You are invited to an... OPEN HOUSE. Recommended Approach for the Franklin Avenue / East River Parkway Intersection

Similar documents
Hennepin County Transportation Department

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Major Bike Routes 102 Avenue Workshop April 21, 2015

Bicycle Facilities Planning

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Tonight is for you. Learn everything you can. Share all your ideas.

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

APPENDIX D. May 22, 2002 Open House Summary and Materials

Pennsylvania Avenue (CR 484) Design Alternatives Study

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

Hennepin County Bicycle and Pedestrian Planning

This page intentionally left blank.

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

ACTION TRANSMITTAL No

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Terwillegar Drive Expressway Draft Concept Plan

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

This page intentionally left blank.

Comments EXECUTIVE SUMMARY

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Display Boards Including Five Refined Design Concepts

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Iowa Highway 58 Corridor Improvement Study

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Davis East Covell Corridor Plan

Bus Rapid Transit Plans

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Shockoe Bottom Preliminary Traffic and Parking Analysis

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Forest Hills Improvement Initiative

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Owl Canyon Corridor Project Overview and Summary

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

Broad Street Bicycle Boulevard City Council Study Session Summary

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Glebe Neighbourhood Cycling Plan

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Giles Run Connector Road

Item No. 14 Town of Atherton

Hennepin/First Transportation Study

Bellevue Downtown Association Downtown Bike Series

Simulation Analysis of Intersection Treatments for Cycle Tracks

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

Public Information Centre

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

5. RUNNINGWAY GUIDELINES

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Physical Implications of Complete Streets Policies

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Cycle Track Design Best Practices Cycle Track Sections

Chapter 5. Complete Streets and Walkable Communities.

Route 7/15 Norwalk. Route 7/15 Norwalk Project Project Advisory Committee Meeting #2. Tuesday, May 23 rd, Norwalk City Hall

South End Transportation Study. Public Meeting. January 31, 2019 Welcome. Public Meeting. January 10, 2018 WELCOME

North Avenue Corridor Study

New Seward and 36 th Avenue Intersection Conceptual Design

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Station Plan: Penn & 43rd Avenue

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

Draft North Industrial Area-Wide Traffic Plan

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Monroe Street Reconstruction Business Focus Group Notes July 18, 2016, HotelRED

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

FINAL REPORT Intersection Control Evaluation Planning Study for the Duluth Area

What is the status of the CPR Yards Crossing Study?

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

9/21/2016 VIA . RE: The Knot (DR16-270)

YELLOWHEAD TRAIL / 149 STREET INTERCHANGE

WELCOME Public Information Centre

Multi-Modal Traffic Analysis. Parisi and Associates

Foothill Expressway Improvements Between El Monte and San Antonio

MASTER BICYCLE AND PEDESTRIAN PLAN

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Building Great Neighbourhoods BONNIE DOON

Lincoln Avenue Road Diet Trial

City of Moorhead Committee of the Whole Meeting

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Transcription:

You are invited to an... OPEN HOUSE Recommended Approach for the Franklin Avenue / East River Parkway Intersection Tuesday, August 25, 2009 6:30 to 8:30 pm St. Frances Cabrini Catholic Church 1500 Franklin Ave SE Open House sponsored by Hennepin County and City of Minneapolis

Final Open House August 25, 2009 Franklin Ave / East River Pkwy Intersection Study Thank you for attending our 3 rd Open House! Purpose of this Open House To view the recommended short term intersection design and to discuss long term issues. Study Goal: Develop an intersection solution that will serve user demands over the next 20+ years. Study Objectives: 1. Improve pedestrian, bicyclist, and vehicle safety. 2. Reduce delay for all users. 3. Improve intersection design and clarity to satisfy user expectations. Study Overview: Over the past several months, Hennepin County has been developing a preliminary design for the intersection of Franklin Avenue, East River Parkway, and 27 th Avenue. The operation of the intersection, and the confusing 5-legged geometry, has been a concern for many years. Intersection deficiency issues involve the following: Combination of commuter and local vehicular traffic Significant pedestrian and bicyclist traffic Long delays and safety concerns Growing traffic demands Imminent change to traffic patterns due to planned initiation of Central Corridor Light Rail transit service (and proposed Washington Avenue pedestrian and transit mall) The study team includes staff from Hennepin County, Minneapolis Public Works, Minneapolis Parks and Recreation, and Study Consultant Short Elliott Hendrickson, Inc. (SEH). The study process also included a Project Advisory Committee comprised of residents from Prospect Park and Seward neighborhoods, and representatives from the

