SECTION P4 SEPARATION SYSTEMS

Size: px
Start display at page:

Download "SECTION P4 SEPARATION SYSTEMS"

Transcription

1 SEPARATION SYSTEMS The platform has a Separation System which consists of a Test Separator (MBD-100). The gas, oil and water discharges to the Departing Bulk Oil Pipeline (KAH-1200). Rev: 1 Date: 7/31/12 Page 1 of 5 HI 376 C

2 A. PRE-STARTUP PROCEDURE NOTICE: Refer to Preliminary Considerations in SECTION 3, PART A before beginning any start-up procedures. 1. Test Separator, MBD-100 a. Verify all vent and drain valves throughout the system are closed NOTICE: Any vessel purging should be done prior to getting system ready for start-up. b. Verify manual valves are open or closed as necessary to correctly direct flow through the system c. Verify that all liquid level controllers, pressure controllers and control valves are in-service and prepared for flow Gas discharge PC/PCV Liquid dump LC/LCVs Rev: 1 Date: 7/31/12 Page 2 of 5 HI 376 C

3 B. START-UP PROCEDURES 1. Test Separator, MBD-100 a. Verify that no safety devices are bypassed beyond those that must be bypassed for start-up (flag device as appropriate) on the Operator Interface b. Press the Well Enable tag for the desired well to be tested c. Verify liquid LCV settings d. Monitor and place safety devices in service as they clear e. Visually verify operating parameters for vessel as production is brought on WARNING: Any operating parameter that is monitored by a safety device must be continuously monitored at all times while the safety device(s) are in bypass. The bypassed safety devices (indicators) must be flagged while in bypass and reset as they come in-service. REFER TO: Section 3 Part A for further details on bypassed devices. 2. Continue to monitor bypassed safety devices and reset as they come in service 3. Immediately begin using Normal Operating Procedures to continue monitoring system REFER TO: SECTION 5, PART D Rev: 1 Date: 7/31/12 Page 3 of 5 HI 376 C

4 C. SHUT-DOWN PROCEDURES WARNING: If complete process shut-down is required in order to shutdown the desired separation system, REFER TO: SECTION 4 NOTICE: Refer to Preliminary Considerations in SECTION 4, PART A before beginning any shut-down procedures. 1. Shut-down and isolate minor components that discharge to the separation system, and are not capable of being diverted to another separation system a. Manually activate the liquid dump to lower the vessel liquid level. Use caution not to lower the level far enough to trip the LSL (if applicable) b. Use LO/TO procedure to shut-down and isolate liquid dump from discharging to separation system WARNING: The Separation System must be returned to service to accept discharge before high liquid level or additional shutdowns will be required. 2. Place the separation system safety devices that are likely to trip and cause a process shutdown in bypass and flag WARNING: Any operating parameter that is monitored by a safety device must be continuously monitored at all times while the safety device(s) are in bypass. The bypassed safety devices (indicators) must be flagged while in bypass and reset as they come in-service. REFER TO: Section 3 Part A for further details on bypassed devices. 3. If possible, divert flow from inputs to alternate systems WARNING: The capacity of any alternate system should be verified before adding any additional inflow. a. Open the manual valve to divert flow to alternate system b. Slowly close manual valve to isolate flow away from separation system to be shutdown c. Monitor system accepting diverted flow to ensure operation within safe parameters Will level or pressure control devices require adjustment? Will new operating ranges need to be established? Rev: 1 Date: 7/31/12 Page 4 of 5 HI 376 C

