HEALTH AND SAFETY SERVICES

Similar documents
HEALTH AND SAFETY SERVICES

[Type here] MANAGEMENT OF X-RAY GENERATING EQUIPMENT

Guidance on the Ionising Radiations Regulations 1999 (IRR99)

UNIVERSITY OF EDINBURGH GENERIC RISK ASSESSMENT - RADIATION RP/RA8 - WORK WITH X-RAY FLUORESCENCE ANALYSERS

Local Rules for Radiography: Ionising Radiation Regulations Working Instructions Staff MUST Follow

University of Aberdeen

Justification and use of hand-held X-ray equipment

3 Philosophy of use. Leaded Gloves. Leaded Apron. Respiratory Protection (RPE) Whole body protective suit

School of Biological Sciences: Zoology Building

Reviewed: DD Month Management of Closed Radioactive Sources

University of Cambridge - Safety Office. Radioactive Substances (Unsealed Sources) Audit - complete checklist

MIT Analytical X-Ray Safety Policies and Procedures

Local Rules: Ionising Radiation Regulations Working Instructions Staff MUST Follow

MANAGING INDUSTRIAL SITE RADIOGRAPHY WORK

Identification of Controlled and Supervised Areas and Designated Sinks

WORKING WITH IONISING RADIATION

DEPARTMENT OF CHEMISTY, PHYSICS AND GEOLOGY RADIATION SAFETY PLAN

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

Guidance. Ionising Radiations

To comply with the OHS Act, the responsible manager must carry out and document the following:

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200

Appendix A: Induction check list

Ionising Radiations Code of Practice & Guidance Contingency Arrangements

Control of Allergies to Laboratory Animals

HAZARD MANAGEMENT PROCEDURE

Centrifugation: High Speed Floor Centrifuges

Work Health and Safety Risk Management Procedures

Hampstead Hill School Health and Safety Policy: Confined Spaces

A MESSAGE FROM THE MD

Health & Safety Policy & Plan. Rightway Roofing.

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

University Safety Policy Supplement

SOAS LONE WORKING GUIDANCE

LONE WORKING HEALTH AND SAFETY GUIDANCE

Lenzing Life Saving Rules

Policy Redesign Project. Plant Safety Policy. Table of Contents

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Diamond Light Source. Accelerator. (Linac vault, Booster ring, Storage Ring and Zone 13 excluding RF test facility)

WORKING ALONE PROGRAM

Chapter 4: Implementing Effective Exposure Controls

Control of Energy - Isolation Process

Radiation Protection Service RADIOISOTOPES : SPECIFIC PROCEDURES AND HAZARD ASSESSMENT

Radiation Producing Machines Radiation Safety Training for X-ray Diffraction Units

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

Risk Assessment for: Roaches Pyrotec dyeing machines

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Risk Assessment Form Cardiff School of Biosciences

General Risk Assessment Form

Hazardous substance risk management

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Procedure: Permit Activities-Work in Confined Spaces and Hot Works

Health & Safety Policy and Procedures Manual SECTION 38 RADIATION SAFETY PROGRAM

Electrical Machines & Drives Group Safety Policy 2018/2019

ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6. Fume Cupboards, Ventilated Cabinets, Local Exhaust Ventilation

Lone and Hazardous Working Policy June 2010

This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled.

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

General Isolation Procedures

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

LOCKOUT SYSTEM AND POLICIES

Health, Safety and Welfare Policy

Student Shop Safety. University of Tennessee Safety Guide GS-005. Purpose. Scope and Applicability. Definitions and Abbreviations.

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Contractor handbook. Purpose

Safe Work Method Statement Tasks

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

MSE CONTROLLED DOCUMENT. Decontamination of NORM Contaminated Equipment

TOOL BOX TALK NO3. Use of P.P.E

Approved by Principal Investigator Date: Approved by Super User: Date:

Accident/Incident Reporting and Investigation Procedures

Elements of a Lockout/Tagout Program OSHA

POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

POLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY

Health and Safety Guidance

Effective Date: 24-April-2017 Version: 6 Page: 1 of 8 TITLE: SAF-370, PERSONAL PROTECTIVE EQUIPMENT GUIDELINES. Table of Contents

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone.

