Turbo-compressor TEK-3200/3300/3400. RCM study. Client: PTTEP

Size: px
Start display at page:

Download "Turbo-compressor TEK-3200/3300/3400. RCM study. Client: PTTEP"

Transcription

1 Turbo-compressor TEK-3200/3300/3400 RCM study Client: PTTEP Reported by Santi Songkunlertchai Manorom Chiewpanich This presentation Services & is Solutions for overview Co., Ltd only. Full report contains 98 pages. Project Ref No : , PTTEP Ref No. SO... Page 1

2 Contents 1. Summary 2. Introduction This 3. Work presentation scope is for overview only. Full report contains 98 pages. 4. Details 5. Maintainable item and interval and maintenance technique This 6. Manpower presentation and is for Resources overview only. Full report contains 98 pages. 7. Attachments Project Ref No : , PTTEP Ref No. SO... Page 2

3 Distribution 8. to the public can not be made without the permission from PTTEP. 1. Summary The summary This below presentation indicates is the for major overview findings only. only. Full report contains 98 pages. 1.1 It Distribution found that to the the current public job can card not is be not made full-fill without the maintenance the permission activities. from PTTEP. Job card shall drilldown to activities and maintenance item level (sub-skid level) as per the result of this RCM. 1.2 Online washing This presentation should be is introduced for overview to Gas only. Producer Full report in order contains to extend 98 pages. the crank wash interval. 1.3 To eliminate wax-gum cumulative at dry gas seal, the source of buffer gas shall be offtaken from the final discharge downstream of the after cooler. 1.4 Dry gas seal replacement interval shall be extended and based on condition base instead of time base. 1.5 Online washing should be introduced to compressor. Rigorous study shall be conducted to prevent dry gas seal damage during on-line wash. 1.6 Power augmentation should be introduced to gain the gas export. 1.7 Anti-surge Distribution function to the shall public be can tested-stimulated not be made without as regular the basis. permission from PTTEP. 1.8 To increase the system availability, TT-3320 function should be changed from shutdown to alarm only. 1.9 Each compression This presentation string, is it for is found overview that only. the total Full maintenance report contains cost 98 with pages. lost time for maintenance Distribution will to the be 76 public million can Baht not be per made year without the permission from PTTEP Each compression string, it is found that the minimum total production lost with out maintenance will be 487 million Baht per year, Maximum: 8000 million Baht per year 1.11 It can pointed that the average recovery time from breakdown should be 12 hours at the lost of revenue at 25% of each of gas compression string. Distribution to the public can not be made without Baht the per permission with from product PTTEP. Cost from maintenance activities year lost Baht per (parts Min production lost w/o maintenance year included) Max breakdown This presentation cost with production is for overview only. Full report Baht per contains 98 pages. lost year RAM 2 A 0,5 Project Ref No : , PTTEP Ref No. SO... Page 3

4 2. Introduction This report was made according the PTTEP Service Order No.to conduct the RCM study using This presentation the combination is for of overview FMEA* only. (Failure Full Mode report Effective contains Analysis) 98 pages. technique and FMECA* Distribution (Failure to the Mode public Effective can not be Critical made Analysis*) without the permission from PTTEP. * Developed by Co., Ltd Project Ref No : , PTTEP Ref No. SO... Page 4

5 3. Work scope The study cover the gas turbine driving export gas compressor for one unit only (three units are identical), This presentation and partly is of for fuel overview gas system only. (full Full scale report RCM contains study 98 of fuel pages. gas system is separated) Distribution as per to the sketch. public can not be made without the permission from PTTEP. Distribution to the public can not Mbe made without the permission M from PTTEP. Fuel gas Gas supply system Project Ref No : , PTTEP Ref No. SO... Page 5

6 4. Details 4.1 This RCM study is based on: This MTTR presentation (Mean Time is for To overview Repair) is only. not including Full report the contains lead time 98 pages. of the work Distribution preparation to the or public spare can part. not be made without the permission from PTTEP Repair or replace process is based on spare module, assembly available e.g. starter, electric motor, gas producer module, etc On condition maintenance covers on-line and off-line and occasion Distribution to On-line the public maintenance can not be consists made without of all operating/process the permission from parameters, PTTEP. vibration analysis, oil analysis (RBOT), thermo-graphic, emission analysis, strain measurement, UTM, Pulse eddy current, and including visual external inspection. Off-line maintenance consists of all internal inspection, pressure test, geometric measurement, NDT, function test / calibration, Etc which requires to shutdown the system. Occasion maintenance is maintenance activity that schedule to be aligned This presentation with scheduled is for off-line overview maintenance. only. Full report contains 98 pages Distribution Unplanned to the shows public in can RCM not study be made as breakdown without the maintenance permission from PTTEP Scheduled maintenance (either overhaul or replacement) interval is pre-fixed in master plan. This The firmed presentation schedule is for maintenance overview only. will Full be based report on contains the condition 98 pages. assessment which Distribution should to be the implemented public can 3-6 not be months made ahead without from the the permission pre-fixed from schedule PTTEP. using the projection/prediction technique This Operating presentation context: is for overview only. Full report contains 98 pages. Turbo-compressor function (TEK-3200/3300/3400) All three compressors are installed at PP to deliver gas from separation process to Erawan platform as 33,3 % x 3 duty. Distribution Custodian the transfer public is can made not at be PP made via without flow-computer. the permission from PTTEP. Operating condition First stage Inlet parameter This Pressure, presentation Barg : 23,1 is for (mean) overview max only. 24, min Full 23,0 report contains 98 pages. Distribution Inlet temp, to the C public : 24,4 can (mean), not be max made 25,6 without the permission from PTTEP. MW 26,05 kg/kmol Compressibility: 0,92 (inlet) See gas compositions attached This Operating presentation speed, is rpm: for overview only. range Full report contains 98 pages. Project Ref No : , PTTEP Ref No. SO... Page 6

7 Distribution First stage to the discharge public can not be made without the permission from PTTEP. This Second presentation stage Inlet is for parameter overview only. Full report contains 98 pages. Distribution Pressure, to the Barg: public 54, 1 can (mean) not be max, made min without the permission from PTTEP. Inlet temp, C: 50,8 (mean), max MW: 26,05 kg/kmol Compressibility: 0,865(inlet) This See gas presentation compositions is for attached overview only. Full report contains 98 pages. Distribution Operating to the speed, public rpm: can not be made range without the permission from PTTEP. This Delivery presentation agreement, is for penalty overview only. Full report contains 98 pages. Distribution Guarantee to the point public at delivery can not be at 630 made MMscfd without (max) the permission from PTTEP. Each compressor train comprise of: LM-2500 gas turbine This PG-25 presentation power turbine is for overview only. Full report contains 98 pages. Distribution NP: 2BCL-608, to the public compressor, can not be internal made without combine the stage permission (1+2), from PTTEP. LM-2500 Requires fuel gas: 7780kg/h (max) at 31 barg Project Ref No : , PTTEP Ref No. SO... Page 7 Pressure, barg: 56,3 Temp, C: 99,9 Second stage discharge Pressure, barg: 108,2 (mean), 112 (max) This Temp, presentation C: 119,8 is for overview only. Full report contains 98 pages. Total Reliability and availability Reliability: 99 % Availability: 95 % Distribution Each of to gas the compression public can not train be made without the permission from PTTEP. Availability: 98,5 % Reliability: unable to pinpoint due to insufficient information. Lubrication system GG uses synthetic oil: Mobil and TOTAL, VG-32 This PG & presentation comp used is mineral for overview oil: TOTAL only. VG-32 Full report contains 98 pages. Seal system Dry gas seal: John crane T28AT Tandem arrangement This Buffer presentation stage 1: Process is for overview gas only. Full report contains 98 pages. Distribution Buffer to stage the 2: public Instrument can not air be made without the permission from PTTEP.

