B741 - TEMPORARY CONCRETE BARRIERS - OPSS 741

Size: px
Start display at page:

Download "B741 - TEMPORARY CONCRETE BARRIERS - OPSS 741"

Transcription

1 B OPSS GENERAL Temporary concrete barrier (TCB) is a portable barrier system consisting of freestanding precast concrete segments that are positively connected together to form a continuous barrier system. Policies and descriptions for the various types of TCB systems accepted for use and specified on provincial highway projects are provided in the Roadside Design Manual. The systems are designed and crash tested for placement on paved surfaces, and paved surfaces should extend at least one metre beyond the back of unrestrained TCB systems TCB Restraint Systems TCBs are often used to provide separation between traffic and work zones, or at the edge of bridge decks. In locations where the offset from back of TCB to edge of excavation, edge of structure, scaffolding, temporary protection (support) system or sign support is less than one metre, it may be necessary to restrain the barrier to minimize deflection. Restraining details have been successfully crash tested to NCHRP Report 350 TL-3 for the Type M TCB. The three restraint systems acceptable for use in MTO contracts include the following: 1) Pinning to asphalt pavement (or concrete); 2) Strapping to concrete pavement or bridge deck (with or without asphalt overlay); 3) Bolting through concrete bridge deck (with or without asphalt overlay) Only the TCB Type M connection should be used with restraint systems. Unrestrained TCB should be transitioned to restrained TCB as shown on the applicable OPSD. Similarly, unrestrained TCB should be transitioned to permanent concrete barrier as shown on the applicable OPSD. The three TCB Restraint System tender items cover only the supply, installation, and removal of the restraint system. Temporary Concrete Barrier and Temporary Concrete Barrier, Relocation tender items are computed separately. Designers should refer to Roadside Design Manual for guidance on when to restrain TCB. January 2018 Page 1 of 5 CDED B741

2 TCB, Reduced Deflection System In locations where the offset from back of TCB to edge of excavation, edge of structure, scaffolding, temporary protection (support) system or sign support is less than one metre, the reduced deflection TCB may be used instead of the restrained system. The Type X TCB does not require any restraint systems and has been successfully crash tested to NCHRP Report 350 TL-3 and AASHTO MASH TL-3. Only the Type X TCB should be used for reduced deflection TCB and transitions to freestanding TCB as shown on the applicable MTODs REFERENCES Roadside Design Manual TENDER ITEMS Temporary Concrete Barrier Temporary Concrete Barrier, Relocation Temporary Concrete Barrier, Drainage Gap Temporary Concrete Barrier Restraint System, Pinned Temporary Concrete Barrier Restraint System, Strapped Temporary Concrete Barrier Restraint System, Bolted Temporary Concrete Barrier, Reduced Deflection Temporary Concrete Barrier, Reduced Deflection, Relocation (Normal, each, PQP) The tender item "Temporary Concrete Barrier" is used for the following work: a) Supplying and transporting the barriers to the site; b) The initial installation and including any additional barriers required for subsequent staging; and c) Removal of barriers after construction has been completed. The tender item "Temporary Concrete Barrier, Relocation" is used for the following work: a) Relocating the barriers within the work area as required for staging or seasonal shutdown for carryover projects; and b) The temporary storage of barriers at the site or other designated locations as necessitated by staging or seasonal shutdown for carryover projects. January 2018 Page 2 of 5 CDED B741

