1 THE DON DISTRICT SALMON FISHERY BOARD RIVER DON DRAFT GRAVEL MANAGEMENT PLAN NEWE DAM

2 Introduction The Newe Dam at Strathdon is situated on the upper reaches of the river Don catchment area, Grid Reference NJ During flood conditions large amounts of gravel and sediment collect behind the weir, which can cause several problems, i.e. restricting movement through the fish pass, restricting the movement of fish above the weir once ascending the fish pass, and possibly giving false readings to the Q90 hands off flow for the Newe Macro Hydro scheme abstraction point, which is situated directly above the weir on the North Bank (see Cover Photo) In previous years a local contractor would remove the gravel allowing the fish to move freely above the weir upon leaving the fish pass. Map below shows the location of the Newe Weir/Dam and grid Reference. Legal Obligations As the DDSFB are the owners of the weir and attached structures to the weir, we have a legal obligation by law to comply with The salmon (Fish Passes and Screens) (Scotland) Regulations 1994 and The water Environment (controlled Activities) (Scotland) Regulations The engineering activity falls under SEPA s guidance on Gravel Abstraction through the General Binding Rules (GBR #12) Sediment Management within 10m upstream of a weir and GBR9: Operating any vehicle, plant or equipment (machinery) when undertaking GBR activities 5, 6, 7, 8, 10, 12, 13 and 14. The DDSFB will ensure compliance with these conditions see Appendix 1.

3 Best Practices All work shall comply with current SEPA Regulations, and codes of Practice. With particular reference being paid to SEPA s Engineering in the water environment a good practice guide Sediment Management. A letter notifying SEPA of the engineering activity will be sent prior to commencement of works. General Binding Rules 9 and 12 shall be followed and adhered to explicitly. All machinery used will be power washed before going near the river. Refuelling and storage of fuels/oils/pollutants will be at a safe distance from any water course. The excavator will always be on drained gravel (hard standing) within the river, as per guidance from SEPA, given during a meeting at the Newe Dam in A member of the DDSFB staff will be on site at all times during operations. Prior notification of works commencing will be given to Mr John Riley Owner of the Newe Macro Hydro scheme. The gravel will be extracted at least twice a year. This will be dependent on gravel movement, due to large increases of river levels throughout the year. Method Statement Operations and timing for the gravel removal from the Newe Weir would be between the months of June and September during typical low flows. Before the month of June young salmon and trout will still be within the substrate. September through to the end of November is the spawning time for this part of the river system. During low flows two by-wash sluice gates, which are pictured in the centre of the image on the far bank, will be opened to divert the flow and drop the water level behind the weir. Once this has taken place an excavator will commence extracting the gravel. At all times the excavator will be on a hard stand on the gravel bar working backwards to where he first entered the channel.

4 Figure 1. Looking from the North Bank towards the fish pass and the twin sluices on the south bank. Notice the raised gravel bars in front of the fish pass. The level of gravel to be removed will be to a depth of approximately 1-2ft below the bottom lip of the fish pass as seen in Figure 2, this will allow for an adequate depth of water for fish to move safely once leaving the fish pass, and move through the fish pass with ease. Figure 2. Looking from the South bank towards the North bank with the Fish Pass on the RHS of the image and the Macro Hydro Abstraction point on the LHS of the image. Note the raised gravel bars and the proximity of these gravel bars in relation to the fish pass. This image was taken during reduced levels when the sluices were open to allow abstraction.

5 Once the required depth has been achieved, the twin sluice gates will be closed to allow for the water level to regain its natural state as illustrated in Figure 3 below. Figure 3. Typical flows exhibited above the weir crest following a previous gravel abstraction note the lack of raised gravel bars present as seen in Figures 1& 2.

