1 Based on draft minutes Infrastructure Standards Committee 15 ovember 2017 Record of ecisions Minute o. Minutes of previous meetings 17/IS/11/184 General 17/IS/11/189 17/IS/11/ /IS/11/195 Minutes of previous meeting held on 20 September 2017 and list of actions IS SC PPROVE the minutes with COMMETS. Inquiry reports and recommendations (for noting) IS SC OTE: - RIB Report October 2017: Fatal accident at lice Holt footpath crossing, Hampshire, 05 October RIB Report October 2017: Collision with buffer stops at King s Cross station, London, 15 ugust 2017 Record of ecisions from other Standards Committees (for noting) IS SC OTE: - EE SC held on 21 September CCS SC held on 28 September RST SC held on 05 October CCS SC held on 26 October 2017 Research and evelopment (for noting) R& Reports: IS SC OTE the R& Reports: 04 October 2017 and 17 ovember C pproved / supported pproved / supported (subject to conditions) C For further information, please contact Tanyel.Mehmet@rssb.co.uk Key: eferred Rejected R For noting Withdrawn (by submitter)/ not required W *n s suffix is applied when acting as a supporting committee Page 1 of 5

2 Minute o. 17/IS/11/196 Research and evelopment (for noting) Project T1118 Optimising the sign and position of platform markings designed to keep people away from the platform edge Presentation: IS SC OTE Project T1118. European delegate reports for noting 17/IS/11/ IS SC OTE the three reports from the previous meeting: - CE TC 256 WG6 erodynamics meeting held on September in Oulu, Finland - BSI RE/1/-8_17_0024 WG10 meeting held on September 2017, Krefeld, Germany - BSI RE/1_17_0362 BS EH/1/2 Scoping Panel Meeting Project: E oise Emissions EW BS Calculation of Road and Railway oise held on October 2017, London and Chiswick, UK. evelopment of Technical Specification for Interoperability (TSIs) and Euronorms (Es) Consultations one. 17/IS/11/201 17/IS/11/202 London to Corby (L2C) Stations Presentation IS SC OTE the presentation. ORR Presentation IS SC OTE the presentation. Changes to Railway Group Standards: ew Proposals 17/IS/11/203 Project RIS-0796-CCS issue one Train to Infrastructure RFI Compatibility (Post Consultation) (Lead Committee: Control Command and Signalling) IS SC made the following decisions: - COMMETE on the proposed responses to comments received during consultation - SUPPORTE without modification the proposed responses - SUPPORTE that the proposed new RIS-0796-CCS delivers the intention of the proposal - SUPPORTE the proposed new RIS-0796-CCS issue one for publication - SUPPORTE the proposed impact assessment - SUPPORTE the proposed briefing note. S Page 2 of 5

3 Minute o. 17/IS/11/204 17/IS/11/205 17/IS/11/206 Project Case for Change Revision of RIS-2703-RST Issue one OO CCTV on Train Camera Monitors (Lead Committee: Rolling Stock) IS SC made the following decisions: - ECIE on the proposal for change - ECIE that all of RIS-2703-RST issue 1 should be subject to the change process - ECIE they will consider this work further at pre-consultation. Project Update of GERT8270 Issue 3 ssessment of Route Compatibility of Vehicles and Infrastructure as a RIS (Lead Committee: Rolling Stock) IS SC made the following decisions: - OTE the work done in accordance with the agreed strategy resulting in production of RIS-8270-RST issue one draft 1b - ECIE that RIS-8270-RST issue one draft 1b delivers the intention of the project - ECIE that RSSB s Impact ssessment draft 1b has correctly set out the predicted impacts - IETIFIE specific organisations or individuals to be included in the consultation - SUGGESTE a full consultation - OTE the progress against each of the items on the appended list of actions - VISE they wish to be included at post-consultation stage, i.e. ecision on draft consultation responses and publication. The 12 month review of the Gauging Standards (Lead Committee: Infrastructure and Rolling Stock) IS SC made the following decisions: - COMMETE on the review - PPROVE the recommendation. S S Changes to Railway Group Standards: Project updates and approvals 17/IS/11/207 17/IS/11/208 Standards Programme Update (for noting) IS SC OTE the updated. Review of Guidance ote (G) GIG7608 issue two Guidance on the Infrastructure Technical Specification for Interoperability IS SC made the following decisions: - COMMETE on the review - PPROVE the recommendation. Page 3 of 5

