SUPERSEDED. Code of practice for temporary traffic management (CoPTTM) Section F. Traffic Control Devices Manual Part 8. manual number: SP/M/010

Size: px
Start display at page:

Download "SUPERSEDED. Code of practice for temporary traffic management (CoPTTM) Section F. Traffic Control Devices Manual Part 8. manual number: SP/M/010"

Transcription

1 Traffic ontrol Devices Manual Part 8 ode of practice for temporary traffic management (opttm) manual number: SP/M/010 Section NZ Transport gency ourth edition, mendment 2 of ode of practice for temporary traffic management ffective from July 2013 ISBN (print) ISBN (online)

2 opyright information This publication is copyright NZ Transport gency. Material in it may be reproduced for personal or in-house use without formal permission or charge, provided suitable acknowledgement is made to this publication and the NZ Transport gency (NZT) as the source. Requests and enquiries about the reproduction of material in this publication for any other purpose should be made to: NZ Transport gency Private Bag 6995 Wellington 6141 The permission to reproduce material in this publication does not extend to any material for which the copyright is identified as being held by a third party. uthorisation to reproduce material belonging to a third party must be obtained from the copyright holder(s) concerned. Disclaimer The NZT has endeavoured to ensure material in this document is technically accurate and reflects legal requirements. However, the document does not override governing legislation. The NZT and its employees and agents involved in the preparation and publication of this document do not accept liability for any consequences arising from the use of this document. Users of this document should apply and rely upon their own skill and judgment, and should not rely on the manual's contents in isolation from other sources of advice and information. In applying their own skill and judgment, the standards of safety and serviceability explicitly required or implied by this manual shall not be reduced. If the user is unsure whether the material is correct, they should make direct reference to the relevant legislation or regulations and contact the NZT. More information Published 2013 ISBN (print) ISBN (online)

3 STTI OPRTIONS No. 1.1 Shoulder closure 1.2 Shoulder closure - low-risk (under 250vpd) 1.3 Lane closure - low-risk (under 250vpd) Under 65km/h - must have SD in both directions 1.4 ll traffic stopped temporarily Manual traffic control 1.5 Single-lane alternating flow Manual traffic control 1.6 Single-lane alternating flow Portable traffic signals 1.7 Single-lane Give way control 1.8 Short no exit road No. LOW VOLUM RODS SHOULDR ND BRM TWO-WY TWO-LN ROD OOTPTH 2.1 ootpath diverted onto berm behind working space irst preference 2.2 ootpath diverted onto berm between working space and carriageway Second preference 2.3 ootpath diverted onto carriageway Third preference 2.4 ootpath closed - permanent speed less than 65km/h ourth preference 2.5 Work on berm and/or footpath Permanent speed less than 65km/h 2.6 Work in parking lane Permanent speed less than 65km/h 2.7 Shoulder closure YL LN LVL 1 RODS SHOULDR, BRM ND PRKING LN 2.8 Traffic not crossing road centre Diverted cycle lane 2.9 Traffic crossing road centre Diverted cycle lane - coned lane control 2.10 Traffic not crossing road centre ycle lane closed TWO-WY TWO-LN ROD 2.11 Traffic not crossing road centre 2.12 Traffic not crossing road centre Signs on median 2.13 Traffic crossing road centre Two-lane diversion 2.14 Single-lane alternating flow Manual traffic control (Stop/Go or Stop/Slow) 2.15 ll traffic stopped temporarily Manual traffic control (Stop/Go or Stop/Slow) 2.16 Single-lane (traffic volume less than 1000vpd - 80vph) Give way control 2.17 Single-lane alternating flow Portable traffic signals 2.18 Work in centre of road DIGRMS LIST

4 STTI OPRTIONS No. LVL 1 RODS TWO-WY TWO-LN ROD Intersection or roundabout 2.19 Road works on side road after intersection - TSL on side road Traffic not crossing road centre 2.20 Road works on side road after intersection - TSL on main road Traffic not crossing road centre 2.21 Work in middle of intersection 2.22 losure at corner of an intersection Manual traffic control (Stop/Go or Stop/Slow) Road closures and detours 2.23 Road closure Temporary route around a hazard or workspace 2.24 Road closure - detour route xample 2.25 Typical detour route signing xample Other hazard 2.26 looding, washout, slip, slippery surface Unattended worksites 2.27 New seal Unattended and/or unswept worksite 2.28 Surface hazard 2.29 Seal repairs on a curve ON-WY TWO-LN DIVIDD OR TWO-LN ROD 2.30 Left-lane closure 2.31 Right-lane closure 2.32 One-lane closure Temporary two-lane diversion 2.33 Lane diversions in both directions 2.34 Work in middle of road TWO-WY THR-LN ROD 2.35 entre-lane closure 2.36 ontraflow lane closure TWO-WY OUR-LN ROD 2.37 Left-lane closure 2.38 Two-lane closure One-lane contraflow 2.39 entre-lane closures DIGRMS LIST ON-WY THR-LN DIVIDD OR THR-LN ROD 2.40 One-lane closure Left lane 2.41 Two-lane closure Left and centre lanes 2.42 Two-lane closure Two lane temporary diversion

5 MOBIL OPRTIONS No. 3.1 Road inspection activites 3.2 Work vehicle is in a lane With SD - on LV Low-risk roads (any speed) and LV roads under 65km/h 3.3 Work vehicle is on berm, shoulder or lane No SD 3.4 Work vehicle on shoulder or berm - clear of live lane SD not required No. 4.1 Work vehicle is more than five (5) metres from the edgeline 4.2 LOW-VOLUM RODS TWO-WY TWO-LN ROD LVL 1 RODS TWO-WY TWO-LN ROD Work vehicle is within five (5) metres of the edgeline 4.3 Work vehicle is within five (5) metres of the edgeline ny speed SD to work vehicle: not required under 65km/h required over 65km/h Speed limit over 65km/h The rear visibility is less than SD 4.4 Work vehicle is in a lane Permanent speed under 65km/h 4.5 Work vehicle is in a lane 4.6 Work vehicle is in a lane 4.7 Personnel on the road ny speed TWO-LN DIVIDD OR TWO-LN ON-WY ROD DIGRMS LIST Permanent speed over 65km/h SD forward visibility to work vehicle Permanent speed over 65km/h No SD to work vehicle 4.8 Work vehicle in the right lane Permanent speed over 65km/h 4.9 Part or all of a lane occupied Semi-static closure work for up to 1 hour

6 RDING TRI MNGMNT DIGRM (TMD) Usually contractors place the signs on left-hand side of the road first with the TMD the right way up. When signs are placed for the right-hand side of the road the contractor tips the TMD upside down and reads which signs have to be placed for that side of the road. To make this process easier: Signs going up the page are shown closest to the road Signs going down the page are shown further away from the road Sign icons and sign numbers for layout down the road (from top to bottom of the TMD) are turned upside down. D G RP4 RP41 T2/T21 6m max 6m max 6m max Down the road PN11 PN11 PN11 Up the road

7 LGND OR DIGRMS

8 LVL LV LYOUT DISTNS TBL

9 LVL 1 LYOUT DISTNS TBL Traffic control devices manua l part 8 opttm Section 4th edition, July 2013

10 SHOULDR ND BRM Shoulder closure 1.1 Level LV 1.one spacing along side of working space on roads: over 65km/h = 20m under 65km/h = 10m 2. 10m taper is allowed where shoulder width is less than 2.5m 3.*or shoulders exceeding 2.5m width, apply the following calculation; calculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of shoulder G = Taper length in metres from the level LV layout distance table B G * T1/T138

11 SHOULDR ND BRM Shoulder closure - low-risk (under 250vpd) 1.dvance warning sign may be attached to rear of work vehicle if sign visibility is available Low-risk Under 250vpd 1.2 Level LV Work vehicle B T1/T138

12 TWO-WY TWO-LN ROD Lane closure Under 65km/h - must have SD in both directions 1.dvance warning sign may be attached to rear of work vehicle if sign visibility is available 2.If the working space is very short (less than 30m) and the MT has at least 120m clear visibility from either direction beyond the point vehicles may need to stop, then one MT operating in the middle of the worksite may be used 3.Minimum 5 cones in cone threshold at: 2.5m centres - less than 65km/h 5m centres - more than 65km/h 4.STOP/GO control may be replaced by GIV WY control 5.or closures of more than 1 day at same location use diagram 1.5 or similar Less than B 30m 30m B Work vehicle Low-risk Under 250vpd T1 1.3 Level LV MT must have 120m clear visibility beyond point vehicles need to stop MT must have 120m clear visibility beyond point vehicles need to stop T1