5 4. If necessary, manually activate liquid dumps in separation system vessels before isolating all system input CAUTION: Pay special attention to the levels in the minor components that were isolated and/or shutdown, the liquids dumped from this separation systems before final shut-down may have an effect on the liquids sent to those vessels later. 5. Shut-down facility inputs that flow to the separation system and will not be diverted a. Platform Wells REFER TO: SECTION P1, PART C 6. Isolate the separation system a. Close all inlet manual valves to separation system b. Close gas discharge manual valves from system components c. Close oil dump manual valves from system components d. Close water dump manual valves from system components 7. Flag shut-down components as Out of Service 8. Open the manual gas relief/vent valve to bleed components to the relief system 9. Open the manual liquid drain valve to drain remaining liquid 10. Verify components are bled to 0 psig 11. Continue to monitor the other in service systems for safe operating parameters 12. Continue to monitor liquid level in other minor isolated components so appropriate action can be taken as necessary NOTICE: If shut-down was performed as preparation for maintenance work, or if the cause of the shutdown requires corrective action/repair, continue with Lock Out/Tag Out (LO/TO) Procedures REFER TO: Fieldwood Safe Work Practices for LO/TO (Section D Chapter 5) (can be found on the Fieldwood SEMS Portal) Rev: 1 Date: 7/31/12 Page 5 of 5 HI 376 C

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS SEPARATION SYSTEMS The #1 Separator, MBD-0100 is a 3-phase separator which receives flow from the Incoming Pipeline, KAQ 0290. Gas from the Separator is directed to Fuel Gas Scrubber, and Gas Compressor

More information

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501). SEPARATION SYSTEMS The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501). The Header System is designed to collect and direct the well stream to the corresponding

More information

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS SEPARATION SYSTEMS The H.P. Separation System begins with the H.P. Production Header (GAY-1000). This header directs flow to the H.P. Production Separator (MBD-1000). Gases from the H.P. Production Separator

More information

SEPARATION SYSTEMS. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is

SEPARATION SYSTEMS. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is SEPARATION SYSTEMS The L.P. Separator (MBD-1600) is a 3-phase separator that receives bulk production from the L.P. Header (GAY-1500), I.P. Separator Oil dump and the H.P. Separator Oil Dump. Gas is discharged

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure and compressed gases flow through the Gas Scrubber (MBF-4540) to the Glycol Contactor (MAF-0900). In the Contactor, gas flows through trays, contacting the lean glycol

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure and compressed gases flow to the Glycol Contactor (MAF-3110). In the Contactor, gas flows through trays, contacting the lean glycol that is flowing across the trays

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure gases from the Gas Compressors (CBA-4070/4020) flow to the Glycol Contactor (MAF-1150). In the Contactor, gas flows through trays, contacting the lean glycol that is

More information

GAS COMPRESSION SYSTEM

GAS COMPRESSION SYSTEM GAS COMPRESSION SYSTEM The gas compression system at HI 376 A consists of two natural gas turbine-driven Compressors (CBA-4020/4070). Both Compressors are needed for the volume of gas being compressed.

More information

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS The Wellheads, Flowlines and Gas Lift Injection Systems are designed to facilitate production from the reservoir to the platform s process systems. New

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

OPERATING PROCEDURES

OPERATING PROCEDURES OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is

More information

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Lockout - Tagout. Control of Hazardous Energy OSHA Standard Lockout/Tagout Lockout - Tagout Control of Hazardous Energy OSHA Standard 1910.147 What Is Lockout/Tagout? Referred to as LOTO Blocks the flow of energy from power source to the equipment Provides means

More information

WHITE PAPER. SmartPlant P&ID Engineering Integrity 10 Example Rules

WHITE PAPER. SmartPlant P&ID Engineering Integrity 10 Example Rules WHITE PAPER SmartPlant P&ID Engineering Integrity 10 Example Rules SmartPlant P&ID Engineering Integrity SmartPlant P&ID Engineering Integrity checks that SmartPlant P&IDs comply with engineering standards

More information

Central Washington University

Central Washington University Central Washington University Lockout / Tagout (LOTO) Program Plan prepared by: Central Washington University Office of Environmental Health & Safety 400 East University Way Ellensburg, WA 98926 P: 509-963-2252

More information

Lockout / Tag out Program

Lockout / Tag out Program Lockout / Tag out Program Presented by DOSHTI www.doshti.com You will learn Purpose of Lockout- Tag out Requirements for LOTO Types of Hazardous Energy Procedures for LOTO The OSHA Standard for the Control

