1

2 Information Document Reference Authors Sign off Version Waiau Pool Feasibility Study Richard Lindsay, Danny O Donnell Craig Jones Final Report Date 7 July 2017 Disclaimer: Information, data and general assumptions used in the compilation of this report have been obtained from sources believed to be reliable. Visitor Solutions Ltd has used this information in good faith and makes no warranties or representations, express or implied, concerning the accuracy or completeness of this information. Visitor Solutions Ltd is acting as an independent consultant. In doing so, the recommendations provided do not necessarily reflect the intentions of the client. Interested parties should perform their own investigations, analysis and projections on all issues prior to acting in any way with regard to this project. Visitor Solutions Waiau Pool Feasibility Study June

3 EXECUTIVE SUMMARY The Waiau Pool was destroyed in the November 2016 earthquake event that struck the Hurunui and Kaikoura communities. The pool was developed in the 1920 s and the community is looking to understand what is a feasible replacement solution. This feasibility study has concluded that it is feasible to construct a replacement pool in the community of Waiau and the preferred location is at the school grounds. This location is central and encourages both school and wider community use. Given there are no indications of any strong growth or decline in population numbers being projected in the next 30 years the development should be aimed at catering for current use-levels. This is subject to whatever increases in activity participation can be achieved through specific programming initiatives. The operating model is predicated on the Waiau School Board of Trustees overseeing this asset. Equally importantly; the pool is operated under a voluntary structure, similar to the previous Waiau pool. The feasibility study concluded that: A replacement of the Waiau Pool is feasible, provided the ongoing operational costs can be minimised through continued volunteer input. The preferred site for the new pool is on the existing school grounds. This site was regarded as meeting all usage criteria. The preferred pool option consists of a main pool and water areas for both Learn-to-Swim and Toddlers water play. The configuration of these areas will be determined with the preferred contractor. Any specialist swimming needs can be accessed in the wider network (e.g. competition and hot water pools at Hanmer Springs) The preferred pool option is most likely to be in the capital cost range of circa $1 1.2 million excluding site infrastructure and a potential solar heating system Should the funds not be available to develop the preferred option a value engineering exercise can occur to reduce the scope of the development to give the best opportunity for a pool will be built in Waiau. This will likely involve developing a smaller single tank (rather than a main pool and learn to swim pool). The feasibility study recommends that: 1. A pool complex l is developed which is appropriate for the size of the Waiau community. 2. Seek independent legal and project management advice in developing a detailed tender brief that can be released to a selected number of D&B companies to confirm total project costs (including an undisclosed contingency). 3. A skilled, experienced Aquatics Project Manager is engaged as the client representative for this development, from tender brief to construction and commissioning. 4. Once the procurement process has been undertaken and a selected contractor identified the obligations of each party should be clearly agreed in a contract. 5. Operational costs continue to be minimised through the voluntary effort of the wider Waiau community. 6. The client seeks third party capital funding support for the facility. Waiau Pool Feasibility Study June

4 CONTENTS Executive Summary Introduction Site Context Demographic Analysis of Waiau and Surrounds Pool facility inventory Assessment Options assessment Preliminary Operational Model Governance and Management Options Road Map Conclusions and Recommendations 30 Appendix 1 Procurement Strategy 31 Appendix 2 Cost Estimates 33 Waiau Pool Feasibility Study June

5 1.0 INTRODUCTION 1.1 Purpose of Report/Feasibility Study The Waiau Pool was destroyed in the November 2016 earthquake event that struck the Hurunui and Kaikoura communities. The pool was developed in the 1920 s and the community is looking to understand what is a feasible replacement solution. The previous pool was used for local swimming requirements and was a focal point in this small, rural community. This feasibility study primarily looks at what Is the best replacement pool option for this community. A pool has been in operation for over 90 years so there Is evidence of a long-term sustainable model that has served Waiau and the surrounding area. The challenge Is to ensure that any future asset Is affordable, both from a capital and ongoing operating cost perspective. This report looks at a series of options available to the community and identifies a preferred site and pool configuration. Preliminary capital estimates are given to guide the Pool Committee in decision making along with operational cost estimates. Waiau Pool Feasibility Study June

6 2.0 SITE CONTEXT The previous Waiau Pool was located at 36 Parnassus Street and was destroyed by the November 2016 earthquakes. The pool was established in the 1920 s and serviced the township of Waiau and surrounding districts. The Waiau Pool was operated using a key system. Users would purchase a seasonal key giving them access to the community facility for the duration of the season. The pool was usually opened from mid-november until March. The pool was managed by the Waiau School Board of Trustees and day to day operations and maintenance were the responsibility of volunteers. The school was the primary user of the facility during the first term of each year. Other regular users included learn to swim participants and recreational swimmers, either from within the district or visitors to the nearby Waiau Holiday park who could purchase short term passes. Operations of the pool were the responsibility of volunteers and a supervising Board of Trustees representative. Plate 2.1 Waiau Pool after November Earthquakes (source: stuff) Waiau Pool Feasibility Study June

7 The previous pool was located on Ministry of Education land 1 approximately 500 metres from the current school site. The following aerial view shows the relative locations of the old pool and the Waiau School. Map 2.1 Map of old pool site and Waiau School circled (source: Google Maps) 1 The location of the previous Waiau School Waiau Pool Feasibility Study June

8 3.0 DEMOGRAPHIC ANALYSIS OF WAIAU AND SURROUNDS When assessing the need for a new pool and the feasibility of a facility in the district it is important to consider any changes to the demographic profile of Waiau. It is acknowledged that post-earthquakes there has been a change in the population at Waiau. It is difficult to predict what medium to long term impact this may have on the demographics of the Waiau community. However, looking at the population changes in Christchurch and surrounding districts post the February 2011 earthquakes we know that after several months people began to return. We have made the same assumption for Waiau and the surrounding community, and given the relative small numbers within the community, it is unlikely that the population will change significantly enough to warrant further investigation. The main population features investigated are population numbers and age-group profiles. Recent and projected future trends are highlighted. The focus was on the Waiau township and its immediate surrounds, as represented by the Waiau Area Unit (AU). Data from the larger Amuri Area Unit, covering the extensive rural areas surrounding Waiau including around Culverden and Hanmer Springs, and for the Hurunui District overall were noted for comparative purposes. 3.1 Overall population numbers and trends The recent population and growth trends of the main background catchment areas for a new Waiau Pool are summarised in Table 3.1. These shows that the rates of overall population growth in the last 13 years have been larger in the wider District overall than in Waiau itself. However, holding a relatively steady population in a small rural town environment is generally a positive result compared with many small towns throughout New Zealand. This stability is reinforced by the Waiau School roll remaining consistently at approximately just over 50 for the last 15 years since Table 3.1: Recent Population Change 3 ( ) change % change Waiau AU Amuri AU 1,347 1,530 1, Hurunui District 9,885 10,476 11,529 1, Looking forward over the next 30 years assuming current projections remain accurate, it is apparent that base numbers will be maintained at similar levels in Waiau. At the same time numbers are projected to grow elsewhere in the District, and particularly in the rurally focussed Amuri Area Unit. This may indicate that greater numbers may become apparent in those rural areas surrounding the immediate Waiau township area. 2 It Is acknowledged the school roll has declined post-eq. (Source: Education Counts - School Roll data). 3 Source: Statistics NZ Census Counts, Waiau Pool Feasibility Study June

9 Table 3.2: Projected Future Population Change 4 ( ) change % change Waiau AU Amuri AU 1,720 1,860 2,000 2,150 2,270 2,390 2, Hurunui District 12,000 13,000 13,500 13,950 14,300 14,600 14,750 2, Added to overall population growth will be significant changes in population composition, most significantly around age-group proportions. 3.2 Age-Group and Trends Looking ahead over the next 30 years, Figure 3.1 shows a broad pattern in Hurunui District overall that is typical of many population areas in New Zealand. Here numbers in the older (65+) age group increase noticeably, while those in lower age-groups are stable or decline a little. Figure 2.1: Age Group Number projections: Hurunui District However, the pattern in Waiau is slightly different (Figure 3.2). 4 Source: Statistics NZ Subnational Population projections medium series Waiau Pool Feasibility Study June

10 Figure 3.2: Age Group Number Projections: Waiau Here the growth in those aged 65+ is less acute, with the main feature being a decline in those aged Those aged 0-14 and actually increase a little in number. Overall this pattern suggests a stable maintenance of the population number without any noticeable growth or decline trends. In fact the Waiau area Unit was the only one in the area where it was found that the proportion of youth aged 0-14 was actually projected to increase their proportion in the population. The others investigated were Amuri, Culverden and Hanmer Springs area units and Hurunui District overall. In Waiau the proportion aged 0-14 was projected to increase from 19% (2013) to 21% (2043), while it declined a few percent in each of those other areas. 3.3 Demographic Summary The main finding from this section is that the current population in and around Waiau is projected to remain largely at current levels. There are no indications of any rapid growth or decline in population numbers being projected in the next 30 years. Any development should be aimed at catering for current use-levels, subject to whatever increases in activity participation can be achieved through specific programming initiatives and new facilities developments. Waiau Pool Feasibility Study June