13 TWO-WY TWO-LN ROD ll traffic stopped temporarily Manual traffic control 1.Temporary delay period not to exceed the limit set or approved by the R 2.MT with RP4/RP41 STOP/GO or RP4/RP42 STOP/SLOW paddle on road shoulder located between 1st and 2nd cone closest to the working space 3.Minimum 5 cones in cone threshold at: 2.5m centres - less than 65km/h 5m centres - more than 65km/h 4.MTs must show same message to oncoming traffic (eg STOP/STOP or GO/GO) 5.Refer to MT essentials for further information 6.Traffic must be stopped in both directions of travel where the width of road is too narrow to cater for: the work delineation safety zones, and road user traffic RP4 RP41 T2/T21 T1 T1 T2/T21 RP41 RP4 1.4 Level LV

14 TWO-WY TWO-LN ROD Single-lane alternating flow Manual traffic control 1.Temporary delay period not to exceed the limit set or approved by the R 2. 30m return taper at the end of the closure is mandatory 3.MT with RP4/RP41 STOP/GO or RP4/RP42 STOP/SLOW paddle on road shoulder located between 1st and 2nd cone closest to the working space 4.Minimum 5 cones in cone threshold at: 2.5m centres - less than 65km/h 5m centres - more than 65km/h 5.When road users are passing the working space in alternating flow, all construction equipment must be stopped on same side of the road 6.Refer to MT essentials for further information 30m 10m 10m RP4 RP41 T2/T21 T1 T1 T2/T21 RP41 RP4 1.5 Level LV

15 TWO-WY TWO-LN ROD Single-lane alternating flow Portable traffic signals 1.Use a full TMP form for this operation as it includes details of the portable traffic signals to be used 2.Install temporary limit lines or use RP61/RP62 signs 3. 30m return taper at the end of the closure is mandatory 4.Minimum 5 cones in cone threshold at: 2.5m centres - less than 65km/h 5m centres - more than 65km/h 30m 10m 10m T1 T1 T1 T1 1.6 Level LV

16 TWO-WY TWO-LN ROD Single-lane Give way control 1.The RP51/RP22 and RP55 controls must be placed in the following priority order: downhill traffic must give way to uphill traffic traffic that has to cross into the opposing lane gives way 2. TSL signs and TSL derestriction signs may be installed if required 3.Working space to be less than 100m 4.Intervisibility is required as indicated on diagram. This means that a road user stopped at one priority sign has unimpeded line of sight to a road user at the other priority sign 30m 100m max 10m 10m RP51/RP22 TL9L/TL9S TL9R/TL9S RP Level LV

17 TWO-WY TWO-LN ROD Short no exit road 1.8 Level LV B (refer to note 2) T1 15m Less than 3 x B (refer to note 4) G 1.T1 sign to be placed at least 15m from the intersection 2.Where less than B, T1/T135 and signs required on main road 3.Working space to be less than 100m 4.Signage is not required past the worksite where there is less than 3 x B from the end of the working space to the end of the road

18 OOTPTH ootpath diverted onto berm behind working space irst preference 1.Minimum pedestrian footpath widths: Residential/Rural - 0.9m Suburban entre - 1.2m BD - 2m 2.Where the length of the working space exceeds 20m, these widths may have to be increased so footpath users do not have to wait to pass 3.Temporary footpath surfaces must be suitable for footpath users 4.Use safety fence to enclose the working space, or at attended worksites, cones connected with cone bars can be used to enclose the working space but only for a short period of time Note: one bars are not recommended where heavy equipment (eg a digger) is being used. safety fence is preferred in these cases 5.This TMD must be used in conjunction with appropriate TTM for any work carried out on the shoulder or in the live lane Berm TU32 TU31 ootpath 2.1 ootpath Berm

19 OOTPTH ootpath diverted onto berm between working space and carriageway Second preference 1.Minimum pedestrian footpath widths: Residential/Rural - 0.9m Suburban entre - 1.2m BD - 2m 2.Where the length of the working space exceeds 20m, these widths may have to be increased so footpath users do not have to wait to pass 3.Temporary footpath surfaces must be suitable for footpath users 4.Use safety fence to enclose the working space, or at attended worksites, cones connected with cone bars can be used to enclose the working space but only for a short period of time Note one bars are not recommended where heavy equipment (eg a digger) is being used. safety fence is preferred in these cases 5.Use barrier or safety fence to delineate the traffic side of the footpath, or at attended worksites (except on state highways) cones connected with cone bars can be used to delineate the traffic side of the TU32 footpath for a short period of time 6.There must be a lateral safety zone between the traffic side of the footpath and the live lane: 0.5m for barrier 1m for safety fence or cone bars 7.This TMD must be used in conjunction with appropriate TTM for any work carried out on the shoulder or in the live lane Berm TU31 Berm ootpath ootpath Berm Berm 2.2

20 OOTPTH ootpath diverted onto carriageway Third preference 1.Minimum pedestrian footpath widths: Residential/Rural - 0.9m Suburban entre - 1.2m BD - 2m 2.Where the length of the working space exceeds 20m, these widths may have to be increased so footpath users do not have to wait to pass 3.Use safety fence to enclose the working space, or at attended worksites, cones connected with cone bars can be used to enclose the working space but only for a short period of time Note one bars are not recommended where heavy equipment (eg a digger) is being used. safety fence is preferred in these cases 4.Use barrier or safety fence to delineate the traffic side of the footpath, or at attended worksites (except on state highways) cones connected with cone bars can be used to delineate the traffic side of the footpath for a short period of time 5.There must be a lateral safety zone between the traffic side of the footpath and the live lane: 0.5m for barrier 1m for safety fence or cone bars 6.Use kerb ramps to assist mobility vehicles, pushchairs, etc 7.t night-time, corners of safety fence may be illuminated with flashing amber warning lights 8.This TMD must be used in conjunction with appropriate TTM for any work carried out on the shoulder or in the live lane D B TU31 TU32 G T1 ootpath ootpath 2.3

21 OOTPTH ootpath closed - permanent speed less than 65km/h ourth preference 1.Use T2 and PDSTRINS supplementary plate to alert road users to the potential of footpath users crossing the carriageway 2.Use safety fence at each end of working space 3.Use kerb ramps 4.Use another TMD as well, where working space/safety zone encroaches on live lane 5.This TMD must be used in conjunction with appropriate TTM for any work carried out on the shoulder or in the live lane B B TG31 TU2/TU31 TU2/TU32 ootpath ootpath T2/To be advised 2.4 TG31 T2/To be advised ootpath ootpath

22 SHOULDR, BRM ND PRKING LN Work on berm and/or footpath Permanent speed less than 65km/h 1.Where work is carried out on the berm or footpath and a work vehicle is parked in a legal parallel car park, provided the vehicle is only accessed from the off traffic side, advance warning T1 and WORKS ND are optional 2.Traffic management must be provided where footpath users or cyclists are affected 3.This layout may only be used during daylight hours 4.Large plant and machinery must not be used in this situation, a more substantial closure is required B Berm T1 ootpath Parking Lane Work vehicle 2.5

23 SHOULDR, BRM ND PRKING LN Work in parking lane Permanent speed less than 65km/h 1.Where work is carried out in the legal parking lane (a place where a vehicle would normally park with a footpath and/or kerb and channel alongside), the following minimum standard of TTM must be provided: a 10m taper in front of the work vehicle cones alongside the work vehicle and the working space a longitudinal safety zone a 1m lateral safety zone along the working space a T1 (or other appropriate advance warning sign) mounted on the back of the work vehicle 2.T1 ROD WORKS and WORKS ND signs are optional 3.The work vehicle must be no larger than a light truck and may have an amber flashing beacon 4.Traffic management must be provided where footpath users or cyclists are affected 5.This layout may only be used during daylight hours 6.Large plant and machinery must not be used in this situation, a more substantial closure is required G=10m D B Berm ootpath T1 Parking Lane Work vehicle 2.6 T1

24 SHOULDR, BRM ND PRKING LN Shoulder closure 1. 10m taper is allowed where shoulder width is less than 2.5m 2.*or shoulders exceeding 2.5m width, apply the following calculation; calculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of shoulder G = Taper length in metres from the level 1 layout distance table B G * D 2.7 T1/T138