More information

Lockout/Tagout Training Overview. Safety Fest 2013

Lockout/Tagout Training Overview. Safety Fest 2013 Lockout/Tagout Training Overview Safety Fest 2013 Purpose of Lockout/Tagout The standard covers the servicing and maintenance of machine and equipment in which the unexpected energization or start up of

More information

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves Tools Required: Flow Meter Pressure gauge Holding valve test block Wrenches for installation of

More information

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS A. PURPOSE 1 B. FACILITIES STAFF RESPONSIBILITIES 2 C. TRAINING AND RETRAINING of AFFECTED and EUTHORIZED EMPLOYEES 3 NINE POINTS TO REMEMBER 5 LOCKOUT/TAGOUT

More information

Temporary Equipment Checklist

Temporary Equipment Checklist Location: Company Name (owner of equipment): Date: ID No.: Type of Equipment: Permit / WCC number: Equipment supporting: Operations Wells Projects General Yes No N/A Will the equipment operator require

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

S & M Water Consultants

S & M Water Consultants S & M Water Consultants Test Procedures In This Manual TEST Reduced Pressure Assembly One Hose Method PAGE 1 Double Check Assembly One Hose Method 5 Pressure Vacuum Breaker One Hose Method 7 Spill Proof

More information

Lockout/Tagout Program

Lockout/Tagout Program Lockout/Tagout Program Control of Hazardous Energy Subpart J - 29 CFR 1910.147 29 CFR 1926.417 OSHA Standard All industries must comply Estimated to prevent Approximately 120 fatalities per year 28,000

More information

P-03 MAINTENANCE MECHANIC TRAINING SKILL DEVELOPMENT GUIDE

P-03 MAINTENANCE MECHANIC TRAINING SKILL DEVELOPMENT GUIDE P-03 MAINTENANCE MECHANIC TRAINING SKILL DEVELOPMENT GUIDE Duty P: Steam Systems P-03: Perform Startup and Shutdown Procedures Issued 01/01/99 Perform Startup and Shutdown Procedures Task Preview Startup

More information

Beverage Systems. Component Inspection and Service TSB-Y Date: Subject: Products Affected: Description: July Inspection of CO 2

Beverage Systems. Component Inspection and Service TSB-Y Date: Subject: Products Affected: Description: July Inspection of CO 2 Component Inspection and Service Beverage Systems Technical Service Bulletin TSB-Y10-007 Date: July 2006 Subject: Inspection of CO 2 Pressure Control Circuits Products Affected: All Chart Beverage Systems

More information

Frequently Asked Questions Directive 056 Facilities Technical

Frequently Asked Questions Directive 056 Facilities Technical Frequently Asked Questions Directive 056 Facilities Technical October 2017 This document clarifies and supports some of the technical requirements related to Directive 056: Energy Development Applications

More information

INSTALLATION AND OPERATION MANUAL CHEMICAL BYPASS FEEDER General Instructions Regarding All Models

INSTALLATION AND OPERATION MANUAL CHEMICAL BYPASS FEEDER General Instructions Regarding All Models INSTALLATION AND OPERATION MANUAL CHEMICAL BYPASS FEEDER General Instructions Regarding All Models General Cautions: 1. CAUTION: Do not open under pressure. Close isolation valves and release pressure

More information

Testing Procedures & Trouble Shooting Guide Reduced Pressure Zone Assembly (1/2, 3/4", 1, 1 1/4, 1 1/2" & 2 )

Testing Procedures & Trouble Shooting Guide Reduced Pressure Zone Assembly (1/2, 3/4, 1, 1 1/4, 1 1/2 & 2 ) Testing Procedures & Trouble Shooting Guide Reduced Pressure Zone Assembly (1/2, 3/4", 1, 1 1/4, 1 1/2" & 2 ) First Check Valve Test 1) Bleed all test cocks. First open test cock 4, make sure it is slightly

