D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

Similar documents
FORGE Energy UL 21 Freedom 1 API Number:

Wellwork Chronological Regulatory Report

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

ENDEAVOR ENERGY RESOURCES

FORGE Energy UL 21 Pahaska 1H API Number:

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Wellwork Chronological Regulatory Report

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Zarvona Energy LLC DAILY OPERATIONS

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

Drilling Morning Report

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

Zarvona DAILY WORKOVER / COMPLETION REPORT

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

Daily Drilling Report

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PHE KE30-A8 WORKOVER PROGRAM

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary


Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

Abandonment Program for Paramount Fort Liard F 36

Dynamic Underbalance (DUB)

Oil Well Potential Test, Completion or Recompletion Report, and Log

Rig Math. Page 1.

A Longer Lasting Flowing Gas Well

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Oil Well Potential Test, Completion or Recompletion Report, and Log

Completions & Workovers Module 1.9

Oil Well Potential Test, Completion or Recompletion Report, and Log

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Practice Exam IADC WellSharp Driller and Supervisor

Casing Design. Casing Design. By Dr. Khaled El-shreef

1. The well has been shut in on a kick and the kill operation has not started.

SPE MS. Copyright 2015, Society of Petroleum Engineers

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

VortexFlow DX (Downhole) Tool Installation Instructions

Why Do Not Disturb Is a Safety Message for Well Integrity

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

BP SIT Testing Franks Facility Lafayette

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Pasquale Imbò e Marco Pelucchi ENI S.pA;

OCEAN DRILLING PROGRAM

A case study : Underground Blowout Control at Well NHK #285

Chapter 5 HORIZONTAL DRILLING

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

SUBSEA KILL SHEET EXERCISE No. 5

BLACK HILLS PLATEAU PRODUCTION COMPANY

HydroPull. Extended-Reach Tool. Applications

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Colorado Oil and Gas Conservation Commission

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Extended leak off testing

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

WELL NO: BJN-8. Lower master valve

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

Hydro-Mech Bridge Plug

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

Float Equipment TYPE 925/926

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

Post Job Summary Cement Intermediate Casing

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

Deliquification Short Stories

Study Guide IADC WellSharp Driller and Supervisor

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Deepwater Horizon Incident Internal Investigation

Rigless Cutting the Cost of Well Abandonments

Basic Well Log Interpretation

W I L D W E L L C O N T R O L AIR DRILLING

Understanding pressure and pressure

5k Slickline Lightweight Pressure Control Equipment 4 ID

Appalachian Basin Gas Well. Marietta College, Marietta, Ohio June 7-8, Development. Robert McKee, P.E. Design Engineer Multi Products Company

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

RIH intermediate section casing in Bazian-1 exploration oil well

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Worked Questions and Answers

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Coal Bed Methane (CBM) Permeability Testing

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

NORSOK Standard D-010 Rev 4, August 2012

HPHT Annular Casing Packer. Obex Annular Casing Packer

VOLUMETRIC METHODS and STRIPPING OPERATIONS

Cased-Hole Logging Environment

Transcription:

Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location. Well had 0 psi. Hang Well on. Good Pump action. RD Basic Well Serv. Fisher Roustabout on Location. Plumbed Well head to flowline. Start Well pumping. Balanced PU. Left Well Pumping. 1996 bbls of Load To Recover.

Daily Completion Report - University CN A #6 API # 42-105-42334 12/22/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time RIH W/ Production Equipment 2655' - PBTD Activity : Arrive Location. Well had 0 psi. RIH to plug and drilled up in 2 hrs. Cleaned out fill to PBTD at 2655'. Circ. Well clean. POOH w/ Tbg. Remove Bit. RD Reverse Unit. RIH w/ tbg as follows. Bull Plug - 1.00' 2 Jts 2 3/8" Tbg - 64.91' Perf Sub - 4' SN - 1.10 67 jts 2 3/8" J-55 Tb Flange up Wellhead. PU BHP and RIH w/ Rods as Follows. Pump - 2' x 1.5" x 12' - 12 ' 86-3/4" KD Rods w/ T cplcplgs. 1-3/4" x 6' sub 1-3/4" x 4' sub 1 Closed Well in. SDFN

bg SN @ 2189' - 1 1/4" x 11' Polish Rod.

Daily Completion Report - University CN A #6 API # 42-105-42334 12/21/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Drill out plug 2655' - PBTD Activity : MIRU Basic WOR and Versatile Reverse Unit. Csg on Vaccum. PU New 3 7/8" Bit. Tally in hole w/ Tbg. Tagged fill at 2362'. Cleaned out sand to Plug at 2500'. Loosing water at 1 bpm. Start Drilling out Plug at 25 Closed Well in. SDFN

500'.

