Draft. Not yet Approved

Similar documents
HOT SHOT OPERATING INSTRUCTIONS AND OWNER S MANUAL. Model SPC-500. (Propane Torch)

5.0 INSPECTING, FILLING AND LABELING SMALL CYLINDERS

OPERATING INSTRUCTIONS AND OWNER S MANUAL READ AND FOLLOW ALL INSTRUCTIONS

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

WARNING: FOR OUTDOOR USE ONLY

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

36E DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Installation and Operation Instructions

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Hotspotter. Model WB-100 Professional Series. Assembly, Testing & Operating Instructions. Safety Information:

36E DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

Types 749B and R130 Changeover Manifolds

G96 Series BASOTROL Dual Operator Valve

Operator: Save these instructions for future use!

Owner's Manual and Instructions

Full Internal Relief Valves Instruction Manual

INSTALLATION AND OPERATING INSTRUCTIONS BIG TEX VENTED GAS LOGS

Owner s Manual for Assembly, Operating & Maintenance of

R600 and HSRL Series Instruction Manual

36H SERIES Combination Gas Valve

R122H, R222, R232A, and R232E Series Instruction Manual

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

Gas Countertop Hot Plates

36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard

Your safety and the safety of others are very important.

BGA158 Series CE Approved Class B Shutoff Gas Valve

USER S INFORMATION MANUAL

Training Program 1A Filling 1 lb. Refillable Propane Cylinders

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

BGA158 Series CE Approved Class A Shutoff Gas Valve

INSTALLATION AND OPERATION INSTRUCTIONS

Standard Gas Countertop Griddle

Management Plan for Compressed Gas

BGA158, BGA171 and BGA110 Series Shutoff Gas Valve

Natural Gas to L.P. Gas Conversion Kit

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848

ACCESSORY KIT INSTALLATION INSTRUCTIONS

LIVE STEAMERS GAS FIRING CODE OF PRACTICE GAS FIRING OF AMBSC BOILERS AUSTRALIAN ASSOCIATION OF

The following instructions were provided by the manufacturer.

Handling and Storage of Gases

R600 and HSRL Series Instruction Manual

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE


G92 Series BASOTROL Automatic Pilot Gas Valve

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

PRESSURIZED EQUIPMENT AND SYSTEMS

Natural Gas to L.P. Gas Conversion Kit

Installation Instructions and valve Maintenance Rev. 0 of 21/09/15

GAS SUPPLY APPLICATION GUIDE

Thanks for shopping with Improvements! Monterey Propane Fire Column Item #574852

3.0 Basic Plant Operations Performance-Based Skills Assessment 2016

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

General Precautions for handling compressed gases

LUBRICATOR ASSEMBLY AND OPERATING INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS

Thank You for Attending Today s Webinar. Today s Featured Speaker

The conversion of new certified central heating gas appliances must conform to directions outlined in this instruction.

ACCESSORY KIT INSTALLATION MANUAL

Operating and Maintenance Instructions

For use with select HPC Fire Pits ONLY- refer to product catalog or website. 100K BTU Maximum WARNING: FOR OUTDOOR USE ONLY

High-Pressure Boiler Inspection Procedures: A Complete Checklist

Congratulations! Hand Held Torch. Warranty Policy PARTS

Operator: Save these instructions for future use!

OWNER'S MANUAL WARNING WARNING WARNING WARNING. Factory No.: HYFP Item No.: 67668ST

GM Series Dual-Block Multi-Function Gas Control Valves

G AS BBQ GRILLS INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE Gas Rangetops

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

This written Compressed Gas Plan is kept at the corporate office and in the written Safety & Health Program.

Installation Instructions

Installation Instructions and valve Maintenance Rev. 0 of 29/09/15

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

Operator: Save these instructions for future use!

Operator: Save these instructions for future use!

WARNING: Gas Conversion Kit Instructions Applies to: Model UDAP, UDAS, UDBP, and UDBS Unit Heaters. General and Warnings FOR YOUR SAFETY

2 GAL AIR COMPRESSOR OPERATOR S MANUAL 1/3HP/2-GALLON IMPORTANT: READ THIS OPERATOR S MANUAL BEFORE USING

Operator: Save these instructions for future use!

Installation Instructions For Natural Gas Conversion

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 5 Utilities Gas Emergencies Revised

Process Name Compressed Gas Cylinders Program

Propane Conversion Kit Instructions

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

Knowing the Job: Any employee actively engaged in dispensing propane should meet minimum responsibilities

ISO INTERNATIONAL STANDARD. Small craft Liquefied petroleum gas (LPG) systems

KENNECOTT UTAH COPPER CORPORATION SAFETY AND HEALTH STANDARDS COMPRESSED GAS

Installation, Operation and Maintenance Manual for Back Pressure Regulator

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

3/8" Dr. Air Butterfly Impact Wrench

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

Installation Instructions WARNING: WARNING: WARNING: LP AND HIGH ALTITUDE LP GAS CONVERSION KIT FOR UNITED STATES INSTALLATIONS

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

Instructions for High Altitude Conversion

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems

ACCESSORY KIT INSTALLATION INSTRUCTIONS

This training does not attempt to cover all safety regulations or precautions.

