S & M Water Consultants
|
|
- Claude Spencer
- 5 years ago
- Views:
Transcription
1 S & M Water Consultants Test Procedures In This Manual TEST Reduced Pressure Assembly One Hose Method PAGE 1 Double Check Assembly One Hose Method 5 Pressure Vacuum Breaker One Hose Method 7 Spill Proof Vacuum Breaker One Hose Method 9 Reduced Pressure Assembly Five Valve Method 11 Double Check Assembly Five Valve Method 13 Pressure Vacuum Breaker Five Valve Method 15
2 PROCEDURES THAT ARE REQUIRED BEFORE ANY TEST IS PREFORMED IMPORTANT ALL TEST SHALL BE PREFORMED WITH THE GAUGE AT THE CRITICAL LEVEL OF THE CHECK and THE UNIT IN A STATIC FLOW CONDITION 1. Notify the property owner or representative that the water will be off for a short time. 2. If the device is on a fire sprinkler system, other agencies will need to be notified. 3. A check for alarm systems must be made. 4. USE CAUTION when disarming any alarm. 5. Notify appropriate agencies. 6. Ask about any water cooled equipment that could be damaged by water shut off. 7. Locate the device. 8. Inspect the device for damage and insure it has operable valves and test cocks. 9. Check serial No. To verify the correct device is being tested. 10. Determine the direction of flow. 11. Locate test cock No. 2. (Device failure is common if the hoses are not attached correctly). NOTE: 1. Some field test procedures require that shut off valve No. 1 be closed. This procedure may introduce debris, such as rust or tuberculin, into the valve that will impact against check valve No 1 or check valve No. 2 and compromise the sealing quality. This potential problem should be considered prior to selection of a test method. 2. To test the check valve when the shut off valve No, 1 is leaking, a tee or other method must be used to flow water from test cock No. 2 and compensate for the leaking valve. A accurate differential pressure cannot be determined with a large leak through shut off valve No. 1, because a flow of water through the tee or other method will create a false indication on the gauge.
3 Reduced pressure assembly 1 HOSE FIELD TEST PROCEDURE Prepare the assembly to attach the gauge: Install adapters and flush test cocks. Install a three way valve at test cock 2 and adapters in test cocks 1,2, 3, and 4. A second three way valve may be used at test cock 3 to Compensate for a leaking shutoff valve. Open test cock 4, then open and close test cocks 1, 2, and 3. Close test cock 4. Purpose: Water flowing through check valve 1 increases the differentia Pressure and reduces the risk of prematurely opening the relief valve while flushing test cock 1and 2. Typical Reduced Pressure Assembly with gauge 1
4 Check #2 in direction of flow test Check 2 Direction of flow Criteria: Gauge value must be 1.0 psid or greater. 1.Remove low pressure and bypass hoses from gauge and maintain gauge at assembly center line. 2.Attach the high pressure hose to test cock 3. 3.Open gauge high bleed, then slowly open test cock 3 and close high bleed. 4.Close shut off valve 2, then shut off valve 1. 5.Slowly open test cock 4. 6.When water stops flowing from test cock 4, record the gauge reading. * If water continues to flow, it may be a leak at shut off valve 2 with back pressure or shut off valve #1. Close test cock 4 and observe the gauge for movement. If needle increases, shut off valve #1 may be leaking. Re open test cock #4. Open Test Cock #2, very slowly, and flow water until the water stops flowing at test cock #4, or the needle holds steady, record this reading. If water continues to flow from Test Cock #4, Shut off valve #2 is leaking with back pressure. If needle holds steady the reading will be accurate. Close all test cocks and remove the high pressure hose. Check 1 Direction of flow Criteria: Gauge value must be 5.0 psid or greater. 1.Install 1/4 inch three way valve at test cock 2 and open test cock 2. 2.Attach 14 inch hose from test cock 1 to test cock 2. 3.Slowly open test cock 1 and 2. 4.Re pressurize assembly Shut off valves 1 and 2 remain closed. 5.Attach gauge high pressure hose to three way valve at test cock 2. 6.Open gauge high bleed valve and three way valve at test cock 2. 2
5 7, Close high bleed valve. 8. Close test cock Slowly open test cock 3. When water stops flowing from test cock 3, record the gauge reading. If water continues to flow through the test cock #3, Shut off valve #1 is leaking. Remove the hose between test cocks 1 and 2 and open the three way valve slightly until water stops flowing at test cock 3. Record this reading. If not using 3 way valve, open High Gauge Valve and very slowly open Gauge By Pass valve to flow water until water stops flowing at Test Cock #3. Relief valve opening test Relief valve Opening Criteria: Vent must open before differential gauge reads 2.0 psid. 1. Observe gauge and slowly open the high bleed valve. 2. Record gauge reading when first drops are felt. 3. Continue opening high bleed valve to verify that the relief valve is fully open. Re pressurize assembly 1. Re pressurize the assembly using supply pressure from test cock 1 through the 3 way valve at test cock Remove trapped air from downstream test cocks. 3. Close all test cocks and remove fittings. 4. Remove gauge. 5. Open shut off valve 1 and then restore the customer to service. 3