More information

High-Pressure Boiler Inspection Procedures: A Complete Checklist

High-Pressure Boiler Inspection Procedures: A Complete Checklist High-Pressure Boiler Inspection Procedures: A Complete Checklist Inspecting high-pressure boilers is a complex process requiring preparation, planning, and a multitude of safety precautions. Regular inspections

More information

Lock Out/Tag Out Control of Hazardous Energy

Lock Out/Tag Out Control of Hazardous Energy Lock Out/Tag Out Control of Hazardous Energy University Facilities Internal Procedure: July 1, 2013 Effective date: July 1, 2013 Last Modified: April 2013 Approved by: Bob Wells 1.0 Program Objective UF

More information

FRYSAFE COOKING OIL FILTRATION I&O MANUAL

FRYSAFE COOKING OIL FILTRATION I&O MANUAL INSTALLATION OPERATIONS AND MAINTENANCE FRYSAFE COOKING OIL FILTRATION I&O MANUAL 1365 N. Clovis Avenue Fresno, California 93727 1.559.255.1601 www.lakos.com LS-899B (Rev. 12/16) Table of Contents Introduction

More information

LO/TO LOCKOUT/TAGOUT PROGRAM

LO/TO LOCKOUT/TAGOUT PROGRAM LO/TO LOCKOUT/TAGOUT PROGRAM April 2017 CONTENTS Section 1: Introduction...1 Section 2: Purpose... 1 Section 3: Application... 1 Section 4: Definitions... 2 Section 5: Roles and Responsibilities... 4 Section

More information

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks 1. Scope This document describes procedures for determining or confirming the fill condition of

More information

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) 1 APPLICABILITY Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) Definitions common to all certification and test procedures

More information

F All types of inert gas systems are to comply with the following:

F All types of inert gas systems are to comply with the following: (1974) (Rev.1 1983) (Rev.2 1987) (Rev.3 May 1998) (Corr. Sept 2001) (Rev.4 May 2004) (Rev.5 Nov 2005) (Rev.6 May 2012) (Rev.7 May 2015) Inert Gas Systems.1 General Requirements.1.1 All types of inert gas

More information

Safety Manual: Hazardous Energy. January, 2017

Safety Manual: Hazardous Energy. January, 2017 Safety Manual: Hazardous Energy January, 2017 9.0 Hazardous Energy Introduction Energized equipment in the workplace pose a significant risk of injury and death. If the unexpected energization or start-up

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide Secondary Coolant System Start-Up Procedures June 2006 Produced by the Hill PHOENIX Learning Center DISCLAIMER This

More information

OPERATION MANUAL NTF-15

OPERATION MANUAL NTF-15 OPERATION MANUAL NTF-15 Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81235-00 (Rev B) TABLE

More information

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide 1. Accumulators Problem Accumulator is overflowing If Accumulator continues to overflow Correction 1. Push and hold the manual activation button

More information

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1 November 30, 1994 534 a 1. PRODUCT NAME VIKING 2" (50mm), 3" (75mm), 4" (100mm), 6" (150mm) 2. MANUFACTURER THE VIKING CORPORATION 210 N. Industrial Park Road Hastings, Michigan 49058 U.S.A. Telephone:

More information

2 Sentry MVS Installation, Operation & Maintenance

2 Sentry MVS Installation, Operation & Maintenance Gas Liquid & Slurry Solid & Powder Steam & Water Installation, Operation & Maintenance Manual Original Instructions Liquid Sampling Manual Low-Emission Samplers S-LS-IOM-0026-4 -7 Sentry MVS 966 Blue Ribbon

More information

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS WIDDER TOOLS HPIC-10000-D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS Description: The WIDDER Hydrostatic Test Systems C Series is a portable, selfcontained, air driven hydrostatic

More information

OPERATION MANUAL NTF-60 Plus

OPERATION MANUAL NTF-60 Plus OPERATION MANUAL NTF-60 Plus Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81264-00 (Rev A)

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM Page: 1 of 15 1.0 Purpose and Applicability 2.0 Scope 1.1 It is the policy of the University of Pennsylvania in coordination with the Office of Environmental Health and Radiation Safety to provide the

