City of Kitchener: Skatepark Planning Study. Infrastructure Services: Operations Design and Development. April 2012

Size: px
Start display at page:

Download "City of Kitchener: Skatepark Planning Study. Infrastructure Services: Operations Design and Development. April 2012"

Transcription

1 A City of Kitchener: Skatepark Planning Study i Infrastructure Services: Operations Design and Development April 2012

2 ii

3 Acknowledgements Project Managers Dan Ritz Supervisor of Design & Development Infrastructure Services / Parks Operations Yvonne Westerveld Cardoso Sarah Longstaff Staff Technical Team Tim O Brien Andy Brand LoriAnn Livingston Breanna Pilon Landscape Architectural Intern Infrastructure Services / Parks Operations Policy Analyst Community Services / Long Range and Policy Planning Landscape Architect Infrastructure Services / Parks Operations Risk and Claims Analyst Waterloo Region Municipalities Insurance Pool Communications and Marketing Associate Communications & Marketing Youth Services Coordinator Community Services / Youth Services Dannon Vasey Bob Cheyne Greg Hummel Shayne Turner Debbie Campbell Lenore Ross Youth Services Coordinator Community Services / Youth Services Supervisor of Athletics Community Services / Athletics Manager of Park Planning, Development and Operations Infrastructure Services / Operations Director of Bylaw Enforcement Community Services / Enforcement Manager of Community Resource Centres Community Services / Community Resource Centres Urban Designer Community Services / Site Development i

4 Table of Contents 1.0 BACKGROUND INTRODUCTION WHY BUILD MORE SKATEPARKS? ADDRESSING COMMON CONCERNS Crime Prevention Noise Injuries SITE SELECTION AND EVALUATION SITE SELECTION CRITERIA INVENTORY OF POTENTIAL SITES DEMOGRAPHIC ANALYSIS SITE VISIT AND EVALUATION INTERNAL REVIEW AND SHORTLISTED SITE SELECTION PUBLIC COMMUNICATION WITH WHOM DID WE COMMUNICATE? HOW DID WE GET THE WORD OUT? HOW DID WE OBTAIN FEEDBACK? ii Online Survey... 13

5 3.3.2 Surveys Completed at Open Houses Surveys Completed by Skateboarders at Existing Skateparks Feedback Obtained from Sportsfield Users and Adjacent Businesses and Organizations GENERAL ONLINE SURVEY RESULTS SHORTLISTED SITE ASSESSMENT SITE SELECTION CRITERIA OVERVIEW WEIGHTED MATRIX SUMMARY Site 1 Fischer Park Site 2 Gzowski Park Site 3 Southwest Optimist Park Site 4 Wilson Park FINAL CONCLUSION RECOMMENDATIONS NEXT STEPS SKATEPARK DESIGN SIZE AND STYLE LOCATION ON SITE iii References... 67

6 List of Figures FIGURE 1: INVENTORY OF EVALUATED SITES... 7 FIGURE 2: DEMOGRAPHIC DISTRIBUTION BASED ON PLANNING COMMUNITY... 8 FIGURE 3: A LISTED SITES FIGURE 4: SURVEY RESPONDENTS FIGURE 5: LOCATIONS WHERE SKATEBOARDERS SKATE FIGURE 6: REASONS FOR NOT USING EXISTING SKATEPARKS FIGURE 7: SKATEPARK PLANNING STUDY WEIGHTED MATRIX Appendices Appendix A: Municipal Skatepark Summaries Appendix B: Shortlisted Sites Public Meeting Poster APPENDIX C: Evaluation of 4 Shortlisted Sites Appendix D: Evaluation of potential sites (not shortlisted) Appendix E: Information Card Handouts Appendix F: Skatepark Advertisement featured in Kitchener s Leisure Magazine Appendix G: Posters at Community Centres Appendix H: Article featured in YOUR KITCHENER Appendix I: City of Kitchener Skatepark Webpage Appendix J: Skatepark Online Survey Appendix L: Additional Comments Provided by Online Survey Respondents Appendix M: Submissions Appendix N: Feedback from Sportsfield Contacts and Adjacent Businesses and Organizations iv

7 1.0 BACKGROUND In 2005, the Leisure Facilities Master Plan recommended that additional skateboard facilities be developed in Kitchener in an effort to expand on the continued success at that time of the Aud Skatepark, and to address the growing need for opportunities in skateboarding (Recommendation 28, item 8). Currently there are two skateboard parks in Kitchener: The Aud, located at the Kitchener Memorial Auditorium Complex and Kitchener s newest skatepark, located at McLennan Park. We also have a portable unit (Skatium) which is rotated to various community centres throughout the summer (Forest Heights, Doon Pioneer Park, Country Hills, Chandler Mowat, Kingsdale, Victoria Hills, Williamsburg and Centreville Chicopee). In 2010, the Parks Strategic Plan further recommended that the City shall complete a site selection study for two proposed skateboard park locations and implement through the ten year capital budget. (Implementation Action 4.1.6) Council has approved capital budget for two more skateparks to be constructed in 2014/15 and 2016/2017 with budget of $550,000 for the design and construction of each additional skatepark. The purpose of this study is to identify the two best sites in the city within which to locate the proposed skateparks. To choose the most appropriate location for the proposed facility, an in depth site selection process and community consultation on the preferred locations has taken place over the past 18 months. On June 21, 2010 staff provided to Community Services Committee an update on the initiation of the skatepark planning study, and outlined the site selection and community consultation process and site selection criteria (CSD 10 39). This study highlights the process followed to determine the four shortlisted sites, gives an overview of the public consultation that took place, examines the four shortlisted sites and outlines the rationale for staff s ultimate conclusion and subsequent recommendation for the two skatepark locations. The exact location, size and shape of the skatepark on the recommended sites will be determined at the design stage of the process. 1.1 INTRODUCTION The City of Kitchener has a park system in excess of 348 parks. During the review of our park inventory for potential skate park locations, many were eliminated as they were unsuitable for our purposes, for obvious reasons. A list of 19 potential sites was arrived at and a rating of these sites took place using a site selection matrix introduced to Community Services Committee on June 21, Ultimately, four potential sites were shortlisted for further review and study. These parks had all received an overall A grade. Staff has therefore been challenged with the task to discern among four strong candidates, from which two would be the best choice as we move forward to implement our goal of establishing two additional skateboard parks. Due to the complexity of this decision making process, we have decided to approach this study from a holistic perspective in order to determine which sites consistently rate above the others in many areas, and which might rank highest in criteria that are considered to be especially important. 1

8 1.2 WHY BUILD MORE SKATEPARKS? There are many benefits to developing skateparks within a community. Skateparks provide unstructured opportunities for youth and youngat heart to develop and master skills; engage in physical exercise and activity; and socialize in a constructive environment. This sport is appealing to a large segment of youth who are not otherwise drawn to more traditional (team) sports (City of London, 2010). It also has the advantage of being a low cost sport to the user, which is important as currently one in three Canadian families cannot afford to enroll their children in sport and recreation activities because of financial barriers (Ipsos Reid, 2009). It is evident that the popularity of skateboarding is growing. Skateboarding has become the third largest participant sport in North America for the 10 to 18 age group. Furthermore, statistics from Canadian and U.S cities show that 4 to 7 percent of the total population is skateboarders (Gomez, 2006). It is important to recognize the needs of this growing segment of the population. Using these figures, we can estimate the number of people we can expect to be skateboarding in Kitchener. With a population of 219,153 (Statistics Canada, 2012), this amounts to between 8,700 15,000 potential skateboarders within the City (FP Markets Canadian Demographics, 2009). As noted in the City s Leisure Facilities Master Plan, based on a community the size of Kitchener, more skateboard facilities are needed to serve the skateboard population in the City. A survey of various municipalities throughout southwestern Ontario was conducted, and of those that responded, we learned that many had indicated a need for additional skateparks and are either in the planning stages of increasing the number of skatepark facilities or have recently completed one or more. The following list shows the number of current and proposed skateparks in the following municipalities. For more detailed information regarding the skateparks at these municipalities, see Appendix A. Barrie 1 existing Guelph 1 proposed Hamilton 4 existing London 11 existing, 1 proposed Mississauga 8 existing Oakville 4 existing, 1 proposed Oshawa 4 existing Richmond Hill 1 existing Toronto existing Waterloo 1 existing, several others proposed Windsor 2 existing As mentioned previously, the Doon Skatium Mobile Skate Park currently travels to a different community centre each week, making the sport accessible to boarders across the city. The Skatium provides valuable programming to younger users who might not be able travel to more distant skateparks, and through the equipment loan program, offers the opportunity of skateboarding to youth who might not otherwise be able to participate due to financial constraints. While the Skatium is available to skateboarders who might not live in close proximity to one of 2

