Project Advisory Team Existing Conditions Meeting Agenda

Similar documents
North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

Federal Way City Center Access Study Comment Log Summary

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

Final Report. Eau Gallie Boulevard to Lake Washington Road

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

Completed Project Justification Package Example

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008

Presented by: Presented to:

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

2017 Active Allegheny Grant Program Program Guidelines

CITY OF STEVENS POINT AGENDA

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

Technical Memorandum. Introduction. Projected Traffic Volumes

PAT Meeting #2 Future Alternatives Meeting Agenda

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.

Sellwood Bridge AM Traffic Evaluation

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1

South Portland Public Input Meeting Summary Notes and Public Comments

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include:

[A quorum of the City Council may attend this meeting]

The Facts About Brentwood School s Expansion Plans

CHAPTER 4 VISION, GOALS AND OBJECTIVES

OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO

A template mass rescue operations plan

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

Technical Briefing Rapid Transit

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

Traffic & Safety Update

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

DRAFT Active Transportation Work Plan

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her.

District 6 and Unit 190 (D4) STaC - Conditions of Contest & Reporting Instructions Fall 2018

Meeting 2 Workshop Summary

3 ways to build a healthy future for NSW

American Association of State Highway and Transportation Officials

Tewantin State School Executive Summary

Department of Transportation Project No Rehabilitation of Bridge No Towns of East Haddam and Haddam, Connecticut

Prepared by: TH STREET SUITE 2301 DENVER, CO CITY AND COUNTY OF DENVER. n W

Additional Investigation Report for a Second Bridge Across the Ashburton River

Long-Term Transportation Plan

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner,

POWELL BOULEVARD ROAD SAFETY AUDIT

Project No.: Notes taken by:

Jobs in Green and Healthy Transport

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad.

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN.

Appendix C. Travel Demand Forecasting Technical Memorandum

Bikeway Classification

TECHNICAL MEMORANDUM

Mount Gravatt State School Executive Summary

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary

TITLE TEXT. School Start Times Exploration Update. Presented by Scott Nielsen

Topic Sheet No. 2 Near misses: Learning from failure

TDM on the Web. How To Use TDM On The Web. Below is information and instructions for using the scheduling modules in TDM

Technical Appendices Transportation Appendix. Transportation Contents

Community Meeting September 29, :30 7:30 p.m. Leataata Floyd Elementary School Multi-Purpose Room 401 McClatchy Way, Sacramento.

ROAD SAFETY AUDIT. Main Street (Route 28) at Elm Street Main Street (Route 28) at William Street Town of Stoneham.

CITY of LOMPOC 2030 General Plan

National Premier Leagues WA. Operational Meeting 25 February 2015

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

GNAC SPORTS REGULATIONS OUTDOOR TRACK & FIELD [updated ]

Cecil Plains State School Executive Summary

American Water Works Association. Organizational & Technical Strategic Data Management Assessment Request for Proposal

USTA Atlanta Combo Doubles Registration Information Play begins in late April

Quebec Street Multimodal Improvement Project Open House Summary September 27, 2017

Subject: Recommended Updates to Transportation Development Parameters

Navajo County Public Works

Guidance on Exception Reporting for Educational and Clinical Supervisors and Leads

Opportunity for Public Participation. Plain Language Summary

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

Kenmore South State School Executive Summary

TRANSPORTATION SYSTEM PLAN ADVISORY COMMITTEE (Transportation Advisory Board / Technical Advisory Committee) Minutes April 11, 2012

CANTERBURY CRICKET CLUB INTRODUCTORY LETTER TO PARENTS

Health and Safety Policy for Groups Policy

Marburg State School Executive Summary

Public School Choice EBR Guidance. North Banks Middle School

CORNERSTONE MONTESSORI ELEMENTARY SCHOOL BOARD OF DIRECTORS MEETING TUESDAY APRIL 21, :00 P.M.

City of Ottawa. Transit Solutions. O c t o b e r

Deer harvest objective for the Deer Plan

Projects, Grouped by MPO Investment Category

Neighborhood Bikeway Concept Plan

Mission Bay Loop Project. Operations & Customer Service Committee August 9, 2016

European Roulette Game Rules

LAND 2 Aesthetic Resources Technical Study Plan Kaweah Project (FERC Project No. 298)

Community Advisory Committee of Market and Octavia Area Plan City and County of San Francisco Meeting Minutes

Jinibara State School Executive Summary

Stakeholder Working Group (SWG) Meeting #2 Summary

SETTING UP A CLUB. Westmorland County Football Association Limited. Contacts. Chief Executive Peter Ducksbury

Newmarket Level Crossing

First Aid Policy Version 2.0

INSTRUCTIONS Sanctioning a 3PAR Competition

Kilkivan State School Executive Summary

Transcription:

Prject Advisry Team Existing Cnditins Meeting Agenda April 25, 2017 Viera Gvernmental Center, Atlantic Rm, Building C, 3 rd Flr 10:00 AM 12:00 PM Wickham Rad Operatinal Analysis 1. Prject Backgrund/Overview 2. Existing Cnditins Analysis a. Existing Facilities (Pedestrian/Transit/Drainage and Utilities) b. Existing Traffic Characteristics c. Operatinal Evaluatin d. Crash Histry (Crridr/Pedestrian/Bicycle) 3. Issues/Opprtunities Discussin a. Multi-Mdal (Pedestrian/Bicycle/Transit) b. Vehicular c. Drainage and Utilities 4. Next Steps a. Majr Task Items i. Existing Cnditins Draft Reprt Wrk ii. Begin Future Cnditins Assessment b. Prject Advisry Team Meetings i. Early August 2017 Future Ops Analysis, Radway Alternatives and Typical Sectins, Drainage and Impacted Utilities Assessment ii. Early Octber 2017 Preliminary Cnstructin and ROW Cst Estimates, Operatinal MOEs and B/C Matrix c. Public Wrkshps i. May 9, 2017 ii. Late Octber 2017 FILENAME: C:\USERS\THILLS\DESKTOP\AURORA AND WICKHAM PAT MEETING AGENDA 2017_04_25.DOCX

April 25, 2017 Page 2 Aurra Rad Crridr Study 1. Prject Backgrund/Overview 2. Existing Cnditins Analysis a. Existing Land Use and Zning b. Cmmunity Features c. ROW and Typical Sectins d. Existing Facilities (Pedestrian and Transit) e. Existing Vlumes and Traffic Characteristics f. Operatinal Evaluatin g. Crash Histry (Crridr/Pedestrian/Bicycle) h. Character Districts 3. Issues/Opprtunities Discussin a. Multi-Mdal (Pedestrian/Bicycle/Transit) b. Vehicular and Drainage 4. Next Steps a. Majr Task Items i. Existing Cnditins Draft Reprt Wrk ii. Begin Future Cnditins Assessment b. Prject Advisry Team Meetings i. Late September 2017 Future Ops and Rad Diet Feasibility Analyses, Initial Radway Alternatives, Drainage and Impacted Utilities Assessment ii. Mid December 2017 Alternatives Analysis iii. Early March 2018 Preferred Alternative and Cncept, Preliminary Cnstructin Cst Estimates c. Public Wrkshps i. May 16, 2017 ii. Early Nvember 2017 iii. Late March 2018 Kittelsn & Assciates, Inc. Orland, Flrida

Meeting Ntes Aurra Rad and Wickham Rad Prject Advisry Team (PAT) Existing Cnditins Evaluatin Meeting SUBJECT: Wickham Operatinal Analysis and Aurra Rad Crridr Study Existing Cnditins Review Meeting MEETING DATE: Tuesday, April 25, 2017 MEETING TIME: VENUE: 10:00 AM 12:00 PM Viera Gvernmental Center, Building C 2725 Judge Fran Jamiesn Way, Melburne, FL 32940, Atlantic Rm Intrductin and Attendees A meeting was held with the PAT t discuss the Existing Cnditins Evaluatin fr bth the Wickham Rad Operatinal Analysis and the Aurra Rad Crridr Study. Belw are the attendees f this PAT Meeting: Laura Carter SCTPO Gerganna Gillette SCTPO Steven Bstel SCTPO Crrina Gumm Brevard Cunty Ashley Stanfrd Brevard Cunty Erin Sterk Brevard Cunty Rachel Gerena Brevard Cunty Jenni Lamb City f Melburne Tdd Crwin City f Melburne Judy Pizz FDOT D5 Lance Parker Space Cast Area Transit JP Weesner KAI Michael Eagle KAI Like Liu KAI A sign-in sheet fr the meeting is attached at the end f these ntes. 1

Wickham Rad Operatinal Analysis Prject Backgrund and Overview Mr. Eagle gave a brief update n the prject schedule, reviewed the crridr existing cnditins characteristics (study limits, AADT, speed limits, etc.), issues and pprtunities within the crridr, and facilitated a discussin abut the prject websites. The fllwing summarizes the related cmments and discussin frm the PAT: Operatinal Evaluatin Crash Histry Brevard Cunty is cnducting a study t review ITS imprvements n Wickham Rad. The results f this study shuld be included in either the existing r future cnditins reprt. KAI was requested t check the time f crashes alng the segment between Eau Gallie Bulevard and Aurra Rad in rder t understand whether crash patterns were influenced by schl traffic. This will be included in the existing cnditins reprt. It was nted that sme crashes may be caused by drivers during the hurs f pick-up and drp-ff at Sabal Elementary Schl. Pedestrian/Bicycle Crash Histry KAI was requested t review these crashes by the time f day t determine if street lighting is an issue. This will be included in the existing cnditins reprt. KAI was requested t add a descriptin r chart t shw the cntributing factrs fr each crash. Specifically the percentage f crashes that invlved mid-blck crssings alng Wickham Rad in rder t understand the necessity fr safer crssing alternatives. This will be included in the existing cnditins reprt. Multi-Mdal Issues and Opprtunities Based n a previus study dne by Tindale Oliver & Assciates, ver 90% f the bus stps in Brevard Cunty are nt ADA cmpliant. Mr. Parker nted that cntinued crdinatin with Space Cast Area Transit is required s that planned ADA imprvements will be incrprated int the Wickham Rad and Aurra Rad alternative evaluatins. Mr. Parker acknwledged at least three pedestrian crashes invlving riders crssing Wickham Rad t catch the bus in the past year. When cmparing the transit facilities map and pedestrian/bicycle crash map, it was nted that sme f the crash lcatins are in the vicinity f transit stps. Mr. Parker nted a transit bus has capacity fr three bicycles n its rack at a time. The Wickham Rad transit rutes have a high number f bicycle 2