11 4.0 POOL FACILITY INVENTORY ASSESSMENT There is a network of pools servicing the Hurunui community. The Hurunui area is made up of a series of smaller communities from Leithfield and Amberley in the South to Cheviot, Waiau and Hanmer Springs in the North. Historical local government boundaries combined with the wide geographic spread of the communities sees a network of small (mainly) outdoor swimming pools located in the townships within Hurunui. Aside from the Hanmer Springs Thermal Resort the rest of the network is significantly aged. Hanmer Springs Thermal Pools is seen as the jewel in the crown of recreation (and tourism) facilities in the Hurunui area. These pools are a major drawcard to the wider community and as well as domestic and international tourists. The Hurunui District Council operate two pools; Amberley Pool and the Hanmer Springs Thermal Pools (being the only year-round facility within the area). Community groups and schools operate four other summer only pools with varying levels of support (in the form of annual grants) from the Hurunui District Council. Table 4.1 The Hurunui Community Pool Network Name Address Distance from Waiau Size Rotherham Pool 71 George Street, Rotherham, km 22 metre pool and small paddling pool Culverden Swim Club Pool 9 Montrose Avenue, Culverden, 7392 Open summer months only 23 km 22 metre outdoor pool Small paddling pool Open summer months only Cheviot Pool Community Cheviot School, 36 Hall Street, Cheviot, km 25 metre heated pool Open summer months only Hanmer Springs Thermal Resort 42 Amuri Ave, Hanmer Springs km 25 metre outdoor heated pool integrated with a wide variety of thermal pools Open year round Hawarden Club Pool Swimming Allandale Hawarden, 7385 Road, 51 km 25 yard outdoor pool and small paddling pool Open summer months only Amberley Pool Douglas Road, Amberley, km 25 yard covered pool and toddler pool. Outdoor LTS pool. Open summer months only Waiau Pool Feasibility Study June

12 5.0 POOL USAGE The previous Waiau Pool has been available for wider community use via a key entry system. Swimmers paid a nominal seasonal fee to have access to the facility while casual swimmers were charged a small entry fee 5. The pool was generally open from mid-december to mid-march each year. The following table outlines the approximate use of the previous facility 6. Table 5.1 Previous Pool Usage Estimates User group Approximate Numbers Approximate Participations Community swimming lessons School Use year 1& School Use year 3& School Use year 5& Community Keys Keys 8,000-10,000 note 7 Casual Swims (honesty box) Totals 10,130-12,180 participations Other user groups included playcentre and pre-school along with the visitors to the Waiau Holiday Park. The table illustrates user levels that reflect a rural township and surrounding area. The emphasis of use is on both in-school and community learn to swim and recreation swimming for families. Any new development needs to consider the main user types to ensure a facility the is developed meets the needs of the Waiau community. 5 Casual use was $2 (adults) or $1 (child) per swim. Casual swimmers are an estimate of swimmers who paid a casual fee. No records were kept of the split between children and adult. 6 Approximations based on conversations with committee and information forwarded from Waiau School. 7 Feedback from the Pool committee estimates keys/annum, each used 50 times by an average 4 family members (therefore 8-10,000 participations). Waiau Pool Feasibility Study June

13 6.0 LOCATION ASSESSMENT 6.1 Site Assessment Factors There are several key factors that should be considered when determining a preferred site location for the new Waiau Pool. These include: Road frontage If a pool is going to be a shared school and wider community asset like the Waiau Pool, then the location on a site is important. The pool needs to be accessible from the road by the wider community. In some instances, school community pools have been developed on school grounds, but tucked away out of easy sight and therefore community usage is lower than anticipated as there is a perception the pool is only for school use. Ownership and Management The previous Waiau Pool was located on Ministry of Education Land (former school site on Parnassus Street), even though it was away from the current school grounds. As such it was operated as part of the Waiau School. A new pool developed on MoE land would be able to be operated by the Waiau School. A location that is not MoE land would require a different ownership, governance and management structure. Another advantage of MoE land is the designation of the land already meets the requirements of a pool and therefore streamlines the planning approval process. Proximity to Users Any sport and recreation facility that is developed to serve a community should be located in a reasonable proximity to these users. Given the Waiau community is relatively small there are few locations that would not be considered generally acceptable. A further lens on proximity would be the proximity to the key users groups, in this instance the school. Proximity to Complementary Facilities Many newer sport and recreation facility developments consider the advantages of co-locating with other similar facilities (e.g. it is common practice to develop indoor courts adjacent to aquatic facilities). This colocating (or hubbing ) can be beneficial in reducing duplication of resources through shared administration and other spaces and creating added vibrancy and foot traffic. Space to Accommodate Facility A critical consideration is available space to accommodate the proposed facility. This would include space for car parking, a safe assembly area outside the facility for groups and ancillary buildings if they are not part of the main pool complex (chemical room, plant room etc). Cost to Occupy Land The cost to purchase land can be prohibitive for some community projects. Care should be taken in selection of parcels of land that the cost of land is factored into any development. Waiau Pool Feasibility Study June

14 Table 6.1 Comparing Site Assessment Factors Option One Option Two Option Three Option Four Option Five 36 Parnassus St 27 Leslie St 18 Clarence St Section 7 Waiau Domain (Old School Site) (Catholic Church Site) (Temp. accomm. site) (School site) Good Road Frontage Governance Management and School Community Community School Community Proximity to Users Proximity Complementary Facilities Available Space to Cost to Occupy Land Summary: Given the small size of Waiau the differences of the various sites are limited. Essentially the benefits of being located on school grounds are the main contributing factor to the new school site being recommended as the preferred option.

15 Map 6.1 Preliminary Overlay of Preferred Site 8 approximate scale 1:1,250: Approximate dimensions of required site 40m*20m 8 Requires confirmation. Excludes car parking requirements

16 6.2 Preferred Site Location The preferred site is the current school grounds. The Ministry of Education (MoE) has indicated they will allow the construction of a new pool on this site. Key considerations in this recommendation are that the preferred option needs to be: On MoE land to ensure efficient management and governance of the asset, Preferably unencumbered by existing fixed assets to avoid replacement/removal costs, located close to user groups to maximise student learning time and minimise travel time, No resource consent is required to construct a pool on school site, Only one additional (disability) car park will be required, There is a well onsite that can potentially be used as the water supply for the school. The preferred site has also been considered with other sites on the school grounds. There are some factors that lead to Section 7 (within the school site) being identified, including: The sight is slightly more elevated than most of the school grounds, minimising the risk of flooding 9, It has road frontage, allowing community use to occur without disruption to student learning Ownership of Pool in the Event of School Closure There is some concern in the community that should the school close, access to the pool by the community may be lost. The MoE has stated that there is no intention or plan to close Waiau School so this would be an unlikely scenario in the foreseeable future. In the unlikely event of a school closure, the current Educational Development Initiative Memorandum of Agreement signed by a Closing school has the following section in it which is relevant: Section 6 PROPERTY AND BUILDINGS 6.1 The Ministry of Education will assume responsibility for the XXX School site as from the Gazetted date of closure. The XXXX School property will be disposed of in accordance with section 40 of the Public Works Act 1981, related local authority legislation and the protection mechanisms in respect of Māori land claims. 6.2 It is agreed that in the event of any community owned buildings needing to be removed from the XXX School site that this happens within 3 months of the closure date. In the event that removal does not take place the Ministry may default to an equity payment for the building(s). 6.3 It is agreed that the Ministry of Education will recognise the proven community contribution for identified assets. The value of the assets will be determined at the time of the property s disposal and will be proportionate to the net disposal proceed for the total property. The following assets have been identified as having a community component: 9 Noting that the school site is considered to be in a flood zone. Waiau Pool Feasibility Study June

