1 SPE/IADC Identification and Qualification of Shale Annular Barriers Using Wireline Logs During Plug and Abandonment Operations Stephen Williams, SPE, Truls Carlsen, SPE, and Kevin Constable, SPE, StatoilHydro ASA, and Arne Guldahl, SPE, Schlumberger Copyright 2009, SPE/IADC Drilling Conference and Exhibition This paper was prepared for presentation at the SPE/IADC Drilling Conference and Exhibition held in Amsterdam, The Netherlands, March This paper was selected for presentation by an SPE/IADC program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Society of Petroleum Engineers or the International Association of Drilling Contractors and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers or the International Association of Drilling Contractors, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers or the International Association of Drilling Contractors is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE/IADC copyright. Abstract It has long been recognised that during and after drilling through certain formations, the rock moves inward and begins to close off the well. Normally this phenomenon is considered undesirable since it can cause problems for drilling and casing running. It can however be put to good use as the mechanism to create an annular barrier behind casing. In order to extend the life of a number of North Sea brown fields many well slots on production platforms and sub-sea templates are being re-used. This process involves permanent plug and abandonment of the old well track prior to sidetrack drilling into a fresh area of the reservoir. Norwegian Continental Shelf (NCS) regulatory requirements dictate that compliant procedures for well abandonment require the establishment of double barriers to avoid leakage from the reservoir. With a shortage of sufficient traditional cement barriers these wells often need costly remedial work in order to meet abandonment requirements. Traditional sonic and ultrasonic azimuthal bond logging provides information on the material immediately behind the casing. Many such bond logs show solid material behind the casing far above the theoretical cement top. Clear correlation of this bonding pattern to shales, known to cause problems during drilling, indicates that the shale has sealed off the annular region and that it is the presence of such formation material that results in a good bond log response Logging and pressure testing sealed off zones in a number of wells allowed the bond log response to be qualified for a certain formation without further pressure testing. In this manner logs can provide a clear answer of whether shale successfully seals off certain zones and consequently provides a natural annular barrier. This technique has been employed successfully on over 40 wells, proving non-destructively that high quality natural annular barriers had formed, resulting in elimination of complex remedial work and substantial cost savings. Introduction Historically log responses indicating a good bond have often been observed on bond logs far above the theoretical top of cement. Many explanations exist for these responses and it is likely that there are a number of possible causes. The most frequent cause is believed to be formation displacement. This is supported by the following observations on the log: Good bond log response far above the top of the theoretical cement. Good quality bond correlates with shale rich intervals. Large and sometimes frequent changes in bond log response at the same depth as geological changes. Above the casing shoe of an outer casing string the log response changes from good quality bond to free pipe as the formation can no longer impinge onto the inner casing string. Sinusoidal patterns on ultrasonic bond log images imply geological beds impinging on the outside of the casing. If the formation has been displaced onto the outside of the casing in a uniform manner around the circumference and over a sufficient interval along the casing, then this formation could provide an annular barrier to reservoir fluids. In order to provide an annular barrier the displaced formation must have certain physical properties. Such properties include sufficient rock

2 2 SPE/IADC strength and extremely low permeability to fluids. It is also important to understand the shale displacement mechanism taking place, as this has implications on whether the formation is capable of creating an annular barrier or not. The significance of the possible use of formation as an annular barrier was realised as producing fields on the NCS have matured. Typical production platforms and sub-sea templates were designed with limited well slots. As producing wells reach the end of their productive life there is a need to drill additional wells into un-drained regions of the field. Due to the limited number of well slots, existing wells are re-used by plugging and abandoning an old well track and then drilling a sidetrack through one of the intermediate casing strings. Planning of typical plug and abandonment operations prior to sidetracking has revealed a shortage of annular barriers, or a lack of documentation supporting the existence of annular barriers. In order to ensure proper annular barriers are in place prior to sidetracking, a number of remedial solutions have been used which include: Perforation of the casing, cement squeeze followed by bond logging of the squeezed cement. Cutting and pulling the existing casing string followed by placement of a long cement plug above and below the casing cut point. Section milling of at least 50 meters of casing followed by placement of a long cement plug across the milled section. Such solutions are time consuming and therefore expensive, they also damage the very casing which is desirable to use as part of the barrier element and experience shows they are sometimes problematic to execute and complete satisfactorily. Using, and being able to observe, displaced shale as a barrier is therefore a desirable alternative, as it avoids the complex remedial work that is otherwise required, retains the casing integrity and is quick and simple to execute. Barrier philosophy on the Norwegian continental shelf Drilling and intervention operations on the NCS are governed by the i Petroleum Safety Authority of Norway (PSA). The PSA is the regulatory authority for technical and operational safety, including emergency preparedness, and the working environment. The PSA have developed and defined regulations for technical and operational safety. The PSA guidelines often refer to recognized local Norwegian and international standards, such as ISO, IEC, EN, API, ii NORSOK, DnV, and OLF as a way to fulfil the functional requirements in the regulations. International standards, ISO and EN, form the basis of all activities in the petroleum industry. Experts from a wide range of Norwegian companies participate heavily in the development of ISO and EN standards, in order to define safe and economical design and processes. However, Norwegian safety framework and climate conditions require amendments to ISO and EN standards. The ii NORSOK standards are developed to form these necessary amendments. The NORSOK standards are developed by the Norwegian petroleum industry to ensure adequate safety, value adding and cost effectiveness for existing and future petroleum industry developments in Norway. The relevant NORSOK standard to describe well integrity requirements during drilling and well operations is NORSOK standard D-010. This document describes the requirements for well barriers at all stages of drilling and well operations. Some of the requirements relevant to this paper are: A double barrier element approach is required at all times, such that if any barrier fails a second barrier exists to prevent well leakage. Each and every barrier element should be verifiable through some form of testing. If any barrier fails it must be repaired before other activities can be carried out. Permanent well barriers must be in place prior to well sidetracks, suspension and abandonment. Chapter 9 of NORSOK D-010 describes the requirements for permanent well barriers during sidetracks, suspension and abandonment operations. It states that permanent well barriers shall extend across the full cross section of the well, include all annuli and seal both vertically and horizontally. Hence, a well barrier element set inside a casing, as part of a permanent well barrier, shall be located in a depth interval where there is a well barrier element with verified quality in all annuli. NORSOK D-010 also states that a permanent well barrier should have the following properties: Impermeable Long term integrity. Non-shrinking. Ductile (non brittle) able to withstand mechanical loads/impact.

