1 Appendix C Typical detail drawings London Cycling Design Standards All drawings are prefixed CCE/ General A1 Cycle Symbol Diagram A3 Raised entry treatment on side roads 166 A4 Raised table at junction 167 A5 20mph on-carriageway (lanes terminated) 168 A6 Sinusoidal profile road hump 169 A7 Road Hump smooth entry profile 170 Cycle Lanes (on carriageway) B1 Cycle lanes at road junctions 171 B1.1 Cycle lanes at junctions with parked vehicles 172 B2 Advanced Stop Lines with single traffic lane 173 B3 Advanced Stop Lines with two traffic lanes 174 B4 Advanced Stop Lines with central and near side feeder lanes 175 B4.1 Advanced Stop Lines with two lanes and central feeder lane 176 B5 Advanced Stop Lines with gate lead-ins 177 B6 Cycle lanes on narrow roads with centre-line (<5000vpd) 178 B6.1 Cycle lanes on narrow roads without centre-line (<3000vpd) 179 B7 Cycle lanes at traffic islands 180 B8 Cycle lanes at right turn lanes 181 B9 Cycle lanes at parking bays 182 B10 Cycle lane junction with side-road cycle route 183 B11 Cycle lane at left-turn slip lanes (off and on) 184 B12 Cycle lane segregation types 185 B13 Mandatory contraflow cycle lane (with segregation at entry points) 186 B14 Advisory contraflow cycle lane 187 B15 Contraflow cycling, with or without advisory lanes 188 B16 Cycle lanes at zig-zags on two way roads 189 B20 Markings and coloured surfacing for guidance 190 B21 Cycle lanes continuous through signal controlled junctions 191 Tracks/paths C1 Cycle track edge details 192 C2 Cycle track at road junction (not cycle priority) 193 C2.1 Cycle track at track junction (not cycle priority) 194 C3 Cycleway crossing footway to join/cross carriageway 195 C4 Access/Exit to segregated path 196 C4.1 Access to Shared Path 197 C4.2 Exit from Shared Path to carriageway 198 C5 Segregated shared route joining/leaving crossing point
2 London Cycling Design Standards Appendix C Typical detail drawings C6 Cycle track at crossover (cycle priority) 200 C7 Cycle track at entry-treatment Set-back < 5.0m (vehicle priority) 201 C7.1 Cycle track at one-way exit-treatment Set-back < 5.0m (cycle priority) 202 C8 Cycle track at entry-treatment Set-back 5m or more (cycle priority) 203 C9 Footpath joining a segregated route 204 C10 Cycle-track joining a segregated route 205 C11 Segregated route with shared area at T junction 206 C11.1 Segregated route T junction linking to carriageway 207 C12 Segregated route at a Toucan crossing 208 C13 Segregated route alongside a Toucan crossing 209 C14 Cycle track Give-way crossing of road 210 C15 Cycle track junction with opposite side-road 211 C16 Toucan at road junction 212 C17 Cycle track at Zebra 213 C18 Cycle track at Zebra changes to lane 214 C19 Cycle track crossing adjacent to Zebra 215 C21 Segregated route at Parallel signal controlled crossing 216 C25 Shared path terminated at side-road 217 C26 Segregated path becoming Shared Path past bus stop 218 C27 Segregated path becoming Shared Path past bus boarder 219 C28 Segregated path at bus boarder, front shelter 220 C29 Segregated path at bus boarder, rear shelter 221 Parking P1 Sheffield parking stand 222 P1.1 Sheffield parking stand (2005 TfL pattern) 223 P2 Cycle parking layouts 224 Signing S1 Route number road markings 225 S2 Cycle symbols for route directions 226 S3 Route marker signs and route number patches 227 S4 Route direction signs flag repeaters 228 S5 Flag type direction signs 229 S6 Variations on flag type direction signs 230 S7 Stack type advance direction signs 231 S8 Map type advance direction signs 232 S9 Combined direction signs 233 S10 Shared use courtesy sign 234 S11 Cycle parking signs
3 165
4 166
5 167
6 168
7 169
8 170
9 171
10 172
11 173
12 174
13 175
14 176
15 177
16 178
17 179
18 180
19 181
20 182
21 183
22 184
23 185
24 186
25 187
26 188
27 189
28 190
29 191
30 192
31 193
32 194
33 195
34 196
35 197
36 198
37 199
38 200
39 201
40 202
41 203
42 204
43 205
44 206
45 207
46 208
47 209
48 210
49 211
50 212
51 213
52 214
53 215
54 216
55 217
56 218
57 219
58 220
59 221
60 222
61 223
62 224
63 225
64 226
65 227
66 228
67 229
68 230
69 231
70 232
71 233
72 234
73 235
London Cycling Design Standards. Chapter 4 Links Cycle lanes, cycle tracks and other cycle facilities
London Cycling Design Standards 4 Chapter 4 Links Cycle lanes, cycle tracks and other cycle facilities Contents 4.1 Introduction and general issues 4.2 Cycle lanes (on-carriageway) 4.3 Bus lanes and other
More informationIssues at T junctions:
TheSlade_PublicConsulationPlans_March2017.pdf These comments relate to junction designs in this phase of the project on The Slade. Comments begin with the northernmost junction: Girdlestone Rd and continue
More informationTraffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.