Daily Completion Report - University CN A #6 API # 42-105-42334 12/20/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Stage 2 Completion 2655' - PBTD Activity : Arrive Location. Found Well with 30 Psi SICP. Release pressure. RU Wireline. RIH w/ CBP and set at 2500'. Test Plug to 4000 psi. Held. Perf Stage 2 from 2240' - 2426' 2 spf. On 6 Runs. RD Wireline. Test Lines. Broke down perfs at 3000 psi. Acidize w/ 2000 gal 15 % NEFE w/ 200 ball Sealers. Frac Stage 2 w/ 49,434 gal of Gelled FW Cross linked. 40,494 # 20/40 Ottawa 12,311 # 12/20 Ottawa Dropped 100 Ball Sealers. Balled out perfs w/ first 25 balls. Serged Balls off. ISIP - 1364 5 min - 1017 10 min - 889 15 min - 774. Closed well in. RD Basic Frac equipment. SDFN Total Load - 1117 bbls. Load Recovered - 0 bbls. Load to Recover - 1996 bbls.

N.

Daily Completion Report - University CN A #6 API # 42-105-42334 12/19/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Completion 2655' - PBTD Activity : MIRU Basic Frac Crew and PSI Wireline. Test Lines. Frac Bottom Perfs 2512' - 2632' with 35,112 gal FW G and 30,161 # 20/40 Ottawa and 12,311 # 12/20 Ottawa. Max Psi - 2150 Avg. - 1868 Avg Rate - 28 bpm 5 min - 1285 10 min - 1253 15 min - 1230. Close Well in. **(Spot 500 gal acid across stage 2 RIH w/ CBP on Wireline. Set at 2500'. Pressure test to 4000 psi. Wireline flange had bad threads. SDFN. ** Dropped 100 ball Sealers during Job. Had slight Ball Action. Total Load - 836 bbls. Load Recovered - 0 bbls. Load to Recover - 879 bbls.

Gel Crosslinked m ISIP - 1435 2 perf Interval behind flush)

Daily Completion Report - University CN A #6 API # 42-105-42334 12/2/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Swab Testing 2655' - PBTD Activity : Arrive Location. Found Tbg Psi @ 150. Csg - Pkr. Released Tbg pressure. RIH w/ Swab. Found 800' of fluid Made 4 swab runs recovering 4 bbls of fluid. 50 % oil cut. Unset Packer. POOH w/ Tbg laying down in sing Closed Well in. RD WOR. Waiting on Frac Date. Forecst : Waiting on Frac Date. Total Load - 70 bbls. Load Recovered - 2 bbls. Load to Recover - 43 bbls.

d above SN. gles.

Daily Completion Report - University CN A #6 API # 42-105-42334 12/1/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Swab Testing 2655' - PBTD Activity : Arrive Location. Open Well. 0 Psi. RIH w/ 6 jts of Tbg. EOT @ 2646'. MIRU Tri Best Acidizers. Spot 150 gal of 15% NEFE Acid across Perfs. Pull Packer to 2410' and Set. Test Csg to 500 psi. Acidized well w/ 2000 ga w/ 100 Ball Sealers as follows: Formation Break - 1600 psi Avg Rate - 4 Bpm Avg Psi - 1800 psi. Moderat ISIP - 1400 psi 5 min - 1340 psi 10 min - 1300 psi 15 min - 1300 psi. Close Well in. RD Tri Best. Left W for 2 hrs. Tbg had 730 psi. Open Tbg and bled off pressure. Well unloading Load Water and Acid Gas. Made 7 Swab Runs swabing Tbg dry. Good oil show. Wait 1 hr. Made 3 swab runs recovering 1 bbl of fluid Wait 1 hr. Made 2 swab runs recovering 0.5 bbls of fluid w/ 40 % oil cut. Closed Well in for Night. SDFN. Forecst : Swab Test Total Load - 70 bbls. Load Recovered - 25 bbls. Load to Recover - 45 bbls.

al 15% NEFE te Ball action. Well Closed in d w/ 30% oil Cut.

Daily Completion Report - University CN A #6 API # 42-105-42334 11/30/2016 Activity at Report Time: Depth at Report Time Prep for Acid 2655' - PBTD Activity : MIRU Big Lake Anchor Service. Set Safety Anchors and Pull Tested. MIRU Basic WOR. Install Frac Valve and MIRU PSI Wireline PU CCL and 3 1/8" Slick Guns. RIH and Correlate w/ SJ and Collars across Perf Interval. Perf 2 SPF from 2512' - 2632' ( 92 holes ). Made 4 Gun Runs. RD PSI. NU BOP on Flow Cross. PU Treatme and SN. Tally in hole w/ 75 jts 2 3/8" J-55 Tbg. Close Well in. SDFN. Forecast: Acidize Lower San Andres. Swab Test.

d Flow Cross.. ent Packer

Daily Completion Report - University CN A #6 API # 42-105-42334 11/23/2016 Activity at Report Time: Depth at Report Time Waiting on Log Interpretation 2655' - PBTD Activity : MIRU PSI Wireline Truck and Mast. RIH w/ GR - CCL - CBL. Found PBTD at 2655'. Found TOC POOH w/ Tools. PU GR - Neutron - CCL Tools. Ran Gamma Ray - CCL and Compensated Neutron Log from RD PSI. Will Evaluate Logs. Forecast: Evaluate Logs.

