S & M Water Consultants

Size: px
Start display at page:

Download "S & M Water Consultants"

Transcription

1 S & M Water Consultants Test Procedures In This Manual TEST Reduced Pressure Assembly One Hose Method PAGE 1 Double Check Assembly One Hose Method 5 Pressure Vacuum Breaker One Hose Method 7 Spill Proof Vacuum Breaker One Hose Method 9 Reduced Pressure Assembly Five Valve Method 11 Double Check Assembly Five Valve Method 13 Pressure Vacuum Breaker Five Valve Method 15

2 PROCEDURES THAT ARE REQUIRED BEFORE ANY TEST IS PREFORMED IMPORTANT ALL TEST SHALL BE PREFORMED WITH THE GAUGE AT THE CRITICAL LEVEL OF THE CHECK and THE UNIT IN A STATIC FLOW CONDITION 1. Notify the property owner or representative that the water will be off for a short time. 2. If the device is on a fire sprinkler system, other agencies will need to be notified. 3. A check for alarm systems must be made. 4. USE CAUTION when disarming any alarm. 5. Notify appropriate agencies. 6. Ask about any water cooled equipment that could be damaged by water shut off. 7. Locate the device. 8. Inspect the device for damage and insure it has operable valves and test cocks. 9. Check serial No. To verify the correct device is being tested. 10. Determine the direction of flow. 11. Locate test cock No. 2. (Device failure is common if the hoses are not attached correctly). NOTE: 1. Some field test procedures require that shut off valve No. 1 be closed. This procedure may introduce debris, such as rust or tuberculin, into the valve that will impact against check valve No 1 or check valve No. 2 and compromise the sealing quality. This potential problem should be considered prior to selection of a test method. 2. To test the check valve when the shut off valve No, 1 is leaking, a tee or other method must be used to flow water from test cock No. 2 and compensate for the leaking valve. A accurate differential pressure cannot be determined with a large leak through shut off valve No. 1, because a flow of water through the tee or other method will create a false indication on the gauge.

3 Reduced pressure assembly 1 HOSE FIELD TEST PROCEDURE Prepare the assembly to attach the gauge: Install adapters and flush test cocks. Install a three way valve at test cock 2 and adapters in test cocks 1,2, 3, and 4. A second three way valve may be used at test cock 3 to Compensate for a leaking shutoff valve. Open test cock 4, then open and close test cocks 1, 2, and 3. Close test cock 4. Purpose: Water flowing through check valve 1 increases the differentia Pressure and reduces the risk of prematurely opening the relief valve while flushing test cock 1and 2. Typical Reduced Pressure Assembly with gauge 1

4 Check #2 in direction of flow test Check 2 Direction of flow Criteria: Gauge value must be 1.0 psid or greater. 1.Remove low pressure and bypass hoses from gauge and maintain gauge at assembly center line. 2.Attach the high pressure hose to test cock 3. 3.Open gauge high bleed, then slowly open test cock 3 and close high bleed. 4.Close shut off valve 2, then shut off valve 1. 5.Slowly open test cock 4. 6.When water stops flowing from test cock 4, record the gauge reading. * If water continues to flow, it may be a leak at shut off valve 2 with back pressure or shut off valve #1. Close test cock 4 and observe the gauge for movement. If needle increases, shut off valve #1 may be leaking. Re open test cock #4. Open Test Cock #2, very slowly, and flow water until the water stops flowing at test cock #4, or the needle holds steady, record this reading. If water continues to flow from Test Cock #4, Shut off valve #2 is leaking with back pressure. If needle holds steady the reading will be accurate. Close all test cocks and remove the high pressure hose. Check 1 Direction of flow Criteria: Gauge value must be 5.0 psid or greater. 1.Install 1/4 inch three way valve at test cock 2 and open test cock 2. 2.Attach 14 inch hose from test cock 1 to test cock 2. 3.Slowly open test cock 1 and 2. 4.Re pressurize assembly Shut off valves 1 and 2 remain closed. 5.Attach gauge high pressure hose to three way valve at test cock 2. 6.Open gauge high bleed valve and three way valve at test cock 2. 2

5 7, Close high bleed valve. 8. Close test cock Slowly open test cock 3. When water stops flowing from test cock 3, record the gauge reading. If water continues to flow through the test cock #3, Shut off valve #1 is leaking. Remove the hose between test cocks 1 and 2 and open the three way valve slightly until water stops flowing at test cock 3. Record this reading. If not using 3 way valve, open High Gauge Valve and very slowly open Gauge By Pass valve to flow water until water stops flowing at Test Cock #3. Relief valve opening test Relief valve Opening Criteria: Vent must open before differential gauge reads 2.0 psid. 1. Observe gauge and slowly open the high bleed valve. 2. Record gauge reading when first drops are felt. 3. Continue opening high bleed valve to verify that the relief valve is fully open. Re pressurize assembly 1. Re pressurize the assembly using supply pressure from test cock 1 through the 3 way valve at test cock Remove trapped air from downstream test cocks. 3. Close all test cocks and remove fittings. 4. Remove gauge. 5. Open shut off valve 1 and then restore the customer to service. 3

