Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Similar documents
UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Tonight is for you. Learn everything you can. Share all your ideas.

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

122 Avenue: 107 Street to Fort Road

STONY PLAIN ROAD STREETSCAPE

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Why invest in the 1 Street S.W. Corridor?

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

COMPLETE STREETS PLANNER S PORTFOLIO

Broad Street Bicycle Boulevard Design Guidelines

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Date: April 7, 2015 To: Chris Hartzell, PE Dakota County, MN From: Jacob Bongard, PE Bolton & Menk, Inc. Subject: Traffic Considerations Memorandum

Road Diets FDOT Process

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

5 CIRCULATION AND STREET DESIGN

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Central Avenue Corridor Study FPID Number:

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Transportation Planning Division

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Columbia Pike Implementation Team (CPIT) Meeting

Environment and Public Works Committee Presentation

NJDOT Complete Streets Checklist

PUBLIC REALM MASTER PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Meeting Summary. St. Helens US 30 & Columbia Blvd./St. Helens St. Corridor Master Plan Technical Advisory Committee Meeting #2

5. RUNNINGWAY GUIDELINES

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

MAKE YOUR PLACE IN CHANNELSIDE

Report. Typical Sections. City of Middleton, WI

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Lincoln Neighborhood Corridor Plan The LiNC

5 Transit & Traffic. Overview

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

S T A T I O N A R E A P L A N

Complete Streets. Designing Streets for Everyone. Sarnia

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Lawrence Avenue Streetscape Concepts August 30, 2011

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Lincoln Highway Streetscape Plan Concept Plan

City of Seattle Edward B. Murray, Mayor

Chapter 2: Standards for Access, Non-Motorized, and Transit

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

What Is a Complete Street?

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

TRANSPORTATION STANDARDS

Transportation Planning Division

Project Advisory Group (PAG) Meeting #2 January 31, SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Community Task Force November 15, 2017

Henderson Ave. Complete Streets Project

Public Information Centre

Complete Streets Chicago: Data Driven Design. Luann Hamilton Deputy Commissioner

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

NEWMARKET UPHAM S CORNER

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Executive Summary Route 30 Corridor Master Plan

Omaha s Complete Streets Policy

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

City of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018

City of Wilsonville 5 th Street to Kinsman Road Extension Project

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

MARTIN LUTHER KING JR. WAY

Albany Shaker Road Corridor Study Public Meeting # 2

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Bay to Bay Boulevard Complete Streets Project

STREETSCAPE CONCEPTS

Lynchburg District Update

Broadway Complete Streets Project

CSAH 101 Preliminary Design

Transcription:

Southview Blvd & 3 rd Avenue Improvement Project Public Open House December 4, 2014 5 to 7pm

Southview Blvd & 3 rd Avenue Public Information Meeting Agenda Presentation 5:30 to 6:15 pm Purpose of Project Opportunities with Project Proposed Draft Corridor Concepts Schedule and Next Steps Open House Format 6:15 to 7pm Discuss Project Elements with Staff

Introductions Project Staff Chris Hartzell, Dakota County Project Manager John Sachi, City of South St. Paul City Engineer Chris Chromy, Consultant Project Manager/Engineer Angie Bersaw, Consultant Transportation Planner Jake Bongard, Consultant Transportation Engineer

Audience Polling How do I use my clicker? Press number on clicker that corresponds to an answer that is asked. Allows for instant polling of the group. Let s Practice.

