1 MODULE III - PROCESS DESIGN In approaching the design of a flare system, process engineers should make reference to the methodology/guidelines described in the API Standard 521, Pressure-relieving and Depressuring Systems (5 th Edition, January 2007), which is equivalent to ISO The standard contains very precise indications about the determination of individual relieving rates, definition of the system load, selection of disposal systems, as well as design criteria for the individual components of the disposal systems (e.g. flare headers, knockout drums, seal drums, etc.). In particular, in its latest edition, API STD 521 mentions two methods that allow the designer to evaluate the system design load with more accuracy than with traditional approach: dynamic simulation and combined probability analysis of installed HIPS (high-integrity protection systems). Since these techniques are relatively new, the attached paper gives an overview of both of them and illustrates the results of the application of the two techniques in some recent Projects developed by Foster Wheeler Italiana. MODULE III PROCESS DESIGN C.Gilardi FOSTER WHEELER ITALIANA March 2011

2 DYNAMIC SIMULATION, HIPS & COMBINED PROBABILITY ANALYSIS REDUCE FLARE LOADS Ingg. Chiara Gilardi, Mariateresa Tonello FOSTER WHEELER ITALIANA 1. Summary The capacity of the existing flare system can represent a bottleneck in refinery expansion projects, which entail an increase of plants capacity and/or addition of new process units. As a consequence, the capital expenditure to revamp the flare system could penalize the economics of the overall project. On the other hand, it has been widely experienced that the relief loads calculated on the basis of a traditional approach (i.e. the API standards) are generally overestimated. The conventional methods for calculating the relief loads from the individual sources and combining them to determine the total release to flare are in fact based on a number of assumptions that allow a simple and conservative approach to the problem, but usually lead to overdesign the flare system. In a revamping project, the identification of the margins available can represent a viable solution to accommodate the extra loads from new/revamped plants without compromising the safety. Dynamic simulation, HIPS addition with combined probability analysis have been experienced as powerful tools to produce a system model that predicts more accurately the relief loads to flare compared to static shortcut method. The present paper gives an overview of both techniques, as well as a synthesis of the results obtained in recent FWI projects where they have been applied. 2. Introduction Many refineries have plans to implement major upgrade projects with the target to increase overall throughput, to improve the products quality and/or to increase conversion level, by revamping the existing facilities as well as by addition of new process units. This leads to an increase of the loads discharged to refinery flare and, typically, the capacity of the existing flare systems represent a bottleneck for the planned expansion. Increasing the plant throughput and/or adding new process units, in fact, the loads to flare due to plant wide emergency events are expected to be higher, thus directionally implying: a built-up backpressure increase inside the flare system, that could reduce the relief valves capacity with possible overpressurization, above design pressure, of the connected equipment, an increase of radiated heat during flaring, that could exceed the allowable intensity at grade. As a consequence, a number of modifications to the original flare system design could become necessary before proceeding with the plant expansion. C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 1

3 The economical benefit of the revamping could be therefore penalised by the cost of flare network upgrading in order to safely collect and dispose the calculated additional relief load. Furthermore, if some big modifications are involved (for example, replacement of an existing stack by a higher structure), the relevant environmental impact should be considered as a further constraint, in addition to the technical and economical considerations. On the other hand, it has been widely experienced that the relief loads calculated on the basis of a traditional approach (i.e. the API standards) are generally overestimated. The conventional methods for: calculating the relief loads from the individual sources (in particular, from towers), combining the individual loads to evaluate the total release to flare, are in fact based on a number of assumptions that allow a simple and conservative approach to the problem, but can lead to flare system overdesign. In the following tables, some of the most effective hypotheses are listed: Evaluation of relief load from an individual source (i.e. a tower) 1) The fluid inventory is considered large enough to pressurize the tower up to the set pressure. 2) Fluids composition is assumed not changing during the failure. This means, for example, that reboiler pinch effect is not considered. Evaluation of total relief load to flare 1) 2) 3) The time dependence of individual releases is not considered, computing the maximum load as the sum of the peak loads from the single sources. Another approach, lacking of scientific evidence, is to consider 100% of the maximum single source load plus 50% of the other loads. The dynamic interaction between process items during emergency events is not considered. No full credit is given to the high integrity trips installed to reduce the total load to flare system. Many common practices (all based on experience or more frequently on the rule of thumb) are used to select which tripped loads contribute to the total load. Therefore, in order to achieve a reduction of the flare design load, some margin exists if a more realistic modelling of the single sources and/or of the entire system can be performed. The continuous improvement of the calculation tools and the possibility of accessing a great number of historical plant data make now possible a more rigorous approach to the problem by applying dynamic simulation modelling and/or by installation of HIPS with probabilistic calculations of their availability to mitigate the relief to flare. C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 2

4 3. Dynamic simulation to evaluate flare loads Dynamic simulation is a powerful tool to describe the system behaviour during the emergency events. Most of the assumptions on which are based the conventional methods can be abandoned for a time-dependent model that better estimates the process variables trend. The dynamic approach can be applied individually to each relief source or to a group of items, to evaluate the effect of the possible reciprocal interactions during emergency situations. In parallel, if any interlock system is installed to reduce the flare load during upsets, a statistical evaluation can be carried out to establish if the trip intervention may be considered reliable on demand. SINGLE SOURCE MULTIPLE SOURCES DYNAMIC SIMULATION TRIPS RELIABILITY STUDY OVERALL LOAD REDUCTION The results obtained by a combination of the above described techniques produce a system model that predicts more accurately the relief loads in case of failure, without the need of including in the flare system design capacity the large margins typical of a static shortcut method. Furthermore, the availability of information about the model reaction to perturbations and about the reliability of the installed cutout devices could highlight the most critical features of the plant. Starting from that point, some technical solutions could be implemented to improve the system design so that a fail-safe position is reached during emergencies. It has to be highlighted that both techniques (i.e. dynamic simulation and trips reliability study) to reduce the overall flare loads are mentioned and accepted in API Standard 521, 5 th Edition, January 2007 (equivalent to ISO 23251). In particular, reference is made to API 521 para. 5.22, and Annex E. C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 3

5 3.1 Analysis of loads from single sources For determining the relief loads from process equipment, two main improvements can be implemented by means of dynamic simulation: the time-dependence of the phenomena involving each real system can be considered, as a consequence, it is possible to take into account the accumulation terms in the material and energy balances. The introduction of the variable time allows the designer to study a series of real effects that are commonly experienced in field during upsets, but that can not be simulated and predicted by means of a stationary model. For example, the inertia of the system to process parameters rapid changes can be monitored: in many cases, when big towers have been analyzed, the time to reach the safety valve set pressure was extremely longer than the emergency duration or than the operator response time. Therefore, it has been reasonably assumed that no contribution to the total flare load had to be considered. Other effects that can contribute to a significant reduction of the calculated relief load from a single source are: The loss of liquid inventory, resulting in a stop of vaporisation. The continuous changes in liquid phase composition; as a consequence, the liquid hold-up raising temperature will result in a decrease of the heating medium driving force and consequently of the heat input. The intervention of protective measures to mitigate the upset consequence. For example, in case of general power failure, the automatic heat-off of a fired heater upstream a crude distillation tower will result in the decrease of heat input to the system. However, a critical analysis of the dynamic model is recommended to ensure that it correctly represents the real system. If possible, a comparison with actual plant transient data shall be made. When no data are available, the most conservative combination of assumptions shall be considered. The following table gives an indication of the loads reduction, compared to a conventional approach of calculation, achieved in revamping Projects for which FWI performed a dynamic simulation analysis. C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 4

