WEEKLY HIGHWAY ALERT RICHMOND DISTRICT
|
|
- Kristian Robertson
- 5 years ago
- Views:
Transcription
1 CONTACT: VDOT Customer Service April 19, 2019 WEEKLY HIGHWAY ALERT RICHMOND DISTRICT SOUTH CHESTERFIELD Below is a forecast of road construction that could cause delays from April 19-26, Updates to previous highway alerts are in bold. The Virginia Department of Transportation (VDOT) will lift most lane closures on interstates and major roads from noon Friday, April 19 through noon Tuesday, April 23 to limit congestion and provide as many travel lanes as possible for holiday travelers. For the most current traffic and road work information, call 511 or visit On the 511 website, drivers can also sign up to receive personalized traffic alerts, view traffic cameras or download the free Android or iphone mobile app. You can also follow 511 Twitter feeds for the metro area or for general information about area road conditions and projects. HIGH PROFILE Location Highway/Road Date/Time Activity Details Chesterfield/ Henrico I-295 north/south at the Varina Enon (mm 16-18) Through summer 2019 Mm = mile marker The left lane will be on I-295 north/south at the Varina Enon (mm 16-18) continuously through summer 2019 for bridge work. More: Henrico/New Kent I-64 east/west I-295 (mm 200) and Bottoms (mm 205) Through fall 2019 overnight lane closures I-64 widening project INTERSTATES & MAJOR HIGHWAYS There will be alternating overnight lane closures on I-64 east/west I-295 (mm 200) and Bottoms (mm 205) continuously through fall 2019 for the I-64 widening project. More: Location Highway/Road Date/Time Activity Details / Dinwiddie I-85 north Rawlings (mm 39) and mm 56 9 a.m.-3 lanes There will be alternating lanes on I- 85 north Rawlings (mm 39) and mm 56 from 9 a.m.-3 for pothole.
2 Chesterfield Dinwiddie Dinwiddie Dinwiddie/ Chippenham Pkwy. (Rt. 150) near Powhite Pkwy. I-85 north mms I-85 north mms I-85 north/south Rt. 460 (mm 61) and Wythe St. (mm 69) Route 288 south near Broad St. I-64 mms I-64 mms Route 288 near the James River I-64 Route 288 (mm 175) and Shannon Hill (mm 148) Broad Street (Rt. 250) Three Chopt and Cooley I-295 (mm 37) and Route 301 (mm 41) 9:30-5:30 a.m. Noon-4 8 a.m.-4 Noon-3 6 Apr a.m. Apr. 26 Noon-5 8 a.m.-5 9 a.m.-3:30 9 a.m.-3:30 7 a.m.-7 9 a.m.-3 lanes lanes Traffic sensor work Landscape work Landscape work lanes The right lane will be on Chippenham Pkwy. (Rt. 150) near Powhite Pkwy. from 9:30-5:30 a.m. for bridge work. The right lane will be on I-85 north mms from noon-4 Apr. 23 for bridge work. The right lane will be on I-85 north mms from 8 a.m.-4 Apr for bridge work. There will be alternating lanes on I-85 north and south Rt. 460 (mm 61 and Wythe St. (mm 69) from noon-3 for pothole. There will be alternating lanes on Route 288 south near Broad St. continuously from 6-2 a.m. for traffic sensor work. The left lane will be on I-64 mms from noon-5 for landscape work. The left lane will be on I-64 mms from 8 a.m.-5 for landscape work. The left lane will be on Route 288 near the James River from 9 a.m.- 3:30 for pothole. The left lane will be on I-64 Route 288 (mm 175) and Shannon Hill (mm 148) from 9 a.m.-3:30 for pothole. There will be alternating lanes on Broad Street (Rt. 250) Three Chopt and Cooley from 7 a.m.-7 for paving. The right lane will be on I-295 (mm 37) and Route 301 (mm 41) from 9 a.m.-3 for pothole.