9 our permanent skatepark locations, it is geared to the beginner level skateboarder, thus supporting the need for skateparks providing challenge at a greater skill level. 1.3 ADDRESSING COMMON CONCERNS Staff is aware that there may be community concern over the proposal of two new skateparks in the City. A review of studies completed by other municipalities indicates that this is common. As such, staff has provided responses to the most common concerns Crime Prevention A study conducted by graduate students from Portland State University, in conjunction with the City of Portland, found that there is no correlation between skateboard parks and serious crime (Gomez, 2006). In the case of London, Ontario, it has been reported that police experience no higher degree of issues associated with skateparks than with other park amenities that serve as gathering points such as swing sets and play equipment (City of London, 2010) Noise Several skatepark sound studies have been conducted to test the issue of noise. The most notable was done by Portland, Oregon s Parks and Recreation Department and found that their 10,000 square foot skatepark emitted less constant noise than light automobile traffic (Whitley, 2011). Overall, studies have concluded that skateparks generate noise levels between decibels. These noise levels are comparable to basketball courts and children playing on playground equipment (Gomez, 2006) Injuries Skateboarding is a low impact and relatively safe sport compared to most other popular sports. Staff had the opportunity to attend a skatepark workshop pertaining to risk management in February The guest speaker, Doug Wyseman, shared statistics from Health Canada that indicate that less than 0.3 percent of people who skateboard suffered injuries that required medical attention. These results rank the sport as safer than ice hockey, baseball, basketball, football, soccer, golf, snowboarding, volleyball and fishing (Wyseman, 2011). Soccer players are almost twice as likely to be injured as skateboarders, while basketball players and baseball players are 3 and 4 times, respectively, more likely to be injured (Gomez, 2006). When injuries do occur, they occur more frequently on streets than skateparks. Statistics show that less than 5% of skateboard injuries take place in skateboard parks, while roads account for more than a third of these injuries (Wyseman, 2011). In FIGURE 6, later in the report, survey results show that many skateboarders in Kitchener currently use streets to skateboard. As such, skateparks can provide a consistent and well maintained skateboarding atmosphere that helps in reducing the amount of injuries to skateboarders and could help lessen the number of skateboarders skateboarding on streets in Kitchener. Furthermore, evidence shows that there are fewer reported accidents and injuries associated with skate parks than with other outdoor park activities (City of London, 2010).) 3

10 2.0 SITE SELECTION AND EVALUATION The success of a skatepark is mainly related to the location and design of the facility (Gomez, 2006). As such, much of the work completed to date has been spent on selecting the best location for the City of Kitchener s two proposed skateparks. This section highlights the site selection process and summarizes key site selection criteria considered important when assessing the appropriateness of a skate facility in the four proposed skatepark locations. Staff began the skatepark site selection study by evaluating all city owned sites. 19 potential sites were evaluated against the site selection criteria and assigned a grade value of A, B or C. 4 sites received an A grade and were shortlisted for further detailed review and public and stakeholder feedback. Through a weighted matrix analysis, staff are recommending 2 sites as approved skatepark locations. 4

11 2.1 SITE SELECTION CRITERIA By examining existing facilities both in Kitchener and other municipalities, as well as reviewing studies completed by other municipalities, staff developed a site selection criteria matrix to qualitatively evaluate potential sites and to identify optimal locations in Kitchener. It is recognized that there may not be a site that fully satisfies all elements of the criteria and meets all stakeholder and community expectations. This is an inherent challenge in planning for skateparks and this study strives to recommend locations that balance competing interests. The site selection criteria matrix was presented to the Community Services Committee in June 2010 addressing four key themes: Theme Criteria Considerations Location Potential users Should be located within an area of high demographics for potential users Existing skatepark Should not be situated too close to the existing skateparks (The AUD and McLennan) Surrounding environment Should not occupy/eliminate the only park space in a community Proximity to residential areas Should be sufficient setback from a new skatepark to the nearest adjacent residences Physical Site Conditions Achievable skatepark area Site should be large enough that introducing a skatepark would not negatively affect the existing activities already occurring at that location Topography Should have minimum construction implications Vegetation Should provide shade/wind protection Access & Security Public transportation Should be accessible by public transportation Pedestrian access Should have pedestrian connections Parking Should have adequate parking available Visibility and surveillance Should be visible from street Supporting Infrastructure Washrooms, drinking water, food, lighting, shelter Should have surrounding amenities to support users When assessing to what degree a site fulfills the components of the site selection criteria, consideration must be given to achieving an appropriate balance. For example, when considering the visibility of a site, it is desirable to achieve the correct balance between high visibility of the skatepark for reasons of safety and security, while achieving the correct level of privacy, comfort and security for local residents, businesses and community organizations. The proximity of the skatepark to supporting infrastructure and facilities, especially staff supported facilities, also requires deliberation. It is advantageous to have the skatepark close to the facilities for the safety and convenience of skatepark users, but it is also important to maintain a suitable distance from a city facility so that skatepark users are encouraged to a develop an appropriate level of responsibility for the cooperative use of the skatepark between users of different ages and skill levels. 5

12 2.2 INVENTORY OF POTENTIAL SITES Staff generated an inventory of sites to consider in the site evaluation process by creating a list of potential city owned land parcels. Land parcels too small, such as neighbourhood parks were removed from the list as they provided numerous design and operational challenges. Community centres, arenas, libraries, pools, and plazas, etc. were recognized as facilities that offer supporting infrastructure and amenities that could be utilized by skateboarders. As such, lands that did not have such landmarks within a reasonable distance were also removed from the list. Once refined, the list of potential sites included 19 properties. 2.3 DEMOGRAPHIC ANALYSIS One of the key criteria in the site selection criteria matrix was the consideration of potential users in relation to the potential site. In order to complete this evaluation, an understanding of the demographic makeup of the City s planning communities was required. A survey conducted by the City of Toronto indicated that 83 percent of skateboarders are between the ages of 10 and 19 (Gomez, 2006). As such, the potential current and future users are primarily considered to be those between the age of 0 and 19. The percentage of the potential skateboarders that reside in each planning community is displayed in the figure 2. The planning communities that have the highest concentration of Kitchener s youth (age 10 19) and a high percentage of youth within their planning community are in the west end of Kitchener in the Laurentian West, Laurentian Hills, Forest Heights, Highland West, and Country Hills West planning communities. There is also a high concentration of the City s youth in south east Kitchener in the Pioneer Park community and also in Vanier and Centreville Chicopee communities. The map in FIGURE 2 graphically shows demographic distribution in the City of Kitchener while also indicating the locations four sites that the staff technical team shortlisted as possible skatepark locations. 2.4 SITE VISIT AND EVALUATION Each of the 19 potential sites was visited by the staff review committee in the summer of While at the sites, staff noted possible locations for the skatepark on each site and observed the surroundings to consider whether a skatepark could be integrated at the desired scale with the existing features and have appropriate visibility, accessibility and supporting amenities. Staff also examined the physical site conditions such as topography and existing vegetation to determine if the site would lend itself well to a skatepark. Taking into account the observations from the site visits, each potential site was evaluated against the established site selection criteria matrix and assigned a point value and an overall letter grade of A, B or C. ( A High, B Medium, C Low suitability) 6

13 FIGURE 1: INVENTORY OF EVALUATED SITES 18 Evaluated Sites Grade 1 Fischer Park A 2 Southwest Optimist Park A 3 Wilson Park A 4 Gzowski Park A 5 Forest Heights CC B 6 Doon Park Pioneer CC B 7 Rosenburg Park B 8 Filsinger Park B 9 Queensmount Arena B 10 Morgan Park B 11 South District Park B 12 Budd Park B 13 Biehn Park B 14 Peter Hallman Ball Yard C Idlewood Park C 16 Victoria Park C 17 Breithaupt Park C 18 Kiwanis Park C 19 Lions Park C McLennan Skatepark 21 Auditorium Skatepark 7

14 FIGURE 2: DEMOGRAPHIC DISTRIBUTION BASED ON PLANNING COMMUNITY GZOWSKI PARK FISCHER PARK MCLENNAN PARK THE AUD WILSON PARK SOUTHWEST OPTIMIST PARK PLANNING COMMUNITY Pioneer Park, Lower Doon, Doon South, Brigadoon 9.1% Forest Heights 8.2% Laurentian West 7.4% Highland West 6.1% Vanier 5.8% Laurentian Hills 5.6% Centreville Chicopee 5.4% Victoria Hills 5.3% Country Hills West 3.5% Heritage Park 3.2% Idlewood 2.8% Forest Hill 2.8% Grand River North 2.7% Stanley Park 2.5% Rosemount 2.1% Southdale 2.1% Country Hills 2.0% Westmount 1.9% Mt. Hope Huron Park 1.9% Central Frederick 1.5% Mill Courtland Woodside Park 1.5% Alpine 1.3% Victoria Park 1.3% Hidden Valley / Pioneer Tower 1.1% Fairfield 1.1% Cherry Hill 1.0% Grand River South 1.0% Bridgeport East 0.9% Auditorium 0.9% K W Hospital 0.9% Meinzinger Park Lakeside 0.9% Bridgeport North 0.8% St. Mary's Hospital 0.8% King East 0.8% Cedar Hill 0.8% Southwest 0.7% Victoria North 0.5% Eastwood 0.5% Rockway 0.4% Northward 0.3% Civic Centre 0.3% City Commercial Core 0.3% 8 CITY WIDE 3.9%