6 4

7 Double Check Valve Assembly 1 HOSE FIELD TEST PROCEDURE Prepare the assembly to attach the gauge: Install adapters and Flush test cocks. Install a three way valve at test cock 2 and adapters In test cocks 1, 2, 3, and 4. A second three way valve may be used at test cock 3 to compensate for a leaking shutoff valve No. 1. Once the adapters are installed, flush the test cocks by opening Test cock 4, then open and close test cocks 1, 2, and 3. Close test cock 4. CHECK 2 DIRECTION OF FLOW Criteria: Gauge value must be 1.0 psid or greater. 1. Remove low pressure and bypass hoses from gauge and maintain gauge at assembly center line. 2. Attach high pressure hose to test cock Open gauge high bleed, then slowly open test cock 3 and close high bleed. 4. Close shut off valve 2, then shut off valve Slowly open test cock When water stops flowing from test cock 4, record the gauge reading. * If water continues to flow, it may be a leak at shut off valve 2 with back pressure or shut off valve #1 7. Close test cock 4 and observe the gauge for movement. If needle increases, shut off valve #1 may be leaking. Re open test cock #4. Open Test Cock #2, and flow water until the water stops flowing at test cock #4, record this reading. If water continues to flow from Test Cock #4, Shut off valve #2 is leaking with back pressure. If needle holds steady the reading will be accurate. Record this reading. 5

8 7. Close test cock 4 and observe the gauge for movement. If needle increases, shut off valve #1 may be leaking. Re open test cock #4. Open Test Cock #2, and flow water until the water stops flowing at test cock #4, record this reading. If water continues to flow from Test Cock #4, Shut off valve #2 is leaking with back pressure. If needle holds steady the reading will be accurate. 8. Close all test cocks and remove the high pressure hose. Check 1 Direction of flow Criteria: Gauge value must be 1.0 psid or greater. 1. Install 1/4 inch three way valve at test cock 2 and open test cock 2. Attached 1/4 inch hose from test cock 1 to test cock Slowly open test cock 1 and Re pressurize assembly Shut off valves 1 and 2 remain closed. 5. Attach gauge high pressure hose to three way valve at test cock Open gauge high bleed valve and three way valve at test cock Close high bleed valve. 8. Close test cock Slowly open test cock 3. When water stops flowing from test cock 3, record the gauge reading. If water continues to flow through the test cock #3, Shut off valve # 1 is leaking. remove the hose between test cocks 1 and 2, and open the three way valve slightly until water stops flowing at test cock 3. Record this reading. If not using 3 way valve, open High Gauge Valve and very slowly open Gauge By Pass valve to flow water until water stops flowing at Test Cock #3. Re pressurize assembly Re pressurize the assembly using supply pressure from test cock 1 through the three way valve at test cock 2. Remove trapped air from downstream test cocks. Close all test cocks and remove fittings, Remove gauge. Open shut off valve 1 and then restore the customer to service. (If shut off 2 was closed on arrival, the valve will remain closed.) 6

9 PRESSURE VACUUM BREAKER 1 HOSE FIELD TEST PROCEDURE 1. Inspect assembly for correct components. 2. Remove canopy and clean any debris around air inlet. 3. Flush test cocks, install 3 way valve at test cock 1 with adapters and re flush test cocks. 4. Remove low and bypass hose from gauge. 5. Close shut off valve number Open high bleed on differential gauge. Air inlet / vent test. Criteria: Determine if the inlet valve opens to atmosphere before the valves internal pressure reaches 1.0 psi. 1. Attach high pressure hose to test cock 2 and slowly open the test cock. 2. Close gauge high bleed when air is purged. 3. Close shut off valve number 1. Important: Observe that the gauge is stationary. If the gauge differential begins to drop before the high bleed is opened, there is a leak in the system, such as shut off valve 2 or a gauge valve is open. 4. Place a finger on top of the air inlet valve. With the gauge centerline at the same elevation as the assembly body, slowly open the high bleed valve. Note: If the gauge differential pressure does not begin to drop with a slight valve opening, and it is necessary to continue opening the high bleed valve, supply pressure may be leaking past a bad shut off valve 1. Open 3 way valve to compensate for #1 shut off leak. Or Open High Gauge valve fully and slowly open the By Pass valve until water stops flowing at test cock #2 5. Observe and record the gauge reading at the inlet opening. 7

10 Note: Do not watch valve for opening and then attempt to read the gauge. 6. Close test cock 2 and remove the hose. 7. Open shut off valve 1. Check valve test. Criteria: Determine if the check valve maintains 1.0 psi. 1. Open high bleed on differential gauge. 2. Attach high pressure hose to test cock 1 and slowly open test cock. 3. Close gauge high bleed when air is purged and top of air inlet is filled with water. 4. Close shut off valve number With the gauge centerline at the same elevation as the assembly body, slowly open test cock 2 6. Observe and record the gauge reading when water stops flowing from the test cock. Note: lf water continues to flow from test cock 2, it may be a leak from shut off valve 1 or 2. lt may be necessary to compensate for a leaking shut off valve 1 at test cock #1. Open 3 way valve to compensate for #1 shut off leak. Or Open High Gauge valve fully and slowly open the By Pass valve until water stops flowing at test cock #2 7. Close test cock 1. Evaluate for backpressure. Criteria: If backpressure is present, it is wrong for the application and the assembly fails. 1. Open shut off valve 2.* Note: If water continues to flow from test cock 2, there is a downstream source of pressure. If the downstream system is large, this test may take a minute or two. 2. Close test cock Close shut off valve 2, open shut off valve 1 and return the assembly to service. 8

11 Spill Proof Vacuum Breaker 1 HOSE FIELD TEST PROCEDURE 1. Inspect assembly for correct components. 2. Remove canopy and clean any debris around the air inlet. 3. Flush test cock(s), install 3 way valve at test cock (1) with adapters and re flush test cock(s). 4. Remove low and bypass hose from gauge. 5. Close shut off valve number Open high bleed on differential gauge Check valve test. Criteria: Determine if the check valve maintains 1.0 psi. 1. Attach high pressure hose to test cock 1 and slowly open test cock. 2. Close gauge high bleed when air is purged and top of air inlet is filled with water. 3. Close shut off valve number * important: Observe that gauge is stationary. If the gauge differential begins to drop, there is a leak in the system, such as shut off valve 2 or a gauge valve is open. VERY SLOWLY loosen the vent screw on assembly and remove screw. Note: No water will come from vent hole. Observe and record the gauge reading for the check valve. 9

