Transport Delivery Plan
|
|
- Lucas Little
- 6 years ago
- Views:
Transcription
1 Transport Delivery Plan to April 2017 v7 Graham Hughes Executive Director Economy, Transport and Transport cambridgeshire.gov.uk
2
3 Transport Delivery Plan to Contents Page 1 Revision / Version number 1 2 Introduction 3 3 Economy, Transport and Environment Services Capital Programme to Economy, Transport and Environment Services Capital Works Programme to Works programme summary page 5 Economy, Transport & Environment Works Programme to Cambridge City East Cambridgeshire Fenland Huntingdonshire South Cambridgeshire Countywide Greater Cambridge Partnership Schemes 61 i
4 ii
5 Revision / Version control December 2016 January 2017 Draft TDP April v1.0 Draft TDP April v2.0 Draft TDP April v3.0 Draft TDP April v3.1 Draft TDP April v3.2 Draft TDP April v5.0 Amendments prior to Spokes 12 th January 2017 Minor amendments Schemes amended to reflect revised budget July 2017 Final version v6.0 Includes all carried forward schemes from 2016/17 Includes all LHI approved schemes Includes allocated fen soil roads September 2017 Update version v7.0 Includes successful bid for DfT Safer s Fund. Includes successful bid for DfT Challenge Fund (inc additional CCC contribution). Includes reprofiled Safety budget. Includes additional schemes to be delivered from efficiencies, with amended budget allocations. References to Greater Cambridge City Deal changed to Greater Cambridge Partnership 1
6 2
7 The Transport Delivery Plan to 1 Introduction 1.1 This is the County Council s Transport Delivery Plan (TDP) to. The Plan provides forward visibility of all the County Council s planned highway and transport schemes. 1.2 This TDP continues to deliver the Council s Highway Asset Management Strategy. The maintenance schemes identified in this TDP support the delivery of a preventative maintenance strategy, targeting assets that are not currently in need of full structural renewal, via the application of whole life costing and lifecycle planning principles. 1.3 The contents of the TDP are based upon the firm formulaic capital maintenance funding allocations to be made to the Council from Central Government and the assumption the Authority will be placed in the top tier (Band 3) for funding via the Incentive Fund for year Following devolution and the creation of a Combined Authority, it is anticipated that the Authority will automatically receive funding commensurate with being in Band 3 of the Incentive Fund assessment. The final two years of this TDP are based upon the Authority receiving this Band 3 funding. 1.5 All maintenance schemes show the complete cost of delivering the works, including allowances for staff costs and overheads. However, it should be recognised that the costs of schemes can change significantly from the initial estimates, which are undertaken for programme planning purposes and preparation of the TDP. Subsequent surveys and detailed design might identify issues requiring adjustment to these initial estimates. 1.6 Where schemes have not yet been identified in years two and three (201820), such as surface dressing or Local Highway Improvements, a budget figure will be included at this stage. Scheme details for these annual programmes will only be listed within year one of each TDP. 1.7 The County Council s Transport Investment Plan (TIP), published in November 2016, sets out the transport infrastructure that is required to support the growth of Cambridgeshire. The schemes in the TIP include strategic schemes (identified through the County Council s transport strategies), those required to facilitate the delivery of Local Plan development sites, for which Section 106 contributions will be sought, and detailed local interventions. Prioritised and funded schemes are entered into the TDP implementation programme. 1.8 The TDP provides greater visibility of the Structures and Traffic Signals programmes to demonstrate improved value over the three year period. 3
8 1.9 This Plan contains details of those schemes identified for delivery via the Local Highway Improvement (LHI) initiative for the period. This initiative helps to meet some of the most pressing needs of the County s communities and businesses The Greater Cambridge Partnership transport vision is to make it easier to travel in, out and around Cambridge and South Cambridgeshire by public transport, cycle or on foot. This will help reduce and maintain lower traffic levels and ease congestion. The projects to be delivered in tranche 1 (up to April 2020) support the Transport Strategy for Cambridge and South Cambridgeshire and are included in the Transport Investment Plan The Council has secured funding from the Growth Deal through the Greater Cambridge Greater Peterborough Enterprise Partnership (GCGP). The Growth Deal Local Growth Fund forms part of the funding package of some of the Council s major schemes. Project Growth Deal Funding King s Dyke 8m Ely Southern Bypass 22m Soham Station 1m Wisbech Access Strategy development 1m Wisbech Access Strategy implementation 10.5m (provisional) St Neots to Cambridge public transport improvements 9m (provisional) 1.12 Where new developments are proposed that might render existing transport infrastructure insufficient, the County Council may seek contributions from developers to mitigate the impact of the development. These contributions can be the provision of new infrastructure or a funding contribution. Section 106 developer contributions are for specific sites of development. However, contributions from a number of developments can be pooled towards the funding of a single scheme, limited to 5 developments per scheme. Such developer funded schemes are included in this TDP The Community Infrastructure Levy (CIL) was introduced in 2010 and is another method by which transport infrastructure schemes may be funded via planning charges. The CIL is enforced and collected by local planning authorities (City and District Councils) and is governed by CIL regulations. Schemes funded from the CIL are also included in this TDP Forward programmes of work might need to flex to accommodate emergencies, issues that might emerge at detailed design stage and other constraints, such as adverse weather conditions. 4
9 Economy, Transport and Environment Services Capital Programme, & SCHEME INTEGRATED TRANSPORT LTP Other Total LTP Other Total LTP Other Total funding funding funding funding funding funding funding funding funding Air Quality Monitoring Major Scheme Development Local Highway Improvements (includes Accessibility & ROW Improvements) Safety Schemes Strategy Development & Integrated Transport Schemes Delivering Transport Strategy Aims 1,346 2, ,762 1,346 1, ,346 Sub Total: Integrated Transport 3,190 2,597 5,787 3,190 3,190 3,190 3,190 OPERATING THE NETWORK Carriageway & Footway Maintenance including Cycle Paths 10, ,359 10,672 10,672 10,672 10,672 Rights of Way Bridge Strengthening 2, , ,564 2,564 2,564 Traffic Signal Replacement , Smarter Travel Management Integrated Highways Management Centre Smarter Travel Management Real Time Bus Information Sub Total: Operating the Network 14,625 1,626 16,251 14,591 14,591 14,591 14,591 5
10 SCHEME LTP Other Total LTP Other Total LTP Other Total funding funding funding funding funding funding funding funding funding INFRASTRUCTURE MANAGEMENT & OPERATIONS Highways Maintenance including Footways and Signals 6, ,269 6, ,250 6, ,250 DfT Pothole Action Fund 1, ,155 DfT National Productivity Investment Fund 2, ,890 DfT Safer s Fund 1, DfT Challenge Fund (inc additional Prudential Borrowing) 4, ,583 Sub Total: Infrastructure Management & Operations 16,072 10,314 6,378 6,378 6,250 6,250 STRATEGY & DEVELOPMENT Ely Crossing 25, ,000 1, ,702 1,300 1,300 Cambridge Cycling Infrastructure 1, ,580 1, ,206 Abbey Chesterton Bridge 2, ,000 1, ,923 Cycling City Ambition Fund King's Dyke 11, , Sub Total: Strategy & Development 41,037 41,037 5,324 5,324 1,300 1,300 TOTAL ALL SCHEMES 17,815 61,332 73,389 17,781 11,702 29,483 17,781 7,550 25,331 1 Agreed Developer Contributions 2 Department for Transport grant 3 Specific Grant and Prudential borrowing 4 Prudential Borrowing Repayable 5 Specific Grant, Prudential borrowing and other contributions 6 Other Contributions 7 Specific grant and Other Contributions 8 Prudential Borrowing Repayable / Agreed developer contributions 9 Third Party funding / Agreed developer contributions * Provisional figures not yet confirmed through Business Planning 6
