BICYCLE ADVISORY COMMITTEE. Spencer Morrison, Interim BAC Member
|
|
- Naomi Golden
- 5 years ago
- Views:
Transcription
1 BICYCLE ADVISORY COMMITTEE Presented by: Spencer Morrison, Interim BAC Member
2 Bicycle Advisory Committee (BAC) Who is on the Bicycle Advisory Committee? Members of the public interested in bicycling Representatives from the Police Department, Public Works, and Community Services Why did we form? Formed in 2010 as working group for the preparation of the City s Bicycle Master Plan. What do we do? Evaluate ways to enhance bicycling in Yuba City. Recommend projects that will forward the implementation of the City s Bicycle Master Plan.
3 National Bicycle Collision Data 6% Increase in bicycle accidents Continuous increase in recent years Average age of bicyclist killed is 43 Age steadily increased in last 10 years Children 15 and younger accounted for 9% of fatalities 24% Bicycle collision fatalities Bicyclist BA >.08
4 Local Bicycle Collision Data 25% Increase compared to bicycle collisions were down 13% 35 Bicycle collisions 22 bicyclist at fault (73%) 17 riding wrong way 2 right of way from stop sign 2 bicycle solo 8 motor vehicle at fault No DUI bicycle violations in 2014
5 Local Historical Bicycle Collision Data
6 Bicycle Education Bicycle Rodeo at local K-5 schools Andros Karperos School Butte Vista School Encinal School Lincoln School Park Avenue School 4 th of July Bicycle Parade Bicycle Rodeo Bicycle Education Enforcement Program (BEEP) 2 hrs traffic safety class for 1 st time violators Voids violation 1,133 Bicycle helmets distributed 1,246 Youth attended safety programs
7 Bicycle Helmet Enforcement Total
8 Three Feet for Safety Act Requires drivers to give those on bikes at least a 3-foot wide clearance when passing them on the road and the bike is traveling in same direction. When three feet is not possible, the motorist must slow to a reasonable and prudent speed and only pass when no danger is present to the bicyclist. Effective Sept. 16, 2014 California Vehicle Code 21750
9 Projects Completed Improved bike legends on Class II Bike Lanes throughout the City Added miles of Class III Bike Routes Introduced the concept of sharrows and installed 176 sharrows on various city streets
10 Projects Completed Developed a Bicycle Parking Cost-Share Program in which 72 bike racks were installed at several commercial establishments and City parks
11 Projects Completed Celebrated May is Bike Month Installed Class II Bike Lanes in accordance with Bicycle Master Plan at the following locations: Lassen Blvd.- Harter Parkway to Walton Avenue Lincoln Road- Karen Drive to Jones Road, Eastcrest Court to Garden Highway Butte House Road- Tharp Road to Madison Road Pease Road- Stabler Lane to Live Oak Boulevard Percy Avenue B Street to Main Street
12 Future Projects Install Class II Bike Lanes at the following locations: Butte House Road- Madison Road to Royo Ranchero Teegarden Avenue Shasta Street to Second Street Upgrade bike lane striping to reduce right-turn conflicts Develop and install destination signage to highlight popular riding destinations Install bicycle detection at major intersections Celebrate May is Bike Month 2015
13 May is Bike Month Activities May 6 Bike to School Day Celebration Andros Karperos Lincoln Tierra Buena Lincrest King Avenue Bridge Street Park Avenue April Lane Riverbend Butte Vista
14 May is Bike Month Activities May 6 Refueling Station Levee Bike 5 th Street Bridge 7:00-9:00 AM Bike to GAP May 15 Bike to Work Day
15 Bicycle Rodeos 2015 Andros Karperos School Tierra Buena April Lane Incorrect Helmet Correct Helmet Plumas Street 4 th of July Parade Each Rodeo includes helmet fitting distribution, safety presentation and skills course.