15 2.5 INTERNAL REVIEW AND SHORTLISTED SITE SELECTION On completion of the site evaluations, 4 potential sites scored an A and were recommended by the staff technical review team as sites to take forward to the public for further consideration. Of the 19 sites initially selected for consideration, 15 sites scored B & C and were removed from further consideration for various reasons, such as: Near existing skateparks (AUD & McLennan) Close proximity to adjacent residential dwellings Lower potential user demographics Site or facility not large enough without negatively impacting existing activities Skatepark would eliminate the only green space in the neighbourhood Inadequate public transportation, pedestrian access or parking Once all these factors were taken in to consideration, only the sites that received a letter grade of A (See FIGURE 3) were selected as sites that warranted presentation to the public for further consideration. These shortlisted sites were: Fischer Park (Fischer Hallman Road Queens Boulevard) Southwest Optimist Park (Pioneer Drive Homer Watson Boulevard) Gzowski Park (Chopin Drive Westmount Road West) Wilson Park (Wilson Avenue Fourth Avenue) 9

16 FIGURE 3: A LISTED SITES Fischer Park Southwest Optimist Park The purpose of this study is to recommend sites for the two future Gzowski Park Wilson Park skateparks. The exact location of the skatepark on each recommended site will be determined 10 at the design stage of the process

17 3.0 PUBLIC COMMUNICATION The City of Kitchener recognizes the benefits of being connected to a diverse community and has worked in partnership with stakeholders to seek mutually beneficial outcomes through building awareness and obtaining feedback. 3.1 WITH WHOM DID WE COMMUNICATE? Staff engaged in multiple methods of public communication to inform the community about the skatepark planning study project, answer questions and receive feedback. Skatepark Users, Local Residents and Members of the General Public Skate park users and parents of skateboarders were given the opportunity to voice their opinions and these primarily revolved around their desired locations for the park, while local residents and the general public had the chance to express their support and/or various concerns. Sportsfield Users and Adjacent Businesses and Organizations of Shortlisted Parks To assess the suitability of a site, one of the main considerations is how much impact the new skatepark will have on the existing users and use of the space. The teams, clubs and organizations currently using the sportsfields at the four shortlisted parks were notified about a skateboard park potentially being located at the park where their team/club meets. They were given the opportunity respond with any questions or concerns or to arrange a meeting to further discuss any concerns. Businesses and organizations adjacent to the shortlisted parks (a high school, community centres, a church, restaurants, libraries and public swimming pool) were given handouts explaining the Skatepark Planning Study and identifying the shortlisted parks. They were also provided with links to additional information on the City website and staff contact information should they have additional questions. 11

18 3.2 HOW DID WE GET THE WORD OUT? Information regarding the Skatepark Planning Study, upcoming Open Houses and the Online Survey was made available to the community through many different means: Communication Method Go Skateboarding Day Handouts at the Skatium and The Aud Your Kitchener Article Kitchener s Leisure Magazine Advertisement Posters at Community Centres Handouts with Kitchener Youth Action Council (KYAC) Handouts for Local Skateboard Business Public Open House and Media Release Details Staff attended Go Skateboarding Day on June 22, 2010 at the Kitchener Memorial Auditorium Complex (The AUD) skatepark and was on hand to answer questions about the study. Informational material was distributed through the summer of 2011 at the Skatium mobile skatepark locations and drop bys at the AUD skatepark. Staff took the opportunity to have one on one discussions with skateboarders and receive feedback. An article was featured in the SEPTEMBER OCTOBER 2010 issue of YOUR KITCHENER. It provided background information about the study and also included the dates of the two open houses. (See Appendix H) The online survey and skatepark project were featured in Kitchener s Leisure magazine. This publication is delivered door todoor to 62,500 local homes and an additional 11,500 copies are distributed to recreation facilities, community service groups, doctors' offices, churches and libraries throughout our community. (See Appendix F) A poster with details about the study and survey was installed at an exterior location at all the community Centres in Kitchener in late summer / early Fall (See Appendix G) KYAC is a voluntary committee of young people who support fellow youth and ensure that youth voices are heard throughout Kitchener. Posters and information cards were distributed to members of KYAC to post and circulate at their schools and local skateboard businesses to hand out to their customers. Information cards and posters were distributed to local skateboard businesses to hand out to their customers. Two public open houses were held in September 2010 in order to receive feedback from the broader community. A media release was advertised in early September Social Media Information about the study was posted on the City s Facebook Page. Skatepark An account, skatepark@kitchener.ca, was set up to allow people to contact staff with questions and to allow staff to direct them to the City skatepark webpage for more information. (See Appendix M) Website The shortlist of preferred skatepark locations were posted on the City s website beginning September, 2010 along with the dates of the open houses. (See Appendix B) Skatium and Skatepark Visits Handouts to Adjacent Businesses and Organizations to Current Sportsfield Users of Shortlisted Parks Staff visited the various Skatium and skatepark locations to speak with skatepark users and parents as well as to provide them with the opportunity to participate in the Skatepark Survey on digital tablets. Businesses and organizations adjacent to the shortlisted parks were given handouts explaining the Skatepark Planning Study and identifying the shortlisted parks. They were also provided with links to additional information on the City website and staff contact information should they have additional questions. The current sportsfield users of the four shortlisted parks were notified about the skatepark planning study. They were given the opportunity respond with any questions or concerns or to arrange a meeting to further discuss any concerns. 12

19 3.3 HOW DID WE OBTAIN FEEDBACK? Online Survey An online survey was provided at the open houses in September 2010 and posted on the City s website throughout fall 2010 until fall 2011, to allow respondents to indicate whether they support the development of a skatepark in the recommended locations and indicate their preference of the four shortlisted sites. A total of 355 responded, of which 81% of the respondents were skateboarders or a parent of a skateboarder. Approximately 40% of these skateboarders presently skateboard on the sidewalk or street. Generally the skateboarders were in favor of all of the shortlisted sites identifying that travel distances represented 53% of the respondent s reason for not using the existing facilities. (See Appendix J and Appendix K for highlights) Surveys Completed at Open Houses In order to receive feedback from the broader community, two public open houses were scheduled during September The open houses were advertised in Your Kitchener, with posters at community centers, and in a City of Kitchener Media Release in early September. The first public open house was held on September 14 at the Doon Pioneer Park Community Centre. The meeting was well attended with approximately 30 people in attendance. The second open house was held on September 28 at the Forest Heights Community Centre and was attended by 5 people. The shortlisted sites (see Appendix B), were on display and staff were on hand to answer questions. An online survey station consisting of 5 computers was also setup to allow people to complete the survey while they were at the open house Surveys Completed by Skateboarders at Existing Skateparks Throughout the summer of 2011, staff equipped with digital tablets, went out to the Aud, McLennan Park and the Doon Skatium locations to make contact with the skateboarders and provide them the opportunity to participate in the Skatepark Survey. The survey on the digital tablets was identical to the online survey and the results were combined. (See Appendix J and Appendix K for highlights) Feedback Obtained from Sportsfield Users and Adjacent Businesses and Organizations Current sportsfield users of the four shortlisted parks, as well as adjacent businesses and organizations were notified about a skateboard park potentially being located at a park that could have an impact on team/business/organization. They were given the opportunity respond to and/or arrange a meeting with Staff to further discuss the proposed skatepark. 13

20 3.4 GENERAL ONLINE SURVEY RESULTS In summary, 355 surveys were completed. The majority who completed the survey have identified themselves as skatepark users or parents of a skateboarder (See FIGURE 4). FIGURE 4: SURVEY RESPONDENTS It appears that many of the skateboarders currently use sidewalks and streets to skateboard on and almost half of the respondents make use of the Doon Skatium mobile skatepark and The AUD Skatepark. (See FIGURE 5) *Note: For most of the duration of the survey, the skatepark at McLennan Park was not yet open. FIGURE 5: LOCATIONS WHERE SKATEBOARDERS SKATE 14

21 The most frequent responses given by skateboarders for not using the existing skateparks were that they were too small and too difficult to get to. About half of the responses indicated that they lacked the features they want in a skatepark. (See FIGURE 6) FIGURE 6: REASONS FOR NOT USING EXISTING SKATEPARKS Fischer and Southwest Optimist Parks ranked highest collectively on survey questions indicating park preference. FIGURE 7: PROPOSED SKATEPARK SURVEY RESULT COMPARISON (supporting) 15

