OIL & GAS. Fatigue. Seminar on revision of Eurocodes. Gunnar Solland 02 May DNV GL May 2018 SAFER, SMARTER, GREENER

Size: px
Start display at page:

Download "OIL & GAS. Fatigue. Seminar on revision of Eurocodes. Gunnar Solland 02 May DNV GL May 2018 SAFER, SMARTER, GREENER"

Transcription

1 OIL & GAS Fatigue Seminar on revision of Eurocodes Gunnar Solland 02 May 2018 SAFER, SMARTER, GREENER

2 Increase in the research activity within the field 2

3 Development of fatigue design methods 3

4 Structures on land and offshore Fatigue is the decisive check for structural dimensions for many offshore structures Fatigue is rarely governing the structural design for structures on land This is reflected in the current design philosophy and code recommendations However, new type of structures will increase the need of adequate fatigue design recommendations also for structures on land 4

5 Floating bridge; dynamically loaded by wind and waves 5

6 Tower structures for wind generators Fatigue govern the design both for towers on land and offshore 6

7 Fatigue in traditional structures on land Even with moderate fatigue loading fatigue failures occur in e.g. bridges, The checks are often formulated to eliminate fatigue as a possible failure mode rather than giving estimates of the design life From: Fatigue and fracture in steel bridges case studies. J.W. Fisher. 7

8 Characteristics of fatigue capacity Structural failure due to fatigue is different from other failure modes: Larger uncertainty Develops over time These aspects will affect recommendations in design codes 8

9 Uncertainty in fatigue resistance 9

10 Test data plotted in linear scale 10

11 Importance of in-service inspection The time needed for a fatigue crack to grow to a size that will lead to failure makes it possible to control the safety of the structure by inspection of critical details The inspection can be made by several methods and principles for where to inspect Traditionally, owners of structures on land are negative to rely on inspection to ascertain safe structures This is probably reflected in the design codes 11

12 Requirements in NS-EN Table 3.1 Recommended values for γ Mf Assessment method Consequence of failure Low High Damage tolerant 1,0 1,15 Safe life 1,15 1,35 The small difference in safety factor between Safe life (no inspection) and Damage tolerant is driving the design against Safe life The preferred safety regime for offshore structures is to design details where cracks will be detected before failure of large consequences may occur and to require adequate inspection to be carried out Details where failure can lead to large consequences need significant larger safety factors than recommended in NS-EN

13 Important terms What is large consequences? What is necessary inspection? What is characteristic load? 13

14 Large consequences In offshore practise and in the Norwegian NA to NS-EN the definition of large consequences is that the residual capacity given a fatigue failure of the considered detail is less than the structure checked with safety factors equal to 1.0 From Tabell NA.3.1: iii) levetidsmetode dersom utmattingsbrudd vil bli oppdaget av ordinær tilstandskontroll. Ved fullt utviklet utmattingsbrudd i en detalj (sprekk gjennom tykkelsen) skal konstruksjonen ha tilstrekkelig restkapasitet i bruddgrensetilstanden med partialfaktor både for materiale og påvirkninger lik 1,0. 14

15 Inspection requirements Fatigue cracks are often detected by ordinary survey of the structure before any catastrophic failure Examples Fatigue in orthotropic steel decks Fatigue of hangers of a suspension bridge Loose bolts in the foundation of a tower 15

16 Characteristic load for fatigue checks Definition of the characteristic fatigue design is presently not clear The definition of the characteristic load is ambiguous The characteristic load in NS-EN (Annex A) are defined as a credible upper bound estimate while in EN 1990 it is defined as expected action spectra The loads for fatigue of bridges is defined in , but is not clear (at least not to me) what is the intended probability level 16

17 Use of FE-analysis in fatigue checks An important deficiency in NS-EN is the lack of design recommendation on how to apply FE-analysis results There is presently no definite plans to include this in the next revision of the code As this has been part of the recommendations for check of offshore structures since 1999 the code should either give sufficient recommendations or be generally harmonized with offshore practise so the methods used there can be utilized 17

18 Thanks for your attention SAFER, SMARTER, GREENER 18

Reliable subsea gas transport; the history and contribution of DNV-OS-F101

Reliable subsea gas transport; the history and contribution of DNV-OS-F101 OIL & GAS Reliable subsea gas transport; the history and contribution of DNV-OS-F101 GL-ST-F101 Pipeline Safety Philosophy Leif Collberg, Vice President, DNV GL 1 SAFER, SMARTER, GREENER Safety Philosophy,

More information

Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments

Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments OIL & GAS Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments Noble Denton marine services Mike White 1 SAFER, SMARTER, GREENER Overview What are we talking