Traffic signs Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs. Although The Highway Code shows many of the signs commonly in use,
More informationMarcus Jones, TRL. Presented by Name Here Job Title - Date
Segregation Insert the title and of priority your at presentation junctions: a here discussion Marcus Jones, TRL Presented by Name Here Job Title - Date Background: TfL cycle facility trials Infrastructure
More informationFrascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation
Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian
More informationCURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.
ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic
More informationDESIGN CODE. Enterprise West Harlow London Road North Design Code 21
DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.
More informationDesign and Installation of Low Level Cycle Signals
Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1
More informationCabinet Member for Highways & Streetscene. Highway Infrastructure Manager
LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS
More information1. TSRGD 2015 rewrite clarification and details
Question 13: The following issues need to be considered in the rewrite of TSRGD. These issues 1. clarify points of detail within the TSRGD rewrite 2. or provide additional signage to measures already approved
More informationSide Roads and Other Non-Signalised Junctions
Green Surfacing Sections of the Cycle Superhighway are marked with green paint these highlight sections where people cycling the Superhighway are likely to come into contact with walkers, drivers, or other
More informationIAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm
IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train
More informationReport from Embassy Visit to Copenhagen May David Arditti
Report from Embassy Visit to Copenhagen May 2013 David Arditti Standard CPH cycle track, one-way 1.5 2m wide, 5cm above carriageway, 5cm below footway Basic one-way cycle track protected by car parking
More informationDMURS - Practical Implications
Comhairle Contae Fhine Gall DMURS - Practical Implications Sean McGrath. 13 November 2013 Planning and Strategic Infrastructure Department DMURS Practical Implications What DMURS means for: Street Layouts
More informationA105 South of Ecclesbourne Gardens to Oakthorpe Road
Cycle Enfield - Section 1 A105 South of Ecclesbourne Gardens to Oakthorpe Road Stage 2 Road Safety Audit Ref: 2759.03.01/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,
More informationDRAFT. Jesmond Vale Lane. Meldon Terrace. Heaton Road. King John Street. Newcastle City Council
Remove footway build-out and reposition crossing equipment & tactile paving uild-out kerb to reduce turning speeds Jesmond Vale Lane Provide gap in parking for right turning cycles Light segregation set-back
More informationA105 Oaktree Avenue to Carpenters Gardens
Cycle Enfield - Section 6 A105 Oaktree Avenue to Carpenters Gardens Stage 2 Road Safety Audit Ref: 2759.03.06/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit, TfL Asset
More informationAppendix 11 Barton Greenway Review
Appendix 11 Barton Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationMilton Road Project Update. Paul van de Bulk 30 January 2018
Milton Road Project Update Paul van de Bulk 30 January 2018 Milton Road Project Objectives Comprehensive priority for buses in both directions wherever practicable; Safer and more convenient routes for
More informationA105 Green Lanes junction with Bourne Hill / Hedge Lane
Cycle Enfield - Section 5 A105 Green Lanes junction with Bourne Hill / Hedge Lane Stage 2 Road Safety Audit Ref: 2759.03.05/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,
More informationTGSI Tactile Ground Surface Indicators
TGSI Tactile Ground Surface Indicators Introduction: This Design Note, No 11, provides guidelines and requirements for the use and installation of Tactile Ground Surface Indicators (TGSI s). References
More informationE4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign
E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon
More information15/06/2015. The new TSRGD: Signals and cycling. Sally Gibbons Senior Engineer Traffic Division 18 May The story so far
IHE Traffic Signal Design Course The story so far The new TSRGD: Signals and cycling Sally Gibbons Senior Engineer Traffic Division 18 May 2015 Traffic Signs Policy Review: 2008-11 Signing the Way : October
More informationPERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3
PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 Install Remove Repair 613 IMPACT ATTENUATOR ACTIVITY DESCRIPTION Repair, install, remove and maintain
More informationGuide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group
Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page
More informationDerby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.
Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling
More informationM6 J7 Rushall Canal: Essential Repair Work Briefing
M6 J7 Rushall Canal: Essential Repair Work Briefing Highways England need to carry out essential repair work to the M6 northbound carriageway between junctions 7 and 8 to keep it in a safe condition. From
More informationStreets for All : 9 Use of white lines
Streets for All : 9 Use of white lines On 1st April 2015 the Historic Buildings and Monuments Commission for England changed its common name from English Heritage to Historic England. We are now re-branding
More informationThe Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport
LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &
More informationWest Midlands Cycle Design Guidance Cycling and the Midland Metro
Transport for the West Midlands Cycling and the Midland Metro September 2017 Project Code: 02821 Phil Jones Associates Ltd Seven House High Street Longbridge Birmingham B31 2UQ philjonesassociates.co.uk
More informationHighway Code for Cyclists Operation Close-Pass
Highway Code for Cyclists Operation Close-Pass 1 2 Operation Close-Pass For the 2 million people who cycle every day, close passes are an almost daily occurrence. Close passes are really intimidating and
More informationAT403.1 Ancient monument Note 3 amended P500 Basic triangle New size 1800mm added
AT403.1 P666 P874 P1028.4 P2509.1 P5001.2 P500 P672 P875 P1032 P2511.1 P5010 P530A P673 P876 P1033 P2512.1 P5011 P530.1 P784.1 P877 P1050 P2601.1 P7005 P543 P786 P878 P2010.1 P2601.1A P7009.1 P563.1 P787
More information10 SHERFORD Town Code
Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of
More informationCycling Safety Review. (April 2017)
Cycling Safety Review (April 2017) Background Analysis of STATS19 database: - Only includes incidents where police were in attendance, or where the crash was subsequently reported to the police - Significantly
More informationCHURCH ROAD. Public consultation document TELL US YOUR VIEWS.
CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from
More informationINTERIM ADVICE NOTE 93/07 DRIVER LOCATION SIGNS INTERIM PERFORMANCE SPECIFICATION
INTERIM ADVICE NOTE 93/07 DRIVER LOCATION SIGNS INTERIM PERFORMANCE SPECIFICATION IAN 93/07 Page 1 of 10 Apr 2007 . for. Interim Advice Note 93/07 The following requirements shall apply until further notice.
