l Civil Engineering Group of PSRA Techn ical Plan Review Team. '\J \

Similar documents
SECTION TRAFFIC REGULATIONS

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

2017 Temporary traffic control guidelines for pedestrians. v.2

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

10.0 CURB EXTENSIONS GUIDELINE

Traffic Control Inspection Checklist Segment:

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6: Temporary Traffic Control

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL

COMPLETE STREETS DURING CONSTRUCTION

Work Area Traffic Control Policies and Procedures

Temporary Traffic Control for Highway Work Zones

WORK ZONE TRAFFIC CONTROL PROCEDURES

Work Zone Pedestrian & Cyclist Accommodation in Washington, DC

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

CHAPTER 6H. TYPICAL APPLICATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

CHAPTER 1 STANDARD PRACTICES

CURBSIDE ACTIVITY DESIGN

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew

Accommodating Pedestrians in the Work Zone

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

2.0 LANE WIDTHS GUIDELINE

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

ADA on Construction. Guidance for Section C Plan Preparers

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

APPENDIX G SIGNAGE AND STRIPING SUPPLEMENT

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Work Zone Traffic Safety

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1. 2 Classification 2

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE

Traffic Circulation & Pedestrian Safety Study

ADA PRESENTATION (CURB RAMPS)

900 BICYCLE FACILITIES Traffic Engineering Manual

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Appendix Work Zone Traffic Control

Revisions to Larimer County Urban Area Street Standards (2016 Update)

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

TRAFFIC CONTROL DEVICES

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

SECTION 1 - TRAFFIC PLANNING

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

CHAPTER 6H. TYPICAL APPLICATIONS

Application for Temporary Street/Sidewalk Closure Permit

0 CITY OF SANTA ANA 0

900 BICYCLE FACILITIES Traffic Engineering Manual

Hospital Link Project Project Update September 2017

Traffic Control Devices

County of Spartanburg South Carolina

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Fundamentals of Traffic Control Devices

Active Transportation Facility Glossary

2009 Manual on Uniform Traffic Control Devices

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Construction Staging Area Vaughan Road

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Hidden Oaks Elementary School

Chapter 17. Work Zone Management. 17 Work Zone Management

Development of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA

NO LATER THAN ONE WEEK BEFORE YOUR PROPOSED CLOSURE START DATE

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Appendix C. Bicycle Route Signage

Table of Contents. Introduction. Prompt List Arterials and Streets. Prompt List Interchange. Prompt List Intersections. Prompt List Limited Access

PUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES

Temporary Traffic Control Manual

Planning Guidance in the 2012 AASHTO Bike Guide

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Orange Center Elementary School

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

Traffic Signs and Markings. Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation

INDEX. Geometric Design Guide for Canadian Roads INDEX

(This page left intentionally blank)

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

City of Charlottesville Traffic Calming Handbook

ROUNDABOUTS/TRAFFIC CIRCLES

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18

CITY OF RICHMOND, VIRGINIA BIKE LANE

On Road Bikeways Part 1: Bicycle Lane Design

Beginning School Bus Driver Curriculum UNIT IX. FIELD TRIPS and TRAFFIC CONTROL DEVICES. Revised 09/2011 Revised 10/2013 (Instructional Content)

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Transcription:

GOVERNMENT OF THE DISTRICT OF COLUMBIA District Department of Transportation Public Space Regulation Administration PSRA.. *.. d ~ oc == *. * GENERAL TRAFFIC CONTROL PLAN (TCP) SUBMITTAL GUIDELINES 18 TH Edition, April 2, 2017 The primary function of Temporary Traff ic Control Plan is to provide for the safe and efficient movement of vehicles, bicyclists, and pedestrians through and /or around Work Zone, while reasonably protecting workers, properties, and equipment. The movement of traffic and traveling public should be inhibited as little as possible. The goal should be to route all roadway users through the work Zone in a safe and efficient manner comparab le to normal street situations. This document is prepared to provide guidance for Traffic Control Plan submissions so they may be approved in a timely manner. Missing or insufficient information will delay approval. APPROVAL If a Traffic Control Plan (TCP) or Maintenance of Traffic (MOT) Plan is submitted as part of a Roadway or Bridge Reconstruct ion, Rehabilitation or Resurfac ing Project to TOA, it w ill be reviewed by the Traffic/C ivil Engineering Group of TOA Safety Team. If a Traffic Control Plan (TCP) or Maintenance of Traffic (MOT) Plan is submitted as part of a public space application to PSRA /Public Space Regulation Administration, it will be reviewed by the Traff ic/ '- l Civil Engineering Group of PSRA Techn ical Plan Review Team. '\J \ COORDINATION: DDOT expects that the submitter has coordinated with Public Space Regulation Administration and the TOA, IPMA on the amount of public space needed for a project to ensure coordinat ion with adjacent projects, and special events appropriate detour routing, and adequate level of service for street operations. REVIEW : TCPs shall be subject to review and verification by DDOT staff for conformance to submission requirements. The MOT/TCP drawing must be checked against the "Detailed City Map", Geographic Information System (GIS). Review MOT/TCP for construction and occupancy permit including : Online Application, MOT/ TCP drawing(s), Sequence of Construction, Phases and Sub-phases of-construction, and Detour Plan(s). The Plan Review Division (PRO) engineer must go to the field for an on-site inspection of the existing conditions of the site verses the MOT/TCP that was submitted with the application. The MOT/TCP drawing and field observations/ notes are brought back to the office where the content of the MOT/TCP is checked against current District of Columbia standards pertaining to