3 SPE/IADC Resistance to different chemicals/ substances (H2S, CO2 and hydrocarbons). Wetting, to ensure bonding to steel. These standards do not define particular materials acceptable for a well barrier element. This allows the operator to choose the barrier element material providing its properties meet NORSOK requirements. More specifically this allows the use of shale as a barrier element since shale satisfies all the requirements. Furthermore the fact that certain shales are cap rocks for many NCS reservoirs indicates that shale is an excellent barrier material. For shale to form an annular barrier the following requirements must be satisfied: The barrier must be shale. This can be demonstrated through electrical logs or cuttings description logs made during or after drilling. The strength of the shale must be sufficient to withstand the maximum expected pressure that could be applied to it. In practice this means calculating the worst case scenario by extrapolating the maximum reservoir pressure to the base of the expected shale barrier via an annular gas column. The displacement mechanism of the shale must be suitable to preserve the well barrier properties. The barrier must extend and seal over the full circumference of the casing and over a suitable interval along the well. This can be verified by using wireline ultrasonic azimuthal bond logging tools. The methods to satisfy the above requirements are detailed below. Formation displacement mechanisms On the NCS and in similar international settings formation displacement is observed as a reduction in well bore diameter, both during and after drilling. This is common in the argillaceous Tertiary and Cretaceous sequences. This reduction of well bore diameter has been observed as both a rapid and a slow process. The following displacement mechanisms are believed to occur in isolation or in combination iii (E. Fjær et al, 2004): Shear or tensile failure Compaction failure and / or consolidation Liquefaction Thermal expansion Chemical effects Creep Observations in wells, test jigs and on logs make it possible to identify the key displacement mechanism occurring as follows: Shear and Tensile failure is seen in many different wellbore inclinations and azimuths. It is most often seen in shale sequences requiring mud weights higher than the pore pressure to remain stable with respect to shear failure calculations. The reduction of density of the mud behind casing over time may therefore be of significance when it comes to initiating this process. However, based on the fact that bond logs have identified distinct lithological layers which have not impinged on the casing in between layers which have, we can conclude that this is not a rubble zone as could be expected if shear failure alone was responsible. Once the process of the formation wall moving onto the casing has started, then compaction failure and consolidation are likely to occur. However this is not regarded this as an important triggering process, rather a consequence response. There is no evidence from logs or drilling experience that liquefaction is involved in the process. The fact that bond log responses indicating a solid material presence in the annulus is enough to indicate that liquefaction is not the key mechanism. Thermal expansion from production may be of minor importance, but the temperature differences involved here, from formation temperature to production phase, are typically small and therefore the effect is not believed to contribute significantly to the displacement observed. Thermal response could, however, be of importance in escalating the process in the shallower sections. The log responses show that the observed bonding appears regardless of the type of drilling mud used, therefore chemical effects are not considered to be a major contributor to the displacement process. A simplified description of the displacement process of the clay-rich rocks is that the formation is moving in a hydraulic way, much like a BOP pipe ram would do during closing. Of the above mentioned mechanisms it is thought that creep appears to best fit the observations, possibly in combination with shear failure.

4 4 SPE/IADC Formation strength requirements: In order to qualify a zone of bonded formation as an annular barrier it is important that the maximum reservoir pressure that could be exerted on the barrier is not higher than the minimum horizontal stress ( h ). In the planning phase of the qualification process the h is taken from the earth stress model of the actual field. The first objective of the strength test is to ensure that a fluid communication system behind the casing does not exist. If communication appears to exist then the verification process has failed, as the barrier can not be confirmed. The second objective of the strength test is to verify that the formation strength is coinciding with the stress prognosis, The strength test could be a Formation Integrity Test (FIT) but since both the communication issue and formation strength can be clarified as part of an extended leak off test (XLOT), this is the preferred option.. If the strength test should give lower strength than expected, then the safety margin against reservoir pressure may become an issue and should be carefully evaluated. Logging tools and log response Cement Bond Log (CBL) and Variable Density (VDL) Logs CBL and VDL logs are acquired with a sonic logging tool that has a monopole transducer and monopole receivers placed respectively at 3 ft and 5 ft from the transmitter (Fig. 1). The monopole sonic transmitter sends a low frequency (10-20 KHz) omni-directional pulse that induces a longitudinal vibration of the casing. The data recorded represents the averaged values over the circumference of the casing. It consists of the amplitude of the first positive peak (denoted by E1) of the sonic waveform received at 3 ft and the full waveform received at 5 ft. When bonded to a stiff material, the vibration of the casing is attenuated and the CBL E1 amplitude is small. The transit time (TT) taken by the wave to travel from transmitter to receiver is used to quality control the tool centralization and set the correct parameters for proper detection. When the casing is fully bonded to a thick enough cement sheath or solid material, the attenuation of sonic signals travelling through the casing is proportional to the shear acoustic impedance of the cement. However, wellbore conditions also affect the attenuation of sonic signals. For instance, the bondedpipe amplitude increases with casing thickness, decreases for larger casing sizes, and depends on fluid type and weight on either side of the casing. To minimize these effects when interpreting the CBL data, a calibration in a free pipe section is recommended to compensate for wellbore differences, assuming that wellbore conditions (casing sizes and weight and mud properties) remain constant over the entire well. Later, this can be assessed with the TT value, which varies with casing inner diameter and mud velocity. Figure 1: Cement bond log (CBL) tool and principle of operation. In addition to wellbore conditions and acquisition parameters, the CBL amplitude is affected by centralization (for example, E1 is reduced by half, and TT by 4 s for a 6.4-mm tool eccentricity), and a micro-annulus, which results in an increase of the CBL amplitude. This increases again with fluid-filled channelling in the cement sheath. The characteristics of the entire waveform at the 5 ft receiver are displayed graphically on the VDL log. In a perfectly bonded situation, weak casing arrivals followed by strong formation P, and then S, arrivals are observed. In free pipe, however, the casing arrivals are strong and appear parallel on the log. Few formation arrivals are observed, and in front of the casing collar, the characteristic chevron pattern can be observed. In partially bonded casing (with channelling), both casing arrivals (accompanied by a high CBL) and formation arrivals may be present. This may also occur in the presence of a microannulus at the casing-cement interface. To differentiate between the two situations (channelling and micro-annulus), the casing pressure is typically increased and the log repeated. A decrease in E1 with vanishing casing arrivals and strengthening formation arrivals favours the micro-annulus hypothesis (with cement in the annulus) versus the channelling hypothesis.