11 Economy, Transport and Environment Services Works Programme Summary Integrated Transport Air Quality Monitoring Countywide 23,000 23,000 23,000 23,000 23,000 23,000 Major Scheme Development Countywide 200, , , , , ,000 Local Highway Improvements (includes Accessibility & RoW Improvements) Countywide 115, , ,750 Cambridge 173,779 East 127,661 28,250 Fenland 102,526 Huntingdonshire 163,209 15,000 15,000 South 181,014 16,750 19, , , ,000 Safety Schemes Countywide 19, , ,000 Cambridge 65,000 20, ,000 East 87,500 72,500 Fenland 315, ,000 South 40,000 Huntingdonshire 67, , , ,000 Strategy Development & Integrated Transport Schemes Countywide 345, , , , , ,000 Delivering Transport Strategy Aims Countywide 40, ,000 1,346,000 Cambridge 526, ,000 East 503,125 Fenland 523,761 Huntingdonshire 1,094, ,000 South 1,073,377 3,762,103 1,346,000 1,346,000 Grand Total Integrated Transport 5,787,292 3,190,000 3,190,000 7
12 Operating the Network Carriageway & Footway Maintenance including Cycle Paths (includes prudential borrowing below) Cambridge 1,331, ,000 1,135,000 East 1,187, , ,000 Fenland 1,907, ,000 1,100,000 Huntingdonshire 1,937,261 1,792,000 1,413,000 South 1,851,148 1,328, ,000 Countywide 9,384,130 11,239,000 12,500,000 17,598,095 16,455,000 16,922,000 Rights of Way East 24,600 20,000 11,500 Fenland 13,400 Huntingdonshire 10,000 38,000 27,000 South 52,000 42,000 29,000 Countywide 40,000 40,000 72, , , ,000 Bridge Strengthening Cambridge East 564, ,000 Fenland 775, , ,000 Huntingdonshire 964,459 1,170,000 South 50,000 1,300, ,000 Countywide 450, , ,000 2,803,459 2,564,000 2,564,000 Traffic Signal Replacement Cambridge 1,014, , ,000 East 141,000 52,000 Fenland 126,000 Huntingdonshire 174,100 52,000 South 203, , ,000 Countywide 51,000 45,000 20,000 1,583, , ,000 Smarter Travel Management Integrated Highways Management Centre Smarter Travel Management Real Time Bus Information Countywide 200, , , , , ,000 Countywide 165, , , , , ,000 Grand Total Operating the Network 22,489,924 20,374,000 20,841,000 8
13 Infrastructure, Management & Operations Highway Maintenance (prudential borrowing) Countywide 6,269,000 6,250,000 6,250,000 (included above) 6,269,000 6,250,000 6,250,000 DfT Pothole Action Fund to be confirmed for & 1,155,000 DfT National Productivity Investment Fund Huntingdonshire 950,000 South 1,940,000 2,890,000 DfT Safer s Fund East / South 1,174, ,500 1,174, ,500 DfT Challenege Fund East 2,498,000 (inc additional prudential borrowing) Fenland 990,000 Huntingdonshire 1,095,333 4,583,333 Grand Total Infrastructure, Management & Operations 14,897,333 6,250,000 6,250,000 Strategy & Development Ely Crossing East 25,000,000 1,702,000 1,300,000 25,000,000 1,702,000 1,300,000 Abbey Chesterton Bridge Cambridge 2,000,000 1,923,000 2,000,000 1,923,000 Cambridge Cycling Infrastructure Cambridge 1,580,000 1,206,000 1,580,000 1,206,000 Cycling City Ambition Fund Cambridge 790, ,000 King's Dyke Fenland 11,667, ,000 11,667, ,000 Grand Total Strategy & Development 41,037,000 5,324,000 1,300,000 9
14 10
15 Cambridge City 11
16 ` 12
17 Cambridge City Works Programme Local Highway Improvements (Includes Accessibility & Rights of Way) Contact Officer: Andy Preston C/F schemes A603 Petersfield East East along parade of shops Improve safety for cyclists and pedestrians 1,080 Unc Arbury Alexwood Rd Near house nos Prevent verge parking 2,700 Unc Arbury Alexwood Rd/Carlton Way Near junction with Carlton Way and Mere Way Verge Protection measures 8,300 Unc Arbury Perse Way/Carlton Way Near its junction with Carlton Way Verge Protection measures 3,176 A1307 Queen Ediths Hills Rd Slipway Hills Rd between Nightingale Avenue and Improve safety for cyclists and Worts Causeway pedestrians 955 Unc Newnham The Driftway The Driftway between the Lammas Land kiosk and Barton Lighting of road from Newnham Rd to Car Park 10,000 Unc West Chesterton Bateson Rd/Garden Walk Garden Walk/ Bateson Rd junction Improve safety at junction 9,000 Unc Arbury Alexwood Rd/Carlton Way Near junction with Carlton Way and Mere Way Verge Protection measures 6,300 A1134 Castle Albion Row Nr Albion Yard Install Zebra crossing 29,396 Schemes Unc Petersfield Ashley Ct / Staffordshire St South side of road 25 hour parking restriction on the southern side along the whole length of the road 1,081 Unc Abbey Abbey Street Between Newmarket Rd crossing and the car park Double yellow lines on Abbey Walk 1,260 Unc Coleridge Hobart / Suez Beween the two roads Improve footway access and environment 5,400 Unc Petersfield Covent Garden Along road Traffic calming 3,510 Unc Petersfield Lyndewode Between Lyndewode Rd and Tenison Rd Install bollards on the cycle junction to prevent motorists incorrectly using junction 750 A1134 Queen Edith's Queen Edith's Way Long to Mowbray roundabout Mobile vehicle activated sign 7,470 Unc Petersfield Emery Street Along road Signs and lines to reinforce no through road 450 A1134 Abbey Newmarket / Barnwell At roundabout Improve safety for cyclists on the outbound approach on Newmarket 3,600 Unc Coleridge Lichfield Outside 238 Lichfield Bus stop area painted on the road to prevent cars parking 450 Various Various High Street, Arbury, Victoria Along roads Mobile vehicle activated sign 3,600 Unc West Chesterton Kirkby Close/Birch Close/Milton At junction Double yellow lines on the junction only 1,350 Unc Queen Edith's Topcliffe Way At access Double yellow lines to maintain access 1,800 B1049 Arbury Histon Borrowdale access Dropped kerb uncontrolled crossing with connecting footway and improvements to the barrier layout to improve access to the adjacent cycle path 4,500 A1134 Coleridge Perne Junction of Perne road and/or Perne Ave, Langham or both Unc West Chesterton Cutter Ferry Path Junction with Manhattan Drive Unc Queen Edith's Godwin Way Outside School 13 Install 'Keep Clear' boxed area 900 New layout and declutter to improve safety and to improve the visual appearance of the area Double Yellow lines on the junction to prohibit parking, fencing / posts on the grass 2,700 2,700
18 Unc King's Hedges Campkin Nr give way feature Parking restrictions on approach to priorty give way feature 1,350 Unc Queen Edith's Chalk Grove & Netherhall Way Various locations Single and double yellow lines parking restrictions 1,350 Chesterton High Street Junction with Green End & Water Lane Village entry gateway treatment 1,800 C280 Romsey Mill Junction with Coleridge Forward advance box for cyclists to enable them to set off ahead of vehicles 4,500 Unc Newnham St Marks Court At corners on St Marks Ct Double yellow lines around corners 1,800 Unc Market Orchard Street At single yellow lines Replace single yellow with double yellow lines 900 Unc Arbury Linden Close Along western side of road Doubleyellow lines along the western side of each 'access arm'. Main parking area marked bays, Signage to enable police to undertake 4,140 enforcement Unc Newnham Sheep's Green Pathways / Bridges Installing solar studs in the paths, and some solar lighting on the bridges 3,600 Unc King's Hedges Lovell Along verges Verge parking prohibition 2,200 C235 Cherry Hinton Fulbourn Nr bus stop near the foot path to the Colville Estate Uncontrolled crossing point 10,000 A1134 Coleridge Perne At Radegund Roundabout Introducing bollards to prevent vehicles parking on pavement/ cycleway 900 Unc Queen Edith's Cavendish Avenue From Hills Rd and along the road Parking restrictions to improve access 2,250 Unc King's Hedges Woodhouse Way In Woodhouse Way Additional new street light 1,800 Unc Coleridge Tiverton Way Junctions with Robert May Close and Britten Place Double yellow lines on the junction 720 Unc Queen Edith's Beaumont At Queen Ediths Way/Beaumont junction Extension of double yellow lines 1,800 Unc Coleridge Lichfield On sharp right hand bend Install double yellow lines 1,800 C298 Abbey Coldhams Lane At Newmarket Feasiiblity study to improve capacity at Newmarket Rd junction approach 2,700 Unc Romsey Romsey Terrace Along Terrace Improve safety 765 Unc Coleridge Lichfield Residents car park locations Access Protection Markings at 9 dropped curb locations to prevent vehicles blocking access to 900 the car parks Unc Arbury Hurrell To the west, north, and south Kneerail fencing along three sides of the public green space 3,150 Unc King's Hedges Nuns Way At Crowland Way Give Way markings 900 C280 Petersfield/Romey Mill Bridge Devonshire to Argyle Street Improvements to lining across the bridge to improve safety for cyclists 900 Various Various Various s Various locations The addition of lights in some specific places: George St, Near No 17 Aylestone No 4 Manhattan Drive, Chesterton Hall Crescent, Highfield Avenue, Fen where it joins Water Street, St Andrews 9,450 Balance/additional schemes to be identified Schemes to be identified for and 1,676 tbc tbc 173,779 14
