Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective

Size: px
Start display at page:

Download "Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective"

Transcription

1 Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective Ahmed Amer, M.S. Ph.D. Candidate Graduate Research/Teaching Assistant Department of Civil & Environmental Engineering Center for Sustainable Mobility, Virginia Tech Transportation Institute 3500 Transportation Research Plaza (0536) Blacksburg, VA Phone: (540) Fax: (540) Total word count: (text) + (tables & figures) = 2, ,500 = 4,972 Paper submitted on February 27, 2009 to the Student Paper Competition of the 2 nd International Symposium on Freeway and Tollway Operations 2009.

2 1 ABSTRACT This paper assesses the impact of reducing the pedestrian design speed from 4 ft/s to 3.5 ft/s as recommended by the American with Disability Act (ADA) on signalized interchanges, namely, the Single Point Urban Interchanges (SPUI) and the Tight Diamond Interchange (TDI). This study investigated the performance of the two types with different traffic loadings and configurations in terms of the control delay and using computer simulation. The results of the study show that the SPUI provides a significant improvement in the efficiency of the interchange over a TDI in medium and heavy traffic loadings, due to the use of a single signal and free flowing right turn movements. It was also found that either configuration provide comparable results under light traffic volumes. The traffic distribution had a small effect on control delay, while reducing pedestrian speed has the greatest impact when used with heavy traffic volumes rather than light and medium volumes. INTRODUCTION There have been many arguments over the use of the Tight Diamond Interchanges (TDI), over the Single Point Urban Interchanges (SPUI). Generally, the SPUI is similar to the TDI with one major difference; that the ramp terminals of the SPUI are joined into one crossing that is operated with one signal. The SPUI is characterized by its ability to allow concurrent off-ramp left-turns to proceed simultaneously, by compressing the two intersections of a diamond into one single intersection over or under the free-flowing road. On the other hand, The TDI is characterized by two closely spaced signalized intersections where the ramps terminate at the cross street and are served with the crossroad movements. Due to the close proximity of the two signals, the signal operations of the two intersections are operated together as one signal. The general layout configuration of each type is shown in Figure 1. Tight Diamond Interchange (TDI) Single Point Urban Interchange (SPUI) Figure 1: General Layouts of the TDI and the SPUI

3 2 There are many advantages for the TDI and the SPUI over each other. The TDI is pretty much easier than the SPUI for both; the road user to understand and the traffic engineer to design and operate. The problem with the SPUI is that the single intersection is geometrically very wide which makes the driver feels lost inside the intersection. Regarding design and operation, because the SPUI compresses the two simple signals of the TDI into one complicated signal, which makes it more challenging to design and operate. Alternatively, the SPUI is generally associated with fewer delays, especially with heavier traffic volumes. Apparently, the SPUI seems to be operationally more recommended rather than the TDI. Nevertheless, if the pedestrians are to be introduced into the signal design and operation, the delay associated with the SPUI might be longer than that with the TDI. This may be attributed to the longer clearance time needed for the SPUI wide intersection, compared to the two small intersections of the TDI. Hence, the use of TDI versus the SPUI is still a question. Furthermore, there are calls by the American with Disability Act (ADA) for adapting the pedestrians design requirements to take care of the disabled pedestrians. The traditional design guidelines by MUTCD recommends walking speed of 4 ft/s [1], whereas the ADA Accessibility Guidelines (ADAAG) recommends a reduced speed of 3.5 ft/s [2]. Such reduction in the pedestrian speed implies longer clearance times for the pedestrians at the intersection, which magnifies the debate of using the TDI or the SPUI. This paper aims to compare the performance of the TDI versus the SPUI corresponding to including the pedestrians in the design of signal timing. In addition, the paper investigates the effect of using the ADAAG walking speed (3.5 ft/s) instead of the MUTCD speed (4 ft/s). These comparisons are to be made in terms of the control delay, which is considered as the main measure for the intersection level of service. Control delay is the delay experienced by a driver due to congestion at an intersection due to deceleration while approaching the intersection, stopping in a queue at the intersection, and acceleration after the queue is released. Rather than the pedestrian speed, many other parameters are involved in the comparison, for instance, the total traffic volume, the balance of the traffic between the main arterial and the freeway ramps. BACKGROUND The SPUIs are used as alternatives to using a typical diamond interchanges in areas with constrained right-of-way. There is a single signalized intersection, servicing ramps and crossroad traffic. A three phase signal control is commonly used with a leading left-turn and through movement for cross street traffic [3]. The first phase controls both crossroad left turn movements. In the second phase both crossroad and through movements take place. Finally, in the third phase both off ramp left turn movements are made [4]. A yield condition is in place for right-turn ramp movements [5]. Using the SPUI configuration can provide 30 to 50 percent better efficiency than the TDI. For the TDI to perform better than a SPUI the following three conditions would likely need to be observed: increasing split of the cross-street thought volumes, increase of the volume of the cross-street left turn opposing the heavy through movement, and imbalanced off-ramp left turns. Under most traffic conditions the SPUI configuration provides better capacity than a diamond interchange. At lower V/C ratios, SPUIs still provide a lower average delay [6]. When choosing between the SPUI and the TDI, traffic volumes are a very important parameter to look at. California recommends the use of a SPUI when the AADT for the major highway through movement is between 20,000 and 35,000 vehicles or the minor road volumes is

