PEAPOD. Pneumatically Energized Auto-throttled Pump Operated for a Developmental Upperstage. Test Readiness Review

Similar documents
Project Number: P14474

TR Electronic Pressure Regulator. User s Manual

Lab 1c Isentropic Blow-down Process and Discharge Coefficient

Cover Page for Lab Report Group Portion. Pump Performance

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

Marc McMullen. Physics Detector Support Group

INSTALLATION & MAINTENANCE INSTRUCTIONS DESCRIPTION SPECIFICATIONS. CE (EMC) Compliant

The Ins and Outs of I/P Transducers

Control Valve : The Final Control Element. Nimish Shah

INSTALLATION & MAINTENANCE INSTRUCTIONS

Mitos Fluika Pressure and Vacuum Pumps Datasheet

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

Technical Review Agenda

Pressure Dump Valve Service Kit for Series 2300 Units

QBS Electronic Pressure Regulator

BAROMETER PRESSURE STANDARD PRESSURE CONTROLLER

SINGLE VALVE WITH LOW-FLOW BYPASS

ISQB1 INTRINSICALLY SAFE ELECTRO-PNEUMATIC CONTROL VALVE INSTALLATION & MAINTENANCE INSTRUCTIONS HAZARDOUS AREA CLASSIFICATION

Air Compressor Control System for Energy Saving in Manufacturing Plant

GDS OPERATING PROCEDURE

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Type 1 - Nitrogen Generation System. Designed for: Dry or Pre-Action Fire Protection Systems (FPS) with a total capacity up to 750 gallons

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions

UNIVERSAL MASK TEST SYSTEM

ACV-10 Automatic Control Valve

FX134, FX1234, FX3030 Problem and Solutions

Type 3 - PSA Nitrogen Generation System

SSR. Smart Valve Positioner.

Key Features & Advantages of JEHA MK IV (5,000 PSI Hydraulic Test Stands)

GP1 & GP2. Electropneumatic Regulators FOR PRESSURE CONTROL TO 1,000 PSI

AutoDrill s OUTSTANDING FEATURES

Pressure Dump Valve Service Kit for Series 3000 Units

Mass Flowmeters. Mass Flowmeters for Gases

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10

RCD - Ultra-Rugged Differential Pressure Flowmeter

Application of CHE100 in Frequency Conversion Alteration of Air Compressor System

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

Series 2G Diaphragm Actuators

Operating Manual. Model BAC-30RT30/BAC-30DC

HumiSys HF High Flow RH Generator

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

USER MANUAL. Intelligent Diagnostic Controller IDC24-A IDC24-AF IDC24-AFL IDC24-F IDP24-A * IDP24-AF * IDP24-AFL * IDP24-F * 1/73

ME 8843-Advanced Mechatronics. Project Proposal-Automatic Bike Transmission

AFC. SDPROC and AFC Analog Mass Flow Controller ANALOG MASS FLOW CONTROLLERS. Principles of Operation. Design Features

Project Title: Pneumatic Exercise Machine

Porter Analytical & Industrial Products

INSTALLATION & MAINTENANCE INSTRUCTIONS QBX ETHERNET MODEL

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times

OPERATING INSTRUCTIONS Pressure Control System PCS-20 through PCS-100

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

GAS FUEL VALVE FORM AGV5 OM 8-03

Installing a Probe. Typical Installation

INTRODUCTION. The Quantum Technology system has the following advantages:, as it does not need plastic gas-bags which are volume-consuming,

Powers Controls RC 195 Multiple Input Receiver- Controller

Test Report # Rev 0. Adiabatic Compression With Constant Bleed Valve

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES

Installation, Operation, and Maintenance Manual

Drift-Chamber Gas System Controls Development for the CEBAF Large Acceptance Spectrometer

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Tightness control TC. Product brochure GB 3 Edition AGA

Basic Pneumatics. Module 2: Direct Control of single acting cylinder PREPARED BY. IAT Curriculum Unit. January 2011

SSL. Smart Valve Positioner.