6 Dynamic Simulation) Relief-load Reduction Results Emergency event: General Power Failure Type of column Relief load reduction, % Comment Preflash Tower 70 Crude Tower (1 st Project) 40 Crude Tower (2 nd Project) 50 Gas Plant Stabilizer 30 C3/C4 Splitter 30 Gas Plant Deethanizer 50 Naphtha Splitter 50 Isomerization Unit Stabilizer 20 CCR Stripper 20 Raffinate Column 10 Stripper Column 100 Xylene Column 100 Deethanizer Column 80 In addition to the significant load reduction, the dynamic model shows that the relief pressure is reached 16 minutes after the power failure occurrence. A model of the crude unit feed fired heater provided the feed temperature decay with time. The relief pressure is reached 5 minutes after the power failure occurrence. A model of the crude unit feed fired heater provided the feed temperature decay with time. The relief pressure is reached 3 minutes after the power failure occurrence. Reboiler pinch reduces the relief load. The relief load decays to zero 5 minutes after the event occurrence. Load reduction is due to sensible heat capacity despite an assumption of constant duty in the reboiler Load reduction is due to sensible heat capacity despite an assumption of constant duty in the reboiler Reboiler pinch reduces the relief load. The relief pressure is reached 7 minutes after the power failure occurrence. Reboiler pinch reduces the relief load. The relief pressure is reached 1 minute after the power failure occurrence. Heater liquid hold-up vaporized is not sufficient to reach relief valve set pressure. Small load reduction is due to the tray liquid hold-up contribution. Both the large volume of the system and the significant tray liquid hold-up prevent the column pressurization. Heater liquid hold-up vaporized is not sufficient to reach relief valve set pressure. Column pressure reaches its maximum after four minutes and then decays slowly. Load reduction is due to the large system volume to be pressurized before relief valve opening. Note: Above load reductions are taken from simulations runs developed for previous projects. Actual loads reduction for a specific system depends on heat and material balance, system configuration, operating conditions, size and type of equipment and control scheme. In particular, for the crude towers mentioned in the table, the dynamic model was worked out taking into account the reduction of the heat input into the system by giving credit to the automatic shutdown of the fired heater in case of general power failure. C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 5

7 The residual heat in the furnace refractory, on which the curve heat input versus time was built, has been estimated on the basis of the heater geometrical data, type of refractory and experimental data for similar systems. For the particular for project Crude Tower (1 st Project), it was calculated that the heater duty would be reduced to approximately 45% of normal operating duty after 1 minute from the emergency heat off. In order to better understand the dynamic behaviour of such a system, reference is made to the following curves, in which the tower pressure and the relief load are plotted against time. On time axis, general power failure event occurs at minute th min 37 t/h 63 rd min 30 t/h The relief valve set pressure is reached 5 after the general power failure occurrence, whereas the maximum load (37 t/h) is discharged approximately minutes after the event. C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 6

8 3.2 Combination of loads from multiple sources In parallel with the analysis of single systems behaviour during emergency events, the dynamic approach shows how to proceed for calculating the total load to flare system during a failure that involves two or more sources. A curve total load versus time can be obtained by summing, during each period, the single releases at that time. Therefore, no empirical assumptions are anymore needed to consider that the peak loads from the individual items are not necessarily contemporary. In the following table, an example of the afore described calculation is given: Flare relief load from Crude Unit and Saturated Gas Plant (in t/h) Time after the general Power Failure occurrence Tower Peak relief 5 min 10 min 15 min 20 min 25 min 30 min Preflash Tower Topping Tower Stabilizer Deethaniser C3-C4 Splitter Total Looking at the figures in the table, worked out for a FWI past Project, it can be noted that the overall load to the flare from Crude Distillation Unit and Saturated Gas Plant has been reduced from 160 t/h to 107 t/h (-33%). Flare load (t/h) % TOTAL LOAD CURVE SUMOF PEAK LOADS CURVES OF SINGLE LOADS Time after GPF (minutes) Also in this case, however, a conservative approach and a critical analysis of the assumptions/results are recommended to the designer. As an example, particular attention shall be made to the interactions of contiguous systems during the contingency event. For complex systems, in fact, an assumption that appears conservative for one subsystem could lead to underestimate the load from another source. C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 7

9 4. HIPS & Combined Probability 4.1 Trips reliability study Traditionally, during emergency events that involve the intervention of multiple trips (e.g. cooling water failure, general power failure), a number of empirical rules were adopted to account for potential interlock failure, for example: the trip on the item producing the maximum load to flare is assumed to fail, a fixed percentage of trips are considered to fail. These approaches, supported only by the experience, can be replaced by a probabilistic analysis based on statistical data. The frequency of failure of: a single trip a combination of two or more trips is evaluated. On this basis, if the frequency is below a preset value, the trips system is deemed sufficiently reliable for its service and the loads associated to their failure are not accounted for in the flare system design load. The evaluation of trips reliability is based on a Fault Tree analysis starting from basic components unavailability data: LEVEL 1 BASIC COMPONENTS FAILURE LEVEL 2 SINGLE TRIPS FAILURE LEVEL 3 MULTIPLE TRIPS FAILURE 1. LOGICAL COMBINATION 2. LOGICAL COMBINATION Basic elements failure rates are available from data banks and specialist sources. Therefore, the unavailability of the basic elements is calculated depending on test frequency, test duration, maintenance duration. As a further step, a rigorous approach is used to calculate single trips failure rates: the relationships between interlock initiators and actuators are described by means of simple logical operations ( OR and AND ) and the trip failure frequency is calculated as a combination of the basic elements data. For example, the failure rate of a system composed of redundant initiators is lower than single initiator failure frequency, being lower the probability that all the elements fail to act contemporarily. Besides the evident advantages (simplicity, standardisation) of this method, a further benefit is the possibility of a critical analysis of the results, eventually identifying a number of viable modifications to increase the interlock reliability: C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 8