More information

DUPLEX PRESSURE REDUCING SET

DUPLEX PRESSURE REDUCING SET DUPLEX PRESSURE REDUCING SET Phoenix Pipeline Products Limited. Unit 8, McKenzie Industrial Park, Tel No.: 44 (0) 161 428 7200 Bird Hall Lane, Fax No.: 44 (0) 161 428 7010 Stockport, Email: info@p3-phoenix.com

More information

MOL LNG Transport (Europe) Ltd File: 02 Checklists 6 pages Rev. No. 1 Loading Plan Part Two (2) (Line UP) Loading Plan Part Two (2) (Line Up)

MOL LNG Transport (Europe) Ltd File: 02 Checklists 6 pages Rev. No. 1 Loading Plan Part Two (2) (Line UP) Loading Plan Part Two (2) (Line Up) Loading Plan Part Two (2) (Line Up) Arm Cool Down; Line Cool Down Line Up: Set up the port manifold as follows:. Open 20% No.1 tank filling valve CL100 Open 20% No. 2 tank filling valve CL200 Open 20%

More information

Thermocirc Installation and Maintenance Instructions

Thermocirc Installation and Maintenance Instructions 1570072/2 IM-P157-36 ST Issue 2 Thermocirc Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4 Commissioning 5 Operation 6 Maintenance

More information

Cycle Isolation Monitoring

Cycle Isolation Monitoring Cycle Isolation Monitoring True North Consulting Greg Alder Santee Cooper Leif Svensen Scientech Symposium 2009 January 14-15, 15, 2009 Clearwater Beach, Florida Introduction Generating plants often suffer

More information

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM Procedure Number EHS-LOTO-2013 Revision Number 00 Effective Date June 1, 2014 I. Purpose II. III. IV. Scope

More information

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE Office of Environmental Health & Safety CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE LOCK OUT/TAG OUT OSHA 29 CFR 1910.147 rev. 3 2014 Director of Environmental Health & Safety Control of Hazardous Energy

More information

NGP-250/500 Nitrogen Generator Quick Start Guide

NGP-250/500 Nitrogen Generator Quick Start Guide NGP-250/500 Nitrogen Generator Quick Start Guide Version: A July 2013 Potter Electric Signal Company, LLC 5757 Phantom Dr., Suite 125 P. O. Box 42037 Hazelwood, MO 63042 Phone: (314) 595-6900 Document

More information

Hazardous Energy Control Lockout/Tagout

Hazardous Energy Control Lockout/Tagout Hazardous Energy Control Lockout/Tagout Debbie Rauen INSafe Safety Consultant Outline Energy Sources Employer Responsibilities Authorized Employee Responsibilities Energy Control (LO/TO) Equipment & Devices

More information

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax: 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use

More information

THE OSHA LOCK-OUT/TAG-OUT STANDARD

THE OSHA LOCK-OUT/TAG-OUT STANDARD PRESENTER'S GUIDE "LOCK-OUT/TAG-OUT" Training for THE OSHA LOCK-OUT/TAG-OUT STANDARD Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS OUTLINE OF MAJOR PROGRAM

More information

BP OIL -- TOLEDO REFINERY

BP OIL -- TOLEDO REFINERY Document Type: Procedure BP OIL -- TOLEDO REFINERY Refinery Wide Reference No.: SAF 086 Effective Date: October 3, 2011 Use of Nitrogen (N 2 ) Rev. No.: 7 Owner: Jon Parker Auth. By: D. C. Durnwald (Signature

More information

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018 University Policy Volume E2: Environment, Health, Safety and Security E2.14 Control of Hazardous Energy Responsible Office: Facilities Management Responsible Officer: Safety Officer POLICY STATEMENT All

More information

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.147 BASIS: Approximately three million workers in the United States face risks from uncontrolled energy when servicing machinery