8 Distribution NP-2BCL-608 to the public can not be made without the permission from PTTEP. Each train, inlet gas before reaching gas compressor train has to be knock-out inlet liquid at suction scrubber. This After presentation 1 st stage compression: is for overview 99,9 only. deg C Full will report be cooled contains by 198 st air/gas pages. cooler (A3230) Distribution to 52,4 to deg the C. public can not be made without the permission from PTTEP. At 2 nd stage, inlet stream will be combined with side stream at 54,1 Barg at 50,8 deg C. prior reaching 2 nd comp unit, gas will be scrubbed by 2 nd KO (D-3240) Distribution Final outlet to the from public 2nd can compressor: not be made 108 without barg at the 119 permission deg C will from be cooled PTTEP. down via air / gas cooler (A3260) at 107,2 barg at 50 deg C Primary and secondary functions Distribution As described, to the RCM public is based can not on FMEA be made technique. without the Primary permission & secondary from PTTEP. functions are determined from the above operating context as: Cost critical analysis is based on: In addition, This the total presentation production is for loss overview of 28,013,400 only. Full million report Baht contains is base 98 on pages. the penalty if no totalsale after Distribution 24 hours to with the the public loss can of sale not opportunity be made without of 5% the interest permission from PTTEP. Parts and material cost is specified in each of failure mode individually. Project Ref No : , PTTEP Ref No. SO... Page 8

9 4.1.9 Risk Assessment Risk assessment is quantified using the specific Risk Matrix and failure consequences which is developed to suit PTTEP business as: Distribution to the public can not be made without the permission Risk from Assessment PTTEP. Matrix Production losses 25% 50% 75% 100% A B C D Evident but no effects on HSE, environment This presentation of operation is for overview Mildonly. Full 72 report h contains 1 98 pages. Evident degraded operation Distribution capacity, No effects to on the HSEpublic can not be made without 12 the h permission 2 from PTTEP. Hidden degraded asap 3 Evident safety and/or environment hazard Lost of life HSE 4 Hidden safety and/or environment hazard Distribution to the public can not be Sample made Coding without 1B0.5 the permission from PTTEP. 1 No effect to HSE B Cause production lost 50% 0,5 Probability occure 1 in every 2 years Distribution to the public can not be made without 4A0.25 the permission from PTTEP. 4 Potential to lost of life or injure A Cause production lost 25% 0,25 Probability occure 1 in every 4 years Project Ref No : , PTTEP Ref No. SO... Page 9

10 Distribution On Condition to the public Maintenance can not be (OCM) made without has to be the corporate permission with from "Incipient PTTEP. failure" failure mode only. The cost of OCM is based on person(s) who carry out the On Condition Monitoring and assessment only. This The subsequent presentation "scheduled is for overview maintenance only. Full cost report is not contains considered 98 pages. on this maintenance Distribution task category. to the public can not be made without the permission from PTTEP. It is recommended that NON RECURRING MAINTENANCE & BUDGET should be reserved. This "Scheduled presentation Overhaul is for (SO)" overview will be only. carried Full report out when contains it gives 98 the pages. lowest cost without Distribution effects to the HSE public can not be made without the permission from PTTEP. The cost of SO is base on the total OCM cost (assuming equivalent to the total manhour requirement for SO) plus spare parts divided by MTBF plus the cost of Loss & Deferment Distribution "Schedule to the Replacement public can not (SR)" be made will be without carried the out permission when it gives from the PTTEP. lowest cost without effects to HSE. The cost of SR is base on the total OCM cost (assuming equivalent to the total manhour requirement for SR) plus equipment cost divided by MTBF plus the cost of This Loss presentation & Deferment is divided for overview by 3 only. Full report contains 98 pages. "Failure Finding (FF)" shall not corporate with "Incipient failure mode" The cost of FF is based on person(s) who carry out the FUNCTION TEST only. The subsequent "scheduled maintenance" cost is not considered on this maintenance task category It is recommended that NON RECURRING MAINTENANCE & BUDGET should be reserved. This "Corrective presentation Maintenance is for overview (CM)" will only. be Full carried report out contains when it 98 gives pages. the lowest cost Distribution without to effects the public to HSE can not be made without the permission from PTTEP. The cost of CM is based on SO cost and further biased with the rejection value of the failure probability. This "Redesign presentation (RD)" is will for be overview commenced only. when Full report all above contains are not 98 applicable pages. Distribution The cost to of the RD public is based can not on the be made equipment without cost the divided permission by the from useful PTTEP. life multiplied by 3 Component corrosion can be applied with this RCM as "Inspection" to be used as "FF" Project Ref No : , PTTEP Ref No. SO... Page Maintenance strategy Maintenance strategy decision is based on the lowest quantified cost amongst tasks categories which the methodology is made differently as:

11 Distribution Failure to Characteristic the public can not Analysis be made without the permission from PTTEP. Each of failure modes is classified to the 1 of the six failure pattern shown. Any failure This presentation mode that the is for history overview could only. be traced, Full report the maintenance contains 98 interval pages. can be Distribution allocated naturally. to the public can not be made without the permission from PTTEP. Any failure mode that history could not be traced, the failure pattern and predicted useful life and trouble free life and the potential to failure are model in Weibull curve as the function This of: presentation is for overview only. Full report contains 98 pages. Project Ref No : , PTTEP Ref No. SO... Page 11

12 Figure Distribution 1 to the public can not be made without the permission from PTTEP. Project Ref No : , PTTEP Ref No. SO... Page 12

13 Function and failure mode Primary/secondary function To deliver gas at 210 MMscfd at the operating condition Function failure Failure mode Gas compressor low performance This presentation is for overview only. Contaminates Full report in synthetic contains oil degradation 98 pages. or oxidation. GG bearing failure due to lubrication degradation GG blades fails from foreign object GG low performance from Inlet filter blockage GG unable to operated at desire speed/power XV42215 S/d/ VV, fails to stuck open or controller XV42211 due to loss of instrument air This presentation is for overview only. T5 Full report spread contains due to thermocouples 98 pages. deteriorated blade coating damaged. Distribution to the public can not be made PDSH42171 without the permission from PTTEP. T42130 (oil/air separator) damaged or clogged up GG unable to start on demand due to starting system failed This presentation is for overview only. Full report contains 98 pages. Project Ref No : , PTTEP Ref No. SO... Page 13 Fouling develop at compressor rotor High vibration due foreign objects to GG from corrosion on vane mist separator, air intake and exhaust ducts GG compressor blade fouling TE High ambient temp, leads to low mass rate Fuel gas blockage (offskid) FV44220 Control VV, fails close due to controller XV42225 fails to function, Loss of fuel gas supply from FV42220, TE Strainer (inlet fuel gas to GG) blockage LSHH42211 not activate or stuck SDV42200 PSV42210 passing XV42211 TE VSV control out of tolerances TE Corrosion cracks on compressor blades or ARV42162 clogged up PSV42160 passing PSV42110 passing PDSL42713 & 15 TS3200 Gas starter failure TE Starting gas turbine regulating valve system