10 changing the configuration (for example, by adding redundant initiators or actuators), increasing basic element reliability (for example, by increasing the test frequency). Following the same probabilistic approach, the combined failure frequency of trips installed on different items can be evaluated, if their simultaneous intervention is expected due to a common process reason (for example, overpressurization due to a plantwide emergency). Applying this method in a revamping project, the first step is to determine a target maximum load to flare, so that the margin in the capacity of the flare system is saturated. The chance of releasing an overall flow higher than the flare capacity depends on the chance that two or more of the trips fail to act, therefore releasing a combined load over the evaluated target. Furthermore, as a result of the fault tree analysis, a probability value can be calculated for each of the possible combinations of all the trips in both the configurations of failure and intervention; the probabilities for those combinations producing an overall load exceeding the target are added together in order to obtain the combined probability to exceed the flare capacity. Finally, the obtained figure is combined with the frequency of the common emergency occurrence: if the resulting frequency is considered low enough (for example, 1 event every 1,000,000 years), the system is deemed reliable and the target flare load not exceeded. In the following table are shown the max flare capacities, compared with maximum load without considering trips action, for some projects for which FWI successfully performed the probability study, thus leading to the conclusion that no replacement/revamping the flare system was needed. Project Max flare capacity / Maximum load (without considering trips action) "A" 30 % "B" 23 % "C" 23 % "E" 40 % "F" 40 % "G" 80 % "H" 80 % C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 9

11 4.2 Level 1 - Basic component failure The unavailability (also called Fractional Dead Time FDT) is the fraction of time whilst the system or one component is not available. In other words, the unavailability is the probability that, at any given time, the protection system does not respond. In order to calculate the unavailability of the single basic components, the following data need to be defined: Failure rate λ (time -1 ) or the Mean Time Between Failure (time) MTBF = 1 λ Time between test τ (TBT) (time) Repair time µ (time -1 ) or the Mean Time To Repair MTTR = 1 µ Test duration θ (time) References for sources of values in terms of failure rate, time between tests, repair time and test duration of the single basic component are for example: Offshore Reliability Data Handbook (Oreda 84 & Oreda 97 & Oreda 2002) Safety Equipment Reliability Handbook (Exida 2007) Sintef Automatic Control Comparative Reliability Assessment The Institution of Chemical Engineers - Course Manual on Hazard Analysis (Hazan) Starting from the "Failure Rates", the probability that a single trip system could not be available (Fractional Dead Time) is calculated from the combined unavailabilities of the trip components causing the undesired system state (top event). Indicative failure rates, for reference only, of a number of single components are reported in the following table. Basic component Test duration (hours) MTTR (hours) Time between test (months) Dangerous Failure rate (failure/year) Pressure Switch Pressure Transmitter Solenoid valve Block valve Control valve (on gas) (*) 10 (*) 0.32 ESD fail safe (**) (**) (*) Component in continuous operation. (**) ESD unavailability for maintenance and test is not considered due to ESD redundancy. Frequency of test and accurate maintenance for trip components operating on demand is strictly related to the fixed probability threshold which is considered acceptable for the risk that the flare is subjected to handle more than the design flow. C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 10

12 Therefore, in order to maintain trip reliability at the fixed threshold, a test schedule and a maintenance program of instrumentation and trips systems components should be established. Tests shall be performed at the required frequencies and written record of test data/results shall be compiled by the personnel responsible for the tests. The impact of test frequency on the unavailability for solenoid valves is given, as an example, in the following table: Test interval Test No. per year Probability to fail on demand No. of failures on demand It is evident that the trip unavailability is directly proportional to the test interval. 4.3 Level 2 - Single trip failure The fault tree analysis is a logical construction that permits the calculation of the unavailability of a complex system starting from data relevant to the single basic components of the system. Fault tree analysis is carried out in two stages: construction of the logic fault tree calculation of the unavailability of the system The fault tree is composed by a series of logical gates ("OR" and "AND"): the combination of the unavailability data for each branch of the gate results in the total probability of failure for the analyzed subsystem. The complexity of the fault tree is gradually increased up to reproduce the overall trip configuration. With reference to the trip s architecture shown in Figure A): in Figure B) the fault tree analysis is shown for the 2 out of 3 PSHH; in Figure C) the fault tree analysis worked out for the complete trip (Block valve actuated by 2 out of 3 pressure switches) is enclosed. Figure A) Block valve actuated by 2 out of 3 pressure switches PS HH IA SOV PS HH PS HH 2oo3 voting system I BV to atm process line C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 11

13 Figure B) 2 out of 3 PSHH fault tree analysis Figure C) Block valve actuated by 2oo3 pressure switches Dynamic simulation and combined probability analysis to reduce flare system loads C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 12

14 As already discussed, one of the benefits of the rigorous approach introduced by the fault tree analysis is to provide a useful indication to the designer in order to improve the system reliability. As an example, looking at the figures in Figure C), it appears not convenient to further improve the ESD reliability, which is already high if compared with the reliability of the other system components, whereas the designer could decide to reduce the trip unavailability by decreasing the failure rate of the solenoid valve. For this purpose, the designer could decide either to install redundant elements and/or improve the system architecture. The influence of the trip configuration on the reliability is analyzed in the following example, in which the unavailability of a system composed of one/multiple solenoid valves (SOV) is evaluated considering different configurations. Four different arrangements have been considered: single solenoid valve, two solenoid valves in series, two solenoid valves in parallel and four solenoid valves (two in series by two in parallel). The configuration with two solenoid valves in series is more reliable than a single SOV system, but introduces a higher probability of spurious trips occurrence. On the other hand, the configuration with two solenoid valves in parallel reduces the frequency of spurious trips, but the system reliability is significantly penalized. Four solenoid valves arrangement (two in series by two in parallel) has a low incident of spurious trips and at the same time a high reliability. In the following table, the probability to fail on demand is compared for the different solenoids arrangement. The relevant probability is only an indication to compare the different cases. SOV configuration Probability to fail on demand No. of failures on demand one SOV 0.05 two SOV in series two SOV in parallel 0.1 four SOV (two in series by two in parallel) Level 3 - Multiple trips failure - Combined Probability The probability of releasing to flare an overall flow higher than flare capacity will be dependent on the chance that two or more trips fail to act. A probability value can be calculated for each of the possible trips combinations in all configurations of failure. The probabilities for those combinations producing an overall load exceeding the Target Flowrate" are added together in order to obtain the combined probability. For complex systems, the calculation is usually made by means of a dedicated computer program. The combined probabilities to exceed the "Flare System Target Flowrate" have to be correlated at the frequency of the event. The probability that the flare capacity is exceeded will be the combined probability multiplied the frequency of the event (e.g. the general power failure frequency). Dynamic simulation and combined probability analysis to reduce flare system loads C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 13