More information

RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING

RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING 2001 Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or

More information

Development of Accidental Collapse Limit State Criteria for Offshore Structures

Development of Accidental Collapse Limit State Criteria for Offshore Structures Risk Acceptance and Risk Communication Stanford, March 26-27, 2007 Development of Accidental Collapse Limit State Criteria for Offshore Structures by Torgeir Moan Norwegian University of Science and Technology

More information

LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE)

LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE) LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE) Politecnico di Milano, Italy piero.baraldi@polimi.it 1 Types of maintenance approaches Intervention Unplanned Planned

More information

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart Technical Standards and Legislation: Risk Based Inspection Presenter: Pierre Swart Agenda Change in Legislation. Where RBI fits in. Application to implement RBI. RBI concepts. Elements of an RBI analysis.

More information

Use of Synthetic Ropes in Deepwater Moorings

Use of Synthetic Ropes in Deepwater Moorings OIL & GAS Use of Synthetic Ropes in Deepwater Moorings INTSOK Conference Delivering Solutions: Deepwater Mega-Projects Robert Gordon, Sr. Principal Engineer 2015-02-19 1 DNV GL 2013 2015-02-19 SAFER, SMARTER,

More information

Life Extension of Mobile Offshore Units

Life Extension of Mobile Offshore Units Life Extension of Mobile Offshore Units Operation of classified aging units Sigmund Røine DNV Mobile Offshore Units in Operation Presentation content MOU integrity during operation Survey Principles for

More information

ABS TECHNICAL PAPERS 2005

ABS TECHNICAL PAPERS 2005 OTC 17535 Structural Reliability Applications in Risk-Based Inspection Plans and Their Sensitivities to Different Environmental Conditions A. P. Ku and R. E. Spong, Energo Engineering; C. Serratella, ABS

More information

Liquefied gas cargo tanks and process pressure vessels

Liquefied gas cargo tanks and process pressure vessels .1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant

More information

Sea-going vessel versus wind turbine

Sea-going vessel versus wind turbine Collision risk at high sea Sea-going vessel versus wind turbine Offshore wind power: Wind turbines off the German coast generally represent obstacles in the traffic routes of ships. What if a large sea-going

More information

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10)

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10) Health, Safety and Environmental Management in Petroleum and offshore Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module No. #

More information

Planning of Drilling Operations in Extreme Ocean Currents

Planning of Drilling Operations in Extreme Ocean Currents DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 OPERATIONS Planning of Drilling Operations in Extreme Ocean Currents Luca Pivano - Marine Cybernetics/DNV GL Kristopher Eide - Marine Cybernetics/DNV

More information

Fuselage, Wings and Stabilising Surfaces

Fuselage, Wings and Stabilising Surfaces Fuselage, Wings and Stabilising Surfaces Chapter 1 DESIGN PHILOSOPHIES The aircraft manufacturer will attempt to design an aircraft to take into account all the loads that it may experience in flight.

More information

Freak Waves: A Suggested Definition and Possible Consequences for Marine Structures

Freak Waves: A Suggested Definition and Possible Consequences for Marine Structures Freak Waves: A Suggested Definition and Possible Consequences for Marine Structures 1. What is the target safety level of offshore structures? 2. Are rogue waves a problem? A) What is a rogues wave? B)

More information

The Best Use of Lockout/Tagout and Control Reliable Circuits

The Best Use of Lockout/Tagout and Control Reliable Circuits Session No. 565 The Best Use of Lockout/Tagout and Control Reliable Circuits Introduction L. Tyson Ross, P.E., C.S.P. Principal LJB Inc. Dayton, Ohio Anyone involved in the design, installation, operation,

More information

Justification of Risk Reduction through In-Service Inspection / REDUCE

Justification of Risk Reduction through In-Service Inspection / REDUCE NUGENIA+ WP6.12 Justification of Risk Reduction through In-Service Inspection / REDUCE Jens Gunnars Inspecta Technology AB jens.gunnars@inspecta.com WP6.12 Task Leader NUGENIA+ Final Seminar, Helsinki

More information

Vibration Related Failures of Small-Bore Attachments

Vibration Related Failures of Small-Bore Attachments Vibration Related Failures of Small-Bore Attachments Brian C. Howes, M.Sc., P.Eng Chief Engineer bhowes@betamachinery.com Chris B. Harper, P.Eng Project Engineer charper@betamachinery.com Beta Machinery

More information

RISK ASSESSMENT. The Flora Stevenson Primary School Playground. Undertaken on 11 th January 2017 on behalf of. The City of Edinburgh Council

