Improving Pedestrian Access to Transit: The Sacramento Pedestrian Master Plan

Similar documents
Presentation Summary Why Use GIS for Ped Planning? What Tools are Most Useful? How Can They be Applied? Pedestrian GIS Tools What are they good for?

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps.

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Existing Pedestrian Conditions. PSAC February 8, 2011

ACTIVE TRANSPORTATION

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Bicycle Master Plan Goals, Strategies, and Policies

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Appendix C 3. Bicycle / Pedestrian Planning

Executive Summary Route 30 Corridor Master Plan

San Jose Transportation Policy

Pedestrian and Bicycle Conditions

Active Transportation Access to Transit

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Richmond Connects Visioning Update

Providing an Efficient and Multi-modal Transportation System

2025 Comprehensive Plan for the City of Temple Terrace Florida. Mobility Element. Adopted by City Council June 30, 2009

Perryville TOD and Greenway Plan

North Coast Corridor:

Omaha s Complete Streets Policy

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

San Mateo County Comprehensive Bicycle and Pedestrian Plan

Bus Rapid Transit Plans

Presentation Starts at 5:30 PM

CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE

MASTER BICYCLE AND PEDESTRIAN PLAN

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION ASSESSMENT

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Polk Streetscape Project

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Corridor Vision Workshop Summary James Madison Elementary February 22,2018

Transportation Action Plan. Transportation & Planning Committee March 14, 2016

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

2016 Planning Conference July 26, CONNECT COLUMBUS Building Columbus Transportation Future

Table #6 VISION CHARACTERISTICS

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Pedestrian Safety Workshop SAN FRANCISCO, CALIFORNIA

Building Community Partnerships for Mobility:

PEDESTRIAN ACTION PLAN

Focus on New Baseline Conditions, Indicators and Analytic Approaches

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

Memorandum. Drive alone

8/1/2018 VIA . Darcy Goulart City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

5. Pedestrian System. Accomplishments Over the Past Five Years

Public Works AGENDA ITEM D-2 STAFF REPORT

Regional Alternatives Analysis. Downtown Corridor Tier 2 Evaluation

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

FINAL REPORT DECEMBER 2011

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Moving Ahead. (Community Engagement) Chapter Three

CHAPTER 7.0 IMPLEMENTATION

7 Complete Streets & Roadway Aesthetics

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

Berkeley Strategic Transportation Plan A-76

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Roanoke Valley TRANSIT VISION PLAN

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Ann Arbor Downtown Street Plan

Vision Zero Task Force June 28, 2017 COUNTERMEASURE PAIRING

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Regional Transportation Needs Within Southeastern Wisconsin

summary of issues and opportunities

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Stakeholder Meeting Handouts. January 2013

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

The New Orleans Downtown Transit Center Study

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

TRANSPORTATION FACILITIES AND THEIR IMPACT ON HEALTH

CONNECTING PEOPLE TO PLACES

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Living Streets Policy

2014 Regional Bicycle and Pedestrian Study Evaluation Tools Leslie A. Meehan, AICP MPO Technical Coordinating Committee Meeting April 1, 2015

Chicago Safe Routes to High School (SRHS) Kelly High School Recommended Improvements

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Welcome. Background. Goals. Vision

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

11/28/2016 VIA

About the Active Transportation Alliance

KEARNY MESA COMMUNITY PLAN UPDATE

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

5.0 Roadway System Plan

PRESS RELEASE San Joaquin Council of Governments

T1-A - Service Reduction (Re-sizing)

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

Transcription:

Improving Pedestrian Access to Transit: The Sacramento Pedestrian Master Plan Matt Haynes Fehr & Peers Associates San Francisco, California Rail~Volution 2005

Presentation Outline Policies What are most effective? Improvements Where can / should they be applied? Integration How can this create a comprehensive Master Plan? Pedestrian access to transit

Policies: Setting the Stage Why is walking important? Streets and their sidewalks, the main public places of a city, are its most vital organs. Jane Jacobs There is this to be said for walking: It's the one mode of human locomotion by which a man proceeds on his own two feet, upright, erect, as a man should be, not squatting on his rear haunches like a frog. Edward Abbey

Policy Background: City of Sacramento California s Capitol City Population of over 400,000 Rapid growth, increase in traffic congestion in recent years Light rail in 1987 ADA issues

Policies for Sacramento Overall Vision To Create the Walking Capital Goals Create a walkable pedestrian environment Connectivity Travelway Character Context Character Improve awareness of the pedestrian mode through education Increase pedestrian safety

Policies for New and Existing Neighborhoods New Neighborhoods: Focus on creating connectivity, character, context Existing Neighborhoods: Typically areas of greater walking activity Focus on improving existing facilities BASIC UPGRADED PREMIUM

New Neighborhoods: Connectivity Street Layout

Travelway Character Street cross sections Clear pedestrian travelway Buffer from traffic Space for amenities

Context Character Policies that increase accessibility appear to have the greatest effect on walking Mixed use zoning Infill development incentives

Policy Recommendations: Sacramento Integrate with related policy documents Pedestrian-friendly Street Standards Pedestrian Safety Guidelines Consider pedestrian collision data Multimodal level of service Main Street Commercial Street Industrial Street Residential Street Pedestrians Bicycles Transit Vehicles Pedestrians Bicycles Transit Vehicles Pedestrians Bicycles Transit Vehicles Pedestrians Bicycles Transit Vehicles Arterial E A C A E C C C D D D E D D C B Collector D C A B D D C C D D D E C D C B Local D D B A C C C C C D D E C D C B

Improvements Where to focus improvements? GIS tool: PedINDEX application

Walkability The ease, comfort, and safety of walking Walkability depends on the condition of the infrastructure High walkability Low walkability Low walkability means a deficient pedestrian infrastructure

Deficiencies Measured infrastructure deficiencies: Sidewalks Connectivity Street widths Traffic signals Hazards / collisions Street lighting

Deficiencies Map

Pedestrian Demand The nature of a place that attracts pedestrians Demand influenced by: Land use and development types including mixes and intensities of uses Presence of public spaces and parks Availability of transit facilities

Pedestrian Demand Measures of pedestrian demand: Population density Transit proximity Employment density Land use mix Proximity to Schools, parks, community centers, shopping areas Age / socio-economic factors

Pedestrian Demand Transit proximity

Pedestrian Demand Map High demand = high potential for walking

Improvement Needs Overall composite score developed

Improvement Needs Highest Priority Areas: Putting facilities where they are needed the most Potential Improvement Need Deficiencies

How Does it Come Together? Integration With Existing Plans / Policies Public Involvement Capital Improvement Program Design Guidelines

Coming Together Integration with Existing City Policies

Coming Together Public Involvement Stakeholder Group participation Public workshops

Coming Together Capital Improvements

Access to Transit: Deficient Sidewalks Light Rail Stations W Watt/I-80 West Roseville Road Marconi/Arcade Globe Arden/Del Paso Swanston Royal Oaks

Coming Together Design Guidelines Pedestrian Countdown Signals Federal, state, local sources Street corners Sidewalks Buffer zone Crossing facilities Bus bulbouts ADA Accessibility

Conclusions / Lessons Learned Public involvement ADA issues Pedestrian safety GIS applications a powerful tool Be proactive opportunities may be lost Supportive city staff / management

The End Contact Information: Matt Haynes Fehr & Peers 604 Mission St, 4 th Floor San Francisco, CA 94105 (415) 369-0425 m.haynes@fehrandpeers.com