6 4
7 Double Check Valve Assembly 1 HOSE FIELD TEST PROCEDURE Prepare the assembly to attach the gauge: Install adapters and Flush test cocks. Install a three way valve at test cock 2 and adapters In test cocks 1, 2, 3, and 4. A second three way valve may be used at test cock 3 to compensate for a leaking shutoff valve No. 1. Once the adapters are installed, flush the test cocks by opening Test cock 4, then open and close test cocks 1, 2, and 3. Close test cock 4. CHECK 2 DIRECTION OF FLOW Criteria: Gauge value must be 1.0 psid or greater. 1. Remove low pressure and bypass hoses from gauge and maintain gauge at assembly center line. 2. Attach high pressure hose to test cock Open gauge high bleed, then slowly open test cock 3 and close high bleed. 4. Close shut off valve 2, then shut off valve Slowly open test cock When water stops flowing from test cock 4, record the gauge reading. * If water continues to flow, it may be a leak at shut off valve 2 with back pressure or shut off valve #1 7. Close test cock 4 and observe the gauge for movement. If needle increases, shut off valve #1 may be leaking. Re open test cock #4. Open Test Cock #2, and flow water until the water stops flowing at test cock #4, record this reading. If water continues to flow from Test Cock #4, Shut off valve #2 is leaking with back pressure. If needle holds steady the reading will be accurate. Record this reading. 5
8 7. Close test cock 4 and observe the gauge for movement. If needle increases, shut off valve #1 may be leaking. Re open test cock #4. Open Test Cock #2, and flow water until the water stops flowing at test cock #4, record this reading. If water continues to flow from Test Cock #4, Shut off valve #2 is leaking with back pressure. If needle holds steady the reading will be accurate. 8. Close all test cocks and remove the high pressure hose. Check 1 Direction of flow Criteria: Gauge value must be 1.0 psid or greater. 1. Install 1/4 inch three way valve at test cock 2 and open test cock 2. Attached 1/4 inch hose from test cock 1 to test cock Slowly open test cock 1 and Re pressurize assembly Shut off valves 1 and 2 remain closed. 5. Attach gauge high pressure hose to three way valve at test cock Open gauge high bleed valve and three way valve at test cock Close high bleed valve. 8. Close test cock Slowly open test cock 3. When water stops flowing from test cock 3, record the gauge reading. If water continues to flow through the test cock #3, Shut off valve # 1 is leaking. remove the hose between test cocks 1 and 2, and open the three way valve slightly until water stops flowing at test cock 3. Record this reading. If not using 3 way valve, open High Gauge Valve and very slowly open Gauge By Pass valve to flow water until water stops flowing at Test Cock #3. Re pressurize assembly Re pressurize the assembly using supply pressure from test cock 1 through the three way valve at test cock 2. Remove trapped air from downstream test cocks. Close all test cocks and remove fittings, Remove gauge. Open shut off valve 1 and then restore the customer to service. (If shut off 2 was closed on arrival, the valve will remain closed.) 6
9 PRESSURE VACUUM BREAKER 1 HOSE FIELD TEST PROCEDURE 1. Inspect assembly for correct components. 2. Remove canopy and clean any debris around air inlet. 3. Flush test cocks, install 3 way valve at test cock 1 with adapters and re flush test cocks. 4. Remove low and bypass hose from gauge. 5. Close shut off valve number Open high bleed on differential gauge. Air inlet / vent test. Criteria: Determine if the inlet valve opens to atmosphere before the valves internal pressure reaches 1.0 psi. 1. Attach high pressure hose to test cock 2 and slowly open the test cock. 2. Close gauge high bleed when air is purged. 3. Close shut off valve number 1. Important: Observe that the gauge is stationary. If the gauge differential begins to drop before the high bleed is opened, there is a leak in the system, such as shut off valve 2 or a gauge valve is open. 4. Place a finger on top of the air inlet valve. With the gauge centerline at the same elevation as the assembly body, slowly open the high bleed valve. Note: If the gauge differential pressure does not begin to drop with a slight valve opening, and it is necessary to continue opening the high bleed valve, supply pressure may be leaking past a bad shut off valve 1. Open 3 way valve to compensate for #1 shut off leak. Or Open High Gauge valve fully and slowly open the By Pass valve until water stops flowing at test cock #2 5. Observe and record the gauge reading at the inlet opening. 7
