ambiente Installation Guide AmbiScreedboard system more than underfloor Customer: Project: Project Reference: Date:

Similar documents
ambiente Installation Guide AmbiPlate more than underfloor Customer: Project: Project Reference: Date:

ambiente Installation Guide AmbiClip Systems more than underfloor Customer: Project: Project Reference: Date:

M03 WUNDATRADE. Heat Pump Manifold. Before you start: Check the contents. Optional. ...a division of WUNDA GROUP PLC

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

ENERGY BLADE 3K4. Energy Blade Installation Instructions

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

SIMPLAIR PIPING TOOL. JXT Company

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION

Jacuzzi. J-CQ420 Cartridge Filter Installation and Operating Instructions

CARTRIDGE FILTERS. Models: CF50, CF75, CF100, CF150,

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

VOLUMATIC WATER REGULATOR

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

OWNER S TECHNICAL MANUAL

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

System Pressure Manager Standard & System Pressure Manager Plus

Assembly-, installation- and maintenance instruction manual for bladder accumulators IBV / EBV , top reparable

KTM 50 (DN ) Installation, maintenance and operating instructions

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

Fiber Optic Lighted Bubbler Spillway Pot (DLP-45) Installation Manual

TECHNICAL DATA. Q = C v P S

Engineering Data Sheet

AREA VALVE SERVICE UNITS

TECHNICAL DATA. Q= Cv S

Installation and commissioning instructions 255 series and 256 series

Flamco Flamco-Fill STA Flamco-Fill STM

SIGNATURE DEF REELS Models: Bare Reel Reel Reel Reel

LNVx Gas Conversion Kit Instructions

Budget Range Operators Handbook

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

Booster Pump PB4-60 Replacement Kits

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

64 Series Pressure Reducing Regulators

bathrooms.com Concentric Thermostatic Shower Mixers Cleaning and Care Installation Manual Contents

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Digital Range

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF

3.5 litr es per INSTALLATION INSTRUCTIONS. Avon 21 Self-closing taps (Push button) B0992AA Self-closing basin pillar tap

1. ABOUT THE PRODUCT:

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Parts List. Description. Additional Considerations. Installation Instructions. Dual/Elite Hydraulic Treadmill Kit (supplied by EPI)

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

HAYWARD FLOW CONTROL Series PBV Back Pressure Valve and Series RPV Pressure Relief Valve INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS

HYDRAULIC CYLINDER TEST

Two-port valves, male threaded, PN25

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

TECHNICAL DATA. Q = C v P S

Glove Box Installation Manual

Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.

P5523. Users Manual. Liquid to Gas Separator. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

V5434T/H THREE-WAY ROTARY VALVE PN10 AND H-EXTENSION

Installation, Operation and Maintenance Instructions for Direct Hot Water Storage Vessels

GM-7000 Series CE Approved Gas Control Valve

Operating Instructions Models 36200, , 46200, Hydrostatic Test Pumps

Unit 24: Applications of Pneumatics and Hydraulics

Assembling and testing fluid power systems

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

Roofing Primer. Primer 610 Spray PRODUCT DESCRIPTION PRODUCT DATA. Spray Applied Primer for use with S-Vap 7000 E DP & Decostik SP

FRIALEN Assembly and Operating Instructions. for FRIATOP clamping unit (Top-Loading) FRIATOOLS

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL

INSTALLATION AND OPERATION INSTRUCTIONS

PO Box 370 Phone: Swansea NSW 2281 Fax: AUSTRALIA Mobile: Web:

Two-stage valve type NE

TECHNICAL DATA OBSOLETE

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions

2-port seat valves PN25 with externally threaded connections

These instructions are to be left with the user

FILTER REGULATORS MODEL NO: CAT155 & CAT156 FITTING & MAINTENANCE INSTRUCTIONS PART NO: & ORIGINAL INSTRUCTIONS

Compact Triple Cabinet Outlet Station Model B Installation and Operating Instructions

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

TECHNICAL INFORMATION

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

PEDESTAL MOUNTED EMERGENCY EYE & EYE/FACE WASH

Halsey Taylor Owners Manual STOP!

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

Thanks for choosing EJAI SOLAR product

TB132. Gas Conversion Kits for NV & NVS Heaters. Issue 1.0 May Applies to models: NV & NVS

THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

INSTALLATION INSTRUCTIONS Non-Pressurized Tank. Non-Pressurized Tank Part Number: AFCG1PT

ROCKSOLID DUAL POST ANCHOR

Rapidmain Installation Guide

Roofing Adhesive PRODUCT DESCRIPTION PRODUCT DATA. Spray Applied Insulation Adhesive for Sarnafil Roofing Systems

INSTALLATION AND OPERATION INSTRUCTIONS

OPERATING AND MAINTENANCE MANUAL

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

1805 Series Relief Valves

Type 4708 Supply Pressure Regulator

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

VOLUMATIC WATER REGULATOR

Auto-Rewind Hose Reels INSTRUCTION MANUAL FOR OXY-LPG MODEL

Model 130M Pneumatic Controller

Pressure Reducing Valve for Steam Type 2333 A

Products For The. Fire & Emergency Services. Cintec International Limited

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

Type 4708 Supply Pressure Regulator

ST 18 Aluminium Gas Model

TECHNICAL DATA. Q = C v P S

Transcription:

ambiente more than underfloor Customer: Project: Project Reference: Installation Guide AmbiScreedboard system Date:

AmbiSCREEDBOARD installation guide AmbiSCREEDBOARD Series Contents Slimline 18mm board Versatile return and straight sections High compressive strength Flexible, pre-grooved screedboard Suitable for new build and refurbishments AmbiScreedboard is a high density, flexible cement based board solution for laying over a flat subfloor. It is particularly recommended for tiled floor areas because the high compression rating of the board and lap joint detail permits tiles to be laid directly over the top when using a decoupling matting. We recommend priming the boards before laying floor coverings in all cases. AmbiScreeedboard system introduction Technical data Installation method Manifold positioning Commissioning the system step by step guide 7 Record and report The system uses an Ambiente five layer, 1mm PE-RT with EVOH oxygen barrier pipe. The pre-grooved channels provide installation flexibility as just two board designs can be used for all pipe run combinations. The panels can also be easily routered where required for added flexibility. Data sheets can be downloaded directly from our website. www.ambienteufh.co.uk AmbiSCREEDBOARD SX18 AmbiSCREEDBOARD RX18 Easily adaptable with a router High compressive strength Versatile pipe layout Lap joint for added strength Ambiente Installation Guide t 01707 1 18 e info@ambienteufh.co.uk

TechNIcal data Technical RX18 (Return) SX18 (Straight) Panel size 0 x 00 x 18mm 0 x 00 x 18mm Edge Type Lapjoint //mm Lapjoint //mm Weight (per board) 1kg 17kg Properties Density 1±0 (kg/m) 1±0 (kg/m) Thermal conductivity 0, W/(mK) 0, W/(mK) Minimum compression strength (kpa) (kpa) Specific heat capacity 1.1 (kj/kgk) 1.1 (kj/kgk) Air sound 8dB 8dB Impact sound 8dB 8dB Ambiente goes beyond just simply the supply of underfloor heating systems. At every stage in the project, we offer advice to all parties, in order to assist in the swift, safe and supportive implementation of your project. From project initiation to final commissioning, ambiente have every stage of underfloor heating covered. For more help and advice, contact our team of highly trained experts today. Visit us online at ambienteufh.co.uk for case studies, product resources and more information. For any installation questions speak to our installation team today on 01707 1 18 or email info@ambienteufh.co.uk. For any information regarding our products and support call our highly trained sales team today on 01707 1 18. www.ambienteufh.co.uk

Distributor 1 00 BATHROOM 1 C 1 W 00 00 00 UTILITY 18 C W S S GAP BETWEEN PLATES 0mm TO mm S 00 BEDROOM 0 C 8 W mm CROSS SECTION OF PLATE ON JOIST (00mm JOIST CENTRES) WITH PIPE FITTED. 17mm DIAMETER 00mm 00mm VOID TO BE FILLED WITH ROCKWOOL OR SIMILAR (SUPPLIED BY OTHERS) S 001 LIVING ROOM 0 C 17 W 18mm (1mm including mounting bracket) Isolation ball valve Manifold brackets Flow meters Manual air vent Manifold Pump Flow manifold 1mm 70mm Return manifold Length Pressure gauge No. of ports 7 8 11 1 Length (mm) 1 0 Changed In UFH Layout /08/1 01 Changed In UFH Layout /08/1 INSTALLATION METHOD 1 Refer to the design plan drawings and prepare to lay the floor in accordance with the layout described. 1 FLOW TEMPERATURE = C RETURN TEMPERATURE = C PUMPED UFH MIXING MANIFOLD ( port manifold used for example purposes only) Surface must be flat and clean before laying Ambiscreedboard. Start in the furthest corner of the room that is furthest from where the pipes enter the room. TYPICAL PLATE LAYOUT (00mm JOIST CENTRES) DIMENSIONS (NTS) mm Use one RX board cut in half for areas where only one return loop is required. Use full width RX boards in areas where two return loops are required to accommodate both transit pipe for loop 1 and flow and return for loop. RX boards are also required in doorways where pipes enter and leave the room. Spread AmbiScreed joint glue along the bottom lap and lay the lap of adjacent board on top and secure with 1mm lap screws. LOOP 1 Starting at the manifold, lay the pipe according to your design drawing, navigating the most efficient route between the manifold and the zone. Lay the pipe into the pre-grooved boards, as per your system design drawings. LOOP 7 On completion of the loop, connect to the return bar (bottom bar with blue caps). Mark up the manifold tag with the loop length and the room name. 7 8 Once all loops are installed and connected to the manifold, pressure test the system. 8 Lay final floor finish after the system has been successfully pressure tested. We recommend priming the boards before laying floor covering in all cases. Ambiente Installation Guide t 01707 1 18 e info@ambienteufh.co.uk