4 Minute o. 17/IS/11/209 Project Withdraw GIRT7019 and review GIG7619 to align with SRT TSI The project was withdrawn. W Changes to Railway Group Standards: Final approval one. eviations against Railway Group Standards: ew applications 17/IS/11/210 17/IS/11/ EV Liverpool Lime Street Station; Overhead Line Electrification (OLE) anchor structures; Re-numbered platforms 1 to 5 and new platforms 7 & 8 (for approval) [GIRT7016 Interface between Station Platforms, Track and Trains] pplicant: etwork Rail The application sought a deviation against clause of the standard. Section refers to new structures, including buildings and columns supporting canopies which cannot be located within the overrun risk zone, extending 20 m behind the face of the buffer stop and 5 m either side of the projected centre line of the track approaching the buffer stop. This is referred to in clause and clause as the overrun risk zone. The scope of the deviation was to remodel and resignal Liverpool Lime Street Station, with the control area transferring to the Liverpool Workstation within the Manchester Rail Operating Centre (MROC). IS SC PPROVE EV EV Cheltenham Spa Station Gauge Clearance and coper realignment (for approval) [GIRT7016 Interface between Station Platforms, Track and Trains] pplicant: etwork Rail The application sought a deviation against clause of the standard. Section refers to new platforms or a platform subject to alteration (as defined), a recess with a minimum width of 300 mm and minimum height of 480 mm measured from rail level, which shall be formed underneath the platform edge. The recess shall be kept clear of cables and other obstructions. The scope of the deviation was part of the Great Western programme of works, responsible for providing route clearance for new trains (IET) and also trains which are moved from one part of the network and introduced to another. IS SC PPROVE WITH COMMET EV, subject to the applicants providing the correct letters of support from the associated TOCs. C Page 4 of 5

5 Minute o. eviations against Railway Group Standards: Update on previous applications (for approval) 17/IS/11/ EV Teignmouth Saunders Overbridge on ML1 at 208m 61ch IS SC EFERRE EV on the basis that the applicants have not supplied an illustration of their understanding of the associated risks and costs. The applicants are required to provide a full risk assessment of the railway in the localised environment as a whole, as opposed to only the platform area. eviations against Railway Group Standards: Time limited applications approved outside Committee 17/IS/11/213 ny other business EV Great Eastern Stations: on-compliant usable platform widths IS SC OTE EV. 17/IS/11/214 Request for help from RSSB with Standards and ational Operations Publications (Including RGSs, RISs, OPs and s) [17-REQ-071] IS SC EFERRE 17-REQ-071. ate of next meeting 25 January 2018 Page 5 of 5

Lineside Signalling Layout Driveability Assessment Requirements

Lineside Signalling Layout Driveability Assessment Requirements Document supersedes Iss 1 (to correct formatting) and supersedes in part GERT8071 Iss 2, Lineside Signalling Layout Driveability Assessment Requirements Synopsis This document sets out requirements for

More information

Lineside Signalling Layout Driveability Assessment Requirements

Lineside Signalling Layout Driveability Assessment Requirements Superseded by Iss 1.1 (to correct formatting) Lineside Signalling Layout Driveability Assessment Requirements Synopsis This document sets out requirements for assessing the driveability of lineside signalling

More information

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls Recommendations for the Risk Assessment of Buffer Stops and End Synopsis This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

Deviation from a Railway Group Standard

Deviation from a Railway Group Standard Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7 and the Standards Manual, part 16) Deviation number: 16-007-DEV 1. Problem statement Network

More information

Guidance on Risk Evaluation and Risk Acceptance

Guidance on Risk Evaluation and Risk Acceptance GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8643 Issue Two: June 2014 Rail Industry Guidance Note Issue record Issue

More information

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Synopsis This document sets out the design, construction and maintenance requirements for means of access onto, along

More information

Rail Safety and Standards Board

Rail Safety and Standards Board Rail Safety and Standards Board Certificate of Derogation from a Railway Group Standard (under 8.3 of the Railway Group Standards Code) Derogation Number: Applicant: Subject Matter of Derogation: RGS Number:

More information

Safer Verges and the Strategic Road Network

Safer Verges and the Strategic Road Network Safer Verges and the Strategic Road Network Gavin Williams Senior Technical Advisor Vehicle Restraints Outline The Journey from Highways Agency to Highway England Overview of the Highways England Health

More information

Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016

Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016 Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016 Frequently Asked Questions Background Level crossings are the main interface between the rail network and road, footpath and bridleway networks.