STANDARD OPERATING PROCEDURE

Control of Substances Hazardous to Health

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

Room B15 Architecture Building Bridgeford Street

BGC HOLDINGS LTD RESPIRATORY PROTECTIVE EQUIPMENT (RPE) POLICY

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

General Accreditation Guidance. User checks and maintenance of laboratory balances

Corporate Standard Hazardous Substance Management HB#625157

TRUST POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH. Version: 4 Status: Final Author: Edward Braisher Job Title Health & Safety Manager

Lecture Demonstrations Safety Manual & New Staff Induction

Standard Operating Procedures and Contingency Plans for Use of Radioactive Materials

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

Health and Safety Policy Statement

Control of Work. Introduction This procedure describes the management of Asbestos. Definitions

Contractor/Visitor Safety Orientation UNBC

Departmental Laser Safety Audit Checklist

ANNUAL IDOL COMPLIANCE TRAINING

RP COP006- Working with Unsealed Radioactive material

Work Equipment: LOCAL EXHAUST VENTILATION

Transcription:

. HEALTH AND SAFETY SERVICES WELLBEING, SAFETY AND HEALTH LOCAL RULES FOR THE USE OF X-RAY EQUIPMENT??FACULTY??? /??FACILITY?? DOCUMENT CONTROL These local rules should be reviewed annually. Date Signed (RPS) Review / amendments

LOCAL RULES (X-RAYS) 1 / 9 HEALTH AND SAFETY SERVICES WELLBEING, SAFETY AND HEALTH LOCAL RULES FOR THE USE OF X-RAY EQUIPMENT 1. PURPOSE The purpose of these local rules is to set out the key arrangements for restricting exposure to ionising radiation from work with x-ray equipment in the named research group. The Local Rules have been written in compliance with regulation 18 of the Ionising Radiations Regulations 2017. 2. GROUP AND PERSONNEL Research Group Radiation Protection Supervisor (RPS) TLD Distributor Tel: Tel: Radiation Safety Coordinator (RSC) University Radiation Protection Manager (RPM) University Radiation Protection Adviser (RPA) Tel: Andrew Cowling Tel: 34202 Mark Bescoby, Radman Associates

LOCAL RULES (X-RAYS) 2 / 9 3. REGISTERED RADIATION AREAS Lab/Area Description Designation 4. AUTHORISED X-RAY EQUIPMENT Manufacturer XRID Type/Serial Description

LOCAL RULES (X-RAYS) 3 / 9 5. MANAGEMENT OF RADIATION WORK The university s management arrangements for work with ionising radiation are detailed in the following three documents: University of Leeds Health and Safety Policy at http://wsh.leeds.ac.uk/info/137/health_and_safety_policy/125/health_and_safety_policy. University of Leeds Health and Safety Standard: Management of Sources of Ionising Radiation (and accompanying guidance) at http://wsh.leeds.ac.uk/download/downloads/id/122/ionising%20radiation%20standard University of Leeds Radiation Governance Arrangements at http://wsh.leeds.ac.uk/download/downloads/id/498/radiation%20governance%20statement. The persons named in section 2 of these rules are responsible for the management and supervision of radiation work in the group as specified in these documents. 6. TRAINING AND RADIATION WORK AUTHORISATION Only authorised persons are permitted to use x-ray equipment. The authorisation procedures ensure that the person has received sufficient information, instruction and training for the radiation work they will be undertaking. Persons using x-ray systems should complete local induction training and any further training and authorisation procedures specific to the equipment (detailed in section 13). The RPS or RSC will authorise their use of the equipment when they are satisfied that sufficient training has been completed. A list of authorised x-ray users for this group is at Appendix 1. 7. RISK ASSESSMENT Risk assessments for x-ray equipment can be found at http://wsh.leeds.ac.uk/info/214/ionising_radiation/82/x-rays. The control measures required to address the hazards identified in the risk assessments are detailed in these local rules. 8. PRIOR AUTHORISATION AND CRITICAL EXAMINATION All x-ray equipment must have adequate shielding, exposure controls, safety devices and warning devices compliant with regulation 9 of IRR17. All x-ray equipment must be subject to a Critical Examination by the installer that ensures that safety features and warning devices operate correctly and that there is sufficient protection for persons from exposure to radiation. The RPM will undertake a further critical examination before first use and annually thereafter to