16 Accomplishments Expanded bicycle network throughout City in accordance with Bicycle Master Plan Introduced concept of sharrows Installed 72 bike racks at 8 businesses and 9 parks Prepared and distributed map of Yuba City bike network Logged 82,659 miles through May is Bike Month efforts in
17
FEDERAL HIGHWAY ADMINISTRATION APPLICATION
FEDERAL HIGHWAY ADMINISTRATION APPLICATION REQUEST FOR PERMISSION TO EXPERIMENT WITH A BICYCLE BOX INTERSECTION TREATMENT Submitted by: City of Columbus Department of Public Service Date: June 26, 2009
More informationThe Big Picture. FY Bicycling Highlights
FY 2007 2009 Bicycling Highlights Bikeway Improvements are identified as a Major City Goal in the 2007-2009 Financial Plan. Objectives of the goal are to continue to work towards the completion of the
More informationCity of Coronado Bicycle Map, Schools, Traffic Signals and Crossing Guard Locations
City of Coronado Bicycle Map, Schools, Traffic Signals and Crossing Guard Locations Early Childhood Development Center Crossing Guard - AM Crossing Guard - PM Coronado Middle Village Elementary Coronado
More information» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking
SAC Meeting Plan #3 for September Walking and 12, Biking 2018 » Draft Recommendations» Discussion» Next Steps Plan for Walking and Biking » Stakeholder and Public Outreach» Background data collection and
More informationBicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013
Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city
More informationBike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.
Bike Routes Assessment: 95 Ave, 106 St & 40 Ave Replace with appropriate image in View > Master. Transportation Committee October 15, 2014 City Council Direction What we are trying to achieve The Way Ahead:
More informationBicycle Facilities Planning
Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists
More information8. Collisions INTRODUCTION
8. Collisions INTRODUCTION While traffic collisions can affect anyone, they have a disproportionate impact on bicyclists, who along with pedestrians are the most vulnerable users of the transportation
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More information2.0 Existing Conditions
20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural
More informationand older adults and people with disabilities still face barriers when using the pedestrian network and public transportation.
Background Afterthe1980Olympics,theLakePlacid/NorthElbacommunityadoptedaneconomicstrategy ofdevelopingandmarketingeventstoincreaseareatourism.thisstrategyhasbeenvery successful.overrecentyearsthevolumeofvisitorshasincreased,andthelengthofthe
More informationDouble the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.
CHAPTER 6 Recommended Policies and Action Items To achieve the goals stated in Chapter 1 and guide implementation of the Bicycle Plan, policies and action items have been identified. They are presented
More informationCity of Richmond Bicycle Master Plan
City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with Eisen Letunic City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with
More informationSubject: Bike Project Field Trial Must Validate Bike Safety Claims
April 12, 2017 To: Menlo Park City Council Subject: Bike Project Field Trial Must Validate Bike Safety Claims A few weeks ago, a collision between my road bike and a white pick-up truck on Woodside Road
More informationChapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions
Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation
More informationSan Francisco 2009 Collisions Report April 21, 2011
San Francisco 29 Collisions Report April 21, 211 City and County of San Francisco San Francisco Municipal Transportation Agency 1 South Van Ness Avenue, 7 th Floor San Francisco CA 9413 CONTENTS About
More informationCHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION Chapter Table of Contents THE 2017 HOUSTON BIKE PLAN 1-1 HOUSTON BIKEWAYS PROGRAM 1-2 HISTORY OF BICYCLE PLANNING IN HOUSTON 1-3 BICYCLE LEVEL OF COMFORT 1-3 EXISTING PLANS, PROGRAMS
More informationWhat are the Qualities that make Newark a Bicycle Friendly Community? What are aspects that make Newark less Bicycle Friendly?
What are the Qualities that make Newark a Bicycle Friendly Community? Many stores are within biking distance (1) Lots of bike lanes and new trail Existing bike routes (2) Designated bike lanes on Del ave.