3 741.4 SPECIFICATIONS The requirements for TCBs and TCB restraint systems are contained in OPSS SPECIAL PROVISIONS Refer to Chapter 'E' of this Manual to review the applicable standard special provisions. Non-standard special provisions are required to specify and provide payment for: TCB that is to remain on a project upon its completion; The identification of specific temporary storage sites for TCB that cannot be accommodated within the project limits during staging or seasonal shutdown on carryover projects; and Restoration of asphalt and concrete surfaces that are disturbed during the installation and removal of TCB restraint systems STANDARD DRAWINGS Applicable standard drawings are contained in the 900 series of the Ontario Provincial Standards Drawings (OPSD) and 900 series of the Ministry of Transportation Ontario Drawings (MTOD) DESIGN TCB should be used on a paved surface, such as asphalt or concrete. TCB drainage gaps should only be used when justified based on the results of a hydraulic analysis. Prior to the 60% completion stage of detail design, the designer should send to the Ministry s Design and Contract Standards Office and Bridge Office the proposed location and quantity of TCB restraint systems along with a typical section(s) showing lane widths, shoulder widths, and offset of the TCB to edge of the excavation or structure. In constrained areas where it is necessary to reduce the width of the level area behind the TCB to the upper edge of each wall of an excavation or temporary protection (support) system to less than one metre, an Engineer shall design and provide January 2018 Page 3 of 5 CDED B741

4 documentation according to the Policies in the Roadside Design Manual, for use during construction according to Ontario Regulation 213/ COMPUTATION These are Plan Quantity Payment items. Quantities are computed in metres. Measurements are scaled or measured along the centreline of each installation. The unit of measurement for TCB drainage gaps is each complete installation. Transitions from restrained TCB to unrestrained TCB are included in the computed length for the appropriate TCB restraint system. Transitions from reduced deflection TCB to unrestrained TCB are included in the computed length for reduced deflection TCB. When a transition from unrestrained TCB to permanent concrete barrier is included in the contract, the length of the transition is included in the computed length for the appropriate TCB restraint system DOCUMENTATION TCBs are depicted on the contract drawings with the designation TCB or TCB Relocation shown adjacent to the symbol. Detail the station and offset for the start and end of each change in direction and/or offset of TCB. Show the locations of the TCB drainage gaps on the contract drawings with the OPSD reference and station shown adjacent to the symbol. Temporary Concrete Barrier - This item pays for the supply of the precast units, the total cannot exceed the largest number of units in place at any one time during the contract. Measurement is from end to end of all locations, restrained and unrestrained. Temporary Concrete Barrier, Relocation - This item will be comprised of all relocations during the contract. Measurement is from end to end of each individual relocation. Temporary concrete barrier lengths, temporary concrete barrier, relocation lengths, temporary concrete barrier, reduced deflection lengths, and temporary concrete barrier, reduced deflection, relocation lengths are computed and entered on the Quantities-Miscellaneous" sheets, showing station to station and location, left or January 2018 Page 4 of 5 CDED B741

5 right of centreline. Provide offsets if required. For contracts that include multiple construction stages, the quantities shall be broken down by each individual stage. Enter each TCB drainage gap installation in the Quantities Miscellaneous sheets as a separate line entry under the appropriate column heading showing station and location, left or right of centreline. Provide offsets if required. For contracts that include multiple construction stages, the quantities shall be broken down by each individual stage. TCB restraint system locations are depicted on the contract drawings with the appropriate OPSD number shown adjacent to the symbol. The limits of restraint shall be clearly indicated. The applicable standard drawings shall be included in the contract. TCB restraint system lengths are computed and entered on the Quantities- Miscellaneous" sheets under the appropriate column heading, showing station to station and location, left or right of centreline. Provide offsets if required. Total each column and transfer the tender totals to the tender document. For contracts that include multiple construction stages, the quantities shall be broken down by each individual stage. Reduced deflection TCB system lengths are depicted on the contract drawings with the designation TCB-RD shown adjacent to the TCB symbol. The minimum 32 m long transitions required on each end of the TCB-RD system are depicted with the designation TCB-RD-T shown adjacent to the TCB symbol. Detail the station and offset for the start and end of each change in direction and/or offset of TCB-RD and TCB-RD-T Documentation Accuracy Station and quantity entries are recorded to the nearest whole metre. Offsets when required are recorded to 0.1 of a metre. Spot checking required. January 2018 Page 5 of 5 CDED B741