17 7.0 OPTIONS ASSESSMENT The following section provides a set of options to replace the Waiau Pool. These options are based on discussions with the Pool Committee group and serve to demonstrate the differences the options bring. There are variants within each option that can be explored once a preferred option is determined. The following series of tables outline the three high level options considered: Option One: Outdoor 25 metre pool with integrated LTS area in the same pool area (25m length) plus small toddlers pool, Option Two: Outdoor 25 metre pool with additional learn to swim and toddlers spaces, Option Three: Covered 25 Metre pool with additional learn to swim and toddlers spaces. 7.1 Option One Outdoor 25 metre pool with integrated LTS area in the same pool area (25m length) plus small toddlers pool. Space Size Notes Main Pool area (25m *7.5m) Plus ramp 25* 7.5 = 187.5m 2 Integrated LTS end would be 6m long * pool width (approximately 45m 2 ). This area could be roped off for LTS and then opened up again for lane swimming Pool Depth variable ( mm deep 10 ), gradual sloping with deep end of 1.3m 1.8m (no more than 1:15 gradient as per NZS4441) Toddlers Area 4m*3m = 12m 2 Total Water Area m 2 Small area for introduction to water play. Depth 300mm-500mm Concourse Concrete surrounds (one side and end deeper for gathering) Shaded Picnic Area Varies Area where people can congregate and recreate out of the sun Fencing Lineal metres As per legislation Change Area Minimum Male/Female/Accessible as per Building Code Small change area for school groups to change each change to cater for up to 12 children max Fixed change benches Chemical Storage Dry, lockable space to secure chemicals Pump Room Minimum space required Lockable Equipment Storage Room Minimum space required Lockable Adjacent to change 10 NZS4441 specifies depths for LTS pools of between mm. Pools for teaching babies to swim often have a bench recessed in to a wall of the pool at up to 300mm below water level in a section of a pool that is 1.200mm deep. This can be used to allow an instructor/carer to stand in the water and encourage the baby to swim off the bench. Waiau Pool Feasibility Study June

18 Option one delivers a pool that would allow all key user groups to undertake their activities. There is some compromise required as lane swimmers would generally have either a reduced distance per length say 20 metres during learn to swim lessons and shallow end that may inhibit some activities. 7.2 Option Two Outdoor 25 metre pool with additional learn to swim and toddlers areas. Space Size Notes Main Pool area (25m *7.5m) Plus ramp Pool Depth 25* 7.5 = 187.5m 2 Five lane pool (noting the lanes are narrower than FINA regulations, but provide the same lane width as the previous pool) Learn to Swim Pool Area 4 * 6 = 24 m 2 Toddlers Area 4m*3m = 12m 2 Total Water Area 223.5m 2 ( mm deep 11 ), Small area for introduction to water play. Depth 300mm-500mm Concourse Surrounds of pool (wider on one side for assembly of children etc, minimum space on other side) Shaded Picnic Area Varies Area where people can congregate and recreate out of the sun Fencing Lineal metres As per legislation Change Area Small change area for school groups to change each change to cater for up to 12 children max Fixed change benches Chemical Storage Dry, lockable space to secure chemicals Pump Room As per required for pool Equipment Storage Small storage area for some pool equipment max 2m*2m This option allows a longer lane pool and for learn to swim to operate in a different water space. The Pool Committee has indicated that children from Waiau are disadvantaged when they go to inter-school competitions, due to the previous pool being a shorter length than other pools in the area. 7.3 Option Three A third preliminary option was explored. The committee requested investigation into a covered pool complex that had the potential to be open all year round. The pool configuration would be similar to Option Two with a 25m*7.5m main pool with additional learn to swim and toddlers spaces. 11 NZS4441 specifies depths for LTS pools of between mm. Pools for teaching babies to swim often have a bench recessed in to a wall of the pool at up to 300mm below water level in a section of a pool that is 1.200mm deep. This can be used to allow an instructor/carer to stand in the water and encourage the baby to swim off the bench. Waiau Pool Feasibility Study June

19 The overall footprint of this pool would be slightly larger given the indoor nature of the asset. Most of the cost would sit with constructing a facility to cater for the pool/s. An indoor pool would provide the Waiau community with an asset that could be operated year-round. There are examples of no frills indoor venues that have been developed in New Zealand in the last several years. However, the catchment for the Waiau pool is far smaller than these other areas and both the capital cost (estimated to be in the range of $4m-$6m) and annual operating costs quickly rule out this as an option that is feasible for the Waiau community. As such, a schedule of spaces has not been developed for this option. Waiau Pool Feasibility Study June

20 8.0 PREFERRED OPTION The preferred option for the new pool to investigate further (as agreed to by the Board of Trustees) is option two which allows for a 25m main pool, a learn to swim pool and small toddlers pool. When selecting this option, and engaging with relevant design and build companies it is critical that the community and contractors design and construct a pool that has the ability to operate in an environment with a history of seismic events. The specifications and materials need to reflect this environment. Unfortunately, it is likely these requirements will come at a premium cost. It is highly likely that the preferred option may change over time as the design is firmed up and a budget envelope for the project Is confirmed. The preferred option has been decided initially on the needs of the Waiau community and there may need to be some compromises to ensure the community can afford the capital and operating costs. 8.1 Preliminary Schedule of Spaces Table 8.1: Schedule of Spaces Space Size Notes Main Pool area (25m *7.5m) Plus ramp Pool Depth 25* 7.5 = 187.5m 2 Five lane pool (noting the lanes are narrower than FINA regulations, but provide a similar lane width as the previous pool). Learn to Swim Area 4 * 6 = 24 m 2 Toddlers Area 4m*3m = 12m 2 Total Water Area 223.5m 2 ( mm deep 12 ), Small area for introduction to water play. Depth 300mm-500mm Concourse Fencing Surrounds of pool As per legislation Change Area Small change area for school groups to change each change to cater for up to 12 children max Fixed change benches Chemical Storage As per required for pool Pump Room As per required for pool Equipment Storage Small storage cupboard for some pool equipment max 2m*2m 12 NZS4441 specifies depths for LTS pools of between mm. Pools for teaching babies to swim often have a bench recessed in to a wall of the pool at up to 300mm below water level in a section of a pool that is 1.200mm deep. This can be used to allow an instructor/carer to stand in the water and encourage the baby to swim off the bench. Waiau Pool Feasibility Study June

21 8.2 Preliminary Capital Cost Estimates The preferred procurement method is Design and Build. The rationale for this strategy is outlined in appendix A. This method of procurement allows the Pool Re-Build Committee, in association with the School Board of Trustees, to seek detailed quotes for the work required. It is important that at this stage there is a clear understanding of the specifications required to ensure cost comparisons can be easily undertaken. Professional support 13 at this stage is a recommended strategy to ensure the community optimise their value for money. At this stage these costs are preliminary estimates to help guide decision making around affordability of a new facility. These costs will be refined over time once the Pool Committee confirm specifications and receive formal quotes. Note, where a contingency has not been quoted a 15% allocation to total budget has been used at this point in time. It is envisaged this contingency will be able to be reduced as the estimate is firmed up. 8.3 Summary Comparison Table The following tables have been created to allow comparisons of each estimate. Direct comparison is not always possible across all areas of quotations. The important principle to apply is that these costs give an approximate price range for the client to then enter in to a competitive tender process with a level of confidence relating to where the project sits with regard to the available project budget. D&B 1 Cost 14 D&B 2 Cost 15 D&B Cost 2a Indepen dent QS Low Estimate Indepen dent QS High Estimate Notes Actual Received Quote $305,000 $950,000 $814,000 $1.15m $1.50m Estimates for Additional Items (where possible) Preliminary Estimate (rounded totals) $498,000 $45,000 $45,000 $17,000 $12,000 $803,000 $995,000 $859,000 $1.17m $1.51m Project Contingency $120,375 $142,000 $122,000 inclusive inclusive Allow 15% at this stage; can be reduced as the cost is further refined Total Preliminary Estimate (rounded totals) $0.923m $1.09m $0.98m $1.17m $1.51m Excludes site infrastructure 13 We would recommend an independent project manager with experience in Aquatic Facilities along with legal advice when negotiating an appropriate construction contract. 14 D&B1 only provided a quote for the main pool, excluding filtration. No other costs were factored in, therefore for the purposes of this study the mid-point of the QS figures has been used to flesh out the cost. 15 D&B2 and B&B2a are both from the same company. The difference is in pool construction method (D&B2 = Myrtha; D&B2a = Concrete Block and Membrane). They were provided as lump sums and for the purposes of this report a contingency has been added but the lump sum has not been broken down. Waiau Pool Feasibility Study June