25 YL LN Traffic not crossing road centre Diverted cycle lane 1.Minimum cycle lane width must be: 1m - 50km/h or less 1.5m - 60km/h or more 2. minimum cycle lane width of 1.5m is required if the temporary cycle lane is uphill 3.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 4.Use TSLs if required by TSL decision matrix 5.The T144 X0km/h HD sign is optional B B D G* TU44 ycle lane 2.8 Minimum cycle lane width

26 YL LN Traffic crossing road centre Diverted cycle lane - coned lane control 1.Minimum cycle lane width must be: 1m - 50km/h or less 1.5m - 60km/h or more 2. minimum cycle lane width of 1.5m is required if the temporary cycle lane is uphill 3.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 4.Use TSLs if required by TSL decision matrix 5.The T144 X0km/h HD sign is optional B B G* G* D ½ ½ ycle lane 2.9 Minimum cycle lane width TU44

27 YL LN Traffic not crossing road centre ycle lane closed 1.Only use this TMD if there is insufficient width to fit a replacement cycle lane 2.Minimum cycle lane width must be: 1m - 50km/h or less 1.5m - 60km/h or more 3. minimum cycle lane width of 1.5m is required if the temporary cycle lane is uphill 4.Merge of cycle lane with live lane must be delineated 5.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 6.The T144 30km/h HD sign is optional B D G* 30m min Minimum cycle lane width TU ycle lane T2/T230 YL LN LOSD

28 TWO-WY TWO-LN ROD Traffic not crossing road centre 1.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 2.If traffic likely to cross the centreline, place cones on the centreline with signs at each end 3.Use TSLs if required by TSL decision matrix 4.If TSLs not required, the T1 and signs on the right hand side of the road are also not required 5.The T144 X0km/h HD sign is optional B B D G* 2.11 Refer note 4 Refer note 4

29 TWO-WY TWO-LN ROD Traffic not crossing road centre Signs on median 1.Use this diagram if signs will not be visible on left-hand side of road, or if it is safer to place signs on median and this will not interfere with turning traffic movements 2.Where a median exists which is more than 2m wide, the signs may be positioned on the median. Signs must be placed back-to-back unless on a solid median 3.Where there is a solid median, signs are not required in the opposing direction 4.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 5.Use TSLs if required by TSL decision matrix 6.The T144 X0km/h HD sign is optional B B D G* 2.12

30 TWO-WY TWO-LN ROD Traffic crossing road centre Two lane diversion 1.ones are required on edge of live lane opposite closure if road is not well defined 2.Return taper at end of closure may be shortened 3.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 4.Use PN11 No Stopping signs, if necessary 5.Use TSLs if required by TSL decision matrix 6.The T144 X0km/h HD sign is optional B B G* D G* ½ 2.13 PN11 PN11 PN11 PN11 ½

31 TWO-WY TWO-LN ROD Single-lane alternating flow Manual traffic control (STOP/GO or STOP/SLOW) 1.xtend or place extra advance warning signs towards on-coming traffic beyond any expected traffic queues 2. 30m return taper at the end of the closure is mandatory 3.ones are required on edge of live lane opposite closure if road is not well defined 4.Use PN11 no stopping signs, if necessary 5.MT with RP4/RP41 STOP/GO or RP4/RP42 STOP/SLOW paddle on road shoulder located between 1st and 2nd cone closest to the working space 6.Minimum 5 cones in cone threshold at: 2.5m centres - less than 65km/h 5m centres - more than 65km/h 7.Refer to MT essentials for further information 8.Delays cannot exceed the time approved by the R (normally 5 to 10 minutes) 9.The T144 30km/h HD sign is optional 30m D 30m 10m 10m RP4 RP41 T2/T21 T2/T21 RP41 RP4 PN11 PN11 PN11 PN

32 TWO-WY TWO-LN ROD ll traffic stopped temporarily Manual traffic control (STOP/GO or STOP/SLOW) 1.losure period not to exceed the limit set or approved by the R 2.xtend advance warning signs towards on-coming traffic beyond any expected traffic queues 3.MT with RP4/RP41 STOP/GO or RP4/RP42 STOP/SLOW paddle on road shoulder located between 1st and 2nd cone closest to the working space 4.Minimum 5 cones in cone threshold at: 2.5m centres - less than 65km/h 5m centres - more than 65km/h 5.MTs must show same message to oncoming traffic (eg STOP/STOP or GO/GO) 6.Refer to MT essentials for further information 7.When road users are passing the working space in alternating flow, all construction equipment must be stopped on same side of the road 8.Where damage is likely to occur to passing traffic eg during sealing, traffic must be stopped in both directions 9.The T144 X0km/h HD sign is optional D D RP4 RP41 T2/T21 T2/T21 RP41 RP4 2.15

33 TWO-WY TWO-LN ROD Single-lane (traffic volume less than 1000vpd - 80vph) Give way control 1.The RP51/RP22 and RP55 controls must be placed in the following priority order: downhill traffic must give way to uphill traffic traffic that has to cross into the opposing lane gives way, however where visibility for this vehicle is marginal the contractor may require the other vehicle with better visibility to give way 2.Intervisibility is required as indicated on diagram. This means that a vehicle at one sign is able to see whether the way ahead is clear 3. 30m return taper at the end of the closure is mandatory 4.Use PN11 No Stopping signs, if necessary 5.ones are required on edge of live lane opposite closure if road is not well defined 6.The T144 X0km/h HD sign is optional 30m D 100m max 30m 10m 10m RP51/RP22 TL9L/TL9S TL9R/TL9S RP52 PN11 PN11 PN

34 TWO-WY TWO-LN ROD Single-lane alternating flow Portable traffic signals 1.Provide details of make and model of portable traffic signals in the TMP 2.Install temporary limit lines or use RP61/RP62 signs 3.pproved temporary speed humps may also be used 4. 30m return taper at the end of the closure is mandatory 5.ones are required on edge of live lane opposite closure if road is not well defined 6.xtend or place extra advance warning signs towards on-coming traffic beyond any expected traffic queues 7.Use PN11 No Stopping signs, if necessary 8.Minimum 5 cones in cone threshold at: 2.5m centres - less than 65km/h 5m centres - more than 65km/h 9.The T144 30km/h HD sign is optional 30m D 30m 10m 10m T1 T1 PN11 PN11 PN11 PN

35 TWO-WY TWO-LN ROD Work in centre of road 1.ones are required on edge of live lane opposite closure if road is not well defined 2.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 3.Use PN11 no stopping signs, if necessary 4.Use TSLs if required by TSL decision matrix 5.The T144 X0km/h HD sign is optional B B G* D D G* ½ ½ PN11 PN11 PN11 PN11 PN11 PN

36 TWO-WY TWO-LN ROD - Intersection or roundabout Road works on side road after intersection - TSL on side road Traffic not crossing road centre 2.19 / T135 B B D G* ** =15m B B / T135 1.Sign spacing of TSL at the intersection can be reduced as per the table shown below 2.Where minimum dimensions cannot be achieved TMD 2.20 is to be used 3.*alculation of taper length for lateral shift of less than 3.5m is: W x G W = Width of lateral shift 3.5 G = Taper length in metres from the level 1 layout distance table 4.If traffic likely to cross the centreline, place cones on the centreline with signs at each end 5.Use TSLs as required by TSL decision matrix 6.The T144 30km/h HD sign is optional Speed Intersection to TSL ** TSL to taper Total <50km/h 15m 15m 30m 60km/h 15m 25m 40m >70km/h 15m 40m 55m

37 TWO-WY TWO-LN ROD - Intersection or roundabout Road works on side road after intersection - TSL on main road Traffic not crossing road centre 2.20 / T135 B RS1/ TG1 B D G* RS1/ RS2/ RS1/ RS2/ B / T135 1.*alculation of taper length for lateral shift of less than 3.5m is: W x G W = Width of lateral shift 3.5 G = Taper length in metres from the level 1 layout distance table 2.If traffic likely to cross the centreline, place cones on the centreline with signs at each end 3.Use TSLs as required by TSL decision matrix 4.The T144 X0km/h HD sign is optional