4 3 between 15,000 and 30,000 vehicles. A TTI report states that the SPUI should be used with the total AADT for entering traffic is 40,000 vehicles [7]. TTI created a SPUI delay model utilizing the sum of critical flows as the independent variable. Two models were developed, one for no right turn on red and one for a yield right turn condition. Their results showed that at a sum of critical flow value of approximately 0.5 there is a difference in vehicle delay of 10 seconds from each of the models, with the yield condition having a lower value. The separation in delay then increases exponentially as the ratio also increases [7]. Furthermore, presence of pedestrians at signalized intersections necessitates combined pedestrian-vehicle phasing intervals. A pedestrian interval is provided to discharge pedestrian traffic safely. Furthermore, walking speed is a crucial factor in the design of a pedestrian change interval because it determines how much time a pedestrian actually is given to cross the road. In general, the pedestrian interval includes a WALK interval and a flashing DON T WALK (clearance) interval. According to the Manual on Uniform Traffic Control Devices (MUTCD) [1], the WALK interval gives pedestrians adequate time to perceive the WALK indication and depart the curb before the clearance interval begins. It is recommended to be 7 seconds at least. On the other hand, the clearance interval time allows pedestrian crossing to leave the curb and travel with walk speed to at least the far side of the traveled way or to a median of sufficient width for pedestrians to wait before opposing vehicles receive a green indication. The MUTCD recommends walk speed of 4.0 ft/sec. However, the Americans with Disability Act (ADA) resulted recently in several calls to lower the walk speed to 3.5 ft/sec [2]. Accordingly, the total pedestrian interval is calculated as where, d t = D+ u t is the minimum pedestrian green time (seconds) D is the WALK interval time (seconds) d is the crossing width (feet) u is the walk speed (ft/sec) Nevertheless, introducing the pedestrians in the design of the signal timing and its effect on the performance of the TDI and the SPUI was not covered heavily in the literature. Not only, this paper introduces the pedestrians into the comparison, but also it compares the impact of reducing the existing design walking speed (4 ft/s) to a recommended reduced speed (3.5 ft/s). In 2002, the ADAAG suggested a walking speed of 3 ft/s [9] to be used instead of the MUTCD traditional speed of 4 ft/s [1]. Nevertheless and based on many comments (e.g. AASHTO comments [10]), the ADAAG revised their report with a maximum design walking speed of 3.5 ft/s [2]. STUDY METHODOLOGY This study uses computer simulation to measure the average control delay per vehicle in the TDI and in the SPUI corresponding to including the pedestrians in the signal timing. Two pedestrian walking speeds are used; MUTCD speed (4 ft/s) and ADAAG speed (3.5 ft/s). Three different traffic loadings were used to evaluate the interchanges; light (4000 vph), medium (5500 vph), and heavy (7000 vph). The volumes were chosen by researching the number of vehicles serviced for various levels of service in previous studies. Two traffic distributions between the arterial and the freeway ramps were tested; a balanced distribution (70% on main arterial and