More information

Oxygen Usage Best Practice Guide

Oxygen Usage Best Practice Guide Oxygen Usage Best Practice Guide 1. Introduction Oxygen enriched systems possess a risk of fire and explosion since ignition and combustion hazards are present in all oxygen systems, and oxygen related

More information

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141 0 Operation Manual Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1 GENERAL 1.1 Warnings and

More information

DEOX FPS 1 CORRISION INHIBITING SYSTEM O&M MANUAL. Revision 2 Date 02/04/16

DEOX FPS 1 CORRISION INHIBITING SYSTEM O&M MANUAL. Revision 2 Date 02/04/16 DEOX FPS 1 CORRISION INHIBITING SYSTEM O&M MANUAL Revision 2 Date 02/04/16 Copyrighted All Rights Reserved 2016 REVISION HISTORY Revision Revision Approved Approval # Date By Date 0 2/27/15 J. Nguyen 3/2/15

More information

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees. SAFETY DIRECTIVE Title: Control of Hazardous Energy Lock-out/Tag-out/Try-out Issuing Department: Town Manager s Safety Office Effective Date: July 1, 2014 Approved: Gilbert Davidson, Town Manager Type

More information

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR Control of Hazardous Energy (Lockout/Tag-out) 29 CFR 1910.147 What Is Lockout/Tag-out? Referred to as LOTO Blocks flow of energy from power source to the equipment Provides means of warning (tag) Regulatory

More information

Model 106 DPI "Micro-switch" Installation and Operating Instructions

Model 106 DPI Micro-switch Installation and Operating Instructions Mid-West Instrument Model 106 DPI "Micro-switch" Installation and Operating Instructions BULLETIN NO. IM116DPImicro/09A Replaces --- INSPECTION Before installation carefully check the Model Number on each

More information

TECHNICAL DATA Q= C. Table 1 - Specifications

TECHNICAL DATA Q= C. Table 1 - Specifications September 25, 2013 Pressure Regulation 537a 1. Description The Model B-3 Pilot Operated Pressure Control Valve is a factory assembled unit. The unit consists of a Model J-2 Halar coated Flow Control Valve,

More information

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM 1.0 OBJECTIVE To study the response of gas pressure control using PID controller. 2.0 INTRODUCTION TO THE APPARATUS a) The process plant consists of two air vessels

More information

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Operations & Service Manual TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Do not attempt to select, install, use or maintain this product until you have read and fully understood this

More information

Installing a Probe. Typical Installation

Installing a Probe. Typical Installation for hazardous locations. Prior to any installation in a Classified Hazardous Location, verify installation methods by the Control Drawing referenced on the product s name tag 2. The Feed Through Assemblies

More information

RULES PUBLICATION NO. 119/P

RULES PUBLICATION NO. 119/P RULES PUBLICATION NO. 119/P PERIODIC SURVEYS OF FUEL INSTALLATIONS ON SHIPS OTHER THAN LIQUEFIED GAS CARRIERS UTILIZING GAS OR OTHER LOW FLASH POINT FUELS 2019 January Publications P (Additional Rule Requirements)

More information

230-LOCKOUT/TAGOUT PROGRAM

230-LOCKOUT/TAGOUT PROGRAM 230.1 PURPOSE A. To confirm implementation, operation, and recordkeeping of Central New Mexico Community College(CNM) lockout/tagout program in compliance with 29 CFR 1910.147. 230.2 SCOPE A. The requirements

More information

Annual Inspection and Calibration Checklist VAF Oilcon MK-6(M) MEPC.108(49) Page 1 of 5

Annual Inspection and Calibration Checklist VAF Oilcon MK-6(M) MEPC.108(49) Page 1 of 5 Page 1 of 5 Vessel Name: Serial number MCU: Serial Number EPU: Serial Number Skid: Mains Supply: V AC @ Hz Software version MCU: Software version EPU: K-factor Cell: K-factor Skid Flowmeter: P/L Maximum

More information

TECHNICAL DATA. Table 1 - Specifications

TECHNICAL DATA. Table 1 - Specifications Page 1 of 6 1. DESCRIPTION Model A-3 Pilot Operated Pressure Control Valves are factory assembled units. Each unit consists of a Model H-2 Halar coated Flow Control Valve, a Speed Control Valve, a Model

More information

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching Standard Operating Procedure for PlasmaQuest ECR II Etching Authors: Rev. 00: Al Schmalz, Vighen Pacradouni and Jeff Young, December 21, 1998 Rev. 01: Dr. Andras G. Pattantyus-Abraham, May 24, 2005 Rev.