Hennepin County and Minneapolis Bike Advisory Committees, and Transit for Livable Communities. The study team has developed a recommended design concept through this process to improve the operation of the intersection in the short term. Provided that funding can be identified, implementation of a traffic management plan could be completed as early as 2010. The following list describes what you will see at each of the open house stations we have set up within the meeting room. Station #1: General Project and Process Information Station #2: Existing and Future Conditions No Build This alternative assumes no intersection or traffic signal changes. Station #3: Recommended Approach Traffic Management Plan The traffic management alternative is intended to improve clarity and safety for all users while also reducing delay. This approach does not require complete street reconstruction and is intended to serve traffic demands for several years until traffic pattern changes are better understood. Bike lanes are included along the 27 th Avenue and over the Franklin River Bridge. Improved clarity is possible through improved lane assignments, pavement markings, signing and traffic signal placement. Efficiencies are possible through re-assignment of lanes and modified traffic signal sequencing to better serve the heaviest vehicle movements. Pedestrian crosswalks are shortened where possible to decrease pedestrian exposure and crossing time. With these changes, a shorter signal cycle length can be achieved allowing pedestrians and vehicles to be served more frequently. Traffic safety, volumes and delay will be monitored and issues will be revisited as needed. Station #4: Alternatives Considered Review the types of long term alternatives considered including: Traffic Signals; Roundabouts and Trail Grade Separations. Station #5: What Happens When the Traffic Management Plan is No Longer Effective? A summary of how each type of long term alternative addresses intersection needs and the resulting implications related to each.

Study Schedule 2009 Study Phase January February March April May June July August September October 1. Issues Gathering 2. Concept Development 3. Recommended Approach 4. Layout Approval Open House 1 Open House 2 Open House 3 Next Steps Present the recommended intersection solution to the Minneapolis City Council and the Hennepin County Board of Commissioners for their approval. Contact Information: Below is the listing of the key contact people for this study. Jim Grube, Hennepin County Project Manager Phone: 612.596.0300 Email: james.grube@co.hennepin.mn.us Meseret Wolana, Minneapolis Public Works Project Engineer Phone: 612.673.3527 Email: meseret.wolana@ci.minneapolis.mn.us Mike Kotila, SEH Project Manager Phone: 952.912.2626 Email: mkotila@sehinc.com Project Website: www.sehinc.com Go to online projects Thank you all for coming and for providing your insights and helpful comments. Please fill out a comment card!

CSAH 5/East River Parkway Intersection Study Insert Aerial Open House No. 3 August 25, 2009

Process Recap Agenda Recommended Approach Next Steps Conversation

August September October Study Schedule Study Schedule Study Phase 1. Issues Gathering 2. Concept Development 3. Recommended Approach 4. Layout Approval 2009 Open House 1 January February March April Open House 2 May June July Open House 3

Study Objectives Improve pedestrian, bicycle, and vehicle safety Improve intersection clarity to satisfy user expectations. Reduce delay for all users

Recommended Approach Traffic Management Plan

Recommended Modified 5-Leg Signal

Recommended Bridge Configuration

Next Steps Presentation to Minneapolis City Council and Hennepin County Board Prepare plans and bid documents Construction Monitor intersection operations through 2015 As needed, re-engage neighborhoods

!!! THANK YOU FOR COMING!!! Comments or Questions?