10 Note: Do not watch valve for opening and then attempt to read the gauge. 6. Close test cock 2 and remove the hose. 7. Open shut off valve 1. Check valve test. Criteria: Determine if the check valve maintains 1.0 psi. 1. Open high bleed on differential gauge. 2. Attach high pressure hose to test cock 1 and slowly open test cock. 3. Close gauge high bleed when air is purged and top of air inlet is filled with water. 4. Close shut off valve number With the gauge centerline at the same elevation as the assembly body, slowly open test cock 2 6. Observe and record the gauge reading when water stops flowing from the test cock. Note: lf water continues to flow from test cock 2, it may be a leak from shut off valve 1 or 2. lt may be necessary to compensate for a leaking shut off valve 1 at test cock #1. Open 3 way valve to compensate for #1 shut off leak. Or Open High Gauge valve fully and slowly open the By Pass valve until water stops flowing at test cock #2 7. Close test cock 1. Evaluate for backpressure. Criteria: If backpressure is present, it is wrong for the application and the assembly fails. 1. Open shut off valve 2.* Note: If water continues to flow from test cock 2, there is a downstream source of pressure. If the downstream system is large, this test may take a minute or two. 2. Close test cock Close shut off valve 2, open shut off valve 1 and return the assembly to service. 8
11 Spill Proof Vacuum Breaker 1 HOSE FIELD TEST PROCEDURE 1. Inspect assembly for correct components. 2. Remove canopy and clean any debris around the air inlet. 3. Flush test cock(s), install 3 way valve at test cock (1) with adapters and re flush test cock(s). 4. Remove low and bypass hose from gauge. 5. Close shut off valve number Open high bleed on differential gauge Check valve test. Criteria: Determine if the check valve maintains 1.0 psi. 1. Attach high pressure hose to test cock 1 and slowly open test cock. 2. Close gauge high bleed when air is purged and top of air inlet is filled with water. 3. Close shut off valve number * important: Observe that gauge is stationary. If the gauge differential begins to drop, there is a leak in the system, such as shut off valve 2 or a gauge valve is open. VERY SLOWLY loosen the vent screw on assembly and remove screw. Note: No water will come from vent hole. Observe and record the gauge reading for the check valve. 9
12 Air inlet opening Criteria: Determine that the inlet opens with a minimum of 1.0 psid. 1. VERY SLOWLY one drip at a time open the high pressure bleed valve and watch the differential gauge and standing water at the air inlet (bonnet). When the water starts to ripple, a drop may discharge from the vent. 2. Record the gauge reading with the drip from the vent screw hole as the inlet opening point. This value must be 1.0 psid or greater. 3. Close test cock (1), remove hose and install canopy cover. Evaluate for backpressure. Criteria: lf backpressure is present, it is wrong for the application AND the assembly fails. 1. Open shut off valve 2. Note: lf water continues to flow from test cock 2, there is a downstream source of pressure. lf the downstream system is large, this test may take a minute or two Close test cock Close shut off valve 2, open shut off valve 1 and return the assembly to service. 10
13 Five Valve Test on an ASSE 1013 Reduced Pressure Valve Assembly Field Testing Requirements Flush Test Cocks (TC) Install test adapters (if applicable 1 Open TC #4 let trickle 2 Open TC #1 Close 3 Open TC #2 Close 4 Open TC #'3 Close 5 Close TC #4 Attach Test Kit 1 Close Hi, Lo and Bypass valves and Hi and Lo bleed valves on test kit 2 Attach Hi hose to TC #2 3 Attach Lo hose to TC #3 4 Open TC #3 5 Open TC #2 6 Open Lo bleed valve bleed air 7 Open Hi bleed valve bleed air close 8 Close Lo bleed valve 9 Attach bypass hose to TC #4 10 Open Hi valve 11 Open bypass valve 12 Loosen bypass hose at TC #4 bleed air tighten 13 Slowly open low bleed valve to cause differential reading to icrease Close low bleed valve.. Test #1 #2 Check w/back Pressure Test 1 Close #2 shut off valve 2 Open TC #4 If the differential gage remains steady, record #2 check valve as tight. Test #2 Tightness of the #2 Shut Off Valve 3 Close TC #2 If the differential gage reading remains steady, record #2 shut off valve as tight 11
14 Test #3 #1 Check Differential 1 Close TC #4 2 Close bypass valve 3 Remove bypass from TC #4 4 Open TC #2 5 Open Lo Bleed valve to cause differential gauge reading to increase 6 Close Lo Bleed valve Test Results Record the actual pressure differential across #1 check valve. If the differential reading is 5 psid or above, record #1 check valve as tight Test #4 Relief valve opening 1 Slowly open Lo valve Test Results Record relief valve psid opening point. The relief valve must drip when the differential gage is 2 psid or above for the RP and 1 psid or above for the RPF. Test #5 Tightness of #2 Check Valve (Spring tension} 1 Close TC #2 and TC #3 2 Remove Lo hoses and Attach Lo hose to TC #4 3 Remove Hi hose and Attach Hi hose to TC #3 4 Open TC #4 5 Open TC #3 6 Open Lo bleed valve 7 Open Hi bleed valve bleed air close 8 Close Lo bleed valve Test Results If differential reading holds steady at 1 psid or higher for the DC and.5 psid or higher for the DCF, record #2 check valve as tight. Restore System 1 Close all TC's 2 Remove hoses 3 Open all valves on test kit to drain water 4 Restore #2 shutoff valve to pre test state The tester shall provide copies of the test results to the owner and other appropriate parties as required. The tester shall maintain a copy for his/her records. 12