22 4.0 SHORTLISTED SITE ASSESSMENT As mentioned earlier in the study, in order to assess four sites which had similarly received a high ranking in the initial site selection evaluation process, a more detailed assessment was required to determine which sites consistently rate above the others in multiple areas, determined to be especially important. Thus, a more detailed site selection matrix was established and criteria ranked to recognize critical criteria. This matrix design also allowed us to review and compare the criteria for all four sites on one document. 4.1 SITE SELECTION CRITERIA OVERVIEW This section summarizes key site selection criteria considered important when assessing the appropriateness for a skate facility in the four shortlisted locations and is based upon the initial site selection matrix. The specific criteria in the matrix has then been weighted in consultation with the Staff Technical Team in order to determine importance (refer second column in matrix, The Importance of Criteria). This ranking has then been applied to each criterion for each individual site, in order to calculate a preferred location. (See 4.2 Weighted Matrix) Criteria Location Physical Site Conditions The location category covers such criteria as demographics and the location of a skatepark in relation to its proximity to users; relationship to other facilities; location with respect to potential conflict; as well as survey support of the proposed location. This broad criterion is based on the physicality of the various sites and whether they can accommodate a skate park of the required scale, function and typology. It also considers technical implications such as drainage and soil conditions as well as implications to existing natural features. Access and Security This criterion looks at how easily accessible the site is for users, parents and those viewing the skatepark or events. With the main age group using this facility being children without the ability to drive, it is important to ensure that the facility can be easily accessed by all and it is critical to ensure that the facility is open, safe and easily accessed in the case of an emergency. Supporting Infrastructure The high visibility of a park can be beneficial for a number of reasons. It can be attractive to the community, encouraging community members to stop by and watch the users perform tricks on their lunch break. It sends a clear message that young people and active healthy living are a community priority. It can also provide an aspect of self policing. Visibility will reduce the vandalism, can prevent unwanted graffiti from appearing in the park, and may help curtail the suspicion that skateboard parks are places for mischief. An active public sporting facility such as a skatepark should have appropriate ancillary amenities. This includes nearby access to food, water and toilets given users can spend many hours using a skatepark in a single session. 16

23 4.2 WEIGHTED MATRIX The criteria of the weighted matrix are organized under the same headings as the Site Selection Criteria Matrix that was used earlier in the site selection process to determine the four shortlisted sites. Additional detailed criteria were added as necessary in some categories to enable a more in depth examination of each site. A number to gauge importance (Importance column) was assigned to each criterion and is applied against the grading (Meets Criteria column) to deliver a criteria point for each criterion for each location (Criteria Points column). The grading generally falls into the higher end of the spectrum, reflecting once again that these locations are our best potential skatepark locations. Finally, the total weighted assessment of each site is provided as well as the percentage of success of each site considering all criteria. FIGURE 7: SKATEPARK PLANNING STUDY WEIGHTED MATRIX The following is an assessment of each of the shortlisted sites based on criteria & questions to ascertain the most appropriate skatepark location. Consideration/Criteria Location Is the area currently lacking in service by another 1 skatepark? Are there a sufficient number of users in the service 2 area to warrant skatepark development? Is the proposed site a location where young people 3 want to be or adjacent to where they currently congregate? Are the respondents from Skatium visits (2011) 4 supportive of a skatepark in this area? Is the proposed site in close proximity to shopping 5 centres, sports or recreation facilities or interested schools? Has the site the capacity to have the skate facility 6 placed to maximize noise attenuation and light intrusion if applicable? 7 Is the site location an adequate distance from residential dwellings and incompatible land uses to Importance 5 highest, 1 lowest Fischer Park Gzowski Park Southwest Optimist Park Meets Criteria 5 highest, 1 lowest Wilson Park Fischer Park Gzowski Park Southwest Optimist Park Criteria Points Wilson Park 17

24 avoid potential noise and light intrusions? 8 Does the feedback from adjacent properties, businesses and organizations support this development? 9 Is the proposed site within or adjacent to a major community hub or central area? Does the online survey and public meeting comments strongly support this location for a proposed skatepark? Physical Site Conditions Is the site adequate size to accommodate a variety of design options and potential expansion? Can the site accommodate access for users and spectators including refuge areas with seating, viewing and adequate separation in an inclusive design? Does the topography at the proposed site require minimal construction implications (i.e. no need for significant earthworks, cut/fill or retaining structures)? Are there minimal complex drainage requirements for the proposed site? Can the proposed site facilitate no net loss of mature or significant trees? Could the site be integrated with the existing surroundings? Subtotal Subtotal Access and Security Is there good access to the proposed site using public transit (i.e. number of bus routes)? Are there public transit stops on or adjacent to the site? Are there pedestrian/footpath connections from transport nodes to the proposed site?

25 4 Can the proposed site provide safe entry to and from the site and safe setbacks from busy roads and intersections? Is there a safe drop off area? Is there adequate car parking? Can the proposed site provide adequate emergency vehicle access (fire and ambulance)? Is the proposed site visually prominent with good public surveillance for safety and for the promotion of the facility and skate facility? How readily accessible is the proposed skatepark location to regular cleaning and maintenance teams? Supporting Infrastructure Are associated amenities such as public telephone, 1 toilets, water, and shelter existing and available or cost effective to install on the proposed site? 2 Is the proposed site close to shops selling food and drink? Subtotal Subtotal Total Weighted Assessment of Each Shortlisted Site Percentage Success of Shortlisted Site Considering all Criteria 88% 73% 86% 77% 4.3 SUMMARY The four shortlisted sites are spaced around the City, so many of the broader considerations are quite varied. Some of the variance is due to the location of each site in consideration of the population of youth in the vicinity. Another is the proximity to existing skateparks. The following discussion summarizes each of the sites in more detail and then outlines our final recommendation as the preferred location for the skatepark, taking in consideration the weighted matrix contained herein. 19

26 4.3.1 Site 1 Fischer Park Fischer Park is located at the corner of Fischer Hallman Road and Queen s Boulevard. The site is adjacent to Forest Heights Collegiate Institute, Forest Heights Pool and the KPL Forest Heights Community Library. Currently there are two soccer fields and one baseball diamond at this location. One block to the north is the Highland Hills Mall and the Forest Heights Community Centre is located across the street on Queen s Boulevard, approximately 250 m away. Online survey results placed this site as the top choice for support of the site. Central to a highly populated area with the highest number of youth between 0 19 years of age (12,398 within a 2.5 km radius). 4 bus routes serve this site and 3 bus routes are located within one block. Distance to the two existing skateparks is as follows: The Aud 5.3 km; McLennan Park 2.9 km. Summary Given the highest matrix result of 88%, this site performs well in a number of areas. The greatest number of youth would be served by a skatepark located in this area. With regard to access to the site via transit, as there is a retail hub located one block to the north, there are seven bus routes that pass within one block of this site. Four of these bus routes run adjacent to the site. Also, Fischer Park ranked highest in the online survey results Site 2 Gzowski Park Gzowski Park is located at the corner of Westmount Road and Chopin Drive. The park is adjacent to the Victoria Hills Community Centre and across the street from AR Kaufman Public School. There is currently one baseball diamond on this site. This site is on the edge of the area with the highest number of youth between 0 19 years of age (8198 within a 2.5 km radius). 2 bus routes serve this site. Distance to the two existing skateparks is as follows: The Aud 4.7 km; McLennan Park 3.9 km. Summary At 73%, Gzowski Park received the lowest matrix result. While this area showed strongly in the numbers of youth between 0 19 years, due to lower numbers in other areas, its overall assessment was weaker. While there is a community centre on the site, due to its location this site lacked attractors of youth to the area that some of the other sites provided. These include a shopping centre, shops selling food or drink and/ or a major community hub. There is potential for the loss of trees at locations on this site that may be able to accommodate the skatepark. Lastly, this site rank third of the four shortlisted sites on the online survey Site 3 Southwest Optimist Park Southwest Optimist Park is located at the corner of Homer Watson Boulevard and Pioneer Drive. The park currently has four baseball diamonds, one T ball diamond and the Southwest Optimists of Kitchener s clubhouse. The Doon Pioneer Park Community Centre is located 20