6 Gravel Use In order to facilitate the replacement of sediment within the system the gravel abstracted from the Newe Weir site will be used to shore up bank repair work through out the river system below the wier. This will ensure that the gravel will find its way back into the river system during flood conditions. The gravel could also be used in other parts of the catchment during in stream habitat improvement works. All SEPA recommendations on gravel management at the Newe site will be followed. Gravel storage Facility Details Following abstraction the gravel will be taken a short distance to a temporary storage area situated at the following address. Owner of facility: Mr Stuart Milne Address: Meikle Tolly AB36 8XA Tele: Grid Reference: NJ Map of Facility Below

7 Newe Weir Ownership details. Don District Salmon Fishery Board Clerk to the Board Mr George Alpine 15 Golden Square, Aberdeen AB10 1WF Tel: Fax: The Don District Salmon Fishery Board Draft Gravel Management Plan compiled by, Mr James Kerr River Superintendent 17 Norman Gray Park Blackburn Aberdeen AB21 0ZR Tele: Mobile:

8 Appendix 1 GBR s GBR9: Operating any vehicle, plant or equipment (machinery) when undertaking GBR activities 5, 6, 7, 8, 10, 12, 13 and 14. Rules: a) Machinery should only operate in water where it is impracticable for it to operate on dry land. b) Refuelling must take place at least 10m away from any surface water. c) Any static plant or equipment used within 10m of surface water must be positioned on a suitable drip tray with capacity for 110% of the fuel tank supplying the static plant or equipment. d) Machinery used in or near surface water must not leak any oil. e) Washing of any machinery must take place at least 10m away from any surface water and the washings must not be allowed to enter any surface water. f) Machinery must not be operated in rivers, burns and ditches when fish are likely to be spawning in the affected surface water, or in the period between spawning and the subsequent emergence of juvenile fish. (If in doubt about these times, you are advised to contact your local District Salmon Fishery Board or Fishery Trust for advice). GBR12: Removal of sediment from the area of impounded water upstream of a weir authorised under CAR, and where desired, return of that sediment to the watercourse. Rules: a) Sediment or other matter can only be removed within the stretch 10m upstream of the weir. b) Only sediment which has recently been deposited (i.e. that which is reasonably expected to have been deposited within the three years preceding the date of removal) can be removed. c) Sediment that has been removed may be returned to the watercourse, provided that: it is returned within the 10m stretch downstream of the weir; it does not cause sediment to accumulate in a manner likely to impede the free passage of migratory fish; all reasonable steps are taken to avoid increased erosion of the bed or banks of the watercourse; and it is not returned during periods in which fish are likely to be spawning, nor in the period between spawning and the subsequent emergence of the juvenile fish.

9 d) The removed sediment and other matter must not be placed on the bank of any watercourse. e) The return or removal must not result in pollution of the water environment. f) Vegetation may be removed from the banks only if the works cannot otherwise be reasonably carried out. g) Vegetation that is removed must not be disposed of into the channel.

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass? Guidance Note Hydropower Guidance Note: This guidance note is not intended as a statement of law. It should be read in combination with, and in the context of, the relevant enactments and EU obligations.

More information

THE DON DISTRICT SALMON FISHERY BOARD. Superintendents Annual Report For The Year 2009

THE DON DISTRICT SALMON FISHERY BOARD. Superintendents Annual Report For The Year 2009 THE DON DISTRICT SALMON FISHERY BOARD Superintendents Annual Report For The Year 2009 Looking upstream towards the Grampian Mountains where the River Don starts her Journey. DON AND DISTRICT SALMON FISHERY

More information

Schedule for Culvert Works in or on the Bed or Bank of a Watercourse PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM

Schedule for Culvert Works in or on the Bed or Bank of a Watercourse PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM 10A Schedule for Culvert Works in or on the Bed or Bank of a Watercourse This form is to be used for applications to use, erect, place, extend, alter or replace a culvert in or on the beds or banks of

More information

Micro Hydropower and Fish.

Micro Hydropower and Fish. Micro Hydropower and Fish. Garry O Neill. Senior Fisheries Officer. Inland Fisheries Branch. 1. Value of Fisheries. 2. Life cycle of the Salmon. 3. Potential impacts of Hydro s on Fish. 4. Fisheries Legislation.

More information

As temporary grade control facilities along waterways until final stabilization is established.