C @ 1030'. Short Joint @ 2219' - 2239'. 2655' - 750'. POOH w / Tools.

Daily Drilling Report - University CN A #6 API # 42-105-42334 11/19/2016 09:00 A.M. Activity at Report Time: Drilling ahead in Dolomite Depth at Report Time 2700' ft - TD Deviation Survey 490' - 0.7 990' - 0.2 Activity Previous 24 Hrs Drill to TD of 2700'. Good Oil and Gas Shows thru San Andres. Circulate for 2 hrs. POOH w/ DP - DC and B Guide Shoe - @ 2699' Float Collar @ 2679'. Short Jt @ 2237'. MIRI Allied Cementer. Pump 300 sks of Al Plug holding. RD Allied. Set Csg on Slips. Cut off 4.5" csg. Released Rig. Final Drilling Report. Vis - 37 Mud Wt - 9 9.5 Ph - 12.0 Forecast: Move Blue Line Rig 3 off location. Mud Used Gel - 85 Sks Lime - 34 Sks Soda Ash - 15 Sks Caustic Sod DF 1500-4 sks Soap Sticks 100 PHPA - 4 Startch - 10 Day Work Hrs Cum - 40

1467 -.05 2250' - 0.5 1782' -.05 2700' - 1.3 BHA laying down. MIRU Byrd Csg Crew. RIH w/ 62 Jts of 4.5" 10.5# J-55 Casing. llied Light Class C and 170 sks of Class C of Premiaum Plus. Bumped Plug @ 8:00 am. da - 6 00 sks Salt Water Gel - 280 Sks

Daily Drilling Report - University CN A #6 API # 42-105-42334 11/18/2016 06:00 A.M. Activity at Report Time: Drilling ahead in Dolomite Depth at Report Time 2265' ft Deviation Survey 490' - 0.7 990' - 0.2 Activity Previous 24 Hrs Drilling 7 7/8" hole. Mud up at 1800'. MIRU Geosite Md Loggers. Start catching 10' samples. Drilling ahea Vis - 37 Mud Wt - 9.3 Ph - 12.0 Forecast: Drill ahead to TD @ 2700'. Cathcing samples. Mud Used Gel - 85 Sks Lime - 34 Sks Soda Ash - 2 Sks Caustic Sod DF 1500-4 sks Soap Sticks 100 PHPA - 4 Startch - 74 Day Work Hrs Cum - 32

1467 -.05 1782' -.05 ad. da - 4 4 sks Salt Water Gel - 202 Sks

Daily Drilling Report - University CN A #6 11/17/2016 06:00 A.M. Activity at Report Time: Drilling ahead in Shale Depth at Report Time 1023 ft Deviation Survey 490' - 0.7 990' - 0.2 Activity Previous 24 Hrs MIRU Byrd Csg Crew. RIH w/ 20 Jts of 8 5/8" 24# Csg to 904'. MIRU Allied Cementers. Pumped 335 Sks o WOC 8 hrs. Cut Csg off. Weld on Bell Nipple. WOC 4 Hrs. NU Wellhead and BOP. PU 7 7/8" Bit RIH DC & DP Forecast: Drill ahead - Mud up at 1800' Mud Used Gel - 55 Sks Lime - 25 Sks Soda Ash - 1 Sks Day Work Hrs Cum - 24

of Class C Premiam Plus Cement. Circulated 72 Sks to Surface. RD Allied. P. Drill out Float Shoe. Start Drilling Formation.

Daily Drilling Report - University CN A #6 11/16/2016 06:00 A.M. Activity at Report Time: Prep to RIH w/ 8 5/8" Csg Depth at Report Time 930 ft Deviation Survey 490' - 0.7 Activity Previous 24 Hrs Finish MIRU Blue Line Drilling. Spud at 12:30 pm. Drilled 12 1/4" Surface hole to 930'. Circ Drilling with Fresh Water. Forecast: RIH w/ 8 5/8" Csg - Cement

culate hole clean for 1 hr. POOH w/ Drill String.

Daily Drilling Report - University CN A #6 11/15/2016 Activety Previous 24 Hrs Move in Blue Line Drilling Rig #3. Start Rigging up. Will Spud on 11-15-16,