12 Air inlet opening Criteria: Determine that the inlet opens with a minimum of 1.0 psid. 1. VERY SLOWLY one drip at a time open the high pressure bleed valve and watch the differential gauge and standing water at the air inlet (bonnet). When the water starts to ripple, a drop may discharge from the vent. 2. Record the gauge reading with the drip from the vent screw hole as the inlet opening point. This value must be 1.0 psid or greater. 3. Close test cock (1), remove hose and install canopy cover. Evaluate for backpressure. Criteria: lf backpressure is present, it is wrong for the application AND the assembly fails. 1. Open shut off valve 2. Note: lf water continues to flow from test cock 2, there is a downstream source of pressure. lf the downstream system is large, this test may take a minute or two Close test cock Close shut off valve 2, open shut off valve 1 and return the assembly to service. 10

13 Five Valve Test on an ASSE 1013 Reduced Pressure Valve Assembly Field Testing Requirements Flush Test Cocks (TC) Install test adapters (if applicable 1 Open TC #4 let trickle 2 Open TC #1 Close 3 Open TC #2 Close 4 Open TC #'3 Close 5 Close TC #4 Attach Test Kit 1 Close Hi, Lo and Bypass valves and Hi and Lo bleed valves on test kit 2 Attach Hi hose to TC #2 3 Attach Lo hose to TC #3 4 Open TC #3 5 Open TC #2 6 Open Lo bleed valve bleed air 7 Open Hi bleed valve bleed air close 8 Close Lo bleed valve 9 Attach bypass hose to TC #4 10 Open Hi valve 11 Open bypass valve 12 Loosen bypass hose at TC #4 bleed air tighten 13 Slowly open low bleed valve to cause differential reading to icrease Close low bleed valve.. Test #1 #2 Check w/back Pressure Test 1 Close #2 shut off valve 2 Open TC #4 If the differential gage remains steady, record #2 check valve as tight. Test #2 Tightness of the #2 Shut Off Valve 3 Close TC #2 If the differential gage reading remains steady, record #2 shut off valve as tight 11

14 Test #3 #1 Check Differential 1 Close TC #4 2 Close bypass valve 3 Remove bypass from TC #4 4 Open TC #2 5 Open Lo Bleed valve to cause differential gauge reading to increase 6 Close Lo Bleed valve Test Results Record the actual pressure differential across #1 check valve. If the differential reading is 5 psid or above, record #1 check valve as tight Test #4 Relief valve opening 1 Slowly open Lo valve Test Results Record relief valve psid opening point. The relief valve must drip when the differential gage is 2 psid or above for the RP and 1 psid or above for the RPF. Test #5 Tightness of #2 Check Valve (Spring tension} 1 Close TC #2 and TC #3 2 Remove Lo hoses and Attach Lo hose to TC #4 3 Remove Hi hose and Attach Hi hose to TC #3 4 Open TC #4 5 Open TC #3 6 Open Lo bleed valve 7 Open Hi bleed valve bleed air close 8 Close Lo bleed valve Test Results If differential reading holds steady at 1 psid or higher for the DC and.5 psid or higher for the DCF, record #2 check valve as tight. Restore System 1 Close all TC's 2 Remove hoses 3 Open all valves on test kit to drain water 4 Restore #2 shutoff valve to pre test state The tester shall provide copies of the test results to the owner and other appropriate parties as required. The tester shall maintain a copy for his/her records. 12

15 Five Valve Test for an ASSE 1015 Double Check Assembly Field Testing Requirements Flush Test Cocks (TC) Step #1 Install test adapters (if applicable) Step #2 Open TC 4 let trickle Step #3 Open TC #1 Close Step #4 Open TC #2 Close Step #5 Open TC #3 Close Step #6 Close TC #4 Attach Test Kit Step #1 Close Hi, Lo and Bypass valves and Hi and Lo bleed valves on test kit Step #2 Attach Hi hose to TC #2 Step #3 Attach Lo hose to TC #3 Step #4 Open TC #3 Step #5 Open TC #2 Step #6 Open Lo bleed valve bleed air Step #7 Open Hi bleed valve bleed air close Step #8 Close Lo bleed valve Step #9 Attach bypass hose to TC #4 Step #10 Open Hi valve Step #11 Open bypass valve Step #12 Loosen bypass hose at TC #4 bleed air tighten Step #13 Slowly open low bleed valve to cause differential reading to increase Close. Test #1 #2 Check w/back Pressure Test Step #1 Close #2 shut off valve Step #2 Open TC #4 If the differential gage remains steady, record #2 check valve as tight. 13

16 Test #2 Tightness of the #2 Shut Off Valve Step #3 Close TC #2 If the differential gage reading remains steady, record #2 shut off valve as tight Test #3 Tightness of # 1 Check Valve Step #1 Close TC #4 Step #2 Close Bypass valve Step #3 Remove bypass hose from TC #4 Step #4 Open TC #2 Step #5 Slowly open low bleed valve to cause differential reading to rise close Test Results If differential reading holds steady at 1 psid or higher for the DC and.5 psid or higher for the DCF, record #1check valve as tight. Test #4 Tightness of #2 Check Valve (spring tension) Step #1 Close TC #2 and TC #3 Step #2 Remove Lo hoses and Attach Lo hose to TC #4 Step #3 Remove Hi hose and Attach Hi hose to TC #3 Step #4 Open TC #4 Step #5 Open TC #3 Step #6 Open Lo bleed valve Step #7 Open Hi bleed valve bleed air close Step #8 Close Lo bleed valve Test Results If differential reading holds steady at 1 psid or higher for the DC and.5 psid or higher for the DCF, record #2 check valve as tight. 14

