CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

Similar documents
ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Bus Rapid Transit Plans


4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

San Jose Transportation Policy

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Bicycle Master Plan Goals, Strategies, and Policies

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

City of San Diego Vision Zero Draft Strategic Plan FY 2017

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

SANTA MONICA BOULEVARD CORRIDOR

Sacramento Grid 2.0. The Downtown Transportation Study

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

PEDESTRIAN ACTION PLAN

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

August 12, The Honorable Edmund G. Brown Jr. Governor, State of California State Capitol Sacramento, CA Dear Governor Brown:

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

PRESS RELEASE San Joaquin Council of Governments

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

FOR INFORMATION ONLY

ACTION: SELECT PREFERRED LIGHT RAIL ALIGNMENT FOR PHASE 2 OF THE EXPOSITION CORRIDOR TRANSIT PROJECT

Westside Transportation Access Needs Assessment - Short and Long Term Improvements

Item B1 November 19, 2009

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Project Status Update

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

5. RUNNINGWAY GUIDELINES

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

TRANSPORTATION TRAINING TOPICS. April 6, 2010

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher

Section 3.5 Transportation and Traffic

City Council Agenda Item #6-A CITY OF ALAMEDA Memorandum. To: Honorable Mayor and Members of the City Council. John A. Russo City Manager

Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative

Transportation Assessment

Metro Bike/Bus Interface Study

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Develop a Multi-Modal Transportation Strategy (Theme 6)

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

Dear City Council Members,

ACTIVE TRANSPORTATION

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

M E M O R A N D U M GOLD LINE GRADE-SEPARATION. Attachment A Nelson/Nygaard Memorandum Report

Transportation Authority of Marin Renew Existing ½-cent Transportation Sales Tax

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Durham Region Long Term Transit Strategy

Traffic Engineering and Operations for BRT in Los Angeles

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Non-Motorized Transportation 7-1

I-105 Corridor Sustainability Study (CSS)

Michael Parmer, Management Aide, City Manager's Office

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Community Task Force July 25, 2017

Transportation Master Plan Advisory Task Force

Berkeley Strategic Transportation Plan A-76

19 July 2016 OUR REF:

ITEM 3 ATTACHMENT A RESOLUTION NO

South King County High-Capacity Transit Corridor Study

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

EL CAMINO REAL BUS RAPID TRANSIT PROJECT

Basalt Creek Transportation Refinement Plan Recommendations

M14A/D Select Bus Service

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Chapter 5 Future Transportation

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

PROJECT FACT SHEET May 25, 2018

North Coast Corridor:

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Transcription:

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: May 9, 2017 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From: Seleta J. Reynolds,general Manager Department of Transportation Subject: STATE ROUTE 710 NORTH STUDY - ALTERNATIVE TRANSPORTATION IMPROVEMENT PROGRAM (CF 17-0245) SUMMARY CF 17-0245 instructs the Los Angeles Department of Transportation (LADOT), in coordination with the Chief Legislative Analyst, to assess the alternatives identified in the State Route 710 North Study environmental impact report (EIR) and to recommend strategies consistent with the City policy if Metro evaluates supplemental alternatives. RECOMMENDATIONS That the City Council: 1. ADOPT LADOT's recommended strategies identified in this report for evaluation as an alternative in the State Route 710 North Study EIR and potential implementation with Measure R funds reserved to address the 710 gap closure. 2. INSTRUCT LADOT to submit this report to the Los Angeles County Metropolitan Transportation Authority (Metro) as the Metro Board considers the certification of the DEIR and selection of a preferred altrernative. BACKGROUND In 2015, Caltrans, in cooperation with Metro, released a Draft Environmental Impact Report (DEIR) for the State Route 710 North Study. The study area for the DEIR included 100 square miles in an area bounded by the City of Los Angeles to the west, the City of La Canada/Flintridge to the north, the City of Irwindale to the east, and the City of Monterey Park to the south. The study evaluated strategies to remedy chronic congestion problems in the area and the DEIR identified the following five project alternatives: No Build Transportation System Management/Transportation Demand Management Bus Rapid Transit Light Rail Transit Freeway Tunnel