RISK ASSESSMENT. The Flora Stevenson Primary School Playground. Undertaken on 11 th January 2017 on behalf of. The City of Edinburgh Council RISK ASSESSMENT For The Flora Stevenson Primary School Playground Undertaken on on behalf of RoSPA inspections are an independent safety assessment of the site and are produced for RoSPA by PlaySafety

More information

Corrugated Hose Loop Calculations

Corrugated Hose Loop Calculations Corrugated Hose Loop Calculations The loop installation is one of the most common application for metal hoses. It allows the flexible hose assembly to work properly. Care must always be exercised to ensure

More information

IGEM/TD/1. Background, Development, Changes J V Haswell

IGEM/TD/1. Background, Development, Changes J V Haswell IGEM/TD/1 Background, Development, Changes J V Haswell TD/1 Background Development, Changes Technical and Safety Philosophy History of Development Key Code Requirements:- Rou?ng, BPDs Design parameters

More information

Federal Aviation Administration Safety & Human Factors Analysis of a Wake Vortex Mitigation Display System

Federal Aviation Administration Safety & Human Factors Analysis of a Wake Vortex Mitigation Display System Safety & Human Factors Analysis of a Wake Vortex Mitigation Display System Presented to: EUROCONTROL Safety R&D Seminar By: Dino Piccione Date: October 23, 2008 Project Objectives Forge a link between

More information

Batch centrifuge basket design.

Batch centrifuge basket design. 1. Abstract. Batch centrifuge basket design. G.C.Grimwood. Director. A.Ainsworth. Chief Engineer. Thomas Broadbent & Sons Ltd. tbs@broadbent.co.uk A short overview of batch centrifuge basket design is

More information

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 9 Fatigue. Edition October 2015 DNV GL AS

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 9 Fatigue. Edition October 2015 DNV GL AS RULES FOR CLASSIFICATION Ships Edition October 2015 Part 3 Hull Chapter 9 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that

More information

Hydro Plant Risk Assessment Guide

Hydro Plant Risk Assessment Guide September 2006 Hydro Plant Risk Assessment Guide Appendix E10: Compressed Air System Condition Assessment E10. 1 GENERAL Compressed air systems are key components at hydroelectric power plants. Compressed

More information

ANNUAL DYNAMIC POSITIONING TRIALS FOR DYNAMICALLY POSITIONED VESSELS

ANNUAL DYNAMIC POSITIONING TRIALS FOR DYNAMICALLY POSITIONED VESSELS Author s Name Name of the Paper Session DYNAMIC POSITIONING CONFERENCE October 11-12, 2011 OPERATIONS SESSION ANNUAL DYNAMIC POSITIONING TRIALS FOR DYNAMICALLY POSITIONED VESSELS By Ian Giddings The International

More information

Flexible hoses - Non-metallic materials

Flexible hoses - Non-metallic materials CLASS PROGRAMME Type approval DNVGL-CP-0183 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

Damage Assessment Following Accidents - Official Discussion

Damage Assessment Following Accidents - Official Discussion Downloaded from orbit.dtu.dk on: Sep 11, 2018 Damage Assessment Following Accidents - Official Discussion Pedersen, Preben Terndrup Published in: Proceedings of the 18th International Ship and Offshore

More information

Reducing risk and cost through an optimised inspection approach. February 2017

Reducing risk and cost through an optimised inspection approach. February 2017 Reducing risk and cost through an optimised inspection approach February 2017 Structural fatigue Maari platform 1.4m long crack found in a horizontal bracing in November 2016. Platform was shut down for

More information

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE HUTTLE TABLE OF CONTENTS 01 DESCRIPTION 03 1.1 Vessel General 03 1. Purpose of the Vessel 0 1.3 High Workability 0 1. Installation Scenarios 05

More information

PC-21 A Damage Tolerant Aircraft. Paper presented at the ICAF 2009 Symposium by Lukas Schmid

PC-21 A Damage Tolerant Aircraft. Paper presented at the ICAF 2009 Symposium by Lukas Schmid PC-21 A Damage Tolerant Aircraft Paper presented at the ICAF 2009 Symposium by Lukas Schmid PC-21 A Damage Tolerant Aircraft 12.05.2009 2 Acknowledgment Markus Gottier, Gottier Engineering Dave Boorman,

More information

NORDEX. Foundations. Nordex N117/3000

NORDEX. Foundations. Nordex N117/3000 Foundations Nordex N117/3000 Nordex Energy GmbH, Langenhorner Chaussee 600, 22419 Hamburg, Germany All rights reserved. Observe protection notice ISO 16016. K0801_042963_EN Revision 00, 2013-02-04 1 /