17 5 Five Valve Test on an ASSE 1020 Pressure Vacuum Breaker Field Testing Requirements Flush Test Cocks (TC) Step #1 Install test adapters (if applicable) Step #2 Open TC # 1 Close Step #3 Open TC #2 Close Attach Test Kit Step #1 Close Hi, Lo and Bypass valves and Hi and Lo Bleed valves on test kit Step #2 Attach Hi to TC #'1 Step #3 Attach Lo hose to TC #2 Step #4 Open TC #1 Step #5 Open Hi bleed valve bleed air close Step #6 Open TC #2 Step #7 Open Lo bleed valve bleed air close Test #1 Tightness of #2 Shut off Valve Step #1 Close #2 shutoff valve Step #2 Open Hi valve Step #3 Open Lo valve (differential will read zero) Step #4 Close Hi valve Step #5 Close Lo valve Step #6 Close Test Cock #1 Test Results If differential gage reading does not rise above zero (0), record #2 shutoff as tight. Test #2 Tightness of Check Valve Step #1 Open #1 Test Cock Step #2 Open Lo bleed valve close Test Results If differential gage reading holds steady at 1 psid or higher, record check valve as tight 15

18 Test #3 Air Inlet Opening Step #1 Close TC #1 and TC #2 Step #2 Remove hoses from TC # 1 and TC #2 Step #3 Attach Hi hose to TC #2 Step #4 Remove air inlet canopy/hood Step #5 Open TC #2 Step #6 Open Hi bleed valve bleed air close Step #7 Close #1 shut off valve Step #8 Center differential gage at TC #2 Step #9 Open Hi bleed valve and record the dif ferential gage reading when the air inlet canopy/hood opens Test Results If air inlet is visibly open, when differential reading is 1 psid or higher, record valve as passed. Replace Air Inlet Canopy/Hood Restore System Step #1 Close TC #2 Step #2 Remove Hi hose Step #3 Open all valves on test kit to drain water Step #4 Open #2 shut off valve Step #5 Open # 1 shut off valve The tester shall provide copies of the test results to the owner and other appropriate parties as required. The tester shall maintain a copy for his/her records. 16

Testing Procedures & Trouble Shooting Guide Reduced Pressure Zone Assembly (1/2, 3/4", 1, 1 1/4, 1 1/2" & 2 )

Testing Procedures & Trouble Shooting Guide Reduced Pressure Zone Assembly (1/2, 3/4, 1, 1 1/4, 1 1/2 & 2 ) Testing Procedures & Trouble Shooting Guide Reduced Pressure Zone Assembly (1/2, 3/4", 1, 1 1/4, 1 1/2" & 2 ) First Check Valve Test 1) Bleed all test cocks. First open test cock 4, make sure it is slightly

More information

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL INSTALLATION, OPERATION, AND MAINTENANCE MANUAL I-867-4T 867-4T Pressure Reducing Valve HANG THESE INSTRUCTIONS ON THE INSTALLED VALVE FOR FUTURE REFERENCE WARNING Read and understand all instructions

More information

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2-12 BERMAD. Application Engineering Bermad Pressure Reducing Valve Model: 720-UL INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working with and around our equipment

More information

553 Series.

553 Series. 38467.03 www.caleffi.com Pre-adjustable filling units Copyright 01 Caleffi 3 Series Function The automatic filling valve is a device consisting of a pressure reducing valve with compensating seat, visual

More information

Bermad Pressure Reducing. Model: 42T

Bermad Pressure Reducing. Model: 42T Bermad Pressure Reducing Pilot Operated Pressure Control Valve Model: 42T Installation Operation Maintenance Manual (IOM) REV. 27.7.17 Page 1 of 12 Safety First BERMAD believes that the safety of personnel

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

WW-730. Pressure Sustaining/Relief Control Valve

WW-730. Pressure Sustaining/Relief Control Valve WW-730 Pressure Sustaining/Relief Control Valve Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 730 Pressure Relief / Sustaining Valve is an automatic control valve designed to

More information

MANUAL BE SERIES Test Benches

MANUAL BE SERIES Test Benches The CustomCrimp Manual BE Series Test Benches are designed with features that make proof and burst testing of hydraulic hose assemblies a quick and easy procedure. CUSTOMIZED AND SPECIAL DESIGN BENCHES

More information

Model: 43T. Bermad Pressure Relief Valve

Model: 43T. Bermad Pressure Relief Valve Model: 43T Bermad Pressure Relief Valve Installation Operation Maintenance Manual () Rev.C1_01.08.17 Page 1 of 10 Safety First BERMAD believes that the safety of personnel working with and around our equipment

More information

SINGER MODEL 106/206-RPS-L&H

SINGER MODEL 106/206-RPS-L&H DESCRIPTION: Model 106/206-RPS-L&H dissipates surges caused by power failure to pumps. The valve anticipates the surge by opening on low line pressure associated with sudden stopping of pumps. This assures

More information

Pressure Reducing Control Valve w/ Hydraulic Check Feature

Pressure Reducing Control Valve w/ Hydraulic Check Feature PERTIN INSTRUTINS peration The BEE Model PR- Pressure Reducing ontrol alve with Hydraulic heck eature is a pilot controlled diaphragm valve designed to reduce a fluctuating higher upstream pressure to

More information

D05 Pressure Regulating Valves

D05 Pressure Regulating Valves D05 Pressure Regulating Valves FEATURES PRODUCT DATA Noncorroding unitized cartridge contains all working parts and is easily replaceable. Includes built-in strainer and thermal bypass. Balanced seat construction

More information

Summary of Substantive Changes between the 2004 e1 and 2017 editions of ASSE 1011, Hose Connection Vacuum Breakers

Summary of Substantive Changes between the 2004 e1 and 2017 editions of ASSE 1011, Hose Connection Vacuum Breakers Summary of Substantive Changes between the 2004 e1 and 2017 editions of ASSE 1011, Hose Connection Vacuum Breakers Presented to the IAPMO Standards Review Committee on October 15, 2018 General: The changes

More information

While testing the double check can I move the bleed valve arrangement from the test cock to the gage when field testing the double check?