22 8.4 Comparison Table The following table shows a breakdown of costs, where possible. D&B 1 Cost 16 D&B 2 Cost 17 D&B Cost 2a Tradition al Low Estimate (QS) Tradition al High Estimate (QS) Notes Total Preliminary Estimate Lump sum estimate only Lump sum estimate only Main Pool area (25m *10.0m) $305,000 $470,000 $600,000 Main Pool Filtration/Chemical Dosing system $32,000 inclusive inclusive Filtration estimate $25k Chemical Dosing $7k Learn to Swim Pool $90,000 $80,000 $100,000 LTS Pool Filtration inclusive inclusive inclusive Toddlers Pool 22,500 $20,000 $25,000 Toddlers Pool Filtration inclusive inclusive inclusive Pipework $35,000 inclusive inclusive Concourse/Paths $46,000 $42,750 $48,450 Gates and Fencing $12,500 $11,600 $14,000 Change Area $123,000 $105,000 $147,000 Range from $2,500 - $3,500 m 2 Chemical Storage / Plant Room/Equipment Storage $64,500 $60,000 $69,000 Consents $10,000 $10,000 $10,000 Provisional Sum Legal Costs $10,000 $10,000 $10,000 Provisional Sum FF&E $25,000 $25,000 $25,000 includes Pool Cover and Hoist estimate Site Works $27,000 $27,000 $27,000 PC Sum of $27k provided by D&B2 Site infrastructure excluded excluded excluded excluded excluded Unknown at this point in time Professional Fees Inclusive, except Project Manager Inclusive, except Project Manager Inclusive, except Project Manager $84,000 $159,000 Allowance for professionals such as designers, engineers and project manager 16 D&B1 only provided a quote for the main pool, excluding filtration. No other costs were factored in, therefore for the purposes of this study the mid-point of the QS figures has been used to flesh out the cost. 17 D&B2 and B&B2a are both from the same company. The difference is in pool construction method (D&B2 = Myrtha; D&B2a = Concrete Block and Membrane). They were provided as lump sums and for the purposes of this report a contingency has been added but the lump sum has not been broken down. Waiau Pool Feasibility Study June

23 Preliminary Estimate (rounded totals) $803,000 $995,000 $814,000 Contingency $120,375 $142,000 $122,000 $94,000 $123,000 Allow 15% at this stage, this can be reduced as the cost if further refined Total Preliminary Estimate $0.923m $1.09m $0.936m $1.167M $1.4M Important Notes: a. All the above estimates exclude site infrastructure services (power, water, wastewater). b. A possible Solar heating system has not been costed. c. A geo-technical assessment is advised d. D&B1 includes a 25*10m pool, but does not include quotes for other pool areas, therefore the mid-figure of the Independent QS report has been used to provide the overall estimate. e. D&B2 includes a hybrid LTS/Toddlers area that is larger than requested. This highlights the variability in quotes. f. Both D&B companies have excluded the cost of a Project Manager (but it is included in QS report) g. All estimates do not include escalation costs h. QS estimates include a demolition cost of old pool ($35,000-$40,000) that is not considered part of this project cost therefore total exclusion costs are lower by the same amount to reflect this. i. All estimates are GST exclusive Capital Cost Conclusions Given all the available information provided by the Design and Build companies and the independent Quantity Surveyor report we can conclude that to construct the preferred pool option it is likely to cost in a range of $923,000 - $1.167m (say $1 1.2 million) excluding site infrastructure, a possible solar energy and in some instances project management fees. During discussions with the Waiau Pool Committee it is evident there is a willingness to provide significant voluntary and local labour skills to help with the development of a new pool. There is also the possibility of re-using some of the newer assets from the old pool (namely solar heating and fencing). This will potentially allow the facility to be developed at a cost lower than if a Design and Build company was doing the entire job. However, such an approach requires the client to be very specific about what is in and out of the main contractor s contract. The client must also be aware of how any building warranties are structured with the Design and Build company, as some warranties can be voided if external contractors (or volunteers) fit out a project. These issues must be fully negotiated and agreed in writing before a final contract is signed. These requirements should also be outlined in the client s tender brief. It is recommended that the Waiau Pool Committee seeks professional legal and project management expertise prior to proceeding with the tender and then a contract. Waiau Pool Feasibility Study June

24 Alternative Option The development of the preferred option is reliant (as are most community facilities) on third party funders. Should a major funder not invest in this community asset then the preferred option may become unattainable for the Pool Committee. If this was the case then the Pool Committee may wish to pursue an alternative option that would still allow a community pool to be developed in Waiau. There have been some discussions relating to a pool that is less than 25 metres in length that could also double up as a learn to swim facility. This would be taking option one in this report and reducing the overall length of the pool. While not seen as the ideal, it would still meet most of the aquatic needs identified during this study, namely learn to swim and recreational swimming. Waiau Pool Feasibility Study June

25 9.0 PRELIMINARY OPERATIONAL MODEL A high-level preliminary operational model has been developed to aid the discussion between the Pool Re-Build Committee and the Waiau School Board of Trustees. The historical operation of Waiau pool was fully reliant on volunteer input. Quite simply, any other model of operation would be unsustainable for this small, rural community. Therefore, the operational model proposed looks at the most cost efficient operating model possible. There may be opportunities to generate further revenue from external grants for one-off costs which should be investigated, particularly as key parts of the pool infrastructure reach the end of their useful life. 9.1 Key Assumptions A series of key assumptions have been made to assist with the development of the preliminary operational model (Table 9.1). These are as follows: General Base Assumptions 1. The model is based on the pool being operated in the same not-for-profit manner as the previous pool, with volunteers responsible for all tasks. 2. The pool will be open for a week period each year Revenue Assumptions 3. Pool keys will be sold to the community for the increased price of $ Casual Entry will be charged at $3 / adult and $2 / child and casual entry will be at a similar level to the previous few years on the assumption that most local families will purchase a key say - $ It is assumed the Hurunui District Council will continue to provide a $2,000 grant toward the running costs of the pool The Waiau School will not be charged admission in lieu of proposed ownership and management arrangement Operational Assumptions Year One Direct Costs 7. Chemicals and Energy are viewed as the major direct costs. 8. Chlorine, chemicals and testing is estimated to cost $2,700 / annum 9. Energy costs are budgeted $2,200 per annum. There is potential for Energy costs to be off-set by an existing Solar energy system that may be installed or through a new Solar system. The amount of savings will be dependent upon the efficiency of the system and have not been costed for the purposes of this operating model. 10. Petrol Vouchers for volunteer support of the pool will remain at levels $1, Training will be required to ensure pool water standards are met allowance of $500 towards costs 12. Miscellaneous costs will be $500/annum, allowing for freight, key costs, etc Overheads 13. Consider cost of replacement of PVC membrane every years at approximately $30,000 (note, the membrane currently has a warranty of 15 years). 18 Hurunui District Council provide subsidies to the following pools: Rotherham ($1,713 via Amuri Ward Amenities), Culverden Pool ($2,000 via Amuri Ward Amenities), Leithfield School Pool ($1,500 from Amberley Ward Amenities), Amberley Pool (rating input from Amberley Ward Amenities of $52,148) Waiau Pool Feasibility Study June

26 14. Insurance Based on information provided there does not seem to have been a provision for Insurance with the previous pool. This should be considered in any new development. An insurance broker has stated a ball park figure of $10,000, but this will need to be confirmed once the preferred option and budget is confirmed. A similar pool constructed in Christchurch recently has only been insured for a proportion of replacement cost, and has allowed $3-$5,000 for insurance. For the purposes of this report we have allocated an annual insurance sum of $3,000. The BoT will need to decide on an appropriate level of cover. 15. Rates - Initially there will still be a requirement to pay rates for the old pool site. This is seen as a cost that needs to remain part of the pool operating costs until the School and the Ministry of Education resolve the future use of that land. We have indicated this as a cost in year one only at this stage (last 5 years average = $460) note Repairs and Maintenance will be nil to low in year one, but will increase over time. A provisional sum of $1,000 has been allocated for minor repairs on an annual basis from year two (noting that large scale repairs would be covered by the appropriate manufacturer warranties and/or grants). 17. Depreciation Contribution Good practice recommends an annual allocation toward depreciation is factored in. The school has a requirement to have a long term view on property upgrades and maintenance (through the 5YPP and 10 Year Plan) and as such depreciation is not currently factored into the Operating Estimate. 19 Rates for the last five years have not been constant, or trending upward ($149.91; $774.17; $462.09; $253.56; $667.56)therefore an average has been used Waiau Pool Feasibility Study June

27 9.2 Preliminary Operational Model Revenue Preliminary Estimate Preliminary Estimate Preliminary Estimate Preliminary Estimate Preliminary Estimate Year One Year Two Year Three Year Four Year Five Pool Keys 50 season $80 $4,000 $4,000 $4,000 $4,000 $4,000 Casual Entry $400 $400 $400 $400 $400 HDC Grant $2,000 $2,000 $2,000 $2,000 $2,000 Waiau School Maintenance Grant $1,471 $1,471 $1,471 $1,471 $1,471 Total Revenue $7,871 $7,871 $7,871 $7,871 $7,871 Expenditure Preliminary Estimate Preliminary Estimate Preliminary Estimate Preliminary Estimate Preliminary Estimate Direct Costs Chemicals $2,700 $2,700 $2,700 $2,700 $2,700 Energy Costs $2,200 $2,200 $2,200 $2,200 $2,200 Volunteer Recognition $1,300 $1,300 $1,300 $1,300 $1,300 Training $500 $500 $500 $500 $500 Miscellaneous $500 $500 $500 $500 $500 Sub-Total Direct Costs $7,200 $7,200 $7,200 $7,200 $7,200 Overheads Insurance (provisional sum) $3,000 $3,000 $3,000 $3,000 $3,000 Rates on Old Site $ Repairs and Maintenance $- $1,000 $1,000 $1,000 $1,000 Sub-Total - Overheads $3,460 $4,000 $4,000 $4,000 $4,000 Total Costs $10,660 $11,200 $11,200 $11,200 $11,200 Annual Operating (Surplus)/Deficit $2,789 $3,329 $3,329 $3,329 $3,329 Contribution toward Depreciation nil nil nil nil nil Note: Any operational deficits for the previous pool have been met by fundraising Waiau Pool Feasibility Study June