Franklin Avenue (CSAH 5) East River Parkway Intersection Study Open House #3 Recommended Approach St. Frances Cabrini Catholic Church 1500 Franklin Avenue, Minneapolis 6:30 to 8:30 pm August 25, 2009 Agenda 1. Open House 2. Presentation (and Q and A) 3. Continuation of Open House Attendance: Approx. 85 persons Meeting Summary Open House From 6:30 to 7:15, meeting attendees gathered at five stations which displayed boards describing: Station #1: General Project and Process Information Project Advisory Committee/Technical Advisory Committee Process Board Goals and Objectives Board Schedule Board Area Map and Issues Board Station #2: Existing Situation and 2030 No-Build Intersection Map/Aerial Board Grand Rounds Missing Link Board City of Mpls Bike Count Map Traffic Count and Forecast Board Existing AM Queuing Existing PM Queuing 2030 AM Queuing 2030 PM Queuing Station #3: Recommended Approach Short Term Modified 5-Leg Signal, Traffic Management Plan/Intersection Board Traffic Management Plan, Franklin Bridge Lane Configurations Board Signal Phasing/Pedestrian Intervals 1

2014 Traffic Forecast Graph Queuing comparison exhibit o Existing AM to 2014 AM Queuing o Existing PM to 2014 PM Queuing Station #4: Alternatives Considered Traffic Signal Board with o Modified 5-Leg Signal Traffic Management Plan o 4-Leg Signal Roundabout Board with o Single Lane Roundabout o Multi-lane Roundabout o Hybrid Roundabout Trail Grade Separation Board o Trail Tunnel o Trail Bridge Station #5: What happens when the Traffic Management Plan is no longer effective? If the Long Term Plan is a 4-Leg Signal... If the Long Term Plan is roundabout... If the Long Term Plan includes a trail grade separation... Staff from Hennepin County, the City of Minneapolis, and SEH consulting firm were at each of the stations to explain the information and graphics, to respond to questions, and to listen to comments. Presentation At approximately 7:15, Hennepin County Director of Transportation Jim Grube opened the meeting with a welcome to all participants. He announced that the purpose of this final Open House was to present the recommended traffic management plan. Mr. Grube introduced Hennepin County Commissioner Peter McLaughlin. Commissioner McLaughlin made a few remarks about the complexity of the intersection issues, including the uncertainty of the magnitude of the traffic impacts of the initiation of the Central Corridor light rail transit service along University Avenue including traffic pattern changes expected with the creation of a transit mall on Washington Avenue on the U of M campus. He advised that the Central Corridor LRT project appears to have all the approvals and is moving ahead. He referred to the impending start of the Northstar commuter rail service, saying that this is an exciting time for the Twin Cities. He thanked all those who have participated in this process and acknowledged the sound technical work of the consultant team and their interaction with the Prospect Park and Seward communities, and U of M and Park Board officials throughout the process. 2

Mr. Grube also recognized Robin Garwood from Minneapolis City Council member Cam Gordon s office. Mr. Grube outlined the Agenda, and then turned the presentation over to consultant team member Dan Cornejo. Mr. Cornejo recapped the study process over the past several months. He stated that the February 19 Open House focused on problem identification and presentation of map graphics and video that demonstrated the complexities of operation of the intersection. The June 9 Open House was a progress report that presented the range of potential solutions, including conventional signalized intersections, various types of roundabouts, and the bridge-tunnel options for a grade-separated trail along East River Parkway. He noted the involvement of the Project Advisory Committee (PAC) (comprised of residents from Prospect Park and Seward, the Hennepin County Bicycle Advisory Committee, the Minneapolis Bicycle Advisory Committee, and a representative of Transit for Livable Communities, which met six (6) times with the consultant study team. He acknowledged the involvement of bike/walk experts brought in by Transit for Livable Communities. He noted the project website (www.sehinc.com, online projects), and the many comment cards and e-mails the consultant team received throughout the process. Project Manager Mike Kotila revisited the Study Objectives: Improve pedestrian, bicycle, and vehicle safety Improve intersection clarity to satisfy user expectations Reduce delay for all users. Mr. Kotila then presented a map graphic to illustrate and explain the recommended Modified 5-Leg Signalized intersection, which he termed the Traffic Management Plan. He explained the recommended curb adjustments needed to better align vehicle traffic toward their desired destinations across and through the intersection. He noted the few locations where right-of-way would need to be adjusted and where property acquisition would be required. He pointed out the saving of all the trees along the southern right-ofway of Franklin Avenue west of Thornton, and the need to remove one tree on the northern right-of-way at the northwest corner of Franklin Avenue and Thornton. And he explained the various signal operations for each of the intersection s five legs. He also pointed out the proposed bike lanes across the Franklin Avenue Bridge and along 27 th Avenue. He described the proposed bike boxes on the eastbound Franklin Avenue and southbound 27 th Avenue approaches to the intersection. He explained the improved situation for pedestrians in terms of increased frequency of service and much lower maximum wait times that can be accomplished with the more efficient traffic signal operation. He also explained how the proposed changes would improve clarity of the operation for all users. Using another map graphic, Mike described the recommended lane changes on the Franklin Avenue Bridge, designed to better sort vehicles to their intended lanes as they 3