While testing the double check can I move the bleed valve arrangement from the test cock to the gage when field testing the double check? S p r i n g 1 9 9 8 Questions and Answers about Field Testing Backflow Prevention assembly testers often call the Foundation office with questions regarding some particular field test procedure. Many questions

More information

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide 1. Accumulators Problem Accumulator is overflowing If Accumulator continues to overflow Correction 1. Push and hold the manual activation button

More information

TECHNICAL DATA. than the water inlet pressure to the concentrate

TECHNICAL DATA. than the water inlet pressure to the concentrate Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler

More information

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve Model CYCLE GARD II, CI & CNA YOUR PRODUCT INFORMATION: Model Number: Date: Serial Number:

More information

Warning: NEVER ALTER TEST EQUIPMENT

Warning: NEVER ALTER TEST EQUIPMENT PAGE 1 OF 6 General: Pressure Testing Shop Built Tanks Pressure testing tanks with either positive pressure or vacuum can be a very dangerous exercise. It is important to understand the equipment involved

More information

D05T Compact Design Pressure Regulating Valves

D05T Compact Design Pressure Regulating Valves D05T Compact Design Pressure Regulating Valves FEATURES PRODUCT DATA Non-corroding unitized cartridge contains all working parts and is easily replaceable. Includes built-in strainer and thermal bypass.

More information

Backflow What is it? City Water. Boiler. Make-Up Water Line

Backflow What is it? City Water. Boiler. Make-Up Water Line Backflow What is it? Backflow? You may have heard of it, and you may understand some of what it involves. This booklet will help you to understand it better; exactly what it is, and how to prevent it.

More information

WW-720. Pressure Reducing Control Valve

WW-720. Pressure Reducing Control Valve WW-720 Pressure Reducing Control Valve (Size Ranges: 2-4 and 6-14 ) Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 720 Pressure Reducing is an automatic control valve (powered

More information

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically

More information

WW-720. Pressure Reducing Control Valve

WW-720. Pressure Reducing Control Valve WW-720 Pressure Reducing Control Valve (Size Ranges: 2-4 and 6-14 ) Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 720 Pressure Reducing is an automatic control valve (powered

More information

Pressure Reducing Valve for Steam Type 2333 A

Pressure Reducing Valve for Steam Type 2333 A Pressure Reducing Valve for Steam Type 2333 A Fig. 1 Type 2333 A 1. Design and principle of operation The pressure reducing valve consists of a balanced control valve and a closing actuator equipped with

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow Model: FP 450-80 Installation Operation Maintenance PAGE 1 OF 5 1. Safety First BERMAD believes that the safety of personnel

More information

INSTALLATION OPERATION MAINTENANCE

INSTALLATION OPERATION MAINTENANCE Bermad Electrically Controlled On-Off Deluge Valve Model: 400E-3D INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working

More information

KJ4000 Operating Instructions & Parts Manual NSN

KJ4000 Operating Instructions & Parts Manual NSN KJ4000 Operating Instructions & Parts Manual NSN 1025-01-473-7710 Mandus Group Ltd. KJ4000 Operators Manual Date: 3 Jan. 2002 TABLE OF CONTENTS General Safety Instructions...Page 1 Operator Instructions...Page

More information

Anti-flood device Model B-1

Anti-flood device Model B-1 December 4, 2009 Dry Systems 123a 1. DESCRIPTION The Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET

More information

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series Introduction Powerex manifolds are cleaned, tested and prepared for the indicated gas service and are built in accordance with the Compressed Gas Association guidelines. The manifold consists of a regulator

More information

AWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use.

AWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use. AWG Fittings LLC Pressure Relief Valve Up to 250 PSI Product Number 30004033 Read this instruction manual before use. Using this device without t understanding di this products operation and care may lead

More information

OPERATING AND MAINTENANCE MANUAL

OPERATING AND MAINTENANCE MANUAL Series 4300 Engineered Performance TABLE OF CONTENTS 0 INTRODUCTION 1 1 Scope 1 2 Description 1 3 Specifications 1 0 INSTALLATION 1 1 Mounting 1 2 Piping 1 1 Connecting Process Pressure 2 2 Vent Connections

More information

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS Items needed for demonstrations: Fire extinguisher PPE (Personal Protective Equipment): o Lab coats/welding jackets o Leather gloves

More information

Operation Manual. Diaphragm Sensed Gas Pressure Regulators

Operation Manual. Diaphragm Sensed Gas Pressure Regulators 687 Technology Way Napa, CA 94558 Phone: (707) 259-0102 FAX: (707) 259-0117 www.aptech-online.com Diaphragm Sensed Gas (AP/AZ/AK Models: 20, 100, 500, 1000, 1000T 10PA, 1100, 1200, 12PA, 1300, 1400T, 14PA,

More information

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION Page 1 of 6 1. DESCRIPTION The Model B-1 Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET condition,

More information

DS06D,G Dial Set Pressure Regulating Valve

DS06D,G Dial Set Pressure Regulating Valve DS06D,G Dial Set Pressure Regulating Valve PRODUCT DATA FEATURES APPLICATION Built-in, factory-calibrated outlet pressure adjustment dial. Noncorroding unitized cartridge contains all working parts and

More information

Model 106 DPI "Micro-switch" Installation and Operating Instructions

Model 106 DPI Micro-switch Installation and Operating Instructions Mid-West Instrument Model 106 DPI "Micro-switch" Installation and Operating Instructions BULLETIN NO. IM116DPImicro/09A Replaces --- INSPECTION Before installation carefully check the Model Number on each

More information

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS WIDDER TOOLS HPIC-10000-D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS Description: The WIDDER Hydrostatic Test Systems C Series is a portable, selfcontained, air driven hydrostatic

More information

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections VALVCHEQ Backflow Preventers Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections Features General application The RP03 provides protection from both

More information

TECHNICAL DATA CAUTION

TECHNICAL DATA CAUTION Page 1 of 6 1. DESCRIPTION The Viking Model D-2 Accelerator is a quick-opening device, with an integral anti-flood assembly, used to increase the operating speed of a differential type dry pipe valve.