15 Five Valve Test for an ASSE 1015 Double Check Assembly Field Testing Requirements Flush Test Cocks (TC) Step #1 Install test adapters (if applicable) Step #2 Open TC 4 let trickle Step #3 Open TC #1 Close Step #4 Open TC #2 Close Step #5 Open TC #3 Close Step #6 Close TC #4 Attach Test Kit Step #1 Close Hi, Lo and Bypass valves and Hi and Lo bleed valves on test kit Step #2 Attach Hi hose to TC #2 Step #3 Attach Lo hose to TC #3 Step #4 Open TC #3 Step #5 Open TC #2 Step #6 Open Lo bleed valve bleed air Step #7 Open Hi bleed valve bleed air close Step #8 Close Lo bleed valve Step #9 Attach bypass hose to TC #4 Step #10 Open Hi valve Step #11 Open bypass valve Step #12 Loosen bypass hose at TC #4 bleed air tighten Step #13 Slowly open low bleed valve to cause differential reading to increase Close. Test #1 #2 Check w/back Pressure Test Step #1 Close #2 shut off valve Step #2 Open TC #4 If the differential gage remains steady, record #2 check valve as tight. 13
16 Test #2 Tightness of the #2 Shut Off Valve Step #3 Close TC #2 If the differential gage reading remains steady, record #2 shut off valve as tight Test #3 Tightness of # 1 Check Valve Step #1 Close TC #4 Step #2 Close Bypass valve Step #3 Remove bypass hose from TC #4 Step #4 Open TC #2 Step #5 Slowly open low bleed valve to cause differential reading to rise close Test Results If differential reading holds steady at 1 psid or higher for the DC and.5 psid or higher for the DCF, record #1check valve as tight. Test #4 Tightness of #2 Check Valve (spring tension) Step #1 Close TC #2 and TC #3 Step #2 Remove Lo hoses and Attach Lo hose to TC #4 Step #3 Remove Hi hose and Attach Hi hose to TC #3 Step #4 Open TC #4 Step #5 Open TC #3 Step #6 Open Lo bleed valve Step #7 Open Hi bleed valve bleed air close Step #8 Close Lo bleed valve Test Results If differential reading holds steady at 1 psid or higher for the DC and.5 psid or higher for the DCF, record #2 check valve as tight. 14
17 5 Five Valve Test on an ASSE 1020 Pressure Vacuum Breaker Field Testing Requirements Flush Test Cocks (TC) Step #1 Install test adapters (if applicable) Step #2 Open TC # 1 Close Step #3 Open TC #2 Close Attach Test Kit Step #1 Close Hi, Lo and Bypass valves and Hi and Lo Bleed valves on test kit Step #2 Attach Hi to TC #'1 Step #3 Attach Lo hose to TC #2 Step #4 Open TC #1 Step #5 Open Hi bleed valve bleed air close Step #6 Open TC #2 Step #7 Open Lo bleed valve bleed air close Test #1 Tightness of #2 Shut off Valve Step #1 Close #2 shutoff valve Step #2 Open Hi valve Step #3 Open Lo valve (differential will read zero) Step #4 Close Hi valve Step #5 Close Lo valve Step #6 Close Test Cock #1 Test Results If differential gage reading does not rise above zero (0), record #2 shutoff as tight. Test #2 Tightness of Check Valve Step #1 Open #1 Test Cock Step #2 Open Lo bleed valve close Test Results If differential gage reading holds steady at 1 psid or higher, record check valve as tight 15
18 Test #3 Air Inlet Opening Step #1 Close TC #1 and TC #2 Step #2 Remove hoses from TC # 1 and TC #2 Step #3 Attach Hi hose to TC #2 Step #4 Remove air inlet canopy/hood Step #5 Open TC #2 Step #6 Open Hi bleed valve bleed air close Step #7 Close #1 shut off valve Step #8 Center differential gage at TC #2 Step #9 Open Hi bleed valve and record the dif ferential gage reading when the air inlet canopy/hood opens Test Results If air inlet is visibly open, when differential reading is 1 psid or higher, record valve as passed. Replace Air Inlet Canopy/Hood Restore System Step #1 Close TC #2 Step #2 Remove Hi hose Step #3 Open all valves on test kit to drain water Step #4 Open #2 shut off valve Step #5 Open # 1 shut off valve The tester shall provide copies of the test results to the owner and other appropriate parties as required. The tester shall maintain a copy for his/her records. 16
Testing Procedures & Trouble Shooting Guide Reduced Pressure Zone Assembly (1/2, 3/4", 1, 1 1/4, 1 1/2" & 2 )
Testing Procedures & Trouble Shooting Guide Reduced Pressure Zone Assembly (1/2, 3/4", 1, 1 1/4, 1 1/2" & 2 ) First Check Valve Test 1) Bleed all test cocks. First open test cock 4, make sure it is slightly
More informationI T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
INSTALLATION, OPERATION, AND MAINTENANCE MANUAL I-867-4T 867-4T Pressure Reducing Valve HANG THESE INSTRUCTIONS ON THE INSTALLED VALVE FOR FUTURE REFERENCE WARNING Read and understand all instructions
More informationModel: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering
Bermad Pressure Reducing Valve Model: 720-UL INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working with and around our equipment
More information553 Series.