Each submitted application through Transportation Online Permitting System (TOPS) must not exceed 20 TCPs, including all phases, sub-phases, and detour plans; All above mentioned 20 TCPs must describe all work zones directly related to the application and located within 3 blocks (in any direction) of the applicat ion's address ; In the event an application has work zones located beyond three-block radius, the applicant must submit a new application to include all these work zones. The new application must not exceed 20 MOT/TCP. TOPS will generate a new application trucking number. If an application doesn 't meet any of these above mentioned criteria, it will be returned to the applicant for resubmission ; The traffic and parking conditions should be maintained as normal as possible. Avoid frequent and abrupt changes in road geometry and traffic pattern. Inhibit traffic movement as little as possible. Standards Traffic Control Plan (TCP) must be tailored to fit contractor 's specific situation. All traffic control shall conform to the standards set forth in 2009 Edition Manual on Uniform Traffic Control Devices (MUTCD) and DC Temporary Traffic Control Manua l. Guidelines and Standards -2006 Edition DDOT. All traffic control shall adhere to DDOT Standards Specificat ions for Highways and Structures [the "Gold Book"] 2013 Edition. Reference section 104.02 Maintenance of Traffic, 603. Guardrails and guardrail Terminals (603.01-603.09), 610 Traffic Barriers (610.01-610.03), 612. Traffic Control (612.01-612.21), 616.Traffic Signing (616.01-616.08), 617. Impact Attenuators (617.01-617.03), 207.Trench Excavation and Backfill (207.01-207.07), and 215. Excavations and Restorations /Utility Lines/ (215.01-215.09) Review MOT plans including : TCP drawings, Traffic Detour Plans, Sequence of Construction. Ensure that the submitted staging plan on the construction site provide maximum protection to motorists and pedestrians for ingress and egress. Property Information Provide detail information about property location Provide Name, Address, Main Telephone Number, Emergency Telephone Numbe r, /Cell Phone/, E-Mail Address of the person(s), the person responsible for the submiss ion of the application and the attached MOT\TCP drawings. Project Information Provide TOPS track ing number. Provide Project Name. Provide Address of Premise for which Public Space Work is proposed. - 3 -

Specify if parking is to be restricted and if bus zone will need to be relocated. Specify bike lane(s), bicycle cycle track, truck and bus restrictions. Specify capital bike sharing (bikes station). Specify car sharing location. Specify embassies, and embassies parking zone. Specify valet parking zone. Show construction trucks /dump trucks / routes in to the construction site, and out from the construction site. Specify quantity of construction trucks /dump trucks / for daily operation by phases of construction. Specify existing traffic control at the Intersections : stop contro l intersections or signal control intersections (for heavy urbanized area) Specify existing infrastructure ( catch basin, bus shelter, bus pad, fire hydrant, traffic control cabinet, curb cut, etc.) Specify placement of all devices. [Arrow board panels, signs, cones, drums, attenuators, barricades, etc.] Specify spacing of devices. [Arrow board panels, signs, cones, drums, barricades, etc.) Specify taper and tangent lengths. Specify if turning radius will impact bus and trash truck turns. Orient traffic sign and device symbols with directions of traffic. Show work vehicle locations. Notes are encouraged. Show Key and /or Legend. Use a legend to define all signs, and symbols and designate them with recent edition of MUTCD nomenclature. Show existing pavement markings, painted crosswalks and bike lanes; include total roadway widths, individual lane widths, parking lane widths, median dimensions and proposed temporary pavement markings. Make distinction between them. Show all existing traffic signals and street lights in the work zone location. Show existing traffic and parking operation signs including RPP signs, parking meters, and proposed temporary WZ signs. Make distinction between them. Show ongoing construct ion projects within vicinity of a proposed MOT/TCP. Coordinate the final MOT/TCP with ongoing construction projects stage by stage of a TCP design. If sidewalk space is to be obstructed, signs and barricades will be required to direct pedestrians through or round the work zone and shall be shown on the MOTfTCP. A detour plan is required when the closing of traffic on main or intersecting roadway, for reconstruction or construction purposes. Ensure that detour plan are clearly identified with temporary guide detour signage which shall be accompanied with appropr iate message sign indicating street name to eliminate confusion for motorists (Do not use abbreviation on the message sign). - 5 -

