City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Similar documents
Mobility Plan Status Report 2012 Average Annual Daily Traffic

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Clackamas County Comprehensive Plan

Transportation Mobility Element

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Reams Road RCA Study. Board of County Commissioners Public Hearing

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Regional Transportation Needs Within Southeastern Wisconsin

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Solana Beach Comprehensive Active Transportation Strategy (CATS)

RZC Appendix 8A Marymoor Subarea Street Requirements

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Bicycle and Pedestrian Plans and Improvements

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Performance Criteria for 2035 Long Range Transportation Plan

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

CONNECTING PEOPLE TO PLACES

Living Streets Policy

Chapter 5 Future Transportation

Classification Criteria

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bay to Bay Boulevard Complete Streets Project

Project Description Form 8EE

ACTIVE TRANSPORTATION

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Sixth Line Development - Transit Facilities Plan

Transportation Policy Manual

Waterford Lakes Small Area Study

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

Road Diets FDOT Process

Rochester Downtown Bicycle Study 2009

Giles Run Connector Road

TRANSPORTATION & MOBILITY

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Multimodal Analysis in the 2010 Highway Capacity Manual

Welcome. If you have any questions or comments on the project, please contact:

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Application of a Complete Street

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Non-Motorized Transportation 7-1

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Physical Implications of Complete Streets Policies

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Hennepin County Bicycle and Pedestrian Planning

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Austell Road Access Management Plan Public Meeting February 17, 2009

5. RUNNINGWAY GUIDELINES

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Roadways. Roadways III.

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

City of Moorhead Committee of the Whole Meeting

Route 29 Solutions Projects

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Route 7 Corridor Study

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Street and Pierce Park Lane Intersection Concept Report

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

5.0 Roadway System Plan

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Prince George s County plans, policies, and projects

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Active Transportation Facility Glossary

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Transportation Corridor Studies: Summary of Recommendations

Final Sidewalk Feasibility Study

Complete Streets Training. Georgia Municipal Association June 27, 2016

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

NJDOT Complete Streets Checklist

TRAFFIC IMPACT ANALYSIS

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

City of Wilsonville 5 th Street to Kinsman Road Extension Project

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

CITY MANUALS AND STANDARDS REVIEW

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Basalt Creek Transportation Refinement Plan Recommendations

Central Avenue Corridor Study FPID Number:

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Bicycle Master Plan Goals, Strategies, and Policies

Duwamish Way-finding and CTR Report

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Complete Streets: Planning, Policy & Performance

Completing the Street: Denning Drive

Transcription:

A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St NW 8th Ave to SW 16th Ave $5,016,000 POINTS: 4.33 Resurface city roadways to maintain the overall pavement condition rating at or above 70 PCI. Resurfacing of city streets is a priority identified in City Strategic Initiative 5.4. City is responsible for maintenance of all traffic signal in Alachua County. Several traffic signal structures have reached the end of their life span and are in need of replacement. Replacement of structures will result in more efficient system operation by decreasing maintenance calls. Reconstruction to include addition of curb and gutter between W University Ave and SW 4th Ave; intersection modifications at the intersection of W University Ave and at SW 4th Ave; addition of on street parking, medians and bike lanes south of SW 4th Ave. Reconstruction is needed to address pavement condition and improve capacity at intersections of W University Ave and SW 4th Ave. The project is consistent with the economic development efforts associated with the Innovation Square District. Collector; carries approximately 7,000 vpd PCI: 60 (range: 23 78) Project Summary Page 1 of 10

B2 SW 62nd Blvd SW 20th Ave to Newberry Rd $23,800,000 POINTS: 4.00 PCI: 57.8 (range: 43 67) B3 NW 8th Ave Bridge Replacement $2,600,000 B4 N Main St Bus Bays $500,000 TYPE: Enhancement of existing system / Capacity Add 2 lanes, bike lanes and dedicated transit lanes (transit lanes from SW 20th Ave to SW 1st Pl only). Roadway needs to be reconstructed as pavement is failing. Options include: (1) reconstruction to the current 2 lane configuration or (2) to the MTPO approved 4 lane cross section. Project as approved by the MTPO expands the roadway connectivity between Archer Rd and Newberry Rd, alleviating congestion on major arterials including Archer Rd, SW 34th St, Newberry Rd and I 75, and enhancing multimodal access to major employment centers. Collector; expected to carry approximately 36,000 vpd as a 4 lane road. Reconstruction of obsolete structure in conjunction with NW 8th Ave reconstruction Bridge is located east of NW 34th St at the Hogtown Creek crossing. Replacement is needed to address sedimentation that creates a backwater condition in the creek contributing to upstream flooding and risk of washout in extreme rainfall events. In addition, the bridge rating based on the state bridge rating system, indicates the need for replacement. Project is associated with the reconstruction of NW 8th Ave; three are cost savings associated with combining the two projects. Construction of northbound and southbound bus bays by Gainesville Shopping Center Transit stops serve on average 130 passengers per day in each direction. High utilization combined with a number of passengers with disabilities contribute to high stoppage times of up to 2.5 minutes during peak hours. Addition of bus bays will increase traffic flow. Arterial; carries approximately 16,700 vpd Project Summary Page 2 of 10