19 Safety Schemes To be invested in road safety engineering work at locations where there is strong evidence of a significantly high risk of injury crashes A1134 Cambridge Lensfield At Trumpington mini roundabouts Final design and delivery 20,000 20,000 A1134 Cambridge Lensfield At Trumpington mini roundabouts Contribution to works costs 230,000 A1134 / A1303 Cambridge Newmarket At Barnwell roundabout Safety Improvements 25,000 Unc Cambridge Chaucer At Trumpington Install Crossing 20,000 65,000 20, ,000 Delivering Transport Strategy Aims Supporting the delivery of Transport Strategies and Market Town Transport Strategies to help improve accessibility and mitigate the impacts of growth C/F schemes Unc Cambridge Tenison Mill to Station Traffic calming 85,944 Schemes A1307 Cambridge Huntingdon Between Victoria Rd/Castle St and Girton Cycleway improvements 200, ,000 C291/C292 Cambridge Victoria Avenue/Maids Causeway Four Lamps roundabout Pedestrian & Cycle crossing improvements 75,000 C287 Cambridge Arbury North Cambridge Academy & Milton Feasibility for cycle route 16,000 Unc Cambridge Oxford / Windsor Throughout Traffic calming 150, , ,000 Carriageway & Footway Maintenance including Cycle Paths Contact Officer: Andy Preston Contact Officer: Andy Preston/Mike Davies Contact Officer: Andy Preston C/F schemes Various Cambridge City Centre Various streets in City centre area Footway repairs 53,000 Unc Cambridge Redfern Close Off Brimley Resurface footway/minor kerb repairs 49,000 Various Cambridge Radial Routes Various East signing review 141,556 Schemes Various Cambridge City Centre Various streets in City centre area Footway repairs 120, , ,000 Unc Cambridge Ditton Walk From Newmarket Slurry seal one side/reconstruct other side 40,000 A603 Cambridge Gonville Place Hotel to Junction Reconstruct footway one side only 25,000 Unc Cambridge Adams Grange to Wilberforce Resurface footway 75,000 Unc Cambridge Gresham / Harvey Harvey and junc with Gresham Rd Install drainage 103,000 C290 Cambridge Sidney Street Throughout road High number of defective drainage/gully systems to replace 80,000 A1134 Cambridge Newnham Silver Street to Fen Causeway Carriageway resurfacing 115,000 C280 Cambridge Gonville Place Regent Street to Parkside Carriageway resurfacing 114,000 C290 Cambridge Magdalene Street / Bridge Street From Chesterton Lane to Jesus Lane Carriageway resurfacing 178,000 C290 Cambridge St Andrews Street Emmanuel St to Regent St Carriageway resurfacing 238,000 15
20 A1307 Cambridge Hills Catholic Church to Station Relay paving 120,000 A1303 Cambridge Madingley M11 interchange area Carriageway resurfacing 200,000 Unc Cambridge Tenison From Station to St Barnabus Carriageway resurfacing 250,000 A1134 Cambridge The Fen Causeway From Newnhams to Trumpington Carriageway resurfacing 330,000 A1134/A1303 Cambridge Newmarket Coldhams Lane to Marshalls Carriageway resurfacing/treatments 465,000 A134 Cambridge Newmarket From Elizabeth Rd roundabout to Grafton c/pk Renew footways 220,000 1,331, ,000 1,135,000 Footway Slurry Sealing Funded from Carriageway & Footway Maintenance Full programme to be confirmed Full programme to be identified for and Contact Officer: Jon Clarke inc inc inc Surface Treatment Schemes Funded from Carriageway & Footway Maintenance Contact Officer: Jon Clarke Unc Market Manor Street Jesus Lane to King Street Gripfibre inc Unc Abbey Keynes All road Micro Asphalt inc Unc Petersfield New Street St Matthews Street to Coldhams Lane Gripfibre inc Unc Abbey York Street New Street to Abbey Walk Micro Asphalt inc Unc Teversham Eland Way All road Micro Asphalt inc Unc Teversham Antelope Way Off Eland Way Micro Asphalt inc Unc Teversham Buffalo Way From Antelope Way Micro Asphalt inc Unc Teversham Caribou Way All road Micro Asphalt inc Unc Teversham Dolphin Close All road Micro Asphalt inc Unc Teversham Fennec Close All road Micro Asphalt inc Unc Teversham Impala drive All road Micro Asphalt inc Unc Teversham Lemur Drive All road Micro Asphalt inc Unc Teversham Loris Court All road Micro Asphalt inc Unc Teversham Mandrill Close All road Micro Asphalt inc Unc Teversham Panther Way All road Micro Asphalt inc Unc Teversham The Lynx All road Micro Asphalt inc Unc Castle Brownlow All road Micro Asphalt inc Unc Castle Blandford Walk All road Micro Asphalt inc Unc Castle Martingale Close All road Micro Asphalt inc Unc Abbey Oyster Row Stanley to Garlic Row Micro Asphalt inc A1134 Abbey Barnwell Newmarket to Coldhams Lane Gripfibre inc 16
21 Traffic Signal Replacement Contact Officer: Richard Ling C/F schemes C233 Cambridge Cherry Hinton At Queen Ediths Way / Robin Hood junc Refurbish signals at junction 617,370 C294 Cambridge Downing Street Near Corn Exchange Street Convertion to Zebra crossing 16,000 Schemes C233 Cambridge Cherry Hinton At Queen Ediths Way / Robin Hood junc Refurbish signals at junction tbc C291 Cambridge Jesus Lane At Park Street / Malcolm Street Proposed removal of signals 32,000 C279 Cambridge Green End Near Kendal Way Refurbish signals at crossing 9,800 A1134 Cambridge Queens Near West Refurbish signals at crossing 53,100 C235 Cambridge Cherry Hinton At Clifton Refurbish signals at junction 211,000 A1134 Cambridge Trumpington Near Fen Causeway Refurbish signals at crossing 75,000 C287 Cambridge Arbury At Campkin /Mansel Way Refurbish signals at junction 218,000 C280 Cambridge Mill At Gwydir Street Refurbish signals at junction 136,000 A1134 Cambridge Newmarket At Garlic Row Proposed removal of signals 25,000 A603 Cambridge Barton At Grantchester Street Refurbish signals at junction 136,000 C289 Cambridge Gilbert At Carlton Way Refurbish signals at junction 121,000 A1303 Cambridge Madingley At Lady Margaret Refurbish signals at junction 128,000 C292 Cambridge Emmanuel Near New Square Refurbish signals at crossing 51,000 1,014, , ,000 Cambridge Cycling Infrastructure Funding from developer contributions to deliver cycling infrastructure Contact Officer: Brian Stinton A1134 Queen Ediths Queen Ediths Way Whole length Cycling and walking improvements tbc tbc tbc A1134 Queen Ediths Queen Ediths Way At Fendon roundabout Cycling and walking improvements tbc tbc tbc C235 Coleridge Cherry Hinton Hills to Perne Cycling and walking improvements tbc tbc tbc Orchard Park(SCD) Ringfort Path B1049 Histon roundabout to Orchard Park Cycling and walking improvements tbc tbc tbc C235 Coleridge Perne /Cherry Hinton roundabout Cycling and walking improvements tbc tbc tbc 1,580,000 1,206,000 17
22 Cycling City Ambition Fund DfT funded cycling infrastructure A1307 Cambridge Huntingdon Phase 2 Oxford Rd to Histon Cycling and Walking improvements tbc tbc tbc To be delivered within South Cambridgeshire A10 Harston High Street Through village Cycling and Walking improvements tbc tbc tbc B1102 Lode/Stow cum Quy Colliers Lane/Quy Between villages Cycling and Walking improvements tbc tbc tbc 790,000 Abbey Chesterton Bridge This cycle route would link together three centres of employment in the city along a North/South axis, including: Addenbrooke s hospital, the CB1 Area and the Science park. The Trail would reduce the levels of congestion by taking vehicles off key city centre roads, including Hills and Milton and Cambridge Science Park Station. Contact Officer: Mike Davies Contact Officer: Mike Davies Cambridge Various streets to form strategic links Chisholm Trail Bridge design / construction 2,000,000 1,923,000 2,000,000 1,923,000 18
23 East Cambridgeshire 19
24 20
25 East Cambridgeshire Works Programme Local Highway Improvements (Includes Accessibility & Rights of Way) Contact Officer: Andy Preston C/F schemes C305 Soham Pratt Street At entrance to Weatheralls School Zebra Crossing 7,600 A1123 Haddenham Hop Row Approach to A1421 Crossroads Zebra Crossing 7,400 Unc Wilburton Carpond Lane Approaching junction with A1123 Raised crossing facility 9,781 B1381 Sutton High Street West of Bellairs Junction Zebra crossing 8,000 Schemes C158 Little Thetford Redfen Near A10 Speed limit reduction, gateway features / treatments and signing 3,600 Various Littleport Various roads Various Mobile Vehicle Activiated Sign (VAS) 4,000 C316 Witchford Main Street North side of Main Street, nr Common Rd Widen existing footway 5,000 Unc Mepal Sutton Along road Mobile Vehicle Activiated Sign (VAS) 3,000 C228 Stetchworth High Street At school School Zig zags and signs 800 B1102 Burwell Ness Along road Safer pedestrian crossing facilities and speed reduction 10,000 A1123 Wicken Nr Stretham end 40mph buffer zone from Stretham end 1,750 Various Haddenham Various roads Various Mobile Vehicle Activiated Sign (VAS) 7,000 Various Snailwell Snailwell village, Fordham, The Street and Fordham and Chippenham The Green, Chippenham Traffic calming, cushions and signage 5,000 Various Isleham Various Various Mobile Vehicle Activiated Sign (VAS) 9,000 B1063 Ashley High Street Includes two other locations Mobile Vehicle Activiated Sign (VAS) 3,000 B1052 Brinkley Weston Colville 2 sets along road Install speed cushions 6,300 C145 Fordham Isleham From Barrowfield Farm/outside school Introduction of a 40mph limit from Barrowfield Farm, vertical feature with zebra crossing outside the school 7,680 Schemes to be identified for and tbc tbc Sub total 98,911 Parish/Town ROW Contact Officer: Jon Clarke Various TRO Byways Upgrade from Farm Gates to Elephant Gates to withstand abuse 10,750 19, /113 Soham 205/113 Work towards surface improvements for cycle link 5,000 Soham Various Soham Restoration of scrub filled route for urbanisation 34/3 Burrough Green 34/3 Work on rural end of byway, minor work on stud end 4, / various Soham 205/ various Various works to improve paths close to new developments to be identified 9,000 9,000 Sub total 28,750 28,250 Grand Total 127,661 28,250 Works 21