15 The probability gives the frequency at which the flare capacity may be exceeded; anyhow the risk that such event may happen anytime is not excluded. In the following table, an example of combined probability calculation is given. Reported data refer to a revamping Project for which FW performed a flare load reduction analysis for power failure contingency. Trip Flowrate discharged Flowrate discharged Probability Number for trip action for trip failure to fail kg/h kg/h E E E E E E E E E E E E E E-05 TOTAL Target flowrate: 270,000 kg/h Power failure frequency: 1 event every 5 years Probability to exceed target: 3.0 E-7 Target flowrate exceeded: once every 16,700,000 years It has to be pointed out that without considering the trips action a total flowrate to flare would have been 664,000 kg/h, while the design can be based on the target flowrate (60% reduction) following the results of probabilistic analysis. Similar considerations could be applied for hydraulic calculation. Flare system piping, sub-headers and headers, should be hydraulically verified or designed based on the same approach. For each sub-header and for the header, combined probability of multitrip failure instead of conventional approach, could allow a flow reduction for which the suitability of the already installed piping shall be checked reducing the requirement for piping modification. 5. Conclusion There are no universally applicable criteria to define whether or not risks are tolerable; this is a social and political judgment, which can be guided but not replaced by technical advice. It is therefore impossible to be precise about whether a risk is tolerable because: Dynamic simulation and combined probability analysis to reduce flare system loads C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 14

16 The value judgments about what is tolerable vary between individuals and between societies, alter with time, accident experience and changing expectations of life, and depend on the perceived risks and benefits of the particular activity; The risk estimates themselves contain uncertainties, often estimated to be an order of magnitude. The criteria recently followed by some official authorities to set the individual risk threshold for the public, such as VROM (the Netherlands, see note 1) and HSE (United Kingdom, see note 2), refer to a tolerable risk in the range of 10-5 / As a general rule, the risk criteria associated to new installations are set to be more stringent than for existing situations. With reference to the above example, it was deemed not necessary to revamp the existing flare system, by accepting the probability to exceed the target flowrate resulting lower than once every 1,000,000 years. Notes: (1) Ministry of Housing, Physical Panning and Environment (VROM) of the Government of the Netherlands. (2) Health and Safety Executive (HSE) of the Government of the United Kingdom. Dynamic simulation and combined probability analysis to reduce flare system loads C.Gilardi, M.Tonello FOSTER WHEELER ITALIANA March page 15

Quantitative Risk Analysis (QRA)

Quantitative Risk Analysis (QRA) Quantitative Risk Analysis (QRA) A realistic approach to relief header and flare system design Siemens AG 2017, All rights reserved 1 Quantitative Risk Analysis Introduction Most existing pressure relief

More information

Every things under control High-Integrity Pressure Protection System (HIPPS)

Every things under control High-Integrity Pressure Protection System (HIPPS) Every things under control www.adico.co info@adico.co Table Of Contents 1. Introduction... 2 2. Standards... 3 3. HIPPS vs Emergency Shut Down... 4 4. Safety Requirement Specification... 4 5. Device Integrity

More information

RELIEF VALVES IN PARALLEL

RELIEF VALVES IN PARALLEL RELIEF VALVES IN PARALLEL Mary Kay O'Connor Process Safety Center International Symposium BEYOND REGULATORY COMPLIANCE MAKING SAFETY SECOND NATURE October 26-28, 2010 James R. Lawrence Sr. Why use a Relief

More information

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI Identification and Screening of Scenarios for LOPA Ken First Dow Chemical Company Midland, MI 1 Layers of Protection Analysis (LOPA) LOPA is a semi-quantitative tool for analyzing and assessing risk. The

More information

High Integrity Pressure Protection Systems HIPPS

High Integrity Pressure Protection Systems HIPPS High Integrity Pressure Protection Systems HIPPS HIPPS > High Integrity Pressure Protection Systems WHAT IS A HIPPS The High Integrity Pressure Protection Systems (HIPPS) is a mechanical and electrical

More information

Challenges in Relief Design for Pilot Plants

Challenges in Relief Design for Pilot Plants Challenges in Relief Design for Pilot Plants Published on July 5, 2017 Michael Trainor Relief system design at the pilot scale presents unique challenges that don t always apply at the commercial scale.

More information

Transient Analyses In Relief Systems

Transient Analyses In Relief Systems Transient Analyses In Relief Systems Dirk Deboer, Brady Haneman and Quoc-Khanh Tran Kaiser Engineers Pty Ltd ABSTRACT Analyses of pressure relief systems are concerned with transient process disturbances

More information

Instrumented Safety Systems

Instrumented Safety Systems Instrumented Safety Systems Engineered Valve Systems for Control and Safety Applications HIPPS Final Elements DINO OLIVIERI Mokveld Agent AIS ISA Giornata di studio HIPPS Agenda The loop Final Elements

More information

Advanced LOPA Topics

Advanced LOPA Topics 11 Advanced LOPA Topics 11.1. Purpose The purpose of this chapter is to discuss more complex methods for using the LOPA technique. It is intended for analysts who are competent with applying the basic

More information

Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance

Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance Mary Ann Lundteigen and Marvin Rausand mary.a.lundteigen@ntnu.no RAMS Group Department of Production and Quality Engineering NTNU

More information

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT Kieran J Glynn, Advisor Major Accident Risk, BP, UK The exceedance curve approach was developed following the issue of the 2003

More information

LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE)

LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE) LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE) Politecnico di Milano, Italy piero.baraldi@polimi.it 1 Types of maintenance approaches Intervention Unplanned Planned

More information

How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology. Jump Start Guide

How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology. Jump Start Guide How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology Jump Start Guide Problem Statement In this guide, you will be introduced to the tools in BLOWDOWN that can be used

More information

L&T Valves Limited SAFETY INTEGRITY LEVEL (SIL) VERIFICATION FOR HIGH INTEGRITY PRESSURE PROTECTION SYSTEM (HIPPS) Report No.

L&T Valves Limited SAFETY INTEGRITY LEVEL (SIL) VERIFICATION FOR HIGH INTEGRITY PRESSURE PROTECTION SYSTEM (HIPPS) Report No. L&T Valves Limited TAMIL NADU SAFETY INTEGRITY LEVEL (SIL) VERIFICATION FOR HIGH INTEGRITY PRESSURE PROTECTION SYSTEM (HIPPS) MAY 2016 Report No. 8113245702-100-01 Submitted to L&T Valves Ltd. Report by

More information

Understanding safety life cycles

Understanding safety life cycles Understanding safety life cycles IEC/EN 61508 is the basis for the specification, design, and operation of safety instrumented systems (SIS) Fast Forward: IEC/EN 61508 standards need to be implemented

More information

Combining disturbance simulation and safety analysis techniques for improvement of process safety and reliability

Combining disturbance simulation and safety analysis techniques for improvement of process safety and reliability 17 th European Symposium on Computer Aided Process Engineering ESCAPE17 V. Plesu and P.S. Agachi (Editors) 2007 Elsevier B.V. All rights reserved. 1 Combining disturbance simulation and safety analysis

More information

Steam generator tube rupture analysis using dynamic simulation

Steam generator tube rupture analysis using dynamic simulation Steam generator tube rupture analysis using dynamic simulation Heat Exchangers are used to transfer heat from a hot fluid to a cold fluid. Most of the times these fluids are available at different pressures