More information

The Criticality of Cooling

The Criticality of Cooling Reliability Solutions White Paper January 2016 The Criticality of Cooling Utilities, power plants, and manufacturing facilities all make use of cooling towers for critical heat transfer needs. By cycling

More information

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER DIGITAL SOLUTIONS TRAINING CATALOGUE QRA and CFD simulation Phast, Safeti and KFX SAFER, SMARTER, GREENER 02 PHAST, SAFETI AND KFX Training catalogue Global training Our increased focus on global training,

More information

Author s Name Name of the Paper Session. Positioning Committee. Marine Technology Society. DYNAMIC POSITIONING CONFERENCE September 18-19, 2001

Author s Name Name of the Paper Session. Positioning Committee. Marine Technology Society. DYNAMIC POSITIONING CONFERENCE September 18-19, 2001 Author s Name Name of the Paper Session PDynamic Positioning Committee Marine Technology Society DYNAMIC POSITIONING CONFERENCE September 18-19, 2001 POWER PLANT SESSION A New Concept for Fuel Tight DP

More information

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device BC Shackle Made in the China Alloy Steel Anchor Shackle Instructions for handling and use - Please read in full before using this device Index 1.) Introduction 2.) Warnings / General Use Guidelines 3.)

More information

LiDAR Application to resource assessment and turbine control

LiDAR Application to resource assessment and turbine control ENERGY LiDAR Application to resource assessment and turbine control Dr. Avishek Kumar The New Zealand Wind Energy Conference 13 th April 2016 1 SAFER, SMARTER, GREENER Agenda What is LiDAR? Remote Sensing

More information

Dynamic Torsion Load Tests for Offshore Hoses

Dynamic Torsion Load Tests for Offshore Hoses a Dynamic Torsion Load Tests for Offshore Hoses Dynamic Torsion Load Tests for Offshore Hoses An Update to the Guide to Manufacturing and Purchasing Hoses for Offshore Moorings (GMPHOM 2009), section 3.4.10.3

More information

Fatigue Resistant Sockets for Dynamic Loads PFEIFER Cable Structures. Cable structures technology Info Nr PFEIFER SEIL- UND HEBETECHNIK GMBH

Fatigue Resistant Sockets for Dynamic Loads PFEIFER Cable Structures. Cable structures technology Info Nr PFEIFER SEIL- UND HEBETECHNIK GMBH Fatigue Resistant Sockets for Dynamic Loads Cable Structures Cable structures technology Info Nr. 3 4-2012 SEIL- UND HEBETECHNIK GMBH DR.-KARL-LENZ-STRASSE 66 D-87700 MEMMINGEN TELEPHONE +49 (0) 83 31-937-393

More information

Assessment and operation of Wind Turbine Installation Vessels.

Assessment and operation of Wind Turbine Installation Vessels. Noble Denton Marine Services Assessment and operation of Wind Turbine Installation Vessels. Risk reduction through implementation of good practice recommendations Mark Hayward 24 January 2017 1 DNV GL

More information

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;

More information

Isofrigo. Cold rooms in Verona. Detail of the internal side

Isofrigo. Cold rooms in Verona. Detail of the internal side Cold rooms in Verona 126 Detail of the internal side EXAMPLES OF PROJECTS SPECIAL PRODUCTS 127 Legend pag. 18 Self-supporting metal faced panel, insulated with polyurethane, extremely versatile and easy

More information

Phase B: Parameter Level Design

Phase B: Parameter Level Design Phase B: Parameter Level Design 1 FMEA A chart describing the ways in which the product may fail, the impact, and what has been done to alleviate any problems. Measure of the inability to achieve overall

More information

TOWER INSPECTION REPORT

TOWER INSPECTION REPORT 3010 S. Hwy 77, Suite 600 Waxahachie, Texas 75165 http://ctctower.com Office: 972/923-9504 Fax: 972/923-9619 TOWER INSPECTION REPORT PREPARED FOR MR. CUSTOMER 1,563 GUYED TOWER NEAR CITY, STATE JANUARY

More information

Trine Risøy, Bergen,

Trine Risøy, Bergen, part of Aker The Installation of Subsea Structures without Offshore Crane Vessel Trine Risøy, Bergen, 04.06.2008 2008 Aker Solutions AKER MARINE CONTRACTORS (AMC) 35 years experience worldwide: Subsea

More information

Rubber Dock Hose care, Use & Maintenance

Rubber Dock Hose care, Use & Maintenance Rubber Dock Hose care, Use & Maintenance Prepared by: Thomas J. Wise VP Corporate Development Contents Revised - July. 2014 1. Novaflex Rubber Dock Hose Testing & Inspection Program 1.1 Introduction -