27 approximately 200 metres from the park. Pioneer Park Plaza is located across the street. This site is in close proximity to St. Timothy Elementary School. The Doon Skatium mobile skateboard facility was instigated in this community from a desire of local groups and individuals to provide a fun, healthy and safe activity for the youth of this community. Funding was obtained through a Trillium Foundation grant, as well as donations from the City of Kitchener and the Southwest Optimists. Throughout the summer months, this portable park is shared with other community centres on a rotating schedule. This area is furthest from the two existing skateparks. Distance is as follows: The Aud 6.6 km; McLennan Park 5.3 km. Online Survey results placed this site as the second choice. Number of youth (0 19) within a 2.5 km radius is 3748, which is the lowest of the 4 shortlisted sites. 2 bus routes serve this to site. Summary With a matrix result of 86%, Southwest Optimist Park runs a very close second to Fischer Park. This site was particularly strong in the various location criteria. As Southwest Optimist Park is located the furthest of all the shortlisted sites from the existing skateparks, not choosing this site would leave the south end youth deficient/too distant from existing and proposed skateparks. This community was spearheaded the Skatium Mobile Skatepark, and has been a strong supporter of this facility/program ever since introduction in Site 4 Wilson Park Wilson Park is located on Wilson Avenue between Fourth Avenue and Shelley Drive. The park currently has three baseball diamonds, one t ball diamond and a soccer field. The Kingsdale Community Centre is also located on the site. Closest to the two existing parks. Distance is as follows: The Aud 2.4 km; McLennan Park 2.6 km. Number of youth (0 19) within a 2.5 km radius is Fewest Skatium visits of the four shortlisted parks. 1 bus route within one block of this site. Summary Wilson Park ranks third in the matrix with a result of 77%. This site also received the least support in the online survey. Of all the four shortlisted parks, it is the closest to both The Aud and McLennan Parks. Access to this site using transit, while available was not as abundant as the three other sites. This site facilitates no net loss of mature or significant trees with the proposed skatepark development. 21

28 5.0 FINAL CONCLUSION As mentioned earlier, the process of evaluating and comparing four strong sites is not a simple task. In a preliminary review, no site stood out above the rest in each and every criterion. In order to effectively assess these sites, an evaluation of multiple criteria was weighted based on importance. That way, the technical team were able to assess true value of criteria where warranted, and ultimately be able to arrive at an outcome directing us to the two most sound choices. Based on this analysis, Fischer Park and Southwest Optimist Park reported the strongest outcomes on the weighted matrix of the four shortlisted sites. Considering the four shortlisted sites, with Fischer and Gzowski Parks just 2.3 km apart, we can assume that only one of these two could be chosen as one of final two selections. Furthermore, looking at the demographic distribution map, the proximity of Fischer Park to McLennan Park could be questioned, but once the numbers of youth between 0 19 are taken into consideration in that area, it becomes evident that the number of youth are so high in this area, they are great enough to support or even necessitate an additional skatepark to serve the youth in this area. Wilson Park, although still ranked high as a shortlisted site was also the closest to the two existing skateparks were continued support could be provided. Currently, and based on a sample service area (2.5 km radius), the population of youth between 0 19 years is lower in the area of Southwest Optimist Park, however our data is based on census data from 2006, as detailed census data from 2011 is not yet available. As significant development continues throughout the south and western portions of Ward 4, the population of youth in the service area of Southwest Optimist Park is expected to have increased significantly since our 2006 numbers and is expected to continue to grow. 5.1 RECOMMENDATIONS RECOMMENDATION #1 As recommended in the Leisure Facilities Master Plan (2005) and Parks Strategic Plan (2010); based on extensive review and study of potential city owned sites, the supporting data and implications for skatepark development within these sites as well as the ascertained need in each neighbourhood, staff recommends that Council approve Fischer Park and Southwest Optimist Park as skatepark locations. RECOMMENDATION #2 That Council direct staff to implement the design/construction of the Fischer Park skatepark in 2014/15 and the Southwest Optimist Park skatepark in 2016/17 subject to final capital budget approval. 22

29 6.0 NEXT STEPS 6.1 SKATEPARK DESIGN Of the people that indicated support of the skateparks, some expressed the design features they would like included while others expressed the importance of getting design input from the skateboarding community. Once the two site locations have been approved, staff will once again consult with the public on the design of the skateparks and will collect more feedback from the skatepark community and interested members of the public. The review of studies completed by other municipalities has revealed that the involvement of local skateboarder in the design process of a skatepark is crucial for its success. This approach proved extremely successful in 2009 during design workshops for the McLennan Park skatepark. While it is not within the scope of this study to contemplate the exact configuration or design of the two future skateparks, staff has recommendations for items that should be given consideration in the design phase. 6.2 SIZE AND STYLE Unlike baseball diamonds and tennis courts, skateboard parks can be designed in a variety of shapes and styles and at different sizes to respond to diverse needs (Moore, 2006). In terms of size, it is envisioned that the two future skateparks would be similar in size to McLennan Park. McLennan Park is approximately 1,000m2 and cost $450,000 to construct (excluding adjacent pathways and landscaping) and $45,000 to design/engineer. As a general guide, a 1,000m2 facility can accommodate approximately 40 skateboarders at one time (Moore, 2006). In order to address the needs of the skateboarding community, it is very important to ensure that the skatepark is an appropriate size and style so it can accommodate the needs of different skill levels. If it is too small, it likely will only serve the needs of beginner to intermediate skill users and the interest and needs of advanced skill users will not be addressed. It is noted that the mobile skatepark (Skatium) already serves the needs of beginner skill users. As such, the two future skateparks should strive to serve a broader range of skill levels (beginner to advance skill users). Also, the survey results indicated that one of the reasons skateboarders do not use existing skatepark facilities is because they feel they are too small. As such, it is very important that the skateparks are large enough to accommodate many skateboarders of various skill levels at one time. If a park is designed to accommodate different styles and appeal to different skill levels, users will ride much longer. Proper design can also bring a diversity of ages to the park, allowing older, more experienced skateboarders to educate younger skateboarders on park etiquette and provide a space for mentoring to naturally occur (Moore, 2006). In addition, BMX biking comments also came up during the consultation and for the purpose of this study, all were compiled as skate park users. Skateparks can serve many styles of users boarders, bikers, bladders, scooters, etc. Design input and consideration should be examined for all potential user groups prior to final design. 23

30 6.3 LOCATION ON SITE As mentioned earlier, the purpose of this study is to recommend two sites for the two future skateparks. The exact positioning of the skatepark on the recommended sites will be determined at the design stage of the process. Interested parties will have the opportunity to provide input into any discussions around location, looking at what location will most benefit skateboarders and the community. With that said, a highly visible location will be selected. The high visibility of a park can be beneficial for a number of reasons. It can be attractive to the community, encouraging community members to stop by and watch the users. It sends a clear message that young people and active healthy living are a community priority. It can also provide an aspect of self policing. Visibility will reduce the vandalism of modular ramps, can prevent unwanted graffiti from appearing in the park, and may help curtail the suspicion that skateparks are places for drug and alcohol abuse (Moore, 2006). Additionally, the principles and practices of Crime Prevention Through Environmental Design (CPTED) will be applied to the site design. 24

31 Appendices 25

32 Appendix A: Municipal Skatepark Summaries A survey of various municipalities throughout southwestern Ontario was conducted and of those who responded the following information regarding their municipal skateboard facilities was obtained. Pop. (2006 census) Number of skateparks Barrie 128,430 1 Proposed skateparks Guelph 114,943 1 Hamilton 504,559 4 Kitchener 204, Skatepark Size Cost Completed Other Info Currently has no Cityowned skateparks. Turner Skatepark Waterdown Memorial Skatepark 1,580 m2 (17,000 sq ft) 1,858 m2 (20,000 sq ft) 550 m2 (5,900 sq ft) $200, Area contained within a fenced compound 1,870 m2 Preliminary budget of. $450,000. Beasley Skatepark: Construction budget not yet known. Small skateboard area within a fourth site. 278 m2 (3,000 sq ft) 1) The Aud 1,000 m2 (10,000 sq ft) 2) McLennan Park 1,000 m2 (10,000 sq ft) Doon Skatium Mobile Skate Facility One proposed City owned skatepark $650, City wide park, street style $225, Community park, transition style approx. $90, Approx. $300,000 Proposed rehabilitation date $450, Rehab. to existing skatepark. Mobile skateboard facility travels to various community centres in summer months. 26

33 London 352, City Wide (1) Carling Heights Optimist Centre Skate Park District (3) Kiwanis Skate Plaza Approx. 1,700 m2 $450,000 funds to expand and upgrade existing skatepark. $460,000 plus $92,000 Kiwanis donation. Medway Skate Park $328,000 plus $33,000 Kiwanis donation c) White Oaks: To be significantly upgraded $15, a local company made the benches saved money. The benches can easily be moved by a lift truck. Neighbourhood (6) Generally $80,000 $100,000 St. Julien $80, Used precast components. Basil Grover $120, Naomi Almedia Local labour group donated $62,000; $54,000 City Contribution $116,000 Stronach Poured in place. West Lions Poured in place. Victoria Park Benches only. Serve as seating during events. Arranged with hoist truck in consultation with boarders. Springbank $100,000 To be constructed in Spring