More information

M&EE Networking Group

M&EE Networking Group Superseded by COP0024 Iss 5 on 05/12/2015 COP0024 Issue 4 March 2014 Code of Practice for Use and Loading of MEWPs M&EE Networking Group No COP0024 Superseded M&EE by Networking COP0024 Iss Group 5 on

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Establishing Minimum Protective Measures at Level Crossings ETF-16-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Establishing Minimum Protective Measures at Level Crossings ETF-16-01 Discipline Engineering Specification Category Supplementary Appendix to ARTC Code of Practice Establishing Minimum Protective Measures at Level Crossings Applicability ARTC Network wide New South Wales

More information

Enabling Magnetic Track Brakes on GB Mainline Rail

Enabling Magnetic Track Brakes on GB Mainline Rail Enabling Magnetic Track Brakes on GB Mainline Rail RSSB Research Project T1099 Presentation to V/T SIC Annual Seminar, 31 st January 2017 Liam Purcell, Senior Consultant, Ricardo Rail Introduction: What

More information

Steve Laffey Railroad Safety Specialist Illinois Commerce Commission.

Steve Laffey Railroad Safety Specialist Illinois Commerce Commission. Steve Laffey Railroad Safety Specialist Illinois Commerce Commission slaffey@icc.illinois.gov 1. International Benchmarking & Best Practices 2. SELCAT 3. ELCF 4. RESTRAIL 5. ILCAD 6. GLXS Data Item 2010

More information

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book GERT8000-TS10 Rule Book ERTMS level 2 train signalling s Issue 4 Module TS10 September 2018 Comes into force 01 December 2018 Conventions used in the Rule Book A black line in the margin indicates a change

More information

Controlling the Speed of Tilting Trains through Curves

Controlling the Speed of Tilting Trains through Curves Rail Industry Standard RIS-8012-CCS Date September 2017 Controlling the Speed of Tilting Trains through Curves Synopsis This document sets out the means by which tilting trains may be operated at higher

More information

M&EE Networking Group

M&EE Networking Group Supersedes COP0011 Iss 2 on 03/03/2012 Superseded by COP0011 Iss 4 on 05/12/2015 COP0011 Issue 3 November 2011 Code of Practice for Planning and Executing Lifting Operations M&EE Networking Group No COP0011

More information

Automatic Warning System (AWS)

Automatic Warning System (AWS) Automatic Warning System Synopsis This document defines the functional, performance and application requirements for the Automatic Warning System. [This document contains one or more pages which contain

More information

2017 MSA Safety Delegate Report

2017 MSA Safety Delegate Report Name of the Rally Organising Club Date Name of the Safety Delegate 2017 MSA Safety Delegate Report SUBJECT No. of evaluations made A C B U 1. Organisation 0 0 0 0 2. Route & Service Area 0 0 0 0 3. Safety

More information

Frontal collision of buses

Frontal collision of buses Transmitted by the expert from Hungary Informal document No. 927 (92 nd, 1620 April 2007 agenda item 2.2.7.) Frontal collision of buses 1. On the 84 th session of the Spanish delegate raised the problem

More information

INTERIM ADVICE NOTE 188/16

INTERIM ADVICE NOTE 188/16 INTERIM ADVICE NOTE 188/16 Guidance on Omission of Warning Lights (Road Danger Lamps) for Relaxation Works on Dual Carriageways Summary Guidance for omission of warning lights (road danger lamps) in temporary

More information

Government transport policy

Government transport policy Government transport policy and the implications for planning RTPI TPS Transport Planning Network James Harris P o l i c y a n d N e t w o r k s M a n a g e r R o y a l To w n P l a n n i n g I n s t i

More information

Taking Safe Decisions and the CSM on Risk Evaluation and Assessment. George Bearfield Head of Safety Knowledge and Planning RSSB

