EXECUTIVE SUMMARY. The primary challenges identified are:

Similar documents
University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

CONNECTING PEOPLE TO PLACES

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Welcome! Public Open House on UBC s Transportation Plan

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Welcome. If you have any questions or comments on the project, please contact:

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

CPC Parking Lot Riverside Drive. Transportation Rationale

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

UBC Vancouver Transportation Status Report Fall 2014

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

Breaking the Cycle of Automobile Dependency

Complete Streets. Designing Streets for Everyone. Sarnia

People killed and injured per million hours spent travelling, Motorcyclist Cyclist Driver Car / van passenger

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

PROJECT FACT SHEET March 21, 2018

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Draft North Industrial Area-Wide Traffic Plan

122 Avenue: 107 Street to Fort Road

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

PEDESTRIAN ACTION PLAN

PROJECT FACT SHEET May 25, 2018

January Project No

102 Avenue Corridor Review

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

U NIVERSITY OF B RITISH C OLUMBIA. Fall 2010 Transportation Status Report

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

CHIEF PEGUIS TRAIL EXTENSION WEST

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Nanaimo Transportation Master Plan. Phase 1 Consultation Summary

Tonight is for you. Learn everything you can. Share all your ideas.

City of Perth Cycle Plan 2029

Public Information Centre

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

5. RUNNINGWAY GUIDELINES

City of Waterloo Complete Streets Policy

Develop a Multi-Modal Transportation Strategy (Theme 6)

ECONOMY PEOPLE ENVIRONMENT

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

TRANSPORTATION NEEDS ASSESSMENT

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Vallecito Elementary School. Travel Plan

Corydon-Osborne Neighbourhood Plan Recommendations

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Shifting Gears for a Healthier City

Standing Committee on Policy and Strategic Priorities

2. Context. Existing framework. The context. The challenge. Transport Strategy

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

New Brunswick Strategic Planning Proposal

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Washington State University Bicycle and Pedestrian Plan Working Paper #7: Implementation Strategies

CHAPTER 3: Vision Statement and Goals

EXECUTIVE SUMMARY. Vision

Toronto Complete Streets Guidelines

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Nomination. Halton Region in Context

Welcome to the McKenzie Interchange Project Open House!

Devonport City Cycling Network Strategy

WELCOME Public Information Centre

October 30 th, 2012 Committee of the Whole Meeting Cycling Task Force Recommendations BIKE RACKS

Cycling Master Plan Community Engagement Session WELCOME

Major Bike Routes 102 Avenue Workshop April 21, 2015

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Pedestrian Crosswalk Audit

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

Baseline Survey of New Zealanders' Attitudes and Behaviours towards Cycling in Urban Settings

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

CITY OF VANCOUVER ADMINISTRATIVE REPORT

City of Seattle Edward B. Murray, Mayor

Sixth Line Development - Transit Facilities Plan

Living Streets Policy

CITY OF KINGSTON INFORMATION REPORT TO ENVIRONMENT, INFRASTRUCTURE & TRANSPORTATION POLICIES COMMITTEE Report No.: EITP

El Centro Mobility Hub

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

Appendix A-K Public Information Centre 2 Materials

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

City of Novi Non-Motorized Master Plan 2011 Executive Summary

UBC Vancouver Transportation Status Report Fall 2017

Transportation Assessment

92% COMMUTING IN THE METRO. Congested Roadways Mode Share. Roadway Congestion & Mode Share

Broad Street Bicycle Boulevard Design Guidelines

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

cyclingincities opinion survey ABOUT THE STUDY WHO DID WE ASK? WHAT DID WE DO?

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

Public Event 1 Community Workshops

NACTO Designing Cities Conference Project Evaluation: Tools for Measuring Success and Building Support. October 29, 2015

Southside Pilot Proposal

Encouragement. Chapter 4. Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning. Encouragement Chapter 4

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave.