As temporary grade control facilities along waterways until final stabilization is established. Check Dams (CD) EC-12 Description Check dams are temporary grade control structures placed in drainage channels to limit the erosivity of stormwater by reducing flow velocity. Check dams are typically

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

P.O. Box 65 Hancock, Michigan USA fax

P.O. Box 65 Hancock, Michigan USA fax This PDF file is a digital version of a chapter in the 2005 GWS Conference Proceedings. Please cite as follows: Harmon, David, ed. 2006. People, Places, and Parks: Proceedings of the 2005 George Wright

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0 Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL 26/02/2015 Version 2.0 1 Table of Contents List of Tables... 2 Introduction... 3 Methods... 4 Preliminary

More information

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 18, 2017

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 18, 2017 Final for the Wallowa Falls Hydroelectric Project Tailrace (FERC No. P-308) December 18, 2017 Prepared by: Jeremiah Doyle PacifiCorp 825 NE Multnomah Street Portland, OR 97232 December 18, 2017 Page 1

More information

COA-F17-F-1343 YEAR END REPORT

COA-F17-F-1343 YEAR END REPORT DAVE MARSHALL SALMON RESERVE RESTORATION, MAINTENANCE, AND UPGRADES YEAR END REPORT Prepared for: Fish and Wildlife Compensation Program Prepared by: Edith Tobe, RPBio, Executive Director Box 1791, Squamish,

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

Cornwell brook Cornwell Manor

Cornwell brook Cornwell Manor Cornwell brook Cornwell Manor An Advisory Visit by the Wild Trout Trust February 2014 1 1. Introduction This report is the output of a Wild Trout Trust visit to a tributary of the Cornwell Brook at Cornwell

More information

Firth Creek Habitat Enhancement Project 1993

Firth Creek Habitat Enhancement Project 1993 Firth Creek Habitat Enhancement Project 1993 A. R. Langston December 1993 PWFWCP Report No. 77 The Peace/Williston Fish & Wildlife Compensation Program is a cooperative venture of BC Hydro and the provincial

More information

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Working with Grantors

Working with Grantors Working with Grantors Introduction Welcome to this Grantors Code of Practice. SSE s core purpose is to provide the energy that people need in a reliable and sustainable way. A key component of this is

More information

X coordinate. Y Coordinate. 0 UD_ Partial No. 1 Gorton Hall Drain Yes No. 2 UD_ Yes No

X coordinate. Y Coordinate. 0 UD_ Partial No. 1 Gorton Hall Drain Yes No. 2 UD_ Yes No Appendix 7 Otter Information Table A7.1 Otter Survey Results Site No. Watercourse ID X coordinate Y Coordinate Access Otter Presence 0 UD_01 240518 412322 Partial No 1 Gorton Hall Drain 239812 411376 Yes

More information

River Restoration: Culvers Island weir removals and river naturalisation project.

River Restoration: Culvers Island weir removals and river naturalisation project. River Restoration: Culvers Island weir removals and river naturalisation project. Background Chalk streams are an incredibly rare habitat on a global scale, and owing to their international importance,

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK Document Title: Work Instruction Isolation of a Water Network Document Reference: DOM-WN-WIN-00000302 Approved By: Asset Management Title: General Manager Record of Changes and Amendments Amendment No.

More information

REPORT OF PHASE 1 OF AN EASTERN TAY DISTRICT RIPARIAN SURVEY. David Summers and Robert Mitchell Tay Foundation May 2010

REPORT OF PHASE 1 OF AN EASTERN TAY DISTRICT RIPARIAN SURVEY. David Summers and Robert Mitchell Tay Foundation May 2010 REPORT OF PHASE 1 OF AN EASTERN TAY DISTRICT RIPARIAN SURVEY 1. INTRODUCTON David Summers and Robert Mitchell Tay Foundation May 2010 The eastern half of the Tay district mainly consists of arable farmland

More information

REPORT TO THE MINISTER OF NATURAL RESOURCES. Pursuant to an appointment made by the Honourable Frank S. Miller, Minister of Natural

REPORT TO THE MINISTER OF NATURAL RESOURCES. Pursuant to an appointment made by the Honourable Frank S. Miller, Minister of Natural Room 569, Fifth Floor, Mowat Block, Queen's Park, Toronto, Ontario. M7A la2 IN THE MATTER OF The Lakes and Rivers Improvement Act; AND IN THE MATTER OF An application by Rudolph Adam for approval under