The Honorable City Council -2- May 9, 2017 Measure R, approved by the voters in 2008, provided up to $780 million in funds for improvements related to State Route 710 North gap closure and congestion relief. DISCUSSION LADOT submitted an official comment letter, dated August 5, 2015, during the DEIR public circulation period. Caltrans accepted the comments, which are attached for reference, as official DEIR comments. The Department of City Planning and Council District 14 also submitted comment letters in 2015 that described opposition to the Freeway Tunnel alternative. Since the preparation of the State Route 710 North Study DEIR, the City has adopted key plans and initiatives related to transportation and mobility. The new Mobility Element (Mobility Plan 2035) stresses the importance of implementing complete streets to enhance safety, access, and mobility for all users of the transportation system. This plan establishes a "safety first" commitment to street design, which aligns with Vision Zero. Mobility Plan 2035 also includes mode share and vehicle-miles-traveled (VMT) reduction goals that match the objectives of the City's Sustainability plan. In the context of the plans and policies adopted since the 2015 comment letter, the list below is an updated list of improvements within the City of Los Angeles that Metro should evaluate in any supplemental analyses prepared for the State Route 710 North Study DEIR. These improvements are expected to enhance safety and mobility and reduce greenhouse gas emissions and VMT within the study area. A. Safety Implement improvements along the Vision Zero priority corridors within the study area (Eastern Avenue, Figueroa Street, Huntington Drive, and Eagle Rock Boulevard). Alhambra Avenue and Valley Boulevard may also benefit from similar improvements. Such improvements may include new traffic signals, crosswalks, curb extensions, protected bicycle lanes, traffic signal timing modifications, and additional safety countermeasures. Implement Quiet Zone enhancements, quad gates, pedestrian crossing safety measures, right of-way fencing, railroad warning systems, and additional safety measures as needed, along the Valley Boulevard rail corridor. B. Mobility Plan 2035 Networks Consistent with the Transit Enhanced Network identified in the Mobility Plan 2035, evaluate Bus Rapid Transit (BRT) improvements on Huntington Drive and Valley Boulevard. In conjunction with the Countywide BRT analysis, Metro should lead the evaluation and outreach and coordinate with other cities in the study area. If the evaluation and outreach demonstrates stakeholder support and strong ridership potential, then the selected project alternative should include investments in BRT enhancements along these roadways. Consistent with the Mobility Plan 2035, evaluate possible implementation of bicycle network improvements along Alhambra Avenue, Eagle Rock Boulevard, Eastern Avenue, Figueroa Street, and Huntington Drive.

The Honorable City Council -3- May 9, 2017 C. Transit Services Evaluate and implement transit amenities and improvements to enhance access to existing transit services along Eastern Avenue, Figueroa Street, Huntington Drive, Monterey Road, Soto Street, and Valley Boulevard. Such improvements can include bicycle parking, enhanced bus shelters, "next bus" technologies, bus stop relocations, streetscape features, and additional enhancements. Provide service upgrades to the DASH community circulators within the study area. Such upgrades may include service hour extension, route expansion, and upgrade of fleet to electric buses. D Operational and Safety Implement traffic signal upgrades along Alhambra Avenue, Eastern Avenue, Huntington Drive, and Valley Boulevard that include, but are not limited to, new CCTV cameras, leftturn phasing, and new vehicle detector loops. Such upgrades improve LADOT's ability to provide real-time signal timing remedies to improve the safety and orderly flow of all users of the transportation system. FISCAL IMPACT STATEMENT There is no significant fiscal impact to the General Fund. The improvements listed in the report, if approved by Metro, would be funded by Measure R funds.

CITY OF LOS ANGELES CALIFORNIA Seteta I. Reynolds GENERAL MANAGER VkbI DEPARTMENT OF TRANSPORTATION 100 South Main Street. 10th Floor Los Angeles, California 90012 (213)972-8470 FAX (213) 972-8410 ERIC GARCETT1 MAYOR August 5,2015 Mr. Garret Damrath Caltrans District 7 Division of Environmental Planning 100 S. Main St., MS-16 Los Angeles, CA 90012 Subject: SR-710 North Study - Draft Environmental Impact Report/Envfronmental Impact Statement (EIR/EIS) Dear Mr. Damrath: The Los Angeles Department of Transportation (LADOT) staff has reviewed the SR-710 Draft EIR/EIS issued by Metro and Caltrans. Out of the proposed alternatives, which include Transportation System Management/Transportation Demand Management (T5M/TDM), Bus Rapid Transit, Light Rail Transit, and several Freeway Tunnel alternatives, only a few elements of the proposed T5M/TDM improvements directly affect local streets within the City of Los Angeles' jurisdiction. Therefore, we have limited our comments to the effectiveness of those proposed improvements. There are five locations within the City of Los Angeles where the consultant has proposed modifications to the existing street and intersection geometry. Upon closer examination, our staff found deficiencies in most of the proposed improvements. The proposed local street and intersection improvements are listed in Table 2.3 of Chapter 2 of the Draft EIR/EIS. The following proposals are within the City's jurisdiction: L-l i-1 1-2 1-3 1-45 Figueroa Street from SR 134 to Colorado Boulevard West Broadway/Colorado Boulevard intersection improvements Eagle Rock Boulevard/York Boulevard intersection improvements Eastern Avenue/Huntington Drive intersection improvements Eagle Rock Bouievard/Coiorado Boulevard intersection improvements Proposal L-l would require a large property take and create double right-turn lanes onto the freeway on-ramps, which are not consistent with LADOT standards. The other proposals would likely create controversial issues within the affected communities, since they would require parking removal, require property acquisitions, create signal phasing issues, and/or result in no substantive transportation AN EQUAL EMPLOYMENT OPPORTUNITY-AFFIRMATIVE ACTION EMPLOYER