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Transcription:

1

EXECUTIVE SUMMARY This report summarizes the recommendations for improving cycling infrastructure at the University of Saskatchewan. This report is a follow-up to the recommendations made in the 2013 Sustainability Mobility Strategic Plan. The results were determined through consultation with various stakeholders including the Campus Cycling Club, Saskatoon Cycles, Grounds (FMD), and members of the cycling community at the University of Saskatchewan. In addition, best practices from universities from around Canada and the United State were researched to determine the best approaches. The primary challenges identified are: Cyclist access to campus crossing College Drive Congestion in the bowl including pedestrian-cyclist conflicts A lack of affordable secure bike parking on campus The final recommendations are: Install additional bicycle racks near the Arts building, Geology building, and College Quarter Purchase bicycle cages to satisfy the demand for affordable secure bicycle parking Install signs in high-traffic area to reduce pedestrian/cycling conflicts Install a dedicated bicycle path on Cumberland Avenue 2

TABLE OF CONTENTS 1.0 Introduction... 4 2.0 State of Campus Cycling... 5 2.1 Bike to Work Day Survey... 5 2.2 Consultation with Campus Cycling Club... 5 2.3 Consultation with Saskatoon Cycles... 6 2.4 Edwards School of Business Cycling Surveys... 6 2.5 Bicycle Parking Surveys... 7 2.6 Consultation With Grounds (FMD)... 7 The 2015 Cycling Infrastructure Report was prepared by the University of Saskatchewan Office of Sustainability We thank the campus community who provided input for this report. 3.0 Recommendations... 7 3.1 Minor Recommendations... 7 3.2 Major Recommendation... 10 4.0 Research & Future Study... 12 4.1 Bicycle Parking Counts... 12 4.2 College Drive and Cumberland Avenue Intersection... 12 4.3 Promotion of Agriculture and Health Sciences Bicycling Parking... 13 4.4 Cyclist Counts... 13 4.5 Partnering with the City of Saskatoon to Improve Cycling on College Drive... 13 Figure 1 Modal Share of Sustainable Travel To/From Campus 4 Figure 2 Standard Bike Racks 8 Figure 3 Bike Cage at the Royal University Hospital 8 Figure 4 Cost Per Bike of Different Rack Designs 9 Figure 5 Proposed Bike Path on Cumberland Avenue 11 3

1.0 INTRODUCTION The University of Saskatchewan has made a commitment in the Sustainability Mobility Strategic Plan 1 to increase the modal share of sustainable transportation. Sustainable transportation is defined as nonsingle occupancy vehicle transportation. In 2013 73.7% of the University of Saskatchewan population commuted to campus in a sustainable manner. The University has committed to increase that figure to 78.1% in 2018. The principle goal of the Sustainable Mobility Strategic Plan is to Increase the quality of and use of sustainable mobility options (public transit, carpooling, cycling, and walking) for travel to, from and within the campus. - Sustainability Mobility Strategic Plan, 2013 While the sustainable modal share for students is expected to increase, a far greater emphasis for strategies and improvements are placed on staff and faculty. Figure 1 shows the anticipated modal share change from 2013-2018. 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 83% 85% 85% 73.70% 77% 78% 60% 55% 50.50% Students Staff and faculty Total (weighted) 2013 (observed) 2016 (target) 2018 (target) Figure 1 Modal Share of Sustainable Travel To/From Campus Cycling is an important part of sustainable transportation and cycling infrastructure can help promote cycling. This report looks at improvements to campus cycling infrastructure that will addresses the current issues with campus cycling and increase the cycling modal share. This report addresses cycling infrastructure and not programs, policies, education, or advocacy. 1 Sustainability Mobility Strategic Plan, 2013 4

2.0 STATE OF CAMPUS CYCLING The Sustainability Mobility Strategic Plan states that 1.5% of students and 3.5% of staff cycle to campus. 2.1 BIKE TO WORK DAY SURVEY On June 24 th 2015, the cycling community of Saskatoon ran their third annual Bike to Work Day. This event intended to encourage cycling in the Saskatoon community. Snacks, coffee, educational tools, and prizes were offered at fifteen stations throughout the City. 330 cyclists past by the station located on the north-west corner of Wiggins Avenue and College Drive, which served as the University of Saskatchewan station. This is an increase over the estimated 120 cyclists the previous year. As part of the festivities, a survey was conducted asking cyclists about their experiences and opinions on cycling to and around the University of Saskatchewan. Eighteen individuals participated in the survey, though many of the participants did not answer every question. The most common comments from people include: There is lots of congestion in the Bowl and cyclist/pedestrian conflict. Cyclists request signage so everyone is aware that the paths in the Bowl are a shared space. It difficult to cycle to campus and crossing College Drive is difficult enough to dissuade people from cycling. Many asked for separated bicycle lanes leading to campus. There is a lack of bicycle racks on campus, particularly secure bicycle parking. The area in front of Arts/Thorvaldsen and Geology/Biology have the greatest need for more bike parking. 2.2 CONSULTATION WITH CAMPUS CYCLING CLUB The Campus Cycling Club was consulted to better understand the group s opinion on ways to improve cycling infrastructure. The key comments include: Number one concern amongst students is availability of cheap and secure bicycle parking. There is a lack of available secure bicycle parking on campus as there are only twenty bike lockers. The Agriculture and Health Science secure parking are not in a location that allows easy access. 5