More information

The Risk of LOPA and SIL Classification in the process industry

The Risk of LOPA and SIL Classification in the process industry The Risk of LOPA and SIL Classification in the process industry Mary Kay O Connor Process Safety Center International Symposium Beyond Regulatory Compliance, Making Safety Second Nature October 28-29,

More information

INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM

INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM Volton Edwards bptt Angus Lyon DNV Energy Alastair Bird DNV Energy INTRODUCTION A term now in common usage within the oil & gas

More information

DISTILLATION COLUMN PROCESS CONTROL STRATEGIES

DISTILLATION COLUMN PROCESS CONTROL STRATEGIES DISTILLATION COLUMN PROCESS CONTROL STRATEGIES Satyajit Deshmukh 1, Salil Rajwade 2, Atharva Pundalik 3, Anil Ranveer 4 ABSTRACT 1,2,3,4 Chemical Engineering Department, Datta Meghe College of Engineering,

More information

SIL Safety Manual. ULTRAMAT 6 Gas Analyzer for the Determination of IR-Absorbing Gases. Supplement to instruction manual ULTRAMAT 6 and OXYMAT 6

SIL Safety Manual. ULTRAMAT 6 Gas Analyzer for the Determination of IR-Absorbing Gases. Supplement to instruction manual ULTRAMAT 6 and OXYMAT 6 ULTRAMAT 6 Gas Analyzer for the Determination of IR-Absorbing Gases SIL Safety Manual Supplement to instruction manual ULTRAMAT 6 and OXYMAT 6 ULTRAMAT 6F 7MB2111, 7MB2117, 7MB2112, 7MB2118 ULTRAMAT 6E

More information

Analysis of Pressure Rise During Internal Arc Faults in Switchgear

Analysis of Pressure Rise During Internal Arc Faults in Switchgear Analysis of Pressure Rise During Internal Arc Faults in Switchgear ASANUMA, Gaku ONCHI, Toshiyuki TOYAMA, Kentaro ABSTRACT Switchgear include devices that play an important role in operations such as electric

More information

Determination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside

Determination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside Determination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside Migyeong Kim a, Gyusung Kim a, *, Jongjin Jung a and Wooseung Sim a a Advanced Technology Institute,

More information

Courses of Instruction: Controlling and Monitoring of Pipelines

Courses of Instruction: Controlling and Monitoring of Pipelines Courses of Instruction: Controlling and Monitoring of Pipelines Date December 2010 Dr. Peter Eschenbacher Partner Angergraben 4 85250 Altomünster Germany Tel. +49-(0)8254 / 99 69 57 Fax +49-(0)8254 / 99

More information

44 (0) E:

44 (0) E: FluidFlow Relief Valve Sizing Handbook Flite Software 2016 Flite Software N.I. Ltd, Block E, Balliniska Business Park, Springtown Rd, Derry, BT48 0LY, N. Ireland. T: 44 (0) 2871 279227 E: sales@fluidflowinfo.com

More information

Tutorial. BOSfluids. Relief valve

Tutorial. BOSfluids. Relief valve Tutorial Relief valve The Relief valve tutorial describes the theory and modeling process of a pressure relief valve or safety valve. It covers the algorithm BOSfluids uses to model the valve and a worked

More information

Eutectic Plug Valve. SIL Safety Manual. SIL SM.015 Rev 0. Compiled By : G. Elliott, Date: 19/10/2016. Innovative and Reliable Valve & Pump Solutions

Eutectic Plug Valve. SIL Safety Manual. SIL SM.015 Rev 0. Compiled By : G. Elliott, Date: 19/10/2016. Innovative and Reliable Valve & Pump Solutions SIL SM.015 Rev 0 Eutectic Plug Valve Compiled By : G. Elliott, Date: 19/10/2016 Contents Terminology Definitions......3 Acronyms & Abbreviations...4 1. Introduction..5 1.1 Scope 5 1.2 Relevant Standards

More information

The Key Variables Needed for PFDavg Calculation

The Key Variables Needed for PFDavg Calculation Iwan van Beurden, CFSE Dr. William M. Goble, CFSE exida Sellersville, PA 18960, USA wgoble@exida.com July 2015 Update 1.2 September 2016 Abstract In performance based functional safety standards, safety

More information

API th Edition Ballot Item 7.8 Work Item 4 Gas Breakthrough

API th Edition Ballot Item 7.8 Work Item 4 Gas Breakthrough API 521 7 th Edition Ballot Item 7.8 Work Item 4 Gas Breakthrough NOTE: This is a reballot of previously approved API 521 7 th Edition Ballot Item 6.3 which was modified based on comments. Comments should

More information

Increasing the Understanding of the BP Texas City Refinery Accident

Increasing the Understanding of the BP Texas City Refinery Accident Increasing the Understanding of the BP Texas City Refinery Accident Davide Manca, Sara Brambilla, Alessandro Villa Dipartimento di Chimica, Materiali e Ingegneria Chimica Politecnico di Milano ITALY 21st

More information

Flare Gas Recovery A consideration of the benefits and issues associated with sizing, installation and selection of the most appropriate technology

Flare Gas Recovery A consideration of the benefits and issues associated with sizing, installation and selection of the most appropriate technology Flare Gas Recovery A consideration of the benefits and issues associated with sizing, installation and selection of the most appropriate technology Peter Angwin, Principal Consultant Process Engineer Stuart

More information

Bespoke Hydraulic Manifold Assembly

Bespoke Hydraulic Manifold Assembly SIL SM.0003 1 Bespoke Hydraulic Manifold Assembly Compiled By : G. Elliott, Date: 12/17/2015 Contents Terminology Definitions......3 Acronyms & Abbreviations..4 1. Introduction 5 1.1 Scope 5 1.2 Relevant

More information

SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main

SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main SPE 102831 Online Water-Injection Optimization and Prevention of Reservoir Damage Bjørn Øyvind Bringedal, Svein Arne Morud, Nicolas Alexander Hall, ABB; Gary Huseman, Shell Copyright 2006, Society of Petroleum

More information

DeZURIK. KGC Cast Knife Gate Valve. Safety Manual

DeZURIK. KGC Cast Knife Gate Valve. Safety Manual KGC Cast Knife Gate Valve Safety Manual Manual D11036 August 29, 2014 Table of Contents 1 Introduction... 3 1.1 Terms... 3 1.2 Abbreviations... 4 1.3 Product Support... 4 1.4 Related Literature... 4 1.5

More information

Safety Manual. Process pressure transmitter IPT-1* 4 20 ma/hart. Process pressure transmitter IPT-1*

Safety Manual. Process pressure transmitter IPT-1* 4 20 ma/hart. Process pressure transmitter IPT-1* Safety Manual Process pressure transmitter IPT-1* 4 20 ma/hart Process pressure transmitter IPT-1* Contents Contents 1 Functional safety 1.1 General information... 3 1.2 Planning... 4 1.3 Instrument parameter

More information

Explanations hydraulic valves TECHNICAL EXPLANATIONS HYDRAULIC VALVES. Contents. 1. Foreword. 2. Characteristic Values