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741 B741 TEMPORARY S - OPSS 741 741.1 GENERAL Temporary concrete barriers (TCBs) are precast units that are installed with interlocking devices connecting consecutive sections. The following types of connections

More information

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering Illini Union Champaign, IL February 24, 2015 Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering Temporary Concrete Barrier Pinning and Drop-off Policy

More information

Traffic Management Guidelines for Structure Rehabilitation Projects

Traffic Management Guidelines for Structure Rehabilitation Projects , Traffic Management Guidelines for Structure Rehabilitation Projects February 2009 1 Purpose & Background These guidelines were prepared in order to assist the Regional Structural Office in determining

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion The SMART Steel Crash Cushion is accepted for use on the New South Wales classified road network. The acceptance is based on the determination

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

SMART STEEL CRASH CUSHION

SMART STEEL CRASH CUSHION APRIL 2015 DETAIL SHEET SMART STEEL CRASH CUSHION VicRoads Requirements Refer to Austroads - Safety Barrier System Acceptance Conditions for the SMART Steel Crash Cushion. All requirements listed by Austroads

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

BARRIER OFFSET 0 A 6 6 A 12 12 A 26 A 26 3A OR 4A L OR S * ** L OR S L OR S ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE

More information

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS PUBLIC WORKS DEPARTMENT 2015 REVISION 1-2016 REVISION SUMMARY - MARCH 2016 Introduction 1.05 - Specifications for Traffic Control Devices Temporary Traffic

More information

CHAPTER 1 STANDARD PRACTICES

CHAPTER 1 STANDARD PRACTICES CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles

More information

MNDOT PAVEMENT DESIGN MANUAL

MNDOT PAVEMENT DESIGN MANUAL MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -

More information

Plan prepared for: Brennan Paving and Construction. Plan prepared by: Direct Traffic Management

Plan prepared for: Brennan Paving and Construction. Plan prepared by: Direct Traffic Management Traffic Control Plan Hwy 401 - Bridgeland Avenue / Site 37-283 Grading, Drainage, Garnular Base, Hot Mix Paving, Electrical, Structural and Plan prepared for: Plan prepared by: General Notes WB 401 Collector

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division

More information

Manual Of Standard Traffic Signs And Pavement Markings Alberta

Manual Of Standard Traffic Signs And Pavement Markings Alberta Manual Of Standard Traffic Signs And Pavement Markings Alberta Traffic Accommodation and Control Alberta Highway Pavement Marking Guide and made available by Alberta Transportation, please see the following

More information

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects January 2012 TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects 1. PURPOSE OF REPORTING The purpose of Tangible Capital Asset (TCA) reporting is to comply with PSAB 3150 reporting

More information

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -

More information

COMPLETE STREETS DURING CONSTRUCTION

COMPLETE STREETS DURING CONSTRUCTION COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

Errata Date February 2016 Errata Edition Field. Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA

Errata Date February 2016 Errata Edition Field. Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA Errata Date February 2016 Errata Edition Field Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA Errata Reference Number Item Number 100 Page No. 39 Errata 7FE/001/16 The first bullet point under

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for

More information

South Carolina Department of Transportation. Engineering Directive

South Carolina Department of Transportation. Engineering Directive South Carolina Department of Transportation Engineering Directive Directive Number: ED-22 Effective: December 16, 2009 Subject: References: Purpose: This Directive Applies to: Considerations for Bicycle

More information

GDOT Cross Section Elements. Course ID: GDOT PDH Credits

GDOT Cross Section Elements. Course ID: GDOT PDH Credits GDOT Cross Section Elements Course ID: GDOT-01 2 PDH Credits Civil Engineer Educators LLC 1026 Timberwolf Lane Juneau, AK 99801 Email: support@civilpdh.com Chapter 6 Contents 6. CROSS SECTION ELEMENTS