Operation Manual. Diaphragm Sensed Gas Pressure Regulators

CHAPTER 3 : AIR COMPRESSOR

CT433 - Machine Safety

Power Valve: Precision Regulator. High precision, large capacity relief regulator

Unit 24: Applications of Pneumatics and Hydraulics

Mass Flow Controller (MFC) for Gases

Product Overview A DIVISION OF MARSH BELLOFRAM

UNIVERSITY OF WATERLOO

Air preparation units

BUBBLER CONTROL SYSTEM

Exercise 8. Closed-Loop Pressure Control, Proportional-Plus-Integral Mode EXERCISE OBJECTIVE

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

Air service units series Y G1/4 to G1

Model 130M Pneumatic Controller

Pressure on Demand. Air Pressure Amplifiers

Stand-Alone Bubble Detection System

Valve Proving System VDK 200 A S06*

Reliability: Piping Distribution & Storage Matter. Instructor: Kurt Thielemann Principal

AIR DRIVEN. Gas Boosters & SYSTEMS. Accepting VISA, MasterCard and American Express

EPP4 Pressure Regulator Basic G 1/4"

435 psi (3.0 MPa) Maximum Supply Pressure High Pressure Electro-Pneumatic Regulator. Maximum supply pressure. Set pressure range.

Air Bubbler Depth Gauge DG2200 Installation and Reference Manual

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

Sorensen DCS Series. 1 3 kw V A. General Purpose Systems Power Supply

Animal Ventilator for Gated Hyperpolarized Helium MRI

UltraLo 1800 Alpha Particle Counter

The Discussion of this exercise covers the following points:

Mass Flow Controller (MFC) for Gases

Automatic Isokinetic Sampler. ST5 Evo

7250 Sys. Ruska Multi-Range Pressure Calibration System. GE Sensing & Inspection Technologies. Features. Applications

hydro-pac, inc. Low-Pressure Gas Compressors 1500 to 6000 PSI

Design of an Automated Perfusion Pump James J Higham

Development of a Miniaturized Pressure Regulation System "mprs"

L3 Pressure and Level transmitter

RD(H)20/25 Pressure-Reducing Regulator User Manual

Transcription:

PEAPOD Pneumatically Energized Auto-throttled Pump Operated for a Developmental Upperstage Test Readiness Review Customer: Special Aerospace Services Chris Webber and Tim Bulk 1

Overview Project Overview Schedule Test Readiness Overview Schedule Test Readiness 2

Project Overview 3

Project Motivation Design, manufacture, and test a pneumatically powered pump system for use on an upper stage rocket engine or lander. Proof of concept pump system for hypergolic propellants 10%-100% throttleability Pneumatically powered Overview Schedule Test Readiness 4

CONOPS Overview Schedule Test Readiness 5

Functional Block Diagram Water Supply Manual Pressure Regulator Solenoid Valve 24 V 28 V Pressure Transducer Thermocouple Pump Pressure Transducer 28 V Thermocouple Tachometer Relief Valve Motor Driver Electronic Pressure Regulator Motor Sink 120 AC wall power Power 1600 W Power Supply 120 W Power Supply 28 V Power Distribution Signal Conditioning Faraday Cage DAQ 1 DAQ 2 600 W User Computer 24 V 28 V 600 W Motor Driver Motor Key Helium Tank Manual Ball Valve Manual Pressure Regulator Solenoid Valve Relief Valve Electronic Pressure Regulator Pressure Transducer Drive System Muffler Provided Purchased Manufactured Analog Signal Digital Signal Electrical Power 6 Mechanical Power

Baseline Design 7

Baseline Design 8

Design Changes 9

Design Changes Air Motor Pressure Regulator Constructed from a manual regulator and stepper motor: Manual Regulator: 400 scfm flowrate (360 required) 0 psi to 120 psi (105 psi required) 12 turns for 0 psi to 105 psi 8 N-m max. adjustment torque Stepper Motor (HT34-487) w/gearbox 2.2rev/s max. rotation rate (0.6 rev/s required) 25 N-m min. torque (8 N-m required) 10