College Drive is a barrier to entry and crossing University Bridge is prohibitively difficult. It discourages unexperienced riders from cycling to campus. Wiggins Avenue is the ideal location for a bike lane due to its low speed (it contains two school zones) and proximity to Nutana. However, it is a narrow road and there is not enough room to add lanes. Cumberland Avenue is a great area for bike lane due to connection to 14 th Street path and proximity of College Quarter. There is ample room for a bike lane. Signage on campus that reiterates paths are shared space to reduce bicycle/pedestrian collisions. 2.3 CONSULTATION WITH SASKATOON CYCLES Saskatoon Cycles was consulted about improving campus cycling infrastructure. The key comments are: There is poor access to campus from all directions. Preston Avenue, College Drive, and the Saskatchewan River are all difficult to cross to make it to the University of Saskatchewan. It is essential that bicycle infrastructure be maintained. The Preston Avenue bike lane is consistently filled with dust and it discourages cycling. College Drive needs improvement. Along with University Bridge, they are the biggest issues in Saskatoon for cycling. Cumberland Avenue would be a great addition and could dramatically improve cycling rates to campus, but the intersection with College Drive needs to be addressed. It is currently unsafe due to the high speed vehicles are travelling coming from the east. 2.4 EDWARDS SCHOOL OF BUSINESS CYCLING SURVEYS Dr. Maureen Bourassa s Commerce 357 class in spring 2015 conducted several surveys for both the Bridge City Bike Co-Op and the Campus Cycling Club to assess cycling behavior, attitudes, barriers, and infrastructure. The key findings are: The largest impediments are lack of bike infrastructure and weather. Many users do not feel comfortable cycling in the same lane as motor vehicles and crossing intersections is prohibitively difficult. Winter conditions greatly reduce the ability of people to cycle. 70% of non-cyclists claimed they would become cyclists if there were more convenient bicycle infrastructure. 6

Better connections to downtown, Broadway, and the University of Saskatchewan were listed as needed to improve cycling. Safety is a major concern for potential cyclists and separated bike lines was cited as the best way to improve safety. 2.5 BICYCLE PARKING SURVEYS On June 9 th, 2015, the Office of Sustainability conducted a bicycle rack inventory at the University of Saskatchewan. This provided information on the quantity of bike parking spots on campus and how utilized they are. The results are included below. There are 253 bicycle racks on campus with 111 being in the main campus, as being defined as within Campus Drive, 41 are located outside of Campus Drive, and 101 being in College Quarter. This translates to roughly 2700 bike parking spots. College Quarter uses a different bicycle rack design. Despite having 101 bicycle racks, there is only capacity for roughly 480 bikes. This compares to a capacity of roughly 620 north of Campus Drive, and roughly 1630 on the main campus. Over 95% of racks had at least one bike, but most bike racks were underutilized. Only 39.8% of the total available spots were used. Note: Innovation Place and the Fieldhouse were not included in the bicycle count, as the University of Saskatchewan does not administer them. 2.6 CONSULTATION WITH GROUNDS (FMD) The Grounds Department was consulted as bike racks are under the responsibility of Grounds. The importance of placing bike racks in locations that are conducive to snow clearance was emphasised. Rotating bike racks 90 so they are not leaning against a wall was identified as a potential solution. This ensures access from both sides and can increase the capacity of bike racks for free. 3.0 RECOMMENDATIONS The recommendation list includes three minor recommendations and one major recommendation. These recommendations attempt to relieve the concerns addressed by the stakeholders and students to improve cycling rate at the University of Saskatchewan. 3.1 MINOR RECOMMENDATIONS 7

