Innovative Grants Summary

Similar documents
Memorandum. Public Comments

City of Darlington Beautification Report

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

MARTIN LUTHER KING JR. WAY

All Season Age Friendly Pedestrian Safety and Walkability Checklist *

64% UNSAFE and. Where can features be added to improve the street for bicyclists?

PROJECT SUMMARY ALBERTA STREETSCAPE PROJECT

Report on Walkability Survey and Workshop for ZIP Code Hosted by the Oklahoma City-County Health Department April 13, 2013

Areas for Redevelopment or New Development:

SAFE ROUTES TO SCHOOL

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Pedestrian Survey Report

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

STADIUM DISTRICT CENTER PLATFORM TACOMA LINK EXPANSION. Existing bus stop remains. Existing parallel parking removed for bus access.

WALKABILITY CHECKLIST How walkable is your community?

SAFE ROUTES TO SCHOOL

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Fill in the rating for each section. Total up the ratings to see how your neighbourhood scores overall for walkability.

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Tonight is for you. Learn everything you can. Share all your ideas.

Broad Street Bicycle Boulevard Design Guidelines

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Streetscape: Core Shopping District

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

JOY ELEMENTARY SCHOOL

Ocean Park Boulevard Green Street Project Community Workshop

Please leave more comments below! (Or refer to numbered comments on your own comment sheet/form if you need more space)

Derby Street. Project Updates. Salem, Massachusetts

Citywide Sidewalk and Crosswalk Programs

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

FOURTH STREET WILMINGTON WALKABLE COMMUNITY WORKSHOP

Walking Audit Supporting Information

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Orange Center Elementary School

Victoria Park Master Plan

CITY OF OAK CREEK SAFE ROUTES TO SCHOOL ACTION PLAN. East Middle School

How walk, bike, and transit friendly is your neighbourhood?

Hidden Oaks Elementary School

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

WELCOME. Traffic & Parking Commission Special Meeting May 30, Iteris, Inc. All rights reserved.

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Irondale on the Move Public Outreach Summary to Date. July 8, 2015

Forest Hills Improvement Initiative

WORKSHOP 2 SUMMARY OVERVIEW GENERAL COMMENTS. Walking and Biking. Greening & Stormwater. Transportation & Parking. Lighting, Art and Identity

North Avenue Corridor Study

Clarkson Walkability Audit: Results and Recommendations Summary

Franklin Boulevard Traffic Calming Study. Public Meeting #1 October 11, 2017

Safe Routes to School: Munroe Elementary Walk Audit Report. Image: Drexel, Barrell & Co.

12/13/2018 VIA

SAFE ROUTES TO SCHOOL (SR2S)

Knox Street Complete Streets Project

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Participation is open to all Stakeholders of the Coastal San Pedro Neighborhood Council.

CITY OF LANCASTER PROPOSED NEW PROJECTS

NUMBER PROJECT TITLE ESTIMATED COST

S. Broadway Improvements Council has made a total of $533,000 available to fund streetscape improvements, mainly to the 3400 block of S Broadway

Neighborhood Slow Zone Program Application

Student Pedestrian Safety Fiddlers Canyon Elementary Community Council 2012

Three Springs Design Guidelines Fencing and Wall Standards

Monroe Street Reconstruction Business Focus Group Notes July 18, 2016, HotelRED

CITY MANUALS AND STANDARDS REVIEW

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Complete Streets. Designing Streets for Everyone. Sarnia

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

Cross Street Corridor Non-Motorized Enhancement Project Project Description

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Canadian Gymnaestrada

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

MIXED USE AND STREETSCAPE INTEGRATION Avondale Will Basil Juliana Zannotto

Neighbourhood Walkability Checklist How walkable is your community?

Hedgepeth Williams Middle School and Paul Robeson Elementary School Trenton, NJ. School Travel Plan

Shafter Avenue Repaving

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Dewey Area Traffic Calming Project

Tigard Tigard Transit Center

5. Automobile Circulation, Wayfinding and Signage

EXHIBIT B. Rodney Wojtanik, Project Manager, Portland Parks & Recreation

Montco 2040 Implementation Grant Program Award Summary

Observations and Ideas: Toomer s Corner Streetscape Improvements

3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811

Lincoln Neighborhood Corridor Plan The LiNC

Guthriesville Village Manual of Written & Graphic Design Guidelines

The DC Pedestrian Master Plan

Community Workshop #1 Summary October 2017

complete streets design and construction standards public primer City of Edmonton

Transcription:

215-16 Innovative Grants Summary Community Council of 591-528 Staff contact: Shari Hart For January 26, 217 PROJECTS / PHOTO INVENTORY: Spaceworks Celebrates Hilltop -Revitalization through Creative Economic Development People's Park and 917923 Martin Luther King Jr Way $5,. plan and host a free community celebration on September 12, 215 to raise visibility for the existing Hilltop businesses, inspire residents to possibly start their own small businesses, and share Spaceworks; plans for the future $15,. & a tool lending library for access to tools and training for proper use of tools; environmental benefits include re-use, repair and reduced consumption of durable goods Tool Library 6-Month Launch Period 1314 Martin Luther King Jr Way

9th & Sprague, NE Corner $375. Sprague Vehicle Activation Sprague SR 16 Entrance Area 9th & Sprague Improvements right-of-way beautification BEFO speed awareness will be more $2,. TOTAL: tbd; PW PROJECT NOT YET 9th & Sprague, SE Corner removal of fence in right-of-way for traffic safety and planting the area 9th & Sprague Improvements $433.76 Eastsid e $8,. BEFO A St Speed Bump, 58th-6th A St, 58th-6th safety of Fawcett Elementary students by reducing unsafe speeds

[REQUESTED PHOTOS] East 34th Street Stairs Eastsid $5,. along East N. Street e goats to remove blackberries on sloped area to make it more safe and clean for the people that walk the stairs; including students at new school Goats on 34th Street Hill East 34th & McKinley Eastsid $5,. through Division & e McKinley plan and implement community street festival on August 15; including school supplies, health services, and art instruction for children. McKinley Hill Street Festival A St Speed Bump, 58th-6th 2 speed bumps to slow traffic 38 Block A St Eastsid e $16,.

[REQUESTED PHOTOS] Eastsid $1,985. e Nine kits for neighborhood patrols to include: reflective vests, flashlights, resource material, garbage pickup tools, etc Neighborhood Patrol Safety Kits Throughout Eastside +

& Entire $7,. North Waterfront Marketing Website shoreline & West promotion of all of 's waterfront as an area for tourism and events, including information about daily activities, places to live, and jobs $4,55. recreational equipment (outdoor ping pong table, croquet, tetherball, four square, soccer balls, basketballs, hula hoops, badminton, volley ball) for children and adults to enhance activities and a fence on one side of the park for child safety. (celebration event on June 26) Neighbors at Play 8th & I Neighbors Park Good Karma Center for Joy, 711 St Helens & $2,5. Luminary Community Workshop Tinkertopia, 1914 Pacific Ave workshop to build community through artistic multicultural expression in September 215 and 216

26th & G; public right of-way Cleanup and landscaping to discourage inappropriate activities that impact safety $6,1. Viet Huong Improvement Project: Retaining Wall & Fence $15,85. Tin Can Alley S. 18th & G Street community garden improvements; adding a 125', 3'-4' high retaining wall along G St and sections along S. 18th, 42' long, 6' high vinyl coated chain link fence, including three 4' wide gates and one 12' wide double gate BEFO Speed Humps (2) on 5th 5th Ave NE, 38th 39th slow down speeding cars on this street and improve safety of residents Northea st $16,.

Browns Pt & Norpoint Way Radar Operated Signs speed awareness will be more Northea $2,. st TOTAL: tbd; PW PROJECT NOT YET North 3th Street and North Alder Street Pedestrian Activated Crosswalk Warning Beacons N 3th St at N Alder $2,255. improved pedestrian safety at on N 3th St at Alder (celebration event on October 8) TOTAL COST: $1,. Proctor Entrance Signs business district identification N. 26th & Washington North $4,25.

Everyone Gets to Garden at PCG N. 21st & Proctor St North $4,. construct a garden shed for tool storage to reduce theft BEFOR Old Town Business North $6,528. District Design, fabrication, and installation of 26 district identity metal banners (four designs) on District's pole Business District Banners

Business District Banners Old Town Business District North $6,528. 2 locations at 47th and South $19,5. Thompson/Yakima Remove hardscape and replace with soil & plants at two locations in proximity to Fallen Riders Memorial park Thompson Depave South South Neighborhood Council Boundaries immediate clean-up or removal of tagging as it appears (3+ locations/occurrences!) Graffiti Tagging Removal $1,267.8 8

BEFOR Bringing Beautification to the Traffic Circles in South Area multiple circles and spaces South $1,21.9 enhancements to existing traffic circles in neighborhoods (14 locations) BEFO On South Way, South $18,521. at 47th & 58th 22 design process for multi-funded ($111k) project to create a sense of place for the South Business District South Business District Gateways COEP T Geiger Montessori Neighborhood Collaboration & Traffic Safety Improvement 741 S 8th St West $6. traffic safety improvements to address blocked sightlines blocked, unmarked crosswalks, and inconsistent speed signage

West artistic beautification to attract people to stop, shop and enjoy neighborhood district Building Mural (2 projects) BEFORE / LOCATION Traffic Circle(s) on South Oxford close to school and 5 residents in wheelchairs TOTAL COST: $56,. 513 & 512 N Pearl St $5,4. BEFORE / LOCATION Oxford @S 1th West $16,.