5 4 30% on freeway ramps) and heavy ramp distribution (60% on main arterial and 40% on freeway ramps) were used with the three traffic volumes. The combinations of these different cases give a total of 24 traffic loading scenarios as summarized in Figure 2. Those should model the most encountered situations in the field. Balanced (70/30) Balanced (70/30) MUTCD Speed (4 ft/s) MUTCD Speed (4 ft/s) Heavy Ramp (60/40) Heavy Ramp (60/40) TDI VS SPUI Balanced (70/30) Balanced (70/30) ADAAG Speed (3.5 ft/s) ADAAG Speed (3.5 ft/s) Heavy Ramp (60/40) Heavy Ramp (60/40) Figure 2: Summary of the 24 Loading Scenarios To simulate these 24 traffic scenarios, the total hourly volume for each scenario was distributed into specific movements. These movements were then coded into Synchro [11] to obtain optimized signal timings. Traffic volumes, movement distributions, and signal timings were then entered into CORSIM [12]. Each traffic scenario was modeled and observed using TRAFVU. Any problems in the configuration of the simulation could be detected in this phase and modified to correctly model the desired condition. It is worth mentioning here that signal timing in the cases of the TDI was developed to minimize the number of vehicles stored between the two signals. Simulations were run to determine the best conditions for each type of interchange. The geometric configuration of the TDI and the SPUI used in the simulation included two through lanes in each direction for cross street traffic, dual left-turn lanes on the cross street and from the ramp terminals, a right turn lane on the off-ramps, and a right turn lane for cross street to on-ramp movements. The geometric layout of the TDI and the SPUI are shown in Figure 3.

6 5 1 2 TDI SPUI Figure 3: Geometric Layout of the TDI and the SPUI

7 6 Traffic Volumes The two traffic distributions that were studied were balanced and heavy ramp situations. The balanced distribution placed 70% of the total traffic on the main arterial and 30% on the ramp movements. The ramp heavy distribution shifted 10% of the arterial movement to the ramps, giving the main arterial 60% of the total flow and the ramps 40%. Three traffic volumes were used within the two distributions. The volumes were selected by studying previous research and observing the range of traffic by which a SPUI would be beneficial. The previous studies gave mixed results using this range of loading. The light loading used an hourly volume of 4000 vehicles, the medium loading used an hourly volume of 5500 vehicles, and the heavy loading used an hourly volume of 7000 vehicles. The individual movement volumes can be found in Table 1. Table 1: Traffic Volumes of Individual Movements (vph) Movement Balanced Distribution Heavy Ramp Distribution Light Medium Heavy Light Medium Heavy Total EBR EBT EBL WBR WBT WBL NBL NBR SBL SBR Signal Timing Initial signal timings were calculated by using Synchro based on a pretimed 3 phase control. The traffic volumes and distributions were entered along with interchange geometry to optimize the signal timings. For the TDI, the default values for yellow and all red times were used; yellow of 3 s and all red of 1 s. For the SPUI configuration, the yellow and all red times were increased by one second each to accommodate for the longer clearance; yellow of 4 s and all red of 2 s. Thereafter, the minimum split was calculated based on the pedestrian speeds (4 ft/s or 3.5 ft/s). The NEMA phasing and the optimized signal timings for the TDI two signals and for the SPUI single signal are given in Table 2 and 3, respectively.

8 7 Table 2: NEMA Phasing and Optimized Timing for the TDI Signals Pedestrian Distribution Volume Intersection # Cycle (sec) Offset (sec) Green Time (sec) Phase 1 Phase 2 Phase 3 Int.2 Int.1 Yellow (sec) All Red (sec) MUTCD ADAAG Heavy Ramp Balanced Heavy Ramp Balanced Light Medium Heavy Light Medium Heavy Light Medium Heavy Light Medium Heavy

9 8 Table 3: NEMA Phasing and Optimized Timing for the SPUI Signal Pedestrians Distribution Volume Cycle (sec) Green (sec) Phase 1 Phase 2 Phase 3 Yellow (sec) All Red (sec) MUTCD ADAAG HRmp Blncd HRmp Blncd Light Medium Heavy Light Medium Heavy Light Medium Heavy Light Medium Heavy CONTROL DELAY DATA/ANALYSIS CORSIM was used to run the simulations for the 24 scenarios and to compile the control delay data for each. The traffic volumes and signal timings were used to calculate control delay for each link. The different links of the TDI and the SPUI are classified as illustrated in Figure 4. Nevertheless, to better analyze and describe the control delay, it is to be analyzed by each movement. Such delay was calculated by adding the delay of each link in the movement. This gave a better indication of how each vehicle would be affected by its destination. TDI Link Classification Figure 4: TDI and SPUI Link Classification SPUI Link Classification

10 9 Balanced Traffic Distribution Scenarios The control delays for the balanced traffic distribution scenarios using both pedestrian speeds are summarized by movement in Table 4. The analysis shows that the total control delay associated with the TDI is higher than that associated with the SPUI in almost all traffic volume cases, especially in the medium traffic volume. This is attributed to that the pedestrians increased the signal split for the minor movements; freeway ramps. Furthermore, the application of the ADAAG speed almost has slight effect on all balanced scenarios for the two interchanges, except for the heavy traffic with the TDI which was increased one and half times. Table 4: Summary of Control Delay (sec) for Balanced Traffic MUTCD Speed Movement Light Medium Heavy TDI SPUI TDI SPUI TDI SPUI EBT EBR EBL WBT WBR WBL NBR NBL SBR SBL Total ADAAG Speed Movement Light Medium Heavy TDI SPUI TDI SPUI TDI SPUI EBT EBR EBL WBT WBR WBL NBR NBL SBR SBL Total