14 Function failure Insufficient cooling and lubricating GG, PT and compressor bearings. Failure mode A42145 & A Cooling fan bearing failure. Insufficient hydraulic oil supply to system Insufficient lube oil to cool and lubricate GG, PT and compressor bearings. Insufficient lube oil to cooling and lubricating compressor and power turbine bearings. A42145 & A Transmission belt or pulleys failure. P42160 hydraulic pump failure A42145 & A Cooling fan failure. P42850 Filter blockage on discharge of cool down pump Distribution to the public can not be made PDI42855 without incorrect the reading permission at low side from PTTEP. Insufficient lube oil to lubricate and cool GG, PT and compressor bearings. TSH42823 M42820, 25 cooler fan motor bearing failure This presentation is for overview only. TE3200 Full - P42110 report synthetic contains oil pump 98 failure pages. Distribution to the public can not be made TE3200 without - P the permission Scavenge pumps from failure PTTEP. Insufficient lube oil to lubricate and cool GG bearings. PSV42246 passing TCV42147 A42145 & A42820 oil cooler fouling This presentation is for overview only. M 42820, Full M report bearing contains failure 98 pages. Insufficient lube oil supply to cool and lubricate compressor bearings PCV42840 TV42821 M42850 bearing failure P42850 bearing failure Insufficient lube oil supply to cool and lubricate compressor bearings. Poor GG compression performance due to insufficient off-line cleaning on compressor blades M42805 bearing failure PCV42813 PT or compressor bearing failure due to lubrication degradation P42610, water wash pump failure M42610 bearing failure, water wash pump T42605 & T42600 tanks corroded or deposit in tanks. Deposits on H42605 heater or heater poor performance This presentation is for overview only. oxidation. Full report contains 98 pages. Unable to operate compressor on demand Unable to operate compressor on demand due to high temp lube oil. Unable to produce at the optimum point Contaminates in lube oil, mineral oil degradation or XV3221 A42820 Lube oil cooler fouling. This presentation is for overview only. PSL42812 Full not report activated contains 98 pages. Unable to run compressor continuously due to both lube oil pumps not functioned. FV3220 (1st stage anti-surge valve) Project Ref No : , PTTEP Ref No. SO... Page 14

15 Failure mode P F42830 & F42835 filter blockage PDSH not activated TE3200-M42500(AC) bearing failure TE3200-M42502 (DC) bearing failure. TE3200-FDP42500 stuck closed TSHH42502 TE3200-FSL42500 PDSHH42501 PDSL42508 TE3200-FDP42503 stuck closed TCP system Blockage in primary or secondary DGS vent lines This presentation is for overview standby only. filter. Full report contains 98 pages. Distribution No status to on the lube public oil filter can not If be not made switch without over the permission E-Hidden from PTTEP. degraded This presentation is for overview trip. only. Full report contains 98 pages. Distribution Low pressure to the alarm public and can not In be case made motor without the permission E-Hidden from PTTEP. degraded This ventilation presentation for cooling in is for overview enclosure only. room Full report contains 98 pages. enclosure room when GG may cause failure Erratic signal may cause This presentation is for overview alternatively. only. Full report contains 98 pages. Distribution If over activated to the public fault, it cause can not be made without the permission E-Hidden from PTTEP. degraded This presentation is for overview may cause only. GG Full report contains 98 pages. trip. This GG trip presentation or can not start is up for overview only. Full report contains C-Evident 98 pages. degraded Project Ref No : , PTTEP Ref No. SO... Page 32 Local & System effect-1 Insufficient lube oil supply may cause high bearing temp trip. blockage is presented. activated standby ventilation fan running, in worse case possible high temp in enclosure room trip. If loss of AC power, insufficient shutdown. Low pressure alarm and activated standby ventilation fan running. compressor trip. Improper ventilation fan operation can not be presented. GG erratic trip. When ventilation fan fault, no signal to start standby vent fan. High pressure in enclosure room. Insufficient cooling on DGS face, heat up to cause DGS failure. Local & System effect-2 However, PDSH42831 activated alarm, operator need to switch over to standby filter in a proper time, insufficient lube oil supply may cause high bearing temp overload trip, standby fan will start automatically. High temp in on instrumentation. High temp in enclosure room can be presented High temp in enclosure room High temp in enclosure room may cause GG trip. Compressor trip. Local & System effect-3 Consequence and Category C-Evident degraded operation capacity, No effects on HSE operation capacity, No effects on HSE C-Evident degraded operation capacity, No effects on HSE Recovery, class Severity class 2 A 3 No 3 No 2 D 2 C

16 Failure mode DGS failure due to deterioration buffer gas Local & System effect-1 Local & System effect-2 Local & System effect-3 Consequence and Category Distribution Compressor to the trip. public can not be made without the permission C-Evident from degraded PTTEP. operation capacity, No effects on HSE Recovery, class Severity class 2 D Buffer fuel gas supply blockage due to strainer or check valve plugged. PDCV42710 PCV42725 No instrument air supply to DGS due to orifice plate plugged PDT42710 PDSL activated alarm. Dirt from process gas may pass to DGS and This presentation is cause for overview primary DGS only. Full report contains 98 pages. failure. Operators have to open bypass valve immediately. Dirt from process gas may pass to DGS and cause primary DGS failure. This Stuck presentation open, is Stuck for overview closed, buffer only. Full report contains E-Hidden 98 pages. degraded Distribution PSH44725 to activated the public gas can may not leak be to made 2nd without the permission from PTTEP. alarm. Loss instrument air. PDSL44713 & 14 activated alarm. seal and gas contaminated lube oil. Stuck closed, buffer gas may leak to 2nd C-Evident degraded operation capacity, No effects This presentation is seal for and overview gas only. Full report contains 98 HSE pages. contaminated lube oil. Improper control clean gas to against process gas leak to DGS 3 C 2 A PDSL42710 SDV3214 If not activated when This true, it presentation may cause no is for overview only. Full report contains 98 pages. Distribution immediate to action the public to can not be made without the permission from PTTEP. verify the problem. If stuck closed, high liquid level (LAHH3211) may If stuck open, LV3214 (automatic closed drain to 2nd stg This cause presentation compressor trip. is separator) for overview and closed only. Full report contains 98 pages. drain header lines can be closed by manual valves. 3 D P42850 mech seal leakage LSL42801 Igniter failure El3222, El3252 (discharge check valve) and station valve stuck opened Lube oil spill to atm may cause fire. B-Evident safety and/or environment hazard If stuck high and If stuck low, during actual low level, it may cause lube oil pump run dry until motor trip. compressor startup sequences, main lube oil pump can not start due to impermissive from lube oil level fault. Distribution No throughput to the due public to can not be made without the permission E-Hidden from degraded PTTEP. unable to operate Back pressure may cause compressor rotor reversal turning. Possible DGS damaged. Project Ref No : , PTTEP Ref No. SO... Page 33 4 A 3 D 3 D