38 TWO-WY TWO-LN ROD - Intersection or roundabout Work in middle of intersection 2.21 B Signs and layout to be repeated on each approach 1.This diagram may be used at a T intersection by removing any one of the roads 2.Signs and layout shown in the box at the bottom of the diagram is to be repeated on each approach 3. signs are not required at an existing roundabout 4.one tapers are optional at existing roundabouts 5.Lane widths,, may need to be increased to allow for turning movements of larger vehicles 6.Use TSLs if required by TSL decision matrix 7.The T144 X0km/h HD sign is optional

39 TWO-WY TWO-LN ROD - Intersection or roundabout losure at corner of an intersection Manual traffic control (Stop/Go or Stop/Slow) 1.This diagram may be used at a T intersection by removing any one of the roads 2.Signs and layout shown in the box at the bottom of the diagram is to be repeated on each approach 3. 30m return taper at the end of the closure is mandatory 4.Use PN11 no stopping signs, if necessary 5.MT with RP4/RP41 STOP/GO or RP4/RP42 STOP/SLOW paddle on road shoulder located between 1st and 2nd cone closest to the working space 6.Minimum 5 cones in cone threshold at: 2.5m centres - less than 65km/h 5m centres - more than 65km/h 7.Refer to MT essentials for further information 8.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 9.The T144 30km/h HD sign is optional RP4 RP41 10m G=30m 10m RP4 D RP41 T2/T21 RD6R RP41 RP RP41 RP4 D G=30m 10m Signs and layout to be repeated on each approach

40 TWO-WY TWO-LN ROD - Road closures and detours Road closure Temporary route around a hazard or workspace 1.Use TSLs if required by TSL decision matrix 2.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 3.The T144 X0km/h HD sign is optional W20-2 RD3 W20-2 RD ½ ½ 2 X G D D 2 x G

41 TWO-WY TWO-LN ROD - Road closures and detours Road closure - detour route xample 1.Block access to road with barricade 2.If a longer term site, use chevron sight board to direct traffic TDB2 TD5 ½ ½ RD1L TD1 TD3 TD1 Less than 20m W20-2 TDB2 or TDB TD5 RD3 D W20-2 T1

42 TWO-WY TWO-LN ROD - Road closures and detours Typical detour route signing xample 2.25 T1 TD5 TD1 TD3 TD2 RD3 and TD2 or W20-2 RD3 and TD2 or W20-2 TD3 TD5 TD2 TD1 TD2 TD1 TD2 TD1 TD1 Signs and layout to be repeated on each approach TD2 T1 1.Signpost all intersections to return diverted traffic back to normal/intended route: Use appropriate sign to indicate detour ahead (eg TD3) Use appropriate route signs before each intersection and on long straights (eg TD1) Use TD5 signs to advise end of detour 2.If detour to operate for more than 48 hours: Use chevron sight board to direct traffic dd destination signage as appropriate

43 TWO-WY TWO-LN ROD Other hazard looding, washout, slip, slippery surface 1.This diagram is for initial response only. ppropriate long term TTM must be installed as soon as practical 2.Use one of the following signs and/or supplementary plates: T211 T212 TR1L/R TR2 TR4 looding Washout Slips Slippery Surface Uneven Surface 3.If necessary, erect TG4 DRY YOUR BRKS sign 4.Delineate hazard if hazard extends onto lane 5.Use TSLs if required by TSL decision matrix 6.The T144 X0km/h HD sign is optional B B RSI/RS2/ TG4 looding RSI/RS2/ T2/T211/ T144 TG4 TG T2/T211/ T144

44 TWO-WY TWO-LN ROD Unattended worksites New seal - unattended and/or unswept worksite 1.Use cones to form a threshold treatment at the start of the new seal. Minimum of 10 cones at 5m centres 2.ones on the trafficked side of signs for sites to be left unattended overnight 3.Worksites need positive traffic management to ensure all road users travel at the TSL 4.Use TSLs if required by TSL decision matrix 5.TSLs to be repeated at 400m maximum centres 6.The T144 X0km/h HD sign is optional B B 400m max 400m max TG31 TR3/TR31/ T TG31 TR3/TR31/ T144

45 TWO-WY TWO-LN ROD Unattended worksites Surface hazard 1.This layout must not be used on an alignment with horizontal curves (corners) or when repairs are carried out on or near horizontal curves. See TMD On long worksites, use Next X km plates, repeat temporary speed limit signs at not more than 400m intervals 3.Signs for some alternative situations: TR4 TR2 TR3 TR31 TR32 Uneven Surface Slippery Surface Gravel/ Unsealed Surface New Seal Seal Repairs 4.ones to be placed on left of carriageway for full length of hazard at 10m centres or at least 3 cones, whichever is the greater 5.ones on the trafficked side of signs for sites to be left unattended overnight 6.Worksites need positive traffic management to ensure all road users travel at the TSL 7.Use TSLs if required by TSL decision matrix 8.The T144 X0km/h HD sign is optional B 400m maximum 400m maximum TG31 TR3/TR32/ T121 TR3/TR32/ T121 TR3/TR32/ T121 TR3/TR32/ T TR3/TR32/T121 TG31 TR3/TR32/ T121 TR3/TR32/ T121 B TR3/TR32/T121

46 TWO-WY TWO-LN ROD Unattended worksites Seal repairs on a curve 1.ones on edge of seal - minimum 3m, maximum spacing 10m, next to each repair area 2.over any curve advisory speed sign that has a higher speed than the TSL 3.Use TSLs if required by TSL decision matrix 4.The T144 X0km/h HD sign is optional B TR3/TR32/ T144 B TG

47 ON-WY TWO-LN DIVIDD OR TWO-LN ROD Left-lane closure 1.Use TSLs if required by TSL decision matrix 2.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 3.The T144 X0km/h HD sign is optional D G RD6R 2.30 TL2L TL2L

48 ON-WY TWO-LN DIVIDD OR TWO-LN ROD Right-lane closure 1.Use TSLs if required by TSL decision matrix 2.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 3.The T144 X0km/h HD sign is optional D G 2.31 TL2R TL2R

49 ON-WY TWO-LN DIVIDD OR TWO-LN ROD One-lane closure Temporary two-lane diversion 1.ones required opposite closure if edge of carriageway not clearly defined 2.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 3.Use TSLs if required by TSL decision matrix 4.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 5.The T144 X0km/h HD sign is optional D G* G ½ RD6R 2.32 TL5R TL5R

50 ON-WY TWO-LN DIVIDD OR TWO-LN ROD Lane diversions in both directions 1.Where a physical centre median exists which is more than 2m wide, signs and cones may be positioned on the median 2.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 3.ones must be placed behind any awayfacing signs for rearside visibility 4.Use PN11 No Stopping signs, if necessary 5.Use TSLs if required by TSL decision matrix 6.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 7.The T144 X0km/h HD sign is optional G* D D G* ½ ½ TL5L TL5L 2.33 TL5L TL5L

51 ON-WY TWO-LN DIVIDD OR TWO-LN ROD Work in middle of road 1.Use either TMD 2.32 or TMD 2.33 in preference to this TMD, unless their use would likely cause traffic delays 2.ones are required on edge of live lane opposite closure if road is not well defined 3.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 4.Use PN11 No Stopping signs, if necessary 5.Use TSLs if required by TSL decision matrix 6.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 7.The T144 X0km/h HD sign is optional B D G* RD6R PN11 PN11 PN

52 TWO-WY THR-LN ROD entre-lane closure 1.If the closure is on a passing lane, the start of the taper must be greater than 600m after the start of the passing lane (if this cannot be achieved then close the passing lane completely and cover all permanent passing lane signs) 2.If the end of the closure is within 600m of the end of a passing lane, continue to close the centre lane 3.ones are required on edge of live lane opposite closure if road is not well defined 4.ones must be placed behind any awayfacing signs for rearside visibility 5.Use TSLs as required by TSL decision matrix 6.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 7. The T144 X0km/h HD sign is optional B G D ½ TL2R TL2R 2.35

53 TWO-WY THR-LN ROD ontraflow lane closure 1.If the closure is on a passing lane, the start of the taper must be greater than 600m after the start of the passing lane (if this cannot be achieved then close the passing lane completely and cover all permanent passing lane signs) 2.If the end of the closure is within 600m of the end of a passing lane, continue to close the centre lane 3.ones must be placed behind any awayfacing signs for rearside visibility 4.Use TSLs as required by TSL decision matrix 5.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 6.The T144 X0km/h HD sign is optional B G D 2xD G ½ ½ TL2R TL2R 2.36