More information

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT INTRODUCTION Cwmni CYNNAL recognises that accidents can arise from working at height. Falls from height can be a cause of injury and absence

More information

MSC Guidelines for Review of Rigging Systems for Sailing Vessels

MSC Guidelines for Review of Rigging Systems for Sailing Vessels S. E. HEMANN, CDR, Chief, Hull Division Table of Contents References... 1 Contact Information... 2 Applicability... 2 General Guidance... 2 Methodology... 3 Stability and Rigging System... 3 Hull Structure

More information

The Use of BS 5400: Part 10: Code of Practice for Fatigue

The Use of BS 5400: Part 10: Code of Practice for Fatigue THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT Amendment No. 1, dated November 1983 THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND The Use of

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 4210-2 Second edition 2015-09-01 Cycles Safety requirements for bicycles Part 2: Requirements for city and trekking, young adult, mountain and racing bicycles Cycles Exigences

More information

Gas Compressor Operation and Control

Gas Compressor Operation and Control Training Title Gas Compressor Operation and Control Training Duration 5 days Training Venue and Dates Gas Compressor Operation and Control 5 7 11 October, 2018 $4,000 Dubai, UAE Trainings will be conducted

More information

SOFTWARE. Sesam user course. 02 May 2016 HydroD Input. Ungraded SAFER, SMARTER, GREENER DNV GL 2016

SOFTWARE. Sesam user course. 02 May 2016 HydroD Input. Ungraded SAFER, SMARTER, GREENER DNV GL 2016 SOFTWARE Sesam user course DNV GL 1 SAFER, SMARTER, GREENER About the presenter Name: Torgeir Kirkhorn Vada Position: Product Manager for floating structures Background: PhD in Applied mathematics/hydrodynamics

More information

IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view?

IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view? IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view? Seamocs meeting in Malta Gaute Storhaug, DNV Maritime 19th of March 2009 Overview

More information

IMO Polar Code. Industry Seminar: Operational conditions for ships on the NSR Busan. Håvard Nyseth 30 May 2016 MARITIME. Ungraded

IMO Polar Code. Industry Seminar: Operational conditions for ships on the NSR Busan. Håvard Nyseth 30 May 2016 MARITIME. Ungraded MARITIME IMO Polar Code Industry Seminar: Operational conditions for ships on the NSR Busan Håvard Nyseth 1 SAFER, SMARTER, GREENER Content 1. Background 2. IMO Polar Code General Introduction Part I-A

More information

Wind Turbine Installation Vessels

Wind Turbine Installation Vessels Oil & Gas Wind Turbine Installation Vessels Presentation for IMCA Copenhagen Meeting Richard Stonor / Mark Hayward 1 IMCA 14 June - Wind 2016 Installation Vessels SAFER, SMARTER, GREENER Opening comments

More information

INCREASE OPERATING DAYS ENHANCE DECK SAFETY AND SPEED MINIMIZE SEA SICKNESS HEAVY DUTY GYROSTABILIZERS FOR COMMERCIAL & DEFENCE APPLICATIONS

INCREASE OPERATING DAYS ENHANCE DECK SAFETY AND SPEED MINIMIZE SEA SICKNESS HEAVY DUTY GYROSTABILIZERS FOR COMMERCIAL & DEFENCE APPLICATIONS LESS MOTION MORE OCEAN HEAVY DUTY GYROSTABILIZERS FOR COMMERCIAL & DEFENCE APPLICATIONS INCREASE OPERATING DAYS ENHANCE DECK SAFETY AND SPEED MINIMIZE SEA SICKNESS 2 VEEM Gyro DEFENCE Image courtesy of

More information

NASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD

NASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD NSS/HP-1740.1 This Standard was CANCELLED on Jul 30 2002 22 FEBRUARY 1974 NASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD OFFICE OF SAFETY AND RELIABILITY AND QUALITY ASSURANCE NATIONAL AERONAUTICS AND

More information

Eliminating Dropped Objects at the Worksite

Eliminating Dropped Objects at the Worksite Eliminating Dropped Objects at the Worksite Allen Smith, DROPS GLOBAL Eliminating Dropped Objects at the Worksite Allen Smith, DROPS GLOBAL ABOUT DROPS: dropsonline.org Oil & Gas Industry Workgroup focused

More information

Marine Risk Assessment

Marine Risk Assessment Marine Risk Assessment Waraporn Srimoon (B.Sc., M.Sc.).) 10 December 2007 What is Risk assessment? Risk assessment is a review as to acceptability of risk based on comparison with risk standards or criteria,