Taking Safe Decisions and the CSM on Risk Evaluation and Assessment. George Bearfield Head of Safety Knowledge and Planning RSSB Taking Safe Decisions and the CSM on Risk Evaluation and Assessment George Bearfield Head of Safety Knowledge and Planning RSSB 2008 1974 Taking Safe Decisions in the GB Railway Health and Safety at Work

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

Guidance Note: Prevention and Mitigation of Overruns Risk Assessment

Guidance Note: Prevention and Mitigation of Overruns Risk Assessment Guidance Note: Prevention and Mitigation of Overruns Risk Assessment Synopsis This document provides guidance on meeting the requirements of Railway Group Standard GI/RT7006. Signatures removed from electronic

More information

1. Describe health and safety hazards on the rail network. 2. Describe how to manage a health and safety hazard on the rail network.

1. Describe health and safety hazards on the rail network. 2. Describe how to manage a health and safety hazard on the rail network. Lesson 1 Bringing in ideas about physical activity Students explore the physical activity of people in and around the rail network. They investigate risks to the health and wellbeing of people moving in

More information

What actions next for G9? 2015 work programme

What actions next for G9? 2015 work programme What actions next for G9? 2015 work programme Stephen Rose Head of Offshore Wind Generation, SSE G9 Focal Group Leader New workstreams Heli Ops Diving Ops Data collection 2015 stakeholder engagement Guideline

More information

Guildford Borough (Draft)

Guildford Borough (Draft) ITEM Annex Page 7 Guildford Borough (Draft) Forward Programme Part A This is a work in progress and its completion is subject to the adoption of the Local Plan and Infrastructure Delivery Schedule November

More information

Capacity of transport infrastructure networks

Capacity of transport infrastructure networks Most infrastructure extension work is concentrated on roads. The total length of the motorway network has increased dramatically during the past two decades (about 3 % per year). Construction of the high-speed

More information

SAEMA Document No. SDN Original Issue Date: April 2017 Revision Reference: Revision Date: Not later than end of April 2019

SAEMA Document No. SDN Original Issue Date: April 2017 Revision Reference: Revision Date: Not later than end of April 2019 ------------------------------------------------------------------------------------------------------------------------------------- SAEMA Document No. SDN. 14000 Original Issue Date: April 2017 Revision

More information

Exeter Flood Defence Scheme

Exeter Flood Defence Scheme Exeter Flood Defence Scheme CECA South West Member s Presentation 30th November 2016 Tristan Bassett Commercial Services Manager, EA Don Higgs Framework Manager, BMM JV Update Covering.. Why we re Building

More information

THE WIVENHOE SOCIETY

THE WIVENHOE SOCIETY THE WIVENHOE SOCIETY 4th July 2017 To: The Secretary of State for Transport, Transport and Works Act Orders Unit, Department for Transport, Zone 1/14, Great Minster House, 33 Horseferry Road. London SW1P

More information

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169 Styal Golf Course Accommodation Works Non-Technical Summary 1007/6.15.2/169 September 2013 Document Control Sheet Project Title: Styal Golf Course Report Title: Non Technical Summary Document No: 1032775.014.001

More information

Significant Accidents 2016 Public Report

Significant Accidents 2016 Public Report UIC Safety Report 2017 Significant Accidents 2016 Public Report Department of Fundamental Values Safety Unit October 2017 ISBN 978-2-7461-2649-7 Warning No part of this publication may be copied, reproduced

More information

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE 165 14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE General Manager responsible: General Manager City Environment, DDI 941-8528 Officer responsible: Transport and Greenspace Unit Manager

More information

Frequently asked questions (FAQ) about a borough-wide 20 mph speed limit

Frequently asked questions (FAQ) about a borough-wide 20 mph speed limit Frequently asked questions (FAQ) about a borough-wide 20 mph speed limit February 2013 1. Is it safer to drive at 20 mph? Yes. According the Royal Society for Prevention of Accidents (RoSPA) if a pedestrian

More information

INFORMATION SHEET 7 AN OPERATORS GUIDE TO BS EN 14960

INFORMATION SHEET 7 AN OPERATORS GUIDE TO BS EN 14960 INFORMATION SHEET 7 AN OPERATORS GUIDE TO BS EN 14960 Since 2002 there has been numerous discussions surrounding the PIPA testing scheme. Some operators have accepted the scheme others remain hostile towards