More informationDún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route
Dún Laoghaire Rathdown County Council Luas to Dart via UCD Cycle and Pedestrian Route October 2012 Luas to Dart via UCD Cycle and Pedestrian Route DOCUMENT CONTROL SHEET Client: Project Title: Document
More informationTS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1
TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield
More informationCrossroads. Inside of Left Bend. Crossroads on Dual Carriageway. Crossroads Ahead at Dual Carrageway. Merging and Diverging Traffic
Two Junctions on Left Two Junctions on Right Side Road on Outside of Left Bend Side Road on Outside of Right Bend Side Road on Inside of Left Bend Side Road on Inside of Right Bend Crossroads on Left Bend
More informationGreen Streets and Urban Greenways
127 11 Green Streets and Urban Greenways 11. Green Streets and Urban Greenways 128 11 Green Streets and Urban Greenways Once the traffic-free section of a route has come to an end, then comes the remaining
More informationHow do we design for pedestrians? Case study: transforming the Walworth Road
How do we design for pedestrians? Case study: transforming the Walworth Road David Moores, Director of Public Realm Institution of Highways and Transportation, November 2009 Presentation overview Design
More informationCHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT
CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to
More informationLEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document
LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk
More informationComments on the Hailsham to Eastbourne Sustainable Transport Corridor
Comments on the Hailsham to Eastbourne Sustainable Transport Corridor Version 1.1 25/01/2015 Paul Humphreys 1 Table of Contents Version Control... 2 Summary... 2 Rationale provided by ESCC... 3 The ESCC
More informationEntry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations
Traffic Advisory Leaflet 2/94 August 1994 Entry Treatments Introduction Entry treatments have been developed for use at side roads so that drivers leaving a major road are in no doubt that they are entering
More informationIMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk
IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments
More informationChapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London
Chapter 4 Route Window C3 Hyde Park and Park Lane shafts Transport for London HYDE PARK AND PARK LANE SHAFTS 4 Route Window C3 Hyde Park and Park Lane shafts Introduction 4.1 In this route window, which
More informationRAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings
RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control
More informationHISTON ROAD Have your say on better public transport, cycling and walking journeys
HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation
More informationChapter 4 - Links Within the Highway. Suitability of Routes
Chapter 4 - Links Within the Highway Suitability of Routes Most cycling takes place on existing urban roads; this will also be the case with the National Cycle Network. As well as following lightly trafficked
More informationAmendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008
Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationMILTON ROAD LLF PROJECT UPDATE
Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable
More informationBackground. Caversham a vision for the future. Joint public meeting arranged by:
Joint public meeting arranged by: Sharing our Streets Caversham a vision for the future and Caversham Traders Association This presentation followed a presentation by Simon Beasley, Network Manager for
More informationCyclists at road narrowings
Traffic Advisory Leaflet 1/97 February 1997 Cyclists at road narrowings Introduction Traffic calmed streets can offer a more attractive environment for cycling, by reducing motor vehicles speeds to a level
More information4. Guided Bus Explained
4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5
More information1.1 This information note accompanies Transport for Greater Manchester s cycle map data released at:
GM Cycle Map Data Supporting Information (July 2017) 1 Background 1.1 This information note accompanies Transport for Greater Manchester s cycle map data released at: https://data.gov.uk/dataset/gm-cycle-routes
More informationAppendix A Type of Traffic Calming Measures Engineering Solutions
Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of
More informationM9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study
A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication
More informationTraffic Calming Regulations
Traffic Advisory Leaflet 7/93 August 1993 Traffic Calming Regulations Introduction Traffic calming can help drivers to make their speeds appropriate to local conditions, through measures which are self-enforcing.
More informationDesign Manual for Road and Bridges (DMRB) Design Standards TD 50/04. Competency 4. Apply DfT and other technical advice and guidance.
Design Standards TD 50/04 Gafoor Din IEng FIHE Principal Engineer Competency 4 Apply DfT and other technical advice and guidance Competency 23 Design a traffic signals scheme (including facilities for
More informationSmart motorways: all lane running on the M25. Guidance for EEAST crews
Smart motorways: all lane running on the M25 Guidance for EEAST crews Published April 2014 Background This month (April 2014) the Highways Agency launched its smart motorways, which make use of new technology
More informationChicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction
Traffic Advisory Leaflet 12/97 December 1997 Chicane Schemes Introduction Traffic Advisory Leaflet 9/94 "Horizontal Deflections" reported on the results of track trials carried out by the Transport Research
More informationCycling Design Guide October 2006
Cycling Design Guide October 2006 Nottinghamshire County Council Cycling Design Guide 2006 Index Page 1.0 Introduction 1 1.1 Procedures for Scheme Identification, Design and Audit 2 1.2 Consultation Procedures
More informationRhebogue Neighbourhood Greenway. Road Safety Audit Stage 2
Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:
More informationBroom Hill/Blackberry Hill Walking and Cycling Improvements
Broom Hill/Blackberry Hill Walking and Cycling Improvements Introduction Bristol has been awarded additional funding from the UK government to upgrade and extend walking and cycling routes across the city.
More informationThe existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.