Q1. I would consider myself a fan of. 29% A. Elvis 24% 26% B. The Beatles C. The Rolling Stones D. Madonna E. Johnny Cash F. Florida Georgia Line 9% 9% 3% Elvis The Beatles The Rolling Stones Madonna Johnny Cash Florida Georgia Line

Project Overview County & City planning for a project in 2016/2017 Preliminary design (Now March 2015) Define WHAT will be built Width of road and pavement Sidewalks and amenities Parking and boulevard space Final design (March 2015 to 2016) Define HOW it will be built Construction staging and sequencing Material types and quantities

Decision Making Process Coordination Community Input City of South St. Paul

Purpose of Meeting Review project need Gather input on elements of proposed design concepts Review where we have been: Public Information Meeting #1 August 7 th Business Advisory #1 September 30 th Business Advisory #2 November 25 th

Nov 25 th Business Advisory Committee Input Concerns raised: Reduction of on-street parking Potential driveway access changes/closures Intersection traffic control changes Pedestrian safety Project costs and assessments

Q2. How would you best describe your interest in the Southview Blvd/3 rd Ave Project? A. Resident B. Business Owner/Operator C. Business Property Owner D. Interested Citizen E. Elected Official F. Other 36% 25% 14% 22% 3% 0% Resident Business Owner/Operator Business Property Owner Interested Citizen Elected Official Other

Q3. Did you attend previous public meetings for the Southview Blvd/3 rd Ave Project? A. Aug 7 th Open House B. Sept 30 th Business Advisory C. Nov 25 th Business Advisory D. Two or more of the above E. This is my first meeting 29% 0% 3% 20% 49% Aug 7th Open House Sept 30th Business Advisory Nov 25th Business Advisory Two or more of the above This is my first meeting

Needs In Project Area Pedestrian movements hindered primary reason for project Obstructed sight lines at intersections Poor street lighting Transit stops provide no shelter from weather 77 vehicle crashes over 3 years 19 involving parked cars 3 involving pedestrian or bicyclist High occurrence of crashes at intersections Delay and back up at 20 th Avenue

Project Needs Pedestrian movements hindered by: uneven sidewalks cluttered with benches, trash cans, planters, trees and tree grates

Project Needs Obstructed sight lines at intersections 19 th Ave 13 th Ave 18 th Ave 8 th Ave

Project Needs Inconsistent street lighting Inconsistent spacing of street lighting leads to hotspots and dark areas Residential Segment Business District Segment

Project Needs Transit stops lack shelter from weather, buses block traffic

Project Needs High occurrence of crashes at 5 th Avenue intersection 6 crashes in 3 years 4 right angle crashes Limited visibility Stop sign violations Higher crashes than expected Eastbound Southview at 5 th Ave

Project Needs High occurrence of crashes at 7 th Avenue intersection 9 crashes in 3 years 2 right angle crashes 2 rear end crashes 3 left turn crashes 1 pedestrian crash Eastbound Southview at 7 th Ave

Project Needs High occurrence of crashes at 12 th Avenue intersection 9 crashes in 3 years 6 rear end crashes Limited visibility Eastbound Southview at 12 th Ave

Project Needs High occurrence of crashes at 13 th Avenue intersection 7 crashes in 3 years 3 right angle crashes Limited visibility Overlapping turning movements in nearby driveways More than double the crashes expected Eastbound Southview at 13 th Ave

Project Needs High occurrence of crashes at 18 th Avenue intersection 6 crashes in 3 years 4 rear end crashes Southview Blvd left turning vehicles block through traffic More than double the crashes expected Eastbound Southview at 18 th Ave

Project Needs Delay and backup at 20 th Avenue intersection 20-30 seconds average right turn delay More than a minute delay for right turns at peak times 4-6 cars back up Right turn is at capacity

Q4. Based on the Project Needs presented, are we accurately reflecting the problems you encounter traveling through the corridor on foot, bike, bus and automobile? A. Strongly Agree B. Agree C. Neutral D. Disagree E. Strongly Disagree 32% 24% 21% 18% 6% Strongly Agree Agree Neutral Disagree Strongly Disagree

Opportunities with the Project Begin Southview Hill Area Study Implementation: Study purpose - identify revitalization opportunities for Southview and Marie businesses Community input opportunities: Open House #1 (October 10, 2013) Open House #2 (January 23, 2014) Open House #3 (March 27, 2014) Online surveys Stakeholder meetings and phone calls Planning Commission and City Council meetings Study adopted in April 2014