3 I-295 south Creighton (mm 32) and Tpk. (mm 37) 9-5 a.m. -25 lanes There will be alternating lanes on I- 295 south Creighton (mm 32) and Tpk. (mm 37) from 9-5 a.m. -25 for pothole. Henrico Henrico Henrico I-95 north Maury St. (mm 73) and I-64 west (mm 79) I-64 mms I-64 west I-95 north (mm 187) and mm 188 I-85 south Route 58 (mm 12) and mm 11 I-85 north/south mile markers 2-6 I-85 north/south mile markers 2-6 Ramps at I-95 and Wagner / Colonial Heights/ Chesterfield/ Prince I-95 Bank St. (mm 52) and the Downtown Expressway (mm 74) I-95 south near Bank St. (mm 52) I-295 north mms a.m. 9-6 a.m a.m a.m.-3 Noon-7:30 7:30 a.m.-7:30 6:30-5 a.m a.m a.m. 9 a.m.-3 lanes lanes Guardrail lanes/ramps lanes Sweeping Guardrail The left lane will be on I-95 north Maury St. (mm 73) and I-64 west (mm 79) from 10-6 a.m. for bridge work. There will be alternating lanes on I- 64 mms from 9-6 a.m. -25 for pothole. There will be alternating lanes on I-64 west I-95 north (mm 187) and mm 188 from 10-6 a.m. -25 for paving. The left lane will be on I-85 south Route 58 (mm 12) and mm 11 from 9 a.m.-3 for guardrail. The right lane will be on I-85 north/south mile markers 2-6 from noon-7:30 for bridge work. The right lane will be on I-85 north/south mile markers 2-6 from 7:30 a.m.-7:30 for bridge work. There will be alternating lanes/ramps at I-95 and Wagner from 6:30-5 a.m. -25 for paving. There will be alternating lanes on I- 95 Bank St. (mm 52) and the Downtown Expressway (mm 74) from 8-5 a.m. -25 for sweeping. The right lane will be on I-95 south near Bank St. (mm 52) from 8-5 a.m. for guardrail. The right lane will be on I-295 north mms 4-5 from 9 a.m.-3 Apr. 24 for pothole.
4 Prince Prince Prince Prince I-95 south at Templeton (mm 41) I-95 north at mm 43 I-295 north mm 6 and Fort Lee (mm 9) I-295 south near Route 460 (mm 3) I-95 north mm 70 and the Downtown Expressway (mm 74) I-95 mm 68 and Hermitage (mm 80) I-95 the Downtown Expressway (mm 74) and Chamberlayne Ave. (mm 76) I-195 the Downtown Expressway and Broad St. I-195 the Downtown Expressway and Broad St. I-95 I- 64 (mm 75) and Maury St. (mm 73) 8-5 a.m. 8-5 a.m. 9 a.m.-3 Apr. 25 Noon a.m a.m a.m a.m a.m a.m. -25 Guardrail Guardrail lanes lanes Sweeping Jersey wall lanes lanes lanes The left lane will be on I-95 south at Templeton (mm 41) from 8-5 a.m. for guardrail. The left lane will be on I-95 north at mm 43 from 8-5 a.m. for guardrail. The right lane will be on I-295 north mm 6 and Fort Lee (mm 9) from 9 a.m.-3 on Apr. 25 for pothole. The right lane will be on I-295 south near Route 460 (mm 3) continuously from noon -3 for pothole. There will be alternating lanes on I- 95 north mm 70 and the Downtown Expressway (mm 74) from 8-6 a.m. -26 for paving. There will be alternating lanes on I- 95 mm 68 and Hermitage (mm 80) from 8-5 a.m. -25 for sweeping. The left lane will be on I-95 the Downtown Expressway (mm 74) and Chamberlayne Ave. (mm 76) from 9-5 a.m. -24 for jersey wall. There will be alternating lanes on I-195 the Downtown Expressway and Broad St. from 9 a.m for bridge work. There will be alternating lanes on I-195 the Downtown Expressway and Broad St. from 7-6 a.m. -25 for bridge work. There will be alternating lanes on I-95 I-64 (mm 75) and Maury St. (mm 73) from 9-6 a.m. -25 for bridge work.
5 PRIMARY AND SECONDARY ROADS Location Highway/Road Date/Time Activity Details Amelia/ Cumberland Amelia Amelia Amelia Brookhill /Fowlkes (Rt. 621) over Appomattox River Soap Stone (Rt. 645) Holly Farms and S. Genito Buckskin Creek (Rt. 640) Poor House Ct. and Old Court House Richardson (Rt. 640) Patrick Henry Hwy. and Mount Zion Ebenezer (Rt. 691) Antioch and Old Stage Chalk Level (Rt. 652) Dr. and School St. Boydton Plank (Rt. 1) Danieltown (Rt. 137) Christanna Hwy. and Mt. Zion Danieltown (Rt. 137) Christanna Hwy. and Mt. Zion 7 a.m. Apr Apr. 24 Noon - 4:30 Apr a.m.-4:30 8 a.m.-4:30 Noon-6 8 a.m.-6 8 a.m.-5 Noon-7 7 a.m.-7 Road lanes lanes lanes lanes lanes lanes inspection lanes lanes Brookhill /Fowlkes (Rt. 621) will be over Appomattox River continuously from 7 a.m. Apr for bridge. Use the posted detour route. There will be alternating lanes on Soap Stone (Rt. 645) Holly Farms and S. Genito continuously from noon -4:30 Apr. 25 for paving. There will be alternating lanes on Buckskin Creek (Rt. 640) Poor House Ct. and Old Court House from 8 a.m.-4:30 for paving. There will be alternating lanes on Richardson (Rt. 640) Patrick Henry Hwy. and Mount Zion from 8 a.m.-4:30 for paving. There will be alternating lanes on Ebenezer (Rt. 691) Antioch and Old Stage from noon-6 for paving. There will be alternating lanes on Chalk Level (Rt. 652) Dr. and School St. from 8 a.m.-6 for paving. There will be alternating lanes on Boydton Plank (Rt. 1) from 8 a.m.-5 for bridge inspection. There will be alternating lanes on Danieltown (Rt. 137) Christanna Hwy. and Mt. Zion from noon-7 April 23 for paving. There will be alternating lanes on Danieltown (Rt. 137) Christanna Hwy. and Mt. Zion from 7 a.m.-7 April for paving.