More informationWELCOME Public Information Centre
WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background
More informationAppendix E: Bike Crash Analysis ( )
Appendix E: Bike Crash Analysis (2009-2012) Davis Bicycle Crashes Analysis 2009-2012 December 2013 Ride Walk Davis Active Transportation Program City of Davis December 2013 Prepared by: Jimmy Fong Active
More informationUpper Market Street Bike Lane Project
Upper Market Street Bike Lane Project 17th Street to Octavia Boulevard 6 30 2010 SAN FRANCISCO, CALIFORNIA Agenda San Francisco & Sustainable Transportation Project Goals Outreach & Coordination Project
More informationCITY OF ELKO BICYCLE AND PATHWAY PLAN
CITY OF ELKO BICYCLE AND PATHWAY PLAN INTRODUCTION: The City of Elko is intended to provide the basic framework for the development of a functional bicycle and pathway system for the community with connections
More informationMadison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process
Bicycle Transportation Plan Summary Madison Urban Area and Dane County Introduction September 2000 Bicycling is an important mode of transportation in the Madison urban area and countywide that is available
More informationThe Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design
The Transformation of Portland into a Two-Wheeled Mecca Mia Birk, Principal, Alta Planning + Design Development of Portland s Bikeway Network 1990 Early 1990s Infrastructure Growing Public Support Growing
More information-Lexington Mayor, Jim Gray
DWIN Ride on over to Lexington, and enjoy some of the most beautiful countryside anywhere. Our trails and major roadway bike lanes have helped achieve bronze-level status from the League of American Bicyclists,
More informationAMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities
I MOVE that the Council: AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities 1. INSTRUCT the Department of City Planning to amend the proposed Mobility Plan to include the following;
More informationThe Wiggle Route in Context
The Wiggle Route in Context In a city of hills, the Wiggle is an important route because it winds its way along the flattest streets from Market to the Panhandle, bringing residents to local parks and
More informationTelegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses
Telegraph Avenue Complete Streets DRAFT Recommendations Oakland Public Works Department September 11 and 13, 2014 Open Houses Presentation Overview What are complete streets? What problem are we trying
More informationOTO BIKE/PED PLAN REPORT
OTO BIKE/PED PLAN REPORT 6/30/2012 Implementation in FY2012 This report outlines the bike/ped accomplishments related to the OTO Bike/Ped Plan. Activities occurring during the 2012 Fiscal Year, July 1,
More informationSharrows and Elephants and Bike Boxes!, s, Oh My!
Sharrows and Elephants and Bike Boxes!, s, Oh My! New Traffic Control Devices on Vancouver s Bike Routes David Rawsthorne, P.Eng. City of Vancouver Engineering g Services CITE Quad Conference, May 2009
More information15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility
15 April 2016 CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility AGENDA What We Heard Campus Framework & Open Space Network Mobility Approach Supporting the Pedestrian Environment Mobility & Sustainability
More informationEMPHASIS AREA 2: SCHOOL CHILDREN
EMPHASIS AREA 2: SCHOOL CHILDREN A child is seriously injured or killed every 17 weeks on their way to or from school on Toronto s roads. School children are pedestrians and cyclists between the ages of
More informationBICYCLING ON ROADWAYS
Massachusetts State Police Academy Training Bulletin 2017-11 BICYCLING ON ROADWAYS Legal Update: Effective April 2017, Chapter 456 of the Acts of 2016 adds section 4D to Chapter 89 of the General Laws,
More informationNorthbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project
Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed
More informationTOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN
TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.
More informationWEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069
MINUTES Meeting of the San Marcos Traffic Commission WEDNESDAY, SEPTEMBER 6, 2017 6:00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069 CALL TO ORDER: Vice Chairman Rico called the
More informationand Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN
Small Town and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN SMALL TOWN AND RURAL MULTIMODAL NETWORKS GUIDE Why a Rural and Small Town Focused Guide? ONE SIZE DOES NOT FIT ALL. The new FHWA-endorsed
More informationREDUCING COLLISIONS AT HIGH CRASH LOCATIONS
REDUCING COLLISIONS AT HIGH CRASH LOCATIONS Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com ACCIDENTS AND SAFETY Why is safety important? Safety components Who is responsible?
More informationRESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY
RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune
More informationDepartment of Transportation
Department of Transportation I. Internal Scan The number of older drivers in the United States will double over the next 30 years. By 2030 one in five Americans will be age 65 or older. On a licensed-driver
More informationEMPHASIS AREA 1: PEDESTRIANS
EMPHASIS AREA 1: PEDESTRIANS A pedestrian is seriously injured or killed every 3 days on Toronto s roads. Pedestrian collisions involve any person that is not riding in a vehicle or on a bicycle. 26% OF
More informationTRAFFIC CALMING PLANNER S PORTFOLIO
TRAFFIC CALMING PLANNER S PORTFOLIO ISSUE 8 January 2017 PLANNER S PORTFOLIO TRAFFIC CALMING 1 OVERVIEW 2 3 4 ENGINEERED TRAFFIC CALMING MEASURES SIGNS AND PAVEMENT MARKINGS EMERGENCY RESPONSE DELAYS 5
More informationPROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access
COMMUNITY MEETING Project Update March 15, 2010 Purcellville, Virginia OVERVIEW Project need / objectives Project recap Design elements Proposed improvements Summary of project benefits / next steps PROJECT
More informationSan Bernardino County Non-Motorized Transportation Plan - Chapter 5
City of Yucaipa Population 51,476 City Overview Yucaipa is located in the eastern portion of the San Bernardino Valley area, at the foot of the San Bernardino Mountains, between the Cities of Redlands
More informationAUTOMATED SPEED ENFORCEMENT: REDUCING SPEED TO SAVE LIVES
Through Vision Zero SF we commit to working together to prioritize street safety and eliminate traffic deaths in San Francisco by 2024 AUTOMATED SPEED ENFORCEMENT: REDUCING SPEED TO SAVE LIVES INTRODUCING
More informationPrince George s County plans, policies, and projects
Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail
More information2012 Petaluma Traffic Safety Report Collisions Rise for 2 nd Year in a Row
NEWS RELEASE For Immediate Release/Broadcast Thursday, March 7, 2013 2012 Petaluma Traffic Safety Report Collisions Rise for 2 nd Year in a Row The 2012 annual review of traffic safety in Petaluma has
More informationBike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010
Policy and Procedures Develop and Implement a Complete Streets Policy to comply with DD-64-R1 and AB1358 Commencing January 1, 2011, AB1358 requires that the legislative body of a city or county, upon
More informationRM 620 FEASIBILITY STUDY
RM 620 FEASIBILITY STUDY Sections 5 & 6 December 7, 2015 STUDY PROCESS Study Purpose and Goals The RM 620 Feasibility Study was launched by the Texas Department of Transportation (TxDOT) to analyze transportation
More informationLessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice
Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS
More informationCommunity Bicycle Planning
Community Bicycle Planning City of Mentor s Bicycle Facility Plan Allen E. Pennington, P.E. Civil Engineer - Traffic Office of the Mentor City Engineer Why has Mentor participated in bicycle planning?
More informationNM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.
Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility
More information43 rd Avenue, Skillman Avenue Protected Bike Lanes
43 rd Avenue, Skillman Avenue Protected Bike Lanes Presented to Queens Community Board 2 Transportation Committee - November 6, 2017 43 rd Avenue, Skillman Avenue: Presentation Overview Background Project
More informationDRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH
RHODE ISLAND MOVING FORWARD BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH T AF CHAPTER 1 D R INTRODUCTION CHAPTER 3 ARTICULATES VISION Bicycling is safe, fun and practical in
More informationTraffic Signs and Signals
CHAPTER FOUR Traffic Signs and Signals Traffic signs control traffic flow, making streets and highways safer for drivers, bicyclists and pedestrians. These signs, which are posted by the Indiana Department
More informationProject Goals and Objectives
Project Goals and Objectives Goal 1: Goal 2: Goal 3: Transform Coast Highway into a Complete Street that accommodates all roadway users (pedestrians, bicyclists, and autos) Objectives: Improve the pedestrian
More informationSanta Ana Creating Community Together
City of Santa Ana Creating Community Together Circulation & Housing Element Update Open House Thursday, May 9, 2013 1 General Plan Circulation Element Update Open House #3 2 What is a Circulation Element?