38467.03 www.caleffi.com Pre-adjustable filling units Copyright 01 Caleffi 3 Series Function The automatic filling valve is a device consisting of a pressure reducing valve with compensating seat, visual
More informationBermad Pressure Reducing. Model: 42T
Bermad Pressure Reducing Pilot Operated Pressure Control Valve Model: 42T Installation Operation Maintenance Manual (IOM) REV. 27.7.17 Page 1 of 12 Safety First BERMAD believes that the safety of personnel
More informationInert Air (N2) Systems Manual
INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing
More informationWW-730. Pressure Sustaining/Relief Control Valve
WW-730 Pressure Sustaining/Relief Control Valve Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 730 Pressure Relief / Sustaining Valve is an automatic control valve designed to
More informationMANUAL BE SERIES Test Benches
The CustomCrimp Manual BE Series Test Benches are designed with features that make proof and burst testing of hydraulic hose assemblies a quick and easy procedure. CUSTOMIZED AND SPECIAL DESIGN BENCHES
More informationModel: 43T. Bermad Pressure Relief Valve
Model: 43T Bermad Pressure Relief Valve Installation Operation Maintenance Manual () Rev.C1_01.08.17 Page 1 of 10 Safety First BERMAD believes that the safety of personnel working with and around our equipment
More informationSINGER MODEL 106/206-RPS-L&H
DESCRIPTION: Model 106/206-RPS-L&H dissipates surges caused by power failure to pumps. The valve anticipates the surge by opening on low line pressure associated with sudden stopping of pumps. This assures
More informationPressure Reducing Control Valve w/ Hydraulic Check Feature
PERTIN INSTRUTINS peration The BEE Model PR- Pressure Reducing ontrol alve with Hydraulic heck eature is a pilot controlled diaphragm valve designed to reduce a fluctuating higher upstream pressure to
More informationD05 Pressure Regulating Valves
D05 Pressure Regulating Valves FEATURES PRODUCT DATA Noncorroding unitized cartridge contains all working parts and is easily replaceable. Includes built-in strainer and thermal bypass. Balanced seat construction
More informationSummary of Substantive Changes between the 2004 e1 and 2017 editions of ASSE 1011, Hose Connection Vacuum Breakers
Summary of Substantive Changes between the 2004 e1 and 2017 editions of ASSE 1011, Hose Connection Vacuum Breakers Presented to the IAPMO Standards Review Committee on October 15, 2018 General: The changes
More informationWhile testing the double check can I move the bleed valve arrangement from the test cock to the gage when field testing the double check?
S p r i n g 1 9 9 8 Questions and Answers about Field Testing Backflow Prevention assembly testers often call the Foundation office with questions regarding some particular field test procedure. Many questions
More informationAcornVac Vacuum Plumbing Systems - Trouble Shooting Guide
AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide 1. Accumulators Problem Accumulator is overflowing If Accumulator continues to overflow Correction 1. Push and hold the manual activation button
More informationTECHNICAL DATA. than the water inlet pressure to the concentrate
Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler
More informationOperation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve
Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve Model CYCLE GARD II, CI & CNA YOUR PRODUCT INFORMATION: Model Number: Date: Serial Number:
More informationWarning: NEVER ALTER TEST EQUIPMENT
PAGE 1 OF 6 General: Pressure Testing Shop Built Tanks Pressure testing tanks with either positive pressure or vacuum can be a very dangerous exercise. It is important to understand the equipment involved
More informationD05T Compact Design Pressure Regulating Valves
D05T Compact Design Pressure Regulating Valves FEATURES PRODUCT DATA Non-corroding unitized cartridge contains all working parts and is easily replaceable. Includes built-in strainer and thermal bypass.
More informationBackflow What is it? City Water. Boiler. Make-Up Water Line
Backflow What is it? Backflow? You may have heard of it, and you may understand some of what it involves. This booklet will help you to understand it better; exactly what it is, and how to prevent it.
More informationWW-720. Pressure Reducing Control Valve
WW-720 Pressure Reducing Control Valve (Size Ranges: 2-4 and 6-14 ) Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 720 Pressure Reducing is an automatic control valve (powered
More informationDESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE
February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically
More informationWW-720. Pressure Reducing Control Valve
WW-720 Pressure Reducing Control Valve (Size Ranges: 2-4 and 6-14 ) Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 720 Pressure Reducing is an automatic control valve (powered
More informationPressure Reducing Valve for Steam Type 2333 A
Pressure Reducing Valve for Steam Type 2333 A Fig. 1 Type 2333 A 1. Design and principle of operation The pressure reducing valve consists of a balanced control valve and a closing actuator equipped with
More informationIWCF Equipment Sample Questions (Surface Stack)
IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000
More informationInstallation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.
Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow Model: FP 450-80 Installation Operation Maintenance PAGE 1 OF 5 1. Safety First BERMAD believes that the safety of personnel
More informationINSTALLATION OPERATION MAINTENANCE
Bermad Electrically Controlled On-Off Deluge Valve Model: 400E-3D INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working
More informationKJ4000 Operating Instructions & Parts Manual NSN
KJ4000 Operating Instructions & Parts Manual NSN 1025-01-473-7710 Mandus Group Ltd. KJ4000 Operators Manual Date: 3 Jan. 2002 TABLE OF CONTENTS General Safety Instructions...Page 1 Operator Instructions...Page
More informationAnti-flood device Model B-1
December 4, 2009 Dry Systems 123a 1. DESCRIPTION The Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET
More informationInstallation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series
Introduction Powerex manifolds are cleaned, tested and prepared for the indicated gas service and are built in accordance with the Compressed Gas Association guidelines. The manifold consists of a regulator
More informationAWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use.