approach the East River Parkway intersection and to accommodate bicycle lanes across the entire length of the bridge. Jim Grube concluded the presentation by describing the next steps, which included presentation to the Minneapolis City Council and Hennepin County Board, the preparation of plans and bid documents, construction sometime in the next year if funds are available, monitoring intersection operations over the next 4-5 years with potentially changing traffic patterns during construction and initiation of Central Corridor LRT. He advised that he was examining his overall Capital Budget to try to find the needed funds (around $500,000) and seek County Board approval. Public Comment and Feedback At times during the presentation, as well as following the presentation, the participants, study engineers, and planners engaged in a dialogue regarding the recommended traffic management plan. Comments and questions from the audience included: This concept looks like it will work. You have been listening to us when we advised that you should make some adjustments now and monitor it to see how traffic reacts over the next few years until LRT starts up. Bike boxes are a good idea, but have you considered special signal indications for bikes to go first before other vehicle traffic? (Response: bike boxes will allow bikes to move to front of the queue; video detection will be used to be sure that bikes place a call to be served from all approaches even if larger vehicles are not present; the proposed signal operation allows the bikes to go first from the Franklin Bridge; Special bike signal indications are not widely used and at this point we have no experience with them so they are not part of the current plan) I think west-bound traffic will continue to back up on Franklin Avenue in the morning. A roundabout would work too, maybe better, but I worry that it would work too well and bring more traffic. I like what I see. This solution will work for now. We ll see what happens when LRT is in operation. With 27 th and Franklin planned as the Grand Rounds Missing Link, it would be nicer if trucks were not allowed. How long will this intersection re-construction take? (Response: There may be some work activity at the intersection over the course of a month or so with spot lane closures along the edges but it s not expected to be very disruptive to traffic through the intersection except for periods when the pavement resurfacing is occurring which will be focused within a period of a week or less.) 4

I m concerned about how the lanes are planned on the west end of the bridge, especially the bottleneck that is created when 2 lanes are reduced to 1 lane. You should be sure that turn lanes, through lanes and bike lanes will work together on the west end. (Response: additional bike lane planning is underway for Franklin from the river bridge all the way to Hennepin Avenue by Minneapolis Public Works. They will coordinate with this traffic management plan and all of the issues raised will be considered.) This solution doesn t go far enough. You need to re-do the Franklin Avenue Bridge too, to get the room you need for proper vehicle alignment and to handle the volumes. This solution makes sense, as a short-term adjustment. At the request of Jim Grube, Council Member Cam Gordon had the final word: He thanked the County, the consultant study team, and everyone who participated in this process. He said that if anyone had any additional ideas or thoughts, that they should e-mail the consultant team. He stated he believed that this recommended solution would help us get through the next 4-5 years until LRT begins. Mr. Grube thanked everyone again for coming and participating, and said that he and the consultants would remain for the next half hour by the boards to respond to anyone who had more questions or wanted to make further comments. The Open House ended about 8:30 pm. Dan Cornejo 09-21-09 ########## 5