Opportunities with the Project Study Recommendations for Southview Blvd: Consider public realm improvements to elevate the area s character and promote placemaking Promote designs that encourage walking and transit use in addition to efficient vehicular travel Explore feasibility of more pedestrian space by removing and relocating some on-street parking to new public parking lots Install high-quality, branded wayfinding and gateway elements

Streetscape Opportunities Sense of Place Safety Mobility (All Modes) Inviting for Business Investment in Community

Elements of a Streetscape Travel Zone Parking Zone Amenity Zone Pedestrian Access Zone

Pedestrian Access Zone Features Pedestrian Access Route Simple /Clear Pavement Design Accessibility to Storefronts

Possible Amenity Zone Features Landscaping (Trees/Planters) Decorative Pavement Lighting Seating Wayfinding Signage Banners/Hanging Baskets Artwork

Base Level Streetscape

Middle Level Streetscape

High Level Streetscape

Streetscape Nodes Primary and Secondary

Opportunities with the Project Mid-block design flexibility Need to understand how to best allocate space within existing right-of-way There are certain requirements Flexibility with other elements Needs are expected to be different at different locations in the corridor

Elements Competing for Space Minimum requirements: (44-52 ) 11 travel lanes 5 shoulder (no parking) 8-10 parking 5-6 sidewalk each side Options for remaining space: (8-16 ) Increase width of elements Parking or No Parking Add Amenity zone/boulevard/snow Add left turn lane (12 )

Mid-Block Design Flexibility We need your input on how to allocate space where flexibility exists: On-street parking Streetscape amenity zone/boulevards/snow storage Pedestrian access route What are your must haves? What can you give up to maintain your must haves?

Q5. In your opinion, how important is it to improve pedestrian facilities (clear path, wider sidewalks)? A. Very important 41% B. Somewhat important C. Neutral D. Not important 24% 26% E. No opinion 9% 0% Very important Somewhat important Neutral Not important No opinion

Q6. In your opinion, how important is it to provide streetscape amenities (trees, benches, planters, etc.)? A. Very important B. Somewhat important C. Neutral D. Not important E. No opinion 42% 33% 17% 8% 0% Very important Somewhat important Neutral Not important No opinion

Q7. In your opinion, which is more important to you as a business patron? A. Off-street parking (either private or public lot) B. On-street parking directly outside of a business C. On-street parking within 1 block of a business D. On-street parking within a few blocks of a business E. No opinion 39% 44% 17% Off-street parking (either priva.. On-street parking directly outs... On-street parking within 1 bloc... On-street parking within a few... 0% 0% No opinion

Intersection Traffic Control Intersection control beyond a thru-stop requires a detailed engineering study that considers: Traffic volume levels on the major and minor street Throughout a typical day, including peak period(s) Conflicting crossing and turning movements Crash history and potential with each option Capacity and delay potential with each option Pedestrian activity and type of pedestrians Conditions within the intersection

Intersection Traffic Control Identified potential traffic control changes needed at: 20 th Avenue current all-way stop 12 th Avenue current traffic signal 7 th Avenue current traffic signal 3 rd Avenue current all-way stop

Intersection Traffic Control Types of Traffic Control for Southview Blvd project Thru-Stop All-Way Stop Roundabout Mini-Roundabout

Intersection Traffic Control Pedestrian Safety Thru-Stop Control Single-stage pedestrian crossing Very little impact to mainline vehicle speeds 7% compliance for vehicles stopping for pedestrian on the curb, waiting to cross Driver awareness to pedestrians: Moderate Pedestrian awareness to drivers: Moderate 1 2 1 2