54 TWO-WY OUR-LN ROD Left-lane closure 1.Where a physical centre median exists which is more than 2m wide, signs and cones may be positioned on the median 2.ones must be placed behind any awayfacing signs for rearside 3.Use TSLs if required by TSL decision matrix 4.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 5.The T144 X0km/h HD sign is optional B D G ½ ½ G2 TL2L RD6R 2.37 TL2L

55 TWO-WY OUR-LN ROD Two-lane closure One-lane contraflow 1.Use PN11 No Stopping signs, if necessary 2.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 3.ones must be placed behind any awayfacing signs for rearside visibility 4.Use TSLs if required by TSL decision matrix 5.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 6.The T144 X0km/h HD sign is optional G K G* D 2xD G* ½ TL2L TL2L 2.38 TL2L TL2L RD6R RD6R PN11 PN11 PN11 PN11

56 TWO-WY OUR-LN ROD entre-lane closures 1.ones must be placed behind any awayfacing signs for rearside visibility 2.ones required opposite closure if edge of carriageway not clearly defined 3. Use TSLs if required by TSL decision matrix 4.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 5.The T144 X0km/h HD sign is optional G D D G ½ ½ 2.39 TL2R TL2R TL2R TL2R

57 ON-WY THR-LN DIVIDD OR THR-LN ROD One-lane closure Left lane 1.ull end taper may be added if required 2.Use TSLs if required by TSL decision matrix 3.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 4.The T144 X0km/h HD sign is optional D G RD6R 2.40 TL3L TL3L T1B/T144 T1B/T144

58 ON-WY THR-LN DIVIDD OR THR-LN ROD Two-lane closure Left and centre lanes 1.ones are required on edge of live lane opposite closure if road is not well defined 2.Use TSLs if required by TSL decision matrix 3.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 4.The T144 X0km/h HD sign is optional K D G G TL2L RD6R RD6R TL2L 2.41 TL3L TL3L

59 ON-WY THR-LN DIVIDD OR THR-LN ROD Two-lane closure Two lane temporary diversion 1.ones are required on edge of live lane opposite closure if road is not well defined 2.*alculation of taper length for lateral shift of less than 3.5m is: W x G 3.5 W = Width of lateral shift G = Taper length in metres from the level 1 layout distance table 3.Use TSLs if required by TSL decision matrix 4.ones from TSL to taper are mandatory at over 65km/h (for positive traffic management) 5.The T144 X0km/h HD sign is optional K G* D G G* ½ ½ TL5R TL3L RD6R RD6R TL5R TL3L 2.42

60 Mobile operations TWO-WY TWO-LN ROD Road inspection activites 3.1 Level LV 1.Work vehicle must be parked clear of the live lane and must have one, preferably two, flashing beacons operating 2.The work vehicle must have a rear mounted sign indicating the type of activity taking place 3.Rear mounted sign not required on level LV roads with less than 250vpd 4.ctivites taking place in front of the work vehicle must allow for a 10m roll ahead zone 5.Inspector can proceed onto the live lane if SD exists and activity takes no longer than 5 minutes 6.If SD is not available, spotters/lookouts may be postioned where they have SD in both directions and can communicate with the inspector 10m roll ahead TV3 Work Vehicle

61 Mobile operations TWO-WY TWO-LN ROD Work vehicle is in a lane With SD - on LV Low-risk roads (any speed) and LV roads under 65km/h 1.This TMD can be used if the work vehicle is on shoulder, berm or live lane 2.The only signage required is a T1 sign with appropriate supplementary plate mounted on the rear of the work vehicle Rear visibility is greater than clear sight distance T1/T132 Work Vehicle 3.2 Level LV

62 Mobile operations TWO-WY TWO-LN ROD Work vehicle is on berm, shoulder or lane No SD 1.This TMD can be used if the work vehicle is berm, shoulder or live lane 2.or long worksites, the T1 advance warning sign must be repeated throughout the worksite at intervals not greater than 4km 3. tail pilot vehicle equipped with T1 advance warning sign and a supplementary plate (T132, T133, T136, T137) can be used to replace all static signs B Static signs not required if tail pilot used TV4 RD6R NXT X km T1/T136/ T121 Tail pilot Work vehicle 3.3 Level LV T1/T136/ T121 NXT X km B Rear visibility is greater than clear sight distance T1/T134 RD6R

63 Mobile operations TWO-WY TWO-LN ROD Work vehicle on shoulder or berm - clear of live lane SD not required 1.The only signage required is a T1 sign with appropriate supplementary plate mounted on the rear of the work vehicle 3.4 Level LV T1/T132 Work Vehicle

64 Mobile operations TWO-WY TWO-LN ROD Work vehicle is more than five (5) metres from the edgeline ny speed 4.1 Work vehicle T1/T136 Greater than 5m

65 Mobile operations TWO-WY TWO-LN ROD Work vehicle is within five (5) metres of the edgeline SD to work vehicle - not required under 65km/h, required over 65km/h 1.If permanent speed is under 65km/h, rear visibility to the work vehicle is not required 2.If permanent speed is over 65km/h, rear visibility to the work vehicle is required 3. tail pilot vehicle equipped with T1 advance warning sign and appropriate supplementary plate may replace the static signs if the permanent speed is under 65km/h (see TMD 4.3) Rear visibility Work vehicle TV4 5m RD6R 4.2 T1/T136/T121

66 Mobile operations TWO-WY TWO-LN ROD Work vehicle is within five (5) metres of the edgeline Speed limit over 65km/h - the rear visibility is less than SD 1.This TMD can replace TMD 4.2 when permanent speed is under 65km/h. In these situations, static signs 5m are not required 4.3 Rear visibility is less than clear sight distance TV4 5 to 20 seconds travel time (approx m) Work vehicle RD6R Tail pilot Rear visibility is greater than clear sight distance T1/T136 RD6R

67 Mobile operations TWO-WY TWO-LN ROD Work vehicle is in a lane Permanent speed under 65km/h 1.dvance warning sign X may be replaced by tail pilot equipped with T1 advance warning sign and appropriate supplementary plate 2.In this case, signs marked with Y do not need to be erected Y TV4 RD6R Work vehicle T1/T121 Y 4.4 X Y T1/T136/ T121

68 Mobile operations TWO-WY TWO-LN ROD Work vehicle is in a lane Permanent speed over 65km/h - SD forward visibility to work vehicle 4.5 orward visibility is greater than clear sight distance Rear visibility TV4 5 to 20 seconds travel time (approx m) TV2 RD6R Tail pilot Work vehicle Rear visibility is greater than clear sight distance T1/T134 RD6R

69 Mobile operations TWO-WY TWO-LN ROD Work vehicle is in a lane Permanent speed over 65km/h - no SD to work vehicle 1.Both forward and rear visibility is less than the clear sight distance continuously for 1km 4.6 orward visibility is greater than clear sight distance orward visibility is less than clear sight distance Rear visibility is less than clear sight distance TV4 TV4 TV2 5 to 20 seconds travel time (approx m) 5 to 20 seconds travel time (approx m) Lead pilot RD6R RD6R Work vehicle Tail pilot Rear visibility is greater than clear sight distance T1/T134 RD6R

70 Mobile operations TWO-WY TWO-LN ROD Personnel on the road ny speed 1.If the permanent speed is under 65km/h, the tail pilot vehicle may be replaced with static signs (T1 with appropriate supplementary plate and ) orward visibility is greater than clear sight distance Under 65km/h 25 to 40m Over 65km/h 40 to 60m 5 to 20 seconds travel time (approx m) TV4 TV4 TV2 RD6R RD6R Work vehicle Shadow vehicle Tail pilot 4.7 Rear visibility is greater than clear sight distance T1/T134 RD6R

71 Mobile operations ON-WY TWO-LN DIVIDD OR TWO-LN ROD Work vehicle in the right lane Permanent speed over 65km/h 1.If the permanent speed is under 65km/h, the tail pilot vehicle may be replaced with static signs (T1 with appropriate supplementary plate and ) to 20 seconds travel time (approx m) Work vehicle Tail pilot TV4 Rear visibility is greater than clear sight distance T1/T134

72 Mobile operations ON-WY TWO-LN DIVIDD OR TWO-LN ROD Part or all of a lane occupied Semi-static closure - work for up to 1 hour 1.Only use this TMD when activity can be completed within 1 hour (excluding set up and removal of worksite) 2.The T1 advance warning signs may be replaced by a tail pilot vehicle with a T1 sign, appropriate supplementary plate and a RD6R/L 3.If shadow vehicle is fitted with a TM, the longitudinal safety zone (D) is not required 10m roll ahead D G T1 Work vehicle Shadow vehicle TV4 T1 4.9 TV4 rrow board