26 Safety Schemes To be invested in road safety engineering work at locations where there is strong evidence of a significantly high risk of injury crashes A142 Route remedial study and implementation Stow cum Quy / A1303 Bottisham / Swaffham Bulbeck Newmarket Contact Officer: Andy Preston From Stow cum Quy to Newmarket bypass Contribution to DfT grant to Implement counter measures to improve safety along route 15,000 72,500 72,500 87,500 72,500 Delivering Transport Strategy Aims Supporting the delivery of Transport Strategies and Market Town Transport Strategies to help improve accessibility and mitigate the impacts of growth Contact Officer: Andy Preston C/F schemes Ely Various High Barns Estate/Lynn crossing Cycle route/upgrade pedestrian refuge 66,400 Ely Various High Barns New Barns Cycle route 95,725 Soham Various Various Installation of bus shelters 31,000 Schemes A142 Ely Linked to new Ely bypass scheme Stuntney to Ely New cycle route tbc tbc A1123/A1421 Haddenham High Street Junction with Hop Row/ The Green Install traffic lights/pedestrian crossing 110,000 A142 Witchford Sutton /Witchford bypass Wentworth to join existing route Cycling improvements 200, ,125 Carriageway & Footway Maintenance including Cycle Paths Contact Officer: Andy Preston Unc Ely Merlin Drive (inc Robins Drive) Estate road area Resurface footway 110,000 A10 Ely Ely bypass Along Ely bypass Renew highway drainage headwalls and outfalls to dyke 27,000 A142 Witchford Witchford bypass Along bypass Renew headwalls and install new gullies and outfalls to dyke 30,000 A1101 Littleport Mildenhall Culvert located near no. 8 Replace damaged culvert 20,000 A10 Littleport Lynn Littleport to Brandon Creek Carriageway resurfacing sections only 250,000 A1304 Stetchworth London roundabout and approach/es Carriageway resurfacing 400,000 C124 Sutton The Gault Section near properties at Flood gates Carriageway resurfacing 100,000 C141 Soham Great North Fen Prickwillow to Hasse Place to place repairs 250,000 22
27 B1381 Sutton High Street 2 sections in village Resurface footway 32,000 Unc Soham Julius Martin Lane From Mereside to Townsend Resurface footway 90,000 A10 Littleport Near A1101 Roundabout to roundabout Crack seal and carriageway repairs 324,500 A142 Witcham Toll A1421 to BP garage At crossroads Carriageway resurfacing 250,000 B1381 Sutton High Street 2 sections in village Resurface footway 32,000 Unc Soham Julius Martin Lane From Mereside to Townsend Resurface footway 90,000 A1101 Littleport Bates Drove Phase 2 Bell's Drove North West towards Toll Carriageway recycle Corner (patches) 240,000 1,187, , ,000 Footway Slurry Sealing Funded from Carriageway & Footway Maintenance Unc Sutton Various streets to be confirmed Slurry sealing inc Full programme to be confirmed inc Full programme to be identified for and inc inc Carriageway Recycling process Funded from Carriageway & Footway Maintenance Unc Littleport Bells Drove/Dairy Drove A1101 Bates's Drove to Dairy Houses Farm Retread inc Unc Wicken Lower Wicken 4x4 to Chapel Lane Retread inc Full programme to be confirmed inc Full programme to be identified for and inc inc Surface Treatment Schemes Funded from Carriageway & Footway Maintenance Contact Officer: Jon Clarke Contact Officer: Jon Clarke Contact Officer: Jon Clarke B1085 Chippenham High Street Between 30mph speed limit in village Gripfibre inc C157 Witchford Grunty Fen Main Street to Old Pools Surface Dress inc C127 Witcham Martins Lane Mepal to High Street Surface Dress inc C127 Witcham The Slade A142 to High Street Surface Dress inc A1123 Soham Wicken A142 roundabout to Wicken Surface Dress inc Unc Littleport Church Lane Parsons Lane to Crown Lane Gripfibre inc C319 Littleport Wisbech A10 to Wellington Street Gripfibre inc Unc Ely Henley Way All road/estate Micro Asphalt inc C227 Woodditton Court Barns Woodditton to Duchess Drive Surface Dress inc Unc Ely Bentham Way From Kings Avenue Micro Asphalt inc A142 Fordham Fordham bypass Bypass Surface Dress inc 23
28 Rights of Way Maintaining the Rights of Way network Parish/Town ROW Various TRO Byways Various Replace criminal damaged gates 10,600 10,000 Various Various IDB Areas Routes that have degraded, focusing on those protected by TRO Mainly groundwork to knock out ruts, some sections of hardened ground using road planings 7,000 7,000 8, /3 Isleham 136/3 Groundwork and road planings 4,000 Various Various Throughout East Cambs Consultant advice and permit for badger mitigation works 3,000 3,000 3,000 24,600 20,000 11,500 Bridge Strengthening Contact Officer: Jon Clarke Contact Officer: Gareth Guest A142 Fordham Snailwell railway bridge Fordham, near county boundary Repairs to brick cladding over rail line 250,000 A142 Mepal Mepal viaduct Mepal viaduct Replace defective linear drainage system and bearings 314,000 C129 Little Downham Downham Common Gravel Head Bridge Brick repairs to abutments/install scour protection or tie back anchors 240, , ,000 Works Traffic Signal Replacement Contact Officer: Richard Ling C/F schemes B1382 Ely Nutholt Lane at Newnham Street Pedestrian crossing 20,000 Schemes C315 Littleport High Street Church Lane / Crown Lane Refurbish signals at junction 121,000 B1085 Kennet Kennett Railway Bridge Station, Kennett Refurbish signals at narrow bridge 52, ,000 52,000 24
29 Ely Crossing The project will alleviate traffic congestion on the A142 at the level crossing adjacent to Ely railway station, which will benefit local businesses and residents. A142 Ely Ely Southern bypass Contact Officer: Brian Stinton New bypass from Angel Drove to Stuntney Causeway Final design and construction of southern bypass 25,000,000 1,702,000 1,300,000 25,000,000 1,702,000 1,300,000 DfT Challenge Fund (inc additional Prudential Borrowing) Allocation of funding following a successful bid for additional funding to repair damaged 'fen soi' roads A1101 Littleport Mildenhall Shippea Hill to past Prickwillow Carriageway treatments 979,000 A1123 Haddenham Hill Row Causeway Second Bridge to Earith Bridge Carriageway treatments 242,000 A1123 Wicken Stretham Level Crossing to Way Lane Carriageway treatments 264,000 A142 Ely Stuntney Causeway High Bridge to Nornea Carriageway treatments 561,000 B1104 Isleham Prickwillow Sections of Carriageway treatments 220,000 B1104 Soham Prickwillow Sections of Carriageway treatments 232,000 2,498,000 DfT Safer s Fund Allocation of funding following a successful bid for the delivery of counter measures to improve the safety of the A1303 between Stow cum Quy and Newmarket Bypass A1303 Stow cum Quy / Bottisham / Swaffham Bulbeck Newmarket Contact Officer: Andy Preston Contact Officer: Andy Preston From Stow cum Quy to Newmarket bypass Implement counter measures to improve safety along route 1,174, ,500 1,174, ,500 25
30 26
31 Fenland 27
32 28