34 Mississauga 668,549 8 Oakville 165, Oshawa 261,573 4 Richmond Hill 165, Iceland Arena (1) 2044 m2 (22,000 sq ft) Smaller skateparks (7) Each facility costs in the range of $140,000. $400, All levels of skill from the beginner. It has street elements, banks and a bowl. It is lit until 11:30 p.m. 5 of the 7 built in 2007 with other two more recent. Beginner to intermediate. Built using modular concrete elements on a poured inplace concrete pad None of the smaller facilities are lit. 1) Shell Park $350,000 June 2005 Poured in place, in ground facility 2) Glen Ashton Park $110,000 June 2009 Prefabricated equipment on concrete pad 3) Glen Abbey Park $110,000 July 2011 Prefabricated equipment on concrete pad 4) Kinoak Arena Indoor Facility Indoor park (set up during the summer months) 5) North Park (Proposed) (budget to be determined) Date of installation TBD Will be their largest facility similar to Hershey Center in Mississauga North Oshawa Park $350, In ground concrete. Legends Centre $35, Steel Modular. Donevan Rec Complex $250, In ground concrete. Lakewoods Park 20, ? Modular. Currently has one skateboard park. 10 Year Capital Forecast anticipates construction of an additional skatepark. $370, Equipment is removed each winter with area used as a snow dump facility

35 Toronto 2,503, Many parks ranging in cost, style, size, elements, & skill. Ashbridges Bay Skatepark Other Skateparks: Alexandra, Ellesmere Park, Greenwood, Stan Wadlow, Vanderhoof, Leonard Linton, Cummer, Port Union, Weston Lions, Scarlet/Lawrence Waterloo 97, ? City of Waterloo Skatepark Windsor 216,473 2 Plans to implement neighbourhood SkateSpots 6,500 m2 $1.2 Million m2 (10,000 sq.ft) No funds currently allocated in 10 year Capital Budget. October 2011 From pre fab satellite spots to large scale Plaza style park Forest Glade 1200 m2 $300, Concrete pad and built in concrete features. Atkinson 1300 m2 $175, Concrete pad with portable steel features. 29

36 Appendix B: Shortlisted Sites Public Meeting Poster 30

37 APPENDIX C: Evaluation of 4 Shortlisted Sites 31

38 32

39 33

40 34

41 Appendix D: Evaluation of Potential Sites (not shortlisted) 35

42 36

43 37

44 38

45 39

46 40

47 41

48 42

49 43

50 44

51 45

52 46

53 47

54 48

55 49

56 Appendix E: Information Card Handouts Appendix F: Skatepark Advertisement featured in Kitchener s Leisure Magazine 50

57 Appendix G: Posters at Community Centres 51 51

58 Appendix H: Article Featured in YOUR KITCHENER 52 52

59 Appendix I: City of Kitchener Skatepark Webpage 53

60 Appendix J: Skatepark Online Survey 54

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

INFORMATION REPORT. Chair and Members Emergency and Community Services Committee. Skateboard Park Study (CES17031) (City Wide)

INFORMATION REPORT. Chair and Members Emergency and Community Services Committee. Skateboard Park Study (CES17031) (City Wide) INFORMATION REPORT TO: Chair and Members Emergency and Community Services Committee COMMITTEE DATE: July 12, 2017 SUBJECT/REPORT NO: WARD(S) AFFECTED: Skateboard Park Study (CES17031) (City Wide) City

More information

162 RESIDENTS ATTENDED 2 DAYS OF WORKSHOPS 15 TABLE DISCUSSIONS WHAT WE HEARD. Oakridge Municipal Town Centre Workshops PLANNING PROGRAM

162 RESIDENTS ATTENDED 2 DAYS OF WORKSHOPS 15 TABLE DISCUSSIONS WHAT WE HEARD. Oakridge Municipal Town Centre Workshops PLANNING PROGRAM OAKRIDGE MTC WORKSHOP 2017 CAMBIE CORRIDOR Phase 3 STEP 3: 3: October June 2017 CAMBIE CORRIDOR PLANNING PROGRAM 2 DAYS OF WORKSHOPS 15 TABLE DISCUSSIONS 162 RESIDENTS ATTENDED WHAT WE HEARD Oakridge Municipal

More information

Mount Pleasant Skateboard Facility. April 27, 2015

Mount Pleasant Skateboard Facility. April 27, 2015 Mount Pleasant Skateboard Facility April 27, 2015 Recommendation A. THAT the Board approve locating an intermediate skill level skateboarding facility in Jonathan Rogers Park; and B. THAT the Board recommend

More information

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES EECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES Topic and Purpose In 2007, the Mayor of Ottawa s Task Force on Transportation suggested adding a

More information

DESIGN CHARETTE AND PUBLIC INFORMATION SESSION CITY OF HAMILTON - LANDINC - SPECTRUM

DESIGN CHARETTE AND PUBLIC INFORMATION SESSION CITY OF HAMILTON - LANDINC - SPECTRUM DESIGN CHARETTE AND PUBLIC INFORMATION SESSION CITY OF HAMILTON - LANDINC - SPECTRUM 1. INTRODUCTIONS 2. WHY ARE WE HERE? CITY - HAMILTON'S RIDE AND ROLL REVOLUTION The goal of the Skateboard Park Study

More information

Traffic Calming Policy

Traffic Calming Policy Page 22 of Report TS-1-13 Development and Infrastructure Division Transportation Services Department Approved by: City Council on February 19, 2013 Report Number: TS-1-13 Effective: February 20, 2013 Amended:

More information

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685 CD10.2 STAFF REPORT ACTION REQUIRED City of Toronto Outdoor Tennis Operations Date: February 19, 2016 To: From: Wards: Reference Number: Community Development and Recreation Committee General Manager,

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations Regional Municipality of Waterloo Planning and Works Committee Agenda Tuesday, April 4, 2017 9:30 a.m. (Following Closed Session) Regional Council Chamber 150 Frederick Street, Kitchener Media Release:

More information

Parks & Recreation Department. Date to Committee: November 14, 2012 Date to Council: November 26, 2012

Parks & Recreation Department. Date to Committee: November 14, 2012 Date to Council: November 26, 2012 Page 1 of Report PR-36-12 TO: Community Services Committee Parks & Recreation Department SUBJECT: Opportunities for a Permanent Cricket Field Report Number: PR-36-12 File Number(s): 930-01 Report Date:

More information

Georgetown Skate Park & Action Sports Needs Assessment Project Background

Georgetown Skate Park & Action Sports Needs Assessment Project Background Project Background Purpose of Study: The purpose of this study is to confirm needs for new action sports opportunities in Georgetown, and develop prioritized implementation strategy. A focus of this project

More information

REPORT. RECOMMENDATION: 1. That the report on Pilot Results Free Transit for Seniors, dated October 25, 2012, from Oakville Transit be received.

REPORT. RECOMMENDATION: 1. That the report on Pilot Results Free Transit for Seniors, dated October 25, 2012, from Oakville Transit be received. REPORT MEETING DATE: NOVEMBER 15, 2012 FROM: Oakville Transit DATE: October 25, 2012 SUBJECT: Pilot Results - Free Transit for Seniors LOCATION: Town Wide WARD: Town wide Page 1 RECOMMENDATION: 1. That

More information

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND COUNCIL POLICY NAME: COUNCIL ADVISORY COMMITTEES - TERMS OF REFERENCE ISSUED: APRIL 3, 2006 AMENDED: NOVEMBER 27, 2006 NOVEMBER 23, 2009 JANUARY 11, 2010 DECEMBER 17, 2012 POLICY COUNCIL REFERENCE: 06/119

More information

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues 1 Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation The Centennial Neighbourhoods Transportation Management Plan (CNTMP) is being undertaken to support the Secondary

More information

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project. TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary

More information

Comments The Plan for Port Whitby

Comments The Plan for Port Whitby Comments The Plan for Port Whitby April 24th, 2013 Community Meeting #2 Summary Report Prepared by GLPi April 29th, 2013 1 Introduction The purpose of the Port Whitby Secondary Plan Update, Community Improvement

More information

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING

More information

Summary Report: Built Environment, Health and Obesity

Summary Report: Built Environment, Health and Obesity Research and education Built Environment Edmonton Project Summary Report: Built Environment, Health and Obesity Introduction In 2007 the Canadian Institutes of Health Research and the Heart and Stroke

More information

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey: Old Strathcona s neighbourhood renewal process is now at the draft concept design phase. Over the last several months, the city has been gathering local knowledge and resident input that has been used

More information

WELCOME! TOWN CENTRE PARK INFORMATION SESSION WHAT IS HAPPENING? GOALS FOR TODAY. TOWN STAY CONNECTED WITH US! #1 INFORM WE ARE HERE

WELCOME! TOWN CENTRE PARK INFORMATION SESSION WHAT IS HAPPENING? GOALS FOR TODAY. TOWN STAY CONNECTED WITH US! #1 INFORM WE ARE HERE 1 WELCOME! Thank you for coming to the Information Session! Please provide us with your comments and ideas. We will use your input to inform the visioning process and creation of the framework for the