More information

Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections

Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections Features General application The RP03 provides protection from both backsiphonage and backpressure

More information

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1 November 30, 1994 534 a 1. PRODUCT NAME VIKING 2" (50mm), 3" (75mm), 4" (100mm), 6" (150mm) 2. MANUFACTURER THE VIKING CORPORATION 210 N. Industrial Park Road Hastings, Michigan 49058 U.S.A. Telephone:

More information

Product Information News

Product Information News Product Information News MMR SECOND STAGE REGULATOR VALVE CORE MSA has changed its recommended rebuilding of the MMR Second Stage Regulator s bypass sleeve assembly during the annual inspection. Based

More information

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device. 2/05 GENERAL

More information

2.0 INSTALLATION & SERVICE

2.0 INSTALLATION & SERVICE Installation, Operation, and Maintenance Instructions MODEL 5600 / 5600R January 2005 CONTENTS 1.0 GENERAL 1.1 5600 Model Number Information -----------------------------------------------------------------------

More information

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax: 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use

More information

STATE OF CONNECTICUT CROSS CONNECTION CONTROL MANUAL

STATE OF CONNECTICUT CROSS CONNECTION CONTROL MANUAL STATE OF CONNECTICUT CROSS CONNECTION CONTROL MANUAL Prepared by: The State of Connecticut Department of Public Health Drinking Water Division 410 Capitol Avenue, MS #51 WAT P.O. Box 340308 Hartford, Connecticut

More information

Series 867. Reduced Pressure Zone Assemblies " 3" (65 80mm)** INDEX. Testing INSTALLATION INSTRUCTIONS WARNING NOTICE NOTICE !

Series 867. Reduced Pressure Zone Assemblies  3 (65 80mm)** INDEX. Testing INSTALLATION INSTRUCTIONS WARNING NOTICE NOTICE ! INSTALLATION INSTRUCTIONS RP/IS-F-867 Series 867 Reduced Pressure Zone Assemblies 2 1 2" 3" (65 80mm)** INDEX 867-NRS Installation Guidelines 2-3 Service, Repair and Maintenance 4-5 Test Procedure for

More information

Model 420-HY Pressure Regulating Hydrant Valve

Model 420-HY Pressure Regulating Hydrant Valve Model 420-HY Pressure Regulating Hydrant Valve INSTALLATION OPERATION MAINTENANCE 1. Safety First BERMAD believes that the safety of personnel working with and around our equipment is the most important

More information

!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7

!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7 EXEL North America, Inc. EXEL Industrial Canada, Inc. 1310 Washington St 931 Progress Ave., #7 West Chicago, IL 60185 Scarborough ONT, M1G 3V5 Ph : (800) 573 5554 Ph : (800) 450 0655 Fx : (800) 664 1511

More information

End Connection. Thread x Thread N/A N/A N/A N/A Flange x Flange N/A

End Connection. Thread x Thread N/A N/A N/A N/A Flange x Flange N/A Worldwide Contacts www.tyco-fire.com Model RV-1 Pressure Relief Valve, Pilot-Operated, Globe and Angle Body Styles General Description Valves, through inch (DN50 through DN00), are factory assembled and

More information

DBML-60/80 Squeeze Tool

DBML-60/80 Squeeze Tool DBML-60/80 Squeeze Tool OPERATORS MANUAL Description The Mustang Model DBML-60/80 Hydraulic squeeze tool has been manufactured since 1995. A Mustang 3 3/4 bore doubleacting cylinder producing 41,000 lbs

More information

MMR Air Mask With. with Quick-Connect Hose

MMR Air Mask With. with Quick-Connect Hose MMR Air Mask With with Quick-Connect Hose Upgrade Kits P/N 10025120 Slide to Connect P/N 10050038 Slide to Connect w/ Solid Cover P/N 10038666 Push To Connect P/N 10050037 Push To Connect w/ Solid Cover

More information

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03 Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections FEATURES GENERAL APPLICATION The RP03 provides protection from both backsiphonage and backpressure

More information

Hot Compressed Air Lance Operation Manual. LAB Manufacturing 9483 Reading Road Cincinnati, OH (800)

Hot Compressed Air Lance Operation Manual.  LAB Manufacturing 9483 Reading Road Cincinnati, OH (800) Hot Compressed Air Lance Operation Manual www.heatlances.com LAB Manufacturing 9483 Reading Road Cincinnati, OH 45215 (800) 776-5830 PARTS CHECK LIST NOTE: Check all fittings & connections prior to operation.