73 Note: This page is to be used as the layout distances table for the level 1 static and semi-static diagrams. Print this page on 3 paper and fold it to fit an 4 page. Unfold this page when you want to view the layout distances table and a diagram at the same time. LVL 1 LYOUT DISTNS TBL LGND OR DIGRMS

NZ Transport agency's traffic control devices manual (TCDM) Part 8 Code of practice for temporary traffic management

NZ Transport agency's traffic control devices manual (TCDM) Part 8 Code of practice for temporary traffic management NZ Transport agency's traffic control devices manual (TDM) Part 8 ode of practice for temporary traffic management Section - layout drawings LVL 1 DIGRMS LIST STTI OPRTIONS No. LOW VOLUM RODS TWO-WY TWO-LN

More information

Auckland Transport Generic Traffic Management Plan. October 2017

Auckland Transport Generic Traffic Management Plan. October 2017 uckland Transport Generic Traffic Management Plan October 2017 uckland Transport - Road ontrolling uthority (R) Introduction: We trust that you will appreciate the work that has gone into this document.

More information

EVENTS DIAGRAMS LIST

EVENTS DIAGRAMS LIST EVENTS DIAGRAMS LIST No. I3.1 LEVEL 1 S Start area (off the carriageway) I3.2 inish area (off the carriageway) I3.3 Event travelling along the route / intersecting side road I3.4 Right hand turn at intersection

More information

Summary of amendments

Summary of amendments CoPTTM 4 th Edition Briefing for Traffic control devices manual Part 8 CoPTTM Summary of amendments The review 1,714 items of feedback 4 working parties o o o o TMP TSL Audit Mobile operations Reference

More information

TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM. RCA: Invercargill District Council. Teviot Street, Appleby, Invercargill Outside #11 L1 50 -

TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM. RCA: Invercargill District Council. Teviot Street, Appleby, Invercargill Outside #11 L1 50 - TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM Organisation/ TMP reference TMP reference: UCG 23600 Contractor (Working space / TTM): Foveaux Communications Ltd Contractor: Principal: Chorus RCA: Invercargill

More information

Technical note - Level 2 low speed (2LS) roads. Document name. Issued: 3 June 2016 Effective: 1 August 2016

Technical note - Level 2 low speed (2LS) roads. Document name. Issued: 3 June 2016 Effective: 1 August 2016 Technical note - Level 2 low speed (2LS) roads Document name Issued: 3 June 2016 Effective: 1 August 2016 Page 1 Introduction of 2LS roads The mandate for change At the 1 October 2014 meeting of the CoPTTM

More information

TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM. RCA: Invercargill District Council. Elles Road, Strathern, Invercargill 9812 Outside #244 L1 50 -

TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM. RCA: Invercargill District Council. Elles Road, Strathern, Invercargill 9812 Outside #244 L1 50 - TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM Organisation/ TMP reference TMP reference: UCG 20882 Contractor (Working space / TTM): Foveaux Communications Ltd Contractor: Principal: Chorus RCA: Invercargill

More information

Extending 200m either side of the intersection Te Mata Mangateretere/ Waimarama/ Te Mata/River Rd

Extending 200m either side of the intersection Te Mata Mangateretere/ Waimarama/ Te Mata/River Rd RCA consent (eg CAR/WAP) and/or RCA contract reference TRAFFIC MANAGEMENT PLAN (TMP) FULL FORM Use this form for complex activities. Refer to the NZ Transport Agency s Traffic control devices manual, part

More information

Explanations / Descriptions

Explanations / Descriptions TTM SITE CONDITION RATING FORM FULL AUDIT SITE DETAILS Explanations / Descriptions RCA Suburb The RCA who has primary responsibility for the worksite The suburb/s affected by the activity Road name The

More information

SH3 Waitara to Bell Block

SH3 Waitara to Bell Block SH3 Waitara to Bell Block NZ Transport Agency August 2017 Community feedback report Copyright information This publication is copyright NZ Transport Agency. Material in it may be reproduced for personal

More information

Appendix Work Zone Traffic Control

Appendix Work Zone Traffic Control ppendix Work Zone Traffic Control The purpose of this appendix is to present basic guidelines for work zone traffic control and to supplement the Highway Work Zone Safety Checklist. This appendix presents

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN RM 12 Centreline Marking using a Line Protection Vehicle Traffic Plan Reference Organisation Contractor Insert Contractor Name For Office Use Only Client Insert Client Name Contract

More information

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce.

More information

MANUAL OF TRAFFIC SIGNS AND MARKINGS SECTION 2

MANUAL OF TRAFFIC SIGNS AND MARKINGS SECTION 2 MANUAL OF TRAFFIC SIGNS AND MARKINGS PART 1 SIGNS SECTION 2 September 2015 VERSION 1.0 - DRAFT FOR REVIEW Part 1 Signs REGULATORY SIGNS GENERAL CONTENTS SECTION 2: REGULATORY SIGNS GENERAL (DESIGN, POLICY

More information

TRAFFIC ACCOMMODATION IN WORK AREAS

TRAFFIC ACCOMMODATION IN WORK AREAS TRAFFIC ACCOMMODATION IN WORK AREAS TRAFFIC ACCOMMODATION IN WORK AREAS Copyright 2005 All rights reserved. Reproduction of this document in whole or in part by any means is prohibited, unless authorized

More information

MANUAL OF TRAFFIC SIGNS AND MARKINGS

MANUAL OF TRAFFIC SIGNS AND MARKINGS www.face MANUAL OF TRAFFIC SIGNS AND MARKINGS PART 1 - SECTION 2 REGULATORY SIGNS - GEMERAL July, 2018 MOTSAM Part 1, Section 3 Regulatory Signs General 1 VERSION 1 July 2018 MOTSAM Part 1, Section 3 Regulatory

More information

CW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)

CW20-1D 48 X 48 (Flags- See note 1) G  X 24 (See note 2) CK: DW: CK: x for mph or less mph devices may be omitted if the work area is a minimum of from the nearest traveled way. (See notes 4 & 5) x for mph or less Work Space mph x for mph or less mph (See notes

More information

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Page 634 2009 Edition Notes for Figure 6H-1 Typical pplication 1 Work eyond the Shoulder 1. If the work space is in the median of a divided

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS 2006 Edition Page 6H-1 CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. Standard: The

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for

More information

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version.

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version. SASKPOWER TRAFFIC CONTROL PLANNING GUIDELINES INTRODUCTION page 3 DEFINITIONS page 3 PLANNING AND PREPARATION page 6 Pedestrian Safety within an Active Work Area page 7 Excavations page 8 Partial Lane

More information

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018 REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL Ginger Quinn & Paul Kelley April 11, 2018 ADA & District Traffic Engineer Added in various sections Work Zone Pedestrian and Bicycle Guidance document VDOT

More information

Low Volume Roads: Rural and Urban

Low Volume Roads: Rural and Urban Rural Highway with less than 400 DT, and an Urban Residential Street with less than 400 DT and speeds of 0 mph or less. *Drawings Not To Scale *Drawings Not To Scale mndot.gov/fieldmanual Low Volume Low

More information

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group Q&A for Safety Code Prepared by the HAUC-UK Safety Code working group 1 What is the latest version of the Safety Code? At the time of writing, the last time any amendments were made to the Safety Code

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

Traffic Management Guidelines for Structure Rehabilitation Projects

Traffic Management Guidelines for Structure Rehabilitation Projects , Traffic Management Guidelines for Structure Rehabilitation Projects February 2009 1 Purpose & Background These guidelines were prepared in order to assist the Regional Structural Office in determining

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Flagpersons play an important role in the high level of traffic safety expected through work zones on Saskatchewan highway projects. Flagpersons are

More information

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -

More information

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL GUIDELINES FOR EMERGENCY TRAFFIC CONTROL TABLE OF Contents Page Introduction...1 Chapter 6I of the 2009 MUTCD...2 Reason for Control...6 Components of Incident Management Area...7 Traffic Control Devices

More information

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings CIRCULAR NO. O-13 Recommended Practices for Manual Protection of Highway/Railway Grade Crossings Effective: October 1, 2004 CONTENTS 1. SCOPE 2. GENERAL PRINCIPLES 3. DEFINITIONS 4. PROTECTION REQUIRED