More information

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000 National Cycle Network Funding Scheme 2012/2012 Application Form Section 1:Project Outline Name and Address of Local Authority Contact person/proposed project manager Waterford City Council Paul Cleary,

More information

Polish-Nordic Road Forum/3rd 26/10/2017 Vilnius

Polish-Nordic Road Forum/3rd 26/10/2017 Vilnius Polish-Nordic Road Forum/3rd 26/10/2017 Vilnius LITHUANIAN STEPS IN IMPLEMENTING ZERO VISION 4-6/June/2018 SOPOT Dovilė Krasauskaitė Head of Traffic Safety and Environmental Protection Division Lithuanian

More information

David Robertson PO Box Office of Rail Regulation One Kemble Street London, WC2B 4AN 1 st May 2012

David Robertson PO Box Office of Rail Regulation One Kemble Street London, WC2B 4AN 1 st May 2012 David Robertson PO Box 4323 Head of Track Access Birmingham Office of Rail Regulation B2 4JB One Kemble Street London, WC2B 4AN 1 st May 2012 Dear David, Re: London and Birmingham Railway Limited 30 th

More information

Evening Seminar on Air Quality and the Government s NO 2 strategy

Evening Seminar on Air Quality and the Government s NO 2 strategy Evening Seminar on Air Quality and the Government s NO 2 strategy In support of World Environmental Health Day 26 September 2017 Running Order Welcome and Introductions Brief speaker presentations Open

More information

Appendix FRANCE Annecy Tunnel Courier

Appendix FRANCE Annecy Tunnel Courier Appendix 2.7 - FRANCE Annecy Tunnel Courier 1. TRANSIT TUNNEL AND ACCESS TO UNDERGROUND PARKING LOTS The Courier tunnel is located in Annecy (France), a city of about 55,000 inhabitants and the centre

More information

Cross Industry collaboration to control the risk of freight wagon derailment

Cross Industry collaboration to control the risk of freight wagon derailment Dallas, 2015 Cross Industry collaboration to control the risk of freight wagon derailment Dr Gareth Tucker 9/11/17 Institute of Railway Research Have a strategic partnership with RSSB (currently in contract

More information

London Safety Camera Partnership

London Safety Camera Partnership London Safety Camera Partnership Between 2001 and 2003 over 17,000 speed related collisions occurred in London, of which 2,000 people lost their lives or were seriously injured. Excessive and inappropriate

More information

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014 GE/RT8000/TS8 Rule Book Module TS8 One-train working s Issue 4 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved by Traffic

More information

Selection Process for Great Britain Olympic Curling Team (Men s and Women s) 2018 Winter Olympic Games Pyeongchang, South Korea

Selection Process for Great Britain Olympic Curling Team (Men s and Women s) 2018 Winter Olympic Games Pyeongchang, South Korea Selection Process for Great Britain Olympic Curling Team (Men s and Women s) 2018 Winter Olympic Games Pyeongchang, South Korea Introduction All athletes wishing to be considered for selection to Team

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/026 Rebuttal THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 REBUTTAL PROOF BY MR PAUL

More information

GERM8000. Rule Book. Possession Workers Manual. Published by Rail Safety and Standards Board Limited

GERM8000. Rule Book. Possession Workers Manual. Published by Rail Safety and Standards Board Limited GERM8000 Rule Book Possession Workers Manual Published by Rail Safety and Standards Board Limited POSSESSION WORKERS MANUAL GERM8000/possessionworkers RSSB has produced this manual to provide end-users

More information

Safe Speed programme ATTACHMENT 1. Randhir Karma, Group Manager Network Management and Safety

Safe Speed programme ATTACHMENT 1. Randhir Karma, Group Manager Network Management and Safety Safe Speed programme ATTACHMENT 1 Randhir Karma, Group Manager Network Management and Safety 1 Why Safe Speeds? AT s strategic context National guidance AT has embraced Vision Zero principles and recognises

More information

A5.1 Permitted activities

A5.1 Permitted activities Section A5 Transportation A5.1 Permitted activities A5.1.1 Activities within roads Note: Refer to Section D for the definition of road (a) Any activity associated with the movement of traffic and the functioning