6 Diamond Grove (Rt. 623) over Genito Creek Until further notice Road Diamond Grove (Rt. 623) is over Genito Creek continuously until further notice for bridge. Use posted detour until s are complete. More: Robinson Ferry (Rt. 644) over the Meherrin River Until further notice Road Tropical storm damage Robinson Ferry (Rt. 644) is over the Meherrin River continuously until further notice due to damage from Tropical Storm Michael. Use posted detour until s are complete. More: Charles City Charles City Wilcox Neck (Rt. 623) John Tyler Memorial Hwy. and The Glebe Ln. Wilcox Neck (Rt. 623) Sandy Point and The Glebe Ln. Noon-4:30 8 a.m.-4:30 Apr lanes Pavement marking work lanes There will be alternating lanes on Wilcox Neck (Rt. 623) John Tyler Memorial Hwy. and The Glebe Ln. from noon-4:30 for pavement marking work. There will be alternating lanes on Wilcox Neck (Rt. 623) Sandy Point and The Glebe Ln. from 8 a.m.- 4:30 Apr for paving. Charles City Herring Creek (Rt. 640) near John Tyler Memorial Hwy. 8:30 a.m.-4:30 Apr. 25 lanes There will be alternating lanes on Herring Creek (Rt. 640) near John Tyler Memorial Hwy. from 8:30 a.m.-4:30 Apr. 25 for paving. Charles City/Prince Benjamin Harrison (Rt. 156) over the James River Intermittent, short-term closures Drivers can expect minor delays intermittently on the Benjamin Harrison for the passing of marine traffic and bridge tender shift change. closures to vehicular traffic should last approximately 10 minutes. Chesterfield Mt. Hermon (Rt. 606) over Otterdale Branch Until further notice Road Tropical storm damage Mt. Hermon (Rt. 606) is over Otterdale Branch until further notice due to damage from Tropical Storm Michael. Use posted detour route until s are complete. Dinwiddie Boydton Plank (Rt. 1) north Simmons Ave. and Simpson Broad Street (Rt. 250) Elpis Church and Oilville Tpk. (Rt. 360) west Studley 7-7 a.m. -24, a.m. 9-6 a.m. -26 lanes lanes lanes There will be alternating lanes on Boydton Plank (Rt. 1) north Simmons Ave. and Simpson from 7-7 a.m. -24, 26 for bridge work. There will be alternating lanes on Broad Street (Rt. 250) Elpis Church and Oilville from 9-6 a.m. for paving. There will be alternating lanes on Tpk. (Rt. 360) Studley and Orchard Ln. from 9-6 a.m. for paving.
7 and Orchard Ln. Tpk. (Rt. 360) west Studley and Orchard Ln. Melton (Rt. 679) cul-de-sac and Ashcake Tnpk. (Rt. 360) east the Henrico County line and I a.m.-4 Noon-4:30 8-5:30 a.m. -26 lanes lanes lanes There will be alternating lanes on Tpk. (Rt. 360) Studley and Orchard Ln. from 9 a.m.-4 for paving. There will be alternating lanes on Melton (Rt. 679) cul-de-sac and Ashcake from noon-4:30 for paving. There will be alternating lanes on Tnpk. (Rt. 360) east the Henrico County line and I-295 from 8-5:30 a.m. -26 for paving. Tnpk. (Rt. 360) east the Henrico County line and I-295 Noon-4 lanes There will be alternating lanes on Tnpk. (Rt. 360) east the Henrico County line and I-295 from noon- 4 for paving. Tnpk. (Rt. 360) east the Henrico County line and I a.m.-4 lanes There will be alternating lanes on Tnpk. (Rt. 360) east the Henrico County line and I-295 from 9 a.m.-4 for paving. Chamberlayne (Rt. 301) north Atlee and Crown Colony Pkwy. Chamberlayne (Rt. 301) south Richfood and I-295 Noon-4 Noon-4 lanes lanes/ramps There will be alternating lanes on Chamberlayne (Rt. 301) north Atlee and Crown Colony Pkwy. from noon-4 for paving. There will be alternating lanes/ramps on Chamberlayne (Rt. 301) south Richfood and I-295 from noon-4 for paving. Chamberlayne (Rt. 301) south Richfood and I a.m.-4 lanes/ramps There will be alternating lanes/ramps on Chamberlayne (Rt. 301) south Richfood and I-295 from 9 a.m.-4 for paving. Lunenburg Burkeville (Rt. 723) at Lewiston Plank 8 a.m.-5 Apr. 25 lanes inspection There will be alternating lanes on Burkeville (Rt. 723) at Lewiston Plank from 8 a.m.-5 Apr. 25 for bridge inspection.