11 10 Heavy Ramp Traffic Distribution Scenarios The control delays for the heavy ramp traffic distribution scenarios using both pedestrian speeds are summarized by movement in Tables 5. The analysis shows that the total control delay associated with the TDI is still higher than that associated with the SPUI in all traffic volume cases. The effect of the reduced ADAAG speed almost has slight effect on all balanced scenarios for the two interchanges, except for the medium traffic volumes. This is due to increasing the delay for large number of vehicles which increases the overall control delay. Table 5: Summary of Control Delay (sec) for Heavy Ramp Traffic MUTCD Speed Movement Light Medium Heavy TDI SPUI TDI SPUI TDI SPUI EBT EBR EBL WBT WBR WBL NBR NBL SBR SBL Total ADAAG Speed Movement Light Medium Heavy TDI SPUI TDI SPUI TDI SPUI EBT EBR EBL WBT WBR WBL NBR NBL SBR SBL Total

12 11 SUMMARY AND CONCLUSIONS The results of this paper show that the SPUI was much more efficient than the TDI under almost all traffic loadings and different pedestrian speeds. On all simulations, the SPUI had significantly shorter control delay. The total control delay of the 24 scenarios is summarized in Table 6. Table 6: Total Control Delay (sec) for the 24 Scenario Total Control Delay (sec) Balanced Heavy Ramp MUTCD ADAAG MUTCD ADAAG Low Medium Heavy TDI SPUI TDI SPUI TDI SPUI The results of this study show that the SPUI provides a significant improvement in the efficiency of the interchange over a TDI in heavy traffic loadings. This is due to the use of a single signal and free flowing right turn movements. There is still a benefit to using a SPUI in medium traffic loadings, but the TDI is easier for the user and the designer. Either configuration could be chosen for light and medium traffic volumes. Traffic distribution had a small effect on control delay. Furthermore, the reduction of the pedestrian walking speed has minor effect on the control delay with the light and the medium traffic volumes. Nevertheless, the ADAAG walking speed is not highly recommended in the areas associated with heavy traffic volumes, either with the TDI or with the SPUI. ACKNOWLEDGMENT The author is more than appreciative for Dr. Montasir Abbas, for his enlightening guidance to the author while conducting this research. Thanks also go for Dr. Hesham Rakha for sponsoring the author during his research. In addition, the author would like to acknowledge Christ Harris, M.S., for his contributions to this work. Gratitude also is due to Hossam Hablas, M.S., who gave an appreciated assistance to the analysis made in the paper.

13 12 REFERENCES 1. Federal Highway Administration (FHWA), Manual on Uniform Traffic Control Devices (MUTCD). 2003: Washington, DC. 2. US Access Board. Revised Draft Guidelines for Accessible Public Rights-of-Way [cited; Available from: 3. Selinger, M.J. and W.H. Sharp, Comparison of SPUI and TUDI Interchange Alternatives with Computer Simulation Modeling. ITE, Qureshi, M., et al., Design of Single Point Urban Interchanges, MoDOT, Editor Garber, N.J. and M.J. Smith, Guidelines for Selecting Single-Point Urban and Diamond Interchanges: Nationwide Survey and Literature Review. Transportation Research Record, Bared, J., A. Powell, and E. Kaisar, Traffic Planning Models for Single Point and Tight Urban Interchanges, in Transportation Research Board Bonneson, J., et al., Recommended Ramp Design Procedures For Facilities Without Frontage Roads, T.T. Institute, Editor Jones, E.G. and M.J. Selinger, A Comparison of the Operations of Single Point and Tight Urban Interchanges, in Transportation Research Board US Access Board. Draft Guidelines for Accessible Public Rights-of-Way [cited; Available from: American Association of State Highway and Transportation Officials (AASHTO), Comments and Recommendations on the Draft Guidelines for Accessible Public Rights-of- Way Trafficware Corporation, Synchro 4: Traffic Signal Coordination Software. 1999: Albany, CA. 12. ITT Systems & Sciences Corporation. FHWA, CORSIM User s Manual