28 10.0 GOVERNANCE AND MANAGEMENT OPTIONS Consideration has been given to the various governance and management options that could be used for the Waiau Pool. Pools can be governed by local government, schools, private organisations or charitable entities. The Hurunui District Council has clearly signalled they do not want to be responsible for another pool in their district and the size and turnover of the pool means there is no incentive for a private operator for this pool. Therefore, the remaining options are either a school based or community based governance and management model. In this situation the preferred site drives the recommended governance and management model. The most feasible option is for the new pool to be governed and managed by the Waiau School Board of Trustees. There are a few reasons that lead to this conclusion. The pool will be located on school land. Based on previous usage, the school will be a major user. As previously mentioned quick access to the pool for in-school swimming reduces down-time and increases time available for learning (both swimming and other curricular areas can be undertaken in the pool environment). The school has administrative capability to manage bookings 20. This removes the need to develop a separate trust to govern and manage the pool. The Board of Trustees can consider the new pool alongside other property matters. This model of governance does not preclude other options in the future should the school close. It is recommended the Pool Committee seek written assurance of their options should the school not remain open. 20 The sale of pool keys, any private bookings or other communications with the community Waiau Pool Feasibility Study June

29 11.0 ROAD MAP Figure 11.1 sets out a summary of the project stages after land owner permissions and other MOE requirements have been secured. Figure 11.1: Summary Project Road Map (Post MOE requirements). Develop Brief and Tender for a Qualified Project Manager (with Aquatics Experience) Confirm Development Brief (including schedule of spaces and associated specifications) Develop Tender Documents (for a design build contract) Run a Selected Tender Process (with experienced companies aquatics experience) Evaluate Tenders (the Project Manger will be required to Identify Tags and Seek Clarifications from Tenderers) Select Optimal Tender (the Project Manger will likely need to negotiate exclusions and tags to determine the final price) Confirm Contingency (the Project Manger will advise the client on a suitable contingency sum which is not disclosed to the contractor) Confirm Funding (Funding will need to be confirmed so a contract can be entered into.) Develop Contract (the Project Manger and a lawyer will develop / review the contract) Sign Contract (A representative/s of the legal entity entering into the contract will sign the contract) Undertake / Complete Design (Based on clients brief) Obtain Building and Resource Consent Commence Construction (The Project Manger will represent the clients interests) Practical Completion Waiau Pool Feasibility Study June

30 12.0 CONCLUSIONS AND RECOMMENDATIONS The feasibility study demonstrates the need for a replacement pool that is fit for purpose for the Waiau community. A preferred site has been identified as have the preferred pool spaces. The operating model is predicated on the Waiau School Board of Trustees overseeing this asset and equally importantly; the pool is operated under a voluntary structure, similar to the previous Waiau pool. The feasibility study concluded that: A replacement of the Waiau Pool is feasible, provided the ongoing operational costs can be minimised through continued volunteer input. The preferred site for the new pool is on the existing school grounds. This site was regarded as meeting all usage criteria. The preferred pool option consists of a main pool and water areas for both Learn-to-Swim and Toddlers water play. The configuration of these areas will be determined with the preferred contractor. Any specialist swimming needs can be accessed in the wider network (e.g. competition and hot water pools at Hanmer Springs) The preferred pool option is most likely to be in the capital cost range of circa $1 1.2 million excluding site infrastructure and a potential solar heating system Should the funds not be available to develop the preferred option a value engineering exercise can occur to reduce the scope of the development to give the best opportunity for a pool will be built in Waiau. This will likely involve developing a smaller single tank (rather than a main pool and learn to swim pool). The feasibility study recommends that: 7. A pool complex l is developed which is appropriate for the size of the Waiau community. 8. Seek independent legal and project management advice in developing a detailed tender brief that can be released to a selected number of D&B companies to confirm total project costs (including an undisclosed contingency). 9. A skilled, experienced Aquatics Project Manager is engaged as the client representative for this development, from tender brief to construction and commissioning. 10. Once the procurement process has been undertaken and a selected contractor identified the obligations of each party should be clearly agreed in a contract. 11. Operational costs continue to be minimised through the voluntary effort of the wider Waiau community. 12. The client seeks third party capital funding support for the facility. Waiau Pool Feasibility Study June

31 APPENDIX 1 PROCUREMENT STRATEGY There are many ways a company can be engaged to develop a sport and recreation facility (referred to as procurement). The two most common procurement methods for facilities of this scale and nature are design and build or traditional. Traditional Method Traditional Method is where the design elements are generally separate from the construct (or build) process. Consultants are appointed for the design and cost control components and then a Contractor is responsible for carrying out the instructed works to develop the sports facility. Design and Build Method Design and build is where the design and construction elements are generally undertaken by one contractor. The client determines the level of information to be given to the contractor, including performance requirements and leaves the responsibility for design and selection firmly with the contractor. This type of procurement strategy is often used for projects that are focussed more on function than form. Table A1.1 Comparison of two well-known procurement methods. Traditional Method Design and Build Method Pros Cons Pros Cons Specialist consultants can guide a more functional outcome Longer time frames 21 (construction cannot start until all design work is complete) Shorter time frames (construction can begin earlier) Client changes to scope can be expensive The specifications are prescriptive, allowing easy comparisons of construction tenders Little or no input into design by construction contractor One firm to deal with Comparing tenders can be difficult as each design is different Price certainty at the award of a contract Multiple contact points to manage Price certainty Variations need to be limited to manage cost control Price is the true competitive market price & therefore ensures substantial value for money Price is only agreed at end of design phase. Price is agreed at an earlier stage part way through the design stage. Price is usually agreed before completion of the design therefore the contractor will add for pricing risk Variations (changes) are easily managed Design risk sits with the contractor Sometimes difficult to prepare an adequate brief Good control over quality of both specification of Design risk sits with the client (albeit backed up by consultants Contractor is able to substitute lessor quality construction to make 21 Source: Sport New Zealand Community Sport and Recreation Facility Development Guide Waiau Pool Feasibility Study June

Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward

Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward Attachment B Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward Introduction The Queenstown Lakes District Council is proposing to build an eight lane lap pool and a learners pool costing

More information

WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL

WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL 17 October 2014 Contents Executive Summary Background National Guidelines The Status Quo Issue One Timing Issue Two Location Issue Three Size Issue Four

More information

Report to COUNCIL for decision

Report to COUNCIL for decision 17 152 Title: Section: Prepared by: Olympic Pool Business Case Community & Recreation Andrew White (Community & Recreation Manager) Meeting Date: 18 May 2017 Legal Financial Significance = Medium Report

More information

The expenditure exceeds the income generated, creating an annual shortfall of around 17,447 per annum.

The expenditure exceeds the income generated, creating an annual shortfall of around 17,447 per annum. Dear Parents, 24th January 2018 It is with a heavy heart that we have to inform you that the swimming pool, based at Mundesley Infant school will close at the end of this term (March 28th 2018). Throughout

More information

Rochester Area Bike Sharing Program Study

Rochester Area Bike Sharing Program Study roc bike share Rochester Area Bike Sharing Program Study Executive Summary ~ January 2015 JANUARY 2015 8484 Georgia Avenue, Suite 800 Silver Spring, MD 20910 3495 Winton Pl., Bldg E, Suite 110 Rochester,

More information

SEASONAL POOLS REVIEW AND STRATEGY

SEASONAL POOLS REVIEW AND STRATEGY SEASONAL POOLS REVIEW AND STRATEGY 1 ACKNOWLEDGEMENTS The Seasonal Pools Review and Strategy Project Team acknowledges the input and support from a range of Council staff and representatives from external

More information

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION 1 PURPOSE 1.1 To provide the following information and supporting evidence for the Member decision (reference

More information

Tennis Victoria Club Guide Coach Relationship

Tennis Victoria Club Guide Coach Relationship Tennis Victoria Club Guide Coach Relationship Background Tennis is in a unique position as the sport has a large workforce of qualified & skilled development officers at its disposal the professional tennis

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT Subject: GROSVENOR POOL REPORT Recommendation(s) 1. That the Grosvenor Outdoor Pool Report Part 2, 2015, provided as Attachment 1 to the Grosvenor Pool Report agenda report dated

More information

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Planning for tennis in your Local Government Area. A resource from Tennis Australia Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.

