Creating the Future Bruce B Downs Blvd

Similar documents
Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Welcome to the Sellwood Bridge Project Open House!

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

ALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Gandy Connector: Travel Demand. Policy Committee August 2013

Bay to Bay Boulevard Complete Streets Project

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

US 1 Express Lanes Public Kick-Off Meeting

Arterial Transitway Corridors Study. Ave

MARTA Expansion Update

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Welcome. If you have any questions or comments on the project, please contact:

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Chapter 3 BUS IMPROVEMENT CONCEPTS

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Giles Run Connector Road

Improving Mobility Without Building More Lanes

State Street and Pierce Park Lane Intersection Concept Report

Welcome to the Quebec Alternatives Analysis Public Meeting

Arterial Transitway Corridors Study

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

Road Diets FDOT Process

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

TRANSPORTATION IMPACT ANALYSIS

Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Interim Transit Ridership Forecast Results Technical Memorandum

Station 1: Street & Sidewalk Upgrades

Completing the Street: Denning Drive

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Project Description Form 8EE

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Maywood Town Hall Meeting. May 4, 2016

1. Provide a dedicated westbound approach bus lane at the intersection;

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Bridge Street Corridor Study Report

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

BRT for Berkeley A Proposal for Consideration

Route 29 Solutions Projects

Washington St. Corridor Study

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

TRAFFIC IMPACT ANALYSIS

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

City of Davis East Covell Corridor Plan

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

Wilshire Boulevard Bus Rapid Transit Project

Technical Working Group November 15, 2017

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

M14A/D Select Bus Service

Blair/Williamson Intersection Expressed Needs

Community Task Force November 15, 2017

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Transportation Planning Division

F L E T C H E R A V E N U E

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

Huntington Station Metro Zone / North Kings Highway Concept Plan

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

APPENDIX D COST SUMMARY TABLES

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

I-10 AT SCENIC LOOP RD. Open House

Multimodal Analysis in the 2010 Highway Capacity Manual

Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative

VIII. Project Prioritization & Implementation

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

Highway 217 Corridor Study. Phase I Overview Report

Public Works and Infrastructure Committee. General Manager, Transportation Services

Appendix D: Concept Screening

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Executive Summary June 2015

Station Plan: Penn & 43rd Avenue

Proposed Action, Purpose and Need Technical Memorandum

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Table 1. Greatest Reductions in Traffic Volume

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Alternatives Public Workshop

Salem City Council November 9, 2009

APPENDIX E Evaluation of Improvement Alternatives

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

CITY OF VANCOUVER ADMINISTRATIVE REPORT

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Harrah s Station Square Casino

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

Fitting Light Rail through Well-established Communities

Transcription:

Creating the Future Bruce B Downs Blvd

How things look today May not be how things look in the future.

Bruce B Downs PD&E Study 2003 Construction programmed 2009, Palm Springs to Pebble Creek

Tampa Rail Project FEIS - 2002 Light rail on Bruce B Downs Blvd as far north as Skipper Road

What can you do with a 20 foot transit envelope? One line of rail OR One lane of busway Problem: Outbound transit vehicle has to wait at a side-track for in-bound to pass, slowing rapid transit

Elevated Rail = Elevated Costs Elevated light rail project for Honolulu: $206 million per mile estimate Source: Honolulu High Capacity Transit Corridor DEIS, NOV 08 Charlotte Blue Line: $50.75 million per mile (grade level) Source: CATS, NOV 07, inflated to 2008 dollars Portland Interstate Max: $84.57 million per mile (grade level) Source: FTA Before & After Studies of New Starts Projects, 2004 reported costs inflated to 2008 dollars

Is rail transit needed on a suburban arterial?

2035 Needs Plan New Tampa Blvd BBD D Fletcher Ave Eight lanes will not be enough to accommodate future traffic. Bruce B Downs fails in 2035 even with New Tampa Blvd as a reliever.

Proposed Approach: All Redesign Options Mean Delay Proceed with the funded project (Segment B/C). Replace turn lanes with rail in future. Redesign other segments (A and D) for 6 lanes. Segment A Segment D Segment B/C

MPO Actions 2009: Support immediate implementation of Segment B/C widening project Request Hillsborough County Commission identify Segment B/C northbound right turn lanes as potential right of way for rail in future Update Long Range Transportation Plan to show need for 6 lanes on Segments A and D

Since Then. More detailed analysis of rail in Bruce B Downs Blvd right-of-way, Seg. A Seg. B/C under construction Seg. D seeking funding

2010 Transit Assessment Findings (Segment A) No station location will fit in the median, with the current 8-lane road design, unless the curbs are relocated Relocating the curb lines would delay construction of the road lanes by perhaps 3 years or require a major reconstruction of the road when transit is extended here (2018?)

9 median closures 7 median closures 16 side street closures

Single LTL s at 2 intersections Mitigate with U- turns No RTL s at 5 intersections No bus pull-off s

3-4 lanes are crossed at a time Median station gives refuge for slow walkers Easy access from east, cross 9-10 lanes from west No median refuge

TRAVEL TIME BY RAIL I-75 to Fletcher/USF Station: 9 minutes (for foreseeable future)

Scenario 1 Comments Fewer neighborhood impacts Better pedestrian connections Better turn lanes or access Don t keep building lanes Concern: funding for transit is not secure 28 Do Not Support 9 Accept with Reservations 66 Support

Scenario 2 Comments More neighborhood impacts Worse ped access to rail Concern re: turn lane impacts and road access Building lanes induces traffic Eight lanes = true need 49 Do not support 21 Accept with Reservations 23 Support

Scenario 3 Comments Buses won t be used Only as an interim step before rail Maybe this is the most realistic scenario if rail is impossible 48 Do not support 33 Accept with reservations 11 Support

Scenario 4 Comments Don t wait to integrate transit Concern re: neighborhood impacts and aesthetics Best idea because the future of transit is uncertain 63 Does not Support 8 Accepts with Reservations 29 Supports

Waiting for the Unknowns Will HART s study recommend rail technology rather than rapid bus? Will HART recommend including the Bruce B Downs segment in the Northeast Corridor? Will funding for transit be approved as soon as this fall?

Exploring Options in Meantime New concept: 7 lanes now, expandable to 8 lanes later Leaves space for transit in median (one lane next to median is not built) Does not delay road construction (footprint does not expand) Worst traffic (southbound A.M. peak) is accommodated first

6-lane Segment, with transit in the median which precludes potential for future widening of southbound lanes due to limited ROW. Southbound Northbound Southbound Northbound Off-set median transit alignment. Can be incorporated into existing 8-lane configuration once east-side/median transition locations are known along BBD. Southbound Northbound Off-set median transit alignment which allows for widening to the east to make up for lost lanes in the median to accommodate transit. Source: Hillsborough County Public Works October 12, 2010