8 Lunenburg Courthouse (Rt. 40) near Crymes Noon-7 lanes There will be alternating lanes on Courthouse (Rt. 40) near Crymes from noon-7 for paving. Lunenburg Courthouse (Rt. 40) near Crymes 7 a.m.-7 lanes There will be alternating lanes on Courthouse (Rt. 40) near Crymes from 7 a.m.-7 for paving. Lunenburg Juniper Creek Ln. (Rt. 691) over Big Juniper Creek Canaan Church (Rt. 624) Blackridge and Canaan Gaulding (Rt. 627) Marengo and Hall Old St. Tammany (Rt. 617) Highway Nine- O-Three and Jimanetta Trinity Church (Rt. 631) near Belfield Until further notice 8 a.m.-6 8 a.m.-6 Apr a.m.-6 Apr a.m.-6 Road Tropical storm damage lanes lanes lanes lanes Juniper Creek Ln. (Rt. 691) is over Big Juniper Creek until further notice due to damage from Tropical Storm Michael. Use posted detour route until s are complete. There will be alternating lanes on Canaan Church (Rt. 624) Blackridge and Canaan from 8 a.m.-6 for paving. There will be alternating lanes on Gaulding (Rt. 627) Marengo and Hall from 8 a.m.-6 Apr. 25 for paving. There will be alternating lanes on Old St. Tammany (Rt. 617) Highway Nine-O-Three and Jimanetta from 8 a.m.-6 Apr. 25 for paving. There will be alternating lanes on Trinity Church (Rt. 631) near Belfield from 8 a.m.-6 for paving. Turtle (Rt. 753) Rocky Branch and the dead end Highway Nine- O-Three (Rt. 903) at I-85 8 a.m.-6 Noon-7:30 lanes lanes There will be alternating lanes on Turtle (Rt. 753) Rocky Branch and the dead end from 8 a.m.-6 for paving. There will be alternating lanes on Highway Nine-O-Three (Rt. 903) at I-85 from noon-7:30 for bridge work. Highway Nine- O-Three (Rt. 903) at I-85 7:30 a.m.-7:30 lanes There will be alternating lanes on Highway Nine-O-Three (Rt. 903) at I-85 from 7:30 a.m.-7:30 for bridge work.
9 New Kent New Kent New Kent Nottoway Good Hope (Rt. 603) Augustus and Colby Dr. Cosby Mill (Rt. 638) Pine Hollow and Hum-Bug Dr. Old River (Rt. 608) N. Courthouse and Talleysville Indian Oak (Rt. 618) Turkey Island and Winningham Wagner (Rt. 9010) I-95 and County Dr. Noon-4:30 Noon-4:30 8 a.m.-4:30 Until further notice 7-7 a.m. -25 lanes lanes lanes Road s lanes There will be alternating lanes on Good Hope (Rt. 603) Augustus and Colby Dr. from noon-4:30 for paving. There will be alternating lanes on Cosby Mill (Rt. 638) Pine Hollow and Hum-Bug Dr. from noon- 4:30 for paving. There will be alternating lanes on Old River (Rt. 608) N. Courthouse and Talleysville from 8 a.m.-4:30 for paving. Indian Oak (Rt. 618) will be Turkey Island and Winningham until further notice for bridge s. Use posted detour route. More: There will be alternating lanes on Wagner (Rt. 9010) I-95 and County Dr. from 7-7 a.m. -25 for paving. Bollingbrook St. (Rt. 301) Adams St. and E. Bank St. Wagner (Rt. 9010) I-95 and County Dr. Noon-5 Noon-7 lanes inspection lanes There will be alternating lanes on Bollingbrook St. (Rt. 301) Adams St. and E. Bank St. from noon-5 Apr. 23 for bridge inspection. There will be alternating lanes on Wagner (Rt. 9010) I-95 and County Dr. from noon-7 for paving. Wagner (Rt. 9010) I-95 and County Dr. 7 a.m.-7 lanes There will be alternating lanes on Wagner (Rt. 9010) I-95 and County Dr. from 7 a.m.-7 for paving. Powhatan Powhatan Huguenot Trl. (Rt. 711) Woolridge and Venita Huguenot Trl. (Rt. 711) Woolridge and Venita Noon-3:30 9 a.m.-3:30-25 lanes Turn lane installation lanes Turn lane installation There will be alternating lanes on Huguenot Trl. (Rt. 711) Woolridge and Venita from noon-3:30 for turn lane installation. There will be alternating lanes on Huguenot Trl. (Rt. 711) Woolridge and Venita from 9 a.m.-3:30-25 for turn lane installation.