All minor recommendations are intended to have a far lower capital cost than the major recommendation. All recommendations come to a price under $10,000 individually. 3.1.1 Increase Standard Bike Racks Three areas are under capacity for bicycle parking: east of the Arts building, south of the Geology building, and College Quarter. It is recommended that the Office of Sustainability collaborate with Grounds and Parking Services to purchase five new bicycle racks. Placing one standard bicycle rack south of Geology, two east of Arts, and two in College Quarter should alleviate the bicycle parking constraints. Figure 2 Standard Bike Racks These bicycle racks can be moved by Grounds as needed for snow clearance. It is recommended that bike-parking levels be monitored and bike racks can be moved as required. Bike racks cost $760 individually, or $3800 for five racks. 3.1.2 Bicycle Cages One of the most requested changes to parking services is to increase secure bicycle parking. The University of Saskatchewan currently offers two forms of secure bicycle parking on campus; individual bike lockers, and storage in both the Agriculture and Health Science parkades. There are currently twenty bike lockers on campus with a long waiting list. Parking Services quotes the price of a new bike locker at $1200 per unit. To increase the capacity for secure bicycle parking using bike lockers would be cost-prohibitive. Figure 3 Bike Cage at the Royal University Hospital 8

The Agriculture and Health Science secure bicycle parking facilities are underutilized. This is largely due to their distance away from the centre of campus and difficulty of physically reaching the facilities. A compromise between the standard bike rack which offers low security at a low cost and the bike lockers that offers high security at a high cost is a bike cage. Bike cages are enclosed fencing around standard bike racks that are opened via key. This reduces the risk of threat greatly as only those with a key can access the cage. Users would still lock their bike to the bike rack as normal. There is currently a bike cage in place at the Royal University Hospital. $400 It is recommended that a pilot project bike cage be installed at the south-west side of the Murray Library. It would involve enclosing two bicycle racks with a chain-link fence. $200 $270 $1,200 Cost/Bike The estimated cost of the project is $8100. 2 This results in $270 per secure bike parking space in comparison to $1200 per secure bike parking space currently required for a bike locker. $0 $51 Standard Bike Rack Bike Cage Figure 4 Cost Per Bike of Different Rack Designs Bike Locker 3.1.3 Signage in the Bowl A major concern expressed by cyclists is that the high-traffic area of the Bowl results in pedestrian-cyclists conflicts. The paths are intended to be shared space, but pedestrian-cyclist conflicts still occur. It is recommended that six signs be installed on light poles in the Bowl. These signs would alert pedestrians and cyclists that the path is a shared space and both parties should be courteous to the other. 2 Quote from Nordic Fencing. 9

The cost of six signs is approximated at $1500. 3.2 MAJOR RECOMMENDATION 3.2.1 Cumberland Bike pathway The most significant complaint stakeholders had related to cycling at the University of Saskatchewan is that it is prohibitively difficult to cycle to campus. The major roadway connections for cycling to campus include: College Drive Wiggins Avenue Preston Avenue 108 th Street Cumberland Avenue Improving the ability to cycle on any of these streets provides a connection to campus. Creating bicycle infrastructure on these streets will allow staff and students to easily commute to campus without interfering with motor vehicles or pedestrians. College Drive is the single largest entry point to campus and Wiggins Avenue and Cumberland Avenue are its major feeders. Improving access amongst streets will greatly improve the ease, comfort, and safety of cycling to campus. College Drive is one of the busiest streets in Saskatoon and the City of Saskatoon has long-term plans for the street that include Bus Rapid Transit (BRT) and corridor growth. As such, it is not advised to install cycling improvements on College Drive, as it would interfere with the longterm plans of the City. Wiggins Avenue has no land owned by the University of Saskatchewan and at a width of 9.1 metres is not wide enough to support bicycle infrastructure. Preston Avenue and 108 th Street have existing dedicated cycling infrastructure. The University of Saskatchewan owns all lands bordering the eastern edge of Cumberland Avenue from 14 th Street to College Drive. Before the development of College Quarter there were plans created to install a permanent bike path that would connect the University of Saskatchewan main campus to the 14 th Street multi-use path. Those plans were put on hold due to ongoing development of the College Quarter area. Now that plans are being realized for College Quarter, it is appropriate to begin implementation of the Cumberland Avenue bike path. 10