Design Changes Back-Pressure Regulator Constructed from a manual back-pressure regulator and stepper motor: Manual Back-Pressure Regulator: 200 lpm flowrate (84 required) 75 psi to 750 psi (full range req.) 11 turns for 75 psi to 750 psi 15N-m max. adjustment torque Stepper Motor (HT34-487) w/gearbox 4 rev/s max. rotation rate (2.2 rev/s required) 25 N-m min. torque @ 2.2 rev/s (15 N-m required) 11

Critical Project Elements CPEs from CDR Develop a functioning pump Meet efficiency requirement of 75% Correct acquisition of pressure, RPM, and mass flow rate Developing throttling capabilities (10-100%) Safe operation of pump and drive system ary restrictions Rationale Manufacturing of the pump is in progress, but assembly and operation of the pump could pose a time risk. Control and design of the pump could cause the pump to achieve a lower efficiency. Have yet to acquire a measurement on flow rate, which is needed for Level 1 Success. Throttling the air motor using a stepper motor attached to a regulator creates unforeseen mechanical and control loop challenges. Operating a pump with high pressures using digital control can present a multitude of problems towards safety. A multitude of parts to purchase Overview Schedule Test Readiness 11

Levels of Success Level Performance Success 1 750 ± 15 psi outlet pressure Structural FOS 2.5 120 seconds of operation 75% efficiency of pump at full throttle 2 10-100% throttleability 0-100% throttle in 2 seconds All level 1 requirements 3 0-100% throttle in 1 second All level 1 and 2 requirements Hypergolic Compatible Key On Track Completed Concerned Will Not Meet Overview Schedule Test Readiness 13

Schedule 14

Overview Logistics Manufacturing 03/22/17 Pump Assembled Air Motor 4d Sensors 2d Software 3d Actuators 3d System 03/24/17 Full System Assembly 4d AIAA Margin 04/03/17 Final System Testing Begins System Testing V&V 3d 04/19/17 Senior Design Symposium 04/24/17 SFR 05/08/17 Final Report 15

Manufacturing Overview Schedule Test Readiness 16

Testing 4d Margin 2d Overview Schedule Test Readiness 17

Testing 3d Margin 3d Overview Schedule Test Readiness 18

Testing 4d Margin 3d 19

Largest Concerns Housing manufacturing is a slow process Control loop design may take longer than expected and already have encountered some DAQ issues Waiting for the arrival of the drivers. Possibility of integration and control problems with the regulators Having enough time to troubleshoot and verify our requirements 20

Test Readiness 21

Testing Status PC/ User Interface DAQ Completed Tasks DAQ Data Collection Sensor Calibration Sensor Signal Conditioning Leak Testing Requirement(s) met: FR.7 Signal Conditioning Overview Schedule Test Readiness 22

Subsystem Test Plan Overview Margin = 14 days 23

Subsystem Test Plan Overview Feb. 6-28 Feb. 28 Mar. 6 Mar. 6-12 Mar. 12-20 Mar. 20-22 Sensor Q&C and breadboard design DAQ GUI Solenoid Testing DAQ Sensor Integration Regulator Testing Air Motor Testing Control Logic Development Stepper Motor Test Air Motor Throttling Pump Assembly Iteration of control algorithm Overview Schedule Test Readiness 24

System CAD Model 25

Pressure Regulator Testing Test Rationale: Relate regulator opening to downstream pressure through data collection. Use results to calibrate downstream pressure to regulator thread engagement. Test Setup: Equipment required: 1 Manual Ball Valve 1 Electric Solenoid Valve 2x Pressure Transducer (1/4 NPT fitted in Tee) 1 Manual Pressure Regulator 1 Venting Cap 1 Piping MBV SV P MR Manual Ball Valve Solenoid Valve Pressure Transducer Manual Regulator Facilities required: Air compressor providing 100PSI provided in Projects Room 26