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More informationBikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN
Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of
More informationPotential Bicycle Facility on Bayou Street Mobile, Alabama
Potential Bicycle Facility on Bayou Street Mobile, Alabama By Richard A. Hall, P.E. Prepared For Mobile Downtown Alliance Hall Planning & Engineering, Inc. March 28, 2018 Introduction Review of the February
More informationSmall Town & Rural Multimodal Networks
Small Town & Rural Multimodal Networks Fred Young, PLA Andrea Clinkscales, AICP, PMP Alta Planning + Design Funding Partners Project Team Existing Design Guidance AASHTO Flexibility Guide 2004 AASHTO Bike
More informationCTDOT Pedestrian and Bicycle Safety Initiatives
CTDOT Pedestrian and Bicycle Safety Initiatives 2017 Northeast Transportation Safety Conference Mark F. Carlino, P.E. Traffic Engineering Division Chief Bureau of Engineering and Construction Connecticut
More informationMayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017
Mayor s Bicycle Advisory Council Wednesday, December 13 th, 2017 Bicyclist Fatalities, Year to Date (January 1 November 30, 2017) - MBAC Briefing Bicyclist Fatality Statistics Year to date total, 2017
More informationTABLE OF CONTENTS. Executive Summary
Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting
More informationGlebe Neighbourhood Cycling Plan
Glebe Neighbourhood Cycling Plan Summary of Public Comments received after June 5 th Public Information Session Comment STUDY NETWORK CS9, CS8, E, E0 CS4, E CS4 CS8 E Suggestions for alternate cycling
More informationBICYCLE MASTER PLAN CITY OF BURBANK ADOPTED DECEMBER 15, 2009
CITY OF BURBANK BICYCLE MASTER PLAN ADOPTED DECEMBER 15, 2009 By a Resolution (Resolution number: 28-046) of the Council of the City of Burbank, this document was adopted and certified as being in compliance
More informationHennepin County Bicycle and Pedestrian Planning
Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion
More informationLANCASTER CITY BICYCLE NETWORK
LANCASTER CITY BICYCLE NETWORK Downtown Merchants Meeting Wednesday, July 19, 2017 http://www.lancasteratp. DOWNTOWN WALKABILITY ANALYSIS What changes can be made, in the least amount of time, and for
More informationCITY OF ELK GROVE CITY COUNCIL STAFF REPORT
CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 10.3 AGENDA TITLE: Bike Lane Installation Project Update MEETING DATE: April 26, 2017 PREPARED BY: Ryan D. Chapman P.E., Traffic Engineer DEPARTMENT
More informationBlue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements
Recommendations on Pedestrian and Bicycle Infrastructure Improvements July 2017 Plan Development: Our committee consisted of seven individuals appointed by the Mayor and Village Board. Those members included:
More informationBikeability Checklist
Bikeability Checklist How bikeable is your community? Riding a bike is fun! Bicycling is a great way to get around and to get your daily dose of physical activity. It's good for the environment, and it
More informationArlington County, Virginia ~ National Capital Region Transportation Planning Board (TPB) Transportation and Land-Use Connections (TLC) Program
Arlington County, Virginia ~ National Capital Region Transportation Planning Board (TPB) Transportation and Land-Use Connections (TLC) Program May 4, 2011 Nature of the Problem European and US Best Practices
More information2017 Annual Traffic Safety Report
2017 Annual Traffic Safety Report City of Santa Cruz Public Works Department I. Introduction The purpose of the 2017 City of Santa Cruz Traffic Safety Report is to provide an overview of traffic safety
More informationOuter Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015
Outer Cape Bicycle & Pedestrian Master Plan PUBLIC WORKSHOP #2 March 26, 2015 Introductions TODAY S DISCUSSION PRESENTATION: Project Background : Where have we been? Where are we now? Steering Committee
More informationBIKE PLAN CONTENTS GATEWAY
CONTENTS Acknowledgments...vii Great Rivers Greenway District Board of Directors... vii Great Rivers Greenway District Staff... vii Project Consultants... vii Committees... viii Citizens Advisory Committee
More informationBICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes
Minutes Approved as Submitted Date: 2/8/18 Initials: EC BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes December 14, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m.
More informationVision Zero Task Force February 28, Collision Landscape Analysis
Vision Zero Task Force February 28, 2017 Collision Landscape Analysis Welcome! What happened since our last Task Force meeting: City Council adopted the Vision Zero Resolution Applied for an OTS grant
More informationChapter 5. Complete Streets and Walkable Communities.