Cumberland Avenue is a unique opportunity to provide dedicated cycling infrastructure to staff and students. It borders Varsity View and College Quarter. Dedicated cycling infrastructure on Cumberland Avenue would provide staff and students in those neighbourhoods a safe and convenient way to cycle to campus. As College Quarter further develops and the University of Saskatchewan endowment land is developed, it will serve as the major cycling connection to the main campus. During the regular school year there are over 2,200 students who live in the Varsity View, College Quarter, and Grosvenor Park neighbourhoods. This is large pool of students to pull from who would be able to use the Cumberland Avenue bike path. 3 Cumberland Avenue is 11.8 metres wide, which is wide enough to support two traffic lanes and two parking lanes. It is not wide enough to support a bike lane on the street. However, there is ample room east of Cumberland Avenue to install a bicycle lane. The proposed bike path is 3.5 metres wide and 750 metres long. The estimated cost of installing a dedicated bike path on Cumberland is $131,250. 4 Figure 5 Proposed Bike Path on Cumberland Avenue 3 Saskatoon Neighbourhood Profiles 4 Quote from Gift Marufu, Manager of Grounds Department 11

4.0 RESEARCH & FUTURE STUDY The recommendations included in section 3.0 are intended to be a first step in making the University of Saskatchewan a place where cycling is an integral part of transportation. There are other aspects that need to be included that are not infrastructure, but are vital to improving cycling at the University. 4.1 BICYCLE PARKING COUNTS A bicycle parking count was conducted on Tuesday, June 9 th, 2015. It was noted that roughly 40% of the total bicycle parking spots were used. The population on campus during June is substantially lower than during the regular school year. It is recommended that a bicycle parking be conducted every three months to better understand how student cycling behaviour changes at different points of the year. It is necessary to maintain consistently for the counts. As such, the second Wednesday approximately every three months is recommended for a bicycle parking count. This correlates to the following days September 9 th, 2015 December 9 th, 2015 March 9 th, 2016 June 8 th, 2016 These four parking counts will better inform the University of Saskatchewan where bicycle parking can be improved. In addition, it would be beneficial to do a bicycle parking count every day of the week to better understand bicycle patterns throughout a week. It is recommended the count be conducted during the peak season of mid-september. Due to the large time commitment involved with doing a full week of counts, it is only recommended this study be done if resources permit. 4.2 COLLEGE DRIVE AND CUMBERLAND AVENUE INTERSECTION The intersection of College Drive and Cumberland Avenue is the busiest intersection for pedestrians and cyclists. 5 This is likely due to the large population of students at College Quarter and Cumberland Avenue acting as a major connection for residents of Varsity View and Grosvenor Park. The Cumberland Avenue bike path and continued growth of College Quarter will result in an increase in the pedestrian and cyclist use of this intersection. 5 Sustainability Transportation Plan pg. 9 12

It is recommended that a design for safe crossing of bicycles and pedestrians at this intersection be created in conjunction with the City of Saskatoon. Not only will this allow for safe crossing of the current users, but is necessary for the Cumberland bike path to succeed. 4.3 PROMOTION OF AGRICULTURE AND HEALTH SCIENCES BICYCLING PARKING There are currently secure bicycle parking facilities in both the Agriculture and Health Science parkades. Both are underutilized. The Agriculture parkade offers 10 secure bike parking spots. Bikes have to be lifted and are stored on a wall. The bicycle parking count on June 9 th found zero bikes parked there. The Health Science parkade offers 92 secure bike parking spots in a bike cage. The bicycle parking count on June 9 th found 11 bikes parked there. Both locations suffer from being difficult to reach in comparison to a standard bike rack. The Health Science location cannot be reached from the east without going through the building. It is recommended that both locations be promoted to increase their usage. 4.4 CYCLIST COUNTS While bicycle parking counts have been conducted, a cyclist count has not been conducted since 2012 for the 2013 Sustainable Mobility Strategic Plan. There has been considerable growth on campus since 2010 particularly in College Quarter. A renewed cyclist count would aid decision-making. 4.5 PARTNERING WITH THE CITY OF SASKATOON TO IMPROVE CYCLING ON COLLEGE DRIVE College Drive is one of the busiest streets in Saskatoon and acts as the major entry point to the University of Saskatchewan. The City of Saskatoon has major long-term plans for the street including Bus Rapid Transit (BRT) and corridor growth. The single best way to improve cycling to campus is to make College Drive a cycling friendly street. To do so requires partnership with the City of Saskatoon to ensure that all of the changes of College Drive work in conjunction with one another. 13

14