5 SPE/IADC Ultrasonic azimuthal bong log The ultrasonic azimuthal bong log uses a high-frequency pulse-echo technique. The tool uses a rotating 7.5-rps transducer which emits a broadband ultrasonic wave, perpendicular to the casing walls, to excite the casing into resonance mode. The ultrasonic wave frequency is adjustable between 250 and 700 khz and the frequency used depends on the casing thickness and the amplitude decay. This is related to the acoustic impedances of the media on either side of the casing. The tool scans the casing with an azimuthal resolution of 10 or 5 degrees providing 36 or 72 measurements at each depth. These are processed to yield the casing thickness, internal radius, and inner wall smoothness (from the initial echo) as well as an azimuthal image of the acoustic impedance of the material behind the casing (from the signal resonance decay). The acoustic impedance is then classified as that of gas when it is typically less than 0.3 MRayl, or liquid when between 0.3 and 2.6 MRayl, or solid bonded material when it is larger than the upper liquid limit of 2.6 MRayl. The accuracy of the estimated cement acoustic impedance depends on the accuracy of the known mud acoustic impedance. This is estimated with the fluid measurement cell when the tool is lowered into the well and the transducer is flipped inward towards a reference plate of known thickness and elastic properties. Figure 2: Principle of operation of the pulse-echo acoustic-impedance measurement. New generation ultrasonic azimuthal bond log When the estimated acoustic impedance is low and close to that of the mud, it becomes difficult to conclude without ambiguity whether a solid (fluidcontaminated or lightweight or foam cement) or a liquid fills the annular space. More recent ultrasonic technology addresses these limitations. The new generation tool combines traditional pulseecho technique with flexural wave imaging, increasing the range of cements and conditions which can be successfully analysed. Flexural wave imaging relies on the pulsed excitation and propagation of a casing flexural mode, which leaks deep-penetrating acoustic bulk waves into the annulus. Attenuation of the first casing arrival, estimated at two receivers, is used to determine the state of the material coupled to the casing as solid, liquid, or gas (SLG). Third-interface reflection echoes arising from the annulus/formation interface yield additional characterization of the cased hole environment. Since acoustic impedance and flexural attenuation are independent measurements, their combined analysis provides borehole fluid properties, not requiring a separate fluid-property measurement. Figure 3: Solid-liquid-gas (SLG) mapping of the measurement plane for a class G cement. Zusit is the impedance estimated from the pulse-echo technique, whereas the attenuation pertains to the flexural wave technique. CBL/Variable Density logs versus the Ultrasonic azimuthal logs The main shortcomings of the ultrasonic azimuthal logs versus the CBL/Variable Density log are its limitations when operated in dense wellbore fluids that tend to heavily attenuate the ultrasonic signal (limits typically correspond to a maximum water-based mud

6 6 SPE/IADC density of 1.9 g/cm3 or an oil-based mud density of 1.4 g/cm3). The ultrasonic tools also have difficulty in the presence of a dry micro-annulus. Shortcomings of the CBL are its single averaged amplitude value, which is highly sensitive to tool centralization and micrometric micro-annuli. The CBL measurement does not allow differentiation between contaminated cement, channelling, or micro - annuli. Additionally the CBL is affected by mud type and density and, when present, by concentric outer casings (in a double string configuration). The main advantage of the Variable Density log is its ability to detect formation arrivals even in the presence of a millimetric micro-annulus, which allows it to differentiate between a fluidfilled annulus and cement in the presence of a large micro-annulus. Given the different responses of the measurements to certain annular conditions, for evaluation purposes, the azimuthal ultrasonic, CBL, and Variable Density logs complement each other and should therefore always be run in combination. Calibration of log responses As previously discussed, for formation to be qualified as an annular barrier a number of requirements must be satisfied. In order to ensure the strength of shale observed on bond logs contacting the backside of the casing is sufficient to provide a barrier, it must be pressure tested. The pressure test must be made from below or near the base of the potential barrier. The pressure test must be made at a high enough pressure to exceed the maximum expected pressure that could be applied to the potential barrier from the reservoir. Practically this often means the pressure test will be made up to leak-off pressure in order to ensure possible leakage is not missed when applying a lower pressure. There are a number of ways such a pressure test could be practically performed. Some of those methods are: Perforate the casing at the base of the potential barrier identified from logs. Apply pressure in the well until either a pressure response is seen at the casing annulus at surface, or a leak-off response is seen. Perforate the casing at the base of the potential barrier identified from logs. Perforate the casing at the top of the potential barrier. Run a test string and packer. Set the packer between the perforations. Apply pressure in the test string until either a pressure response is seen at the test string annulus, or a leak-off response is seen. v Run a cased hole formation tester with pump-in capability. Make a hole in the casing at the base of the potential barrier. Monitor formation pressure to ensure no connectivity to other pressured zones. Pump into the hole until leak-off pressure is reached. Repeat the measurement to ensure good quality. Once a particular shale horizon has been pressure tested successfully, the bond log response associated with the now proven barrier is assumed to indicate the required minimum acceptable bond log response for barrier confirmation in subsequent wells. Experience has shown that when an acceptable bond log response is observed in a shale zone, repeating such pressure tests on a number of wells in different fields consistently proves an annular barrier is present. In other words the bond log response is now qualified to identify an annular barrier in a particular shale horizon without a pressure test. The supposition that a bond log response indicates an annular barrier relies on the assumption that the log only indicates a good bond when a solid material is pressed hard enough onto the outside surface of the casing to prevent migration of well fluids in the annulus. In order to confirm this assumption a test jig was built to observe bond log responses when different materials were present in the annulus. The main purpose of the test was to show that nonconsolidated granular materials in the annulus such as sand and shale fragments would not produce a log response that could falsely indicate a good annular barrier, as loose annular material of this type is unlikely to create a suitable annular barrier (at least over a relatively short interval). Figure 4: Test jig for observing log response in presence of different types of annular material

7 SPE/IADC The test jig was designed to allow bond logging tools to be inserted inside a water filled 9 5/8 casing which could then be pressurised to allow correct functioning of the tool acoustics. The annulus was built by centralising the 9 5/8 casing inside a section of 20 casing. The annular space between the 9 5/8 and 20 casing could then be filled with unpressurised material. Water was first tested as the control medium in the annulus. Following the water test the annulus was filled with sand. This sand was mixed grain size and had a low pore volume of around 25%. The pore space contained water and some small air bubbles due to the process of pumping the slurrified sand into the annulus. After the sand had been allowed to settle in the annulus, the log responses from different bond logging tools were recorded. Figure 5: Test jig results: Unconsolidated sand in the annulus (upper) and water in the annulus (lower) With water in the annulus the CBL shows, as expected, a free pipe signal of 55 mv and a free pipe pattern on the VDL. The ultrasonic azimuthal bond log shows an average acoustic impedance of around 1.5 MRayls, which is consistent with water. A few gas bubbles appear on the log, which can be explained by possible air bubbles on the outside surface of the 9 5/8 casing. With sand in the annulus the CBL showed only a slightly lower signal than free pipe of around 48 mv. This is assumed to be because the loose sand did not prevent compressional vibration of the 9 5/8 to any significant extent. The VDL signal showed slightly more attenuation than the VDL in the water. The ultrasonic azimuthal bond log showed a very low acoustic impedance result indicating a mixed fluid and gas in the annulus. This was unexpected as it was hypothesised that the result would show the average acoustic impedance of the sand and fluid mix. The presence of small gas bubbles in the sand much smaller than the ultrasonic beam diameter appears to have a large effect on the log response. It is assumed that if the annulus had been pressurised and the gas bubbles compressed to a very small size, the acoustic impedance reading would be significantly higher. It can be concluded however that the presence of fluids between the grains and wetting the outside of the 9 5/8 casing has a considerable effect on the log response and that a good bond consistent with an annular would not result in the presence of non consolidated granular materials filling the annulus.