B5 NW 31st Ave Glen Springs Rd to NW 19th St $2,800,000 POINTS: 3.67 Collector; carries approximately 1,400 vpd PCI: 100 B6 SE 3rd Ave/SE 4th Ave Hawthorne Rd to Williston Rd $1,500,000 POINTS: 3.33 Reconstruction to include addition of curb and gutter, sidewalks, and intersection modifications at Glen Springs Rd and at NW 20th St. Primarily a safety project to install a roundabout at the intersection to decrease the number of conflicting movements (there were 23 crashes at this location since 2006) and to add sidewalks. Note: Due to lack of funding for full reconstruction, roadway was resurfaced in 2011 to prevent further degradation of pavement. Reconstruction to include addition of bike lanes, sidewalk enhancements and on street parking. This major connector between the east side and downtown is identified in the Plan East Gainesville study as a priority project to assist with economic development efforts. Curb may need to be relocated to add parking. Collector; carries approximately 4,300 vpd PCI: 82 (range: 70 97) B7 SE 7th Ave/SE 8th Ave Hawthorne Rd to Williston Rd $2,700,000 POINTS: 3.00 Reconstruction to include addition of bike lanes and sidewalk enhancements. Alternative route from east Gainesville to downtown and UF. Project ties into the programmed Depot Ave reconstruction project and assists with redevelopment efforts in the SEGRI district. Collector; carries approximately 3,600 vpd PCI: 70 (range: 36 89) Project Summary Page 3 of 10

B8 NE 21st Ter E University Ave to NE 3rd Ave $375,000 POINTS: 3.00 Reconstruction to add curb and gutter and sidewalks. Local road; volume not available. PCI: 83 B9 NE 2nd St NE 10th Ave to NE 16th Ave $850,000 POINTS: 2.00 Local road; carries approximately 1,400 vpd PCI: 76 (range: 73 79) B10 Roundabout: SW 40th Blvd at SW 42nd St $500,000 POINTS: 9.00 Construct roundabout. Segment reconstruction to improve a substandard roadway (inverted crown) to a curb and gutter crosssection, addressing stormwater management issues and adding sidewalks. Reconstruction to include addition of curb and gutter and sidewalks. Reconstruction is needed to address stormwater management issues and improve multimodal connectivity. Installation of a roundabout at this location is recommended to address recurring crashes (31 crashes between 2005 2010). Modifications were implemented in 2011 by changing the 2 way stop control to a multi way stop control as a short term, low cost solution (8 crashes occurred from 01/2011 08/2013). The roundabout will provide more efficient traffic control and reduce the number and severity of traffic crashes. Collector/Collector; 15,000 vpd entering volume Project Summary Page 4 of 10

B11 Roundabout: NW 24th Blvd at NW 45th Ave $600,000 POINTS: 7.00 Collector/Collector; 5,600 vpd entering volume B12 Roundabout: SE 3rd Ave at SE 15th St $500,000 POINTS: 5.00 Replace traffic signal. Collector/Collector; 7,300 vpd entering volume B13 Roundabout: SE 2nd Ave at SE 3rd St $300,000 POINTS: 4.00 Construct roundabout. Construct roundabout at 2 way stop controlled intersection. Intersection is located in a residential area in close proximity to Norton Elementary School. Installation of roundabout will increase efficiency of this intersection and improve safety conditions. Corridor study conducted by Public Works in October 2006 showed 12 crashes at this location; 3 additional crashes occurred since then; low severity. Traffic signal at this location has exceed its useful life and needs to be replaced (installed in 1993). Installation of a roundabout will facilitate more efficient operation of the intersection. There were 16 crashes at this location since 2006; low severity. Installation of a roundabout is part of the SE 2nd Ave corridor improvement plan and redevelopment efforts in the downtown area. This is a 4 way stop controlled intersection. There was 1 crash at this location since 2006. Collector/Collector; 10,700 vpd entering volume Project Summary Page 5 of 10

