA 12/372,965 2 ANCHOR SYSTEMS ANCHOR POSTS Anchor Post System Anchor Posts Anchor Posts are an innovative patented* system designed by our founder, Ewan Smith, for lightweight foundations using hand held equipment. Ingeniously simple, they fulfil

More information

29 CFR 1926, Subpart M. Fall Protection Program Table of Contents

29 CFR 1926, Subpart M. Fall Protection Program Table of Contents I. Objective II. Policy III. Assignment of Responsibility IV. Training V. Controlled Access Zones VI. Excavations VII. Fall Protection Systems A. Covers B. Guardrail Systems C. Personal Fall Arrest Systems

More information

"STEEL FRAMED" ALUMINUM PANEL SHIELDS

STEEL FRAMED ALUMINUM PANEL SHIELDS "STEEL FRAMED" ALUMINUM PANEL SHIELDS MANUFACTURE S TABULATED DATA 3330 S. Sam Houston Pkwy Houston, Texas 77047 (713)943-0750 USA Toll Free 1-800-231-6662 Fax (713)943-8483 Www.speedshore.com PRINTED

More information

INSTALLATION INSTRUCTIONS FOR EXHAUST CUFF MODIFICATION

INSTALLATION INSTRUCTIONS FOR EXHAUST CUFF MODIFICATION INSTALLATION INSTRUCTIONS FOR EXHAUST CUFF MODIFICATION Document # PCA1001-22 Revision LTR: A Date: 07/06/09 1 Notes: 1. The cuff must be installed onto the aircraft prior to painting. Once installed the

More information

Pack Contents: Fittings: 2 Backbar. Code: Product: INS600 Revision 3 30/11/10 Harrod UK Limited FBL-079/084/207/210/215/600

Pack Contents: Fittings: 2 Backbar. Code: Product: INS600 Revision 3 30/11/10 Harrod UK Limited FBL-079/084/207/210/215/600 Code: Product: FBL-079/084/207/210/215/00 3G Aluminium Football Goalposts Pack Contents: Identify the product that you have purchased and refer to the correct pack contents shown below. The fittings pack

More information

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071 Reliance Industries, LLC Operating instructions for the 3071-1 / 3071-2 Bolt-on D-Ring Anchorage Model # 3071 Reliance Industries, LLC PO Box 140008 Denver, CO 80214 Ph. (800) 488-5751 Ph. (303) 424-8650

More information

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment.

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment. Page 1 of 7 REFERENCES Personal Protective Equipment Standards 1.31 PURPOSE This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall

More information

Per foot Prices. Chain Link. Iron Fence BUDGET FENCE COMPANY. us: (702) Gates (702) ' tall 8' tall. Automatic Gate Openers

Per foot Prices. Chain Link. Iron Fence BUDGET FENCE COMPANY.  us: (702) Gates (702) ' tall 8' tall. Automatic Gate Openers BUDGET FENCE COMPANY Email us: Per foot Prices Chain Link from $6.00 per lin. ft. from $9.00 per lin. ft. ( includes wire, top rail, line posts, ties & loop caps) Materials Only Iron Fence from $20.00

More information

Final Assembly Instructions Bikes with Threaded Headsets

Final Assembly Instructions Bikes with Threaded Headsets Final Assembly Instructions Bikes with Threaded Headsets Thank you for buying your new bicycle from L.L.Bean. Read these instructions carefully before beginning the final assembly. Prior to shipping, our

More information

Intertrack Fencing Construction and Maintenance

Intertrack Fencing Construction and Maintenance Panel Discussion On Intertrack Fencing Construction and Maintenance Tuesday, September 22, 2009 Passenger & Transit Session 9:30AM to 10:00AM. Facilitators: D. Grigg, C.E.T., PMP Hatch Mott MacDonald J.

More information

SafetyRail. Product & Compliance Guide. ADA-Compliant Pedestrian Barricade

SafetyRail. Product & Compliance Guide. ADA-Compliant Pedestrian Barricade Product & Compliance Guide ADA-Compliant Pedestrian Barricade SafetyRail SafetyRail is an NCHRP-350 certified, MUTCD and ADA-compliant, temporary traffic control device that provides continuous, obstacle-free

More information

Fall Protection Program

Fall Protection Program Page 1 of 13 Sect: 1.0 Purpose The purpose of the fall protection program is to: o Ensure all work areas are free from uncontrolled fall hazards. o Ensure all employees are properly trained in fall prevention

More information

Safe Work Method Statement

Safe Work Method Statement Company Name: Safe Work Method Statement Site Address: Other Details: Contractor: Activity/Trade: Electrician Date: TASKS List the tasks required to perform the activity in sequence carried out. Entry

More information