Pressure Regulator Testing Test Procedure: Set regulator to certain thread engagement, record the subsequent downstream pressure. Repeat as needed for a sufficient amount of points over the full pressure range. Risk Mitigation: The results of this test will help to operate the regulator electronically, getting the project closer to fulfilling its requirement of electronically regulating the pump. Time Requirement: 7 man hours Test Setup: Notable Results: The relationship between the regulator thread engagement and the downstream pressure is roughly linear, allowing for an initial simple controller to be designed. Requirements met at test completion: None Overview Schedule Test Readiness 27

Air Motor Testing Test Rationale: Determine the operational throttle range of the motor. Quantification of motor vibrations. Test Setup: Equipment required: 1 Manual Ball Valve 1 Electric Solenoid Valve 125PSI Relief Valve (1/4 NPT fitted in Tee) 1 Air Filter Pressure Transducer (1/4 NPT fitted in Tee) 1 Manual Pressure Regulator 1 Air Lubricator Air Motor with muffler mounted on exhaust Tachometer Shaft Torque Device 1 Piping MBV SV RV P MR F LB TM Manual Ball Valve Solenoid Valve Relief Valve Pressure Transducer Manual Regulator Air Filter Air Lubricator Tachometer Facilities required: Air compressor providing 100PSI Air @45CFM, provided on East Campus Overview Schedule Test Readiness 28

Air Motor Testing Test Procedure: Regulator is set to a known pressure (starting at 10PSI), the system is activated. The resulting RPM of the drive shaft is recorded. The test is run for a the full range of pressures 0-100PSI. Risk Mitigation: The results of this test will verify that the motor can attain the full throttle range of 10-100% throttleability. This test will also quantify expected vibrations the motor will induce on the test assembly Time Requirement: 20 man hours Test Setup: Requirements met at test completion: FR2 Pump is throttleable Overview Schedule Test Readiness 29

Stepper Motor Testing Phase 1 Test Rationale: Determined motor can be controlled through LabVIEW. Quantify accuracy of control system and slew rates Test Setup: Equipment required: Computer Data Acquisition (DAQ) Stepper Motor Motor Driver 1600W power supply Facilities required: Projects room Overview Schedule Test Readiness 30

Stepper Motor Testing Phase 1 Test Procedure: Motor will be connected to the DAQ, while LabVIEW commands the motor to step to specific angles. Test Setup: Risk Mitigation: The results of this test will verify that the stepper motor can be controlled through LabVIEW allowing pressure to be regulated to the angles specified. Time Requirement: 10 man hours Requirements met at test completion: None Overview Schedule Test Readiness 31

Stepper Motor Testing Phase 2 Test Procedure: Motor will be connected to the DAQ, while in LabVIEW the command the motor to step at specific angles. The corresponding downstream pressure is recorded. The test is then iterated through a series of pressure settings Test Setup: Risk Mitigation: The results of this test will verify that the stepper motor can be controlled through LabVIEW allowing pressure to be regulated electronically. This allows for the development of the feedback control with the downstream pressure transducer. Time Requirement: 10 man hours MBV SV P EP Manual Ball Valve Solenoid Valve Pressure Transducer Electronic Pressure Regulator Requirements met at test completion: None Overview Schedule Test Readiness 32

Air Motor Throttling Test Rationale: Verify that acquired stepper motor operates as expected. Verify that control algorithms and driver correctly actuate motor to desired positions. Quantify accuracy of control system and slew rates Test Setup: Facilities required: Air compressor providing 100PSI Air @45CFM, provided on East Campus Equipment required: 1 Manual Ball Valve 1 Electric Solenoid Valve 125PSI Relief Valve (1/4 NPT fitted in Tee) 1 Air Filter Pressure Transducer (1/4 NPT fitted in Tee) 1 Manual Pressure Regulator mounted with stepper motor 1 Air Lubricator Air Motor with muffler mounted on exhaust Tachometer Shaft Torque Device 1 Piping MBV SV RV P BPR EP F LB TM Manual Ball Valve Solenoid Valve Relief Valve Pressure Transducer Back Pressure Regulator Electronic Pressure Regulator Air Filter Air Lubricator Tachometer Overview Schedule Test Readiness 33