17 Failure mode PSH42844 not activated TSHH Local & System effect-1 Local & System effect-2 Local & System effect-3 Consequence and Category Distribution Not signal to to the stop public cool can not be made without the permission E-Hidden from degraded PTTEP. down pump, it may cause hot pump running if not stop by manual. This Possibly presentation damage or is for overview only. Full report contains E-Hidden 98 pages. degraded burn instruments and Distribution controls. to the public can not be made without the permission from PTTEP. Recovery, class Severity class 3 No 5. Maintainable item and interval and maintenance technique Interval On line Resource Maintenance Work description Distribution Off line to the public can strategy not be made without the permission from PTTEP. Tag Occasion daily On line Prod On condition maint 1) Since it is A/B/C/D arrangement, to Fuel filter skid monitor and switchover is normal practice. 2) While switchover, replacement filter is a must. 3) However, Distribution to the public can not be made there without are automatic the permission control valves from to PTTEP. open a bypass line across the filters when blockage. daily On line Prod On condition maint Walk around observe for noise & temp PSV-3210 daily This presentation is for overview only. profile Full from report passing contains 98 pages. On line Prod On condition maint Daily, verify that no passing leak of anti FV-3220 Distribution to the public can not be made surge without valve the at normal permission operation from PTTEP. daily On line Prod On condition maint Daily check& record lube oil temp and PSV pressure. monthly On line Prod On condition maint 1) Monthly measure record fuel gas TE Fuel gas daily This presentation is for overview only. pressure Full report contains 98 pages. strainer On line Mech On condition maint 1) Walk around to observe noise of icing XV from high gas flow 2) Visual check at valve stem position 3) Recommend to install work instruction at local. daily On line Mech On condition maint Monitor & record lube oil pressure P This presentation is for overview only. (PI42125) Full report and temp contains (TE42121). 98 pages. PI TE daily On line Mech On condition maint Monitor & record oil sump temp and P sump discharge pressure. P P P daily On line This presentation Mech On is for condition overview maint only. Monitor Full & report trending contains diff. temp 98 between pages. A Distribution to the public can not be made TI without and the TI permission from PTTEP. TI TI daily On line Mech On condition maint Monitor PDI and PI in P order to verify hydraulic pump problem. PSV PDI PI Project Ref No : , PTTEP Ref No. SO... Page 34

18 Interval Distribution On line Resource to the public Maintenance can not be made without Work the permission description from PTTEP. Tag Off line strategy Occasion 4 years Occasion Instr Failure finding Clean, check calibration and function LAHH-3241 test on Occasion planned inherently with LG-3243 This presentation is for overview only. half Full life inspection. report contains 98 pages. 4 years Occasion Distribution to Instr the public Failure can not finding be made Occasion without planned the permission inherently with from half PTTEP. SDV-3241 life inspection, check calibration and SDV-3242 function test. 4 years Occasion Instr Failure finding Occasion planned inherently with half FV-3250 life inspection, check calibration and FE-3250 This presentation is for overview only. function Full test. report contains 98 pages. 4 years Occasion Distribution to Instr the public Failure can not finding be made Occasion without Check the permission calibration and from function PTTEP. SDV-3211 test. FT-3200 Project Ref No : , PTTEP Ref No. SO... Page 42 4 years Occasion Instr Failure finding Occasion planned inherently with half life inspection, clean and check calibration. 4 years Occasion This presentation Instr is Failure for overview finding only. Occasion Full report planned contains inherently 98 with pages. half PT Distribution to the public can not be made life without inspection, the check permission calibration from and PTTEP. PSL function test. PAL PI PI years Occasion Instr Failure finding Occasion planned inherently with half PSL This presentation is for overview only. life inspection, Full report check contains calibration 98 pages. and Distribution to the public can not be made function without test. the permission from PTTEP. PSH years Occasion Instr Failure finding Occasion planned inherently with half life inspection, check calibration and function test. 4 years Occasion Instr Scheduled overhaul 1) Operation inherent indicates the status FDP This presentation is for overview only. 2) Occasion Full report to lubricate contains the 98 moving pages. FDP Distribution to the public can not be made parts without and function the permission test from PTTEP. FDP SOV SOV SOV years Occasion Instr Failure finding Occasion planned inherently with half TSHH This presentation is for overview only. life inspection, Full report check contains calibration 98 pages. and TSH Distribution to the public can not be made function without test. the permission from PTTEP. 4 years Occasion Instr Failure finding Occasion planned inherently with half FSL life inspection, check calibration and FSL function test. FSL years Occasion Instr Failure finding Occasion planned inherently with half PDSH This presentation is for overview only. life inspection, Full report check contains calibration 98 pages. and PDSHH Distribution to the public can not be made function without test. the permission from PTTEP. PDSHH years Occasion Instr Failure finding 1) Occasion planned inherently with half PDSL life inspection, check calibration and PDI function test. 4 years Occasion Instr Scheduled overhaul 1) Occasion planned inherently with half FDP This presentation is for overview only. life inspection, Full report check contains calibration 98 pages. and FDP Distribution to the public can not be made function without test. the 2) permission Lubricate moving from parts PTTEP. SOV and function test SOV PSV years Occasion Instr On condition maint Clean, disassemble to inspect and replace damaged parts Calibration test as 8 years required as standard RV certification. Occasion Instr Scheduled overhaul Occasion planned inherently with half PSV-42210

19 Interval Distribution On line Resource to the public Maintenance can not be made without Work the permission description from PTTEP. Tag Off line strategy Occasion 8 years Occasion Specialist On condition maint Occasion planned inherently with half D-3210 life inspection; perform internal cleaning D-3240 This presentation is for overview only. and Full inspection report (RBI, contains check wall 98 pages. Distribution to the public can not be made thickness without and the corrosion permission rate, etc.). from PTTEP. 8 years Occasion Specialist On condition maint Visual inspection and clean if necessary T years Off line Specialist Scheduled Exchange GG, Inherently, inspect Gas generator replacement power turbine for life assessment 8 years Occasion GE On condition maint Life assessment during Power turbine This presentation is for overview only. removing/exchange Full report contains GG 98 pages. 10 years Distribution Off line to Instr the public can Redesign not be made Redesign without to the alarm permission instead of shutdown from PTTEP. TT-3220 TI years Off line Specialist Redesign Redesign to relocate buffer gas off-take DGS point to the final discharge line 10 years Off line Specialist Redesign Consider to cool inlet air temp or steam Gas generator This presentation is for overview only. injection Full as report power contains augmentation 98 pages. 10 years Distribution Off line Specialist to the public can Redesign not be made Redesign without online the permission water wash to from extend PTTEP. TE-3200 off line water wash interval K-3200-Compressor 10 years Off line Specialist Redesign Redesign gas compressor on line washing using ZOC Manpower and Resources Estimated manpower This presentation and resources is for overview for each turbocompressor only. Full report contains loop of pages. years life cycle are as follows: Turbocompressor Avg. Man-hr/year (loop of 8-10 years (only one unit - TEK3200): life cycle) Prod Mech Elect 7.8 Instr Specialist Note: Manpower will be based on estimated effective work only (not included preparation, downtime and contingency works). 4 years interval will be turnaround period that may be extended to 5-6 years. Project Ref No : , PTTEP Ref No. SO... Page 45

20 7. Attachments All information of Turbocompressor - RCM had been kept in a spread sheet (Excel file). Additionally This concerned presentation information is overview also kept only. together Full in report the same contains CD 98 addressed pages. to PTTEP accordingly. - Drawings: PFD, P&ID - Data Sheets: Gas Turbine & Compressor - Drawings: Schematic Diagrams (LM2500 & NP compressor) - Cross-sectional drawings: Gas turbine & Compressor - Daily Log Sheets - Lube This Oil presentation Analysis is for overview only. Full report contains 98 pages. - GT Compressor Cleaning Project Ref No : , PTTEP Ref No. SO... Page 46

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment CHRIS JAMES RELIABILITY MANAGEMENT LTD Cairo, November 2018 The rate

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance

Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance Why - Dry Gas Seal??? M&I shutdown and Catalyst replacement

More information

Performance Monitoring Examples Monitor, Analyze, Optimize

Performance Monitoring Examples Monitor, Analyze, Optimize Performance Monitoring Examples Monitor, Analyze, Optimize BETA's Performance Assessment service is a low cost remote monitoring service for reciprocating compressors, centrifugal compressors, engines,

More information

Reliability Engineering. Module 3. Proactive Techniques - Definitions

Reliability Engineering. Module 3. Proactive Techniques - Definitions Reliability Engineering Module 3 1 Proactive Techniques - Definitions Functional Failure: The inability of an asset to meet a desired standard of performance. Failure Cause: The circumstances during design,

More information

GAS COMPRESSION SYSTEM

GAS COMPRESSION SYSTEM GAS COMPRESSION SYSTEM The gas compression system at HI 376 A consists of two natural gas turbine-driven Compressors (CBA-4020/4070). Both Compressors are needed for the volume of gas being compressed.