More information

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 20, 2018

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 20, 2018 Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace (FERC No. P-308) December 20, 2018 Prepared by: Jeremiah Doyle PacifiCorp 825 NE Multnomah Street

More information

La Crescent Township Zoning Ordinance

La Crescent Township Zoning Ordinance La Crescent Township Zoning Ordinance Table of Contents SECTION 1 ~ PREAMBLE, TITLE, SHORT TITLE AND PURPOSE... 1 0101 Preamble... 1 0102 Title... 1 0103 Short Title... 1 0104 Purpose... 1 SECTION 2 ~

More information

Does DFO Need to Review My Project?

Does DFO Need to Review My Project? Working Together for Responsible Erosion & Sediment Control Workshop Does DFO Need to Review My Project? June 6, 2014 Fisheries Protection Program Department of Fisheries and Oceans Amendments to the Fisheries

More information

Habitat Advisory visit to the River Fergus system Co.Clare, Eire. Undertaken on behalf of Ennis and District Anglers Association, by Vaughan Lewis,

Habitat Advisory visit to the River Fergus system Co.Clare, Eire. Undertaken on behalf of Ennis and District Anglers Association, by Vaughan Lewis, Habitat Advisory visit to the River Fergus system Co.Clare, Eire. Undertaken on behalf of Ennis and District Anglers Association, by Vaughan Lewis, Windrush AEC Ltd April 2006 1.0 Introduction This report

More information

Fish population survey report

Fish population survey report Fish population survey report Upper River Avon Catchment This report provides a summary of results from recent fish population surveys on the Tetbury Avon, Sherston Avon and River Marden The surveys were

More information

MCCAW REACH RESTORATION

MCCAW REACH RESTORATION Final Report MCCAW REACH FISH RESTORATION PHASE B Jack McCaw Inland Empire Action Coalition http://www.wwccd.net/ Phone: 509-956-3777 Hours: 8:00-4:30 Walla Walla County Conservation District Snake River

More information

TAGGING IN GULF OF CARPENTARIA GILBERT RIVER TO FLINDERS RIVER

TAGGING IN GULF OF CARPENTARIA GILBERT RIVER TO FLINDERS RIVER TAGGING IN GULF OF CARPENTARIA GILBERT RIVER TO FLINDERS RIVER 1985-2014 TAGGING IN GULF OF CARPENTARIA GILBERT RIVER TO FLINDERS RIVER 1985-2014 REPORT This report has been prepared by Infofish Australia

More information

Advisory Visit. Bradshaw Brook, Lancashire. August 2010

Advisory Visit. Bradshaw Brook, Lancashire. August 2010 Advisory Visit Bradshaw Brook, Lancashire August 2010 1.0 Introduction This report is the output of a site visit undertaken by Tim Jacklin of the Wild Trout Trust to the Bradshaw Brook, Bolton, Lancashire

More information

River Don Hatchery Evaluation

River Don Hatchery Evaluation THE RIVER DON TRUST- River in harmony River Don Hatchery Evaluation Prepared by Jamie Urquhart as part of the River Don Fishery Management Plan v.1 River Don Trust November 2012 1 P a g e Contents 1. Introduction

More information

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

Project Completion Abstract Fish Passage Activity ( Engineering Activities) Project Completion Abstract Fish Passage Activity ( Engineering Activities) SUBMIT COMPLETED FORM TO DISTRICT MANAGER AND FIA ADMINISTRATOR AFTER PROJECT COMPLETION SECTION A GENERAL INFORMATION Recipient:

More information

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Kootenai River Habitat Restoration Program Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Decline of native species Kootenai River White Sturgeon ENDANGERED

More information

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries Sources of Habitat Impairment Sedimentation Channelization

More information

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project Steelhead Society of BC Presents: Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project Application for Funding December 2013 1.0 BACKGROUND