8 8 SPE/IADC Calibration of bond logs in well conditions To measure and calibrate the bond log response in displaced shale which has formed an annular barrier, both logging and pressure testing are required to be carried out in the same well. This process was carried out successfully in three NCS wells. In subsequent wells the calibrated log response was used to identify shale annular barriers without pressure testing. The first calibration test was carried out on a NCS well on a production platform undergoing a sidetracking operation. The sidetrack was planned to be made at the 13 3/8 casing shoe at 1865m by first cutting and pulling the 9 5/8 casing and then using a whipstock to mill through the 13 3/8 casing in order to drill a new well track in a less depleted portion of the reservoir. The old well track was completed with a perforated 7 liner set just above the 9 5/8 casing shoe at 3704m. The primary annular barrier behind the intermediate 9 5/8 casing string was the primary cement job with an estimated top around 3184m. Prior to abandonment of the old well track a second barrier was required to meet NORSOK requirements on the NCS. No suitable barrier existed in this well. Instead of carrying out remedial work a known tertiary shale sequence (Hordaland Green clay) which had created tight wellbore conditions during drilling was suggested as a possible candidate for an annular barrier. This sequence was deep enough and estimated to be strong enough to provide an annular barrier. Figure 6: Well sketch of first calibration well The potential barrier section was pressure tested by perforating approximately 10 meters below the top and 10 meters above the base of the Green Clay sequence. A test string with a retrievable packer was run. The packer was set above the lower perforations and pressure applied through the test string. No pressure increase was observed in the test string or the 9 5/8 casing annulus. The pressure response observed and the volumes pumped through the test string were interpreted to represent formation leak-off in the Green Clay. The leak-off value was consistent with previous knowledge for this formation and indicated that an annular barrier had formed. Bond logs were run which showed good bonding over the entire Green Clay interval; however the CBL and impedance values were lower than would be expected in good cement. The higher CBL value in shale then cement is most likely due to shale being less stiff than well set cement. This would allow a little more axial compressional wave casing motion with shale than with cement. The lower acoustic impedance values observed on the ultrasonic azimuthal bond log is explained because the acoustic impedance of shale is significantly lower than standard class G cements. Good bonding was also observed in the shales above the Green Clay. Above the 13 3/8 casing shoe a free pipe response was observed, indicating no displaced shale. This is simply explained by the fact that bond logging tools only respond to the primary annulus which was now shielded from the formation by the 13 3/8 casing. The change over from poor bond below the Green Clay to a good bond coinciding with the base of the Green Clay and the change from good to poor bond at the 13 3/8 casing shoe is clear evidence of the capability of these tertiary shales to create an annular barrier.

9 SPE/IADC Free pipe bond log response due to 13 3/8 casing stopping the shale being displacement onto the outside of the 9 5/8 casing. CBL reading average of 65mV, high contrast VDL pattern and acoustic impedance average of 2.0 MRayl due heavy oil based mud presence in the annulus. 13 3/8 casing shoe at 1862 m (logging depth) stops shale impinging on outside of 9 5/8 casing. Good bond log response due to displaced shale pressing on the outside of the 9 5/8 casing. CBL reading average of 15mV, low contrast VDL pattern and acoustic impedance average of 4 MRayl with good azimuthal coverage. Good bond log response due to displaced shale pressing on the outside of the 9 5/8 casing. CBL reading average of 12mV, low contrast VDL pattern and acoustic impedance average of 3.5 MRayl. Low impedance streak is due to a drill pipe wear groove on the inside of the casing an anomalous effect on the impedance image. Base of Green Clay at 2705m MD (logging depth). Poor bond log response due to a lack of cement or displaced shale. This zone has no annular barrier. It is likely that the annulus is filled with a mixture of drilling mud, rock fragments or partially collapsed shale. CBL reading average of 35mV, medium to high contrast VDL pattern and acoustic impedance average of 1.8 MRayl. Figure 7: CBL/VDL and ultrasonic azimuthal bond logs over an interval in the Hordaland Green Clay

10 10 SPE/IADC This calibration process was repeated in a number of other wells with remarkably similar results. Similar annular barriers were observed and tested in all cases. Bond logs with similar responses were associated with the tested annular barriers. These observations built confidence that a positive bond log response similar to or better than the response observed in these wells could be used to determine the presence of an annular barrier without subsequent pressure testing. Despite the fact that remarkably similar log responses associated with positive pressure tests have been observed in a number of geologically different shale horizons, it is prudent to re-calibrate the log response in a new shale by means of a pressure test. Due to the variation in the mechanical properties of different shales the possibility exists that a good bond response may not be a clear indication of an annular barrier. Practically this means a positive pressure test should be made in a new area before bond logs can be used alone to identify and qualify shale annular barriers. Results and examples Following the verification of the collapsed Hordaland Green Clay as an annular barrier in the first field, qualification procedures have been carried out in additional fields that penetrate other clay rich formations on the NCS. Following these qualifications, a significant number of wells have been logged to confirm the presence and quality of the formation bonding in line with the barrier requirements. In all but three of these wells a good formation barrier has been observed. In those three where it was not, remedial action was required to put sufficient well barriers in place. This experience further underlines the need to confirm the barrier quality with log measurements. In this section examples from two wells are presented. Example #1 Shetland Clay Cement Bond logs were recorded in a 9 5/8 casing as part of a plug and abandonment program to recover the well slot for a planned sidetrack. Logs were run to verify the formation to casing bond in the Shetland clay sequence and confirm the displaced Shetland formation as the secondary well barrier to the reservoir. The log graphic shown in Figure 8 shows the CBL/VDL and ultrasonic log responses over a representative interval in the Shetland Clay. First to note is that the Ultrasonic images indicate a good formation to casing bond, with well bonded, high impedance material present all around the annulus. The CBL and VDL log responses support this, with low CBL amplitudes and a VDL image showing clear dampening of the casing arrivals in combination with strong formation arrivals. The observed log responses are in fact almost identical to those expected in well bonded Class G cement. This log example is also interesting in that it shows three distinct intervals where the formation has not impinged on the casing. These three intervals remain liquid filled with well bonded displaced formation above and below. The sinusoidal appearance of these intervals on the image logs indicate that these are geological beds, which can be identified as layers of Shetland Chalk. The fact that these chalk layers appear as liquid filled pockets further supports the plastic creep theory as we see no indication of rubble fill which would have been expected with a shear/tensile failure mechanism. In addition any thermal expansion would have been expected to affect both the shale and the chalk formations to a relatively similar degree. A subsequent pressure test procedure (the same procedure as carried out in the first Hordaland Green clay well) confirmed the annular barrier created by the displaced Shetland formation to meet all of the NORSOK requirements.

