SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Similar documents
Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

FM #: ETDM #: 11241

Financial Project ID No(s).: and ETDM No(s).: and 14181

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

Roundabout Feasibility Memorandum

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

Florida Department of Transportation

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

State Road (S.R.) 61 (U.S. 319) FPID s and

Route 7 Corridor Study

Master Plan. Planning. Environmental. Linton Blvd. to Northlake Blvd. I-95 (SR 9) Interchange Master Plan Palm Beach County

US 1 Express Lanes Public Kick-Off Meeting

Design Traffic Technical Memorandum

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

PRESENTATION OUTLINE

Project Development & Environment (PD&E) Study JUNE 22, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Reams Road RCA Study. Board of County Commissioners Public Hearing

Performance Criteria for 2035 Long Range Transportation Plan

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

Prepared For: DIRECTION 2035 SHAPING OUR FUTURE SUMMARY REPORT JULY Prepared By: Staff to Bay County TPO

Casablanca Boulevard & GO Station Access

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

LANE ELIMINATION PROJECTS

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Fairfax County Parkway Widening Fairfax County

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

SR/CR A1A PEDESTRIAN SAFETY & MOBILITY STUDY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

STREET AND HIGHWAY PLAN

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

Technical Advisory Committee (TAC)

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

7.0 Preferred Alternative with Service Road Concept

The Transportation Improvement Program

Intersection Control Evaluation Report Project: Alternative: Location: Evaluator:

Final Sidewalk Feasibility Study

FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

Central Avenue Corridor Study FPID Number:

Joshua Jester, E.I., Florida Department of Transportation, District One

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR. I-95 (SR 9) Interchange at Northlake Boulevard in Palm Beach County

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

Proposed Project I 35 from Denton to Cooke County Line

VISION ZERO ACTION PLAN

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Osceola County Expressway Authority. Alternatives Public Meeting

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Florida s Intersection Safety Implementation Plan (ISIP)

NO BUILD TRAFFIC OPERATIONS

City of Moorhead Committee of the Whole Meeting

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Alternatives Public Workshop

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1)

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

2012 PRIORITY TRANSPORTATION PROJECTS

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Final Project Prioritization Plan

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Road Diets FDOT Process

Donahue Drive Corridor Traffic Operational Evaluation

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

::~-~ w ANNUAL LIST OF PALM BEACH MPO PRIORITY PROJECTS FY Adopted July 20, '"',, - ==~"'c;;f'";~":?:'!""

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

Application of a Complete Street

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Needs Plan and Cost Feasible Plan Amendment Report FLORIDA-ALABAMA 2040 LONG RANGE TRANSPORTATION PLAN

Chapter 4 Traffic Analysis

FY FY 2023 Bay County TPO Project Priorities

Transcription:

SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017

SR 9/I-95 Interchange at PD&E Study Presentation Outline Overview of Planning and Programming o I-95 Interchange Master Plan o Strategic Intermodal System (SIS) o Project Development Process Overview of the I-95 at PD&E Study o Project Limits: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to Congress Avenue Palm Beach County, Florida o Project Manager Robert Lopes, P.E. 2

SR 9/I-95 Interchange at PD&E Study SR 9 (I-95) Interchange Master Plan Palm Beach County Completed in December 2014 Evaluated 17 interchanges o From Linton Boulevard to Northlake Boulevard Analyzed interchanges to determine existing and potential future deficiencies Coordinated with Local Agencies and MPO Identified operational and safety needs o o Developed short-term improvements Developed long-term conceptual design alternatives Facilitated programming of future interchange studies and projects through the SIS program 3

SR 9/I-95 Interchange at PD&E Study SR 9 (I-95) Interchange Master Plan Palm Beach County Study Results FDOT incorporated recommendations into: o Design Projects o PD&E Studies FDOT programs PD&E Studies and Design Projects based on priority and SIS funding availability. 4

SR 9/I-95 Interchange at PD&E Study Strategic Intermodal System (SIS) Established by the Florida Legislature in 2003 (F.S. 339.61) State Funded Program Focuses state resources on transportation facilities most critical to statewide travel, including: Interstates Interchanges Airports Seaports Spaceports Rail Highways of Interregional Significance Last Mile Connectors SIS Planning Documents: First 5 Year Plan projects funded in 5 Year work program Second 5 Year Plan planned projects years 6-10 SIS Cost feasible Plan projects projected for years 11-25 SIS Multi Modal Unfunded Needs Plan 5

SR 9/I-95 Interchange at PD&E Study Project Development Process Flow Chart Time Varies Planning We are currently here *2 Years PD&E Design 2-3 Years Right of Way 2-4 Years Construction *Categorical Exclusion Type II 6

SR 9/I-95 Interchange at 45th Street PD&E Study Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to Congress Avenue Palm Beach County, Florida MUNICIPALITIES: City of West Palm Beach Town of Mangonia Park City of Riviera Beach FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 7

SR 9/I-95 Interchange at PD&E Study Purpose and Need Project Purpose: o Identify short-term and long-term needs within the study area; o Develop design concepts to address traffic spillback onto I-95; o Improve interchange operations, reduce congestion, and increase safety at the study interchange. Project Need: o Alleviate existing and future traffic congestion thereby improving safety at the interchange. FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 8