More information

Environmental Review and Permitting for Wild Trout

Environmental Review and Permitting for Wild Trout Environmental Review and Permitting for Wild Trout Tom Shervinskie Wild Trout Summit Watershed Analysis Section August 26, 2017 Division of Environmental Services The mission of the Pennsylvania Fish and

More information

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Big Spring Creek Habitat Enhancement and Fishery Management Plans Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and

More information

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors Appendix 1 Health & Safety Declaration, Roles and Responsibilities Each exhibitor and Informa appointed contractor must complete the Health and Safety Declaration form provided below to confirm they have

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

River Medway Upper Medway Fly Fishers

River Medway Upper Medway Fly Fishers River Medway Upper Medway Fly Fishers An Advisory Visit by the Wild Trout Trust April 2015 1 1. Introduction This report is the output of a site meeting and walk-over survey of a 2-km stretch of the River

More information

COLUMBIA LAKE DAM REMOVAL PROJECT

COLUMBIA LAKE DAM REMOVAL PROJECT COLUMBIA LAKE DAM REMOVAL PROJECT Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ OKANAGAN RIVER RESTORATION INITIATIVE - FAQ Initiative background: The health of the q awsitk w (Okanagan River) has been severely impacted by the channelization works that occurred in the mid-1950 s.

More information

Interim Guidance Fish Presence Absence

Interim Guidance Fish Presence Absence Interim Guidance Fish Presence Absence Source: Forest Practices Act Guidance for Division 635 of the forest practices act dealing with stream classification when no fish surveys have been done (referenced

More information

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Talk overview: Restoration projects

More information

Safe working practices to ensure the integrity of gas pipelines and associated installations

Safe working practices to ensure the integrity of gas pipelines and associated installations Safety Recommendations Founded 1863 IGE/SR/18 Edition 2 Royal Charter 1929 Communication 1678 Patron Her Majesty The Queen Safe working practices to ensure the integrity of gas pipelines and associated

More information

Design & Maintenance of Culverts

Design & Maintenance of Culverts While every effort is made to ensure that information held within this document is accurate and up to date, Croft Consultants will not be held responsible for any loss, damage, injury, or inconvenience

More information

Bogo Operations Pollution Incident Response Management Plan

Bogo Operations Pollution Incident Response Management Plan Bogo Operations Pollution Incident Response Management Plan Rhyolite Hard Rock Aggregate Quarry 134 Paynes Road BOOKHAM NSW 2582 PO Box 426 COWRA NSW 2794 p: 02 6227 7260 p: 02 6345 4253 e: info@bogoquarry.com.au

More information

Council. CNL(15)42rev. Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany)

Council. CNL(15)42rev. Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany) Agenda Item 5.2 For Information Council CNL(15)42rev Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany) CNL(15)42rev Restoration of upstream and downstream connectivity

More information

Geotechnics, Face and Stockpile Operations

Geotechnics, Face and Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face and Stockpile Operations Information Sheet 4 October 2012 Duties of the Operator This information sheet has been developed by the Quarries

More information

Nechako white sturgeon are an Endangered Species

Nechako white sturgeon are an Endangered Species Nechako white sturgeon are an Endangered Species There are likely less than 350 Nechako white sturgeon, and historically there were over 5000 in the Nechako Watershed. Endangered as per the Species at

More information

PROCEDURES FOR STANDBY

PROCEDURES FOR STANDBY 1 SCOPE This Procedure details both the circumstances in which standby shall be provided and the responsibilities borne by the Standby Man in such circumstances. 2 ISSUE RECORD This is a maintained/controlled

More information

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS On May 31, 2013 representatives from CDFW, USFWS, and NMFS went on a field tour to look at locations in

More information

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS The Monterey Peninsula Water Management District (MPWMD), in cooperation with

More information

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area Omaha Public Power District Nebraska City Station Nebraska City, Nebraska January 19, 2018 OPPD Nebraska City Station NC1 Ash Disposal Area

More information

FINAL Fish Salvage Plan for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) April 19, 2017

FINAL Fish Salvage Plan for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) April 19, 2017 FINAL for the Wallowa Falls Hydroelectric Project Tailrace (FERC No. P-308) April 19, 2017 Prepared by: Jeremiah Doyle PacifiCorp 825 NE Multnomah Street Portland, OR 97232 April 19, 2017 Page 1 of 10