More information

SOFTWARE. Sesam user course. 12 May 2016 HydroD Hydrostatics & Stability. Ungraded SAFER, SMARTER, GREENER DNV GL 2016

SOFTWARE. Sesam user course. 12 May 2016 HydroD Hydrostatics & Stability. Ungraded SAFER, SMARTER, GREENER DNV GL 2016 SOFTWARE Sesam user course DNV GL 1 SAFER, SMARTER, GREENER Scope of presentation Describe features & commands for performing a hydrostatic analysis, and their concepts Analysis setup Code-checking Reporting

More information

Pile Gripper Systems

Pile Gripper Systems Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +

More information

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT PRELIMINARY RISK ASSESSMENT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT RIDM PROJECT MAY 3, 2018 DAVID S. BOWLES AND LOREN R. ANDERSON RAC ENGINEERS AND ECONOMISTS, LLC AND UTAH STATE UNIVERSITY

More information

OPERATION AND MAINTENANCE

OPERATION AND MAINTENANCE Chapter 11 OPERATION AND MAINTENANCE General Considerations The nature and scope of the operation and maintenance required will vary with the design and elements of water-supply systems. Depending upon

More information

Process Safety and the Human Factor

Process Safety and the Human Factor Process Safety and the Human Factor INTRODUCTION The increasing lifetime of industrial processing plants creates a growing challenge for plant owners/operators to continue to run in a safe and efficient

More information

A Previously Unidentified Failure Mode for Ladder-Climbing Fall-Protection Systems

A Previously Unidentified Failure Mode for Ladder-Climbing Fall-Protection Systems Session No. 716 A Previously Unidentified Failure Mode for Ladder-Climbing Fall-Protection Systems Introduction Steve Arndt, Ph.D. Principal Engineer Exponent Failure Analysis Associates Chicago, Illinois

More information

FATIGUE ASSESSMENT OF OFFSHORE STRUCTURES

FATIGUE ASSESSMENT OF OFFSHORE STRUCTURES Guide for the Fatigue Assessment of Offshore Structures GUIDE FOR FATIGUE ASSESSMENT OF OFFSHORE STRUCTURES APRIL 2003 (Updated March 2018 see next page) American Bureau of Shipping Incorporated by Act

More information

CHECK VALVES FOR CRYOGENIC SERVICE

CHECK VALVES FOR CRYOGENIC SERVICE CHECK VALVES FOR CRYOGENIC SERVICE www.checkvalves.co.uk Performing where it matters Goodwin International is globally approved for its design, manufacture and supply of Dual Plate Check Valves and Non-Slam

More information

Damage Tolerance Inspection Methodology for Slow Crack Growth Metallic Structure

Damage Tolerance Inspection Methodology for Slow Crack Growth Metallic Structure Structures Bulletin ASC/EN Bldg 28, 2145 Monahan Way WPAFB, OH 45433-7101 Phone 937-656-9956 Number: EN-SB-12-003 Date: 19 July 2012 Subject: Damage Tolerance Inspection Methodology for Slow Crack Growth

More information

Air gap on semi-submersible MOUs under DNVGL Class. Current & Future Design Practice

Air gap on semi-submersible MOUs under DNVGL Class. Current & Future Design Practice Air gap on semi-submersible MOUs under DNVGL Class Current & Future Design Practice Topics for the presentation Wood Group Norway Motivation DNVGL OTG-13 DNVGL OTG-14 Case study Impact on semi submersible

More information

Risk Assessment for Radio Rogaine

Risk Assessment for Radio Rogaine Risk Assessment for Radio Rogaine Reviews Completed By Revision Date Approved By Approval Date R Shanks 24/07/2018 A Daykin 24/07/2018 171 Nojoor Road Twin waters QLD 4564 P: 1300 122677 Apexcamps.com.au

More information

Non-Linear Seismic Analysis of Multi-Storey Building

Non-Linear Seismic Analysis of Multi-Storey Building Non-Linear Seismic Analysis of Multi-Storey Building Uzair Khan 1 1 M.Tech (Structural & Construction Engineering) Department of Civil Engineering, National Institute of Technology, Jalandhar. Hina Gupta

More information

Managing for Liability Avoidance. (c) Lewis Bass

Managing for Liability Avoidance. (c) Lewis Bass Managing for Liability Avoidance (c) Lewis Bass 2005 1 Staying Safe in an Automated World Keys to Automation Safety and Liability Avoidance Presented by: Lewis Bass, P.E. Mechanical, Industrial and Safety

More information

TEST REPORT. Solamatrix Inc. GLASS-GARD GGL1200 Multi-ply Window Film and Wetglaze Anchoring System on Single 6mm (1/4 ) Annealed Glass.