11 SPE/IADC Chalk Beds that have not displaced appear as liquid filled pockets. Sinusoidal appearance due to well path cutting the chalk beds at approximately 60 deg Shetland Clay displaced against the casing. The ultrasonic images show high measured impedance values around the entire annulus. Low CBL amplitudes and strong formation arrivals on the VDL image from the sonic tool support the ultrasonic interpretation, namely that the clay is hard packed against the casing. This was subsequently verified as a barrier element through pressure testing. Figure 8: CBL/VDL and Ultrasonic Cement Bond Logs over an interval in the Shetland Clay

12 12 SPE/IADC Example #2 Shetland Group (Nise Clay) Example In the next well example a procedure was undertaken to qualify the displaced Shetland (Nise clay) formation as an annular hydraulic barrier. Historical cement bond logs had, once again, shown good bonding high above the theoretical top of cement and qualification of the Shetland (Nise clay) formation as a barrier would allow significant efficiency savings related to slot recovery operations. The procedure involved first logging the 9 5/8 casing using both a CBL/VDL and an iv ultrasonic azimuthal bond logging tool which would determine the extent and quality of the formation bond. If an acceptable bond quality was identified over a sufficiently long interval then a second logging run with a v cased hole formation testing tool would be undertaken to verify the barrier through pressure testing. The CBL/VDL/Ultrasonic data from the first run showed that the formation had displaced and had formed a hard packed bond against the 9 5/8 casing, it also showed that the bonding extended over a sufficiently large interval (>200m). Based on these results a test depth was chosen from the logs and a pressure testing procedure was carried out with the cased hole formation tester. Figure 10 shows a section of the CBL/VDL and Ultrasonic logs illustrating the good formation bond, it also shows the depth chosen for the subsequent pressure testing (3275mMD). The pressure testing procedure involved first observing the annular pressure after communication to the annulus had been achieved, this pressure was found to be significantly higher than that of the depleted reservoir below, indicating that that a hydraulic barrier existed in the annulus between the reservoir and the test point. An extended leak of test then followed. Details can be seen in Figure 9. This test confirmed no communication via the annulus and that the formation strength was sufficient with respect to the reservoir pressure. The XLOT was then repeated giving the same results. The results from this testing procedure confirmed that the Shetland (Nise clay) formation satisfied all of the NORSOK annular barrier requirements and subsequent use of this annular displaced formation as a barrier element will offer significant savings related to future plug and abandonment operations on this field Pressure indicates annular isolation from depleted reservoir below XLOT test first confirmed no annular communication. Interpretation of fall off data after breakdown also confirmed formation strength at this depth to be as expected and therefore sufficient w.r.t. reservoir pressure. This test therefore confirms the annular barrier to be compliant. 1 3 Repeated extended leak off test confirms results from the first test. Figure 9: Test sequence performed with cased hole formation tester at a probe depth of 3275mMD

13 SPE/IADC Ultrasonic logs show high impedance and high flexural attenuation all around the annular circumference. The solid/liquid/gas map, which is computed using both the independent attenuation and impedance measurements and a prior knowledge of the properties of all the possible materials behind the casing, also shows that there is solid material around the whole of the annulus. The results therefore showed that the Shetland (Nise clay) formation had displaced and filled the annulus and that it had bonded well to the casing. Given the results of the ultrasonic logging it was decided to continue with the XLOT testing procedure to allow verification of the annular formation material as a qualified barrier. Depth selected for XLOT testing with a cased hole formation tester mMD Figure 10: Ultrasonic Cement Bond Logs over an interval in the Shetland (Nise) Clay

14 14 SPE/IADC Changes in steering documentation In order to ensure appropriate and correct application of the methods described above, it was important and necessary to modify the operating company internal steering documents and best practice procedures. A new steering document section was written to describe the requirement to verify formation as a permanent barrier element. This section is as follows: If competent formation is considered used as a permanent barrier element, position of displaced formation shall be identified and seal ability verified. Methodology Position and extent of collapsed formation shall be identified through appropriate logs. Two (2) independent logging measurements/tools shall be applied. Logging tools shall be suitable for applicable well conditions e.g. number of casing strings, casing dimensions and conditions, fluid types and densities. Logging tools shall be properly calibrated. Logs shall be interpreted by personnel with sufficient competence. Log response criteria for good bonding shall be established prior to initiating the logging operation. Log interpretation Both log measurements/tools show continuous good bonding of minimum 50 meter = Barrier element verified. Less than 50 meter continuous good bonding and/or non-unambiguous log response = Verify collapsed formation through pressure test or inflow test. No/poor bonding identified. No barrier element identified = Further action to be determined. In addition best practice procedures were written. These procedures describe the logging procedures with particular logging tools. They also list particular geological formations which have been qualified through both logging and pressure testing to be able to form suitable annular barriers. The cut off value of bond logging responses has been calibrated against successful pressure tests in a number of formations and has found to be remarkably consistent in different formations. The following readings are suggested as guidelines. Cement bond log amplitude Variable Density log Ultrasonic acoustic impedance scanner Good Barrier No Barrier CBL less than 20 mv over 80% of interval CBL reading within 20% of free pipe reading Low contrast casing signal and clear formation arrivals High contrast casing signal and weak formation arrivals AI reading greater than 3 MRayl on all azimuthal readings Reading less than 2 MRayl on some azimuthal readings Table 1: Calibrated bond log values Conclusion Tradition methods of checking or creating annular barriers during plug and abandonment operations are time consuming, expensive and not practical. Using shale that has collapsed against the casing via the mechanism of plastic creep due to overburden pressure provides a practical and effective annular barrier. The presence of such barriers can be proven by using wireline logs. These logs are used to identify shale formations and identify zones of sufficient length and azimuthal coverage which have collapsed and are squeezed hard onto the outside of the casing. Prior to being able to determine that an annular barrier identified by bond logs is good enough to withstand the pressures it may be exposed to, a particular geological formation must be calibrated by pressure testing to determine the barrier observed on logs is real. In addition the particular formation must be limit tested to determine the formation strength. This process was carried out on key NCS tertiary and cretaceous shales successfully.

15 SPE/IADC These new procedures were accepted by the Norwegian PSA and the operating company steering documents and best practice documents were appropriately updated. Regular use of bond logging to identify shale barriers during P&A operations on the NCS has been carried out during 2007 and Over 40 P&A operations have used this method with a success rate of over 90% of proving shale annular barriers. In some cases good annular barriers have been proven within a few weeks of setting the casing indicating that the process of creep can in some cases occur quite rapidly. The results of this method has given significant rig time and operating cost savings, prolonged well life in some cases and an overall improvement in the quality of well integrity. Identifying, qualifying and making use of nature s own barrier provides a solution which is extremely durable, self-healing and more robust than man made barriers. References: i The Petroleum Safety Authority of Norway (PSA), ii The Standards Organisation in Norway (NORSOK) - standard D-010, Well integrity in drilling and well operations (Rev. 3, August 2004), iii Fjær E., Holt R.M., Horsrud P., Raaen A.M., Risnes R. (2004) Petroleum Related Rock Mechanics 2nd edition. Developments in Petroleum Science, Elsvier iv R. van Kuijk, SPE, S. Zeroug, B. Froelich, SPE, M. Allouche, SPE, S. Bose, D. Miller, J.-L. le Calvez, V. Schoepf, SPE, and A. Pagnin, Schlumberger. A Novel Ultrasonic Cased-Hole Imager for Enhanced Cement Evaluation. SPE-10546, International Petroleum Technology Conference, November 2005, Doha, Qatar v K.A. Burgess, Schlumberger; T.D. MacDougall, Schlumberger; R.W. Siegfried, Gas Research Institute; T.G. Fields, Schlumberger, Wireline-Conveyed Through-Casing Formation Tester That Preserves Casing Integrity, SPE-72371, SPE Eastern Regional Meeting, Canton, Ohio, October 2001.