B14 Roundabout: SE 2nd Ave at SE 9th St $300,000 POINTS: 3.00 Construct roundabout. Collector/Collector; 5,700 vpd entering volume B15 Roundabout: SE 2nd Ave at SE 7th St $220,000 POINTS: 2.00 Construct roundabout. Collector/Collector; 4,000 vpd entering volume C1 ADA Improvements $2,500,000 TYPE: Multimodal / Safety POINTS: N/A Retrofit or addition of ADA access ramps to sidewalks Installation of a roundabout is part of the SE 2nd Ave corridor improvement plan and redevelopment efforts in the downtown area. This is a 4 way stop controlled intersection. There were 3 crashes at this location since 2006; low severity. Installation of a roundabout is part of the SE 2nd Ave corridor improvement plan and redevelopment efforts in the downtown area. This is a 4 way stop controlled intersection. There were no crashes at this location since 2006. Several sidewalk segments are not accessible to users on wheelchairs or do not meet current ADA standards. Preliminary findings of the ADA facility inventory currently underway shows that over 1,300 ramps need retrofit and 470 new ramps are needed in the expanded downtown area. In FY12, 114 ramps were installed or modified. Installation of ADA ramps enhances mobility and accessibility for all users. Consistent with City's Strategic Initiative 6.2. Project Summary Page 6 of 10

C2 Sidewalk Fund $2,334,000 TYPE: Multimodal / Safety POINTS: N/A Construction of new sidewalks Several roadway segments lack sidewalks. A complete sidewalk system improves access and mobility reducing dependency on automobiles. In addition, sidewalks increase safety for users by providing a dedicated path and reducing pedestrian exposure. Presence of sidewalks also facilitates intermodal connectivity. C3 Bicycle and Pedestrian Safety Improvements $2,100,000 TYPE: Multimodal / Safety POINTS: N/A C4 Norton Trail NW 45th Ave to NW 39th Ave $150,000 TYPE: Multimodal POINTS: 6.00 Construct 10 ft wide trail segment. Expansion of sidewalk system is part of the safety strategy to improve mobility and reduce the number and severity of crashes involving pedestrians. Consistent with City's Strategic Initiative 6.2. Addition of signalized midblock crossings and other safety components Gainesville ranks as 2nd in the number fatal and injury crashes involving cyclists and 7th involving pedestrian out of 31 cities in Florida with population of 75,000 or more. Safety plan includes infrastructure modifications including: installation of signalized midblock crossings; installation of access ramps at roundabouts; installation of bike boxes; implementation of modifications along priority corridors identified in the bike/ped safety action plan. Comprehensive approach to reduce the number and severity of crashes involving bicyclists and pedestrians. Consistent with City's Strategic Initiative 6.2. Enhance area connectivity and expand the multiuse trail network. Existing segment connects NW 53rd Ave to NW 45th Ave. Trail will enhance access to Norton Elementary School. This is identified as a priority project in the MTPO List of Priority of Projects. Expansion of the multimodal trail network; consistent with the City's comprehensive plan and the Parks Master Plan. Project Summary Page 7 of 10

C5 Sixth Street Trail NW 16th Ave to NW 23rd Ave $4,500,000 TYPE: Multimodal POINTS: 5.00 Construct 10 ft wide trail segment. Enhance area connectivity and expand the multiuse trail network. This segment was originally included in the Sixth St trail plans but due to site contamination issues it was not eligible for State funding. This project is consistent with the goals outlined in the Transportation Element of the City's Comprehensive Plan and is identified as a priority project in the MTPO List of Priority of Projects. C6 Waldo Road Trail NE 47th Ave to City Limits $380,000 TYPE: Multimodal POINTS: 4.00 Construct 10 ft wide trail segment. D1 SW 62nd Blvd SW 20th Ave to SW 24th Ave $33,600,000 TYPE: Enhancements / New Corridor POINTS: 4.00 Expansion of the multimodal trail network; consistent with the City's comprehensive plan and the Parks Master Plan. Expand the trail system in the urban area. The project is consistent with the goals outlined in the Transportation Element of the City's Comprehensive Plan. The project ties into an Alachua County identified priority to extend the trail to the City of Waldo (total of approximately 9 miles). Expansion of the multimodal trail network; consistent with the City's comprehensive plan. New 4 lane roadway with bike lanes, sidewalks and dedicated transit lane. Project of regional significance approved by MTPO. Project expands the roadway connectivity between Archer Rd and Newberry Rd, alleviating congestion on major arterials including Archer Rd, SW 34th St, Newberry Rd and I 75; severe congestion (LOS E/yellow or F/red) exist for several hours a day on major arterials. Project will enhance multimodal access to major employment centers. Collector; expected to carry approximately 23,000 vpd Project Summary Page 8 of 10