More information

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES NB16 0603 NR Task Group 1 9 16 1. One update by NR task group page 3: 7/17/19 2. Two updates to S6.1 and S6.3 on page 1: 7/19/17 SUPPLEMENT 6 PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES

More information

OPERATING INSTRUCTIONS Pressure Control System PCS-20 through PCS-100

OPERATING INSTRUCTIONS Pressure Control System PCS-20 through PCS-100 107 W. Main Street Worthington, PA 16262 Phone: 724.297.3416 Fax: 724.297.5189 http://www.airtak.com OPERATING INSTRUCTIONS Pressure Control System PCS-20 through PCS-100 12-2007 TABLE OF CONTENTS PAGE

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) 1. PURPOSE The purpose of this program is to establish policy, rules and procedures for the protection of employees against the unexpected energizing, start-up,

More information

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING

More information

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary? What is Lockout? Lockout means to physically neutralize all energies in a piece of equipment before beginning any maintenance or repair work. Lockouts generally involve: Stopping all energy flows (for

More information

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

Standard Operating and Maintenance Instructions for Pumping System Model PS-90 Standard Operating and Maintenance Instructions for Pumping System Model PS-90 High Pressure Equipment Company 2955 West 17th Street, Suite 6 PO Box 8248 Erie, PA 16505 USA 814-838-2028 (phone) 814-838-6075

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL INFORMATION Installation, Operation, and Maintenance Balston Model 75-77 Nitrogen Generator Figure 1-75-77 Overall Dimensions These instructions must be thoroughly read and understood before

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

Proper Pump Installation Practices

Proper Pump Installation Practices Proper Pump Installation Practices 80-779, Rev. 10/08 There is a Reason Every Unit Comes With This Bright Orange Tag! Proper Alignment and Coupling Installation Do Not Drive Coupling Onto Shaft Pump Alignment

More information

Cash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified

Cash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified Cash Valve PILOT OPERATED BACK PRESSURE VALVE ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 01 Certified KP HIGH CAPACITY PILOT OPERATED BACK PRESSURE VALVE DESCRIPTION The Cash Valve Type KP is a pilot

More information

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels (Jan 2017) Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels CONTENTS 1. Application 2. Special Survey 2.1 Schedule 2.2 Scope

More information

DuraSite 3000 Sample Vessel User's Guide. Version Rev-1

DuraSite 3000 Sample Vessel User's Guide. Version Rev-1 DuraSite 3000 Sample Vessel User's Guide Version 09022003 Rev-1 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application

More information

2 Sentry MCL Installation, Operation & Maintenance

2 Sentry MCL Installation, Operation & Maintenance Gas Liquid & Slurry Solid & Powder Steam & Water Installation, Operation & Maintenance Manual Original Instructions Liquid Sampling Manual Low-Emission Samplers S-GA-IOM-00249-7 11-17 Sentry MCL 966 Blue

More information

DF1 and DF2 Diffusers

DF1 and DF2 Diffusers 1550650/4 IM-P155-07 ST Issue 4 and Diffusers Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6. Maintenance

More information

Fisher DVI Desuperheater Venturi Inline

Fisher DVI Desuperheater Venturi Inline Instruction Manual DVI Desuperheater Fisher DVI Desuperheater Venturi Inline Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 3 Operating Instructions...