I-95 SB Off Ramp I-95 NB Off Ramp Corporate Way Congress Ave Northpoint Blvd SR 9/I-95 Interchange at PD&E Study Existing Year Conditions - Lane Configuration, Delay and LOS Existing Lane Change in pavement marking Proposed additional lane 1 2 3 4 5 1 24.0 C 30.5 C 2 34.9 C 33.8 C 30.1 C 41.3 D 3 4 5 26.8 C 22.2 C 14.3 B 10.2 B Level Of Service A B C D E F AM Delay / LOS PM Delay / LOS 9

I-95 SB Off Ramp I-95 NB Off Ramp Corporate Way Congress Ave Northpoint Blvd SR 9/I-95 Interchange at PD&E Study No-Build 2040 Year Conditions - Lane Configuration, Delay and LOS Existing Lane Change in pavement marking Proposed additional lane LOS F Movements 1 2 3 4 5 1 48.5 D 50.3 D 2 83.1 F 54.3 D 41.9 D 62.9 E 3 4 5 80.3 F 31.8 C 22.0 C 13.4 B Level Of Service A B C D E F AM Delay / LOS PM Delay / LOS 10

SR 9/I-95 Interchange at 45th Street PD&E Study Alternatives Analysis No-Build Transportation System Management & Operations (TSM&O) o Short Term o Open to Traffic in 3-5 Years o No Right-of-Way Impacts o Lower Cost Build Alternatives o Long Term o Open to Traffic in 8-10 Years o Ultimate Improvements FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Alternatives Evaluation Process No-Build TSM&O NB A Build Alternatives 1 2 3 4 ALTERNATIVES SCREENING Traffic Operations Safety Freight SIS Connectivity Access Management Utilities Constructability MOT Historic & Archeological Wetlands Canal Impacts Noise Impacts Permitting R/W Impacts Aesthetic Features Community Services EVALUATION MATRIX Alternatives Public Workshop Recommended Alternative 11

SR 9/I-95 Interchange at PD&E Study Alternatives Analysis TSM&O Add additional right and left turn lane at the ramp intersections Add directional signage on NB off-ramp to North Congress Avenue Add one EB and one NB left turn lane at Congress Avenue Provide travel information system Develop signal system strategies 12

I-95 SB Off Ramp Corporate Way Northpoint Blvd I-95 NB Off Ramp Congress Ave SR 9/I-95 Interchange at PD&E Study TSM&O 2040 Year Conditions - Lane Configuration, Delay and LOS Existing Lane Change in pavement marking Proposed additional lane LOS F Movements 1 2 3 4 5 1 36.2 D 50.2 D 2 40.1 D 50.5 D 39.6 D 53.0 D 3 4 5 34.7 C 29.3 C 18.0 B 13.5 B Level Of Service A B C D E F AM Delay / LOS PM Delay / LOS 13

SR 9/I-95 Interchange at PD&E Study Alternatives Analysis Alternative 1 Widening FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 14

SR 9/I-95 Interchange at PD&E Study Alternatives Analysis Alternative 2 Diverging Diamond Interchange 15

SR 9/I-95 Interchange at PD&E Study Alternatives Analysis Alternative 2 Diverging Diamond Interchange FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 16

SR 9/I-95 Interchange at 45th Street PD&E Study Alternatives Analysis Alternative 3 SR 710 Ramps CONGRESS AVENUE SR 710 / MLKJ BOULEVARD 45TH STREET FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 17

SR 9/I-95 Interchange at 45th Street PD&E Study CUMBERLAND DRIVE VILLAVE BOULEVARD Alternatives Analysis Alternative 4 Cumberland Drive Extension 45TH STREET CUMBERLAND DRIVE VILLAVE BOULEVARD CONGRESS AVENUE FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 18

I-95 SB Off Ramp I-95 NB Off Ramp Corporate Way Congress Ave Northpoint Blvd SR 9/I-95 Interchange at PD&E Study Alternative 1 2040 Year Conditions Lane Configuration, Delay and LOS Existing Lane Change in pavement marking Proposed additional lane 1 2 3 4 5 29.5 C 46.7 D 1 2 26.0 C 23.3 C 3 31.8 C 30.6 C 20.7 C 18.2 B 4 5 54.0 D 53.7 D Level Of Service A B C D E F AM Delay / LOS PM Delay / LOS 19

I-95 SB Off Ramp I-95 NB Off Ramp Corporate Way Congress Ave Northpoint Blvd SR 9/I-95 Interchange at PD&E Study Alternative 2 2040 Year Conditions Lane Configuration, Delay and LOS Existing Lane Change in pavement marking Proposed additional lane 1 2 3 4 5 1 33.4 C 48.4 D 26.4 C 2 3 28.1 C 38.2 D 49.5 D 21.9 C 15.4 B 4 5 51.8 D 50.2 D Level Of Service A B C D E F AM Delay / LOS PM Delay / LOS 20