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES

WORK ZONE TRAFFIC CONTROL PROCEDURES WORK ZONE SETUP / REMOVAL WORK ZONE TRAFFIC CONTROL PROCEDURES When installing a work zone, install the advance warning signs on all approaches prior to installing the traffic control devices. Perform

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to

More information

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE May 2006 Street and Utility Repairs Work Area Protection Guide TABLE OF CONTENTS 1. Introduction... 1 2. Typical Applications... 11 2.1 Use of Hand-Signaling

More information

CHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT

CHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT CHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT 6.1 Road alignment and cross-section 6.1.1 Visibility; sight distance Is sight distance adequate for the speed of traffic using the route? Is adequate sight

More information

Chapter 8 (2009) - Summary of key changes

Chapter 8 (2009) - Summary of key changes Chapter 8 (2009) - Summary of key changes (Some sections and paragraphs in the revised edition have been renumbered to take account of new sections and paragraphs; section numbers below refer to the revised

More information

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs. Traffic signs Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs. Although The Highway Code shows many of the signs commonly in use,

More information

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT 5.1 General items 5.1.1 Alignment Are the roadworks located safely with respect to horizontal and vertical alignment? If not, does works signing cater for this?

More information

MINNESOTA FLAGGING HANDBOOK

MINNESOTA FLAGGING HANDBOOK MINNESOTA FLAGGING HANDBOOK January, 2018 Flagging Handbook This Flagging Handbook has been developed following the guidelines of the 2011 edition of the Minnesota Manual on Uniform Traffic Control Devices,

More information

Safety at Street Works and Road Works

Safety at Street Works and Road Works Safety at Street Works and Road Works A Code of Practice issued by the Secretary of State for Transport, the Scottish Executive and the National Assembly for Wales under sections 65 and 124 of the New

More information

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS PUBLIC WORKS DEPARTMENT 2015 REVISION 1-2016 REVISION SUMMARY - MARCH 2016 Introduction 1.05 - Specifications for Traffic Control Devices Temporary Traffic

More information

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES CONTROL OF TRAFFIC C201 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C201 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS

More information

Errata Date February 2016 Errata Edition Field. Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA

Errata Date February 2016 Errata Edition Field. Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA Errata Date February 2016 Errata Edition Field Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA Errata Reference Number Item Number 100 Page No. 39 Errata 7FE/001/16 The first bullet point under

More information

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group Q&A for Safety Code Prepared by the HAUC-UK Safety Code working group 1 What is the latest version of the Safety Code? At the time of writing, the last time any amendments were made to the Safety Code

More information

Guidelines for flush medians RTS 4

Guidelines for flush medians RTS 4 Guidelines for flush medians RTS 4 November 1991 Reprinted July 2001 Land Transport Safety Authority PO Box 2840 Wellington Telephone: 04 494 8600 Facsimile: 04 494 8601 ISSN: 1170-5337 ISBN: 0-477-05267-3

More information

Where differences to CCC s Construction Standards Specification (CSS) exist, this document takes precedence.

Where differences to CCC s Construction Standards Specification (CSS) exist, this document takes precedence. CHRISTCHURCH TRANSPORT OPERATIONS CENTRE A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving TTM Local Operating Procedures (LOP)_v4

More information

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Introduction Methodology Study area and data collection Results and recommendation Conclusion References Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision

More information

Sign Designs and Markings Manual (TEM 295-2) Page 8-3

Sign Designs and Markings Manual (TEM 295-2) Page 8-3 Sign Designs and Markings Manual (TEM 295-2) Page 8-3 TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 STOP R1-2 YIELD R1-2a TO ONCOMING TRAFFIC R2-1 SPEED LIMIT R2-H2a VEHICLES OVER 4 TONS

More information

(HIGHWAY GEOMETRIC DESIGN -1)

(HIGHWAY GEOMETRIC DESIGN -1) LECTURE HOUR-19 TE-1(10CV56) UNIT-3 (HIGHWAY GEOMETRIC DESIGN -1) Width of carriage way: Width of the carriage way or the width of the pavement depends on the width of the traffic lane and number of lanes.

More information

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group Q&A for Safety Code Prepared by the HAUC-UK Safety Code working group Q1 What is the latest version of the Safety Code? The last time any amendments were made to the Safety Code was in June 2014. This

More information

Appendix A Guiding Principles for Cycling Safety in Work Zones

Appendix A Guiding Principles for Cycling Safety in Work Zones Appendix A Guiding Principles for Cycling Safety in Work Zones 1. Identify Existing Cycling Facility and Requirements This step should be part of the permitting/approval processes for construction zones

More information

Emergency Roadside Technician Dies When Struck by a Single-Unit Truck on an Interstate Shoulder. Incident Number: 05KY001

Emergency Roadside Technician Dies When Struck by a Single-Unit Truck on an Interstate Shoulder. Incident Number: 05KY001 Emergency Roadside Technician Dies When Struck by a Single-Unit Truck on an Interstate Shoulder Incident Number: 05KY001 Location on bridge where responder attempted to avoid semi. Kentucky Fatality Assessment

More information

SH6 Blenheim to Nelson

SH6 Blenheim to Nelson SH6 Blenheim to Nelson November 2017 Community engagement report Copyright information This publication is copyright NZ Transport Agency. Material in it may be reproduced for personal or in-house use without

More information

4.1 INTRODUCTION 4.1 ROAD SAFETY

4.1 INTRODUCTION 4.1 ROAD SAFETY CHAPTER 4. ROAD SAFETY 4.1 INTRODUCTION High volumes of traffic travel at speed on national roads. Working on or close to the road surface can be very dangerous. Routine maintenance staff need to develop

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

Operation Guidance Temporary Traffic Management. Part. Level 3 Roads Dual Carriageways and Motorways. Draft June

Operation Guidance Temporary Traffic Management. Part. Level 3 Roads Dual Carriageways and Motorways. Draft June Operation Guidance Temporary Traffic Management Part 3 Level 3 Roads Dual Carriageways and Motorways Draft June 2017 www.dttas.ie [Blank Page] Table of Contents 3.1 Introduction... 3-1 3.1.1 Training Requirements...

More information

2017 Changes to the 2011 MMUTCD January 2017

2017 Changes to the 2011 MMUTCD January 2017 2017 Changes to the 2011 MMUTCD January 2017 The design for the Weight Limit symbol sign (R12-5) has been modified to show a threeunit vehicle as the third line of the regulatory weight limit sign. This

More information

INTERSECTIONS AT GRADE INTERSECTIONS

INTERSECTIONS AT GRADE INTERSECTIONS INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.

More information

Sign Design Manual (TEM 295-2)

Sign Design Manual (TEM 295-2) TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 R-1 STOP R1-2 R-2 YIELD R1-2a R-2A TO ONCOMING TRAFFIC R4-1 R-33 DO NOT PASS R4-2 R-34 PASS WITH CARE R4-3 R-35 SLOWER TRAFFIC KEEP RIGHT R4-9

More information

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4 PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,

More information

STATE OF MARYLAND FLAGGER EXAM

STATE OF MARYLAND FLAGGER EXAM GRADE: NAME (PRINT): ADDRESS: CITY, STATE, ZIP HOME PHONE: INSTRUCTOR: DATE: YES, I give ATSSA permission to distribute my phone number through its national flagger database, which will be accessible to

More information

CHAPTER 1 STANDARD PRACTICES

CHAPTER 1 STANDARD PRACTICES CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles

More information

Concise Handbook for Temporary Traffic Control - Construction, Maintenance, and Utility Operations

Concise Handbook for Temporary Traffic Control - Construction, Maintenance, and Utility Operations Purdue University Purdue e-pubs Indiana Local Technical ssistance Program (LTP) Publications Indiana Local Technical ssistance Program (LTP) 5-2016 Concise Handbook for Temporary Traffic Control - Construction,

More information

Proposed: Temporary Traffic Management Design Guidance

Proposed: Temporary Traffic Management Design Guidance Current Temporary Traffic Management Guidance Structure: Chapter 8 Traffic Signs Manual First published in 1996, updated 2007 Addendum in 2010 Guidance for the Control and Management of Traffic at Road

More information

(This page left intentionally blank)

(This page left intentionally blank) (This page left intentionally blank) 2011 Edition - Revision 1 Page 553 Section 5A.01 Function CHAPTER 5A. GENERAL 01 A low-volume road shall be defined for this Part of the Manual as follows: A. A low-volume