Air Motor Throttling Test Procedure: The DAQ system is loaded with a desired throttle profile. The DAQ now starts up the test by setting the motor to 10% throttle. The motor is then ran through a throttle profile. Test Setup: Risk Mitigation: The results of this test will verify that the stepper motor can actuate the regulator through the full range of 10-100% to guarantee electronic throttle-ability. This test will also quantify the slew rate of this control system. Time Requirement: 15 man hours Requirements met at test completion: FR2 - Pump is electronically throttleable FR4 - Pump system can run throttle profile Overview Schedule Test Readiness 34

Final Test Plan Overview Margin = 7 days Overview Schedule Test Readiness 35

Final Test Plan Overview Mar. 21-23 Apr. 3-7 Apr. 7-17 Pump Assembly Mass Flow Rate Testing Outlet Pressure Testing Pressure Fluctuation Testing K-Bottle Testing Throttle Profile Testing Iteration of control algorithm Overview Schedule Test Readiness 36

Mass Flow Rate Testing Test Setup: Test Rationale: Verify that after full assembly the pump outputs the expected amount of water for a certain throttle setting. Equipment required: Complete Assembly of all systems, operational DAQ and control components Facilities required: Air compressor providing 100PSI Air @45CFM, provided on East Campus MBV SV RV P T MR BPR EP F LB TM Manual Ball Valve Solenoid Valve Relief Valve Pressure Transducer Thermocouple Manual Regulator Back Pressure Regulator Electronic Pressure Regulator Air Filter Air Lubricator Tachometer Overview Schedule Test Readiness 37

Mass Flow Rate Testing Test Procedure: The DAQ system is loaded with a desired throttle setting (constant). The pump is set to run, the flow is switched to the control volume for a certain amount of time and then switched back to the regular sink. Requirements met at test completion: DR2.1 - Pump operates at 1.4L/s at full throttle Risk Mitigation: The results of this test will verify that the system meets design expectations, that is meeting an output flow rate of 1.4L/s Time Requirement: 20 man hours Test Setup: Overview Schedule Test Readiness 38

Pressure Fluctuation Testing Test Rationale: Verify that after full assembly the pump output flow has minimal pressure fluctuation. Equipment required: Complete Assembly of all systems, operational DAQ and control components Facilities required: Air compressor providing 100PSI Air @45CFM, provided on East Campus Test Setup: MBV SV RV P T MR BPR EP F LB TM Manual Ball Valve Solenoid Valve Relief Valve Pressure Transducer Thermocouple Manual Regulator Back Pressure Regulator Electronic Pressure Regulator Air Filter Air Lubricator Tachometer Overview Schedule Test Readiness 39

Pressure Fluctuation Testing Test Procedure: The DAQ system is loaded with a desired throttle setting (constant). The pump is set to run, the output flow pressure is measured and recorded. Risk Mitigation: The results of this test will verify that the pump meets design expectations, that is of having pressure fluctuations no greater than 15PSI. Time Requirement: 5 man hours Test Setup: Requirements met at test completion: DR2.3 - Pump operates with pressure fluctuations less than 15PSI Overview Schedule Test Readiness 40

K-Bottle Testing Test Rationale: Verify that after full assembly the pump system can operate using a Helium K-Bottle to run the motor. Test Setup: Equipment required: Complete Assembly of all systems, operational DAQ and control components Facilities required: Water Source Helium K-Bottle MBV SV Manual Ball Valve Solenoid Valve RV P T MR BPR EP F LB TM Relief Valve Pressure Transducer Thermocouple Manual Regulator Back Pressure Regulator Electronic Pressure Regulator Air Filter Air Lubricator Tachometer Overview Schedule Test Readiness 41