[blank]

Area Spaceworks Celebrates Hilltop -- Revitalization through Creative Economic Development & Tool Library 6-Month Launch Period People's Park and 917-923 Martin Luther King Way 1314 MLK) 9th & Physical Sprague, Improvement-- 9th 1735 S. 9th & Sprague St. right-ofway Sprague Vehicle Activation Sprague SR 16 Entrance Area 9th & Sprague Improvements Eastside "A" Street Safety Road Bump Eastside Goats on 34th Street Hill Eastside McKinley Hill Street Festival ROW, eastside of 9th @Sprague Between 58th & 6th Streets on "A" Street E 34th St stairs along East N. St On McKinley 34th- Division Eastside A Street Safety Road Bump 38 Block A St Eastside Neighborhood Patrol Safety Kits Throughout Eastside & Waterfront Entire North Marketing Website shoreline & West Neighbors' Neighbors at Play Park, S. 8th and S. I St Good Karma Luminary Center for Community Joy: and Workshop Tinkertopia: The Tin Can Alley 26th & G St Park and Rain right-of-way Garden Community Viet Huong Garden at Improvement S. 18th & G Project; Fence St Viet Huong Community Improvement Garden at Project; Retaining S. 18th & G Wall St Funded Payment Method Budget/payment target thru 216.Q1 216.Q2 216.Q3 216.Q4 5,. via Chamber 5,. 15,. via non profit 1,4. 375. Notes 11,15. 2,45. Waiting for 375. invoice 1/25 from C Schedule: Unknown; Cost: 37. 15,925. Unknown (PW indicates project will cost more) 19,625. PW Project 433.76 8,. City led contract 5,. 5,. 16,. City led contract 12,5. ; NEED PHOTOS 2,. 1,985. 7,. via TWA 4,55. 4,55. 2,5. 1,25. 6,1. via DDDG 8,35. via TULT 8,35. 7,5. via TULT 7,5. 433.76 8,. 5,. ; NEED PHOTOS 5,. 3,5. 3,5. 4,729.5 1,25. 1,37.5

Area Northeast Speed Humps Northeast Radar Operated Signs Payment Funded Method 5th Ave NE between 38th City led 16,. St NE & 39th contract St NE Browns Point Boulevard & Norpoint Way Budget/payment target thru 216.Q1 216.Q2 216.Q3 216.Q4 16,. Schedule: Unknown; Cost: 9,7. 1,3. Unknown (PW indicates project will cost more) 2,. PW Project N 3th St at N Alder St Pedestrian N 3th St at City led North 2,255. Safety N Alder contract Improvements NE corner of Proctor Entrance North N. 26th & 4,25. Signs via PDA Wash. Community Everyone Gets to Garden --N. North 4,. Garden at PCG 21st & N. Proctor St Old Town Business District North Business 6,528. Banners via OTBD District 2 locations: South 47th & Thompson Depave 19,5. Thompson/ via PCD Yakima Mall South South Blvd at I-5 on Gateway Entry 15,. ramp/off Sign ramp Notes 2,255. [$1,] 4,25. 4,. 6,528. 19,5. Could not complete South Graffiti Tagging Removal ST Boundaries 1,267.88 1,267.88 South Bringing Beautification to the Traffic Circles in South Area multiple circles in ST area 1,21.9 1,21.9 South South Business District Gateways On South Way, at 47th & 58th 18,521.22 City led contract 18,521.2 2 Geiger Montessori 741 S 8th West Traffic Safety Street Improvement 6,2. City/PW led project 6. West Building Mural 513 North Pearl 2,7. via RPDBD 2,7. West Building Mural 512 North Pearl 2,7. via RPDBD 2,7. 2,. [$49,1] West TOTAL Traffic Circle on South Oxford Oxford @S 1th 2,. City led contract 27,521.7 6 21,428. 45,463.2 79,126.2 69,664.2 6 2 8 BALAE 249,93. 23,63. 124,54. 54,84. 76 5 28