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Advanced Applications of Wireline Cased-Hole Formation Testers Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Agenda Introduction to Cased Hole Formation tester Tool specifications Applications

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells CHDT Cased Hole Dynamics Tester testing and sampling in cased wells Applications Evaluation of old wells for bypassed hydrocarbons Development of critical economic data for well evaluation Reduced-risk

More information

GEOTHERMAL WELL COMPLETION TESTS

GEOTHERMAL WELL COMPLETION TESTS GEOTHERMAL WELL COMPLETION TESTS Hagen Hole Geothermal Consultants NZ Ltd., Birkenhead, Auckland, New Zealand. ABSTRACT This paper reviews the measurements that are typically made in a well immediately

More information

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A. Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A. Sean Yakeley, Ed Wood and Yang Xu (Baker Hughes Inc)

More information

Hard or Soft Shut-in : Which is the Best Approach?

Hard or Soft Shut-in : Which is the Best Approach? HARD - SOFT shut-in? Hard or Soft Shut-in : Which is the Best Approach? March '93 INTRODUCTION There is now reasonable acceptance through-out the industry for the use of a hard shut-in procedure following

More information

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Squeeze Cementing Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Definition Squeeze Cementing is the process of applying hydraulic pressure to force or squeeze a cement slurry

More information

Extended leak off testing

Extended leak off testing Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures

More information

Next Generation Quartz Pressure Gauges

Next Generation Quartz Pressure Gauges Next Generation Quartz Pressure Gauges Rick Puccio, Ph.D. Senior Scientist Quartzdyne Houston, TX March 2, 2016 Outline Quartz Pressure Gauge Introduction Gauge Size Reduction Long Term Pressure Drift

More information

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS 5.1 Introduction Using surcharging as the sole soil consolidation mean can take a long time to reach the desired soil settlement. Soil consolidation using prefabricated

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

Level MEASUREMENT 1/2016

Level MEASUREMENT 1/2016 Level MEASUREMENT 1/2016 AGENDA 2 A. Introduction B. Float method C. Displacer method D. Hydrostatic pressure method E. Capacitance method G. Ultrasonic method H. Radar method I. Laser method J. Level

More information

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

ARTICLE. Overcome casing integrity issues in your plug-and-perf operations

ARTICLE. Overcome casing integrity issues in your plug-and-perf operations ARTICLE Overcome casing integrity issues in your plug-and-perf operations CONTENT A challenge to plug-and-perf success 3 Causes of casing restrictions 9 How extended-range frac plugs keep operations moving

More information

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS Authors: J. Daniel Arthur, P.E., SPEC, Tom Tomastik, Senior Geologist, Kris Anderson,

More information

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) AADE-07-NTCE-41 A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) Paknejad, A., Texas A&M University; Schubert, J., Texas A&M University

More information

North Dakota Petroleum Council Re-stimulation Initiative

North Dakota Petroleum Council Re-stimulation Initiative North Dakota Petroleum Council Re-stimulation Initiative Refracs: Completion Discussion for Bakken Generation 1 Wellbores Originally presented to the Interim Energy Development and Transmission Committee

More information

Worked Questions and Answers

Worked Questions and Answers Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of

More information

Flow Scanner. Production logging in multiphase horizontal wells

Flow Scanner. Production logging in multiphase horizontal wells Flow Scanner Production logging in multiphase horizontal wells Applications Multiphase flow profiling in nonvertical wells Identification of fluid and gas entries in multiphase well or liquid in gas wells

More information

Chapter 8: Reservoir Mechanics

Chapter 8: Reservoir Mechanics PTRT 1472: Petroleum Data Management II Chapter 8: Reservoir Mechanics - Reservoir drives Types of Natural Gas Reservoir Fluids Natural gas is petroleum in a gaseous state, so it is always accompanied

More information

Float Equipment TYPE 925/926

Float Equipment TYPE 925/926 Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category

More information

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability Talisman energy COIN Virtual Meeting # 17 26 th January 2011 Darren Bewick Graeme Douglas Martin Forbes David McGuckien Matt Morrison Martin Mosley Talisman Energy UK Ltd (TLMUK), Aberdeen 1 Presentations

More information

Seismic Survey Designs for Converted Waves

Seismic Survey Designs for Converted Waves Seismic Survey Designs for Converted Waves James A. Musser* GMG/AXIS Inc., Denver, CO 1720 Red Cloud Road, Longmont, CO, 80501, USA jmusser@gmg.com ABSTRACT Designing converted wave 3D surveys is considerably

More information

Casing and Cementing Requirements

Casing and Cementing Requirements Directive PNG005 May 2018 Revision 2.0 Governing Legislation: Act: The Oil and Gas Conservation Act Regulation: The Oil and Gas Conservation Regulations, 2012 Order: 148/18 Record of Change Revision Date

More information

HRLA High-Resolution Laterolog Array Tool. Improving the accuracy of Rt

HRLA High-Resolution Laterolog Array Tool. Improving the accuracy of Rt HRLA High-Resolution Laterolog Array Tool Improving the accuracy of Rt Applications Resistivity determination in conductive mud systems Thin-bed evaluation Invasion characterization for permeability indication

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

New generation of solid expandable liners help give operators a jump on trouble zones

New generation of solid expandable liners help give operators a jump on trouble zones New generation of solid expandable liners help give operators a jump on trouble zones By Pat York, Weatherford SINCE SOLID EXPANDABLE technology has gained credibility as an effective contingency option,

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

New power in production logging

New power in production logging New power in production logging Locating the zones where fluids enter the wellbore in a producing or injecting well is an important aspect of production logging. It is relatively straightforward to establish

More information

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following graphs.

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

EXPERIMENTAL RESULTS OF GUIDED WAVE TRAVEL TIME TOMOGRAPHY

EXPERIMENTAL RESULTS OF GUIDED WAVE TRAVEL TIME TOMOGRAPHY 18 th World Conference on Non destructive Testing, 16-20 April 2012, Durban, South Africa EXPERIMENTAL RESULTS OF GUIDED WAVE TRAVEL TIME TOMOGRAPHY Arno VOLKER 1 and Hendrik VOS 1 TNO, Stieltjesweg 1,

More information

A review of best practices for Selection, Installation, Operation and Maintenance of Gas meters for Flare Applications used for Managing facility

A review of best practices for Selection, Installation, Operation and Maintenance of Gas meters for Flare Applications used for Managing facility A review of best practices for Selection, Installation, Operation and Maintenance of Gas meters for Flare Applications used for Managing facility mass balance and compliance 1. What, When and Why? 2. Flare

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

Along-string pressure, temperature measurements hold revolutionary promise for downhole management Along-string pressure, temperature measurements hold revolutionary promise for downhole management IT S WIDELY KNOWN that the majority of stuck pipe incidents occur while pulling out of hole. If we can

More information

WILD WELL CONTROL WARNING SIGNS OF KICKS

WILD WELL CONTROL WARNING SIGNS OF KICKS WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn

More information

Coal and Water Protection. PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management

Coal and Water Protection. PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management Coal and Water Protection PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management Review of Applicable Regulations & Laws Coal protective casing: A string