More information

Road safety at road and rail interface

Road safety at road and rail interface Hellenic Road Safety Institute R.S.I. Panos Mylonas 5th edition of ILCAD hosted by UNECE in the framework of the 2 nd United Nations Global Road Safety Week Road safety at road and rail interface Vassiliki

More information

Review of Guidelines for Cycleway Safety Fencing

Review of Guidelines for Cycleway Safety Fencing Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Rerailing Precautions to be Taken Reference Number SMP 26 (RIC Standard: SC 00 52 00 26 SI) Document Control Status Date Prepared Reviewed

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

Guidance on Minor Improvements to National Roads (Including Erratum No. 1)

Guidance on Minor Improvements to National Roads (Including Erratum No. 1) Volume 6 Section 1 Part 1 NRA TA 85/11 Guidance on Minor Improvements to National Roads November 2011 (Including Erratum No. 1, February 2012) St. Martin s House, Waterloo Road, Dublin 4. Tel:+353 1 660

More information

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles

More information

Scotland s consultancy for sustainable transport.

Scotland s consultancy for sustainable transport. Scotland s consultancy for sustainable transport. Transform Consulting is Scotland s specialist research and communications consultancy for sustainable transport. Our work ranges from walking, cycling

More information

Design and Installation of Low Level Cycle Signals

Design and Installation of Low Level Cycle Signals Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1

More information

Operation and safety of tramways in interaction with public space. COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha

Operation and safety of tramways in interaction with public space. COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha Operation and safety of tramways in interaction with public space COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha Introduction The COST Action TU1103 deals with the improvement

More information

Stoke Mandeville Parish Council 17 April 2018

Stoke Mandeville Parish Council 17 April 2018 Stoke Mandeville Parish Council 17 April 2018 Stoke Mandeville Parish Council 1 Introductions 2 Construction Approach 3 MWCC in Stoke Mandeville 4 Future Engagement Introduction HS2 Phase One Delivery

More information

Seal Extension Guidelines. Asset Management and Systems

Seal Extension Guidelines. Asset Management and Systems Seal Extension Guidelines 1. Guideline Definitions AADT - Annual Average Daily Traffic is measured at regular annual (or greater) intervals and adjusted for seasonal effects, using an approved traffic

More information

Findings on the Effectiveness of Intersection Treatments included in the Victorian Statewide Accident Black Spot Program

Findings on the Effectiveness of Intersection Treatments included in the Victorian Statewide Accident Black Spot Program Findings on the Effectiveness of Intersection Treatments included in the Victorian Statewide Accident Black Spot Program Nimmi Candappa, Jim Scully, Stuart Newstead and Bruce Corben, Monash University

More information

Local Highway Panels Members Guide. 9 Public Rights of Way

Local Highway Panels Members Guide. 9 Public Rights of Way Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.

More information

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS BRITISH STANDARD BS 341-4:2004 Transportable gas container valves Part 4: Pressure relief devices ICS 23.060.40 This British Standard, having been prepared under the direction of the Standards Policy and

More information

Frequently Asked Questions (FAQ) on Refresher trainings and Certificates of Proficiency

Frequently Asked Questions (FAQ) on Refresher trainings and Certificates of Proficiency Frequently Asked Questions (FAQ) on Refresher trainings and Certificates of Proficiency Note: The information provided in this document is subject to change Personnel on board vessels others than fishings

More information

Dockless Cycle Share

Dockless Cycle Share Dockless Cycle Share Code of Practice December 2017 135 Albert Street Private Bag 92300, Auckland 1142 aucklandcouncil.govt.nz Ph 09 301 0101 1. Introduction Auckland has seen a significant increase in

More information

The British Amateur Boxing Association Limited Simpson Thacher, City Point, One Ropemaker Street, London, EC2Y 9HU Tuesday 22 nd November 2016

The British Amateur Boxing Association Limited Simpson Thacher, City Point, One Ropemaker Street, London, EC2Y 9HU Tuesday 22 nd November 2016 The British Amateur Boxing Association Limited Simpson Thacher, City Point, One Ropemaker Street, London, EC2Y 9HU 11.00 Tuesday 22 nd November 2016 Board meeting minutes In attendance Steven Esom (BABA