More information

Benefits of Detailed Compressor Modeling in Optimizing Production from Gas-Lifted Fields. Manickam S. Nadar Greg Stephenson

Benefits of Detailed Compressor Modeling in Optimizing Production from Gas-Lifted Fields. Manickam S. Nadar Greg Stephenson Benefits of Detailed Compressor Modeling in Optimizing Production from Gas-Lifted Fields Manickam S. Nadar Greg Stephenson Contents Optimization of Gas-Lifted Fields The Need for Modelling of Gas-Lift

More information

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES Training Title MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES Training Duration 5 days Training Venue and Dates REF Mechanical Equipments:

More information

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems Name of Property: Address: Phone Number: Inspector: Contract No.: Date: This Report Covers: Monthly Quarterly Annual Other

More information

SEPARATION SEAL UPGRADE TO OVERCOME REPETITIVE FAILURES

SEPARATION SEAL UPGRADE TO OVERCOME REPETITIVE FAILURES SEPARATION SEAL UPGRADE TO OVERCOME REPETITIVE FAILURES Author : Rasgas Pradip B Sonavane (Senior Engineer - Rotating Equipment) AbdelKhalek, Mohamed H (Advisor - Rotating Equipment) Quraisy Shatri (Head

More information

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society Guideline No.M-05(201510) M-05 AIR COMPRESSOR Issued date: 20 October 2015 China Classification Society Foreword This Guideline constitutes the CCS rules, and establishes the applicable technical requirements

More information

DEVELOPING YOUR PREVENTIVE MAINTENANCE PROGRAM

DEVELOPING YOUR PREVENTIVE MAINTENANCE PROGRAM DEVELOPING YOUR PREVENTIVE MAINTENANCE PROGRAM By Owe Forsberg, Senior Consultant You are the new Reliability Engineer in a plant that currently lacks documented procedures to maintain the plant. You have

More information

OWNER S TECHNICAL MANUAL

OWNER S TECHNICAL MANUAL EL SERIES OWNER S TECHNICAL MANUAL DP7002 1 Air Operated Diaphragm Pump Description The DP7002 1 air operated diaphragm pump is the ideal device for the pumping, transfer and dispensing of chemical liquids,

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1 Dry 131h 1. DESCRIPTION The Viking Model G-1 Maintenance Air Compressor is an electric motor-driven, aircooled, single-stage, oil-less compressor. The unit is equipped with a check valve and provides a

More information

API Piping Plan 62: A Reliable Quench System

API Piping Plan 62: A Reliable Quench System MAY05PUMPS&SYSp24-33 4/19/05 4:04 PM Page 24 It s one of the few methods you have to control the environment outside a mechanical seal. By Keith Schindler, PE, Schindler Engineering, Inc., and Paul McMahan,

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

Hydraulic Reliability & Preventive Maintenance Report

Hydraulic Reliability & Preventive Maintenance Report Hydraulic Reliability & Preventive Maintenance Report The following is a report of the test, procedures and recommendations for the in-plant press. This information was recorded on May 10 th and 11 th,

More information

Economic Benefits Of Compressor Analysis >

Economic Benefits Of Compressor Analysis > Economic Benefits Of Compressor Analysis > Improving gas flow through a compressor maximizes value and revenue By EDWARD B. FLANAGAN, PE Edward B. Flanagan, PE, is the general manager at Windrock Inc.

More information

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE Rohrback Cosasco Systems, Inc. 11841 E. Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com

More information

Improve Reliability of Turbomachinery Lubrication and Sealing Systems

Improve Reliability of Turbomachinery Lubrication and Sealing Systems Improve Reliability of Turbomachinery Lubrication and Sealing Systems Fisher Pressure Control Solutions For Turbomachinery Applications Protect the integrity of your Turbomachinery support system Turbomachinery

More information

Analysis of Instrumentation Failure Data

Analysis of Instrumentation Failure Data Analysis of Instrumentation Failure Data A structured approach Standards Certification Education & Training Publishing Conferences & Exhibits Matthew F. (Matt) Murphy Senior Consultant, DuPont Engineering

More information

Compressor Seal Replacement and Upgrades SERVICES

Compressor Seal Replacement and Upgrades SERVICES Compressor Seal Replacement and Upgrades SERVICES Compressor Seal Upgrades An Elliott Group compressor seal upgrade increases seal reliability and reduces process gas leakage to improve overall efficiency.

More information

The routine maintenance and inspection of local exhaust ventilation (LEV)

The routine maintenance and inspection of local exhaust ventilation (LEV) The routine maintenance and inspection of local exhaust ventilation (LEV) This document details the standards for inspection and maintenance that should be achieved for all local exhaust ventilation owned

More information

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions.  IMPORTANT NOTICE SAPAG IMPORTANT NOTICE Contents Important notice 1 0 Valve identification 2 1 Storage 2 2 Installation 2 3 Operation 2 4 Maintenance 3 4.1 Dismantling 3 4.2 Inspection 3 4.3 Repair 3 4.4 Assembly 4 4.5

More information

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25 Self-operated Pressure Regulators Differential Pressure Regulators (opening) Type 42-20 Type 42-25 Type 42-20 Differential Pressure Regulator Type 42-25 Differential Pressure Regulator Mounting and Operating

More information

Mechanical Seal Piping Plans

Mechanical Seal Piping Plans Mechanical Seal Piping Plans Single Seals plans 01, 02, 11, 13, 14, 21, 23, 31, 32, 41 Dual Seals plans 52, 53A, 53B, 53C, 54 Quench Seals plans 62, 65 Gas Seals plans 72, 74, 75, 76 Mechanical Seal Piping

More information

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM Brookhaven National Laboratory Major Plant Equipment Categories / Locations Compressor Refrigerator Service Buildings The Maintenance program is based on the

More information

Industrial Compressor Controls Standard Custom

Industrial Compressor Controls Standard Custom Technical Seminars 2012 Industrial Compressor Controls Standard Custom CONTROLLING the power of ENERGY 1 TM 2 Woodward Compressor Controls Small Steam Turbine Driven Compressors (ITCC) 3 Simple Compressor

More information

SF SERIES CNG COMPRESSOR MODEL HF-4MH. 4 Nm3/Hour Displacement OPERATION MANUAL

SF SERIES CNG COMPRESSOR MODEL HF-4MH. 4 Nm3/Hour Displacement OPERATION MANUAL SF SERIES CNG COMPRESSOR MODEL HF-4MH 4 Nm3/Hour Displacement OPERATION MANUAL 1 Content 1. General Description...3 2. Main technical parameters...3 3. Structural principle...4 3.1Main structure...4 3.2Compressor

More information

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST OIL-LESS TYPE IMPORTANT: PLEASE READ CAREFULLY BEFORE STARTING OPERATIONS. THE CONTENTS ARE FOR GENERAL INFORMATION OF ALL THE SIMILAR MODELS. Record

More information

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart Technical Standards and Legislation: Risk Based Inspection Presenter: Pierre Swart Agenda Change in Legislation. Where RBI fits in. Application to implement RBI. RBI concepts. Elements of an RBI analysis.