More information

Abstract Objective Scope of Study Introduction Procedures

Abstract Objective Scope of Study Introduction Procedures AADE-05-NTCE-71 A Practical Solution to Control Gas Migration Ned Shiflet, Forest Oil Corporation; Michael O. Dion, TAM International; and David P. Flores, TAM International This paper was prepared for

More information

Testing Services Overview

Testing Services Overview 2 Jet Research Center JRC Jet Research Center Perforating Center of Excellence Testing Services Overview API RP19B Testing Advanced Testing Operational Testing API RP19B Testing The American Petroleum

More information

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2). Bulletin 2011-35 December 20, 2011 Surface Casing Vent Requirements for Wells This bulletin clarifies Section 6.100(4) of the Oil and Gas Conservation Regulations (OGCR) and provide additional surface

More information

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015 International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages 116- ISSN: 2289-4713 Improving Reservoir Recovery Factor Using Enhanced Electrical Submersible Pump Design; a Case

More information

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production? PLEASE NOTE THAT ALL USES OF THE WORD OPERATOR IN THIS DOCUMENT REFER TO THE ACT 13 DEFINITION OF WELL OPERATOR AND THUS, REFERENCE THE PERMIT HOLDER (PERMITEE) FOR THE WELL. ANY ENFORCEMENT ACTIONS UNDER

More information

Is my well safe? Terje Løkke-Sørensen, CTO, add energy

Is my well safe? Terje Løkke-Sørensen, CTO, add energy Is my well safe? Terje Løkke-Sørensen, CTO, add energy Introduction What is? a Safe Well?.. an Unsafe Well? A well with 2 well barriers both fully intact? A well with known issues risks can be managed?

More information

Perforating Center of Excellence TESTING SERVICES OVERVIEW

Perforating Center of Excellence TESTING SERVICES OVERVIEW Perforating Center of Excellence TESTING SERVICES OVERVIEW Jet Research Center (JRC) is the leader in energetic research and testing for the oil and gas industry. Since introducing jet perforators for

More information

Situated 250km from Muscat in

Situated 250km from Muscat in CYAN MAGENTA YELLOW BLACK GRAVITY GAINS A novel method of determining gas saturation has proved successful in Oman s Natih Field where conventional methods were giving anomalous results in difficult conditions.

More information

The key to connectivity

The key to connectivity The key to connectivity Kerry Daly, Global BD Manager, Tubing Conveyed Perforating (TCP) First published by Oilfield Technology, November 2015 Connecting oil or gas-bearing formations with the wellbore

More information

SEMATECH Provisional Test Method for Pressure Cycle Testing Filter Cartridges Used in UPW Distribution Systems

SEMATECH Provisional Test Method for Pressure Cycle Testing Filter Cartridges Used in UPW Distribution Systems Provisional Test Method for Pressure Cycle Testing Filter Cartridges Used in UPW Distribution Systems Technology Transfer 92010941B-STD and the logo are registered service marks of, Inc. 1996, Inc. Provisional

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

31 st Gas-Lift Workshop

31 st Gas-Lift Workshop 31 st Gas-Lift Workshop Houston, Texas February 4-8, 2008 NEW REQUIREMENTS TO GAS LIFT VALVES Øyvind Stokka & Erling Kleppa Petroleum Technology Company This presentation is the property of the author(s)

More information

Acoustic Pulse Reflectometry Brings an End to Tube Inspection Sampling By Dr. Noam Amir, Chief Technology Officer, AcousticEye

Acoustic Pulse Reflectometry Brings an End to Tube Inspection Sampling By Dr. Noam Amir, Chief Technology Officer, AcousticEye SINCE2011 Singapore International NDT Conference & Exhibition, 3-4 November 2011 Acoustic Pulse Reflectometry Brings an End to Tube Inspection Sampling By Dr. Noam Amir, Chief Technology Officer, AcousticEye

More information

Seismic Sources. Seismic sources. Recorders. Requirements; Principles; Onshore, offshore. Digitals recorders; Analog-to-Digital (A/D) converters.

Seismic Sources. Seismic sources. Recorders. Requirements; Principles; Onshore, offshore. Digitals recorders; Analog-to-Digital (A/D) converters. Seismic Sources Seismic sources Requirements; Principles; Onshore, offshore. Recorders Digitals recorders; Analog-to-Digital (A/D) converters. Reading: Reynolds, Section 4.5 Telford et al., Section 4.5

More information

COAL SEAM METHANE - EXPLORATION AND PRODUCTION

COAL SEAM METHANE - EXPLORATION AND PRODUCTION COAL SEAM METHANE - EXPLORATION AND PRODUCTION Dr Ian Gray, Principal Sigra Pty Ltd, 72 Donaldson Road, Rocklea, Queensland 4106 Australia. Tel +61 7 3216 6344, Fax +61 7 3216 6988, WWW: www.sigra.com.au

More information

ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION

ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION Application Note Doc. G8108-001 Rev. A - 23-Jul-02 ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION For more information regarding Digiquartz products contact: Paroscientific,

More information

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations WELL SCAVENGER Versatile wellbore clean-up tool for the most demanding operations WELL SCAVENGER: A versatile wellbore cleanup tool for flowrestricted applications The inability to recover wellbore debris

More information

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh

More information

Cased-Hole Logging Environment

Cased-Hole Logging Environment Cased-Hole Logging Environment 2 Planning a Production Logging Job Planning is an important part of a production logging job. Frequently these jobs can only be done in safety during daylight. Thus, the

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

DB Bridge Plug. Features. Benefits. Applications

DB Bridge Plug. Features. Benefits. Applications DB Bridge Plug The WELLFIRST Premium Cast Iron Bridge Plug designed to run on electric line. Rated between 2000-10000-psi differential, and 300 F from above and below. Features Field Proven Design Constructed

More information

NORSOK standard D-010 Rev. 3, August 2004

NORSOK standard D-010 Rev. 3, August 2004 7 COMPLETION ACTIVITIES... 3 7.1 GENERAL... 3 7.2 WELL BARRIER SCHEMATICS... 3 7.3 WELL BARRIER ACCEPTANCE CRITERIA... 3 7.4 WELL BARRIER ELEMENTS ACCEPTANCE CRITERIA... 5 7.5 WELL CONTROL ACTION PROCEDURES

More information

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC Perforation Design for Well Stimulation R. D. Barree Barree & Associates LLC Typical Shaped Charge Primer charge Main explosive charge Case or container Detonating cord groove ¾ point of initiation Liner

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES DOCUMENT CONTROL: Created Date: May 06, 2013 Last Updated Date: September 15, 2015 Last Updated By: Stuart Ellsworth

More information

Corrosion problems in seawater pump caissons. Practical solutions.