More information

Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain

Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain 1 Level Crossing Facts (Great Britain) Over 7000 in active use

More information

WORK-RELATED ROAD SAFETY

WORK-RELATED ROAD SAFETY WORK-RELATED ROAD SAFETY UGT DE CATALUNYA (labour union) Barcelona, 15 May 2014 VI INTERNATIONAL CONFERENCE ON EUROPEAN ROAD POLICIES UGT de Catalunya GENERAL CONSIDERATIONS ON MOBILITY: The current model,

More information

a CYCLING ACTION PROGRESS MEETING

a CYCLING ACTION PROGRESS MEETING a CYCLING ACTION PROGRESS MEETING 9 TH APRIL 2013 Present: Apologies: Chris Vinestock (CCS Transportation, Head of Service) Cllr Nick Davies (CCS Cycle Forum Designate) Ben George (CCS Transport Strategy)

More information

OFFSHORE WIND: A CRASH COURSE

OFFSHORE WIND: A CRASH COURSE OFFSHORE WIND: A CRASH COURSE OFFSHORE WIND: DEFINED OFFSHORE WIND: Construction of wind farms in bodies of water to generate electricity from wind. Unlike the typical usage of the term offshore in the

More information

Traffic Sensitive Streets. Guidance Notes. GeoPlace Streets Team. Traffic Sensitive Streets. Guidance Note Page 1 of 7.

Traffic Sensitive Streets. Guidance Notes. GeoPlace Streets Team. Traffic Sensitive Streets. Guidance Note Page 1 of 7. Guidance Notes GeoPlace Streets Team Guidance Note Page 1 of 7 Introduction The guidance note provides information on the definition, role and value of. It will also focus on how and why Traffic Sensitive

More information

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book GERT8000-HB12 Rule Book Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession Issue 6 September 2017 Comes into force 02 December 2017 Handbook 12 Uncontrolled when printed

More information

Zlatko Krstulich, P.Eng. City of O9awa

Zlatko Krstulich, P.Eng. City of O9awa Zlatko Krstulich, P.Eng. City of O9awa 1. Introduction to the Ontario Traffic Manual Series 2. What is OTM Book 18: Bicycle Facilities? 3. Study / Committee Team Members 4. Brief overview of the content

More information

POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS

POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS Effective January 1, 2017 PLAN SUBMITTAL Any person proposing to renovate, replaster, reconstruct or alter a public pool or its ancillary facilities,

More information

MOVEMENT: the Bicycle

MOVEMENT: the Bicycle Published on THE SOUTH AFRICAN INFORMAL CITY (http://informalcity.co.za) Home > Seminar > Movement > The Bicycle MOVEMENT: the Bicycle Andrew M Wheeldon, MSc Bicycling Empowerment Network www.benbikes.org.za

More information

Integrated Pedestrian Simulation in VISSIM

Integrated Pedestrian Simulation in VISSIM Integrated Pedestrian Simulation in VISSIM PTV worldwide MUGS Conference October 30-31, 2008 Wellington Founded > 1979 30 years fast approaching Employees > Approximately 800 persons in the PTV Group worldwide

More information

MANAGING POLICY INTERACTION WITH THE EU ETS 27 September Alex Luta

MANAGING POLICY INTERACTION WITH THE EU ETS 27 September Alex Luta MANAGING POLICY INTERACTION WITH THE EU ETS 27 September 2017 Alex Luta PÖYRY IN BRIEF CARBON FORWARD: ETS POLICY OVERLAP MECHANISM 2 2008 2011 2014 2017 2020 2023 2026 2029 Million EUAs NEED FOR STEADINESS

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Heat Recovery Steam Generators Jeanne Moreau DATE: April 23, 2010 SUBJECT: NFPA 85 F10 ROC Letter Ballot The ROC letter ballot

More information

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure 18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related

More information

High Visibility Clothing

High Visibility Clothing High Visibility Clothing Synopsis This document sets out the minimum specification for high visibility warning clothing. Submitted by Elizabeth Fleming Standards Project Manager Authorised by Brian Alston