More information

Design and Installation of Low Level Cycle Signals

Design and Installation of Low Level Cycle Signals Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1

More information

SAFE TRAFFIC CONTROL AT ROAD WORKS DEPARTMENT OF WORKS THE INDEPENDENT STATE OF PAPUA NEW GUINEA

SAFE TRAFFIC CONTROL AT ROAD WORKS DEPARTMENT OF WORKS THE INDEPENDENT STATE OF PAPUA NEW GUINEA SAFE TRAFFIC CONTROL AT ROAD WORKS DEPARTMENT OF WORKS THE INDEPENDENT STATE OF PAPUA NEW GUINEA 1 IF004_PNGManual_SP_FIN.indd 1 This work is copyright. Apart from any use for education or training purposes,

More information

Work Area Traffic Control Manual

Work Area Traffic Control Manual Work Area Traffic Control Manual 2009 New Brunswick Work Area Traffic Control Manual Table of Contents Definitions... ii 1 General Information... 1 1.1 Introduction... 1 1.2 Legal Authority... 1 1.3 Planning

More information

PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS

PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS 2005 Edition Page TC5-1 PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS CHAPTER 5A. Section 5A.01 Section 5A.02 Section 5A.03 Section 5A.04 CHAPTER 5B. GENERAL Page Function...5A-1

More information

Plan prepared for: Brennan Paving and Construction. Plan prepared by: Direct Traffic Management

Plan prepared for: Brennan Paving and Construction. Plan prepared by: Direct Traffic Management Traffic Control Plan Hwy 401 - Bridgeland Avenue / Site 37-283 Grading, Drainage, Garnular Base, Hot Mix Paving, Electrical, Structural and Plan prepared for: Plan prepared by: General Notes WB 401 Collector

More information

Temporary Vehicle Restraint System Policy

Temporary Vehicle Restraint System Policy Temporary Vehicle Restraint System Policy Prepared By; J Wilkinson H&S Manager, Civils Prepared for: Installation of TVRS on all triio highways projects including JV s. Page 1 of 8 Contents 1.0 Introduction

More information

Australian Standard. Manual of uniform traffic control devices. Part 3: Traffic control for works on roads AS AS 1742.

Australian Standard. Manual of uniform traffic control devices. Part 3: Traffic control for works on roads AS AS 1742. AS 1742.3 2009 AS 1742.3 2009 Australian Standard Manual of uniform traffic control devices Part 3: Traffic control for works on roads This Australian Standard was prepared by Committee MS-012, Road Signs

More information

Traffic Signs and Signals

Traffic Signs and Signals CHAPTER FOUR Traffic Signs and Signals Traffic signs control traffic flow, making streets and highways safer for drivers, bicyclists and pedestrians. These signs, which are posted by the Indiana Department

More information

TEMPORARY TRAFFIC CONTROL

TEMPORARY TRAFFIC CONTROL (MI) PART 6 TEMPORARY TRAFFIC CONTROL CHAPTER 6A GENERAL Section 6A.01 General... 547 CHAPTER 6B FUNDAMENTAL PRINCIPLES... 549 CHAPTER 6C TEMPORARY TRAFFIC CONTROL ELEMENTS...551............ 554... 554...

More information

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets. ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic

More information

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS PART 5. TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS TABLE OF CONTENTS Chapter 5A. GENERAL Page Section 5A.1 Function............................................................... 5A-1 5A.2 Application............................................................

More information

WORK ZONE TRAFFIC CONTROL & SAFETY

WORK ZONE TRAFFIC CONTROL & SAFETY WORK ZONE TRAFFIC CONTROL & SAFETY Purpose of Temporary Traffic Control 1. Warn motorists and pedestrians of hazards. 2. Advise proper travel path. 3. Delineate areas not to be used. 4. Separate the travel

More information

Crossroads. Inside of Left Bend. Crossroads on Dual Carriageway. Crossroads Ahead at Dual Carrageway. Merging and Diverging Traffic

Crossroads. Inside of Left Bend. Crossroads on Dual Carriageway. Crossroads Ahead at Dual Carrageway. Merging and Diverging Traffic Two Junctions on Left Two Junctions on Right Side Road on Outside of Left Bend Side Road on Outside of Right Bend Side Road on Inside of Left Bend Side Road on Inside of Right Bend Crossroads on Left Bend

More information

Guidelines for Traffic Control in Work Zones

Guidelines for Traffic Control in Work Zones Guidelines for Traffic Control in Work Zones pril 2007 Guidelines for Traffic Control in Work Zones Table of Contents Introduction...1 Major Traffic Control Considerations...2 Fundamental Principles...3

More information

ETMS ADVISORY BOOKLET 1 GUIDANCE NOTES FOR ROAD CLOSURES AND DIVERSIONS

ETMS ADVISORY BOOKLET 1 GUIDANCE NOTES FOR ROAD CLOSURES AND DIVERSIONS ETMS ADVISORY BOOKLET 1 GUIDANCE NOTES FOR ROAD CLOSURES AND DIVERSIONS Version 1.0 Road Closure with Diversion ROAD CLOSURE SIGNING In Advance of the Closure At the Point of Closure STANDARD DIVERSION

More information

Parking. Signing. Appendix C Typical detail drawings. London Cycling Design Standards

Parking. Signing. Appendix C Typical detail drawings. London Cycling Design Standards Appendix C Typical detail drawings London Cycling Design Standards All drawings are prefixed CCE/ General A1 Cycle Symbol Diagram 1057 165 A3 Raised entry treatment on side roads 166 A4 Raised table at

More information

SARF Engineering for Road Safety

SARF Engineering for Road Safety SARF Engineering for Road Safety 1 Road Traffic Signs Manual & Legislation National Road Traffic Act, Act 93 of 1996 National Regulations 2000 SADC and SA Road Traffic Signs Manuals No. Title SADCRTSM

More information

WORKSITE TRAFFIC MANAGEMENT

WORKSITE TRAFFIC MANAGEMENT SECTION 3 It is the intention of this section of the Fieldworkers Handbook to provide high level traffic management guidance to employees and contractors of Victorian electrical distributions companies

More information

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments

More information

GEOMETRIC DESIGN OF ROUNDABOUTS AND TRAFFIC S IGNAL SIGNAL CONTROLLED

GEOMETRIC DESIGN OF ROUNDABOUTS AND TRAFFIC S IGNAL SIGNAL CONTROLLED TD 16/07 and TD 50/04 GEOMETRIC DESIGN OF ROUNDABOUTS AND TRAFFIC SIGNAL CONTROLLED JUNCTIONS DMRB Vol 6 File 6 0 ROUNDABOUTS: INTRODUCTION Principles Roundabout Types Entry Deflection Capacity Visibility

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL SECTION 900 TRAFFIC CONTROL STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL Section Number Title 901 GENERAL 902 MATERIALS, EQUIPMENT, AND

More information

2003 Edition Page 2C-1

2003 Edition Page 2C-1 2003 Edition Page 2C-1 CHAPTER 2C. WARNING SIGNS Section 2C.01 Function of Warning Signs Support: Warning signs call attention to unexpected conditions on or adjacent to a highway or street and to situations

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 20 June 2009 Part 3: Motorways and Expressways CONTENTS Reference Page Page Number Date SECTION 12: MARKINGS AND DELINEATION 12.1 GENERAL... 12-1 June 2009 12.1.1 INTRODUCTION... 12-1 June 2009

More information

Signs. signs, signals and road markings. in this chapter

Signs. signs, signals and road markings. in this chapter 3 signs, signals and road markings in this chapter Signs regulatory signs school, playground and crosswalk signs lane use signs turn control signs parking signs reserved lane signs warning signs object

More information

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Development Engineering 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 Engineering Services Division REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Phone: 916-808-8300 Fax: 916-808-1984 Preparation

More information

10 SHERFORD Town Code

10 SHERFORD Town Code Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of

More information

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations

More information

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS This Interim Advice Note announces amendments to a series of guidelines related to cantilever and

More information

Global EHS Powered Industrial Truck and Pedestrian Safety

Global EHS Powered Industrial Truck and Pedestrian Safety Global EHS Powered Industrial Truck and Pedestrian Safety Control No: Policy Name: Powered Industrial Truck and Pedestrian Safety Policy Responsible Corporate Function/Business Segment: Global Environmental

More information