33 Fenland Works Programme Local Highway Improvements (Includes Accessibility & Rights of Way) Contact Officer: Andy Preston C/F schemes B1101 Elm Main Rd In vicinity of Elm C of E Schhol Localised speed reduction outside school 6,500 Unc Wisbech West Parade North End/Leverington Rd junc heading South Remove rat run 3,300 C20 Wisbech St Mary Pigeons Corner/Back Rd Murrow Accident reduction measures and reduce traffic Crossroads and surrounding vicinity on Back Rd Murrow 4,500 B1101 Elm Main At Maltmas Drove Traffic Calming 5,400 Schemes Unc Whittlesey Windmill Street Includes Stonald and adjacent roads Double yellow lines be installed up to ten metres from the junctions and opposite 1,500 Unc Whittlesey New Up to the recycling centre Extend footpath on South Side 9,926 A605 Whittlesey Gravel House Corner Introduce 40 mph limit 1,500 Unc March City Past Police station car park Extension of footway 7,000 B1101 Elm March Rd, Friday Bridge 172 March, Friday Bridge School warning signs combined with other signs, lines and reflective bollards to highlight 1,300 the school access C308 Wimblington Doddington Rd & March Rd Along roads Provide Vehicle activated speed signs 4,725 Unc Wisbech South Brink Throughout road Construct 2 build outs 9,000 B1093 Doddington High Street Nr School Footpath extension 10,000 Various Manea Various Various Speedwatch equipment 2,250 C19 Parson Drove Sealeys Lane End of existing footway Footpath extension 9,000 B1165 Newton Various Throughout village Footway maintenance 7,800 C307 Chatteris Doddington including Curf & Willey Terrace Signing and lining improvements 4,000 B1100 Christchurch Tipps End Through residential area Reduce speed limit to 40mph. Erect signs for the sharp bends/road conditions 4,001 Balance/additional schemes to be identified 8,824 Schemes to be identified for and tbc tbc Sub total 100,526 Parish/Town ROW Contact Officer: Jon Clarke Various Greenwich Meridian Trail Signage 1,000 Various Hereward Way Signage 1,000 Sub total 2,000 Grand total 102,526 Works 29
34 Safety Schemes To be invested in road safety engineering work at locations where there is strong evidence of a significantly high risk of injury crashes Contact Officer: Andy Preston A141 Wimblington Isle of Ely Way Junction with B1093, Manea Install signals 300, ,000 A142 Route remedial study and implementation 15, , ,000 Delivering Transport Strategy Aims Supporting the delivery of Transport Strategies and Market Town Transport Strategies to help improve accessibility and mitigate the impacts of growth Contact Officer: Andy Preston C/F schemes C72 March Norwood Along Norwood corridor Cycle improvements 222,184 B1101 March Station Cycleway from railway satation to St Johns Cycle improvements 10,000 Unc March Robingoodfellows Lane Various Cycle improvements 7,260 March Various cycle routes Various Cycle improvements 51,317 B1101 March Wimblington Along new cycle route Street lighting enhancements cont 25,000 Various Whittlesey Various locations various bus stops Bus stop provision aand/or improvements 20,000 Various Wisbech Various locations various bus stops Bus stop provision aand/or improvements 13,000 Schemes Various March Various Southwest March to town centre Cycle route 175, ,761 30
35 Carriageway & Footway Maintenance including Cycle Paths Contact Officer: Andy Preston C/F schemes C307 Doddington Primrose Hill Near Cowslip Close Replace/upgrade drainage system 35,000 Schemes Unc March Newlands Avenue Cul de sac Resurface footway 135,000 A141 March Isle of Ely Way March bypass Renew highway drainage outfalls & upgrade headwalls 28,000 Unc Chatteris Eden Crescent Along cul de sac Install new drainage system 60,000 A1101 Leverington Sutton Parson Drove Lane towards Bledwick Dove Carriageway resurfacing 290,000 C69 March Whittlesey, Turves From level crossing past Prospect House Fm Carriageway recycling 166,000 C20 Murrow Back From Seadyke Bank Localised haunch/widening 32,000 B1050 Chatteris London From national speed limit to Crafty Fox Carriageway recycling 196,000 C20 Wisbech St Mary Seadyke Bank From Eaufield Farm to High Side, and including Carriageway recycling northern section of Sandbank 180,000 C33 Guyhirn Gull Drove Worst sections Carriageway recycling 220,000 Unc Parson Drove Silvers Lane From Main Rd to Seadyke Bank Carriageway recycling 140,000 C78 March Knights End Floods Ferry Place to place Carriageway resurfacing 185,000 C18 Newton Mill place to place Carriageway recycling 30,000 C19 Murrow Murrow Lane place to place Carriageway recycling 60,000 B1187 Guyhirn Gull place to place Carriageway recycling 150,000 C79 March Burrowmoor Various sections throughout Resurface footway 80,000 C73 March Creek Worst sections only Resurface footway 44,000 C10 Tydd St Giles Grangehill From Grangehill corner to Cross Drove Carriageway resurfacing 235,000 B1093 Wimblington Manea From Nr A141 to new surfacing Carriageway resurfacing 350,000 B1093 Manea Station /Fodder Fen Wisbech to Railway Station Resurface footway 120,000 Unc March West End from town centre to nr 88 Carriageway resurfacing 120,000 B1166 Parson Drove Main Nr John Peck Close to near bends Carriageway resurfacing 300,000 B198 Wisbech Cromwell At South Brink Junc and Weasenham Ln to signals at Sandown Carriageway resurfacing 240,000 Unc Chatteris Wenny From East Park Street to nr A141 Carriageway resurfacing 225,000 C32 Parson Drove Fen From Long Drove to Swan Bridge Carriageway resurfacing 95,000 1,907, ,000 1,100,000 Footway Slurry Sealing Funded from Carriageway & Footway Maintenance Full programme to be confirmed Full programme to be identified for and Contact Officer: Jon Clarke inc inc inc 31
36 Carriageway Recycling process Funded from Carriageway & Footway Maintenance Unc Chatteris Honeysome C&G Coaches to Honeysome Farm Retread inc Full programme to be confirmed inc Full programme to be identified for and inc inc Surface Treatment Schemes Funded from Carriageway & Footway Maintenance Unc Whittlesey Northgate & Stonald Ave All roads Micro Asphalt inc Unc Whittlesey Northgate Close All road Micro Asphalt inc Unc Whittlesey Marne All road Micro Asphalt inc Unc Whittlesey Mulberry Close All road Micro Asphalt inc Unc Chatteris Tithe All estate Micro Asphalt inc B1050 Chatteris Huntingdon A142 to London Gripfibre inc C74 March Elwyn High Street to Upwell Gripfibre inc C25 Wisbech Walton Waterlees to County boundary Micro Asphalt inc Unc Wisbech Eastfield All road Micro Asphalt inc Unc Wisbech Westfield Rd All road Micro Asphalt inc Unc Wisbech St Martins All road Micro Asphalt inc A142 Wimblington Isle of Ely Way Mill Hill roundabout to Eastwood End Surface Dress inc A142 Chatteris Isle of Ely Way Nr Eastmoor Farm to A142 roundabout Surface Dress inc C12 Tydd St Giles Cross Drove Bythorne Bank to Tydd Fen Bridge Surface Dress inc A605 Coates Wisbech Kingsland Farm to March junction Surface Dress inc B1101 Coldham March From village Surface Dress inc Rights of Way Maintaining the Rights of Way network Parish/Town ROW Contact Officer: Jon Clarke Contact Officer: Jon Clarke Contact Officer: Jon Clarke Various Greenwich Meridian Trail Surface repairs & scrub management 4,000 Various Hereward Way Surface repairs & scrub management 4,000 Manea Various Surface repairs & scrub management 1,800 Doddington Various Surface repairs & scrub management 1,700 March Various Surface repairs & scrub management 1,900 13,400 Works 32
37 Bridge Strengthening Contact Officer: Gareth Guest A1101 Tydd St Giles Tydd Gote Bridge Sutton Parapets, joints and concrete repairs 400,000 B1098 Christchurch Cottons Corner Bridge Sixteen Foot Bank New parapets/safety barriers and deck edge strengthening 375,000 B1093 Chatteris Boots Bridge Manea /Sixteenfoot Concrete repairs and safety barrier 500,000 B1099 March Bedlam Bridge Upwell Concrete repairs to piers and underside of deck 314,000 Unc March Martins Bridge Binnimoor Concrete repairs and strengthening substandard weak bridge 240, , , ,000 Traffic Signal Replacement B1101 March Dartford At Broad Street Refurbish signals at junction 126, ,000 Kings Dyke A605 Whittlesey Kings Dyke Kings Dyke level crossing Scheme development and construction 11,667, ,000 11,667, ,000 DfT Challenge Fund (inc additional Prudential Borrowing) Allocation of funding following a successful bid for additional funding to repair damaged 'fen soi' roads Contact Officer: Richard Ling The level crossing at King's Dyke between Whittlesey and Peterborough has long been a problem for people using the A605. The downtime of the barriers at the crossing causes traffic to queue for significant periods of time and this situation will get worse as rail traffic increases along the Ely to Peterborough railway line in the future. The issue is also made worse during the winter months when the B1040 at North Brink often floods, leading to its closure and making more traffic use the A605 across King's Dyke. Contact Officer: Brian Stinton Contact Officer: Andy Preston A605 Coates / Elm March / Goosetree Goosetree Bridge to C69 Carriageway treatments 286,000 B1040 Whittlesey Ramsey Pondersbridge to level crossing Carriageway treatments 341,000 B1096 Benwick Ramsey Benwick to Forty Foot Carriageway treatments 363, ,000 33
38 34
39 Huntingdonshire 35
40 36