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX 2010 Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX Hongchao Liu, Hao Xu, and Rhett Dollins Multidisciplinary Research in Transportation Texas Tech University Mulidisciplinary Research

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs

An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs A Thesis Proposal By XIAOHAN LI Submitted to the Office of Graduate Studies of Texas A&M University In partial fulfillment

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Application of Diamond Interchange Control Strategies at Closely Spaced Intersections

Application of Diamond Interchange Control Strategies at Closely Spaced Intersections Application of Diamond Interchange Control Strategies at Closely Spaced Intersections Zong Tian, Thomas Urbanik II, and Reed Gibby Signalized diamond interchanges are one of the most common interchange

More information

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY Class Project Report for ECIV 542 Traffic Engineering Submitted by Omor Sharif Muchun Song Narges Kaveshgar Quyen Pham Chih-Yao Lin Submission

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions CONTENTS (MODULE 3) Introduction...1 Purpose...1 Goals and Learning Outcomes...1 Organization

More information

Diverging Diamond Interchange and Double Crossover Intersection Vehicle and Pedestrian Performance

Diverging Diamond Interchange and Double Crossover Intersection Vehicle and Pedestrian Performance Diverging Diamond Interchange and Double Crossover Intersection Vehicle and Pedestrian Performance Praveen K. Edara, Department of Civil and Environmental Engineering, Virginia Polytechnic Institute and

More information

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Intersections are the physical component of the roadways where two highways intersect. They are the most complex element of roadways, since it requires more

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Thesis Proposal By James A. Robertson Submitted to the Office of Graduate Studies Texas A&M University in partial fulfillment

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

TECHNIQUES TO IMPROVE SAFETY AND OPERATIONS AT SIGNALIZED DIAMOND INTERCHANGES IN NEVADA

TECHNIQUES TO IMPROVE SAFETY AND OPERATIONS AT SIGNALIZED DIAMOND INTERCHANGES IN NEVADA TECHNIQUES TO IMPROVE SAFETY AND OPERATIONS AT SIGNALIZED DIAMOND INTERCHANGES IN NEVADA FINAL REPORT Prepared for Nevada Department of Transportation Authors Zong Z. Tian, PhD, PE Ahmed Abdel Dayem Department

More information

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB FAQ/RULES OF THUMB HCS intersection analysis criteria See LDM Figure 401-14aE Cycle lengths between 60 to 120 seconds No impractical phases, i.e., 1 second green time Yellow + All Red must be no less than

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

An Evaluation of Signalized Intersection System Analysis Techniques Walter J. Freeman, P.E., Kien Y. Ho, P.E., Elizabeth A. McChesney, E.I.T.

An Evaluation of Signalized Intersection System Analysis Techniques Walter J. Freeman, P.E., Kien Y. Ho, P.E., Elizabeth A. McChesney, E.I.T. An Evaluation of Signalized Intersection System Analysis Techniques Walter J. Freeman, P.E., Kien Y. Ho, P.E., Elizabeth A. McChesney, E.I.T. A system of signalized intersections is a critical element

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

1982 by Prentice-Hall, Inc., Englewood Cliffs, N.J Library of Congress Catalog Card Number: ISBN:

1982 by Prentice-Hall, Inc., Englewood Cliffs, N.J Library of Congress Catalog Card Number: ISBN: 1982 by Prentice-Hall, Inc., Englewood Cliffs, N.J. 07632 All rights reserved. No part of this book may be reproduced in any form or by any means without permission in writing from the publisher. Library

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Roundabouts along Rural Arterials in South Africa

Roundabouts along Rural Arterials in South Africa Krogscheepers & Watters 0 0 Word count: 00 text + figures = 0 equivalent words including Title and Abstract. Roundabouts along Rural Arterials in South Africa Prepared for: rd Annual Meeting of Transportation

More information

ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY

ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY 2nd Int. Symposium in Civil Engineering 1998 Budapest ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY István Styevola

More information

Evaluation of Work Zone Strategies at Signalized Intersections

Evaluation of Work Zone Strategies at Signalized Intersections Evaluation of Work Zone Strategies at Signalized Intersections Khaled Shaaban Qatar University/Department of Civil and Architectural Engineering, Doha, Qatar Email: kshaaban@qu.edu.qa Dina Elnashar Qatar

More information

Synchro Studio 8. Overview. By Ioannis Psarros

Synchro Studio 8. Overview. By Ioannis Psarros Synchro Studio 8 Overview By Ioannis Psarros What is Synchro? Software for signal optimization Developed by Trafficware Optimization can be applied to: Cycle lengths Splits Offsets Source: http://bikewalklee.blogspot.com