More information

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Executive Summary. Map 1. The Santa Clara River watershed with topography. Santa Clara River Steelhead Trout: Assessment and Recovery Opportunities December 2005 Prepared By: Matt Stoecker and Elise Kelley, Ph.D. University of California, Santa Barbara Prepared For: The Santa

More information

Rights of Way Enforcement Procedure for Land Managers

Rights of Way Enforcement Procedure for Land Managers Rights of Way Enforcement Procedure for Land Managers November 2006 Contents 1. Introduction 2. Infringements 2.1 Disturbance to the surface of a right of way 2.2 Obstructions 2.3 Structures 3. Enforcement

More information

Safe working practices to ensure the integrity of gas assets and associated installations

Safe working practices to ensure the integrity of gas assets and associated installations Communication 1828 Safe working practices to ensure the integrity of gas assets and associated installations Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen Communication 1828 Safe working

More information

River Semington West Lavington

River Semington West Lavington River Semington West Lavington An advisory visit carried out by the Wild Trout Trust December 2009 1. Introduction This report is the output of a Wild Trout Trust advisory visit undertaken on the headwaters

More information

SALMONID FISH PASSAGES IN THE RIVERS HELGE, MÖRRUM AND EMÅN IN THE SOUTH OF SWEDEN

SALMONID FISH PASSAGES IN THE RIVERS HELGE, MÖRRUM AND EMÅN IN THE SOUTH OF SWEDEN SALMONID FISH PASSAGES IN THE RIVERS HELGE, MÖRRUM AND EMÅN IN THE SOUTH OF SWEDEN December 2006 Katrin Hammarlund INTRODUCTION One of CCB s priority working areas is protection of the naturally spawning

More information

Advisory Visit. Brailsford Brook, Derbyshire

Advisory Visit. Brailsford Brook, Derbyshire Advisory Visit Brailsford Brook, Derbyshire July 2015 1.0 Introduction This report is the output of a site visit undertaken by Tim Jacklin of the Wild Trout Trust to the Brailsford Brook, Ednaston, Derbyshire

More information

2.0 Management Systems and Documentation

2.0 Management Systems and Documentation SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This

More information

Holderness. The Three Watersheds within the Newfound Lake Drainage Dorchester. Groton Plymouth. Ashland. Hebron. Canaan. Bridgewater.

Holderness. The Three Watersheds within the Newfound Lake Drainage Dorchester. Groton Plymouth. Ashland. Hebron. Canaan. Bridgewater. Background Brook trout are the only native stream dwelling trout species in New Hampshire, having a historic range that extended from Georgia to eastern Canada. It is believed that wild brook trout were

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

NPTC LEVEL 2 AWARD IN THE SAFE USE OF PESTICIDES (QCF) UNIT PA6 HAND HELD APPLICATORS

NPTC LEVEL 2 AWARD IN THE SAFE USE OF PESTICIDES (QCF) UNIT PA6 HAND HELD APPLICATORS NPTC Registered Charity No. 1096429 ABBEY PARK, STARETON, WARWICKSHIRE, CV8 2LY Tel: 024 7685 7300 Fax: 024 7669 6128 Email: information@nptc.org.uk NPTC LEVEL 2 AWARD IN THE SAFE USE OF PESTICIDES (QCF)

More information

Michigan Department of Natural Resources Status of the Fishery Resource Report Page 1

Michigan Department of Natural Resources Status of the Fishery Resource Report Page 1 Michigan Department of Natural Resources 2008-59 Status of the Fishery Resource Report Page 1 Bowens Manistee County, (T24N R16W Sec. 11, 12, 13, 14, 15, 24, and 30). Last surveyed 2008 Mark A. Tonello

More information

FSOC Upstream Fish Passage Guidance Document

FSOC Upstream Fish Passage Guidance Document FSOC Upstream Fish Passage Guidance Document STEP 1: Identify species and life stages in need of fish passage STEP 2: Identify fishway options and species applicability STEP 3 Fish passage criteria review