41 Huntingdonshire Works Programme Local Highway Improvements (Includes Accessibility & Rights of Way) Contact Officer: Andy Preston C/F schemes B1040 Pidley cum Fenton Warboys Between Fen Rd and Oldhurst Rd Speed cushions 8,600 Schemes B1086 Somersham St Ives The White Post junction, at St Ives To reprofile the road layout to form a /B1089 Pidley traditional T junction 10,000 Various St Neots Loves Farm Throughtout Loves Farm community Managed parking control scheme 8,000 B1091 Yaxley Broadway Nr Install Zebra crossing 10,000 B1096 Ramsey Ramsey, Ramsey Forty Foot Throughout Traffic Calming measures 10,000 A1123 Bluntisham Station In Station Central Refuge Island 8,000 Unc St Ives Cordell Close In Cordell Close Installation of street light 5,000 B645 Hail Weston The Highway Throughout 50mph speed limit, gateways, improved signage and lining 8,400 A1123 Earith High Street Throughout speed reduction buffer zone and structural road islands with appropriate road signs/lining 6,000 C109 Woodwalton Bridge Street To Raveley Village gateways, dragons teeth, Mobile VAS 7,200 C120 Colne Bluntisham Throughout 2 No. Priority give way traffic islands & three sets of cushions 8,000 B645 Great Staughton The Highway Junction with The Causeway Realignment of kerbline at junction to improve safety 8,500 C111 Bury Upwood Various locations Village Gates & 30mph Roundel, Dragons Teeth and to look at the formal crossing from 4,500 Valiant Square to the Upwood path B645 Kimbolton & Stonely Thrapston In Thrapston Mobility crossing 2,000 Unc Holywellcum Double Yellow Lines and TRO to deter parking In village In Needingworth Needingworth right on the junction 1,600 C101 Sawtry Green End Between Chesham and St Judith's Lane Buildout traffic calming feature 2,000 Unc Ellington St Peters Way Inc High Street Double yellow lines at junction 600 C111 Change Ramsey Rd 60mph to 50mph between Upwood and the Between Bury deristriction signs and 40mph Ramsey Upwood / Bury including new gates, new lining Raveleys signs at Upwood and dragons teeth on approach 4,250 B1040 Pidley cum Fenton High Street Throughout High Street Central refuge island, 40mph speed limit, dragon's teeth 6,500 C111 Broughton Bridge Includes Causeway and School Gate feature and Signage at all 3 entrances to the village and Mobile VAS 7,805 Unc Huntingdon High Street At Hartford Zebra or Puffin/Tucan Crossing 10,000 B645 Tilbrook High Street Throughout road Mobile Vehicle Activiated Sign (VAS) 3,000 Unc Glatton High Haden Throughout road Ridden Horse warning signs 500 B660 Old Weston High Street Through village Carriageway buildouts and road markings 1,000 B1040 Warboys High Street In village resurface a length of footway 6,754 Schemes to be identified for and tbc tbc Sub total 148,209 37
42 Parish/Town ROW Woodwalton BW 10 &15 Diversions/creations to create approx 7km of additional bridleway 7,500 Holywellcum 7,500 2 Upgrade to bridleway and clear scrub/surface and drainage improvements Needingworth Woodwalton BW 10 & 15 Diversions/creations to create approx 7km of additional bridleway 7,500 Holywellcum 7,500 2 Upgrade to bridleway and clear scrub/surface and drainage improvements Needingworth Winwick Various Reorganisation package 7,500 Folksworth Various Reorganisation package 7,500 Sub total 15,000 15,000 15,000 Grand total 163,209 15,000 15,000 Safety Schemes To be invested in road safety engineering work at locations where there is strong evidence of a significantly high risk of injury crashes Contact Officer: Jon Clarke Contact Officer: Andy Preston B1040 Various Warboys to Bury At bends Bend remedial measures 10,000 A605 Elton Peterborough At Junction to villlage Junction improvement measures 30,000 B660 Covington Three Shires Hill At County boundary Bend remedial measures 12,500 C112 Broughton Wistow At Crossroads Junction improvement measures 15,000 67,500 Works Delivering Transport Strategy Aims Supporting the delivery of Transport Strategies and Market Town Transport Strategies to help improve accessibility and mitigate the impacts of growth Contact Officer: Andy Preston C/F schemes St Ives Various Route 12 Cycle route ,321 B1044 Huntingdon Stukeley Nr Stukeley Meadows Industrial Estate Install crossing 92,575 Schemes St Ives Various Route 12 Cycle route ,000 A1123 St Ives Houghton & St Audreys Lane Throughout roads Cycle route 3 Eastwest route 230, ,000 A1123 Huntingdon Houghton Wyton Houghton Wyton link Public transport bus stop infrastructure 50,000 Contact Officer: Mike Davies St Neots Northern Foot and Cycle Bridge St Neots (north) New bridge *part funding shown only tbc tbc tbc B1091 Yaxley / Farcet Broadway Link from Yaxley to Farcet Extension of cycle facility tbc tbc tbc 1,094, ,000 38
43 Carriageway & Footway Maintenance including Cycle Paths Contact Officer: Andy Preston C/F schemes B1096 Somersham St Ives /High Street From Chatteris to St Ives Resurface Footway 60,000 C166 Ellington High Street Off A14 slip roads to village Install new drainage system/renew kerbs and associated footway repairs 43,261 B1090 Abbots Ripton Station Along embankment Carriageway resurfacing/bank investigations 252,000 Schemes C173 Buckden Mill Sections through village Resurface Footway 45,000 Unc St Neots Shakespear Estate Resurface Footway 60,000 B1040 Warboys High Street Nr the Green Replace drainage system 40,000 Unc Huntingdon Buttsgrove Way Conygear to California Renew drainage system 40,000 Unc Hemmingford Grey Apple Orchard Off High Street Renew drainage system 125,000 B645 Stonely Easton junction of Old Ford Lane Renew drainage system 34,000 B1096 Ramsey High Street Blenheim to Hollow Lane South side Renew drainage system 28,000 Unc St Ives Ramsey At junction with Houghton Renew drainage system 28,000 B1090 Abbots Ripton Station Along embankment *provisional Carriageway resurfacing/bank investigations 345, ,000 A1123 Bluntisham Needingworth From Station to Needingworth Carriageway resurfacing 446,000 A141 Warboys High Fen Straight Drove Nr bends/chatteris Carriageway resurfacing 296,000 Various Various A141 / A142 / A1123 / A1198 / A1096 Various roundabouts along A roads Carriageway crack sealing / joint repairs 95,000 Various St Ives Town Centre area Eastern town centre area Relay small element paving 100,000 Unc Earith Greenfields estate Greenfields estate Resurface Footway 42,000 B1040 Pidley Fenton Village to A141 Carriageway resurfacing 275,000 Unc St Ives Hill Rise From A1123 Carriageway resurfacing 308,000 A1123 St Ives St Audrey Lane Ramsey to/inc Compass Point r'bt Carriageway resurfacing 550,000 Unc St Ives North including East Rd and pt of Ramsey Rd Carriageway resurfacing 187,000 Unc Sawtry St Andrews Way Across bridge to village Carriageway resurfacing 130,000 Unc Huntingdon Chequers Court All link Footway resurfacing 95,000 C174/Unc Waresleycum Tetworth Tetworth Hill Place to place Carriageway repairs/retread 200,000 B1043 St Neots Huntingdon Street Signals to Huntingdon Carriageway resurfacing 285,000 C86 Ramsey Oil Mills, Ramsey Mereside Sections nr Church Farm and Marriotts Drove to Oil Mills Drove Carriageway resurfacing 210,000 B1050 Somersham Chatteris Between Somersham and Chatteris Carriageway resurfacing 163,000 C89 Yaxley Holme Gravel Bridge past bend to Hod Fen Drove Carriageway recycling 155,000 Unc Farcet Kings Delph Drove All road Carriageway recycling 90,000 C174 Waresley Manor Farm From Pitsdean to St Ives Carriageway retread 180,000 Unc Somersham Bank Avenue Cul de sac Carriageway resurfacing 35,000 1,937,261 1,792,000 1,413,000 39
Transport Delivery Plan 2017/18 to 2019/20
Transport Delivery Plan to Graham Hughes April 2017 v6.0 Executive Director Economy, Transport and Environment www.cambridgeshire.gov.uk Transport Delivery Plan 2017-2018 to 2019-20 Contents Page 1 Revision
More informationTIP Scheme List East Cambridgeshire
C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 454 P Soham Railway Station Rail Improvement LTTS + 455 P Ely area rail infrastructure improvements Rail Improvement
More information= <10k <250k = <500k = 500k+ Major schemes
Cost Scheme Reference Schemes Scheme Type Relevant document / Source Timescale =
More informationTIP Scheme List Huntingdonshire
Scheme List 2018 - Huntingdonshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 265 T A1096 junction capacity enhancements Highway Capacity Improvements LTTS around
More informationTransport Delivery Plan 2016/17 to 2018/19
Transport Delivery Plan to Graham Hughes April 2016 v1.2 Executive Director Economy, Transport and Environment www.cambridgeshire.gov.uk Transport Delivery Plan 2016-2017 to 2018-19 Contents Page 1 Revision
More informationSt. Ives Transport Strategy
St. Ives Transport Strategy Introduction This is the St. Ives Transport Strategy. It forms part of the County Council s Local Transport Plan (LTP). It has been drawn up following consultation with stakeholders,
More informationTransport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.
Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age 30 th March 2015 1 Presentation Overview Roles and responsibilities Snapshot of Key Challenges
More informationThe Greater Cambridge City Deal
The Greater Cambridge City Deal Submission concerning the Histon Road initial consultation on better bus, cycling and walking trips. From: Carina O Reilly, Charlotte Perry and Mike Todd-Jones, City Councillors,
More informationMILTON ROAD LLF PROJECT UPDATE
Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable
More informationAppendix 11 Barton Greenway Review
Appendix 11 Barton Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationTRAFFIC INFORMATION. road closures and diversions
TRAFFIC INFORMATION road closures and diversions 1 Cambridge Half Marathon Traffic Information This document outlines details of the road closures and diversions that will be in place on Sunday March 3,
More informationDesign Workshops Summary of all Feedback January 2017
Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000
More informationHISTON ROAD Have your say on better public transport, cycling and walking journeys
HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation
More informationAdvanced Stop Lines. Advanced Stop Lines are a low-cost but highly-effective way of helping cyclists at junctions,
Cambridge Cycling Campaign Advanced Stop Lines 1 Advanced Stop Lines Advanced Stop Lines are a low-cost but highly-effective way of helping cyclists at junctions, and are becoming increasingly common in
More informationThe Chatteris Market Town Transport Strategy
1 The Chatteris Market Town Transport Strategy Introduction The Market Town Transport Strategies form an important part of the Cambridgeshire Local Transport Plan (LTP). This document sets out the main
More informationYour guide to safe and considerate cycling in Cambridge, the cycling capital of the UK.
Your guide to safe and considerate cycling in Cambridge, the cycling capital of the UK. Cambridge is the UK s cycling capital Cycling is fast, it s cheap, it s good for your health and for the environment.
More informationChelmsford City Growth Package
Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents
More informationTHE STRATEGY: PROPOSED PROJECTS TO BE DELIVERED. Walking
THE STRATEGY: PROPOSED PROJECTS TO BE DELIVERED alking The following walking and public rights of way projects will improve the attractiveness of walking both within March itself and out into the countryside.
More informationCambridgeshire Local Transport Plan Policies and Strategy
Cambridgeshire Local Transport Plan 2011 2026 Policies and Strategy John Onslow Acting Executive Director of Environment Services Cambridgeshire County Council Shire Hall Castle Hill Cambridge CB3 0AP
More informationMarch Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016
Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local
More informationCHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update
CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update The following report provides an update on the current position of all of the schemes which the Chelmsford City Local Highway
More informationSpeed Limit Policy Isle of Wight Council
APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits
More informationCAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY
CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY Study Report Final November 2006 Prepared for: Cambridge East Transport Topic Group c/o Cambridgeshire County Council Castle Court Cambridge CB3 0AP Prepared
More informationThe Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport
LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &
More informationReport to: Greater Cambridge Partnership Executive Board 4 July Transport Strategy - Future Public Transport Requirements
Report to: Greater Cambridge Partnership Executive Board 4 July 2018 Lead officer: Peter Blake GCP Transport Director Transport Strategy - Future Public Transport Requirements 1. Purpose 1.1. This paper
More informationGreater Cambridge City Deal. Initial consultation on better bus, cycling and walking trips. Milton Road
Greater Cambridge City Deal Initial consultation on better bus, cycling and walking trips Milton Road Response by Kings Hedges, East and West Chesterton Labour Parties The Greater Cambridge City Deal has
More informationScheme Category. Traffic Management. Traffic Management. Implementation LBAS ,000. Traffic Management. Traffic Management. Traffic Management
90,000 Ref Location Description Requested by Scheme Category Scheme stage Cost Code Estimated cost Comments RA London Road, Wickford close to no 63 2 Twinstead, Wickford 3 4 5 6 7 B48 Westmayne / Ford
More informationCambridge Metro: High quality transport infrastructure for the Cambridge City Deal
Cambridge Metro: High quality transport infrastructure for the Cambridge City Deal City Deal Cambridge is currently assessing how to invest the initial City Deal funding of 100m which is available for
More informationLEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document
LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk
More informationEly Market Town Transport Strategy
Ely Market Town Transport Strategy Contents Introduction 1 Aims of the strategy 2 Regional Spatial Strategy and Local Development Framework 2 The Ely Masterplan 2 Background 2 Existing transport provision
More informationMILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING
MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)
More informationAngel Drove carpark 3/day
GETTING TO ELY ( A on the map below marks the city centre; for a larger scale see the map at the end of the directions, where there are also details of car parking and pedestrian access to the venue) Angel
More informationStrategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment
Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -
More informationPublic Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY
Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout
More informationTransport Strategy for East Cambridgeshire 2016
Transport Strategy for East Cambridgeshire 2016 Transport Strategy and High Level Programme Graham Hughes Executive Director, Economy, Transport and Environment Cambridgeshire County Council Shire Hall
More informationBramshaw traffic calming proposal
- 1 - Bramshaw traffic calming proposal Initial options appraisal report July 2017 - 2-1. Project background Hampshire Country Council has commissioned Test Valley Borough Council to carry out an option
More informationMilton Road Project Update. Paul van de Bulk 30 January 2018
Milton Road Project Update Paul van de Bulk 30 January 2018 Milton Road Project Objectives Comprehensive priority for buses in both directions wherever practicable; Safer and more convenient routes for
More informationInfrastructure Policies
Infrastructure Policies 1. Primary Healthcare Health facilities in Ashtead comprise, Ashtead Private Hospital, two GP surgeries at Gilbert House and St Stephens, two Dental practices, the Arch and Tudor
More informationGuildford Borough (Draft)
ITEM Annex Page 7 Guildford Borough (Draft) Forward Programme Part A This is a work in progress and its completion is subject to the adoption of the Local Plan and Infrastructure Delivery Schedule November
More informationCAMBRIDGE SOUTH EAST. Transport Study. Consultation extended to 9 April. Formerly known as A1307, Three Campuses to Cambridge.
CAMBRIDGE SOUTH EAST Transport Study Formerly known as, Three es to Have your say on new public transport links new and improved walking and cycling routes road safety improvements What are we consulting
More informationGreater Cambridge City Deal Executive Board & Joint Assembly
Greater Cambridge City Deal Executive Board & Joint Assembly Welcome to the Call for Evidence on tackling congestion in Cambridge Launch Event 11 th November 2015 Bob Menzies Service Director: Strategy
More information6. Improving the Transport network
6. Improving the Transport network This section details what methods the Strategy will use to reduce the negative impacts of transport on the environment and people who live, work and travel through East
More informationMap 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.
Milton Road and Histon Road corridors bus priority infrastructure 1. Purpose The County Council would like to understand in more detail, the options to deliver the most effective corridor-based public
More informationCycle City Ambition Grants
Cycle City Ambition Grants Guidance on the Application Process is published alongside this application form on the Department s website. Please include all relevant information with your completed application
More informationA52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017
Nottingham Junctions Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Introduction The is the key east-west link across the East Midlands. The route is subject
More informationAppendix 12 Parking on footways and verges
Appendix 12 Parking on footways and verges Legal position Parking on footways and verges whether wholly or partly is banned throughout London, unless signs are placed to allow parking. The ban requires
More informationCycle Network Background Paper
Cycle Network Background Paper The council is hoping to achieve a comprehensive cycle network including radial routes into town, routes across town N-S and E-W including safer junctions. The aim overall
More informationSLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane
SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's
More informationFrome Street Bicycle Route
The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities
More informationRoad Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements
Road Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements Introduction Radyr and Morganstown Community Council has been invited
More informationTo: The results of these surveys have been analysed and are summarised within this Technical Note.