More information

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS Section Page 48-1 GENERAL...48.1 48-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS...48.1 48-3 PAINTED TRAFFIC STRIPES AND PAVEMENT

More information

Temporary Vehicle Restraint System Policy

Temporary Vehicle Restraint System Policy Temporary Vehicle Restraint System Policy Prepared By; J Wilkinson H&S Manager, Civils Prepared for: Installation of TVRS on all triio highways projects including JV s. Page 1 of 8 Contents 1.0 Introduction

More information

Clear Zone Conflicts in AASHTO Publications

Clear Zone Conflicts in AASHTO Publications Clear Zone Conflicts in AASHTO Publications Dick Albin Washington State Department of Transportation Presented at the AASHTO Sub Committee on Design Meeting June 2007 Burlington, Vermont Clear Zone is

More information

Restoration Requirements

Restoration Requirements Restoration Requirements Street Excavation Rules & Regulations Public Works Code Article 2.4 DPW Order 178,940 Regulations Article 2.4 of the Public Works Code requires any person excavating in the Public

More information

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

On Road Bikeways Part 1: Bicycle Lane Design

On Road Bikeways Part 1: Bicycle Lane Design On Road Bikeways Part 1: Bicycle Lane Design Presentation by: Nick Jackson Bill Schultheiss, P.E. September 04, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar

More information

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones Designing Pedestrian Facilities for Accessibility Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in s Maintenance of Accessible Features Title II (28 CFR 35.133(a))

More information

Appendix C. Bicycle Route Signage

Appendix C. Bicycle Route Signage Appendix C Bicycle Route Signage This page intentionally left blank. APPENDIX C - BICYCLE ROUTE AND WAYFINDING SIGNAGE Bicycle route signs are wayfinding signs that guide bicyclists along preferred, designated

More information

H3 Roadside Design Process

H3 Roadside Design Process H3 Roadside Design Process FIGURE H3.1 Roadside Design Process H3.1 Introduction This section summarizes the design process used to determine the most appropriate and costeffective design strategies for

More information

SECTION TRAFFIC REGULATIONS

SECTION TRAFFIC REGULATIONS SECTION 01550 TRAFFIC REGULATIONS PART 1 - GENERAL 1.01 OBJECTIVES A. The Contractor shall provide for safe movement of vehicular, bicycle and pedestrian traffic, including persons with disabilities in

More information

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles. Policy Statement Subject Placement of Rigid Distribution Poles Along Roads With Speed Limits Exceeding 70KM/H Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised

More information

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio 1 Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio 43223 (614) 752-0438 Fax: (614) 644-8199 jim.roth@dot.state.oh.us

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

(This page left intentionally blank)

(This page left intentionally blank) (This page left intentionally blank) 2011 Edition - Revision 1 Page 553 Section 5A.01 Function CHAPTER 5A. GENERAL 01 A low-volume road shall be defined for this Part of the Manual as follows: A. A low-volume

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way

More information

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN. 3' HINGE POINT EACH POST (TYP) (MIN.) (SAW CUT OR FUSE PLATE) EDGE OF FORESLOPE 4" STEEL COLUMN 6" WOOD POST THRU TRAVELED 7'MIN. SHOULDER LATERAL OFFSET (FORESLOPE) (VARIABLE) BREAKA POSTS THE LATERAL

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

CHAPTER 2F. TOLL ROAD SIGNS. Table 2F-1. Toll Road Sign and Plaque Minimum Sizes

CHAPTER 2F. TOLL ROAD SIGNS. Table 2F-1. Toll Road Sign and Plaque Minimum Sizes 2011 Edition Page 249 Section 2F.01 Scope CHAPTER 2F. TOLL ROAD SIGNS 01 Toll highways are typically limited-access freeway or expressway facilities. A portion of or an entire route might be a toll highway,