Explanations hydraulic valves TECHNICAL EXPLANATIONS HYDRAULIC VALVES. Contents. 1. Foreword. 2. Characteristic Values TECHNICAL EXPLANATIONS HYDRAULIC VALVES Contents 1. Foreword 2. Characteristic Values 2.1. Characteristic Values for Directional Control Valves 2.1.1. Standard Values 2.1.2. General Characteristic Values

More information

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including:

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including: By Phil Smith, Project Manager and Chen-Hsiang Su, PE, Senior Consultant, Lincolnshire, IL, JENSEN HUGHES A hydraulic model is a computer program configured to simulate flows for a hydraulic system. The

More information

Pneumatic QEV. SIL Safety Manual SIL SM Compiled By : G. Elliott, Date: 8/19/2015. Innovative and Reliable Valve & Pump Solutions

Pneumatic QEV. SIL Safety Manual SIL SM Compiled By : G. Elliott, Date: 8/19/2015. Innovative and Reliable Valve & Pump Solutions SIL SM.0010 1 Pneumatic QEV Compiled By : G. Elliott, Date: 8/19/2015 Contents Terminology Definitions......3 Acronyms & Abbreviations..4 1. Introduction 5 1.1 Scope 5 1.2 Relevant Standards 5 1.3 Other

More information

Reliability of Safety-Critical Systems Chapter 3. Failures and Failure Analysis

Reliability of Safety-Critical Systems Chapter 3. Failures and Failure Analysis Reliability of Safety-Critical Systems Chapter 3. Failures and Failure Analysis Mary Ann Lundteigen and Marvin Rausand mary.a.lundteigen@ntnu.no RAMS Group Department of Production and Quality Engineering

More information

Safety Manual VEGAVIB series 60

Safety Manual VEGAVIB series 60 Safety Manual VEGAVIB series 60 NAMUR Document ID: 32005 Contents Contents 1 Functional safety... 3 1.1 General information... 3 1.2 Planning... 4 1.3 Adjustment instructions... 6 1.4 Setup... 6 1.5 Reaction

More information

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries Focus Area: Automation HMI Title: Author: Shared Field Instruments in SIS: Incidents Caused by Poor Design

More information

Dynamic Analysis of a Multi-Stage Compressor Train. Augusto Garcia-Hernandez, Jeffrey A. Bennett, and Dr. Klaus Brun

Dynamic Analysis of a Multi-Stage Compressor Train. Augusto Garcia-Hernandez, Jeffrey A. Bennett, and Dr. Klaus Brun Dynamic Analysis of a Multi-Stage Compressor Train Augusto Garcia-Hernandez, Jeffrey A. Bennett, and Dr. Klaus Brun Slide 2: Presenter/Author Bios Augusto Garcia-Hernandez Group Leader, Pipeline Simulation,

More information

FP15 Interface Valve. SIL Safety Manual. SIL SM.018 Rev 1. Compiled By : G. Elliott, Date: 30/10/2017. Innovative and Reliable Valve & Pump Solutions

FP15 Interface Valve. SIL Safety Manual. SIL SM.018 Rev 1. Compiled By : G. Elliott, Date: 30/10/2017. Innovative and Reliable Valve & Pump Solutions SIL SM.018 Rev 1 FP15 Interface Valve Compiled By : G. Elliott, Date: 30/10/2017 FP15/L1 FP15/H1 Contents Terminology Definitions......3 Acronyms & Abbreviations...4 1. Introduction...5 1.1 Scope.. 5 1.2

More information

Solenoid Valves used in Safety Instrumented Systems

Solenoid Valves used in Safety Instrumented Systems I&M V9629R1 Solenoid Valves used in Safety Instrumented Systems Operating Manual in accordance with IEC 61508 ASCO Valves Page 1 of 7 Table of Contents 1 Introduction...3 1.1 Terms and Abbreviations...3

More information

Tube rupture in a natural gas heater

Tube rupture in a natural gas heater Tube rupture in a natural gas heater Dynamic simulation supports the use of a pressure safety valve over a rupture disk in the event of a tube rupture HARRY Z HA and PATRICK STANG Fluor Canada Ltd A fast

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 11 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

Implementing IEC Standards for Safety Instrumented Systems

Implementing IEC Standards for Safety Instrumented Systems Implementing IEC Standards for Safety Instrumented Systems ABHAY THODGE TUV Certificate: PFSE-06-607 INVENSYS OPERATIONS MANAGEMENT What is a Safety Instrumented System (SIS)? An SIS is designed to: respond

More information

Safety Manual OPTISWITCH series relay (DPDT)

Safety Manual OPTISWITCH series relay (DPDT) Safety Manual OPTISWITCH series 5000 - relay (DPDT) 1 Content Content 1 Functional safety 1.1 In general................................ 3 1.2 Planning................................. 5 1.3 Adjustment

More information

RICK FAUSEL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES

RICK FAUSEL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES RICK FAUL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES The primary design objective for any turbomachinery control system should be to maintain or maximize machine and

More information

Experimental Investigation on Transient Response of Two Stage Pressure Relief Valve

Experimental Investigation on Transient Response of Two Stage Pressure Relief Valve Experimental Investigation on Transient Response of Two Stage Pressure Relief Valve Prof. Basavaraj V.HUBBALLI 1, Dr. Vilas B.SONDUR 2 1 Jain College of Engineering, Belagavi Karnataka, India, bvhubliabhi@gmail.com

More information

Safety Manual VEGAVIB series 60

Safety Manual VEGAVIB series 60 Safety Manual VEGAVIB series 60 Contactless electronic switch Document ID: 32002 Contents Contents 1 Functional safety... 3 1.1 General information... 3 1.2 Planning... 4 1.3 Adjustment instructions...

More information

Achieving Compliance in Hardware Fault Tolerance

Achieving Compliance in Hardware Fault Tolerance Mirek Generowicz FS Senior Expert (TÜV Rheinland #183/12) Engineering Manager, I&E Systems Pty Ltd Abstract The functional safety standards ISA S84/IEC 61511 (1 st Edition, 2003) and IEC 61508 both set

More information

DeZURIK Double Block & Bleed (DBB) Knife Gate Valve Safety Manual

DeZURIK Double Block & Bleed (DBB) Knife Gate Valve Safety Manual Double Block & Bleed (DBB) Knife Gate Valve Safety Manual Manual D11044 September, 2015 Table of Contents 1 Introduction... 3 1.1 Terms... 3 1.2 Abbreviations... 4 1.3 Product Support... 4 1.4 Related

More information

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES Industry Guidelines Part 2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES ISSUE 5.1 Ref: POP10B 15 MAR 2010 Disclaimer In formulating this guideline PIPA has relied

More information

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 Simon J Brown Technology Division, Health & Safety Executive, Bootle, Merseyside L20 3QZ, UK Crown Copyright