Chapter 5. Complete Streets and Walkable Communities. 5.1 Description of Complete Streets. Cities throughout the world, and specifically the United States, are coming to embrace a new transportation and
More informationPedestrian Safety Action Plan Bicycle Safety Action Plan
Pedestrian Safety Action Plan Bicycle Safety Action Plan January 24, 2017 VISION: Safe travel for all MISSION STATEMENT: Partner with the community to plan and fund transportation projects and programs
More informationRolling Out New Bike Facilities Within the North Bethesda & White Flint Area
Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Agenda Designing for all Cyclists Background on
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationAppendix D: Planning Level Cost Calculator
Appendix D: Planning Level Cost Calculator Network Costs by Facility Type Facility Type Total Miles of Facility Total Number of Intersections Cost per feature or per mile Total Cost Bicycle Boulevard 52.14
More informationV2X Bicycle and Pedestrian Detection. ITS Wisconsin Annual Conference October 23, 2018
V2X Bicycle and Pedestrian Detection ITS Wisconsin Annual Conference October 23, 2018 Adam Lyons Iteris, Inc. Denver, CO Adam Lyons Iteris, Inc. Denver, CO WisDOT Funded Bike/Ped Projects 1993 2014 ~700
More informationWelcome and Purpose of Meeting
Welcome and Purpose of Meeting Waterfront Trail Connection Lake Shore Cycling Improvements There is a gap in the Waterfront trail along Lake Shore Blvd West between Norris and First St We are looking at
More informationI am a CUNY student, bicyclist and resident in New York City. This dialogue is presented
Ming Lin, Fair Treatment for Two Wheels I am a CUNY student, bicyclist and resident in New York City. This dialogue is presented as my real story and recommendation to improve the New York City traffic
More informationThis class was edited for the City of Glendale by the Coalition of Arizona Bicyclists from a presentation originally developed by members of the
This class was edited for the City of Glendale by the Coalition of Arizona Bicyclists from a presentation originally developed by members of the North Carolina Active Transportation Alliance and the Raleigh
More informationThe City of Chicago s. Bike 2015 Plan. Nick Jackson, Deputy Director Chicagoland Bicycle Federation RAIL-VOLUTION 2006
The City of Chicago s Bike 2015 Plan Nick Jackson, Deputy Director Chicagoland Bicycle Federation RAIL-VOLUTION 2006 Plan funded by $75,000 grant from the Unified Work Program (UWP) received from the Chicago
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More informationOfficer Safety Webinar
Officer Safety Webinar Hosted by: December 8, 2015 Start time: 9:30 AM (MST) 11:30 AM (EST) 1 About Laser Technology, Inc. 1 st proximity laser for NASA missions 1 st commercial speed laser 1 st recreational
More informationTraffic Calming & Cyclists
Traffic Calming & Cyclists In the planning, design, and operation of transportation facilities bicyclists and pedestrians should be included as a matter of routine and the decision not to accommodate them
More informationAugust 3, Bay Trail Connection With The Community
Ms. Lina Velasco, Senior Planner City of Richmond Planning Division P.O. Box 4046 Richmond, CA 94804 Dear Ms. Velasco: August 3, 2009 73 Belvedere Ave. Richmond, CA 94801 Phone/Fax: 510-235-2835 Email:tracbaytrail@earthlink.net
More informationPublic Information Centre
WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationContents. Bicyclist Pocket Guide. Quick Reference. 2nd Edition. GeorgiaBikes.org. 1. Legal Status of Bicyclists Rules of the Road 7
Bicyclist Pocket Guide 2nd Edition 2013 GeorgiaBikes.org 2 Contents 1. Legal Status of Bicyclists 6 2. Rules of the Road 7 3. Safe Cycling 17 4. Crashes 24 Quick Reference Bicycles are vehicles and have
More informationMonterey Road Complete Streets
Monterey Road Complete Streets Complete Street Objectives Improve livability and economic vitality Enhance pedestrian environment Accommodate bicyclists safely Reduce noise and air pollution Create attractive,
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationCOMPLETE STREETS PLANNER S PORTFOLIO
COMPLETE STREETS PLANNER S PORTFOLIO ISSUE 3 APRIL 2016 PLANNER S PORTFOLIO COMPLETE STREETS 1 2 6 10 14 OVERVIEW MATURE NEIGHBORHOODS GROWING SUBURBS CENTRAL PLACES ACTIVITY CORRIDORS Planner s Portfolio
More informationMarket/Octavia - Transportation Projects Update
Market/Octavia - Transportation Projects Update Market/Octavia Community Advisory Committee Feb 9, 2015 Tonight s Goals Update CAC on pending/active projects Respond to Nov 2014 CAC resolution Obtain support
More informationThe total net revenue to the City for the previous four fiscal years was $255,856.
Subject: Red Light Camera Enforcement Project Date: 11/08/2012 Page 2 of 3 Language included in the proposed contract entitles the City to recover the first $8,500 per month from gross cash received to
More informationSeptember The State of Bicycling in Montgomery County
September 2015 The State of Bicycling in Montgomery County The State of Bicycling in Montgomery County Abstract: This report documents the state of bicycling in Montgomery County as of September 2015.
More information