AWG Fittings LLC Pressure Relief Valve Up to 250 PSI Product Number 30004033 Read this instruction manual before use. Using this device without t understanding di this products operation and care may lead
More informationOPERATING AND MAINTENANCE MANUAL
Series 4300 Engineered Performance TABLE OF CONTENTS 0 INTRODUCTION 1 1 Scope 1 2 Description 1 3 Specifications 1 0 INSTALLATION 1 1 Mounting 1 2 Piping 1 1 Connecting Process Pressure 2 2 Vent Connections
More informationOXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS
OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS Items needed for demonstrations: Fire extinguisher PPE (Personal Protective Equipment): o Lab coats/welding jackets o Leather gloves
More informationOperation Manual. Diaphragm Sensed Gas Pressure Regulators
687 Technology Way Napa, CA 94558 Phone: (707) 259-0102 FAX: (707) 259-0117 www.aptech-online.com Diaphragm Sensed Gas (AP/AZ/AK Models: 20, 100, 500, 1000, 1000T 10PA, 1100, 1200, 12PA, 1300, 1400T, 14PA,
More informationTECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION
Page 1 of 6 1. DESCRIPTION The Model B-1 Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET condition,
More informationDS06D,G Dial Set Pressure Regulating Valve
DS06D,G Dial Set Pressure Regulating Valve PRODUCT DATA FEATURES APPLICATION Built-in, factory-calibrated outlet pressure adjustment dial. Noncorroding unitized cartridge contains all working parts and
More informationModel 106 DPI "Micro-switch" Installation and Operating Instructions
Mid-West Instrument Model 106 DPI "Micro-switch" Installation and Operating Instructions BULLETIN NO. IM116DPImicro/09A Replaces --- INSPECTION Before installation carefully check the Model Number on each
More informationHPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS
WIDDER TOOLS HPIC-10000-D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS Description: The WIDDER Hydrostatic Test Systems C Series is a portable, selfcontained, air driven hydrostatic
More informationReduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections
VALVCHEQ Backflow Preventers Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections Features General application The RP03 provides protection from both
More informationTECHNICAL DATA CAUTION
Page 1 of 6 1. DESCRIPTION The Viking Model D-2 Accelerator is a quick-opening device, with an integral anti-flood assembly, used to increase the operating speed of a differential type dry pipe valve.
More informationReduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections
Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections Features General application The RP03 provides protection from both backsiphonage and backpressure
More informationTECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1
November 30, 1994 534 a 1. PRODUCT NAME VIKING 2" (50mm), 3" (75mm), 4" (100mm), 6" (150mm) 2. MANUFACTURER THE VIKING CORPORATION 210 N. Industrial Park Road Hastings, Michigan 49058 U.S.A. Telephone:
More informationProduct Information News
Product Information News MMR SECOND STAGE REGULATOR VALVE CORE MSA has changed its recommended rebuilding of the MMR Second Stage Regulator s bypass sleeve assembly during the annual inspection. Based
More informationSERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL
SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device. 2/05 GENERAL
More information2.0 INSTALLATION & SERVICE
Installation, Operation, and Maintenance Instructions MODEL 5600 / 5600R January 2005 CONTENTS 1.0 GENERAL 1.1 5600 Model Number Information -----------------------------------------------------------------------
More informationEASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:
2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use
More informationSTATE OF CONNECTICUT CROSS CONNECTION CONTROL MANUAL
STATE OF CONNECTICUT CROSS CONNECTION CONTROL MANUAL Prepared by: The State of Connecticut Department of Public Health Drinking Water Division 410 Capitol Avenue, MS #51 WAT P.O. Box 340308 Hartford, Connecticut
More informationSeries 867. Reduced Pressure Zone Assemblies " 3" (65 80mm)** INDEX. Testing INSTALLATION INSTRUCTIONS WARNING NOTICE NOTICE !
INSTALLATION INSTRUCTIONS RP/IS-F-867 Series 867 Reduced Pressure Zone Assemblies 2 1 2" 3" (65 80mm)** INDEX 867-NRS Installation Guidelines 2-3 Service, Repair and Maintenance 4-5 Test Procedure for
More informationModel 420-HY Pressure Regulating Hydrant Valve
Model 420-HY Pressure Regulating Hydrant Valve INSTALLATION OPERATION MAINTENANCE 1. Safety First BERMAD believes that the safety of personnel working with and around our equipment is the most important
More information!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7
EXEL North America, Inc. EXEL Industrial Canada, Inc. 1310 Washington St 931 Progress Ave., #7 West Chicago, IL 60185 Scarborough ONT, M1G 3V5 Ph : (800) 573 5554 Ph : (800) 450 0655 Fx : (800) 664 1511
More informationEnd Connection. Thread x Thread N/A N/A N/A N/A Flange x Flange N/A
Worldwide Contacts www.tyco-fire.com Model RV-1 Pressure Relief Valve, Pilot-Operated, Globe and Angle Body Styles General Description Valves, through inch (DN50 through DN00), are factory assembled and
More informationDBML-60/80 Squeeze Tool
DBML-60/80 Squeeze Tool OPERATORS MANUAL Description The Mustang Model DBML-60/80 Hydraulic squeeze tool has been manufactured since 1995. A Mustang 3 3/4 bore doubleacting cylinder producing 41,000 lbs
More informationMMR Air Mask With. with Quick-Connect Hose
MMR Air Mask With with Quick-Connect Hose Upgrade Kits P/N 10025120 Slide to Connect P/N 10050038 Slide to Connect w/ Solid Cover P/N 10038666 Push To Connect P/N 10050037 Push To Connect w/ Solid Cover
More informationVALVCHEQ BACKFLOW PREVENTERS FIGURE RP03
Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections FEATURES GENERAL APPLICATION The RP03 provides protection from both backsiphonage and backpressure
More informationHot Compressed Air Lance Operation Manual. LAB Manufacturing 9483 Reading Road Cincinnati, OH (800)
Hot Compressed Air Lance Operation Manual www.heatlances.com LAB Manufacturing 9483 Reading Road Cincinnati, OH 45215 (800) 776-5830 PARTS CHECK LIST NOTE: Check all fittings & connections prior to operation.