Technical Note Project: Histon Road / Milton Road, Cambridge Parking Surveys To: Andy Harrison Subject: Survey Report v1.6 From: Jonathan Barlow Date: 18 th February 2016 cc: Richard Jones / Dave Boddy
More informationMARKHOUSE ROAD IMPROVEMENTS
MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the
More informationPerne Rd / Radegund Rd Roundabout Cambridge
Perne Rd / Radegund Rd Roundabout Cambridge The conversion of an conventional urban roundabout to continental geometry A little bit of history The first traffic roundabout was built in Sollershott, Letchworth
More informationIMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING
IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE
More informationTransportation Consultants. Construction Consultants PROPOSED RESIDENTIAL DEVELOPMENT ON LAND AT WILBURTON ROAD, HADDENHAM TRANSPORT ASSESSMENT
PROPOSED RESIDENTIAL DEVELOPMENT ON LAND AT WILBURTON ROAD, HADDENHAM TRANSPORT ASSESSMENT Client: Gladman Developments Ltd February 2014 Transportation Consultants Woolstone Centre, 1-2 Mill Lane, Woolstone,
More informationKings Road, Herne Bay: Proposed Crash Remedial Measure
Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:
More informationCOTTENHAM PARISH COUNCIL HIGHWAYS COMMITTEE
COTTENHAM PARISH COUNCIL HIGHWAYS COMMITTEE AGENDA REPORTS PACK AUGUST 2014 Item 14H/004 CLERKS REPORT August 2014 Highways Telegraph Street - unsuitable for HCV s sign has been installed but only at the
More informationThe Ramsey Market Town Transport Strategy 26 th April 2010
The Ramsey Market Town Transport Strategy 26 th April 2010 Contents INTRODUCTION 2 BACKGROUND 3 Strategy Area 4 Travel to, from and within Ramsey 5 Transport problems in the town 6 Links with other policies
More information1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,
1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology
More informationSt Neots Market Town Transport Strategy
St Neots Market Town Transport Strategy 9th September 2008 Contents INTRODUCTION 1 Aims of the strategy 1 BACKGROUND 2 Travel to, from and within St Neots 2 Transport issues in St Neots 3 Links with other
More informationLocal Highway Panels Members Guide. 9 Public Rights of Way
Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.
More informationNorth West Non-Technical Summary of the Transport Assessment September 2011
North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North
More informationThe existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.
Project: A428 Study To: Cambridgeshire County Council Subject: Tidal Bus lane Review From: Atkins Date: 24 May 2016 cc: Introduction As part of the A428 Corridor Study to improve the bus journey time between
More informationEaston Safer Streets - Final Project Report BRISTOL
- Final Project Report BRISTOL A Sustrans Community Street Design Project in partnership with Bristol City Council February 07 About Sustrans Sustrans makes smarter travel choices possible, desirable and
More informationA1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts
Report To: Greater Cambridge City Deal Executive Board 3 March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A1307 Haverhill
More informationStrategy for Walking & Cycling Action Plan
Strategy for Walking & Cycling Action Plan To achieve higher levels of walking and cycling activity, the destinations which people access have to be available within suitable distances and designed to
More informationWisbech Market Town Transport Strategy
Wisbech Market Town Transport Strategy November 2014 Transport Strategy and Action Plan www.cambridgeshire.gov.uk Wisbech Market Town Transport Strategy Contents 1. Introduction... 2 2. Scope of the Strategy...
More informationCabinet Member for Highways & Streetscene. Highway Infrastructure Manager
LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS
More informationA future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network
Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely
More informationCHURCH ROAD. Public consultation document TELL US YOUR VIEWS.
CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from
More informationRhebogue Neighbourhood Greenway. Road Safety Audit Stage 2
Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:
More informationCambourne to Cambridge Better Bus Journeys Cambridge City Centre - Potential Bus Priority Greater Cambridge Partnership. July 2017
Cambourne to Cambridge Better Bus Journeys Cambridge City Centre - Potential Bus Priority Greater Cambridge Partnership July 2017 Notice This document and its contents have been prepared and are intended
More informationTechnical note. 1. Introduction
Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this
More information14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE
165 14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE General Manager responsible: General Manager City Environment, DDI 941-8528 Officer responsible: Transport and Greenspace Unit Manager
More informationLocal Highway Panels Members Guide. 5 Crossing Facilities
Local Highway Panels Members Guide 5 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction On the Network where there are sufficient crossing opportunities most individuals are able to cross
More informationGETTING WHERE WE WANT TO BE
CAMBRIDGESHIRE & peterborough GETTING WHERE WE WANT TO BE A GREEN PARTY TRANSPORT POLICY CONTENTS Our Campaign Priorities 4 Bus Franchising 6 Supporting Active Transport 8 Workplace Parking Levy 9 Tackling
More informationCambridge Cycling Campaign
February 15, 2016 Our Ref: RH 160215 Milton Road Consultation Response City Deal Team, SH1311, Shire Hall, Cambridge CB3 0AP Cambridge Cycling Campaign Llandaff Cambers, 2 Regent Street, Cambridge CB2
More informationSevenways Roundabout, and the need for a Road Safety Scheme:
Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and
More informationA127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017
A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place
More informationMartlesham Heath: January 23 rd 2014
Public meetings - Roads & Transport responses Three public meeting were held in which members of the public were invited to give their views. This document contains the comments received. For each meeting
More informationCUERDEN TRANSPORT PROPOSALS
1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This
More informationAppendix A Type of Traffic Calming Measures Engineering Solutions
Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of
More informationLea Bridge Road A street for everyone Tell us
Lea Bridge Road A street for everyone Tell us Public consultation document Section H your views 1 Lea Bridge Road: a street for everyone Introduction Mni-Holland is an exciting programme to improve walking
More informationProcess for managing parking on verges, footways and footpaths
Process for managing parking on verges, footways and footpaths Author: MG/NR Highways and Transport Environment Department Date: 28 July 2015 Version: 2.0 PARKING ON VERGES, FOOTWAYS AND FOOTPATHS Introduction
More informationDESIGN CODE. Enterprise West Harlow London Road North Design Code 21
DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.
More informationWarfield Neighbourhood Plan: 4.4 Infrastructure
Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy
More informationBulwell Cycling Consultation
Bulwell Cycling Consultation Image 1 Bulwell Bogs (Sutton, 2015) As part of a final year research project, I am seeking feedback on proposals for cycling improvements in Bulwell. This consultation is not
More information1.2. South Cambridgeshire Local Plan Proposed Submission, July 2013
Project: A428 Corridor Study To: Subject: Planning Policy Context From: Date: 2 May 2014 cc: 1. Introduction The aim of this note is to provide a brief overview of the national and local policy relating
More informationTransport Plan Adopted March 2012
Burneside Parish Council Transport Plan Adopted March 2012 POLICY AREAS: TP1: Motor Vehicles TP2: Public Transport TP3: Cycling and Pedestrian Routes THE REPORT: 1. Scope of the Plan 2. Background 3. Local
More informationDouglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013
Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along
More informationRegional Cycle Programme Update
Agenda Item 10 (ii) Regional Cycle Programme Update Glossary Auckland Council Auckland Transport Cycle Action Auckland New Zealand Transport Agency Regional Cycle Network (AC) (AT) (CAA) (NZTA) (RCN) Executive
More informationIMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk
IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments
More informationCAMBRIDGE SOUTH WEST PARK & RIDE
CAMBRIDGE SOUTH WEST PARK & RIDE Have your say on: Extra Park & Ride spaces to the south west of Cambridge Bus priority measures into the city centre CREATING MORE PARK & RIDE SPACES The existing Park
More informationTS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1
TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield
More informationAppendix B Option 1 Design, Plans and Estimates
19 Appendix B Option 1 Design, Plans and Estimates Opus International Consultants Ltd Design Details All options where designed using NZTA MOTSAM part 2, NCC Land development manual 2010 and Cycling
More information6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT
6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken
More informationAPPENDIX B: CAMBRIDGE NORTH WEST TRANSPORT STUDY
APPENDIX B: CAMBRIDGE NORTH WEST TRANSPORT STUDY Appendices not included due to size Whole report including appendices can be found here: http://www.cambridgeshire.gov.uk/transport/strategies/longterm/developmenta
More information9. Parking Supporting Statement
9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.
More informationDerby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.
Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling
More informationSHOTLEY BRIDGE VILLAGE TRUST
SHOTLEY BRIDGE VILLAGE TRUST Traffic & Parking Study - 2009 The Parking Lot, a focus group of the Shotley Bridge Village Trust, has undertaken this study. Evidence was gathered, through surveys during
More information