K-Bottle Testing Test Procedure: The pump system is setup as it normally would except that instead of using compressed air, the motor system uses a helium k-bottle. Test Setup: Risk Mitigation: The results of this test will verify that the pump meets design expectations, that is of being able to run off of a helium k- bottle Time Requirement: 10 man hours Requirements met at test completion: DR1.1 - Pump operates with a Helium K-Bottle Overview Schedule Test Readiness 42

Throttle Profile Testing Test Rationale: Verify that control algorithms drive the system through a desired throttle profile. Quantify accuracy of control system and slew rates Equipment required: Complete Assembly of all systems, operational DAQ and control components Facilities required: Air compressor providing 100PSI Air @45CFM, provided on East Campus Test Setup: MBV SV RV P T MR BPR EP F LB TM Manual Ball Valve Solenoid Valve Relief Valve Pressure Transducer Thermocouple Manual Regulator Back Pressure Regulator Electronic Pressure Regulator Air Filter Air Lubricator Tachometer Overview Schedule Test Readiness 43

Throttle Profile Testing Test Procedure: The DAQ system is loaded with a desired throttle setting (constant). The pump is set to run, the full system operation is monitored and recorded. Risk Mitigation: The results of this test will verify that the pump system can correctly run a throttle profile. Successfully doing this would demonstrate the completeness of the project. Time Requirement: 15 man hours Test Setup: Requirements met at test completion: All requirements are met at this point Overview Schedule Test Readiness 44

Control Algorithm Iteration Test Rationale: Verify that acquired stepper motor operates as expected. Verify that control algorithms and driver correctly actuate motor to desired positions. Quantify accuracy of control system, slew rates and torque. Test Setup: Equipment required: Pressure Transducer (1/4 NPT fitted in Tee) 1 Manual Pressure Regulator mounted with stepper motor Computer Data Acquisition DAQ Motor Driver Stepper Motor Power Supply 1 Piping Facilities required: Projects room Overview Schedule Test Readiness 45

Control Algorithm Iteration Test Procedure: LabVIEW will be set to a specific pressure where the computer will control stepper motor to regulated the pressure through the pressure regulator. Different pressures will be tested to understand the slew rate for the system. Risk Mitigation: The results of this test will verify that the stepper motor can actuate the regulator to the desire pressure, in order to guarantee electronic throttle-ability. This test will also quantify the slew rate of this control system. Time Requirement: 20 man hours Requirements met at test completion: FR2 - Pump is electronically throttleable Overview Schedule Test Readiness 46

47

Statistics and Progress 85.89% of Parts purchased (by dollar value) $1173.10 of Margin! *See backup slides for full itemized budget Overview Schedule Test Readiness 48

: Parts left to buy Left to buy: $962.85 Overview Schedule Test Readiness 49

Questions? 50

Backup 51

DAQ Input Testing 52

System Tests Goals Determine data variance and system (non-sensor) error Qualitatively verify all datalinks work Equipment DAQ PC (with LabVIEW) Thermocouples Pressure transducers Tachometer Solenoid valves DC power supply 53

System Tests Procedure Connect all devices appropriately Run LabVIEW code (LabVIEWDAQpractice10) - collect pressure, temperature, tachometer data Stop code, save data Analyze data on MATLAB 54

IO testing 55

Results: Nominal sample rate limited to 1 khz Max error 4 mv (vs multimeter) Data spiking (right) corrected by using lower sample rate (rate shown: 1 khz) Verified Accuracy of thermocouple, pressure, and tachometer readings Maximum control loop rate Control possible, gain limits to be determined Input test 56

DAQ Input Testing Goals: Verify correct real-time acquisition of data from pressure Justin & transducer, Cesar thermocouple, and tachometer Procedure highlights Connect equipment Run control and data VI Measure pressure/tachometer data Vary pressure and test device rotation speed Run emergency shutoff Stop VI Process Data Equipment required: 1 Pressure Regulator Test setup 1 thermocouple 1 tachometer 1 power drill (modified) 1 DAQ and PC system 1 DC power supply 1 multimeter Risk Mitigation: The results of this test will ensure the certainty of data being measured from the pump, and validate the safety and control systems 57

58

59