10 Powhatan Huguenot Trl. (Rt. 711) at King William Woods 8 a.m.-5 lanes inspection There will be alternating lanes on Huguenot Trl. (Rt. 711) at King William Woods from 8 a.m.-5 for bridge inspection. -End-
WEEKLY HIGHWAY ALERT RICHMOND DISTRICT
HIGHWAY ALERT VirginiaDOT.org CONTACT: Public Affairs Oct.3, Richmondinfo@VirginiaDOT.org WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Road construction that is expected to cause delays from
More informationSTONE BID RESULTS FOR THE LETTING OF AUGUST 13, 2018
RFQ: 0000154775 Official award notification is posted at www.eva.virginia.gov after bids are reviewed and awards are made by VDOT. Stone bids can now be found at www.vtca.org/news-events/publications/stone-bid-results/
More informationCHAPTER 5 TRANSPORTATION GOAL
CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe
More informationCLASS 6 PLAYOFFS. Class 6, Region A: #1 Ocean Lakes (10-0) 34 #8 Kellam (5-5) 18 #1 Ocean Lakes. #4 Cox (8-2) 43 #4 Cox #5 Bayside (6-4) 27
CLASS 6 PLAYOFFS Class 6, Region A: #1 Ocean Lakes (10-0) 34 #8 Kellam (5-5) 18 #1 Ocean Lakes #4 Cox (8-2) 43 #4 Cox #5 Bayside (6-4) 27 #3 Woodside (8-2) 7 #6 Landstown (6-4) 20 #6 Landstown #2 Oscar
More informationColonial200 Relay - Leg #1
Colonial200 Relay - Leg #1 6.10 Miles Preddy Creek Trail Park Preddy's Creek Baptist Church 4394 Stony Point Road Barboursville, VA Medium Lat: 38.117 Long: -78.345 1. Head out of Preddy Creek Trail Park.12
More informationFACT SHEET VirginiaDOT.org
FACT SHEET VirginiaDOT.org Interstate 64 East Hampton Roads Bridge-Tunnel (HRBT) Paving Project Hampton/ Norfolk Contractor: Basic Construction (part of the I-64 paving project in Hampton) Contract Amount:
More informationMembership Campaign Goals
Central High School 1 21 26 31 Eastside High School 1 32 37 42 John I. Burton 1 10 15 20 Lee County Career & Tech Ctr 1 141 146 151 Ridgeview 1 27 32 37 Union High School 1 17 22 27 Abingdon High School
More informationCLASS 6A PLAYOFFS. 6A-South (Conf. 1-2) Playoffs: #1 Oscar Smith (9-1) 21 #8 Western Branch (6-4) 14 #1 Oscar Smith 43
CLASS 6A PLAYOFFS 6A-South (Conf. 1-2) Playoffs: #1 Oscar Smith (9-1) 21 #8 Western Branch (6-4) 14 #1 Oscar Smith 43 #4 Bayside (8-2) 26 #4 Bayside 21 #5 Tallwood (8-2) 13 #1 Oscar Smith 13 #3 Woodside
More informationJuly 1, 2017 Population Estimates for Virginia and its Counties and Cities
Published on January 25, 2018 by the Weldon Cooper Center for Public Service Demographics Research Group https://demographics.coopercenter.org Virginia 8,001,024 8,470,020 468,996 5.9% 001 Accomack County
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May5 th through May 11 th, 2016 Road Maintenance This Week Striping Maintenance:
More informationTRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE February 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-039 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationRoute 1 and Harrison Road Intersection Improvements
Route 1 and Harrison Road Intersection Improvements April 27, 2016 Randy McKinney, P.E. Virginia Department of Transportation, Fredericksburg District Area Construction Engineer Route 1 and Harrison Road
More informationImportant Lane Closures for Jan , 2012
Jan. 19, 2011 CONTACT: Marcia McAllister T: 703-572-0506 C: 571-730-9117 marcia.mcallister@dullesmetro.com Important Lane Closures for Jan. 22-28, 2012 Bridge Construction along Median of Route 7 Continues,
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Capital Beltway HOT Lanes Project Update January 2011 Major Milestones Reached in 2010 Project is 55% complete New bridge spans completed at every interchange; Second phase well
More informationVirginia. Private and Public Educational Services Profile
Virginia Private and Public Educational Services Profile September 2016 For additional information or explanation of the contents of this document, you may contact the Economic/Operations Research section
More informationAttached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects
More informationCALL for information about clinic locations or to leave a message for a nurse.