Intersection Traffic Control Pedestrian Safety All-Way Stop Control Single-stage pedestrian crossing Potentially reduces vehicle speeds Near 100% compliance since vehicles required to stop at the STOP sign. Driver awareness to pedestrians: Moderate Pedestrian awareness to drivers: Moderate 1 2 1 2

Intersection Traffic Control Pedestrian Safety Roundabout Two-stage pedestrian crossing Wide median refuge Improves safety by allowing pedestrian to focus on crossing one direction of traffic at a time Reduced vehicle speeds Driver awareness to pedestrians: High Pedestrian awareness to drivers: High 1 2 3

Intersection Traffic Control Pedestrian Safety Mini-Roundabout Single-stage pedestrian crossing Narrow median refuge Crossing similar to conventional intersection Reduced vehicle speeds Driver awareness to pedestrians: Moderate Pedestrian awareness to drivers: Moderate 1 2 Median Too Narrow To Safely Accommodate Pedestrians

Intersection Traffic Control 20 th Avenue Primary movements (76% or more) Consider alternatives to allow more free-flow condition for primary movements Maintain all-way stop Reconfigure intersection Roundabout (regular or mini) Primary Movements

Intersection Traffic Control 3 rd Avenue Primary movements (44% or more) Consider alternatives to allow more free-flow condition for primary movements All-way stop Mini-Roundabout Southview Blvd 3 rd Ave Primary Movements

Intersection Traffic Control 7 th Avenue and 12 th Avenue Intersections Traffic signals are not justified to serve intersection traffic volumes levels Traffic signal equipment beyond its useful life, costly to replace Fewer crashes expected WITHOUT a traffic signal

Intersection Traffic Control 7 th Avenue Intersection All-way stop, Mini-roundabout, or thru-stop are appropriate at this location All-way stop reduces unnecessary delay by as much as 35% reduction during off-peak 45% reduction during peak Bump-outs/ Narrowed Roadway Mini-Roundabout

Intersection Traffic Control 12 th Avenue Intersection Thru-stop Control is most appropriate at this location Improved visibility from side streets is necessary Bump-outs Reduces unnecessary delay by as much as 75% reduction during off-peak 70% reduction during peak Existing Bump-outs/ Narrowed Roadway

Draft Corridor Concepts Three different approaches Balanced Mobility Concept Roundabout Concept Vehicle-Orientated Concept Pieces of each concept can be combined Our responsibility is to pull together an overall corridor that functions as a system with many parts

Balanced Mobility Corridor Concept Balances: Space for pedestrians, streetscape and transit amenities Movement of vehicular traffic Improves intersection sight lines Reduces crossing distance for pedestrians

Roundabout Corridor Concept Increases space for pedestrians, streetscape and transit amenities (but less than Balanced Mobility Concept) Most efficiently moves vehicular traffic Improves intersection sight lines Reduces crossing distance for pedestrians

Vehicle Oriented Corridor Concept Greater focus on efficiently moving vehicular traffic Turn lanes to separate movements Focus on primary intersection movements Increases space for pedestrians, streetscape and transit amenities (but less than other concepts) Some reduction in pedestrian crossing distance

Next Steps Iterative process to refine and evaluate concepts; arrive at a Sustainable Solution Opportunities for continued involvement: Business Advisory Committee (January) Citizens Advisory Committee (January) Public Open House #3 (February) Public Open House #4 (March)

Your Input Tonight We need your input on what elements are most important to you and where does flexibility exist: On-street parking specific locations Streetscape amenity zone/boulevards/nodes Sidewalk width pedestrian access route Talk with project staff Fill out a comment form or email staff

Project Contacts Chris Hartzell Dakota County Chris Chromy Bolton & Menk 952-891-7106 952-890-0509 Chris.hartzell@co.dakota.mn.us chrisch@bolton-menk.com John Sachi South St. Paul Angie Bersaw Bolton & Menk 651-554-3210 507-625-4171 jsachi@sspmn.org angiebe@bolton-menk.com www.southviewblvd.com Like us on Facebook