More information

Callander Mountain Bike Trails Feasibility Study Executive Summary January 2015

Callander Mountain Bike Trails Feasibility Study Executive Summary January 2015 Callander Mountain Bike Trails Feasibility Study Executive Summary January 2015 Client : Callander Community Development Trust & Callander Mountain Bike Trails Date : 26 January 2015 Status : FINAL Executive

More information

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL September 2017 HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL Table of Contents EXECUTIVE SUMMARY 3 1. INTRODUCTION 4 2. LOCAL CONTEXT 5 3. OBJECTIVES 7 4. PRIORITIES 8 5. FUNDING OPTIONS

More information

WELLINGTON S FUTURE FOOTBALL HUB

WELLINGTON S FUTURE FOOTBALL HUB WELLINGTON S FUTURE FOOTBALL HUB APPLICATION BY AND SUPPORTED BY ARTIFICIAL FOOTBALL TURF AT HUTT CITY S MEMORIAL PARK APPLICATION FOR FUNDING TO PUB CHARITY - JULY 2011 Early artist s impression of turf

More information

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685 CD10.2 STAFF REPORT ACTION REQUIRED City of Toronto Outdoor Tennis Operations Date: February 19, 2016 To: From: Wards: Reference Number: Community Development and Recreation Committee General Manager,

More information

Stonehouse Skate Park. Stonehouse Town Council. Stonehouse, Gloucestershire. Skateboarding, BMX, In- line skating. 50,000 (43% of total)

Stonehouse Skate Park. Stonehouse Town Council. Stonehouse, Gloucestershire. Skateboarding, BMX, In- line skating. 50,000 (43% of total) Inspired Facilities Stonehouse Skate Park CASE STUDY THEMES Providing new opportunities for young people to be physically active Working with young people to design a new facility Providing opportunities

More information

Have your say. Aquatic AND Leisure Facility. Aquatic AND Leisure Facility ON THE NEW. Information Booklet

Have your say. Aquatic AND Leisure Facility. Aquatic AND Leisure Facility ON THE NEW. Information Booklet Have your say Aquatic AND Leisure Facility ON THE NEW Aquatic AND Leisure Facility Information Booklet It s time to upgrade our aquatic and leisure facilities to meet your needs now, and into the future.

More information

Role Profile. Chief Executive of Blackburn Youth Zone. Chair and Board of Blackburn Youth Zone

Role Profile. Chief Executive of Blackburn Youth Zone. Chair and Board of Blackburn Youth Zone Role Profile Job Role: Accountable to: Key Relationships: Chief Executive of Blackburn Youth Zone Chair and Board of Blackburn Youth Zone Youth Zone Chair and Board, Youth Zone Senior Management Team,

More information

Cooroy Golf Club Inc. (ABN ) of 28 Myall Street, Cooroy Q4563

Cooroy Golf Club Inc. (ABN ) of 28 Myall Street, Cooroy Q4563 Between Cooroy Golf Club Inc. (ABN 74 635 574 801) of 28 Myall Street, Cooroy Q4563 and Cooroy Veterans Golf Club (ABN 63 454 683 229) of 28 Myall Street, Cooroy Q4563 Background 1. A Background providing

More information

Progress with the Road Investment Strategy

Progress with the Road Investment Strategy Report by the Comptroller and Auditor General Department for Transport and Highways England Progress with the Road Investment Strategy HC 1056 SESSION 2016-17 22 MARCH 2017 4 Key facts Progress with the

More information

Board Members Vancouver Park Board General Manager Parks and Recreation. SUBJECT: Construction Contract Award Kitsilano Beach Tennis Courts Renovation

Board Members Vancouver Park Board General Manager Parks and Recreation. SUBJECT: Construction Contract Award Kitsilano Beach Tennis Courts Renovation TO: FROM: Board Members Vancouver Park Board General Manager Parks and Recreation Date: April 22, 2013 SUBJECT: Construction Contract Award Kitsilano Beach Tennis Courts Renovation RECOMMENDATION A. THAT,

More information

Seal Extension Guidelines. Asset Management and Systems

Seal Extension Guidelines. Asset Management and Systems Seal Extension Guidelines 1. Guideline Definitions AADT - Annual Average Daily Traffic is measured at regular annual (or greater) intervals and adjusted for seasonal effects, using an approved traffic

More information

Delivering the. Strategy 7.0

Delivering the. Strategy 7.0 7.0 Delivering the Strategy 7.1 Introduction This chapter presents a framework for the delivery of the strategy. Key challenges and opportunities are identified that will have an impact on the successful

More information

QLDC Council 29 October Report for Agenda Item: 3

QLDC Council 29 October Report for Agenda Item: 3 QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options

More information

Discussion Paper Men s and Boy s Competition Review 26 May 2017

Discussion Paper Men s and Boy s Competition Review 26 May 2017 BACKGROUND As we enter into the third year of the Men s National Premier League (NPL) three-year licence period, and having launched the Women s NPL off the back of last year s Women s and Girl s Competition

More information

[Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the

[Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the [Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] 4 th Summer Youth Olympic Games

More information

DRAFT Community Facilities Asset Management Plan Aquatics

DRAFT Community Facilities Asset Management Plan Aquatics DRAFT Community Facilities Asset Management Plan Aquatics - 2018-28 Please note that the following Community Facilities Asset Management Plan - Aquatics is in DRAFT as an input to the 2018-28 DRAFT Long

More information

This report provides an overview of all the feedback received, key themes which emerged and the actions Grenadier will take in response.

This report provides an overview of all the feedback received, key themes which emerged and the actions Grenadier will take in response. Executive Summary During October 2017, Grenadier held three well attended public consultation events at Ocean in Exmouth. In addition, a bespoke consultation website was created to allow for online feedback,

More information

LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers OVERVIEW

LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers   OVERVIEW LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers www.lakebluffparks.org OVERVIEW Q: How did the community rate the pool on the Community Wide survey? A: The top three highest rated

More information

110 Edgar Martinez Drive South P.O. Box Seattle, WA (206) August 15, 2018

110 Edgar Martinez Drive South P.O. Box Seattle, WA (206) August 15, 2018 WASHINGTON STATE MAJOR LEAGUE BASEBALL STADIUM PUBLIC FACILITIES DISTRICT 110 Edgar Martinez Drive South P.O. Box 94445 Seattle, WA 98124 (206) 664-3076 www.ballpark.org Metropolitan King County Council

More information

VISION MISSION NEW ZEALAND GOLF STRATEGIC TEGIC PLAN To be the sport of choice for all New Zealanders throughout their lives.

VISION MISSION NEW ZEALAND GOLF STRATEGIC TEGIC PLAN To be the sport of choice for all New Zealanders throughout their lives. STRATEGIC PLAN 2008-2010 NEW ZEALAND GOLF STRATEGIC TEGIC PLAN 2008-2010 VISION To be the sport of choice for all New Zealanders throughout their lives. MISSION New Zealand Golf aspires to develop the

More information

Pre Feasibility Study Report Citiwater Cleveland Bay Purification Plant

Pre Feasibility Study Report Citiwater Cleveland Bay Purification Plant SOLAR POWER SPECIALISTS.Pure Power ACN 074 127 718 ABN 85 074 127 718 POWER MAGIC PTY LTD 245 INGHAM RD GARBUTT QLD 4814 Phone: 1800 068 977 Fax: 07 4725 2479 Email: FNQSOLAR@bigpond.com Pre Feasibility

More information

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road) 21 Pitt Street PO Box 6345, Auckland 1141, New Zealand T: +64 9 300 9000 // F: +64 9 300 9300 E: info@beca.com // www.beca.com Auckland Council Private Bag 92300 Victoria Street West Auckland 1142 15 August

More information

Operational Policy. Queensland Parks and Wildlife Service. Mountain biking in QPWS managed areas. Visitor Management. 1 Purpose

Operational Policy. Queensland Parks and Wildlife Service. Mountain biking in QPWS managed areas. Visitor Management. 1 Purpose Queensland Parks and Wildlife Service Operational Policy Visitor Management Mountain biking in QPWS managed areas Operational policies provide a policy direction or set operational standards for day-to-day

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010 London Organising Committee of the Olympic Games and Paralympic Games 14 June 2010 London 2012 Olympic and Paralympic Games Volunteer Protocol Title This document shall be known as the London 2012 Olympic