More information

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM Procedure Number EHS-LOTO-2013 Revision Number 01 02 Effective Date June 1, 2014 October 15, 2017 I. Purpose

More information

GDS OPERATING PROCEDURE

GDS OPERATING PROCEDURE SU/GP-B P0886 Rev A 4 September, 2002 STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA 94305-4085 GDS OPERATING PROCEDURE

More information

RHPS Series PRV 6 User Manual

RHPS Series PRV 6 User Manual RHPS Series PRV 6 User Manual Read the complete manual before installing and using the valve. 1 WARNING Before removing a valve from the system for service, you must depressurize system purge the system

More information

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection February 9, 1998 Foam 201a 1. DESCRIPTION A Deluge Bladder Tank Foam/Water System is a standard deluge system capable of discharging a foam/water solution automatically through open sprinklers, spray nozzles,

More information

Thank You for Attending Today s Webinar. Today s Featured Speaker

Thank You for Attending Today s Webinar. Today s Featured Speaker Thank You for Attending Today s Webinar Your Host Mike DeLacluyse President Lesman Instrument Company miked@lesman.com Today s Featured Speaker A.J. Piskor Combustion & Controls Specialist Lesman Instrument

More information

AWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use.

AWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use. AWG Fittings LLC Pressure Relief Valve Up to 250 PSI Product Number 30004033 Read this instruction manual before use. Using this device without t understanding di this products operation and care may lead

More information

Delayed Coker Automation & Interlocks

Delayed Coker Automation & Interlocks Delayed Coker Automation & Interlocks a Presented by Mitch Moloney of ExxonMobil @ coking.com April-2005 MJ Moloney - ExxonMobil April-2005 coking.com 0 Automation & Interlocks @ ExxonMobil - Background

More information

AIR DISTRIBUTOR. PART NUMBER (Including, but not inclusive) AD28483-_ALB, AD28563-_ALB, AD36097-_ALB, AD36098-_ALB, AD28485-_ALB

AIR DISTRIBUTOR. PART NUMBER (Including, but not inclusive) AD28483-_ALB, AD28563-_ALB, AD36097-_ALB, AD36098-_ALB, AD28485-_ALB Manual #: MM-AD001 12/5/11 Rev. A Page 1 of 8 PART NUMBER (Including, but not inclusive) AD28483-_ALB, AD28563-_ALB, AD36097-_ALB, AD36098-_ALB, AD28485-_ALB Manual #: MM-AD001 12/5/11 Rev. A Page 2 of

More information

Integrity Testing LifeASSURE BNA045 and BNA065 Series Filter Cartridges

Integrity Testing LifeASSURE BNA045 and BNA065 Series Filter Cartridges Integrity Testing LifeASSURE BNA045 and BNA065 Series Filter Cartridges SAFETY INFORMATION Read, understand, and follow all safety information contained in these instructions and the instructions provided

More information

SERIES SAFETY VALVE

SERIES SAFETY VALVE R Manufactured by Conbraco Industries, Inc. 10-600 SERIES SAFETY VALVE INSTALLATION, OPERATION, & MAINTENANCE Part I Document Number: ES-1325 Revision Level: B Issued By: T.HAMILTON Date: 3/3/16 Approved

More information

Increase Gas Production, Reduce Maintenance and Decrease Environmental Risks

Increase Gas Production, Reduce Maintenance and Decrease Environmental Risks Increase Gas Production, Reduce Maintenance and Decrease Environmental Risks Complete Turn-Key Two Phase Separator System Optimized to Increase Gas Production Two Phase Separator Optimization Regulators

More information

Air Mortar User Manual

Air Mortar User Manual Page 1/5 1 Introduction The Air Mortar is a fast-acting pneumatic system, designed to provide a rapid discharge of inert gas when triggered by 12VDC input signal. The standard system vessel has a volume

More information

Initial Hazard Specifics Gap Analysis for Fruit & Vegetable Processing

Initial Hazard Specifics Gap Analysis for Fruit & Vegetable Processing Initial Hazard Specifics Gap Analysis for Fruit & Vegetable Processing Answer the following questions to assist you in identifying the health and safety hazards associated with your processes: Section

More information