ALEXANDRIA 10/1/2010 3:00 PM 6:00 PM Inova Alexandria Hospital 4320 Seminary Road 10/3/2010 9:30 AM 12:30 PM Aldersgate United Methodist Church 1301 Collingwood Ave 10/3/2010 12:15 PM 1:15 PM Washington
More informationVirginia. Administrative and Waste Services Profile
Virginia Administrative and Waste Services Profile September 2016 For additional information or explanation of the contents of this document, you may contact the Economic/Operations Research section at
More information2002 Virginia Department of Transportation Daily Traffic Volume Estimates. Jurisdiction Report 20
Daily Traffic Volume Estimates Jurisdiction Report 20 City of Colonial Heights City of Richmond Prepared By In Cooperation With U.S. Department of Transportation Federal Highway Administration Traffic
More informationDepartment of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018
^Lee County Jt Southwest T:[o ln Onaa Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE July 19 - July 25, 2018 Sanibel Bridge
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update April 1, 2016 Corkscrew Road West of I-75: Lee County DOT will
More informationVirginia. Wholesale Trade Profile
Virginia Wholesale Trade Profile July 2016 For additional information or explanation of the contents of this document, you may contact the Economic/Operations Research section at (804) 786-7497 or James.Wilson@vec.virginia.gov.
More informationVirginia. Accommodation and Food Services Profile
Virginia Accommodation and Food Services Profile October 2016 For additional information or explanation of the contents of this document, you may contact the Economic/Operations Research section at (804)
More informationTraffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library
Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library Presentation Format Project Goals and Overview Sidewalk
More informationSome streets and highways will be closed to vehicular traffic during the 2015 Road World Championships. While
Some streets and highways will be closed to vehicular traffic during the 2015 Road World Championships. While some closures last the entire duration of the 2015 Worlds, most will occur daily to accommodate
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: Friday, August 3, 2012, #12-220 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566
More informationRoundabouts: The Virginia Experience AASHTO SCOTE June 20, 2012
Roundabouts: The Virginia Experience 2012 AASHTO SCOTE June 20, 2012 Virginia Virginia's Highway System 57,867 miles of statemaintained system 1,118 miles of Interstate 8,111 miles of Primaries 48,305
More informationAccommodation & Food Services
ECONOMIC INFORMATION & ANALYTICS Virginia Employment Commission 2017 Virginia Accommodation & Food Services Accommodation and Food Services: Accommodation and Food services ranks fourth for average private
More informationVirginia. Transportation and Warehousing Profile
Virginia and Warehousing Profile August 2016 For additional information or explanation of the contents of this document, you may contact the Economic/Operations Research section at (804) 786-7497 or James.Wilson@vec.virginia.gov.
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationPlanned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle
More information1860 Presidential Election Returns Source: Richmond Daily Enquirer, 24 December County and City Bell Breckinridge Douglas Lincoln
Accomack County 736 (47.39%) 737 (47.46%) 80 (5.15%) 0 (0.0%) Albemarle County 1317 (53.32%) 1056 (42.75%) 97 (3.93%) 0 (0.0%) Alexandria County and City 1012 (63.49%) 565 (35.45%) 3 (0.18%) 14 (0.88%)
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 9 November 15, 2017 Update: 11/9/17 3:45 p.m. New Pass, Bridge
More information2005 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 37
Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Jurisdiction Report 37 Prepared By In Cooperation With U.S. Department of Transportation Federal Highway Administration
More informationRichmond / Tri -Cities Appraisal Directory. Green Certified. License Type FHA VA
Richmond / Tri -Cities Appraisal Directory Name Mack Strickland, RAA 12440 Percival St Chester, VA 23831 804-748-2203 Office 804-337-3993 Mobile stricklandappraisal@comcast.net Michael Small, AGA 9305
More informationVirginia Public School Authority
001 ACCOMACK 11 286,000 50,000 336,000 67,200 002 ALBEMARLE 26 676,000 50,000 726,000 145,200 003 ALLEGHANY 7 182,000 100,000 282,000 46,400 004 AMELIA 3 78,000 50,000 128,000 25,600 005 AMHERST 10 260,000
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationGRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015
GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 Welcome! Meeting Agenda Project update presentation Up to 15 minutes for Pulse Q&A about project design. (Please reserve
More informationRegional Applications
Regional Applications Richmond Regional Transportation Planning Organization September 1, 2016 Barbara Nelson Sarah Rhodes Richmond Regional Transportation Planning Organization Action Smart Scale Regional
More informationAppendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P (Version 2) Bikeway Projects in Currently Approved Plans Key: Removals Scope Changes Question Keep this in plan? = Included on map O = Not Included on map Planned Improvements from Sector &
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationUpdate January 4, 2016
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update January 4, 2016 Cape Coral - Del Prado Boulevard Lee County DOT
More informationTrade. Private Retail Virginia ECONOMIC INFORMATION & ANALYTICS
ECONOMIC INFORMATION & ANALYTICS Virginia Employment Commission 2018 Virginia Private Retail Trade With a large employment loss in Department Stores continuing over the past five years, Retail Trade fell
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationCincinnati Dayton Rd Widening
Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationProject Fact Sheet. August 1,
Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation
More informationRoute 58 Corridor Development Fund
Corridor Development Fund Appropriation Act Item 448 B.3 (2016) Report to the Chairmen of the Committees on Senate Finance and House Appropriations Virginia Department of Transportation 1401 East Broad
More information2016 RSTP & CMAQ. Funding the transportation priorities of the Richmond region. Richmond Regional Transportation Planning Organization
2016 & CMAQ the transportation priorities of the Richmond region Richmond Regional Transportation Planning Organization $160 Million for regional transportation priorities in FY17-FY22. Regional Introduction
More informationTask Force Meeting #5, August 3, Prepared by DKS Associates
Task Force Meeting #5, August 3, 2018 Prepared by DKS Associates Agenda 1. Agenda Review and Meeting #4 Recap 2. Review Project Goal, Data, and Project Ideas 3. Recommendations and Reporting a) Recommended
More information2017 RSTP & CMAQ. Funding the transportation priorities of the Richmond region. Richmond Regional Transportation Planning Organization
2017 RSTP & CMAQ the transportation priorities of the Richmond region Richmond Regional Transportation Planning Organization $164 Million for regional transportation priorities in FY18-FY23. Regional Introduction
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE October 12 October 18, 2017 Gunnery Road and 8th Street SW Intersection
More informationPublic Information Meeting
Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 15, 2013 DATE: June 4, 2013 SUBJECT: Request to authorize Advertisement of a Public Hearing to consider an Amendment to Chapter 14.2
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationRio Intersection Traffic Restrictions Begin Monday
May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September
More informationRoute 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015
Route 28 Corridor Safety and Operations Study Public Information Meetings July 20 and 22, 2015 1 Study Goals and Objectives Phase 1 Short-term Short-term improvements Ability to implement quickly Cost
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationRoads that are intended to be included in the VDOT system of maintained roadways must meet the standards and specifications prescribed by the VDOT.
SECTION 1 - GENERAL 1-1 Purpose This Manual has been prepared to promote uniform design procedures for designers and technicians in the development of property and roads in the County of Henrico, Virginia.
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationIncluded below is summary information regarding closures and debris accomplishments. Detailed reports are also attached.
Hurricane Matthew Status of Operations 11:00 AM October 26, 2016 Statewide Summary SCDOT is working to repair infrastructure damaged by Hurricane Matthew. In addition to infrastructure repair, SCDOT is
More informationUPDATE. I-81 VDOT launches I-81 improvement study. Virginia Keeps America Moving Winter 1996
Alvin Alston I- VDOT launches I- improvement study The Virginia Department of Transportation has begun a major effort to plan and design road improvements for Interstate. Most notably, the department is
More informationDriving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter
Driving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter BUSINESS 40 IMPROVEMENT PROJECT AUGUST 31, 2018 DRIVING TO THE DOWNTOWN HEALTH PLAZA DURING BUSINESS
More informationCHESTERFIELD COUNTY BIKEWAYS AND TRAILS PLAN
CHESTERFIELD COUNTY BIKEWAYS AND TRAILS PLAN Draft May 2015 Chesterfield County Planning Department Overview Developing a safe and accessible bicycle and pedestrian friendly environment is an important
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May 25 May 31, 2017 College Parkway: Lee County DOT will be trimming
More informationKC Scout Kansas City s Bi-State Transportation Management Center
KC Scout Kansas City s Bi-State Transportation Management Center Operations Report August- 215 This report contains statistical and operational data of activities at the Scout TMC for the period Saturday,
More informationPOWHATAN COUNTY HISTORICAL SOCIETY 2006 HOUSE TOUR UPCOUNTRY HOMES ALONG THE OLD HUNTING PATH. Saturday, September 30, A.M. 4 P.M.