Transcription:

201178 Part 12.5.20 Recommended Safety Instructions for LP-Gas Winter Switch Protection Devices Revised 201178 (6 Pages) A. Purpose 1. This Manual Part recommends instructions for LP-Gas systems servicing winter switch protection devices such as hot air blower snow melters and switch heaters. The term "switch heater" will be used herein. TheyIt sets forth general requirements representing recommended practice. 2. These instructions are predicated on a standard vapor withdrawal application using American Society of Mechanical Engineers (ASME) storage containers (or "tanks"), and it mustshould be recognized that generalized procedures cannot anticipate all situations. Accordingly, in some cases deviation from these instructions may be necessary to determine safe conditions. B. General Safety Instructions 1. In the interest of safety, all persons employed in handling LP-Gases should shall be trained in proper handling and operating procedures. 2. Employees should shall wear fire-retardant work clothing during all fuel transfer operations. 3. Employees should shall wear approved PPE during all fuel transfer operations. 4. Smoking or providing any source of ignition shall not be permitted in the area where work is being done on or near tanks, piping, tubing or equipment which contains or has contained LP-Gases. 5. Before attempting to open any joints in gas supply piping or equipment, employees shall first ensure that the system is free of pressure. C. LP-Gas Storage Systems 1. LP-Gas storage systems shallshould be designed, constructed, installed and operated conforming to NFPA 58: (Standard for the Storage and Handling of Liquiefied Petroleum Gases Code), issued by the National Fire Protection Association, Inc. (NFPA),; and shall conform to individual railroad or purchaser instructionsany other requirement as specified by the railroad. - 1

Part 12.5.20 201178 2. The normal minimum distance to the nearest point of a tank shell from any railway track (gauge side of nearest rail) should not be less than 20 ft (6.1 m). 3. The minimum distance to the nearest point of a tank shell from railway buildings, such as shelters to house switch heater assemblies, railway tool houses, or railway communications and signal bungalows should not be less than 10 ft (3.0 m). 4. Storage tank and its supports should be given a careful inspection at the time of installation and at the start of each winter operating season. Section F. LP-Gas Switch Heaters Storage Tank and Fuel Supply Systems Annual Safety Inspection Checklist may be used as an annual inspection checklist to determine if a tank is suitable for continued service. 5. Storage tank and its supports shall also be given an inspection at the time of each refilling. Storage tanks and itsany supports that show evidence of damage, deterioration or incorrect installation shall not be filled. 6. Total storage capacity should not normally exceed 2,000 U.S. gallons (7,571 L) of water capacity. 7. In heavily populated or congested areas, storage tanks should be enclosed within a suitable protective fence. 8. The area within 25 ft. (7.6 m) of a tank should be kept free of debris and combustible materials, other than railway ties that are in place on the track. Grass and weeds within 10 ft. (3.0 m) of a tank should be kept cut to a height not exceeding 6 in. (152.4 mm). 9. Tanks should be kept properly painted. 10. Tank vapor service valve should be kept tightly closed, and protective valve cover (or "dome") should be kept locked when switch heaters are NOT in regular use. 11. Tanks shallshould be marked labeled "FLAMMABLE" and either "LP- GAS," "LPG," "PROPANE" or "BUTANE.", and the label shall conform to American National Standards Institute (ANSI) standard Z535.4-2011 Product Safety Signs and Labels. 12. Tank valves and gauges should be given a careful inspection at the time of installation and at the start of each winter operating season to ensure that they are gastight and operational. All valve accessories such as rain - 2

201178 Part 12.5.20 caps, hand wheels, etc. shallshould be properly installed and secured against improper operation. 13. Outdoor pressure regulators shallshould be designed, installed, or protected so their operation should willshall not be affected by the elements. Outdoor regulator vent opening shallshould be pointed downward, or the regulator should be installed under a protective cover. 14. Outdoor pressure regulators should be inspected periodically by qualified personnelfor internal corrosion. Pressure regulators that show evidence of corrosion shouldshall be replaced promptly. (Note: To inspect for internal corrosion, it is necessary to close the tank vapor service valve and remove the regulator adjusting screw and main spring assemblies. Look into the spring casing with a flashlight. If there is any evidence of corrosion, the regulator shall be replaced. After inspection, regulator operating pressure shall be reset and the switch heater checked for proper operation.) 15. Safety relief valves shallshould be given a careful inspection at the start of each winter operating season. Safety relief valves that show evidence of corrosion, damage, plugging of orifices or channels, and leakage shall be replaced promptly. CAUTIONWARNING: Eye protection shouldshall be used when examining relief valves under pressure. 16. Pressure relief valves and pressure regulators should be replaced as needed or as recommended by supplier at 15-year intervals. D. Gas Piping Systems 1. Aboveground portions of gas supply piping such as vertical risers at storage tank and at switch heaters should be protected by suitable guard rails against damage from moving vehicles and other traffic. 2. Gas pipelines running parallel to a railway track should not be closer than 10 ft. (3.0 m) to the gauge side of the nearest rail of that track. 3. Underground pipelines within 20 ft. (6.1 m) of the gauge side of the nearest rail of any track should be laid not less than 3 ft. (1 m) below ground. 4. Gas piping systems shallshould be tested and proven free of leaks at not less than the normal working pressure at the time of installation and at the - 3