TEST REPORT. Solamatrix Inc. GLASS-GARD GGL1200 Multi-ply Window Film and Wetglaze Anchoring System on Single 6mm (1/4 ) Annealed Glass. TEST REPORT Solamatrix Inc. GLASS-GARD GGL1200 Multi-ply Window Film and Wetglaze Anchoring System on Single 6mm (1/4 ) Annealed Glass. Class 3B US General Services Administration Explosion Resistant Standard

More information

ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES

ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES GE Oil & Gas PII Pipeline Solutions Inessa Yablonskikh Principal Consultant Aberdeen, November, 14 th 2007 Assessment And Analysis Of Pipeline Buckles Introduction

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3788:2006 AS/NZS 3788:2006 Australian/New Zealand Standard Pressure equipment In-service inspection AS/NZS 3788:2006 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee

More information

Tresca s or Mises Yield Condition in Pressure Vessel Design

Tresca s or Mises Yield Condition in Pressure Vessel Design Tresca s or Mises Yield Condition in Pressure Vessel Design Franz Rauscher Institute for Pressure Vessels and Plant Technology Vienna University of Technology Austria Why using Tresca s yield condition

More information

High-Energy Ship Collision with Jacket Legs

High-Energy Ship Collision with Jacket Legs High-Energy Ship Collision with Jacket Legs Jørgen Amdahl Department of Marine Structures, NTNU, Trondheim, Norway Atle Johansen MARINTEK, Trondheim, Norway ABSTRACT Risk analysis of planned jacket installations

More information

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1 Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2

More information

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS RULES FOR CLASSIFICATION Naval vessels Edition January 2016 Part 1 Classification and surveys Chapter 5 The content of this service document is the subject of intellectual property rights reserved by ("DNV

More information

New requirement: Plan for recovery of persons from the water

New requirement: Plan for recovery of persons from the water SAFER, SMARTER, GREENER TECHNICAL UPDATE 3-2014 / FEBRUARY New requirement: Plan for recovery of persons from the water ApplicATIon The requirement applies to all newbuildings provided with SOLAS certificates

More information

WORK METHOD STATEMENT ELECTRICAL

WORK METHOD STATEMENT ELECTRICAL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Abrasion and Twist Effects on High-Performance Synthetic Ropes for Towing Applications

Abrasion and Twist Effects on High-Performance Synthetic Ropes for Towing Applications Abrasion and Twist Effects on High-Performance Synthetic Ropes for Towing Applications Kris Volpenhein, Application Engineer Rafael Chou, Vice President of Research and Development Samson Rope Technologies,

More information

Ameliorating the Negative Damping in the Dynamic Responses of a Tension Leg Spar-Type Support Structure with a Downwind Turbine

Ameliorating the Negative Damping in the Dynamic Responses of a Tension Leg Spar-Type Support Structure with a Downwind Turbine 1 Ameliorating the Negative Damping in the Dynamic Responses of a Tension Leg Spar-Type Support Structure with a Downwind Turbine Madjid Karimirad Torgeir Moan Author CeSOS Centre Centre for Ships for

More information

Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Brass Check Valve RDL

Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Brass Check Valve RDL Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU FAS Brass Check Valve RDL Please read these operating instructions carefully to ensure a safe operation and keep the same

More information

DRILLING HOSE SOLUTIONS

DRILLING HOSE SOLUTIONS DRILLING HOSE SOLUTIONS HIGH PRESSURE FLEXIBLE LINES FOR A WIDE RANGE OF DRILLING APPLICATIONS HIGH QUALITY - HIGH STANDARD WE DELIVER ACCORDING TO THE HIGHEST LEVELS OF SPECIFICATIONS AND STANDARDS WITH

More information

SCANNING ELECTRON MICROSCOPY ANALYSIS OF ELASTOMERIC O-RINGS AND SPRING SEALS FRACTURED DURING RAPID GAS DECOMPRESSION.