More information

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed

More information

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS Section Page 48-1 GENERAL... 48.1 48-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS... 48.1 48-3 PAINTED TRAFFIC STRIPES AND

More information

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS SECTION 48 TRAFFIC STRIPES AND PAVEMENT MARKINGS 48-1 GENERAL Traffic stripes and pavement markings shall

More information

Chapter 17. Work Zone Management. 17 Work Zone Management

Chapter 17. Work Zone Management. 17 Work Zone Management Chapter 17 Work Zone Management 17 Work Zone Management Chapter 17 Work Zone Management 17.1 Introduction Construction always has some impact on the users of the facility. The various activities required

More information

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES: GENERAL NOTES: CURB NOTES: 5'-0" MIN 5'-0" 5'-0" MIN 1. 2. THESE SHEETS ARE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA), AND THE REQUIREMENTS OF THE 2011 PROPOSED ACCESSIBILITY GUIDELINES

More information

Temporary Traffic Control for Highway Work Zones

Temporary Traffic Control for Highway Work Zones Temporary Traffic Control for Highway Work Zones MONTHLY DELMARVA MISS UTILITY MEMBER MEETING MARCH 20, 2014 PRESENTED BY: Adam Weiser, P.E. PTOE Safety Programs Manager Delaware Department of Transportation

More information

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E. RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project

More information

ITEMIZED LIST FOR TRAFFIC CONTROL TOTAL UNITS S

ITEMIZED LIST FOR TRAFFIC CONTROL TOTAL UNITS S STATE OF SOUTH DAKOTA PROJECT SHEET TOTAL SHEETS ( ) 029S-288 10 2 7 MAINTENANCE OF TRAFFIC Removing, relocating, covering, salvaging and resetting of permanent traffic control devices, including delineation,

More information

ASSET ASSET IDENTIFICATION SIGNAGE

ASSET ASSET IDENTIFICATION SIGNAGE PART PART E E: ASSET ASSET IDENTIFICATION SIGNAGE Manual No. SM051 E-1 7 ASSET IDENTIFICATION SIGN DESIGN AND PLACEMENT General The location referencing system does not include asset identification. However,

More information

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers. SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS 1 SCOPE This specification shall apply to the installation of raised pavement markers. 2 DEFINITIONS Type A Marker - Retroreflective raised pavement

More information

H3 Roadside Design Process

H3 Roadside Design Process H3 Roadside Design Process FIGURE H3.1 Roadside Design Process H3.1 Introduction This section summarizes the design process used to determine the most appropriate and costeffective design strategies for

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting 72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME Public Information Meeting Project Goals About the Project The goal of this project is to address congestion along 72 Avenue and adjacent streets

More information

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS PART 5. TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS TABLE OF CONTENTS Chapter 5A. GENERAL Page Section 5A.1 Function............................................................... 5A-1 5A.2 Application............................................................

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details

More information

Long Island Rail Road Expansion Project Floral Park to Hicksville

Long Island Rail Road Expansion Project Floral Park to Hicksville Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral

More information

Bases, Ballasts, and Paving

Bases, Ballasts, and Paving Sections Included In This Standard: 1.1 Paving and Surfacing 1.2 Protection of the Work 1.3 Repair of Pavement 1.4 Pavement Marking 1.1 PAVING AND SURFACING A. DESIGN REQUIREMENTS 1. Applicable Design

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES APPLICATION Delineation devices are used to warn and alert motorists of hazards created by work activities in or near the travelled way and to guide and direct

More information

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3

More information

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE Virginia Supplement to the 2009 MUTCD Revision 1 Page TC-3-1 PART 3. MARKINGS CHAPTER 3A. GENERAL PAGE Section 3A.01 Functions and Limitations Section 3A.02 Standardization of Application Section 3A.03