Project: A428 Study To: Cambridgeshire County Council Subject: Tidal Bus lane Review From: Atkins Date: 24 May 2016 cc: Introduction As part of the A428 Corridor Study to improve the bus journey time between
More informationguide to a phased approach TRIPP
complete street development guide to a phased approach TRIPP development phases Existing 00 months 00 crores/km Phase 0 months 0 crores/km Phase 09 months 0 to 08 crores/km Phase months 07 to crores/km
More informationAt each type of conflict location, the risk is affected by certain parameters:
TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.
More informationTechnical Information Note No. 5. Cycle network signing
Technical Information Note No. 5 Cycle network signing Issue date: November 2008 Issue level: 02 Owned by: Technical Director Contact: Christian.Ensslin@sustrans.org.uk Sustrans is the UK s leading sustainable
More informationEssential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle
Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce.
More informationMilton Road Bus Stop and Crossings Workshop WSP. 19th September 2017
Bus Stop and Crossings Workshop WSP 19th September 2017 Workshop Aims Task 1: Identify preferences for bus stop designs relative to: (a) Ranking preference between 4 possible bus stop designs on the narrower
More informationTraffic calming regulations (Scotland)
Traffic Advisory Leaflet 11/94 December 1994 Traffic calming regulations (Scotland) Introduction Traffic calming can help drivers to make their speeds appropriate to local conditions, through measures
More informationMotorways (autobahns) Abandoned motorway projects. New roads schemes according to the 2030 Federal Transport Infrastructure Plan
Motorways (autobahns) Motorway, 4 lanes (2+2) Motorway, 5 lanes (3+2) Motorway, 6 lanes (3+3) Motorway, 7 lanes (4+3) Motorway, 7 lanes (5+2) Motorway, 8 lanes (4+4) Temporary opening of hard shoulder
More informationBACCHER CERTIFICATES / CONTENTS CERTIFICATES / STATUS CONTENTS. l TRAFFIC ACCOMMODATION. ROAD SERVICES (PTY) LTD Your Vision Our Reality!
CERTIFICATES / CONTENTS CERTIFICATES / STATUS CONTENTS CONTENTS / CERTIFICATION BACKGROUND 2 3 ROAD SIGNS 4 REGULATORY SIGNS WARNING SIGNS 6 9 INFORMATION SIGNS GUIDANCE SIGNS TOURISM SIGNS ROUTE MARKERS
More informationLiveable Neighbourhoods Design Code and Policy
CNU London Transportation Summit, November 2007 The West Australian Liveable Neighbourhoods Design Code and Policy Incorporating a New Urbanist Street Design Manual for New Communities Wendy Morris Ecologically
More informationChapter 8 (2009) - Summary of key changes
Chapter 8 (2009) - Summary of key changes (Some sections and paragraphs in the revised edition have been renumbered to take account of new sections and paragraphs; section numbers below refer to the revised
More informationForeword. Councillor Jon Collins. Leader of Nottingham City Council Council
Foreword Nottingham has a world class public transport system which is essential to the local economy, I now want the City to have a world class cycle network, which we can all be proud of and want to
More informationBEST PRACTICES FOR ACCESSIBLE TRANSPORT. C G B (Kit) Mitchell
BEST PRACTICES FOR ACCESSIBLE TRANSPORT by C G B (Kit) Mitchell Independent mobility is necessary for independent living Many people with disabilities use cars, either as driver or passenger Those who
More informationGiving Cyclists the Green Light: Prioritising Cycles at Traffic Signals
Giving Cyclists the Green Light: Prioritising Cycles at Traffic Signals Tony Russell CEng MICE MIHT, Transport Engineering Manager, Sustrans 1. Introduction In recent years cycling has moved up the political
More informationTRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION
TRAFFIC LINE MANUAL TRAFFIC-ROADWAY SECTION TABLE OF CONTENTS Foreword...iv Section A: General Principles A-1 Functions and Limitations... 1 A-2 Colors... 1 A-3 Colored Pavements... 1 A-4 Functions, Widths,
More informationIntroduction Methodology Study area and data collection Results and recommendation Conclusion References
Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision
More informationOLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES. Christopher G B (Kit) Mitchell
OLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES by Christopher G B (Kit) Mitchell Independent mobility is necessary for a high quality of adult life In developed countries, the automobile has
More informationOn foot. Remember. Respect. Think ahead. and by bicycle
On foot Remember. Respect. Think ahead. and by bicycle Contents: On foot and by bicycle... 3 On their own paths... 4 Bicycle path and pavement side by side... 4 Shared-use path... 5 Using bicycle lanes...