More information

Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road

Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road STAFF REPT ACTION REQUIRED Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road Date: February 2, 2012 To: From: Wards: Reference Number: Etobicoke York Community Council Acting

More information

Plainfield Gateway. Plainfield Context

Plainfield Gateway. Plainfield Context Plainfield Gateway The western arm of The Campus, much like the Thomas Street Placita eastern arm, must connect residents and workers from the western side of the neighborhood to The Campus and the activity

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

September 2017 I City of New Westminster

September 2017 I City of New Westminster September 2017 I City of New Westminster Page 1 1. Context Sapperton is a predominantly residential community and home to the Royal Columbian Hospital (RCH). The neighbourhood is undergrowing major growth

More information

Discussion Paper Men s and Boy s Competition Review 26 May 2017

Discussion Paper Men s and Boy s Competition Review 26 May 2017 BACKGROUND As we enter into the third year of the Men s National Premier League (NPL) three-year licence period, and having launched the Women s NPL off the back of last year s Women s and Girl s Competition

More information

Safe Routes to School Grant Application Phase I March 2014

Safe Routes to School Grant Application Phase I March 2014 Safe Routes to School Grant Application Phase I March 2014 Page 1 The City of Mission is requesting grant funding to create a Safe Routes to School Plan which will encompass all of the existing elementary

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

REPORT. Engineering and Construction Department

REPORT. Engineering and Construction Department REPORT COMMUNITY SERVICES COMMITTEE MEETING DATE: JUNE 11, 2013 FROM: Engineering and Construction Department DATE: May 24, 2013 SUBJECT: Great Lakes Boulevard Mini Roundabout LOCATION: Great Lakes Boulevard

More information

General Manager, Parks, Recreation and Culture. Request for Upgrades to Bridgeview Park Ball Diamonds

General Manager, Parks, Recreation and Culture. Request for Upgrades to Bridgeview Park Ball Diamonds Corporate NO: F003 Report COUNCIL DATE: January 15, 2007 FINANCE COMMITTEE TO: Mayor & Council DATE: January 11, 2007 FROM: General Manager, Parks, Recreation and Culture FILE: 6140-20/B SUBJECT: Request

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL September 2017 HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL Table of Contents EXECUTIVE SUMMARY 3 1. INTRODUCTION 4 2. LOCAL CONTEXT 5 3. OBJECTIVES 7 4. PRIORITIES 8 5. FUNDING OPTIONS

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT Subject: GROSVENOR POOL REPORT Recommendation(s) 1. That the Grosvenor Outdoor Pool Report Part 2, 2015, provided as Attachment 1 to the Grosvenor Pool Report agenda report dated

More information

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Kelowna On the Move. Pedestrian and Bicycle Master Plan Kelowna On the Move Pedestrian and Bicycle Master Plan Executive Summary April 2016 Purpose of the Plan The Pedestrian and Bicycle Master Plan identifies infrastructure, planning, and policy requirements

More information

QUEEN ELIZABETH SCHOOL PARK AND GLENGARRY PARK USAGE SURVEY RESULTS Integrated Strategic Development- Citizen Services- City of Edmonton

QUEEN ELIZABETH SCHOOL PARK AND GLENGARRY PARK USAGE SURVEY RESULTS Integrated Strategic Development- Citizen Services- City of Edmonton QUEEN ELIZABETH SCHOOL PARK AND GLENGARRY PARK USAGE SURVEY RESULTS 2016 Integrated Strategic Development- Citizen Services- City of Edmonton Introduction Background and Objectives District Parks are busy,

More information

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS FEBRUARY 2019 EXECUTIVE SUMMARY Starting in 2019, Alberta Avenue will see the replacement and enhancement of its aging collector and local

More information

Project Launch Community Meeting 1 Summary

Project Launch Community Meeting 1 Summary ConsumersNext: Planning for People and Business at Sheppard and Victoria Park Project Launch Community Meeting 1 Summary Participants Listening to the Overview Presentation Prepared for the City of Toronto

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

Cycling Master Plan Community Engagement Session WELCOME

Cycling Master Plan Community Engagement Session WELCOME Cycling Master Plan Community Engagement Session WELCOME WHY COMMUNITIES PLAN Considering Short Term and Long Term Needs City of Lethbridge is committed to planning - to determine short term goals along

More information

2010 Pedestrian and Bicyclist Special Districts Study Update

2010 Pedestrian and Bicyclist Special Districts Study Update 2010 Pedestrian and Bicyclist Special Districts Study Update Pedestrian and Bicyclist Special Districts Program Overview H-GAC s Special Districts Program aims to provide strategic investments in pedestrian

More information

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Speed Limits Study and Proposal. Public Input Session: 8/14/13 Speed Limits Study and Proposal Public Input Session: 8/14/13 Why is Decatur a unique place for this project? First Community Transportation Plan in the nation with a Health Impact Assessment. Strong sense

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

EXHIBIT B. Rodney Wojtanik, Project Manager, Portland Parks & Recreation

EXHIBIT B. Rodney Wojtanik, Project Manager, Portland Parks & Recreation EXHIBIT B TO: FROM: City Council Rodney Wojtanik, Project Manager, Portland Parks & Recreation DATE: June 22, 2005 For additional information on the public outreach process and recommendations for the

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

Traffic Calming Rosemount Avenue, between Ralph Street and Queenslea Avenue

Traffic Calming Rosemount Avenue, between Ralph Street and Queenslea Avenue STAFF REPT ACTION REQUIRED Traffic Calming Rosemount Avenue, between Ralph Street and Queenslea Avenue Date: April 20, 2016 To: From: Wards: Report Number: Etobicoke York Community Council Director, Transportation

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

NW SKATEPARK OPEN HOUSE

NW SKATEPARK OPEN HOUSE 1 NW SKATE OPEN HOUSE WELCOME TO OPEN HOUSE #1 MERCER SKATE RELOCATION New Westminster Secondary School (NWSS) is being redeveloped and the existing Mercer Stadium skatepark needs to be relocated. As per

More information

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT WELCOME TO PUBLIC INFORMATION CENTRE #1 AIRPORT ROAD ENVIRONMENTAL ASSESSMENT From Braydon Boulevard/Stonecrest Drive to Countryside Drive November 23, 2017 6:30 PM 8:30 PM Please sign in and fill out

More information

5 Transit & Traffic. Overview

5 Transit & Traffic. Overview 5 Transit & Traffic Overview Montgomery Place s roadways and overall traffic circulation are unique in the city due to the narrow streets and avenues with boulevards; however, no sidewalks or curbs in

More information

Appendix A-K Public Information Centre 2 Materials

Appendix A-K Public Information Centre 2 Materials Appendix A-K Public Information Centre 2 Materials Our Rapid Transit Initiative Make an impact on the future of transit Join the discussion on Rapid Transit in London You re invited to a Public Information

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Congupna Community Plan Steering Committee (CCPSC) Greater Shepparton City Council (GSCC) CCPSC GSCC VicRoads CCPSC GSCC. CCPSC GSCC VicRoads

Congupna Community Plan Steering Committee (CCPSC) Greater Shepparton City Council (GSCC) CCPSC GSCC VicRoads CCPSC GSCC. CCPSC GSCC VicRoads CONGUPNA Action Plan Goal Actions Partnerships Timeframes / 1. Advocate for services - natural gas, sewerage Identify a range of advocacy measures to lobby with relevant government departments and utility

More information

POLICY: TRAFFIC CALMING

POLICY: TRAFFIC CALMING 2006 MAY REFERENCE: COUNCIL APPROVED BY COUNCIL MAY 23, 2006 CITY OPERATIONS - NO. 608 POLICY: TRAFFIC CALMING A. All requests for traffic calming within the City shall be considered in accordance with

More information

2760 Cameron Road, West Kelowna, BC V1Z 2T6 Tel.: ; Fax:

2760 Cameron Road, West Kelowna, BC V1Z 2T6 Tel.: ; Fax: Hello West Kelowna Resident! You have been randomly selected to participate in the City of West Kelowna s Annual Citizens Survey. This anonymous, statistically-accurate survey provides West Kelowna Council

More information

CYCLING PLAN UPDATE. DIY Workshop FACILITATOR GUIDE

CYCLING PLAN UPDATE. DIY Workshop FACILITATOR GUIDE DIY Workshop FACILITATOR GUIDE CYCLING PLAN UPDATE Prepared as part of the Public and Statekholder Engagement Program for the City of Burlington Cycling Plan Update February 2018 About this Facilitator

More information

Non-motorized Transportation Planning Resource Book Mayor s Task Force on Walking and Bicycling City of Lansing, Michigan Spring 2007 pg.