More information

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND COUNCIL POLICY NAME: COUNCIL ADVISORY COMMITTEES - TERMS OF REFERENCE ISSUED: APRIL 3, 2006 AMENDED: NOVEMBER 27, 2006 NOVEMBER 23, 2009 JANUARY 11, 2010 DECEMBER 17, 2012 POLICY COUNCIL REFERENCE: 06/119

More information

SWIM POOL MANAGEMENT City of Blue Springs, Missouri

SWIM POOL MANAGEMENT City of Blue Springs, Missouri Request for Qualifications SWIM POOL MANAGEMENT City of Blue Springs, Missouri The City of Blue Springs, Missouri will accept Request for Qualifications (RFQ) statements from interested firms to provide

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT 6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken

More information

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services Transport - 128 - Road Network KEY FACTS Council operates and maintains a network of some 2,53 km which includes: o 864 km of sealed roads o 1,666 km of unsealed roads o 7 bridges and large culverts o

More information

TYPE F. Home Pools GUIDELINES FOR SAFE POOL OPERATION DOMESTIC POOLS SLSQ ANNUAL REPORT 14 15

TYPE F. Home Pools GUIDELINES FOR SAFE POOL OPERATION DOMESTIC POOLS SLSQ ANNUAL REPORT 14 15 0 TYPE F Home Pools GUIDELINES FOR SAFE POOL OPERATION DOMESTIC POOLS SLSQ ANNUAL REPORT 14 15 Royal Life Saving Bahrain Royal Life Saving Bahrain (RLSB) is a charity registered under the Ministry of Social

More information

Pedestrian Crosswalk Audit

Pedestrian Crosswalk Audit 1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Pedestrian Crosswalk Audit June 19, 2017 The conducted this project in accordance with the International Standards

More information

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers. SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS 1 SCOPE This specification shall apply to the installation of raised pavement markers. 2 DEFINITIONS Type A Marker - Retroreflective raised pavement

More information

The development of Emergency Aquatic Animal Disease Response Arrangements

The development of Emergency Aquatic Animal Disease Response Arrangements Working together for animal health The development of Emergency Aquatic Animal Disease Response Arrangements 1. What are emergency response arrangements? Australia has a number of emergency response arrangements

More information

CITY OF KINGSPORT LANE RENTAL APPLICATION APPLICATION FOR AGE GROUP COMPETITIVE SWIM TEAM PRACTICE AND MEET TIMES AT THE KINGSPORT AQUATIC CENTER

CITY OF KINGSPORT LANE RENTAL APPLICATION APPLICATION FOR AGE GROUP COMPETITIVE SWIM TEAM PRACTICE AND MEET TIMES AT THE KINGSPORT AQUATIC CENTER CITY OF KINGSPORT LANE RENTAL APPLICATION APPLICATION FOR AGE GROUP COMPETITIVE SWIM TEAM PRACTICE AND MEET TIMES AT THE KINGSPORT AQUATIC CENTER APPLICATION ISSUE DATE: 12/1/17 DUE DATE FOR APPLICATIONS:

More information

Town of Carbondale John M. Fleet Municipal Pool

Town of Carbondale John M. Fleet Municipal Pool Town of Carbondale John M. Fleet Municipal Pool History Master Plans Survey Data Present Pool Funding RSUT Budget Actuals- 2014-2017 Budget FY 2018 Pool admittance numbers comparison 2015-2017 Cost Recovery

More information

2015/16 Annual review of Sport and Recreation New Zealand

2015/16 Annual review of Sport and Recreation New Zealand 2015/16 Annual review of Sport and Recreation New Zealand Report of the Government Administration Committee Contents Recommendation 2 Introduction 2 Financial performance 2 The Rio de Janeiro Olympics,

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

IMPLEMENTATION STRATEGIES

IMPLEMENTATION STRATEGIES GEORGETOWN SIDEWALK MASTER PLAN 34% of funding is dedicated to Downtown Overlay District sidewalks 28% of funding is recommended within 1/4 mile of Southwestern University 26% of funding is recommended

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

BICYCLE PARKING IN RESIDENTIAL AREAS

BICYCLE PARKING IN RESIDENTIAL AREAS Infrastructure Give Cycling a Push INFRASTRUCTURE/ PARKING BICYCLE PARKING IN RESIDENTIAL AREAS Overview In residential areas, all residents should have safe overnight storage for a bicycle. This is crucial

More information

High level Peer Review on the Around the Mountain Cycle Track Reports (Oreti/Mararoa Route Options)

High level Peer Review on the Around the Mountain Cycle Track Reports (Oreti/Mararoa Route Options) High level Peer Review on the Around the Mountain Cycle Track Reports (Oreti/Mararoa Route Options) Conducted for Marcus Roy Resource Management Planner, Southland District Council High level Peer Review,

More information

PART 1: INFRASTRUCTURE OPPORTUNITIES

PART 1: INFRASTRUCTURE OPPORTUNITIES PART 1: INFRASTRUCTURE OPPORTUNITIES AUTHORS This article was authored by David Nancarrow (Partner, Perth), Alyson Eather (Senior Associate, Perth) and Celeste Koravos (Associate, Melbourne and Tokyo).

More information

Service Business Plan

Service Business Plan Service Business Plan Service Name Transportation Planning Service Type Public Service Owner Name Kaylan Edgcumbe Budget Year 2019 Service Owner Title Service Description Manager of Transportation Planning

More information

INDOOR NETBALL NSW REPRESENTATIVE HANDBOOK

INDOOR NETBALL NSW REPRESENTATIVE HANDBOOK INDOOR NETBALL NSW REPRESENTATIVE HANDBOOK Team Officials Congratulations on gaining selection as an Official for an Indoor Sports NSW State Team. Selection into a NSW State Team is a great honour and

More information

ANALYZING THE SHIP DISPOSAL OPTIONS

ANALYZING THE SHIP DISPOSAL OPTIONS Chapter Six ANALYZING THE SHIP DISPOSAL OPTIONS Chapters Two through Five examined the option of long-term storage and the three ship-disposal options: domestic recycling, overseas recycling, and reefing.

More information

APPOINTMENT OF AUDIT SERVICES PROVIDER INVITATION TO TENDER

APPOINTMENT OF AUDIT SERVICES PROVIDER INVITATION TO TENDER APPOINTMENT OF AUDIT SERVICES PROVIDER INVITATION TO TENDER Tenders must be received at Cricket Ireland, Unit 22, Grattan Business Park, Clonshaugh, Dublin 17 no later than 15:00 on Friday March 13 TH,

More information

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations Regional Municipality of Waterloo Planning and Works Committee Agenda Tuesday, April 4, 2017 9:30 a.m. (Following Closed Session) Regional Council Chamber 150 Frederick Street, Kitchener Media Release:

More information

Domestic Energy Fact File (2006): Owner occupied, Local authority, Private rented and Registered social landlord homes

Domestic Energy Fact File (2006): Owner occupied, Local authority, Private rented and Registered social landlord homes Domestic Energy Fact File (2006): Owner occupied, Local authority, Private rented and Registered social landlord homes Domestic Energy Fact File (2006): Owner occupied, Local authority, Private rented

More information

Safety barriers to a swimming pool and spa pool at 130 Wharf Road, Pigeon Bay

Safety barriers to a swimming pool and spa pool at 130 Wharf Road, Pigeon Bay Determination 2010/104 Safety barriers to a swimming pool and spa pool at 130 Wharf Road, Pigeon Bay 1. The matters to be determined 1.1 This is a Determination under Part 3 Subpart 1 of the Building Act

More information

Recommendation to the Minister of Energy by the Gas Industry Co on the Specification for Reticulated Natural Gas

Recommendation to the Minister of Energy by the Gas Industry Co on the Specification for Reticulated Natural Gas Recommendation to the Minister of Energy by the Gas Industry Co on the Specification for Reticulated Natural Gas July 2006 1 Introduction The Gas Industry Co is required by the Government s Policy Statement

More information

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT COMMITTEE 6 DECEMBER 2011 Meeting Status: Public Purpose of Report: For Decision PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION

More information

INFORMATION REPORT. Chair and Members Emergency and Community Services Committee. Skateboard Park Study (CES17031) (City Wide)

INFORMATION REPORT. Chair and Members Emergency and Community Services Committee. Skateboard Park Study (CES17031) (City Wide) INFORMATION REPORT TO: Chair and Members Emergency and Community Services Committee COMMITTEE DATE: July 12, 2017 SUBJECT/REPORT NO: WARD(S) AFFECTED: Skateboard Park Study (CES17031) (City Wide) City

More information

Teaching young people to learn to swim

Teaching young people to learn to swim Teaching young people to learn to swim A community effort SALLY ROBERTSON KEY POINTS Learning to swim is crucial for water safety. Schools in this survey saw swimming as an important skill for students