Corrosion problems in seawater pump caissons. Practical solutions. Corrosion problems in seawater pump caissons. Practical solutions. Svenn Magne Wigen FORCE Technology Norway AS Hornebergveien 7 7038 Trondheim, Norway Harald Osvoll FORCE Technology Norway AS Hornebergveien

More information

Instrumentation & Data Acquisition Systems

Instrumentation & Data Acquisition Systems Instrumentation & Data Acquisition Systems Section 3 -Level Robert W. Harrison, PE Bob@TheHarrisonHouse.com Made in USA 1 Level Section Question Which level measuring technology is the best solution when

More information

On-Off Connector Skirt

On-Off Connector Skirt On-Off Connector Skirt Retrievable Packers & Accessories The On-Off Connector Skirt is compact, reliable, fully sealing, J-type tubing disconnect device that automatically engages and releases with a small

More information

Paper #: POWER

Paper #: POWER Proceedings of POWER2008 ASME Power 2008 July 22-24, 2008, Orlando, Florida, USA Paper #: POWER2008-60061 THE USE OF AN EDDY CURRENT INSPECTION OF BRASS TUBES IN A SURFACE CONDENSER TO PROVIDE A CONDITION

More information

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE OIL AND GAS DO0KET NO. 01-0249550 THE APPLICATION OF REGENCY FS LP UNDER RULE 36 AND RULE 46 TO DISPOSE OF OIL AND WASTE CONTAINING HYDROGEN SULFIDE GAS INTO ITS TILDEN GPI WELL NO. 1, TILDEN, S. (WILCOX

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

4 RESERVOIR ENGINEERING

4 RESERVOIR ENGINEERING 4 RESERVOIR ENGINEERING This chapter summarizes the reservoir engineering data and analysis used in the development of the Depletion Plan for the White Rose Field. The data were derived from seismic and

More information

Inflatable Packers for Grouting 11/10/00

Inflatable Packers for Grouting 11/10/00 Introduction Inflatable Packers for Grouting 11/10/00 Inflatable packers are frequently used for grout injection in geotechnical applications for structural reinforcement and/or water-proofing of foundations,

More information

Step-Rate Formation Integrity Test Method for Geothermal Wells

Step-Rate Formation Integrity Test Method for Geothermal Wells GRC Transactions, Vol. 41, 2017 Step-Rate Formation Integrity Test Method for Geothermal Wells William M. Rickard, Ozgur Balamir and Ernesto Rivas Geothermal Resource Group, Inc. services@geothermalresourcegroup.com

More information

SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main

SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main SPE 102831 Online Water-Injection Optimization and Prevention of Reservoir Damage Bjørn Øyvind Bringedal, Svein Arne Morud, Nicolas Alexander Hall, ABB; Gary Huseman, Shell Copyright 2006, Society of Petroleum

More information

Wave Motion. interference destructive interferecne constructive interference in phase. out of phase standing wave antinodes resonant frequencies

Wave Motion. interference destructive interferecne constructive interference in phase. out of phase standing wave antinodes resonant frequencies Wave Motion Vocabulary mechanical waves pulse continuous periodic wave amplitude period wavelength period wave velocity phase transverse wave longitudinal wave intensity displacement amplitude phase velocity

More information

Enbridge G & P (East Texas) LP EXAMINER S REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

Enbridge G & P (East Texas) LP EXAMINER S REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE OIL AND GAS DOCKET NO. 05-0263914 THE APPLICATION OF ENBRIDGE G & P (EAST TEXAS) LP FOR AUTHORITY PURSUANT TO STATEWIDE RULES 9 AND 36 TO DISPOSE OF OIL AND GAS WASTE CONTAINING HYDROGEN SULFIDE INTO ITS

More information

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement Rotary Steerable System for high-performance drilling and accurate wellbore placement The PowerDrive X6 RSS maintains control under the most difficult conditions, bringing the benefits of rotary steerable

More information

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion PTRT 1471: Exploration and Production I Chapter 6: Drilling and Well Completion Well Planning Drilling is a major investment (over $100m for offshore) Planning is aimed at maximizing investment Wells are

More information

Restoring Fluid Flow in Tubing Strings

Restoring Fluid Flow in Tubing Strings Restoring Fluid Flow in Tubing Strings Andrew Roth, Product Manager Fike Corporation Fike Hydraulic Tubing Drains (HTD) for use with deep hole drilling tools, downhole devices and other oil and off shore

More information

Petroleum Development

Petroleum Development Petroleum Development Original Idea... It has been said, "oil is first found in the minds of explorationists." Usually, this is the case. An explorationist, utilizing available data and information, will

More information

Impact of imperfect sealing on the flow measurement of natural gas by orifice plates

Impact of imperfect sealing on the flow measurement of natural gas by orifice plates Impact of imperfect sealing on the flow measurement of natural gas by orifice plates Rubens Silva Telles 1, Kazuto Kawakita 2 1 IPT Instituto de Pesquisas Tecnológicas, São Paulo, Brazil, rtelles@ipt.br

More information

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS CONSULTATION AND ENGAGEMENT DRAFT MAY 17, 2016 If you would like this information in

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

Downhole Gas Separator Selection

Downhole Gas Separator Selection 4th Annual Appalachian Basin Gas Well Deliquification Workshop Marietta College, Marietta, Ohio June 3 5, 2013 Downhole Gas Separator Selection Lynn Rowlan Proper Downhole Gas Separator Selection Critical

More information

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing ECD Reduction Tool R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing Drilling Engineering Association, Fourth Quarter Meeting November 20, 2008 1 Presentation outline Description

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

Beam Pumping to Dewater Horizontal Gas Wells

Beam Pumping to Dewater Horizontal Gas Wells 2 nd Annual Appalachian Basin Gas Well Deliquification Seminar Hilton Garden Inn, Pittsburg, PA June 13-14, 2011 Beam Pumping to Dewater Horizontal Gas Wells Lynn Rowlan, Echometer Co. J F Lea, Production

More information

Basic Well Log Interpretation

Basic Well Log Interpretation PDHonline Course K132 (3 PDH) Basic Well Log Interpretation Instructor: Joshua Cook, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS What are some applications in which you ve successfully used this product? New Completions - Stage by Stage Diversion Between Frac plugs for Intra-Stage Diversion Replace Frac Plugs with Perf PODs - Full

More information

Challenging Subsea Gas Lift Application, Offshore Norway.

Challenging Subsea Gas Lift Application, Offshore Norway. Challenging Subsea Gas Lift Application, Offshore Norway. Authors: Magnus Paulsen - Schlumberger Artificial Lift, Norway Rina Stabell StatoilHydro, Norway Eric Lovie - Schlumberger Artificial Lift, Europe

More information

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment Contents 1. GENERAL INFORMATION & RECOMMENDATIONS 1 2. INSTALLATION FLOAT EQUIPMENT 2 2.1 PRE-USE FIELD INSPECTION 2 2.2 POSITION FLOAT ON CASING STRING 3 3. RUNNING OF FLOAT EQUIPMENT 3 3.1 CIRCULATION

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

Structural Design of Tank Weighing Systems

Structural Design of Tank Weighing Systems Structural Design of Tank Weighing Systems 1. Initial observations Some essential rules must be followed when installing load cells in tanks. For example, tanks are frequently subject to weather conditions

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY

117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY 117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY No.: 117 Established: 01.10.08 Revision no: 6 Date revised: 08.11.2017 Page: 2 PREFACE This guideline is supported by Norwegian Oil and

More information