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

Self-Organizing Signals: A Better Framework for Transit Signal Priority

Self-Organizing Signals: A Better Framework for Transit Signal Priority Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 3-13-2015 Self-Organizing Signals: A Better Framework for Transit Signal Priority Peter

More information

Shawn Leight, P.E., PTOE, PTP CBB Transportation Engineers + Planners ITE International President Washington University

Shawn Leight, P.E., PTOE, PTP CBB Transportation Engineers + Planners ITE International President Washington University JCE 3460 Traffic! Shawn Leight, P.E., PTOE, PTP CBB Transportation Engineers + Planners ITE International President Washington University sleight@cbbtraffic.com Primary Traffic References AASHTO Green

More information

Pedestrian Safety at Interchanges

Pedestrian Safety at Interchanges Countermeasure Strategies for Pedestrian Safety Pedestrian Safety at Interchanges Meghan Mitman Fehr and Peers December 10, 2015 Today s Presentation Introduction and housekeeping Audio issues? Dial into

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS A. Volume, Demand, and Capacity 2-1 B. Performance Measures 2-7 C. Critical Lane Volume Analysis 2-9 3. DATA COLLECTION 4. SIGNAL PHASING

More information

Yellow and Red Intervals It s Just a Matter of Time. 58 th Annual Alabama Transportation Conference February 9, 2015

Yellow and Red Intervals It s Just a Matter of Time. 58 th Annual Alabama Transportation Conference February 9, 2015 Yellow and Red Intervals It s Just a Matter of Time 58 th Annual Alabama Transportation Conference February 9, 2015 Presentation Content Background on Timing Methodology Findings and Recommendations from

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

2009 PE Review Course Traffic! Part 1: HCM. Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University

2009 PE Review Course Traffic! Part 1: HCM. Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University 2009 PE Review Course Traffic! Part 1: HCM Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University sleight@cbbtraffic.com Topic Areas Highway Capacity Manual Highway Capacity Analysis

More information

Background on the Revisions to VDOT s Access Management Spacing Standards

Background on the Revisions to VDOT s Access Management Spacing Standards December 2011 Background on the Revisions to VDOT s Access Management Spacing Standards Spacing Standards for Commercial Entrances, Signals, Intersections, and Crossovers The spacing standards were located

More information

Operational Performance Comparison between Three Unconventional Intersection Designs: Left-turn Bypass, Diverging Flow and Displaced Left-turn

Operational Performance Comparison between Three Unconventional Intersection Designs: Left-turn Bypass, Diverging Flow and Displaced Left-turn Ninth LACCEI Latin American and Caribbean Conference (LACCEI 2011), Engineering for a Smart Planet, Innovation, Information Technology and Computational Tools for Sustainable Development, August 3-5, 2011,

More information

ScienceDirect. Microscopic Simulation on the Design and Operational Performance of Diverging Diamond Interchange

ScienceDirect. Microscopic Simulation on the Design and Operational Performance of Diverging Diamond Interchange Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 6 (2015 ) 198 212 4th International Symposium of Transport Simulation-ISTS 14, 1-4 June 2014, Corsica, France Microscopic

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

KDOT Access Management Policy (AMP)

KDOT Access Management Policy (AMP) KDOT Access Management Policy (AMP) (January 2013 Edition) Errata KDOT intends to correct these errors during the next revision to the Policy. Corrections are denoted in red text with a solid line through

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Arterial Traffic Analysis Actuated Signal Control

Arterial Traffic Analysis Actuated Signal Control Arterial Traffic Analysis Actuated Signal Control Dr. Gang-Len Chang Professor and Director of Traffic Safety and Operations Lab. University of Maryland-College Park Actuated Signal Control Fully Actuated

More information

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc. Technical Memo To: Steve Gramm, SDDOT From: Steve Hoff, Engineering, Inc. Project: I-190/Silver Street Study CC: Date: 6//010 Job No: DOT Contract 41044, Order PD-0-09 RE: Phase 1, Task 100: Baseline Analysis

More information

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building State University of New York at Albany City of Albany,

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure

More information

Traffic Signal Design

Traffic Signal Design Traffic Signal Design Instructor: S. M. Mahdi Amiripour m.amiripour@gmail.com 2 Introduction Intersection is an area shared by two or more roads Designated for the vehicles to turn to different directions

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT Technical Memorandum TO: Hoang Hong, NDOT DATE: September 21, 2012 FROM: SUBJECT: COPIES: John Karachepone, Jacobs USA Parkway Traffic Operations Analysis, Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy

More information

Signal Timing Design CIVL 4162/6162

Signal Timing Design CIVL 4162/6162 Signal Timing Design CIVL 4162/6162 Summary of Signal Design Signal Phase Plans Treatment of Left Turns General Considerations Phase and Ring Diagrams Common Phase Plans and Their Use Vehicular Needs Change

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a HIGH-CAPACITY ROUNDABOUT INTERSECTION ANALYSIS: GOING AROUND IN CIRCLES David Stanek, PE and Ronald T. Milam, AICP Abstract. Roundabouts have become increasingly popular in recent years as an innovative

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

Collision Estimation and Cost Calculation

Collision Estimation and Cost Calculation Collision Estimation and Cost Calculation Table of Contents Introduction... 3 Rates Based Method... 4 20-Year Collision Cost Procedure... 4 Safety Performance Function Method... 7 Important notes when

More information

Turn Lane Warrants: Concepts, Standards, Application in Review

Turn Lane Warrants: Concepts, Standards, Application in Review Turn Lane Warrants: Concepts, Standards, Application in Review David J. DeBaie P.E., P.T.O.E. 2004 ITE, District 1 Annual Meeting Burlington, Vermont Introduction Turning lanes at intersections reduce

More information

SELECTED ROADWAY CAPACITY ANALYSIS

SELECTED ROADWAY CAPACITY ANALYSIS CHAPTERFOUR SELECTED ROADWAY CAPACITY ANALYSIS 4.1 SELECTED ROADWAY CAPACITY ANALYSIS Introduction Capacity analysis was performed on six selected roadways within the Dearborn County study area using the

More information

THE EFFECT OF WEAVING MANEUVERS ON OPERATION OF A FREE RIGHT-TURN LANE AT RAMP TERMINALS. A Thesis MINCHUL PARK

THE EFFECT OF WEAVING MANEUVERS ON OPERATION OF A FREE RIGHT-TURN LANE AT RAMP TERMINALS. A Thesis MINCHUL PARK THE EFFECT OF WEAVING MANEUVERS ON OPERATION OF A FREE RIGHT-TURN LANE AT RAMP TERMINALS A Thesis by MINCHUL PARK Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment

More information

Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County

Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County Prepared for Oregon Department of Transportation, Region 3 3500 NW Stewart

More information

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006 ATTACHMENT NO. 30 Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006 Roundabouts are becoming an increasingly utilized form of intersection design

More information

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Hao Xu (Corresponding Author) Research Associate Department of Civil & Environmental Engineering Texas

More information

Advisor: Peter G Furth

Advisor: Peter G Furth 2016 Adewale Ogunleke Northeastern University, MA 4/26/2016 Advisor: Peter G Furth ABSTRACT During peak periods, Everett s Upper Broadway Corridor from Ferry St. and Gladstone Street faces crippling traffic

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

FEBRUARY, 2001 ROAD DESIGN MANUAL (ENGLISH) 6-0(1)

FEBRUARY, 2001 ROAD DESIGN MANUAL (ENGLISH) 6-0(1) FEBRUARY, 2001 ROAD DESIGN MANUAL (ENGLISH) 6-0(1) CHAPTER 6 INTERCHANGES AND GRADE SEPARATIONS 6-1.0 GENERAL 6-1.01 Definitions 6-1.02 Warrants 6-1.03 Types of Interchanges 6-1.03.01 General 6-1.03.02

More information

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 February 13, 2017 Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 Re: Modified Entrance Layout - Revised Traffic Assessment and Sight Distance Analysis Proposed Stewart's

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000)

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000) Methodology for analysing capacity and level of service for signalized intersections (HCM 2000) Ivana Nedevska 1, Slobodan Ognjenović 2,* and Elena Gusakova 3 1 GEING Krebs und Kiefer-Skopje, Macedonia

More information

ROUNDABOUTS/TRAFFIC CIRCLES

ROUNDABOUTS/TRAFFIC CIRCLES GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Simulation Analysis of Intersection Treatments for Cycle Tracks

Simulation Analysis of Intersection Treatments for Cycle Tracks Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

By Kay Fitzpatrick, Ph.D., P.E., Ann Do, P.E., and Bruce Friedman, P.E.