More information

Verification and validation of computer codes Exercise

Verification and validation of computer codes Exercise IAEA Safety Assessment Education and Training (SAET) Programme Joint ICTP- IAEA Essential Knowledge Workshop on Deterministic Safety Assessment and Engineering Aspects Important to Safety Verification

More information

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Naser Badri 1, Farshad Nourai 2 and Davod Rashtchian

More information

QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS

QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS Steve Sherwen Senior Consultant, ABB Engineering Services, Daresbury Park,

More information

Looking Beyond Relief System Design Standards

Looking Beyond Relief System Design Standards Looking Beyond Relief System Design Standards M. Reilly & T. Craddock Introduction A correctly designed relief system is key to safe plant design and operation, ensuring the ability to handle any potential

More information

Solenoid Valves For Gas Service FP02G & FP05G

Solenoid Valves For Gas Service FP02G & FP05G SIL Safety Manual SM.0002 Rev 02 Solenoid Valves For Gas Service FP02G & FP05G Compiled By : G. Elliott, Date: 31/10/2017 Reviewed By : Peter Kyrycz Date: 31/10/2017 Contents Terminology Definitions......3

More information

SIL explained. Understanding the use of valve actuators in SIL rated safety instrumented systems ACTUATION

SIL explained. Understanding the use of valve actuators in SIL rated safety instrumented systems ACTUATION SIL explained Understanding the use of valve actuators in SIL rated safety instrumented systems The requirement for Safety Integrity Level (SIL) equipment can be complicated and confusing. In this document,

More information

FUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016

FUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016 INTRODUCTION Fired equipment such as Heaters and Boilers, normally have to comply with either NFPA 85/86 or API 556 for North America and some other countries which apply such standards, or EN 746-2 for

More information

Section 1: Multiple Choice

Section 1: Multiple Choice CFSP Process Applications Section 1: Multiple Choice EXAMPLE Candidate Exam Number (No Name): Please write down your name in the above provided space. Only one answer is correct. Please circle only the

More information

Safety Critical Systems

Safety Critical Systems Safety Critical Systems Mostly from: Douglass, Doing Hard Time, developing Real-Time Systems with UML, Objects, Frameworks And Patterns, Addison-Wesley. ISBN 0-201-49837-5 1 Definitions channel a set of

More information

Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils

Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils 86 Pet.Sci.(29)6:86-9 DOI 1.17/s12182-9-16-x Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils Ehsan Khamehchi 1, Fariborz Rashidi

More information

SPR - Pneumatic Spool Valve

SPR - Pneumatic Spool Valve SIL SM.008 Rev 7 SPR - Pneumatic Spool Valve Compiled By : G. Elliott, Date: 31/08/17 Contents Terminology Definitions:... 3 Acronyms & Abbreviations:... 4 1.0 Introduction... 5 1.1 Purpose & Scope...

More information

HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS

HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS Proceedings of the First Middle East Turbomachinery Symposium February 13-16, 2011, Doha, Qatar HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS Amer A. Al-Dhafiri Rotating Equipment Engineer Nabeel M. Al-Odan

More information

Hydraulic (Subsea) Shuttle Valves

Hydraulic (Subsea) Shuttle Valves SIL SM.009 0 Hydraulic (Subsea) Shuttle Valves Compiled By : G. Elliott, Date: 11/3/2014 Contents Terminology Definitions......3 Acronyms & Abbreviations..4 1. Introduction 5 1.1 Scope 5 1.2 Relevant Standards

More information

Failure Modes, Effects and Diagnostic Analysis

Failure Modes, Effects and Diagnostic Analysis Failure Modes, Effects and Diagnostic Analysis Project: Solenoid Drivers KFD2-SL2-(Ex)1.LK.vvcc KFD2-SL2-(Ex)*(.B).vvcc Customer: Pepperl+Fuchs GmbH Mannheim Germany Contract No.: P+F 06/09-23 Report No.:

More information

Ultima. X Series Gas Monitor

Ultima. X Series Gas Monitor Ultima X Series Gas Monitor Safety Manual SIL 2 Certified " The Ultima X Series Gas Monitor is qualified as an SIL 2 device under IEC 61508 and must be installed, used, and maintained in accordance with

More information

Understanding the How, Why, and What of a Safety Integrity Level (SIL)

Understanding the How, Why, and What of a Safety Integrity Level (SIL) Understanding the How, Why, and What of a Safety Integrity Level (SIL) Audio is provided via internet. Please enable your speaker (in all places) and mute your microphone. Understanding the How, Why, and

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

Valve Communication Solutions. Safety instrumented systems

Valve Communication Solutions. Safety instrumented systems Safety instrumented systems Safety Instrumented System (SIS) is implemented as part of a risk reduction strategy. The primary focus is to prevent catastrophic accidents resulting from abnormal operation.

More information

Safety-critical systems: Basic definitions

Safety-critical systems: Basic definitions Safety-critical systems: Basic definitions Ákos Horváth Based on István Majzik s slides Dept. of Measurement and Information Systems Budapest University of Technology and Economics Department of Measurement

More information

DeZURIK. KSV Knife Gate Valve. Safety Manual

DeZURIK. KSV Knife Gate Valve. Safety Manual KSV Knife Gate Valve Safety Manual Manual D11035 August 29, 2014 Table of Contents 1 Introduction... 3 1.1 Terms... 3 1.2 Abbreviations... 4 1.3 Product Support... 4 1.4 Related Literature... 4 1.5 Reference

More information

TRI LOK SAFETY MANUAL TRI LOK TRIPLE OFFSET BUTTERFLY VALVE. The High Performance Company

TRI LOK SAFETY MANUAL TRI LOK TRIPLE OFFSET BUTTERFLY VALVE. The High Performance Company TRI LOK TRI LOK TRIPLE OFFSET BUTTERFLY VALVE SAFETY MANUAL The High Performance Company Table of Contents 1.0 Introduction...1 1.1 Terms and Abbreviations... 1 1.2 Acronyms... 1 1.3 Product Support...