users and it is up t the discretin f the bus driver whether r nt t allw bicycles n the bus. Mr. Parker nted that the bus stps at Lake Washingtn Rad and Aurra Rad feature a rute transfer. The pedestrian facilities at these lcatins are nt cnducive t pedestrians making transfer cnnectins, thus leading t mid-blck crssings trying t catch the transfer bus. KAI was requested t study these intersectins t prpse alternatives fr imprved pedestrian facilities. Mr. Parker nted there is an nging discussin within Space Cast Area Transit t shift bus stps where there is n right-turn nly lane frm farside intersectin bus stps t near-side bus stps. There is a pssibility fr a mid-blck crssing imprvement at the Wickham Rad and Lansing Street intersectin. Pedestrian facilities will be included if a signal is cnstructed at this intersectin. Vehicular and Drainage Issues and Opprtunities Prject Websites There are drainage issues at the suthwest and sutheast crners f the Aurra Rad and Lake Washingtn intersectins. Drainage icns shuld be added t the figure at these lcatins. Mr. Eagle demnstrated hw t use the prject websites t slicit feedback. The prject websites are at the fllwing lcatins: Wickham Rad Operatinal Analysis: http://maps.kittelsn.cm/wickhamrad Aurra Rad Crridr Study: http://maps.kittelsn.cm/aurrarad 3

Aurra Rad Crridr Study Prject Backgrund and Overview Mr. Weesner gave a brief update n the prject schedule, reviewed the crridr existing cnditins characteristics (study limits, AADT, speed limits, etc.), and issues and pprtunities within the crridr. The fllwing summarizes the related cmments and discussin frm the PAT: Multi-Mdal Issues and Opprtunities It was suggested there were pssible walking rutes t Sabal Elementary Schl frm Aurra Rad t Wickham Rad. The prject team will study the schl zne maps and may update the walk rutes n the Aurra Rad issues and pprtunities map accrdingly. Ms. Sterk nted that fr bth crridrs the general beautificatin and increase in walkability/bikeability is desired. Mr. Weesner nted these ideas will be incrprated int the prpsed sectin alternatives in a future phase f the prject in additin t weighing ptins fr medians, mving curb, ROW acquisitin, and near and lng term ptentials. It was nted that with the sidewalk upgrades alng Aurra Rad, the ped/bike vlumes will increase. Therefre, the need fr imprvements f the pedestrian/bicycle facilities at the intersectin f Wickham Rad and Aurra Rad will be required t accmmdate future demand. Vehicular and Drainage Issues and Opprtunities The PAT members were cncerned abut where strmwater is cllected, specific water quality standards, and whether r nt filtratin is needed. It was indicated by City f Melburne that the queuing alng Cmmdre Bulevard may have been caused by the re-pening f Apll Bulevard. Mr. Parker nted it was difficult fr his bus drivers t make turns at the Cmmdre Bulevard intersectin, because f the number f students crssing, lack f exclusive left-turn lanes, and permitted nly left-turn phasing. Nne f the PAT members knew whether there was an agreement with the aut dealerships regarding the ccupied ROW. The aut dealerships shuld be infrmed and met with during the future cnditin assessment. Next Steps Public Wrkshp Ntificatin Ms. Carter explained the Public Wrkshp ntificatin prcess and hw the mailers were sent ut t the residents within the pstal cdes f the Study Area as well as emails that were sent t the elected and appinted fficials. Ms. Carter ffered t check with the Cmmunity Center t see if prject flyers culd be psted n their cmmunity bard. 4

The SCTPO will wrk with the City f Melburne t get the public wrkshp infrmatin n their website. Space Cast Area Transit will als pst the public wrkshp infrmatin n their website and blg. Public Wrkshp Dates Wickham Rad Operatinal Analysis Public Wrkshp May 9, 2017 Aurra Rad Crridr Study Public Wrkshp May 16, 2017 These meeting minutes are Like Liu s interpretatin f the cmments, requests, and discussin during the meeting. Questins, additins, and/r clarificatins shuld be directed t her at 407-540-0555 r lliu@kittelsn.cm. 5