D2 SW 40th Blvd Archer Rd to SW 47th Ave $2,900,000 TYPE: Enhancements / New Corridor POINTS: 3.67 New 2 lane roadway with medians, bike lanes and sidewalks. Project expands roadway connectivity and alleviates congestion on major arterials including Archer Rd, SW 34th St and I 75. Combined with the SW 62nd Blvd enhancements the system will serve as a by pass route connecting Williston Rd to Newberry Rd, relieving the major intersections that are currently failing during peak hours. Addition of a multiuse trail on one side is proposed, connecting to the Archer Braid trail north of Archer Rd (included in the Parks Master Plan).Project includes reconstruction of existing segments. Collector; expected to carry approximately 8,000 vpd D3 Hull Rd SW 38th Ter to SW 42nd St $4,800,000 TYPE: Enhancements / New Corridor POINTS: 3.33 New 2 lane roadway with bike lanes and sidewalks. Project is the remaining piece to complete the new connector between SW 34th St and SW 43rd St which is identified as a priority in the MTPO Long Range Transportation Plan and key element of the redevelopment efforts associated with the Urban Village. Once complete, the project will serve to relieve congestion along SW 20th Ave and critical intersections along SW 34th St. The west end was complete except for the intersection modification at SW 43rd St and SW 20th Ave. The east end from SW 34th St to SW 38th Ter is expected to be constructed as part of a new development plan. Project requires right of way acquisition. Collector; expected to carry approximately 10,000 vpd E1 SE 16th Ave S Main St to Williston Rd $15,000,000 TYPE: MTPO Priority / Reconstruction MTPO Priority: 1 Add 2 lanes Project is a MTPO priority project identified in the 2035 Long Range Transportation Plan to increase roadway capacity. FDOT has programmed funds for intersection modifications at S Main St and at Williston Rd that will serve as an interim solution. Long term, the project is intended to improve goods movement in the region, serving as a bypass to the areas surrounding the university campus and the downtown. Arterial; carries approximately 7,300 vpd Project Summary Page 9 of 10

E2 NW 34th St/Blvd NW 16th Ave to US 441 $6,000,000 MTPO Priority: 2 TYPE: MTPO Priority / Corridor Enhancement Add center turn lane Arterial; carries approximately 14,500 vpd E3 University Ave Gale Lemerand Blvd to Waldo Rd $4,750,000 MTPO Priority: 3 TYPE: Corridor Enhancement Multimodal integration Project is a MTPO priority project identified in the 2035 Long Range Transportation Plan to increase roadway capacity. Project envisions addition of a center turn lane to increase roadway capacity and improve safety. Project is listed as priority #2 in the Cost Feasible Plan. Modifications to accommodate auto, truck, bus, bike and pedestrian travel and link the different modes, enhancing safety and convenience of all users. Elements to be considered include: improved bike/ped/transit facilities including consideration of sidewalk enhancements, bike lanes, midblock crossings, medians, curb extensions, dedicated transit lanes and transit stop improvements. Arterial; carries approximately 21,400 vpd E4 W 13th St Archer Rd to NW 33rd Ave $4,750,000 MTPO Priority: 4 TYPE: MTPO Priority / Corridor Enhancement Multimodal integration Modifications to accommodate auto, truck, bus, bike and pedestrian travel and link the different modes, enhancing safety and convenience of all users. Elements to be considered include: improved bike/ped/transit facilities including consideration of sidewalk enhancements, bike lanes, midblock crossings, medians, curb extensions, dedicated transit lanes and transit stop improvements. Arterial; carries approximately 29,500 vpd E5 Waldo Rd E University Ave to NE 39th Ave $3,000,000 MTPO Priority: 5 TYPE: MTPO Priority / Corridor Enhancement Multimodal integration Modifications to support bus rapid transit, multiuse trail, midblock crossings and corridor redevelopment. Arterial; carries approximately 23,600 vpd Project Summary Page 10 of 10