POWHATAN COUNTY HISTORICAL SOCIETY 2006 HOUSE TOUR UPCOUNTRY HOMES ALONG THE OLD HUNTING PATH Saturday, September 30, 2006 10 A.M. 4 P.M. Large planters patented thousands of acres of land in Powhatan
More informationHenry Clay/John M. Gandy Elementary Schools
Run: 1 Bus: 289 Start run at the intersection of: Arbor Oak Drive at Washington Highway (7:20am) Left onto Arbor Oak Drive Continue on Arbor Oak Drive to Winter Oak Left on Winter Oak Drive Right on Arbor
More informationPERFORMANCE ACTIVITY 405 LIMB MANAGEMENT
PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationI-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT
I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:
More informationFairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells,
More informationMILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO
MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve
More informationSmoothing Out the Bumpy Road Ahead
Julie Hannah, P.E. Technical Services and Asset Management May 11, 2017 Smoothing Out the Bumpy Road Ahead Nationwide D = Poor, At Risk Conditions & Capacity Pavement Condition & Congestion Nationwide
More information^ Lee County ^OU fewest T:foH^ Lee County
^ Lee County ^OU fewest T:foH^ Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 18th through August 24th, 2016 Ben
More informationSpring/Summer Traffic and Construction Technical Briefing
Spring/Summer Traffic and Construction Technical Briefing 1 1. Introduction 2. Infrastructure Investments 3. Impacts to Mobility 4. Transit Operations 5. Mitigation Measures 6. Wrap-Up Overview 2 Infrastructure
More informationFI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway
TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 13 December 19, 2018 Alico Road Widening from Ben Hill Griffin
More informationRoute 28 Corridor Safety and Operations Study
Route 28 Corridor Safety and Operations Study Technical Committee Meeting #4 May 22, 2015 1 Agenda Planned Corridor Activities Candidate Improvements Recommendations Immediate Actions & Status Next Steps
More informationDeck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge
Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge US 1 NB & Ramps Chelsea September 11, 2017 Maurice J. Tobin Memorial Bridge Big Mystic Truss Current Project Little Mystic Truss Toll
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 24 August 30, 2017 Hancock Bridge Parkway: Lee County DOT will
More informationCITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT
Meeting Date: May 10, 2016 Department: Submitted By: Prepared By: Agenda Title: Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. CITY
More informationRoute 28 Corridor Safety and Operations Study
Route 28 Corridor Safety and Operations Study Steering Committee Meeting #5 May 29, 2015 1 Agenda Planned Corridor Activities Candidate Improvements Recommendations Immediate Actions & Status Next Steps
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More informationReplace Bridge 51 on Blackiston Mill Dr. over Silver Creek,
INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north
More informationGandy Connector: Travel Demand. Policy Committee August 2013
Gandy Connector: Travel Demand Policy Committee August 2013 What options to the Gandy Elevated Lanes exist? What are the current conditions? Who s using Gandy Blvd? What s currently planned? What s been
More information2001 Virginia Department of Transportation Daily Traffic Volumes Including Vehicle Classification Estimates where available. Jurisdiction Report 72
Daily Traffic Volumes Including Vehicle Classification Estimates where available Jurisdiction Report 72 Traffic Monitoring Section The (VDOT) conducts a program where traffic count data are gathered from
More informationLee County Department of Transportation
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE New Updates & Revisions September 3 rd, through September 9 th, 2015
More informationTransform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018
Transform I-66 Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform 66: Program Goals Improve multimodal mobility by providing diverse travel choices in a cost-effective manner Enhance transportation
More informationI-25 South Gap Project Monument to Castle Rock
I-25 South Gap Project Monument to Castle Rock Project Overview Castle Rock Town Council April 3, 2018 by Chuck Attardo I-25 South: Monument to C-470 An Important Corridor to Colorado Links the state s
More informationSTAFF REPORT. Comprehensive Plan Amendment CPA #PLN
COUNTY OF PRINCE WILLIAM 5 County Complex Court, Prince William, Virginia 22192-9201 PLANNING (703) 792-7615 FAX (703) 792-4401 OFFICE www.pwcgov.org Christopher M. Price, AICP Director of Planning STAFF
More information2011 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 247
Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Special Locality Report 247 Information in this report is included in Report (Lunenburg County) Prepared By In
More informationRegional Goals. Goal 1: Increase the safety of the transportation system.
Regional Goals Goal : Increase the safety of the transportation system. Goal : rotect and enhance the natural, historic, and neighborhood environment while making improvements to the existing system or
More informationNews Release Eastern Oregon Region 5
News Release Eastern Oregon Region 5 Morrow, Umatilla, Wallowa, Union, Baker, Grant, Harney, and Malheur Counties Oregon Department of Transportation Date: May 22, 2015 NR number: 150522015 For more information:
More information