Manifold Positioning 0mm 0mm min. Note that the two manifold bars are offset so that the pipes can pass behind the lower bar for connection to the top bar we recommend using the top bar as the flow and the bottom bar as the return. The manifold comes left-handed as standard, but can be changed, see opposite for how to change the handing of Ambiente manifolds. 0mm 0mm mm Ambiente manifolds are supplied ready assembled and simply need mounting on brackets prior to installation. < Flow Local Fused Spur (on heating RCD) 0mm > Return 0vt Relay Box (if required) Wiring Centre Manifolds should be positioned where they are easily accessible to allow for future servicing and commissioning. We recommend allowing at least 00mm between the finished floor level and the bottom of the manifold, with 7mm clearance above and at least 0mm at either side. 0mm > Flow 00mm min. (00mm pref.) < Return Isolation points to be installed on primary pipework prior to the manifold for servicing purposes. Final Floor Level (FFL) 0mm min. 0mm min. for supply pipework 1mm 70mm As per table below 0mm min. 1 Manifold flow bar Manifold return bar Isolating ball valves CircoMax circulating pump Blending valve 1 8 7 Flow meter 7 Actuator head (shown with pre-install caps) 8 Pressure gauge Air vent Filling taps mm 70mm See manifold table below Four port manifold shown for example purposes Number of ports 7 8 11 1 Manifold Length (mm) 1 www.ambienteufh.co.uk

Commissioning the system Step By Step Checklist Filling and flushing the system Sequence Checklist Completed 1 Close the isolating ball valves that are connected to the manifold on both bars. Isolate all zones by screwing down the blue caps on the bottom (return) bar and the flow meters on the top (flow) bar. Open the first flow meter (start furthest away from the filling valve) on the top (flow) bar (use the red collar to turn the black section fully anti-clockwise, do not use grips hand tight only). Ensure that all other flow meters are closed, except the loop that you are flushing. Remove the black plastic blanking cap from the filling valve on the top (flow) bar and fit the hose connection/hose which should be connected to the mains water supply. Open the filling valve using the key on the reverse of the drain valve cap. Fix a suitable hose to the drain valve on the bottom bar. Fully loosen the blue protection cap on the bottom bar on the first zone to be filled. 7 8 Open the tap on the mains water supply and open the drain valve on the bottom bar using the key on the reverse of the blanking cap. Run water through the loop until air is removed from the system, closing down the blue caps on each loop as it is purged. This can now be repeated for each zone by opening the next zone, closing the flushed zone and repeating steps -8. At this point the system can be pressure tested if required by closing the drain valve and unscrewing all the blue protection caps the pressure should rise slowly allow it to rise to bar and then close the filling valve and close off the mains water. This should be left for hours to check for any significant drops in pressure. Pressure testing using an air compressor Sequence Checklist Completed 1 Close the isolating ball valves that are connected to the manifold on both bars. Open all zones by unscrewing the blue caps on the bottom (return) bar. Open all flow meters on the top (flow) bar use the red collar to turn the black section fully anti-clockwise. Open the filling valve using the key on the front of the blanking cap and connect the compressor hose up to it. Make sure the drain valve is closed. Turn on the air compressor and allow the pressure to rise to bar. Once the desired level has been reached, close the filling valve using the key on the blanking cap. This should be left for hrs to check for any significant drops in pressure. Change the handing of Ambiente manifolds Sequence Checklist Completed 1 Reverse the handing of the two manifold bars on their brackets. Remove the mixing valve from the base of the pumpset by undoing the nut that connects the two together. Unscrew the blanking cap from the base of the mixing valve. Note: this has a left-handed thread. Then unscrew the pump connection from the top of the mixing valve. Again, this has a left-handed thread. Rotate the mixing valve through 180 degrees and swap the blanking cap and pump connection around. Remount the mixing valve onto the pumpset, making sure you use the rubber washers provided. Ambiente Installation Guide t 01707 1 18 e info@ambienteufh.co.uk

Record and Report Site details Site name Address Date Reference Technician Floor level Pipe reference Manifold reference Please tick the appropriate boxes Installation Re-pressurise Repair Test method Hydraulic (Water) Period of test Min 0 mins Test method Co (air) Test pressure Min bar Sufficient room to attach pumpset (minimum 0mm required) Yes N/A Has the manifold label been fitted? Description Yes No Comments System left drained System left full of water System left under pressure Signature of tester Print name Date Signature of witness Print name Date Ambiente Systems UK cannot accept liability for water freezing within the pipes. This form must be completed and a copy returned to Ambiente Systems UK within 0 days of installation or 1 weeks of delivery, in order to activate the warranty. Please return to: Ambiente Systems UK, 1 Woodside Lane, Bell Bar, Hertfordshire AL DE Or mail a scanned form to: info@ambienteufh.co.uk www.ambienteufh.co.uk 7

ambiente more than underfloor Need more information or advice? Contact our team of highly trained experts today. 01707 1 18 info@ambienteufh.co.uk www.ambienteufh.co.uk Ambiente Heritage House, 1 Woodside Lane, Bell Bar, Hertfordshire AL DE t 01707 1 18 e info@ambienteufh.co.uk www.ambienteufh.co.uk