Part 12.5.20 201178 start of each winter operating season. A match, candle, flame or other source of ignition shallshould not be used to check for leaks. E. Switch Heaters 1. Switch heaters should be installed in accordance with the manufacturer's recommendations and, in the case of listed or approved equipment, it should be installed in accordance with the listing or approval. 2. Switch heater apparatus installed outside of track and above ground shallshould be located outside AREMA Manual for Railway Engineering, Chapter 28-Clearances, or other applicable track clearances or any other requirements as specified by as instructed by the railroad or purchaser. 3. Switch heater should be given a careful inspection at time of installation and at the start of each winter operating season to ensure apparatus is in proper condition for service. All mounting hardware should be checked to confirm that it is secured according to manufacturer s instructions. Switch heaters that do not operate properly are to shall be promptly repaired or removed from service. 4. Gas burners should be adjusted to their proper input in accordance with the manufacturer's instructions at the time of installation. Burners shall not be overfired. 5. Switch heaters should be operated for at least 15 minutes. at the start of each winter operating season. The system should be tested to ensure that it is operating properly according to manufacturer s specifications. and checked to see that main burner is operating properly. 6. Switch heater gas combustion equipment, including burners, combustion chambers, pilots, etc., should be kept clean and should be examined at regular intervals to assure good condition. 7. When automatic flame safeguards are used, a complete shutdown and restart should be made at the start of each winter operating season to check the components for proper operation. Test in accordance with the manufacturer's recommendations. 8. Accessory safeguard equipment, such as high temperature limit switches, air flow switches, etc. should be operated at the start of each winter operating season to ensure proper functioning. Test in accordance with manufacturer's recommendations. - 4

201178 Part 12.5.20 9. Switch heaters should be inspected for proper alignment and operation periodically during winter operating season and necessary repairs and replacements shallshould be made promptly or removed from service. F. LP-Gas Switch Heaters Storage Tank and Fuel Supply Systems Annual Safety Inspection Checklist This checklist is designed as a guide to aid in determining that a LP-Gas storage facility is properly installed and in a safe condition for continuing use. It does not replace any federal, state or local requirements for storage tank inspections. --- Check that tank area is free of debris and combustible materials. Check that grass and weed growth is controlled. --- Check that tanks are located outside AREMA or other applicable track clearances. --- Check that the metal data plate (design specification markings) is clear and legible and that the plate is securely attached to tank. --- Check that pressure rating of tank is suitable for type of LP-Gas used. --- Check that tank product and hazard identification markings are clear and legible. --- Check that paint coating is smooth and clean, rust-free, with no chipping or flaking. --- Check that protective valve cover (or "dome") is properly attached and capable of being locked. --- Check tank for fire damage. Look for sign of charred or bubbled paint, heavy sooting, or bulging. --- Check that tank shell and heads are smooth and free of defects, digs, dents, cuts or other damage that can weaken the tank. --- Check that welds or seams are rust-free and are not cracked or broken. --- Check that tank supports ("feet" or saddles) are properly attached to container body. Tank supports should be properly painted. - 5

Part 12.5.20 201178 --- Check that tank is seated flat, level, and secured to on its foundation and level. Check that foundation is not sinking or settling. Foundation should be able to secure tank in the event of flooding or other environmental events. --- Check that tank valves, pressure regulator, and gauges are gastight and operational. Check that all valve accessories (rain caps, hand wheels, etc.) are properly installed. --- Check that pressure regulator vents are free from any obstruction and in the case of outdoor pressure regulators, pointing downward or are equipped with protective "drip lips". --- Check safety relief valve for corrosion, damage, plugging of orifices or channels, and leakage. Safety relief valves shall be replaced if there is any doubt regarding the suitability of the device for service. CAUTIONWARNING: Eye protection shall be used when examining relief valves under pressure. --- Check hoses for cuts, exposed fabric, soft spots, bulges, and similar defects. Also check for slippage at couplings. Hose subjected to unusual abuse, such as kinking or flattening shallshould be immediately removed from service. --- Check that aboveground portions of gas supply pipelines are free of defects, dents, digs, cuts or other damage that can weaken the pipeline. --- Check that guard posts are properly installed and capable of protecting vertical pipeline risers at switch heater. Formatted: Left, Indent: Left: 0.5", No bullets or numbering Formatted: Indent: Left: 1.25", First line: 0" - 6