More information

A Sub-Synchronous Vibration Problem: Trapped Fluid in Compressor Coupling Spacer. Diagnosis and Resolution

A Sub-Synchronous Vibration Problem: Trapped Fluid in Compressor Coupling Spacer. Diagnosis and Resolution A Sub-Synchronous Vibration Problem: Trapped Fluid in Compressor Coupling Spacer Diagnosis and Resolution September 10-13, 2007 John E Sutton Chevron Energy Technology Company Pty Ltd Perth, Western Australia

More information

MUD 1. Vent check valves. Instruction and maintenance manual.

MUD 1. Vent check valves. Instruction and maintenance manual. MUD 1 Vent check valves Instruction and maintenance manual. Version: 04-02-2011. 2 List of Contents 1. INTRODUCTION 3 1.1 The Problem... 3 1.2 The Solution... 3 2. RULES AND REGULATIONS 3 2.1 General requirements....

More information

Gas Compressor Operation and Control

Gas Compressor Operation and Control Training Title Gas Compressor Operation and Control Training Duration 5 days Training Venue and Dates Gas Compressor Operation and Control 5 7 11 October, 2018 $4,000 Dubai, UAE Trainings will be conducted

More information

Easy Nest Kits. Installation Suggestions

Easy Nest Kits. Installation Suggestions Easy Nest Kits Installation Suggestions 2 General Recommendations Hydraulics Vacuum breakers should be installed to prevent siphoning. Flexible connectors should follow FRP tank manufacturers recommendations.

More information

Liquid ring vacuum pumps single-stage

Liquid ring vacuum pumps single-stage Liquid ring vacuum pumps single-stage LPH 40106, LPH 40411, LPH 40516 Pressure range: Suction volume flow: 150 to 1013 mbar 50 to 270 m³/h CONSTRUCTION TYPE Sterling SIHI liquid ring vacuum pumps are displacement

More information

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk (June 1999) (Rev.1 Mar 2006) (Rev.2 May 2007) (Rev.3 Mar 2010) (Corr.1 Feb 2011) (Rev.4 Oct 2013) Periodical surveys of cargo installations on ships carrying liquefied gases in bulk 1 General 1.1 Scope

More information

KOMPRESSOREN COMPRESSORS KAESER AIR SERVICE Our Services An Overview

KOMPRESSOREN COMPRESSORS KAESER AIR SERVICE Our Services An Overview KOMPRESSOREN Our Services An Overview Fully equipped 100% quality and service One of the key requirements for any compressed air application is maximum compressed air availability. This is achieved however

More information

Nirvana Variable-Speed Drive, Contact-Cooled Rotary Screw Air Compressors

Nirvana Variable-Speed Drive, Contact-Cooled Rotary Screw Air Compressors Variable-Speed Drive, Contact-Cooled Rotary Screw Air Compressors Exceptional Reliability Introducing - A True Variable-Speed Drive Compressor Now Available in Single- and Two-Stage. By matching a standard

More information

24 Litre Air Compressor

24 Litre Air Compressor Operator s Manual 24 Litre Air Compressor WARNING! Before using this appliance, read the Operator s manual and follow all its safety rules and instructions. SPECIFICATION Model Power ITEM DATA HWKAC2 1Kw/1.5HP&1.5Kw/2HP&1.8Kw/2.5HP

More information

Dry Gas Seal Rack CH-3185 Schmitten Tel Mail:

Dry Gas Seal Rack CH-3185 Schmitten Tel Mail: Dry Gas Seal Rack CH-3185 Schmitten Tel. +41 26 497 55 66 Mail: info@felcon.ch Usually, compressor modifications are carried out because of adaptations to new operating parameters. However, in cases of

More information

WW-720. Pressure Reducing Control Valve

WW-720. Pressure Reducing Control Valve WW-720 Pressure Reducing Control Valve (Size Ranges: 2-4 and 6-14 ) Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 720 Pressure Reducing is an automatic control valve (powered

More information

Hand pump type CH. Product documentation. 300 bar 8.3 cm 3 /stroke. Operating pressure p max : Displacement volume V max stroke :

Hand pump type CH. Product documentation. 300 bar 8.3 cm 3 /stroke. Operating pressure p max : Displacement volume V max stroke : Hand pump type CH Product documentation Operating pressure p max : Displacement volume V max stroke : 300 bar 8.3 cm 3 /stroke D 7147 CH 04-2018-1.1 by HAWE Hydraulik SE. The reproduction and distribution

More information

Cycle Isolation Monitoring

Cycle Isolation Monitoring Cycle Isolation Monitoring True North Consulting Greg Alder Santee Cooper Leif Svensen Scientech Symposium 2009 January 14-15, 15, 2009 Clearwater Beach, Florida Introduction Generating plants often suffer

More information

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE 11841 Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com Page: 2 of 26 Revision

More information

VERSION 1 SUMP PUMP PIT UNIT KAWAMOTO PUMP ASIA CO.,LTD.

VERSION 1 SUMP PUMP PIT UNIT KAWAMOTO PUMP ASIA CO.,LTD. SUMP PUMP PIT UNIT FEATURES All needed parts are assembled and united as a sump pit and easy to install for short period. Sump tank is made of SUS with epoxy coating and pipe is integrated by stainless

More information

STANDARD HIGH PRESSURE COMPRESSORS COMPACT PACKAGE FOR DEMANDING APPLICATIONS

STANDARD HIGH PRESSURE COMPRESSORS COMPACT PACKAGE FOR DEMANDING APPLICATIONS STANDARD HIGH PRESSURE COMPRESSORS COMPACT PACKAGE FOR DEMANDING APPLICATIONS 2 STANDARD HIGH PRESSURE COMPRESSORS BURCKHARDT COMPRESSION GLOBAL TECHNOLOGY LEADER IN THE RECIPROCATING COMPRESSOR WORLD

More information

Becker* Products Below Ground Ball Valve Regulators

Becker* Products Below Ground Ball Valve Regulators GE Oil & Gas Becker* Products Below Ground Ball Valve Regulators Reduce Noise Levels at Large Volume Regulator Stations GE s Becker* Below Ground ball valve regulator has the long-term proven reliability,

More information

SAMSON SOLUTIONS Energy and Power (Critical Applications)

SAMSON SOLUTIONS Energy and Power (Critical Applications) SAMSON SOLUTIONS Energy and Power (Critical Applications) Speakers: Ing. Gianluigi Rossi Ing. Stefano Salvadori Managing Director - SAMSON Italy Head of Sales and Project Department - SAMSON Italy MARKET

More information

Mechanical Seal Piping Plans

Mechanical Seal Piping Plans Mechanical Seal Piping Plans Single Seals plans 01, 02, 03, 11, 13, 14, 21, 23, 31, 32, 41 Dual Seals plans 52, 53A, 53B, 53C, 54, 55 Quench Seals plans 62, 65A, 65B, 66A, 66B Gas Seals plans 72, 74, 75,

More information

Premature Dry Gas Seal Failure on a Sales Gas Centrifugal Compressor. Sergio Vidal (Saudi Aramco, Hawiyah Gas Plant - Reliability Unit)