LOCAL RULES (X-RAYS) 4 / 9 confirm that the equipment complies with the prior authorisation and that the safety features, warning devices and exposure protection are satisfactory. A further critical examination by the RPM will be required if the equipment is repaired, moved, or altered significantly. 9. RADIATION AREA CATEGORIES AND ACCESS RESTRICTIONS X-ray equipment must only be used in secure locations, i.e. in rooms protected by Simons-Voss transponders (or equivalent), to which only persons authorised by the RPS have access. Each radiation area must be registered with the RPM and is categorised based on the level of risk and access restriction required. The categories are: Controlled Area Access is restricted to authorised radiation workers operating (Highly restricted access) under a specific written system of work for this area. A local access permit is required for service engineers, maintenance contractors, visitors, etc. to enter these areas (issued by RPS or RSC). Supervised Area Access is restricted to authorised radiation workers. (Restricted access) A local access permit is required for service engineers, maintenance contractors, visitors, etc. to enter these areas (issued by RPS or RSC). Undesignated Area Access to these areas is not restricted. (Limited access) All work areas, samples and equipment should be clearly labelled. 10. DOSE LIMITS, PERSONAL DOSIMETRY AND DOSE INVESTIGATION LEVELS Dose Constraints A dose constraint is a specified limit on the radiation dose that could be received from any planned work with ionising radiation and is used to restrict radiation doses as low as reasonably practicable. The University s dose constraints for all users of ionising radiation are: 1mSv / year whole body dose 10mSv / year extremity dose. Personal Dosimetry Workers using fully enclosed x-ray systems do not require personal dosimetry. Workers undertaking work on live x-ray beams require personal dosimetry, e.g. undertaking XRD alignment procedures with safety interlocks disabled. Some equipment is also subject to area dosimetry using TLDs e.g. CT scanners, DXA equipment.

LOCAL RULES (X-RAYS) 5 / 9 Extremity TLDs Extremity TLDs are worn underneath disposable gloves on the first finger of the dominant hand or two can be worn, one TLD on each hand. Extremity TLDs are issued monthly and a batch is placed in the group s main radiation lab at the beginning of each month with a list of authorised wearers. TLDs should be returned to the used container after your period of work or by the end of the month (whichever is sooner). Whole body TLDs Whole body TLDs are worn either attached to the lab coat top pocket or trouser belt. TLD badges are issued quarterly by a local distributor, and must be returned on the given dates. Investigation levels Whole body and extremity dose investigation levels are: 0.4mSv - a note is made on the dosimetry record 0.6 msv - an investigation is undertaken by the RSC / RPM. 11. RADIATION MONITORS Radiation monitors (if required) are supplied to the group by the RSC or RPM. The correct monitor for each application is specified in section 13. Monitors used for contamination and dose rate monitoring must be tested and calibrated annually. Testing is carried out by the RPM and any monitor used should have a valid calibration label. 12. GENERAL WORKING INSTRUCTIONS These instructions cover the radiation protection aspects of work with x-rays. In addition the user must also follow any other local procedures, e.g. lab protocols, COSHH procedures, instructions for the use of equipment, etc. The user should also read and follow any supplier s / manufacturer s information regarding the use of the equipment. The following are general instructions for using x-ray equipment. Further specific instructions for the equipment used in this group are given in section 13. Do not work with x-ray equipment unless you have been given a local induction, are authorised to use the equipment and know how to operate it safely. Do not interfere with, attempt to by-pass or over-ride any safety systems. If any hazard warning bulbs fail, or the equipment appears to be out of order, does not work or otherwise appears to be malfunctioning, stop working and notify the RPS. When not in use x-ray equipment must be left in a safe condition, i.e. switched off, locked-

LOCAL RULES (X-RAYS) 6 / 9 off, software password protected, etc. Familiarise yourself with the emergency actions (section 14). 13. SPECIFIC WORKING INSTRUCTIONS Additional instructions specific to equipment (Detail here any instructions or procedures further to those identified in the General Working Instructions (section 12) that are required to restrict exposures for specific x-ray equipment): Equipment: Monthly leakage checks undertaken by RPS using.

LOCAL RULES (X-RAYS) 7 / 9 14. ACCIDENT PROCEDURES (CONTINGENCY PLAN) 1) Hit the Emergency Stop button: In an emergency x-ray emission may be stopped by pressing the red STOP button. 2) Deal with life threatening conditions first: Summon someone trained in First Aid if necessary. 3) Stabilise the Situation: If possible, return to the x-ray generator and ensure it is switched off and the X-ray source is electrically isolated. Activating the Emergency Stop button should have done this, but it is worth checking. If necessary use a laboratory emergency cut out facility (if present). 4) Prevent Access: Ensure that no one is able to restart the x-ray generator. Post appropriate warning messages on the machine and remove the keys. 5) Get help: Contact your RPS and let them know what has happened. If the equipment has been damaged in any way seek advice before using the equipment again. 6) Report: After the incident has been satisfactorily dealt with you will need to help your RPS to report on what happened via the university s accident reporting system, Sentinel.

LOCAL RULES (X-RAYS) 8 / 9 APPENDIX 1 AUTHORISED OPERATORS LIST Equipment: Name Training completed Name Training completed (date and RPS (date and RPS signature) signature)

LOCAL RULES (X-RAYS) 9 / 9 APPENDIX 2 RADIATION LEAKAGE CHECKS Equipment: Date Person Result Date Person Result undertaking undertaking checks checks