More information

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT Health and Safety Policy Our Health and Safety Policy Name of Church: Address: As a church we understand that we owe a duty of care to ensure the safety

More information

Know Your River - River Ogmore Salmon and Sea Trout Catchment Summary

Know Your River - River Ogmore Salmon and Sea Trout Catchment Summary Know Your River - River Ogmore Salmon and Sea Trout Catchment Summary Introduction This report describes the status of the salmon and sea trout populations in the Ogmore catchments. Bringing together data

More information

Council CNL(15)42. Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany)

Council CNL(15)42. Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany) Agenda Item 5.2 For Information Council CNL(15)42 Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany) CNL(15)42 Restoration of upstream and downstream connectivity

More information

SUMMARY OF MOVEMENT AND HABITAT USED BY TAGGED BROOK TROUT IN THE MAIN BRANCH AND NORTH BRANCH AU SABLE RIVER DURING SUMMER Data Submitted to:

SUMMARY OF MOVEMENT AND HABITAT USED BY TAGGED BROOK TROUT IN THE MAIN BRANCH AND NORTH BRANCH AU SABLE RIVER DURING SUMMER Data Submitted to: SUMMARY OF MOVEMENT AND HABITAT USED BY TAGGED BROOK TROUT IN THE MAIN BRANCH AND NORTH BRANCH AU SABLE RIVER DURING SUMMER 2014 Data Submitted to: Anglers of the Au Sable Submitted by: Dr. Mark R. Luttenton

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mission Statement The mission of the Mid-Columbia Fisheries Enhancement Group is to restore self-sustaining

More information

The Spey Catchment Initiative

The Spey Catchment Initiative The Spey Catchment Initiative Introducing the Spey Catchment Initiative The Spey Catchment Initiative is a new project which aims to help deliver the objectives of the River Spey Catchment Management Plan

More information

SLIDE RAIL INSTALLATION GUIDE MANUFACTURE S TABULATED DATA

SLIDE RAIL INSTALLATION GUIDE MANUFACTURE S TABULATED DATA SLIDE RAIL INSTALLATION GUIDE MANUFACTURE S TABULATED DATA 3330 S. Sam Houston Pkwy Houston, Texas 77047 (713)943-0750 USA Toll Free 1-800-231-6662 Fax (713)943-8483 Www.speedshore.com PRINTED IN U.S.A.

More information

Salmon Five Point Approach restoring salmon in England

Salmon Five Point Approach restoring salmon in England Salmon Five Point Approach restoring salmon in England Our Mission To restore the abundance, diversity and resilience of salmon stocks throughout England We will do this by:- a) Maximising the production

More information

Appendix A - Management of the CMA Recommended Changes and section 32AA assessment

Appendix A - Management of the CMA Recommended Changes and section 32AA assessment Appendix A - Management of the CMA Recommended Changes and section 32AA assessment This table sets out only the provisions of the notified proposed Plan on this topic for which submissions were specifically

More information

Yours Aye Eddie. Chairman of the LLFT

Yours Aye Eddie. Chairman of the LLFT Welcome to the Loch Lomond Fisheries Trust (LLFT) second Annual Newsletter. Most of you will know the role of the Trust: we are an environmental charity which exists to champion the conservation of Loch

More information

Follow this and additional works at:

Follow this and additional works at: University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

RESPONSE TO COMMENT: 45

RESPONSE TO COMMENT: 45 45 a. 45 b. RESPONSE TO COMMENT: 45 California State Lands Commission (Stephen L. Jenkins) 45-a: The comment states that the State Lands Commission will not require a lease at this time but may require

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project The Columbia Lake dam located 1/4 mile upstream of the Paulins Kill River's confluence with the Delaware River in Knowlton Township, Warren County has been proposed for

More information

NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic Salmon Habitat

NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic Salmon Habitat NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic Salmon Habitat 1 NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic Salmon Habitat Additional copies