Premature Dry Gas Seal Failure on a Sales Gas Centrifugal Compressor. Sergio Vidal (Saudi Aramco, Hawiyah Gas Plant - Reliability Unit) Premature Dry Gas Seal Failure on a Sales Gas Centrifugal Compressor Sergio Vidal (Saudi Aramco, Hawiyah Gas Plant - Reliability Unit) 1 Index Copyright Saudi Aramco (YEAR). All rights reserved. No portion

More information

International Research Journal of Electronics and Computer Engineering Vol 1(3) Oct-Dec 2015

International Research Journal of Electronics and Computer Engineering Vol 1(3) Oct-Dec 2015 The PLC Based Design for the Air Compressor Control Process Miss Zahra Haghparas Electrical and electronic engineering Shiraz university of technology Shiraz, Iran f.haghparas@yahoo.com Ebrahim Abiri Associate

More information

HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS

HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS Proceedings of the First Middle East Turbomachinery Symposium February 13-16, 2011, Doha, Qatar HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS Amer A. Al-Dhafiri Rotating Equipment Engineer Nabeel M. Al-Odan

More information

A large Layer of Protection Analysis for a Gas terminal scenarios/ cause consequence pairs

A large Layer of Protection Analysis for a Gas terminal scenarios/ cause consequence pairs A large Layer of Protection Analysis for a Gas terminal 2000+ scenarios/ cause consequence pairs Richard Gowland European process Safety Centre The scope of the study was a large gas terminal handling

More information

Part IV: Troubleshooting

Part IV: Troubleshooting Part IV: Troubleshooting Excessive Oil Carryover Pump-Up Time Test Excessive oil carryover can have adverse effects on the performance of pneumatic climate control systems. Although some oil entrainment

More information

V-Major, V-Compact. Reciprocating Compressors. Intelligent Air Technology

V-Major, V-Compact. Reciprocating Compressors. Intelligent Air Technology V-Major, V-Compact Reciprocating Compressors Intelligent Air Technology & Significant Energy Savings with Lower Running Costs Efficient. LOW POWER CONSUMPTION 75% of the running cost of an air compressor

More information

Installation & Operation Manual Proven Quality since 1892

Installation & Operation Manual Proven Quality since 1892 Content 1. ERIKS operating companies 2. Product description 3. Requirements for maintenance staff 4. Transport and storage 5. Function 6. Application 7. Installation 8. Maintenance 9. Service and repair

More information

TECHNICAL DATA Q= C. Table 1 - Specifications

TECHNICAL DATA Q= C. Table 1 - Specifications September 25, 2013 Pressure Regulation 537a 1. Description The Model B-3 Pilot Operated Pressure Control Valve is a factory assembled unit. The unit consists of a Model J-2 Halar coated Flow Control Valve,

More information

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle SB Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing A family of API liquid ring compressors has been developed and has been in the market for nearly a decade, they are specifically made

More information

WW-720. Pressure Reducing Control Valve

WW-720. Pressure Reducing Control Valve WW-720 Pressure Reducing Control Valve (Size Ranges: 2-4 and 6-14 ) Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 720 Pressure Reducing is an automatic control valve (powered

More information

Reclaim Basic Set Up

Reclaim Basic Set Up This purpose of the document is to simplify the set up and understand the Gas Services reclaim system functions. The Gas Services Reclaim Manual is to be used for reference, maintenance, and servicing.

More information

Maintenance handbook

Maintenance handbook Maintenance handbook ontents HPU IDENTIFIATION SHEET... 4 1. MAINTENANE... 5 1.1 Filling level... 5 1.2 Fluid top-up... 5 1.3 Fluid replacing... 5 1.4 Fluid temperature control... 6 1.5 Functional control...

More information

Technical Specifications of Hydrogen Isotope Handling and Recovery System

Technical Specifications of Hydrogen Isotope Handling and Recovery System SECTION - C TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS. Technical Specifications of Hydrogen Isotope Handling and Recovery System INSTITUTE FOR PLASMA RESEARCH GANDHINAGAR, GUJARAT 382428 ANNEXURE-I

More information

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is

More information

Technical Service Bulletin March 2015 TSB142.01

Technical Service Bulletin March 2015 TSB142.01 Technical Service Bulletin March 2015 TSB142.01 Commissioning Procedure for HYDRAcap This Technical Service Bulletin provides information for commissioning of a HYDRAcap membrane system in a water treatment

More information

Liquid ring compressor

Liquid ring compressor Liquid ring compressor KLH 47005, KLH 47105 Compression pressures: Suction volume flow: 2 to 11 bar 56 to 65 m³/h CONSTRUCTION TYPE Sterling SIHI liquid ring compressors are displacement compressors of

More information

Installation, Operation, and Maintenance Manual Parker Balston Model N2-04 Nitrogen Generator

Installation, Operation, and Maintenance Manual Parker Balston Model N2-04 Nitrogen Generator Installation, Operation, and Maintenance Manual Parker Balston Figure 1 - N2-04 Nitrogen Generator These instructions must be thoroughly read and understood before installing and operating this product.

More information

Condition Based Maintenance Of Rotating Equipments On OSI PI Platform Refineries/ Petrochem Plants

Condition Based Maintenance Of Rotating Equipments On OSI PI Platform Refineries/ Petrochem Plants Condition Based Maintenance Of Rotating Equipments On OSI PI Platform Refineries/ Petrochem Plants Haridoss Padmanabhan Lead Consultant TABLE OF CONTENTS Introduction...3 Different Maintenance Methodologies...

More information

The Univentor 1250 Anaesthesia Unit

The Univentor 1250 Anaesthesia Unit THE UNIVENTOR 1200/1250 ANAESTHESIA UNIT The Univentor 1250 Anaesthesia Unit TABLE OF CONTENTS EDITION 1 Section 1 - WARRANTY & SERVICE 1.1. WARRANTY 2 1.2. DAMAGED SHIPMENTS 2 1.3. SERVICE 2 Section 2

More information

GAS SEAL CONTAMINATION

GAS SEAL CONTAMINATION Proceedings of the First Middle East Turbomachinery Symposium February 13-16, 2011, Doha, Qatar GAS SEAL CONTAMINATION Raphael Bridon Components Focus Factory Manager Dresser-Rand Le Havre, France rbridon@dresser-rand.com

More information

TECHNICAL DATA. Table 1 - Specifications

TECHNICAL DATA. Table 1 - Specifications Page 1 of 6 1. DESCRIPTION Model A-3 Pilot Operated Pressure Control Valves are factory assembled units. Each unit consists of a Model H-2 Halar coated Flow Control Valve, a Speed Control Valve, a Model

More information

AIR BRAKE SYSTEM TROUBLESHOOTING

AIR BRAKE SYSTEM TROUBLESHOOTING AIR BRAKE SYSTEM TROUBLESHOOTING Page 10 04_26125_pg10-11.pmd 10 5/27/2004, 7:59 PM Page 11 1.) Before replacing any valve with a new or remanufactured valve, be sure to blow the air lines out either using

More information

Hi-Force Limited Prospect Way Daventry Northants NN11 8PL United Kingdom Tel: +44(0) : Fax: +44(0) : Website:

Hi-Force Limited Prospect Way Daventry Northants NN11 8PL United Kingdom Tel: +44(0) : Fax: +44(0) : Website: 1.0 Inspection of the product upon receipt: On receipt of the product, visually inspect the item for any evidence of shipping damage. Please note shipping damage is not covered by warranty. If shipping

More information

Liquid ring vacuum pumps in compact design

Liquid ring vacuum pumps in compact design Liquid ring vacuum pumps in compact design LEM 26, LEM 51 Pressure range: Suction volume flow: 33 to 113 mbar 3 to 58 m³/h CONSTRUCTION TYPE SIHI liquid ring vacuum pumps are displacement pumps of uncomplicated