More information

Smart Water Application Technologies (SWAT) TM

Smart Water Application Technologies (SWAT) TM Smart Water Application Technologies (SWAT) TM Equipment Functionality Test Protocol Version 2.3 June 2014 SWAT Committee 8280 Willow Oaks Corporate Drive Suite 400 Fairfax, VA 22031 www.irrigation.org

More information

Installation and operation Manual. Bermad Surge Anticipation Valve. Model No 435

Installation and operation Manual. Bermad Surge Anticipation Valve. Model No 435 Instruction manual Bermad surge anticipation manual Model No 435 Installation and operation Manual Bermad Surge Anticipation Valve Model No 435 Bermad Water Technologies Rev 0 5/05/2015 7 Inglewood Drive,

More information

MEGR-1627 Instruction Manual

MEGR-1627 Instruction Manual MEGR-1627 HIGH FLOW GAS REGULATOR Instruction Manual- Look Inside For: Description Installation Remote Vent Line Installations Startup and Adjustment Shutdown Maintenance Body Maintenance Procedures Diaphragm

More information

AIR GAP (AG) Low Hazard High Hazard

AIR GAP (AG) Low Hazard High Hazard AIR GAP (AG) On Low Hazard and High Hazard applications, Air Gap (AG) is used for the physical separation (vertical distance) between the lowest opening point from any pipe or outlet supplying water and

More information

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) THE BP-301 SERIES Operating and Service Manual Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) Issue B October 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation...

More information

Bermad Model:

Bermad Model: Bermad Model: 405-02 Manually Operated Hydraulic Valve INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working with and around

More information

TECHNICAL DATA ACCELERATOR MODEL E-1

TECHNICAL DATA ACCELERATOR MODEL E-1 Page 1 of 10 1. PRODUCT DESCRIPTION The Viking Model E-1 Accelerator is a quick-opening device. When installed with the required external Anti-flood Device, the assembly is designed to increase the operating

More information

Propane Conversion Kit Instruction

Propane Conversion Kit Instruction Propane Conversion Kit Instruction Condensing gas boiler Required Input Rates GB142-24 84,800 btu/hr GB142-30 106,000 btu/hr GB142-45 160,900 btu/hr GB142-60 214,800 btu/hr This kit and instructions are

More information

GREIG FILTERS, INC. OPERATION MANUAL

GREIG FILTERS, INC. OPERATION MANUAL GREIG FILTERS, INC. OPERATION MANUAL MODEL DCFH 3P 15/3 100 S4 DOE/222 DUAL CARTRIDGE FILTER HOUSING TABLE OF CONTENTS I. INTRODUCTION II. CARTRIDGE FILTER HOUSING UNIT A. OPERATION B. INSTALLATION C.

More information

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , & REDQ Regulators Model 411B Barstock Design Powreactor Dome Regulator OPERATION AND MAINTENANCE Contents Scope..............................1 Installation..........................1 General Description....................1

More information

Irrigation System Winterization and Pressurization Procedures

Irrigation System Winterization and Pressurization Procedures Irrigation System Winterization and Pressurization Procedures Introduction Any time that an irrigation system is filled and pressurized, or when the system is drained and water flushed from the system,

More information

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03 Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections FEATURES GENERAL APPLICATION The RP03 provides protection from both backsiphonage and backpressure

More information

Propane Conversion Kit Instruction

Propane Conversion Kit Instruction Propane Conversion Kit Instruction Condensing gas boiler Required Input Rates GB42-24 84,800 btu/hr Tab. GB42-30 06,000 btu/hr GB42-45 49,000 btu/hr GB42-60 24,800 btu/hr This kit and instructions are

More information

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves Tools Required: Flow Meter Pressure gauge Holding valve test block Wrenches for installation of

More information

APPS-160 Gen 2 User Manual

APPS-160 Gen 2 User Manual APPS-160 Gen 2 User Manual Applicable Products: PN 11914406 - APPS-160 10 to 50 PSIG operating pressure PN 11918618 - APPS-160 40 to 85 PSIG operating pressure Rev 9/16/2004 Chart Ind. www-chart-ind.com

More information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1048 - REVISED: 2009 Double Check Detector Fire Protection Backflow Prevention Assemblies Separate, complete laboratory

More information

RS(H)20, 25 USER MANUAL

RS(H)20, 25 USER MANUAL RS(H)20, 25 USER MANUAL Read the complete manual before installing and using the regulator. WARNING Before removing a regulator from the system for service, you must depressurize system purge the system

More information

TECHNICAL DATA. Page 1 of 12

TECHNICAL DATA. Page 1 of 12 Page 1 of 12 1. DESCRIPTION The Viking Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking Model H or J Flow Control

More information

Design DSA Steam-Atomized Desuperheater

Design DSA Steam-Atomized Desuperheater Instruction Manual DSA Desuperheater Design DSA Steam-Atomized Desuperheater Contents Introduction............................... 1 Scope of Manual......................... 1 Description..............................

More information

Pressure Regulators. Operating Instructions. Instrumentation

Pressure Regulators. Operating Instructions. Instrumentation Pressure Regulators Operating Instructions FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THIS PRODUCT CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE. This document and other information from the

More information

Adjustable. Unloader Valve. O&M Manual. Part #

Adjustable. Unloader Valve. O&M Manual. Part # Adjustable Unloader Valve O&M Manual Unloader Valve Part #60-020-361 ADVANCED PRESSURE SYSTEMS 701 S. Persimmon St., Suite 85 - Tomball, TX 77375 Toll Free in North America: (877) 290-4277 Phone: (281)

More information

STREAMLINE SHOP SERIES MODEL 30040V OPERATION & PARTS MANUAL

STREAMLINE SHOP SERIES MODEL 30040V OPERATION & PARTS MANUAL STREAMLINE SHOP SERIES MODEL 30040V OPERATION & PARTS MANUAL Sage Oil Vac 360 North Lakeside Drive Amarillo, TX 79118 phone: 806.372.7559 fax: 806.372.7565 1 2 1.1 WARRANTY SERVICE OR RETURNS Call 1-877-645-8227

More information

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009 April 24, 29 Pressure Regulation 531a 1. DESCRIPTION The Viking Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking

More information

WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE

WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE PACIFIC LIQUID & AIR SYSTEMS WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE IN THE BEGINNING Before installing or operating this system, familiarize yourself with these instructions. You should

More information

HIGH RATE BASKET STRAINER

HIGH RATE BASKET STRAINER Installation and Operation Instruction Manual INSMAN-105 High Rate Basket Strainer Phone: 951.656.6716 Toll-Free: 800.854.4788 www.yardneyfilters.com Yardney Water Management Systems, Inc. 6666 Box Springs

More information

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve. Foam 302 a 1. DESCRIPTION (Refer to Figure 1 on page 302 e.) The Viking Low-Flow Foam/Water Proportioning System is a UL Listed and FM Approved system, for use with 3M and Viking brand foam concentrate.