More informationSmart Water Application Technologies (SWAT) TM
Smart Water Application Technologies (SWAT) TM Equipment Functionality Test Protocol Version 2.3 June 2014 SWAT Committee 8280 Willow Oaks Corporate Drive Suite 400 Fairfax, VA 22031 www.irrigation.org
More informationInstallation and operation Manual. Bermad Surge Anticipation Valve. Model No 435
Instruction manual Bermad surge anticipation manual Model No 435 Installation and operation Manual Bermad Surge Anticipation Valve Model No 435 Bermad Water Technologies Rev 0 5/05/2015 7 Inglewood Drive,
More informationMEGR-1627 Instruction Manual
MEGR-1627 HIGH FLOW GAS REGULATOR Instruction Manual- Look Inside For: Description Installation Remote Vent Line Installations Startup and Adjustment Shutdown Maintenance Body Maintenance Procedures Diaphragm
More informationAIR GAP (AG) Low Hazard High Hazard
AIR GAP (AG) On Low Hazard and High Hazard applications, Air Gap (AG) is used for the physical separation (vertical distance) between the lowest opening point from any pipe or outlet supplying water and
More informationTHE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)
THE BP-301 SERIES Operating and Service Manual Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) Issue B October 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation...
More informationBermad Model:
Bermad Model: 405-02 Manually Operated Hydraulic Valve INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working with and around
More informationTECHNICAL DATA ACCELERATOR MODEL E-1
Page 1 of 10 1. PRODUCT DESCRIPTION The Viking Model E-1 Accelerator is a quick-opening device. When installed with the required external Anti-flood Device, the assembly is designed to increase the operating
More informationPropane Conversion Kit Instruction
Propane Conversion Kit Instruction Condensing gas boiler Required Input Rates GB142-24 84,800 btu/hr GB142-30 106,000 btu/hr GB142-45 160,900 btu/hr GB142-60 214,800 btu/hr This kit and instructions are
More informationGREIG FILTERS, INC. OPERATION MANUAL
GREIG FILTERS, INC. OPERATION MANUAL MODEL DCFH 3P 15/3 100 S4 DOE/222 DUAL CARTRIDGE FILTER HOUSING TABLE OF CONTENTS I. INTRODUCTION II. CARTRIDGE FILTER HOUSING UNIT A. OPERATION B. INSTALLATION C.
More informationAssembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &
REDQ Regulators Model 411B Barstock Design Powreactor Dome Regulator OPERATION AND MAINTENANCE Contents Scope..............................1 Installation..........................1 General Description....................1
More informationIrrigation System Winterization and Pressurization Procedures
Irrigation System Winterization and Pressurization Procedures Introduction Any time that an irrigation system is filled and pressurized, or when the system is drained and water flushed from the system,
More informationVALVCHEQ BACKFLOW PREVENTERS FIGURE RP03
Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections FEATURES GENERAL APPLICATION The RP03 provides protection from both backsiphonage and backpressure
More informationPropane Conversion Kit Instruction
Propane Conversion Kit Instruction Condensing gas boiler Required Input Rates GB42-24 84,800 btu/hr Tab. GB42-30 06,000 btu/hr GB42-45 49,000 btu/hr GB42-60 24,800 btu/hr This kit and instructions are
More informationTech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves
Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves Tools Required: Flow Meter Pressure gauge Holding valve test block Wrenches for installation of
More informationAPPS-160 Gen 2 User Manual
APPS-160 Gen 2 User Manual Applicable Products: PN 11914406 - APPS-160 10 to 50 PSIG operating pressure PN 11918618 - APPS-160 40 to 85 PSIG operating pressure Rev 9/16/2004 Chart Ind. www-chart-ind.com
More informationAmerican Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM
American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1048 - REVISED: 2009 Double Check Detector Fire Protection Backflow Prevention Assemblies Separate, complete laboratory
More informationRS(H)20, 25 USER MANUAL
RS(H)20, 25 USER MANUAL Read the complete manual before installing and using the regulator. WARNING Before removing a regulator from the system for service, you must depressurize system purge the system
More informationTECHNICAL DATA. Page 1 of 12
Page 1 of 12 1. DESCRIPTION The Viking Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking Model H or J Flow Control
More informationDesign DSA Steam-Atomized Desuperheater
Instruction Manual DSA Desuperheater Design DSA Steam-Atomized Desuperheater Contents Introduction............................... 1 Scope of Manual......................... 1 Description..............................
More informationPressure Regulators. Operating Instructions. Instrumentation
Pressure Regulators Operating Instructions FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THIS PRODUCT CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE. This document and other information from the
More informationAdjustable. Unloader Valve. O&M Manual. Part #
Adjustable Unloader Valve O&M Manual Unloader Valve Part #60-020-361 ADVANCED PRESSURE SYSTEMS 701 S. Persimmon St., Suite 85 - Tomball, TX 77375 Toll Free in North America: (877) 290-4277 Phone: (281)
More informationSTREAMLINE SHOP SERIES MODEL 30040V OPERATION & PARTS MANUAL
STREAMLINE SHOP SERIES MODEL 30040V OPERATION & PARTS MANUAL Sage Oil Vac 360 North Lakeside Drive Amarillo, TX 79118 phone: 806.372.7559 fax: 806.372.7565 1 2 1.1 WARRANTY SERVICE OR RETURNS Call 1-877-645-8227
More informationTECHNICAL DATA. Pressure Regulation 531a. April 24, 2009
April 24, 29 Pressure Regulation 531a 1. DESCRIPTION The Viking Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking
More informationWPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE
PACIFIC LIQUID & AIR SYSTEMS WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE IN THE BEGINNING Before installing or operating this system, familiarize yourself with these instructions. You should
More informationHIGH RATE BASKET STRAINER
Installation and Operation Instruction Manual INSMAN-105 High Rate Basket Strainer Phone: 951.656.6716 Toll-Free: 800.854.4788 www.yardneyfilters.com Yardney Water Management Systems, Inc. 6666 Box Springs
More informationTECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.