More information

GRAND RAPIDS RESTORATION GRAND RAPIDS REVITALIZATION

GRAND RAPIDS RESTORATION GRAND RAPIDS REVITALIZATION GRAND RAPIDS RESTORATION RETURNING THE RAPIDS TO THE GRAND WHY IS THIS PLACE CALLED GRAND RAPIDS? We have been asking for over 100- years, where are the rapids? WHY IS THIS PLACE CALLED GRAND RAPIDS? compare

More information

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work. APPENDIX G TRAFFIC CONTROL GUIDELINES FOR UTILITY WORK WITHIN ROADWAY RIGHTS- OF-WAY JUNE 2001 Scope of Guidelines These traffic control guidelines cover work performed by utility companies and/or their

More information

Definitions as used in this Subchapter:

Definitions as used in this Subchapter: 21-2 Streets and Sidewalks 21-2 STORM WATER. 21-2.01 Definitions as used in this Subchapter: The terms as used in this Subchapter are further defined in the City of Bowling Green Stormwater Best Management

More information

River Leach Cotswold Fly Fishers

River Leach Cotswold Fly Fishers River Leach Cotswold Fly Fishers A Project Proposal by the Wild Trout Trust - April 2015 1 1. Introduction This report is the output of a site visit to the River Leach on water controlled by the Cotswold

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Session C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish

Session C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Home Phone 197 Ryland St., San Jose, CA, (408) Business Address (Street, Apt., City, State, Zip Code) Description.

Home Phone 197 Ryland St., San Jose, CA, (408) Business Address (Street, Apt., City, State, Zip Code) Description. ARREST/INVESTIGATION REPORT WPD 6a (10-98) Region # NCD Page 1 X ONE X ONE TYPE OF REPORT ( X APPLICABLE) [ ] Arrest Report [X] Self Initiated [ ] Commercial Fishing [ ] Hunting [X] Inland Pollution [

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

IC Chapter 9. Regulation of Fishing

IC Chapter 9. Regulation of Fishing IC 14-22-9 Chapter 9. Regulation of Fishing IC 14-22-9-1 Unlawful means of taking fish; special permits Sec. 1. (a) Except as allowed by sections 3 and 11 of this chapter, an individual may not take fish

More information

Incorporating Geomorphic Processes and Sediment Dynamics into Salmonid Habitat Restoration Design

Incorporating Geomorphic Processes and Sediment Dynamics into Salmonid Habitat Restoration Design Salmonid Restoration Federation 35 th Annual Salmonid Restoration Conference Davis, CA Incorporating Geomorphic Processes and Sediment Dynamics into Salmonid Habitat Restoration Design Concurrent Session:

More information

Chadbourne Dam Repair and Fish Barrier

Chadbourne Dam Repair and Fish Barrier Chadbourne Dam Repair and Fish Barrier Final Report for the Western Native Trout Initiative Prepared by: Carol Endicott Yellowstone Cutthroat Trout Conservation Biologist Montana Fish, Wildlife & Parks

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 PERSONNEL DIVISION REVIEWED AUTUMN 1999 CONTENTS Page 1 INTRODUCTION 1

More information

Angling Trust East of England Fisheries Forum (Cambridge)

Angling Trust East of England Fisheries Forum (Cambridge) Angling Trust East of England Fisheries Forum (Cambridge) Chris Middleton & Kye Jerrom Fisheries, Biodiversity & Geomorphology East Anglia Area 17 November 2016 This presentation is a snap shot of where

More information

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) FACILITY OPERATOR: NextEra Energy Resources, LLC 700 Universe Boulevard Juno Beach, FL 33408 For Horizontal Directional Drilling Contents

More information

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011. Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011. Pam Harrington TU,1020 W. Main Street Suite 440, Boise,

More information

Massachusetts Stream Crossing Case Studies

Massachusetts Stream Crossing Case Studies Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people

More information

Overview of typical compensation measures and results of the monitoring campaign on the Upper Rhine at two HPPs

Overview of typical compensation measures and results of the monitoring campaign on the Upper Rhine at two HPPs Overview of typical compensation measures and results of the monitoring campaign on the Upper Rhine at two HPPs / FIThydro, Augsburg / Jochen Ulrich Overview Upper Rhine HPP Rheinfelden and Ryburg-Schwörstadt