More information

TECHNICAL DATA CAUTION

TECHNICAL DATA CAUTION Page 1 of 12 1. DESCRIPTION The Viking Model C-2 Pilot Pressure Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking

More information

Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions

Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions WIL-IO-SD-001-10 1 Description The Triple Duty Valve (TDV) / Triple Service Valve (TSV) is a quiet operating heavy-duty

More information

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS READ ALL INSTRUCTIONS PRIOR TO INSTALLATION AND OPERATION TO AVOID POSSIBLE INJURY Warning: Always consider any accumulator to contain pressure until proven

More information

Propane Conversion Kit Instruction

Propane Conversion Kit Instruction Propane Conversion Kit Instruction Condensing gas boiler Required Input Rates Logamax plus GB62-80 kw 270,000 btu/hr Logamax plus GB62-00 kw 35,000 btu/hr This kit and instructions are for converting the

More information

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation.

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation. Quality Products at Competitive Prices Gas Check Automatic testing of the down-stream installation to check that all valves are closed and that pipework and fittings are gas tight before each system start-up.

More information

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual 10-12 Steel Pipe Squeezer Sch. 40 & Sch. 80 Operations Manual 1.0 Introduction This manual is issued as a basic operation manual covering the Regent Model 7989T, Pipe Squeezer and Pump as manufactured

More information

Hydrostatic Pressure Testing

Hydrostatic Pressure Testing General An experienced or qualified person will be put in charge of hydro and should meet with the supervisor in charge of the job prior to test. Customer expectations should be clarified prior to beginning

More information

Model 1800 PFM Series Regulator For Constant Outlet Pressure Precise Fixed Factor Measurement From 0.5 to 30 PSIG

Model 1800 PFM Series Regulator For Constant Outlet Pressure Precise Fixed Factor Measurement From 0.5 to 30 PSIG A C E D SB 8551.3 Model 1800 PFM Series Regulator For Constant Precise Fixed Factor Measurement From 0.5 to 30 G AMC Quality System QMI is Accredited by: C R E D I T ISO 900 Registered R E ANSI RAB G I

More information

SERVICE MANUAL MODEL BA200AMST-S1 BREATHING AIR PANEL

SERVICE MANUAL MODEL BA200AMST-S1 BREATHING AIR PANEL 1 SERVICE MANUAL MODEL BA200AMST-S1 BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device. 2 GENERAL

More information

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING In SANS 10105 you will find the Minimum water pressure for both the hydrant and the hose reel. Which is 300KPA Manufacturing Standard SANS 543 1 Front & Back plates 2 Curved Plate 3 Waterway assembly 4

More information

Thank You for Attending Today s Webinar. Today s Featured Speaker

Thank You for Attending Today s Webinar. Today s Featured Speaker Thank You for Attending Today s Webinar Your Host Mike DeLacluyse President Lesman Instrument Company miked@lesman.com Today s Featured Speaker A.J. Piskor Combustion & Controls Specialist Lesman Instrument

More information

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141 0 Operation Manual Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1 GENERAL 1.1 Warnings and

More information

Models: C62/63/64-A/D

Models: C62/63/64-A/D Installation & Service C62-991-24A3 Models: C62/63/64-A/D Diaphragm Bypass Pressure Regulating Valves IMPORTANT Record your pump model number and serial number here for easy reference: Model No. Serial

More information

Instructions for Installation, Operation, Care and Maintenance

Instructions for Installation, Operation, Care and Maintenance Model B1 Accelerator with Integral Accelo-Check Bulletin 323 Rev. E Bulletin 323 Rev. E Instructions for Installation, Operation, Care and Maintenance Features 1. Quickens the operation of dry pipe valves.

More information

NGP-250/500 Nitrogen Generator Quick Start Guide

NGP-250/500 Nitrogen Generator Quick Start Guide NGP-250/500 Nitrogen Generator Quick Start Guide Version: A July 2013 Potter Electric Signal Company, LLC 5757 Phantom Dr., Suite 125 P. O. Box 42037 Hazelwood, MO 63042 Phone: (314) 595-6900 Document

More information

Combination Air Valve Model

Combination Air Valve Model Combination Air Valve Model Model C10 /C11 Installation, Operation and Maintenance Manual (IOM) Table of Contents General...Page 2 Safety...Page 2 Operational Data...Page 3 Materials and Connections...Page

More information

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM IMI CORNELIUS INC One Cornelius Place Anoka, MN 55303-623 Telephone (800) 238-3600 Facsimile (612) 22-326 INSTALLATION INSTRUCTIONS FOR INSTALLING CO 2 BLENDER KIT (P/N 111612000 IN BEER SYSTEM SECONDARY

More information

Types 749B and R130 Changeover Manifolds

Types 749B and R130 Changeover Manifolds Instruction Manual MCK-1179 Types 749B and R130 June 2012 Types 749B and R130 Changeover Manifolds TYPE HSRL-749B TYPE 64SR/122 TYPE R130/21 TYPE 749B/21 Figure 1. Changeover Manifolds and Regulator Assemblies

More information

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator. LRS(H)4 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to the

More information