Franklin Avenue (CSAH 5) East River Parkway Intersection Study Open House #3 Recommended Approach St. Frances Cabrini Catholic Church 1500 Franklin Avenue, Minneapolis 6:30 to 8:30 pm August 25, 2009 Agenda 1. Open House 2. Presentation (and Q and A) 3. Continuation of Open House Attendance: Approx. 85 persons Meeting Summary Open House From 6:30 to 7:15, meeting attendees gathered at five stations which displayed boards describing: Station #1: General Project and Process Information Project Advisory Committee/Technical Advisory Committee Process Board Goals and Objectives Board Schedule Board Area Map and Issues Board Station #2: Existing Situation and 2030 No-Build Intersection Map/Aerial Board Grand Rounds Missing Link Board City of Mpls Bike Count Map Traffic Count and Forecast Board Existing AM Queuing Existing PM Queuing 2030 AM Queuing 2030 PM Queuing Station #3: Recommended Approach Short Term Modified 5-Leg Signal, Traffic Management Plan/Intersection Board Traffic Management Plan, Franklin Bridge Lane Configurations Board Signal Phasing/Pedestrian Intervals 1

2014 Traffic Forecast Graph Queuing comparison exhibit o Existing AM to 2014 AM Queuing o Existing PM to 2014 PM Queuing Station #4: Alternatives Considered Traffic Signal Board with o Modified 5-Leg Signal Traffic Management Plan o 4-Leg Signal Roundabout Board with o Single Lane Roundabout o Multi-lane Roundabout o Hybrid Roundabout Trail Grade Separation Board o Trail Tunnel o Trail Bridge Station #5: What happens when the Traffic Management Plan is no longer effective? If the Long Term Plan is a 4-Leg Signal... If the Long Term Plan is roundabout... If the Long Term Plan includes a trail grade separation... Staff from Hennepin County, the City of Minneapolis, and SEH consulting firm were at each of the stations to explain the information and graphics, to respond to questions, and to listen to comments. Presentation At approximately 7:15, Hennepin County Director of Transportation Jim Grube opened the meeting with a welcome to all participants. He announced that the purpose of this final Open House was to present the recommended traffic management plan. Mr. Grube introduced Hennepin County Commissioner Peter McLaughlin. Commissioner McLaughlin made a few remarks about the complexity of the intersection issues, including the uncertainty of the magnitude of the traffic impacts of the initiation of the Central Corridor light rail transit service along University Avenue including traffic pattern changes expected with the creation of a transit mall on Washington Avenue on the U of M campus. He advised that the Central Corridor LRT project appears to have all the approvals and is moving ahead. He referred to the impending start of the Northstar commuter rail service, saying that this is an exciting time for the Twin Cities. He thanked all those who have participated in this process and acknowledged the sound technical work of the consultant team and their interaction with the Prospect Park and Seward communities, and U of M and Park Board officials throughout the process. 2