More information

Scaling Up Safely: Making Smarter Decisions about Rate Dependency

Scaling Up Safely: Making Smarter Decisions about Rate Dependency Scaling Up Safely: Making Smarter Decisions about Rate Dependency Zubin Kumana, P.E., Venkata Badam,P.E., and Achilles Arnaez, P.E. 7600 W. Tidwell Rd., Ste. 600 Houston, TX 770400 (713) 802-2647 SmithBurgess.com

More information

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications Application Description AG/266PILD-EN Rev. C 2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic Pressure Measurement Engineered solutions for all applications Increase plant productivity

More information

Neles trunnion mounted ball valve Series D Rev. 2. Safety Manual

Neles trunnion mounted ball valve Series D Rev. 2. Safety Manual Neles trunnion mounted ball valve Series D Rev. 2 Safety Manual 10SM D en 1/2017 2 Neles trunnion mounted ball valve, Series D Table of Contents 1 Introduction...3 2 Structure of the D series trunnion

More information

A study on the relation between safety analysis process and system engineering process of train control system

A study on the relation between safety analysis process and system engineering process of train control system A study on the relation between safety analysis process and system engineering process of train control system Abstract - In this paper, the relationship between system engineering lifecycle and safety

More information

Delayed Coker Automation & Interlocks

Delayed Coker Automation & Interlocks Delayed Coker Automation & Interlocks a Presented by Mitch Moloney of ExxonMobil @ coking.com April-2005 MJ Moloney - ExxonMobil April-2005 coking.com 0 Automation & Interlocks @ ExxonMobil - Background

More information

Safety Engineering - Hazard Identification Techniques - M. Jahoda

Safety Engineering - Hazard Identification Techniques - M. Jahoda Safety Engineering - Hazard Identification Techniques - M. Jahoda Hazard identification The risk management of a plant 2 Identification of the hazards involved in the operation of the plant, due to the

More information

ERTC PETROCHEMICAL Conference 20 st -22 nd February 2002, Amsterdam, The Netherlands

ERTC PETROCHEMICAL Conference 20 st -22 nd February 2002, Amsterdam, The Netherlands Reprint from Presentation at ERTC PETROCHEMICAL Conference 20 st -22 nd February 2002, Amsterdam, The Netherlands and ARTC PETROCHEMICAL Conference 11 th 13 th March 2002, Bangkok, Thailand Sulzer Chemtech,

More information

Explaining the Differences in Mechanical Failure Rates: exida FMEDA Predictions and OREDA Estimations

Explaining the Differences in Mechanical Failure Rates: exida FMEDA Predictions and OREDA Estimations Explaining the Differences in Mechanical Failure Rates: exida FMEDA Predictions and OREDA Estimations Julia V. Bukowski, PhD Department of Electrical & Computer Engineering Villanova University Loren Stewart,

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC) PAGE : 1 / 11 1. PASSIVE SINGLE FAILURE ANALYSIS The aim of the accident analysis in Chapter P is to demonstrate that the safety objectives have been fully achieved, despite the most adverse single failure.

More information

Risk Based Method to Establish Inspection Intervals for Pressure Relief Devices

Risk Based Method to Establish Inspection Intervals for Pressure Relief Devices Risk Based Method to Establish Inspection Intervals for Pressure Relief Devices Mary Kay O Connor Process Safety Symposium College Station, TX October 27, 2010 Philip A. Henry, P.E. Principal Engineer

More information

Operational Behaviour of Safety Valves with Constant Superimposed Backpressure

Operational Behaviour of Safety Valves with Constant Superimposed Backpressure Operational Behaviour of Safety Valves with Constant Superimposed Backpressure Arne Gastberg Albert Richter ARI-Armaturen GmbH & Co. KG When selecting spring loaded safety valves, an accurate knowledge

More information

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch. Training Title CONTROL & SAFETY RELIEF VALVES Training Duration 5 days Training Venue and Dates Control & Safety Relief Valves 5 06-10 May, 2018 $4,000 Dubai, UAE Trainings will be conducted in any of

More information

PROCESS AUTOMATION SIL. Manual Safety Integrity Level. Edition 2005 IEC 61508/61511

PROCESS AUTOMATION SIL. Manual Safety Integrity Level. Edition 2005 IEC 61508/61511 PROCESS AUTOMATION Manual Safety Integrity Level SIL Edition 2005 IEC 61508/61511 With regard to the supply of products, the current issue of the following document is applicable: The General Terms of

More information

Neles ValvGuard VG9000H Rev 2.0. Safety Manual

Neles ValvGuard VG9000H Rev 2.0. Safety Manual Neles ValvGuard VG9000H Rev 2.0 Safety Manual 10SM VG9000H en 11/2016 2 Neles ValvGuard VG9000H Rev 2.0 Safety Manual Table of Contents 1 General information...3 1.1 Purpose of the document... 3 1.2 Description

More information

Knowledge, Certification, Networking

Knowledge, Certification, Networking www.iacpe.com Knowledge, Certification, Networking Page :1 of 71 Rev 01 Sept 2016 IACPE No 19, Jalan Bilal Mahmood 80100 Johor Bahru Malaysia The International of is providing the introduction to the Training

More information

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10)

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10) Health, Safety and Environmental Management in Petroleum and offshore Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module No. #

More information

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS POP Safety Valve POP Safety Valve INTRODUCTION The effects of exceeding safe pressure levels in an unprotected pressure vessel or system, can have catastrophic effects on both plant and personnel. Safety

More information

UNIVERSITY OF WATERLOO

UNIVERSITY OF WATERLOO UNIVERSITY OF WATERLOO Department of Chemical Engineering ChE 524 Process Control Laboratory Instruction Manual January, 2001 Revised: May, 2009 1 Experiment # 2 - Double Pipe Heat Exchanger Experimental

More information

Compressors. Basic Classification and design overview

Compressors. Basic Classification and design overview Compressors Basic Classification and design overview What are compressors? Compressors are mechanical devices that compresses gases. It is widely used in industries and has various applications How they

More information

Using LOPA for Other Applications

Using LOPA for Other Applications 10 Using LOPA for Other Applications 10.1. Purpose LOPA is a tool used to perform risk assessments. Previous chapters described its use in assessing the risk level of process hazards scenarios and in evaluating

More information

THE IMPROVEMENT OF SIL CALCULATION METHODOLOGY. Jinhyung Park 1 II. THE SIL CALCULATION METHODOLOGY ON IEC61508 AND SOME ARGUMENT

THE IMPROVEMENT OF SIL CALCULATION METHODOLOGY. Jinhyung Park 1 II. THE SIL CALCULATION METHODOLOGY ON IEC61508 AND SOME ARGUMENT THE IMPROVEMENT OF SIL CALCULATION METHODOLOGY Jinhyung Park 1 1 Yokogawa Electric Korea: 21, Seonyu-ro45-gil Yeongdeungpo-gu, Seoul, 07209, Jinhyung.park@kr.yokogawa.com Safety Integrity Level (SIL) is

More information

Changes Between API STD 520 Part II 6th Ed and 5th Ed Cataloged

Changes Between API STD 520 Part II 6th Ed and 5th Ed Cataloged Changes Between API STD 520 Part II 6th Ed and 5th Ed Cataloged Dustin Smith Smith & Burgess LLC 7600 W Tidwell, Houston, TX Dustin.Smith@smithburgess.com John Burgess Jessye Palladino Smith & Burgess

More information

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart Technical Standards and Legislation: Risk Based Inspection Presenter: Pierre Swart Agenda Change in Legislation. Where RBI fits in. Application to implement RBI. RBI concepts. Elements of an RBI analysis.

More information

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch. Training Title GAS CONDITIONING & PROCESSING Training Duration 5 days Training Venue and Dates Gas Conditioning & Processing 5 07 11 April, 2019 $4,000 Dubai, UAE Trainings will be conducted in any of

More information