SCANNING ELECTRON MICROSCOPY ANALYSIS OF ELASTOMERIC O-RINGS AND SPRING SEALS FRACTURED DURING RAPID GAS DECOMPRESSION. SCANNING ELECTRON MICROSCOPY ANALYSIS OF ELASTOMERIC O-RINGS AND SPRING SEALS FRACTURED DURING RAPID GAS DECOMPRESSION. T. Mbwadzawo* and A. Hodzic Composite Systems Innovation Centre, Department of Mechanical

More information

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 5 Hull girder strength. Edition October 2015 DNV GL AS

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 5 Hull girder strength. Edition October 2015 DNV GL AS RULES FOR CLASSIFICATION Ships Edition October 2015 Part 3 Hull Chapter 5 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that

More information

HAZARD MANAGEMENT PROCEDURE

HAZARD MANAGEMENT PROCEDURE TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk

More information

Wind Farm Blockage: Searching for Suitable Validation Data

Wind Farm Blockage: Searching for Suitable Validation Data ENERGY Wind Farm Blockage: Searching for Suitable Validation Data James Bleeg, Mark Purcell, Renzo Ruisi, and Elizabeth Traiger 09 April 2018 1 DNV GL 2014 09 April 2018 SAFER, SMARTER, GREENER Wind turbine

More information

COASTAL HAZARDS. What are Coastal Hazards?

COASTAL HAZARDS. What are Coastal Hazards? COASTAL HAZARDS What are Coastal Hazards? Hazards in the New Jersey coastal zone include unavoidable risks to life and property generated by: coastal flooding, waves, high winds and waves, short-term and

More information

WINDSPEED. Resultat og erfaringer med MSP. 26. september 2013 Hans Chr. Sørensen, SPOK ApS. Contract number: EIE/07/759/S

WINDSPEED. Resultat og erfaringer med MSP. 26. september 2013 Hans Chr. Sørensen, SPOK ApS. Contract number: EIE/07/759/S WINDSPEED Resultat og erfaringer med MSP 26. september 2013 Hans Chr. Sørensen, SPOK ApS Contract number: EIE/07/759/S12.499460 www.windspeed.eu Background H C Sørensen Business and university background

More information

INTERIM ADVICE NOTE 171/12. Risk Based Principal Inspection Intervals

INTERIM ADVICE NOTE 171/12. Risk Based Principal Inspection Intervals INTERIM ADVICE NOTE 171/12 Risk Based Principal Inspection Intervals Summary This Interim Advice Note sets out the requirements and guidance for service providers using risk based inspection intervals.

More information

Subsea Wellhead and Conductor Fatigue

Subsea Wellhead and Conductor Fatigue Subsea Wellhead and Conductor Fatigue 29th January 2014 Simeon Powell, PE Importance of Wellhead Fatigue Fatigue failure of high pressure wellhead housing Due to VIV West of Shetland Region 440 meter water

More information

What I ve Learned About Dam Safety Good, Bad and Ugly

What I ve Learned About Dam Safety Good, Bad and Ugly What I ve Learned About Dam Safety Good, Bad and Ugly Ron Gruzesky Dam Safety and Floodplain Compliance Kentucky Division of Water Department for Environmental Protection August 26, 2015 What is a Dam?

More information

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23.

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. (2) For the resisting side, passive pressure theory indicates

More information

Electronic Monitoring of Norwegian Minke Whaling

Electronic Monitoring of Norwegian Minke Whaling Electronic Monitoring of Norwegian Minke Whaling By Dr. Egil Ole Øen Associate professor Norwegian School of Veterinary Science Section of Arctic Veterinary Medicine Norway Submitted to IWC 2005 Management

More information

SHHP50 FLOOR STANDING HYDRAULIC PRESS

SHHP50 FLOOR STANDING HYDRAULIC PRESS SHHP50 FLOOR STANDING HYDRAULIC PRESS OWNER S MANUAL FOR YOUR SAFETY PLEASE READ THESE INSTRUCTIONS CAREFULLY AND RETAIN THEM FOR FUTURE USE. SPECIFICATION MAX CAPACITY STROKE WORK RANGE WEIGHT 50 TON

More information

Vibration response of long cable-stayed timber footbridge case study

Vibration response of long cable-stayed timber footbridge case study Vibration response of long cable-stayed timber footbridge case study Robert Kliger Chalmers Univ. of Technology Div. of Structural Engineering SE-412 98 Gothenburg Sweden Robert.kliger@chalmers.se Tomas

More information

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

RECENT IMPROVEMENTS REGARDING ULTRASONIC CRACK INSPECTION OF PIPELINES Herbert Willems, Thomas Hennig NDT Global, Stutensee, Germany

RECENT IMPROVEMENTS REGARDING ULTRASONIC CRACK INSPECTION OF PIPELINES Herbert Willems, Thomas Hennig NDT Global, Stutensee, Germany RECENT IMPROVEMENTS REGARDING ULTRASONIC CRACK INSPECTION OF PIPELINES Herbert Willems, Thomas Hennig NDT Global, Stutensee, Germany ABSTRACT Crack inspection of pipelines using conventional ultrasonic

More information