Mr. Grube also recognized Robin Garwood from Minneapolis City Council member Cam Gordon s office. Mr. Grube outlined the Agenda, and then turned the presentation over to consultant team member Dan Cornejo. Mr. Cornejo recapped the study process over the past several months. He stated that the February 19 Open House focused on problem identification and presentation of map graphics and video that demonstrated the complexities of operation of the intersection. The June 9 Open House was a progress report that presented the range of potential solutions, including conventional signalized intersections, various types of roundabouts, and the bridge-tunnel options for a grade-separated trail along East River Parkway. He noted the involvement of the Project Advisory Committee (PAC) (comprised of residents from Prospect Park and Seward, the Hennepin County Bicycle Advisory Committee, the Minneapolis Bicycle Advisory Committee, and a representative of Transit for Livable Communities, which met six (6) times with the consultant study team. He acknowledged the involvement of bike/walk experts brought in by Transit for Livable Communities. He noted the project website (www.sehinc.com, online projects), and the many comment cards and e-mails the consultant team received throughout the process. Project Manager Mike Kotila revisited the Study Objectives: Improve pedestrian, bicycle, and vehicle safety Improve intersection clarity to satisfy user expectations Reduce delay for all users. Mr. Kotila then presented a map graphic to illustrate and explain the recommended Modified 5-Leg Signalized intersection, which he termed the Traffic Management Plan. He explained the recommended curb adjustments needed to better align vehicle traffic toward their desired destinations across and through the intersection. He noted the few locations where right-of-way would need to be adjusted and where property acquisition would be required. He pointed out the saving of all the trees along the southern right-ofway of Franklin Avenue west of Thornton, and the need to remove one tree on the northern right-of-way at the northwest corner of Franklin Avenue and Thornton. And he explained the various signal operations for each of the intersection s five legs. He also pointed out the proposed bike lanes across the Franklin Avenue Bridge and along 27 th Avenue. He described the proposed bike boxes on the eastbound Franklin Avenue and southbound 27 th Avenue approaches to the intersection. He explained the improved situation for pedestrians in terms of increased frequency of service and much lower maximum wait times that can be accomplished with the more efficient traffic signal operation. He also explained how the proposed changes would improve clarity of the operation for all users. Using another map graphic, Mike described the recommended lane changes on the Franklin Avenue Bridge, designed to better sort vehicles to their intended lanes as they 3

approach the East River Parkway intersection and to accommodate bicycle lanes across the entire length of the bridge. Jim Grube concluded the presentation by describing the next steps, which included presentation to the Minneapolis City Council and Hennepin County Board, the preparation of plans and bid documents, construction sometime in the next year if funds are available, monitoring intersection operations over the next 4-5 years with potentially changing traffic patterns during construction and initiation of Central Corridor LRT. He advised that he was examining his overall Capital Budget to try to find the needed funds (around $500,000) and seek County Board approval. Public Comment and Feedback At times during the presentation, as well as following the presentation, the participants, study engineers, and planners engaged in a dialogue regarding the recommended traffic management plan. Comments and questions from the audience included: This concept looks like it will work. You have been listening to us when we advised that you should make some adjustments now and monitor it to see how traffic reacts over the next few years until LRT starts up. Bike boxes are a good idea, but have you considered special signal indications for bikes to go first before other vehicle traffic? (Response: bike boxes will allow bikes to move to front of the queue; video detection will be used to be sure that bikes place a call to be served from all approaches even if larger vehicles are not present; the proposed signal operation allows the bikes to go first from the Franklin Bridge; Special bike signal indications are not widely used and at this point we have no experience with them so they are not part of the current plan) I think west-bound traffic will continue to back up on Franklin Avenue in the morning. A roundabout would work too, maybe better, but I worry that it would work too well and bring more traffic. I like what I see. This solution will work for now. We ll see what happens when LRT is in operation. With 27 th and Franklin planned as the Grand Rounds Missing Link, it would be nicer if trucks were not allowed. How long will this intersection re-construction take? (Response: There may be some work activity at the intersection over the course of a month or so with spot lane closures along the edges but it s not expected to be very disruptive to traffic through the intersection except for periods when the pavement resurfacing is occurring which will be focused within a period of a week or less.) 4

I m concerned about how the lanes are planned on the west end of the bridge, especially the bottleneck that is created when 2 lanes are reduced to 1 lane. You should be sure that turn lanes, through lanes and bike lanes will work together on the west end. (Response: additional bike lane planning is underway for Franklin from the river bridge all the way to Hennepin Avenue by Minneapolis Public Works. They will coordinate with this traffic management plan and all of the issues raised will be considered.) This solution doesn t go far enough. You need to re-do the Franklin Avenue Bridge too, to get the room you need for proper vehicle alignment and to handle the volumes. This solution makes sense, as a short-term adjustment. At the request of Jim Grube, Council Member Cam Gordon had the final word: He thanked the County, the consultant study team, and everyone who participated in this process. He said that if anyone had any additional ideas or thoughts, that they should e-mail the consultant team. He stated he believed that this recommended solution would help us get through the next 4-5 years until LRT begins. Mr. Grube thanked everyone again for coming and participating, and said that he and the consultants would remain for the next half hour by the boards to respond to anyone who had more questions or wanted to make further comments. The Open House ended about 8:30 pm. Dan Cornejo 09-21-09 ########## 5