More information

MACKAY REGIONAL AQUATIC STRATEGY FINAL DRAFT REPORT

MACKAY REGIONAL AQUATIC STRATEGY FINAL DRAFT REPORT MACKAY REGIONAL AQUATIC STRATEGY FINAL DRAFT REPORT AUGUST 2018 Prepared by Otium Planning Group Pty Ltd in association with Turner Townsend Quantity Surveyors OTIUM PLANNING GROUP PTY LTD Head Office:

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

Report on Yearsley Pool - December 2010

Report on Yearsley Pool - December 2010 Report on Yearsley Pool - December 2010 Briefing note for Councillor Alexander Background and history: Yearsley Baths, as it was known then, was built in 1908 by Rowntree & Co. Ltd. and gifted by deed

More information

CASUAL SWIMMING INSTRUCTOR POSITION DESCRIPTION

CASUAL SWIMMING INSTRUCTOR POSITION DESCRIPTION CASUAL SWIMMING INSTRUCTOR POSITION DESCRIPTION Position Title: Responsible To: Council Program: Casual Swimming Instructor Swim School Supervisor Finance & Businesses Classification Level: Leisure, Level

More information

LAKE VIEW GOLF & COUNTRY CLUB TEMPORARY COMMITTEE Box 1089 Soap Lake, Washington 98851

LAKE VIEW GOLF & COUNTRY CLUB TEMPORARY COMMITTEE Box 1089 Soap Lake, Washington 98851 April 24, 2015 1. PURPOSE This letter is being written to inform each member of the McCullar Golf, Inc of the status of the McCullar Golf, Inc s offer to sell the the golf course to the members; to inform

More information

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities The planning and policy context Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities THE PLANNING AND POLICY CONTEXT Providing

More information

WORKING WITH COMMUNITIES AND INTEREST GROUPS

WORKING WITH COMMUNITIES AND INTEREST GROUPS WORKING WITH COMMUNITIES AND INTEREST GROUPS OSPRI is committed to listening and accommodating a wide range of views through thorough and genuine public consultation about the effects of its operations.

More information

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project. TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary

More information

Welsh Triathlon. National Championship and National Series Events. Tender Process for 2018 season

Welsh Triathlon. National Championship and National Series Events. Tender Process for 2018 season Welsh Triathlon National Championship and National Series Events Tender Process for 2018 season 1 Introduction This document is intended for event organisers interested in hosting an event that form part

More information

Strategic Plan for Sevens Rugby. September 2006

Strategic Plan for Sevens Rugby. September 2006 Strategic Plan for Sevens Rugby September 2006 Introduction The promotion of Sevens has been instrumental in taking Rugby to new territories and regions. The continued growth of Sevens would help achieve

More information

TRAFF IC CALMING POLICY

TRAFF IC CALMING POLICY TRAFF IC CALMING POLICY Policy No: 45396 Approved by Council 28 May 2008 C11/05/08 Further amendment by Council 22 June 2011 vide c08/06/11 Contents 1 Problem Statement 1 2 Desired Outcomes 2 3 Strategic

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

A5.1 Permitted activities

A5.1 Permitted activities Section A5 Transportation A5.1 Permitted activities A5.1.1 Activities within roads Note: Refer to Section D for the definition of road (a) Any activity associated with the movement of traffic and the functioning

More information

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report. TO: FROM: Mayors Council on Regional Transportation Geoff Cross, Vice President of Planning and Policy DATE: September 27, 2017 SUBJECT: ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

Logan City Council Planning for Tennis Together

Logan City Council Planning for Tennis Together Logan City Council Planning for Tennis Together February 2016 Introduction Tennis Queensland and Tennis Australia are seeking the opportunity to proactively work with the Logan City Council (LCC) to address

More information

New Plymouth District Aquatic Facility Study

New Plymouth District Aquatic Facility Study For Council 1 Contents Executive Summary 1. Introduction 2. Population and Participation Overview 3. Context, Trends & Strategic Overview 4. New Plymouth Aquatics Survey 5. Key Stakeholder Considerations

More information

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS Authors: Randhir Karma NDip: Eng (Civil) B. Tech Eng (Civil) M Eng (Hons) (Transportation) Auckland Traffic Service Group Manager

More information

CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures.

CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures. CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW Step 1: Petition Petitioner defines the project area limits and gathers petition signatures. 50% of addresses within the project area must sign

More information

Sutherland District Hockey Club Inc. Junior Hockey Policies

Sutherland District Hockey Club Inc. Junior Hockey Policies Policy Purpose To provide clear principles, guidelines and procedures by which the Club will organise its junior hockey operations. These policies will assist players, parents, selectors, coaches and managers

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 Severn Trent Water Forum DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 The Water Forum is a multi-stakeholder panel created in 2012 to challenge Severn Trent as it developed its business

More information

The primary purpose of the TFF is to help promote a healthy farm tenanted sector in Scotland. It aims to fulfil this purpose by:

The primary purpose of the TFF is to help promote a healthy farm tenanted sector in Scotland. It aims to fulfil this purpose by: T e n a n t F a r m i n g F o r u m S u b m i s s i o n o f E v i d e n c e t o t h e L a n d R e f o r m R e v i e w G r o u p I N T R O D U C T I O N The Tenant Farming Forum (TFF) is a membership organisation

More information

Frankston City Council Centenary Park Sporting Complex Management and Business Model

Frankston City Council Centenary Park Sporting Complex Management and Business Model Frankston City Council Centenary Park Sporting Complex Management and Business Model Review Forum 16th August 2016 Project Aims To develop a sustainable model in which Golf, Tennis and Gymnastics can be

More information

Adrian J Tidbury - Estates and Valuation Surveyor Portfolio Development

Adrian J Tidbury - Estates and Valuation Surveyor Portfolio Development 18th September 2017 Community, Health & Housing Committee Courage Playing Fields Report of: Wards Affected: This report is: Adrian J Tidbury - Estates and Valuation Surveyor Portfolio Development Shenfield

More information

Local Highway Panels Members Guide. 9 Public Rights of Way

Local Highway Panels Members Guide. 9 Public Rights of Way Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.

More information

SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND

SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND The Canal & River Trust is the owner of the canal bed and permission is needed for the exclusive right to occupy water space as a home mooring.

More information

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements POLICY REPORT Report Date: April 23, 2018 Contact: Lon LaClaire Contact No.: 604.873.7722 RTS No.: 9944 VanRIMS No.: 08-2000-20 Meeting Date: May 16, 2018 TO: FROM: SUBJECT: Standing Committee on Policy

More information

New Zealand Thoroughbred Racing (NZTR) Job Description

New Zealand Thoroughbred Racing (NZTR) Job Description New Zealand Thoroughbred Racing (NZTR) Job Description Position Director, NZTR Board External and Internal Key Relationships Internal: NZTR CEO Managers & Staff of NZTR External: NZ Racing Board (NZRB)

More information

Local Government Road Safety Summit - 9 April 2018

Local Government Road Safety Summit - 9 April 2018 Local Government Road Safety Summit - 9 April 2018 Report on outcomes The Associate Minister of Transport, Hon Julie Anne Genter held the Local Government Road Safety Summit in Wellington on 9 April 2018.

More information

Christchurch City Council. Community Services Group. Suburban Swimming Pools Review. May 2005

Christchurch City Council. Community Services Group. Suburban Swimming Pools Review. May 2005 Christchurch City Council Community Services Group Suburban Swimming Pools Review May 2005 Edgeware Pool Templeton Pool Papanui Pool Woolston Pool Belfast Pool Prepared by: John Filsell Recreation Facilities

More information

Hurunui Trails Trust Strategic Plan to 2020

Hurunui Trails Trust Strategic Plan to 2020 Hurunui Trails Trust Strategic Plan to 2020 Version 0.9 July 2017 Contents 1.0 Background... 2 2.0 Introduction Who is this plan for?... 4 3.0 Trail Users (Our Audiences)... 4 4.0 Key Issues and Opportunities...

More information

Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai

Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai Summary This determination considers whether the barriers to a small heated pool comply with Clause

More information

TO: FROM: SUBJECT: RECOMMENDATION REPORT SUMMARY BOARD AUTHORITY

TO: FROM: SUBJECT: RECOMMENDATION REPORT SUMMARY BOARD AUTHORITY February 8, 2018 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Douglas Park Playground Replacement - Construction Contract RECOMMENDATION

More information

Wanaka Community Board 16 November Report for Agenda Item: 1. Temporary Road Closure - Challenge Wanaka Triathlon Event 2017

Wanaka Community Board 16 November Report for Agenda Item: 1. Temporary Road Closure - Challenge Wanaka Triathlon Event 2017 Wanaka Community Board 16 November 2016 Department: Property & Infrastructure Report for Agenda Item: 1 Temporary Road Closure - Challenge Wanaka Triathlon Event 2017 Purpose 1 The purpose of this report

More information