More information

SARA 006:2012 Edition 1

SARA 006:2012 Edition 1 SARA 006:2012 Sheet 9.6 W361-electrical-shock warning sign Minimum Speed V (km/h) H (mm) W (mm) V d 60 600 450 60 > V > 100 900 675 V e 100 1 200 900 V = 0 450 340 Overhead sign 1 600 1 200 Class 2A: Yield

More information

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009 Van Ness Avenue BRT Overview and Scoping Process Geary BRT CAC January 8, 2009 VAN NESS AVENUE S ROLE Identified in Prop K for BRT treatment Muni 47 and 49; 19 operates on Polk 20,000 daily riders on Van

More information

SUMMARY OF SAFETY INVESTIGATION REPORT

SUMMARY OF SAFETY INVESTIGATION REPORT Investigation Body for Railway Accidents and Incidents SUMMARY OF SAFETY INVESTIGATION REPORT COLLISION OF TWO PASSENGER TRAINS IN BUIZINGEN ON 15 FEBRUARY 2010 May 2012 On Monday 15 February 2010 at 08:28:19,

More information

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access The replacement of the George Washington Bridge suspender ropes is part of the

More information

George Street Concept Design

George Street Concept Design George Street Concept Design City of Sydney with Gehl Architects This document sets out the design principles that will guide the detailed design of George Street. It outlines strategies and concepts for

More information

The Safe System Approach

The Safe System Approach There are very few areas of public discussion and sentiment which generate as much consensus as road safety. Everyone wants safer roads for all users, and road safety is a key priority for governments,

More information

ROAD SAFETY AT WORK: THE PRAISE PROJECT & Good practice in the workplace Examples from Transport for London and BT

ROAD SAFETY AT WORK: THE PRAISE PROJECT & Good practice in the workplace Examples from Transport for London and BT ROAD SAFETY AT WORK: THE PRAISE PROJECT & Good practice in the workplace Examples from Transport for London and BT Madrid, November 2016 Luana Bidasca Project Manager European Transport Safety Council

More information

DEVELOPMENT OF A CYCLIST-AEB TESTING SYSTEM. CATS - Sjef van Montfort, TNO

DEVELOPMENT OF A CYCLIST-AEB TESTING SYSTEM. CATS - Sjef van Montfort, TNO DEVELOPMENT OF A CYCLIST-AEB TESTING SYSTEM CATS - Sjef van Montfort, TNO OUTLINE Introduction CATS project: Objectives & timing Process Accident analysis Test scenario definition Dummy & Propulsion system

More information

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16 UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit www.ukcg.org Page 1 of 16 Contents Foreword Reference Material Initial Considerations Planning and Preparation for MEWP Activities

More information

Accident Precursor Monitoring in Metro Railways

Accident Precursor Monitoring in Metro Railways Accident Precursor Monitoring in Metro Railways Workshop on accident/ incident precursor analysis in air transport and railways Imperial College, 9 February 2006 The data and sponsors: the and Nova groups

More information

Safety of Decommissioning: International Cooperation under the IAEA Coordination

Safety of Decommissioning: International Cooperation under the IAEA Coordination Safety of Decommissioning: International Cooperation under the IAEA Coordination Vladan Ljubenov WM 09, Session 68 - Panel discussion IAEA Mission The IAEA serves as an intergovernmental forum for scientific

More information

Changes to EN388 and what new glove markings will mean

Changes to EN388 and what new glove markings will mean Changes to EN388 and what new glove markings will mean Changes to EN388 and what new glove markings will mean The Coupe test has been revised, limiting the maximum number of passes the blade makes to 60

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

THE DEVELOPMENT OF MALAYSIAN HIGHWAY RAIL LEVEL CROSSING SAFETY SYSTEMS: A PROPOSED RESEARCH FRAMEWORK. Siti Zaharah Ishak

THE DEVELOPMENT OF MALAYSIAN HIGHWAY RAIL LEVEL CROSSING SAFETY SYSTEMS: A PROPOSED RESEARCH FRAMEWORK. Siti Zaharah Ishak THE DEVELOPMENT OF MALAYSIAN HIGHWAY RAIL LEVEL CROSSING SAFETY SYSTEMS: A PROPOSED RESEARCH FRAMEWORK Siti Zaharah Ishak Transport System Centre, School of Natural & Built Environments, University Of

More information