More information

STATEMENT of POLICY and PROCEDURE

STATEMENT of POLICY and PROCEDURE SCHEDULE B to BY-LAW NO. 96-2013 STATEMENT of POLICY and PROCEDURE No. Responsibility: Roads Date: October 21, 2013 Policy: Road Design Standards Revised: Approved by: By-law No. 96-2013 Pages: 6 Purpose:

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

TRAFFIC ACCOMMODATION IN WORK ZONES

TRAFFIC ACCOMMODATION IN WORK ZONES TRAFFIC ACCOMMODATION IN WORK ZONES 2017 Date of Issue: January 2017 This document has been published under the authority of the General Manager of Infrastructure Services 1 P age Table of Contents SECTION

More information

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for

More information

General References Definitions. (1) Design Guidance. (2) Supporting Information

General References Definitions. (1) Design Guidance. (2) Supporting Information Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to

More information

Off-Road Facilities Part 1: Shared Use Path Design

Off-Road Facilities Part 1: Shared Use Path Design Off-Road Facilities Part 1: Shared Use Path Design Presentation by: Eric Mongelli, P.E. Tom Huber October 9, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar @tooledesign

More information

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions Section 3A.04 Colors Markings shall be yellow, white, red, or blue, or purple. The colors for markings shall conform to the standard highway colors. Black in conjunction with one of the above colors shall

More information

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX 78541 (956) 388-8210 SPEED HUMPS INSTALLATION POLICY A. GENERAL Speed humps are an effective and appropriate device for safely

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid City of Conway Mayor s Office 1201 Oak Street Conway, AR 72032 www.cityofconway.org Invitation and Bid 2010-25 INVITATION TO THE VENDOR ADDRESSED: Bidders are invited to furnish the items listed herein

More information

Work Zone Traffic Safety

Work Zone Traffic Safety Work Zone Traffic Safety Summary The Hazard: death or serious injury from being struck by vehicles or equipment in work zones. Who is at risk: streets/highways, utilities and other public works department

More information

24,801 Roadway Departure Fatalities Nationally. The Safety Edge : Minimizing The Effects of Shoulder Drop-off. 41,059 Highway Fatalities a Year

24,801 Roadway Departure Fatalities Nationally. The Safety Edge : Minimizing The Effects of Shoulder Drop-off. 41,059 Highway Fatalities a Year 48 th Annual: Idaho Asphalt Conference 24,801 Roadway Departure Fatalities Nationally The Safety Edge : Minimizing The Effects of Shoulder Drop-off 49% jl 51% Roadway Departure October 23, 2008 Moscow,

More information

PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS

PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS 2005 Edition Page TC5-1 PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS CHAPTER 5A. Section 5A.01 Section 5A.02 Section 5A.03 Section 5A.04 CHAPTER 5B. GENERAL Page Function...5A-1

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 20 June 2009 Part 3: Motorways and Expressways CONTENTS Reference Page Page Number Date SECTION 12: MARKINGS AND DELINEATION 12.1 GENERAL... 12-1 June 2009 12.1.1 INTRODUCTION... 12-1 June 2009

More information

APPENDIX L. Design Criteria

APPENDIX L. Design Criteria APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West

More information

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program Why worry about the roadside? 18,586 deaths per year in the USA Annual U.S. Fatalities

More information

and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN

and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN Small Town and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN SMALL TOWN AND RURAL MULTIMODAL NETWORKS GUIDE Why a Rural and Small Town Focused Guide? ONE SIZE DOES NOT FIT ALL. The new FHWA-endorsed

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES CONTROL OF TRAFFIC C201 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C201 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS

More information

TRAFFIC CONTROL DEVICES

TRAFFIC CONTROL DEVICES TRAFFIC CONTROL DEVICES SIGNS Temporary traffic control work zone signs include regulatory, warning and guide signs utilized to provide regulations, warnings and guidance information to road users impacted

More information

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects NCHRP Project 15-50 July 2017 1 Research Objective Develop guidelines for safe and cost-effective

More information