emergency and excavation. The Matrix for Safe Accommodations of Pedestrians Table 1. MOT/TCP For Sidewalk Closure FUNCTIONAL CLASSIFICATION OF STREETS IN THE DISTRICT OF COLUMBIA & DURATION OF SIDEWALK CLOSURE Minor Local Street Collector Principal Arterial Detour Pedestrians to the ~ 7 Days ~ 5 Days ~ 1 Day ~ 6 hours other side of street. Incorporate sidewalks, Full Closure of Full Closure of Full Closure of Full Closure of and crosswalks. Show the Sidewalk for the Sidewalk the Sidewalk the Sidewalk detour for pedestrian no longer a for no longer 5 for no longer 1 between traffic and provide week (7 days), days, including day, including 9:30AMappropriate pedestrians including after after hours and after hours and 3:30PM signage such as "Sidewalk hours and on on Sundays on Sundays Monday - Friday Closed, Arrow, Use Other Sundays Side", "Sidewalk Closed", "Sidewalk Closed, Cross Here" etc. Provide a pedestrian walkway on the same > 7 Days > 5 Days >1 Day > 6 hours side of t he Street. Next to work side. Contractor Full Closure of Full Closure of Full Closure of Full Closure of must reconfigure roadway the Sidewalk for the Sidewalk the Sidewalk the Sidewalk to include removing longer a week for longer 5 for longer 1 between parking on opposite side (7 days) where days where no day where no 9:30AM - of work to accommodate no walkway is walkway is wa lkway is 3:30PM pedestrians. The provided, provided, pro vided, Monday - Friday pedestrian access road including after including after including after must be surrounded by hours and on hours and on hours and on water filled plastic Sundays Sundays Sundays barriers (Jersey Barrier) The "Last Resort" analysis must be based on multifunctional analysis of All Others different variables which will help determinate a safe and efficient MOT/TCP. The "Last Resort" analysis must be provided individually for each MOT /TCP project - 7 -

Cannot place equipment of any type : in a "NO PARKING ANYTIME ZONE ", "NO STANDING OR PARKING ANYTIME", and "NO STANDING OR PARKING METRO BUS ZONE". All required dimensions shall be shown on crane and dumpster appl ications If any prohibiting signs (Regulat ory) are proposed ("NO Left Turn", "No Right Turn"; whether symbolic or text message), advance coordinate with the TOA Traffic and Parking Operation engineers, must occur to ensure the adequate traffic movements are provided in the vicinity of the project site. When traffic signals are specified in the contract, the contractor will provide the timing plan for approval and will also provide whatever detection they feel will best fit the situation. District traffic is to be consulted to help review timing plans and detection zones. Overhead lighting must be provided at each signal location. Each plan page of all submissions must include the following statement, "I certify that this plan conforms to the requirements set forth in the 2009 Edition Manual on Uniform Traffic Control Devices (MUTCD), the 2006 DDOT DC Temporary Traffic Control Manual. Guidelines and Standards and adheres to DDOT Standards Specifications for Highways and Structures," followed by an original signature. This requirement is exempted for submission with Professional Engineer stamp. MOT/TCP is only valid 6 months after initial approval seal has been placed on by DDOT/PSRA/PLAN REVIEW DIVISION REVIEWER. MOT/TCP must be renewed thereafter TYPICAL TCPs FOR UTILITY WORK: Twenty-one typical TCPs for utility work only are available through the DDOT website in PDF format for use. Please visit the website for further information : http://ddot.dev.dc.gov/ddot/cwp/v iew, a, 1250,q, 640384. asp The above mentioned is the link to the Temporary Traffic Control Manual Guidelines and Standards, Work Zone Pocket Guide, and Utility Work Zone Typical. When submitt ing DDOT typicals, make sure to specify street geometry, existing street dimensions, street names, etc. Each typical Traffic Contro l Plan drawing should contain the list of locations for which the TCP is applicable. According to DDOT Road Functional Classification map the typical TCPs are applicable only for local streets. Submit only those typicals that apply. The submitted typical TCPs should fit to the real street condit ions. Otherwise, submit MOT/ TCP individually by actual real street conditions and work zone location. SPECIAL EVENTS: Scheduled Special event such as sporting activities, parades, major concerts, or major convent ions can have significant impacts on traffic operations within District of Columb ia. Special events usually generate large volumes of pedestrian and vehicular traffic, and congestion generally occurs on the city large streets segment at or near the generator. Managing traffic during special events can result in reduced congestion and delay and improved safety. A traffic control plan must be submitted by the event sponsor at least four weeks 20 working days in advance of the event for approval by the DDOT. - 9 -