More information

Eaton Filtration, LLC

Eaton Filtration, LLC Eaton Filtration, LLC 900 Fairmount Avenue, Elizabeth, NJ 07207 Phone: 908-787-1000 Fax: 908-351-7893 E-Mail: filtration@eaton.com Web: www.filtration.eaton.com Installation, Operation & Service Manual

More information

Thermoflex Online. October 5 th, 2017 Bram Kroon

Thermoflex Online. October 5 th, 2017 Bram Kroon Thermoflex Online October 5 th, 2017 Bram Kroon Introduction Name Company: Department: Location Position: Thermoflex Bram Kroon Engie Energie Nederland (Generation) Eems & Lelystad Power Plant Process

More information

AQUAMATIC EASY NEST KITS INSTALLATION SUGGESTIONS

AQUAMATIC EASY NEST KITS INSTALLATION SUGGESTIONS AQUAMATIC EASY NEST KITS INSTALLATION SUGGESTIONS TABLE OF CONTENTS TABLE OF CONTENTS...2 GENERAL RECOMMENDATIONS...2 TROUBLESHOOTING GUIDE...3 EXISTING EASY NEST SYSTEM TROUBLESHOOTING GUIDE...4 COMPONENT

More information

Frequently Asked Questions Directive 056 Facilities Technical

Frequently Asked Questions Directive 056 Facilities Technical Frequently Asked Questions Directive 056 Facilities Technical October 2017 This document clarifies and supports some of the technical requirements related to Directive 056: Energy Development Applications

More information

Hydro Plant Risk Assessment Guide

Hydro Plant Risk Assessment Guide September 2006 Hydro Plant Risk Assessment Guide Appendix E10: Compressed Air System Condition Assessment E10. 1 GENERAL Compressed air systems are key components at hydroelectric power plants. Compressed

More information

Challenges in Relief Design for Pilot Plants

Challenges in Relief Design for Pilot Plants Challenges in Relief Design for Pilot Plants Published on July 5, 2017 Michael Trainor Relief system design at the pilot scale presents unique challenges that don t always apply at the commercial scale.

More information

RICK FAUSEL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES

RICK FAUSEL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES RICK FAUL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES The primary design objective for any turbomachinery control system should be to maintain or maximize machine and

More information

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES s of the IGF Code CONTENTS GF1 Test for gas fuel tank s high level alarm Rev.1 July 2017 GF2 Ship Steel Protection against Liquefied Gas Fuel (Part

More information

WW-730. Pressure Sustaining/Relief Control Valve

WW-730. Pressure Sustaining/Relief Control Valve WW-730 Pressure Sustaining/Relief Control Valve Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 730 Pressure Relief / Sustaining Valve is an automatic control valve designed to

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure and compressed gases flow through the Gas Scrubber (MBF-4540) to the Glycol Contactor (MAF-0900). In the Contactor, gas flows through trays, contacting the lean glycol

More information

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL DESCRIPTION 1. No mar 2. No mar tip 3. Housing grip 4. Trigger 5. Air inlet 6. Air inlet plug 7. Plastic board Important! It is essential that you read the

More information

Temperature Controllers

Temperature Controllers IM0004 April 2013 CONTENTS T-12 Thermostat PAGE Introduction 1 Scope 1 Description 1 Specification 1 Temperature Controllers 2 INTRODUCTION CAUTION Prior to installing, the instructions provided herein

More information

COSASCO 6000 PSI DOUBLE ISOLATION SERVICE VALVE MAINTENANCE

COSASCO 6000 PSI DOUBLE ISOLATION SERVICE VALVE MAINTENANCE COSASCO 6000 PSI DOUBLE ISOLATION SERVICE VALVE MAINTENANCE 11841 Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com Page: 2 of 28 Revision History

More information

Mechanical Seal Piping Plans

Mechanical Seal Piping Plans Mechanical Seal Piping Plans Companion Booklet Single Seals Dual Seals Quench Seals Second. Cont. Dual Gas Introduction A primary factor in achieving highly reliable, effective sealing performance is to

More information

Key Features & Advantages of JEHA MK IV (5,000 PSI Hydraulic Test Stands)

Key Features & Advantages of JEHA MK IV (5,000 PSI Hydraulic Test Stands) Key Features & Advantages of JEHA MK IV (5,000 PSI Hydraulic Test Stands) The key reasons why MRO Facility now requires 5,000 PSI Hydraulic Test Stand are as follows: 1) New generation commercial aircraft

More information

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger OM008 Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger The operating and maintenance instructions contained within this package are for Pacific water/water

More information

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL 00, 0, 000 00, 000, 00 A. TECHNICAL INFORMATION Model 00 Inlet/Outlet " Air Inlet /" 0 / 000 /" /" 00 /" /" 000 /" /" 00 /" /" Flow Rate GPM/ 0LPM GPM/ 0LPM GPM/ LPM GPM/ LPM GPM/ 0LPM GPM/ 0LPM Maximum

More information

PRE BID QUERIES FOR CNG & CITY GAS DISTRIBUTION FOR HYDERABAD. Clause No. Description in tender documents Clarifications / Request for change

PRE BID QUERIES FOR CNG & CITY GAS DISTRIBUTION FOR HYDERABAD. Clause No. Description in tender documents Clarifications / Request for change Tender : Bid Document : BGL/100/2010-11 PRE BID QUERIES FOR CNG & CITY GAS DISTRIBUTION FOR HYDERABAD Sl. Clause Description in tender documents Clarifications / 1. ARTICLE 19 :Price If the contractor

More information

Liquid ring compressors

Liquid ring compressors Liquid ring compressors KPH 85220, KPH 85227 Compression pressures: Suction volume flow: 2 to 7 bar 940 to 1450 m³/h CONSTRUCTION TYPE Sterling SIHI liquid ring compressors are displacement compressors

More information

SHELL FLAGS INSPECTION CASE STUDY

SHELL FLAGS INSPECTION CASE STUDY SHELL FLAGS INSPECTION CASE STUDY J. Nonemaker, Solution Engineer, ROSEN T. Steinvoorte, Business Development, ROSEN R. Subramanian, Pipelines & Subsea Technical Support Engineer, Shell U.K. Limited Introduction

More information

Operating Instructions in accordance with the Machines Directive 2006/42/EC

Operating Instructions in accordance with the Machines Directive 2006/42/EC Lubricating Equipment Metering Technology for Grease and Oil High Pressure Hydraulic Customised Developments Operating Instructions in accordance with the Machines Directive 2006/42/EC Compressed air filling

More information

Liquid ring vacuum pumps in compact design

Liquid ring vacuum pumps in compact design Liquid ring vacuum pumps in compact design LEM 25, LEM 5 Pressure range: Suction volume flow: 33 to 113 mbar 4 to 6 m³/h CONSTRUCTION SIHI liquid ring vacuum pumps are displacement pumps of uncomplicated

More information

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch. Training Title CONTROL & SAFETY RELIEF VALVES Training Duration 5 days Training Venue and Dates Control & Safety Relief Valves 5 06-10 May, 2018 $4,000 Dubai, UAE Trainings will be conducted in any of

More information

COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE

COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE 11841 Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 Revision History Record www.cosasco.com Page: 2 of

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure and compressed gases flow to the Glycol Contactor (MAF-3110). In the Contactor, gas flows through trays, contacting the lean glycol that is flowing across the trays

More information