Non-motorized Transportation Planning Resource Book Mayor s Task Force on Walking and Bicycling City of Lansing, Michigan Spring 2007 pg. Non-motorized Transportation Planning Resource Book pg. 105 of 158 Non-motorized Transportation Planning Resource Book pg. 106 of 158 Non-motorized Transportation Planning Resource Book pg. 107 of 158

More information

TO: FROM: SUBJECT: RECOMMENDATION REPORT SUMMARY BOARD AUTHORITY

TO: FROM: SUBJECT: RECOMMENDATION REPORT SUMMARY BOARD AUTHORITY February 8, 2018 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Douglas Park Playground Replacement - Construction Contract RECOMMENDATION

More information

City of Toronto Complete Streets Guidelines

City of Toronto Complete Streets Guidelines Round One This is a summary of the Complete Streets Guidelines Survey posted on June 18 th, 2015 and live until July 2 nd, 2015. The survey was designed to solicit feedback on the draft Complete Streets

More information

Sardis Elementary School Road Safety Plan. Produced by: Sardis Elementary School - Safer School Travel Team in cooperation with Safer City

Sardis Elementary School Road Safety Plan. Produced by: Sardis Elementary School - Safer School Travel Team in cooperation with Safer City Sardis Elementary Road Safety Plan Produced by: Sardis Elementary - Safer Travel Team in cooperation with Safer City Plan completed in January 2016 1 Acknowledgements It takes commitment and community

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System Appendix A Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report 2000 A.1 of A.10 A.2 of A.10 STAFF REPORT January 26, 2000 To: From: Works Committee Barry

More information

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project West Capitol Avenue Road Rehabilitation and Safety Enhancement Project Stakeholder Focus Group Meeting #2 Tuesday, August 28, 2018 7:00 8:00 a.m. West Sacramento City Hall 1110 West Capitol Avenue, West

More information

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX ADOT Statewide Bicycle and Pedestrian Program Summary of Activities APPENDIX B PEDESTRIAN DEMAND INDEX May 24, 2009 Pedestrian Demand Index for State Highway Facilities Revised: May 29, 2007 Introduction

More information

Engagement Summary: Round 1

Engagement Summary: Round 1 Engagement Summary: Round 1 June 21, 2018 REPORT FOR: City of Courtenay 830 Cliff Avenue Courtenay, BC V9N 2J7 PREPARED BY: Urban Systems Ltd. 550 1090 Home Street Vancouver, BC V6B 2W9 ALONG WITH: Kathleen

More information

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

Residential Traffic Calming Program Guide. Town of Ashland, Virginia Residential Traffic Calming Program Guide Town of Ashland, Virginia August 1, 2006 TABLE OF CONTENTS A. INTRODUCTION... 1 B. GOALS... 1 C. CRITERIA... 1 D. IDENTIFYING NEIGHBORHOOD TRAFFIC CONCERNS...

More information

Community Improvement Plans: Creating walkable and liveable communities that support local business

Community Improvement Plans: Creating walkable and liveable communities that support local business Community Improvement Plans: Creating walkable and liveable communities that support local business Kate Hall Program Manager ~ WALK Friendly Ontario Canada Walks, Green Communities Canada khall@greencommunitiescanada.org

More information

Downey Road. Transportation Improvement Study

Downey Road. Transportation Improvement Study Downey Road Transportation Improvement Study Workshop 2 Participant Handbook Workshop 1 May 18 and 19, 2016 Workshop 2 June 23 and 28, 2016 Prepared By: City of Guelph Paradigm Transportation Solutions

More information

Appendix 1 Transit Network Analysis

Appendix 1 Transit Network Analysis Appendix 1 Transit Network Analysis APPENDIX 1 TRANSIT NETWORK ANALYSIS The purpose of this appendix is to provide an update on the transit network analysis as it pertains to: i. SmartTrack ii. Scarborough

More information

DRAFT. Malibu Bluffs Park Skate Park Facility Site Assessment. Prepared For: The City of Malibu Parks and Recreation Department

DRAFT. Malibu Bluffs Park Skate Park Facility Site Assessment. Prepared For: The City of Malibu Parks and Recreation Department Malibu Bluffs Park Skate Park Facility Site Assessment Prepared For: The City of Malibu Parks and Recreation Department Prepared on February 28, 2013 By: 1 INTRODUCTION AND PROJECT BACKGROUND For more

More information

Public Meeting #1 Minutes Job No March 06, 2018

Public Meeting #1 Minutes Job No March 06, 2018 Gig Harbor Sports Complex Bruce Dees & Associates Public Meeting #1 Minutes Job No. 173-02-01 March 06, 2018 PURPOSE The purpose of this meeting was to receive public input on the preliminary program for

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

3.1 TRAFFIC CALMING PROCESS SUMMARY

3.1 TRAFFIC CALMING PROCESS SUMMARY SECTION 3 3.0 TRAFFIC CALMING 3.1 TRAFFIC CALMING PROCESS SUMMARY Traffic calming is a means in which to reduce speeds and minimize vehicular traffic on local neighborhood streets. Citizen involvement

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures.

CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures. CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW Step 1: Petition Petitioner defines the project area limits and gathers petition signatures. 50% of addresses within the project area must sign

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

CITY OF VISTA TRAFFIC CALMING PROGRAM

CITY OF VISTA TRAFFIC CALMING PROGRAM CITY OF VISTA TRAFFIC CALMING PROGRAM The purpose of the Vista Traffic Calming Program is to reduce speeds of motorists driving through residential neighborhoods. The program does not apply to nonresidential

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

Appendix A-2: Screen 1 Alternatives Report

Appendix A-2: Screen 1 Alternatives Report Appendix A-2: Screen 1 Alternatives Report SCREEN 1 ALTERNATIVES REPORT Western & Ashland Corridors Bus Rapid Transit (BRT) Project Prepared for Chicago Transit Authority 567 West Lake Street Chicago,

More information

Pedestrian Project List and Prioritization

Pedestrian Project List and Prioritization To: Kyle Wagenschutz, City of Memphis CC: From: Anne Conlon and John Cock, Alta Planning + Design Date: December, 2014 Re: Project List Development (Task 3.1-3.2) and Project List Prioritization (Task

More information

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Planning for tennis in your Local Government Area. A resource from Tennis Australia Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.

More information

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE 3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following report dated December

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

APPENDIX A. Outreach Summary

APPENDIX A. Outreach Summary APPENDIX A Outreach Summary COUNTYWIDE TRANSPORTATION PLAN Summary of Public Outreach and Engagement To gather an understanding of the transportation issues and priorities throughout the county, and inform

More information

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division TO: Chair and Members Public Works Committee COMMITTEE DATE: June 18, 2018 SUBJECT/REPORT NO:

More information

STRATEGIC PLANNING FOR DEVELOPMENT OF THE OREGON SHORT LINE TERMINUS HISTORIC DISTRICT

STRATEGIC PLANNING FOR DEVELOPMENT OF THE OREGON SHORT LINE TERMINUS HISTORIC DISTRICT STRATEGIC PLANNING FOR DEVELOPMENT OF THE OREGON SHORT LINE TERMINUS HISTORIC DISTRICT & AN EXECUTIVE SUMMARY OF THE HEART OF WEST YELLOWSTONE CONCEPTUAL PLANNING REPORT November 2004 PREPARED BY The Portico

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

Improve the livability of our streets by

Improve the livability of our streets by Pedestrian and Traffic Calming Policy March 2018 2 of 6 Neighborhood Traffic Calming Policy The City of Aspen continually strives to protect multimodal function while maintaining a high standard of safety.

More information

Attachment A VOLLEYBALL TASK FORCE REPORT

Attachment A VOLLEYBALL TASK FORCE REPORT Attachment A VOLLEYBALL TASK FORCE REPORT MAY 2001 INTRODUCTION In 2001, the Park Board conducted a public consultation process for a 12 court sand volleyball facility on the area directly south of the

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014) Chapter 14 PARLIER This chapter describes the current status and future plans for biking and walking in the City of Parlier. RELATIONSHIP TO CITY PLANS AND POLICIES The Parlier General Plan is the primary

More information

Welcome 78 Ave S.E. Underpass and Road Widening Project Update

Welcome 78 Ave S.E. Underpass and Road Widening Project Update Welcome 78 Ave S.E. Underpass and Road Widening Project Update About the 78 Avenue S.E. Project 69 Avenue S.E. crossing of CP proposed to close to accommodate future CP operations. 78 Avenue S.E. would

More information

Bike Share Social Equity and Inclusion Target Neighborhoods

Bike Share Social Equity and Inclusion Target Neighborhoods Bike Share Social Equity and Inclusion Target Neighborhoods Target Neighborhoods West End/Visitation Park/Academy/Hamilton Heights Wellsgoodfellow/Kingsway West The Ville/Greater Ville Kingsway East/Fountain

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

SIDEWALK GUIDELINES April 14, 2008

SIDEWALK GUIDELINES April 14, 2008 SIDEWALK GUIDELINES April 14, 2008 I. Introduction The issue of sidewalks represents a delicate balance that must be considered carefully. On the one hand, in certain circumstances, sidewalks are needed

More information