Open House Comments and Responses Franklin/East River Parkway Intersection Study August 25, 2009 Type Subject Comment Study Team Acknowledgement I like the proposal as is. Thank you for your feedback. I like and support the current recommendation as a short term fix. The bike boxes are great. Bike boxes great idea. We look forward to implementing the bike boxes which are expected to serve user needs very well on the intersection approaches that will also be served by bike lanes. Reaction to Recommended Approach Modified 5 leg Traffic Management Plan I don t see a proposed bike box for traffic following Franklin Ave SE west direction across the bridge. From my experience, this is a difficult left turn for bikes with 2 lanes of traffic, many traveling across to the River Road (N). I understand bike boxes are experimental. I'd encourage considering placing on at this point as well. A bike box on the westbound Franklin approach would be considered if bike lanes were able to be included to allow bikes to pass by waiting cars Love the outcome. The presentation tonight clear and very easy to listen to. Love the lane concept for calming traffic. Thank you for your feedback. Overall I am pleased with the traffic management approach and optimistic for the future present of bicyclist on the Franklin Ave bridge as well as the continuation of bike lanes along Franklin/27th Aves. Any doubts I have remain with the alternative solutions and major physical changes to the intersection (which, aside from grade separation of the River Road bike/ped lanes remain unnecessary for lack of a better word). I hope that we can deal with increasing traffic and continually work to decrease traffic overall. Thank you. I hope the City and County will continue to consider a roundabout and not be deferred by the "conservative" no change mentality of those who feel they can have the neighborhood [to themselves] The traffic management approach is expected to address some of the existing issues as well as enable the intersection to be responsive to modest levels of change. The City and County will monitor safety and intersection operations over the next several years as traffic patterns change. Balancing the needs of all users against local impacts is always a consideration in a long term decision making process. Reaction to Long Term Alternatives Roundabouts General Trail Bridge/Tunnel I enthusiastically support a roundabout as a long term solution. Ultimately sometime in our future, I support a roundabout proposal for this signal. Thank you. I would also support the idea of studying the feasibility of a bike/ped bridge over the end of the bridge along the River Road. (We have a beautiful bike/ped bridge across Hiawatha, which has been a great improvement there, and could be used as a model in concept if not design) North/south peds and bikes on the path (next to the river) could pass the intersection via a catwalk under the bridge. It is cheaper than a tunnel and open (not scary). Thank you for your feedback. Through the course of this study process, feedback we've had generally supports your sentiment. If a larger solution is needed, a roundabout that is "right sized" to serve all user demands seems to be the favored long term solution. The US Park Service has indicated that a pedestrian/bike bridge would not likely be approvable due to the visual impacts from the river and West Bank. The bridge underpass/cat walk idea would have a visual impact as well especially as it passes in front of Bridal Veil Falls. Just wanted to say : Thank you for your time and effort Study Process General Thank you for recognizing the efforts of the study team. Good Job SEH, Inc. 9/15/2009 Page 1 of 1

Franklin/East River Parkway Intersection Study Open House No. 3 August 25, 2009 Attendance and Comment Sheet Statistics Overall Attendance (based upon sign in sheet): 49 Written Comments Sheets Received: 9 Resident Business Owner/Operator Commuter/Visitor In Prospect Park East River Road Neighborhood In Seward neighborhood At the University of Minnesota Other location I use the intersection as a: Driver/passenger in a motorized vehicle Pedestrian Bicyclist Transit rider Other Description Comment Sheet Number 1 2 3 4 5 6 7 8 9 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Moped X X X X X Total 9 8 1 0 5 0 0 1 9 8 7 5 1 % of Total 89% 11% 0% 56% 0% 0% 11% 100% 89% 78% 56% 11%