By Kay Fitzpatrick, Ph.D., P.E., Ann Do, P.E., and Bruce Friedman, P.E. feature shutterstock.com/dieter Hawlan Rapid-Flashing Beacons for Pedestrian Treatments By Kay Fitzpatrick, Ph.D., P.E., Ann Do, P.E., and Bruce Friedman, P.E. The rectangular rapid-flashing beacon has

More information

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection IJIRST International Journal for Innovative Research in Science & Technology Volume 2 Issue 05 October 2015 ISSN (online): 2349-6010 Conversation of at Grade Signalized Intersection in to Grade Separated

More information

TECHNICAL MEMORANDUM VDOT Central Region On Call Task Order

TECHNICAL MEMORANDUM VDOT Central Region On Call Task Order Kittelson & Associates, Inc. T R A N S P O R T A T I O N E N G I N E E R I N G / P L A N N I N G 1850 Centennial Park Drive, Suite 130, 20191 P 703-885-8970 F 703-885-8971 TECHNICAL MEMORANDUM VDOT Central

More information

Effects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc.

Effects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc. Effects of Traffic Signal Retiming on Safety Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc. Introduction It has long been recognized that traffic signal timing can have an impact

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

Operation of signalized diamond interchanges with frontage roads using dynamic reversible lane control

Operation of signalized diamond interchanges with frontage roads using dynamic reversible lane control 0 0 0 0 0 Operation of signalized diamond interchanges with frontage roads using dynamic reversible lane control Jing Zhao Ph.D. Candidate Key Laboratory of Road and Traffic Engineering of the Ministry

More information

4. Include the associated years anticipated for the short term and long term analysis in the

4. Include the associated years anticipated for the short term and long term analysis in the 2nd DE Review SM ROCHA, LLC responses to City comments are provided within. 8. Trip distribution is displayed in Figure 6. Distribution assumes SFA and commercial traffic combined for most conservative

More information

Development of Guidelines for Driveway Location and Median Configuration in the Vicinity of Interchanges. Final Report March 2006

Development of Guidelines for Driveway Location and Median Configuration in the Vicinity of Interchanges. Final Report March 2006 Development of Guidelines for Driveway Location and Median Configuration in the Vicinity of Interchanges Final Report March 2006 Contract #: BD-545-14 UF Project #: 4554-036-12 Prepared for: The Florida

More information

Impact of U-Turns as Alternatives to Direct LeftTurns on the Operation of Signalized. Intersections

Impact of U-Turns as Alternatives to Direct LeftTurns on the Operation of Signalized. Intersections Journal of Traffic and Logistics Engineering Vol. 3, No., June 20 Impact of UTurns as Alternatives to Direct LeftTurns on the Operation of Signalized Intersections Mahmoud A. Taha and Akmal S. Abdelfatah

More information

A paper prepared for the 2012 TRB Annual meeting

A paper prepared for the 2012 TRB Annual meeting 1 1 1 1 1 1 1 1 0 1 0 1 GUIDELINES FOR ROAD DIET CONVERSIONS By Nikiforos Stamatiadis, PhD, PE Professor Department of Civil Engineering University of Kentucky 1 Raymond Building Lexington KY 00 E-mail:

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool

FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool Virginia Section ITE Annual Meeting Virginia Beach June 217 Pete Jenior Kittelson & Associates, Inc. 1 Intersection Control Evaluation

More information

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New

More information

Operation Green Light Traffic Signal Coordination Report North Oak Trafficway - New Mark Drive to NE 42nd Street

Operation Green Light Traffic Signal Coordination Report North Oak Trafficway - New Mark Drive to NE 42nd Street Introduction Operation Green Light Traffic Signal Coordination Report North Oak Trafficway - New Mark Drive to NE 42nd Street Operation Green Light (OGL) is a regional effort to improve traffic flow and

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

Actuated Signal Timing Design CIVL 4162/6162

Actuated Signal Timing Design CIVL 4162/6162 Actuated Signal Timing Design CIVL 4162/6162 Session Objective Explain terms related to actuated signals Explain why and where actuated signals are used Determine detector locations given traffic conditions

More information

LYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation

LYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation LYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation A J Joubert*, S L Burnett**, and T Ueckermann* *PWV Consortium, PO Box 1109, Sunninghill 2157 **Gautrans, Gauteng Department

More information

EVALUATING THE IMPACT OF TWO ALLOWABLE PERMISSIVE LEFT-TURN INDICATIONS

EVALUATING THE IMPACT OF TWO ALLOWABLE PERMISSIVE LEFT-TURN INDICATIONS EVALUATING THE IMPACT OF TWO ALLOWABLE PERMISSIVE LEFT-TURN INDICATIONS Michael A. Knodler Jr., Ph.D. Assistant Professor Department of Civil and Environmental Engineering University of Massachusetts-Amherst

More information