Mr. Garret Damrath -2- August 5,2015 benefits. Some of the listed modifications advocate adding double right-turn lanes at intersections, which would create signal phasing and pedestrian safety concerns, and therefore, are not advisable under the current LADOT standards. The only component of the TSM/TDM alternative that may benefit regional transportation and relieve congestion is the Connector Road between Valley Boulevard and Mission Road, which includes an underpass crossing beneath the Union Pacific Railroad (UPRR) corridor. LADOT previously analyzed a similar project and the related impacts at the SR-710/Valley Blvd intersection; however, a connector road between Valley Boulevard and Mission Road was met with strong objections from the local Council office and the El Sereno Community. If you have any questions, or would like to discuss this project further, please contact me at (213) 972-4963, or Larisa Bolotsky of my staff at (213) 972-5024. Sincerely, Carlos Rios Senior Transportation Engineer, LADOT c: Kevin Ocubillo, CD 14 Daniel Mitchell, LADOT Michael Hunt, LADOT Larisa Bolotsky, LADOT

MOTION TRANSPORTATION The 1-710 North Study is being conducted to explore transportation improvements that will increase mobility and improve traffic efficiency in east/northeast Los Angeles and the western San Gabriel Valley. The Los Angeles County Metropolitan Transit Authority (Metro), in conjunction with the California Department of transportation (Caltrans) released a Draft Environmental Impact Report in March 2015 which analyzed the environmental impacts of five project alternatives: a No Build Alternative, Transportation System Management / Transportation Demand Management (TSM/TDM) Alternative, Bus Rapid Transit Alternative (BRT), Light Rail Transit (LRT) Alternative and a Freeway Tunnel Alternative. None of the build options sufficiently balance the transportation and mobility needs of the local community and the regional area. Specifically, the tunnel design is in direct conflict with the City s position against any freeway that would cut through the City of Los Angeles (12-0002-S82, 09-0002-S189). Furthermore, the tunnel directly exposes residents of all communities along its route to unnecessary health, safety and monetary cost risks due to significant design flaws. Assembiymember Chris Holden has introduced Assembly Bill 287 (AB 287) to create a 17-member 1-710 Gap Advisory Committee to review a range of traffic calming, green space, and mass transit options for the 6.2 mile gap of the 1-710 North study area in order to make recommendations to the state legislature. AB 287 would prohibit the California Department of Transportation from considering a tunnel as an option due to the negative impacts from cost, additional car trips, and greenhouse gas emissions. Broad based community opposition to a 1-710 North freeway has been consistent since the project was first conceived, it is vital that any identified alternative incorporate community based solutions, and it is in the City s interest to pursue, including through the aforementioned processes at Metro and the state Legislature, potential transportation investments that would benefit its residents. I THEREFORE MOVE that the Department of Transportation and Chief Legislative Analyst report in 30 days with an assessment of the alternatives in the EIR to identify those most benefrtting the City and the El Sereno area surrounding the project. The report should also recommend any additional strategies consistent with City policy which merit analysis using Measure R funding set aside for the 710 North study area, to expand the transportation benefits to Los Angeles in any eventual 710 North project. I FURTHER MOVE that the Chief Legislative Analyst, with assistance from the Department of Transportation, be requested to report with an analysis of AB 287 to assess its potential impacts on the City and to recommend the City s legislative position and any possible amendments for ensuring its benefit to the City. PRESENTED BY: / JOSE HUIZAR, Councilmember, 14th District SECONDED BYi V4;t '/fit