Congress Ave I-95 SB Off Ramp I-95 NB Off Ramp Corporate Way Congress Ave Northpoint Blvd SR 9/I-95 Interchange at PD&E Study Alternative 3 2040 Year Conditions Lane Configuration, Delay and LOS Existing Lane Change in pavement marking Proposed additional lane 1 2 3 4 5 22.7 C 45.0 D 33.3 C 27.1 C 2 14.9 B 4 48.4 D 5 34.7 C 35.4 D 1 Level Of Service AM Delay / LOS 3 28.2 C 22.7 C A B C D E F PM Delay / LOS 21

I-95 SB Off Ramp I-95 NB Off Ramp Corporate Way Congress Ave Northpoint Blvd SR 9/I-95 Interchange at PD&E Study Alternative 4 2040 Year Conditions Lane Configuration, Delay and LOS 1 2 3 4 5 1 44.8 D 37.8 D 51.6 D 30.5 C 2 19.9 B 13.2 B 4 61.4 E 67.6 E 5 3 49.4 D Level Of Service AM Delay / LOS 29.4 C A B C D E F PM Delay / LOS 22

Cost Environmental Social- Economic Engineering SR 9/I-95 Interchange at PD&E Study Alternative Evaluation Matrix PARAMETERS NO BUILD TSM&O ALT 1 ALT 2 ALT 3 ALT 4 Geometric Compliance to Design Criteria 3 3 4 5 4 4 Access Management 3 3 5 5 1 4 Multimodal (Transit/Pedestrian/Bicycle) 3 3 4 4 3 4 Mobility 1 2 5 5 4 4 Safety Impacts 1 2 4 4 4 4 Utility Impacts 3 3 2 3 1 1 Maintenance of Traffic 3 3 5 4 2 1 Meets Purpose & Need 1 2 5 5 2 2 Social & Neighborhood Impacts 3 3 4 4 2 1 Relocation Potential 3 3 4 4 1 3 Community Services Facilities 3 3 3 3 3 3 Economic & Employment Impacts 3 3 3 3 3 3 Public Comments 2 3 4 5 3 1 Wetlands and Essential Fish Habitat 3 3 2 3 2 2 Water Quality and Quantity 3 3 4 4 2 3 Wildlife and Habitat 3 3 3 3 2 3 Cultural/Historical/Archeological 3 3 3 3 2 2 Noise Impacts 3 3 4 4 2 1 Air Quality 2 2 4 4 3 3 Contamination 3 3 3 3 2 3 Engineering/CEI/Construction 3 4 5 5 1 2 Right-of-Way/Business Damages 3 5 4 4 2 3 SCORE 58 65 84 87 51 57 FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 23

SR 9/I-95 Interchange at PD&E Study Preliminary Cost Estimate COMPONENT TSM&O ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 ALTERNATIVE 4 Roadway Construction $3,880,000 $9,778,000 $9,295,000 $54,207,000 $26,362,000 Engineering/Design (10% Construction) $388,000 $978,000 $930,000 $5,421,000 $2,636,000 CEI (15% Construction) $582,000 $1,467,000 $1,394,000 $8,131,000 $3,954,000 Right-of-Way Acquisition $0 $2,261,000 $2,261,000 $4,581,000 $2,000,000 TOTAL COST $4,850,000 $14,484,000 $13,880,000 $72,340,000 $34,952,000 FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 24

SR 9/I-95 Interchange at PD&E Study Public Involvement Agency & Public Kick-Off Meetings September 13, 2016 Elected Officials/Agencies Briefings o Palm Beach County Engineering o Palm Beach County MPO o City of West Palm Beach o Town of Mangonia Park o City of Riviera Beach Alternatives Public Workshop March 28, 2017 Other Meetings o Coordination with City of West Palm Beach & Town of Mangonia Park o Corridor Summit Multiagency Discussion Public Hearing November 2, 2017 FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 25

SR 9/I-95 Interchange at PD&E Study Summary Schedule ACTIVITY 2016 2017 2018 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J Notice to Proceed Fact Sheet/Newsletter Elected Officials/Agency Kick-Off Meeting Public Kick-Off Meeting Engineering Data Collection Engineering Analysis Environmental Data Collection Environmental Analysis Develop and Evaluate Alternatives Alternatives Public Workshop Engineering Reports Environmental Reports Public Hearing Final Project Documentation Location and Design Concept Acceptance (LDCA) Continuous Public Involvement FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 TODAY 26

SR 9/I-95 Interchange at PD&E Study Long Range Transportation Plan (LRTP) I-95 at 45th Street Interchange Project FM #436519-1 Current approval for statewide SIS funds for all phases Work Program FY 2018 FY 2022 and SIS 2nd Five Note: (1) Shown in Year of Expenditure (YOE) dollars 27

SR 9/I-95 Interchange at PD&E Study THANK YOU For more information, please call, email or write to: Robert Lopes, PE Project Manager Florida Department of Transportation District Four 3400 West Commercial Boulevard Fort Lauderdale, FL 33309 Phone: (954) 777-4425 Toll free: (866) 336-8435, ext. 4425 E-mail: Robert.Lopes@dot.state.fl.us www.95at45street.com FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 28