Foam 302 a 1. DESCRIPTION (Refer to Figure 1 on page 302 e.) The Viking Low-Flow Foam/Water Proportioning System is a UL Listed and FM Approved system, for use with 3M and Viking brand foam concentrate.
More informationTECHNICAL DATA CAUTION
Page 1 of 12 1. DESCRIPTION The Viking Model C-2 Pilot Pressure Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking
More informationWilo Triple Duty Valve / Triple Service Valve Installation and operating instructions
Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions WIL-IO-SD-001-10 1 Description The Triple Duty Valve (TDV) / Triple Service Valve (TSV) is a quiet operating heavy-duty
More informationACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS
ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS READ ALL INSTRUCTIONS PRIOR TO INSTALLATION AND OPERATION TO AVOID POSSIBLE INJURY Warning: Always consider any accumulator to contain pressure until proven
More informationPropane Conversion Kit Instruction
Propane Conversion Kit Instruction Condensing gas boiler Required Input Rates Logamax plus GB62-80 kw 270,000 btu/hr Logamax plus GB62-00 kw 35,000 btu/hr This kit and instructions are for converting the
More informationGas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation.
Quality Products at Competitive Prices Gas Check Automatic testing of the down-stream installation to check that all valves are closed and that pipework and fittings are gas tight before each system start-up.
More informationModel 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual
10-12 Steel Pipe Squeezer Sch. 40 & Sch. 80 Operations Manual 1.0 Introduction This manual is issued as a basic operation manual covering the Regent Model 7989T, Pipe Squeezer and Pump as manufactured
More informationHydrostatic Pressure Testing
General An experienced or qualified person will be put in charge of hydro and should meet with the supervisor in charge of the job prior to test. Customer expectations should be clarified prior to beginning
More informationModel 1800 PFM Series Regulator For Constant Outlet Pressure Precise Fixed Factor Measurement From 0.5 to 30 PSIG
A C E D SB 8551.3 Model 1800 PFM Series Regulator For Constant Precise Fixed Factor Measurement From 0.5 to 30 G AMC Quality System QMI is Accredited by: C R E D I T ISO 900 Registered R E ANSI RAB G I
More informationSERVICE MANUAL MODEL BA200AMST-S1 BREATHING AIR PANEL
1 SERVICE MANUAL MODEL BA200AMST-S1 BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device. 2 GENERAL
More informationTOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING
In SANS 10105 you will find the Minimum water pressure for both the hydrant and the hose reel. Which is 300KPA Manufacturing Standard SANS 543 1 Front & Back plates 2 Curved Plate 3 Waterway assembly 4
More informationThank You for Attending Today s Webinar. Today s Featured Speaker
Thank You for Attending Today s Webinar Your Host Mike DeLacluyse President Lesman Instrument Company miked@lesman.com Today s Featured Speaker A.J. Piskor Combustion & Controls Specialist Lesman Instrument
More informationConcentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141
0 Operation Manual Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1 GENERAL 1.1 Warnings and
More informationModels: C62/63/64-A/D
Installation & Service C62-991-24A3 Models: C62/63/64-A/D Diaphragm Bypass Pressure Regulating Valves IMPORTANT Record your pump model number and serial number here for easy reference: Model No. Serial
More informationInstructions for Installation, Operation, Care and Maintenance
Model B1 Accelerator with Integral Accelo-Check Bulletin 323 Rev. E Bulletin 323 Rev. E Instructions for Installation, Operation, Care and Maintenance Features 1. Quickens the operation of dry pipe valves.
More informationNGP-250/500 Nitrogen Generator Quick Start Guide
NGP-250/500 Nitrogen Generator Quick Start Guide Version: A July 2013 Potter Electric Signal Company, LLC 5757 Phantom Dr., Suite 125 P. O. Box 42037 Hazelwood, MO 63042 Phone: (314) 595-6900 Document
More informationCombination Air Valve Model
Combination Air Valve Model Model C10 /C11 Installation, Operation and Maintenance Manual (IOM) Table of Contents General...Page 2 Safety...Page 2 Operational Data...Page 3 Materials and Connections...Page
More informationFOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM
IMI CORNELIUS INC One Cornelius Place Anoka, MN 55303-623 Telephone (800) 238-3600 Facsimile (612) 22-326 INSTALLATION INSTRUCTIONS FOR INSTALLING CO 2 BLENDER KIT (P/N 111612000 IN BEER SYSTEM SECONDARY
More informationTypes 749B and R130 Changeover Manifolds
Instruction Manual MCK-1179 Types 749B and R130 June 2012 Types 749B and R130 Changeover Manifolds TYPE HSRL-749B TYPE 64SR/122 TYPE R130/21 TYPE 749B/21 Figure 1. Changeover Manifolds and Regulator Assemblies
More informationLRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.
LRS(H)4 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to the
More information