More informationChelmsford City Growth Package
Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents
More informationCycle Superhighway 4 from Tower Bridge to Greenwich
Cycle Superhighway 4 from Tower Bridge to Greenwich About Sustrans Sustrans is the charity making it easier for people to walk and cycle. We are engineers and educators, experts and advocates. We connect
More informationSH1, Karo Drive Wellington Crash Reduction Study
SH1, Karo Drive Wellington Crash Reduction Study A REPORT PREPARED FOR New Zealand Transport Agency Reference: 12334 January 2013 Hawke s Bay office: PO Box 28 208, Havelock North 4157 Tel: (06) 877 8040
More informationCHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update
CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update The following report provides an update on the current position of all of the schemes which the Chelmsford City Local Highway
More informationBulwell Cycling Consultation
Bulwell Cycling Consultation Image 1 Bulwell Bogs (Sutton, 2015) As part of a final year research project, I am seeking feedback on proposals for cycling improvements in Bulwell. This consultation is not
More informationRoad humps: discomfort, noise, and groundborne
Traffic Advisory Leaflet 10/00 December 2000 Road humps: discomfort, noise, and groundborne vibration Introduction Acceptance of road humps schemes depends in part on whether traffic speeds are reduced.
More informationNW Bicester Masterplan. Access and Travel Strategy Appendix 2 Walking and Cycling Linkages
NW Bicester Masterplan Access and Travel Strategy Hyder Consulting (UK) Limited 2212959 HCL House Fortran Road St Mellons Business Park St Mellons Cardiff CF3 0EY United Kingdom Tel: +44 (0)29 2092 6700
More informationAppendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan
Appendix A Knoxville TPO Greenway Signage Guidelines 75 Overview: Adequate signing and marking are essential on shared-use paths, especially to alert bicyclists to potential conflicts and to convey regulatory
More informationLONDON FIELDS AREA WIDE REVIEW OF PROPOSALS
LONDON FIELDS AREA WIDE REVIEW OF PROPOSALS Summary Report MARCH 2017 London Fields Area Wide Review of Proposals Summary Report CONTACTS CHARLES HUTCHINSON Associate Technical Director dd + 44 (0)20 03014
More informationTemporary Vehicle Restraint System Policy
Temporary Vehicle Restraint System Policy Prepared By; J Wilkinson H&S Manager, Civils Prepared for: Installation of TVRS on all triio highways projects including JV s. Page 1 of 8 Contents 1.0 Introduction
More informationJanuary Greater Manchester Cycling Design Guidance & Standards Version 2.0
January 2014 Greater Manchester Cycling Design Guidance & Standards Version 2.0 Greater Manchester Cycling Design Guidance & Standards Version No. Comments Prepared by 1.0 Initial Draft prepared by AECOM
More informationPerne Rd / Radegund Rd Roundabout Cambridge
Perne Rd / Radegund Rd Roundabout Cambridge The conversion of an conventional urban roundabout to continental geometry A little bit of history The first traffic roundabout was built in Sollershott, Letchworth
More informationIMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING
IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE
More informationRegulatory traffic signs
Section 21: Regulatory traffic signs This section includes the signs that show a road regulation is in place. These must be obeyed. Regulatory signs show the course a driver must follow and an action they
More informationCambridge Cycling Campaign The Bike Depot 140 Cowley Road Cambridge CB4 0DL.
Cambridge Cycling Campaign The Bike Depot 140 Cowley Road Cambridge CB4 0DL 01223 690718 contact@camcycle.org.uk www.camcycle.org.uk Subject: Application S/3440/18/OL Case Officer Mike Huntington South
More informationSubmission on Clontarf to City Centre Cycle Route with signatures of 1,493 people
Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people Route should use a fully segregated two-way cycle path Contact details Cian Ginty - editor, IrishCycle.com - cian.ginty@gmail.com
More information